| 1 |
ASSAM |
Education |
Bodo Language Research and Development centre for Gauhati University Kokrajhar(BTC Package-2) |
Special Packages |
BTC |
|
2011-01-28 |
2.96 |
2014-01-31 |
2.5337 |
0 |
2.5337 |
2.5337 |
Completed |
| 2 |
ASSAM |
Irrigation and Flood Control |
Champamati Irrigation Project (BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
43.85 |
2007-12-31 |
43.85 |
0 |
43.85 |
43.85 |
Completed |
| 3 |
ASSAM |
Irrigation and Flood Control |
Sukla Irrigation Project (BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
8.13 |
2007-12-31 |
8.1272 |
0 |
8.1272 |
8.1272 |
Completed |
| 4 |
ASSAM |
Health |
Construction of 100 bedded hospital at Kajalgaon in BTC area(BTC Package) |
Special Packages |
BTC |
|
2005-01-27 |
38.52 |
2008-01-31 |
37.7169 |
0 |
37.7169 |
38.5161 |
Completed |
| 5 |
ASSAM |
Health |
Renovation/Re-construction of RNB Civil Hospital at Kokrajhar (BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
7.58 |
2007-10-31 |
7.5809 |
0 |
7.5809 |
7.5809 |
Completed |
| 6 |
ASSAM |
Miscellaneous |
Bodoland Bhawan at Dwarka New Delhi(BTC Package-2) |
Special Packages |
BTC |
|
2011-01-10 |
9.1 |
2014-01-10 |
8.4416 |
0 |
8.4416 |
8.4416 |
Completed |
| 7 |
ASSAM |
Miscellaneous |
Construction of Auditorium at Songpijang in Haflong, Dima Hasao District, NCHAC. |
Special Packages |
DHATC |
|
2016-02-29 |
2.38 |
2018-08-31 |
2.3037 |
0 |
2.3037 |
2.3037 |
Completed |
| 8 |
ASSAM |
Miscellaneous |
Construction of Bodofa Cultural Complex at Kokrajhar (BTC Package) |
Special Packages |
BTC |
|
2005-02-07 |
18.44 |
2007-03-31 |
17.94 |
0 |
17.94 |
18.44 |
Completed |
| 9 |
ASSAM |
Miscellaneous |
construction of cold storage ar Barama (Baska))(BTC Package-2) |
Special Packages |
BTC |
|
2011-01-10 |
8.9 |
2014-01-10 |
8.5888 |
0 |
8.5888 |
8.5888 |
Completed |
| 10 |
ASSAM |
Miscellaneous |
Construction of Cold storage at Kokrajahar district(BTC Package) |
Special Packages |
BTC |
|
2005-12-27 |
4.14 |
2008-12-27 |
4.1365 |
0 |
4.1365 |
4.1365 |
Completed |
| 11 |
ASSAM |
Miscellaneous |
Construction of Cold Storage at Udalguri district(BTC Package) |
Special Packages |
BTC |
|
2005-12-27 |
4.14 |
2008-12-27 |
4.1365 |
0 |
4.1365 |
4.1365 |
Completed |
| 12 |
ASSAM |
Miscellaneous |
Construction of Infrastructure (Vertical Extension) of District Centre Building at Mushalpur in Baksa District |
Special Packages |
BTC |
|
2020-02-25 |
3.85 |
2022-02-25 |
3.6012 |
0 |
3.6012 |
3.6012 |
Completed |
| 13 |
ASSAM |
Miscellaneous |
Construction of North East Gate Way Bus Terminus at Srinwgai Gossaigaon(BTC Package) |
Special Packages |
BTC |
|
2005-12-27 |
1.44 |
2008-12-27 |
1.4442 |
0 |
1.4442 |
1.4038 |
Completed |
| 14 |
ASSAM |
Miscellaneous |
Construction of Vertical Extension of District Centre Building (Assam Type with Dyna roofing on second floor of the building). |
Special Packages |
BTC |
|
2020-02-25 |
3.85 |
2022-02-25 |
3.6014 |
0 |
3.6014 |
3.6014 |
Completed |
| 15 |
ASSAM |
Miscellaneous |
Enhancement of existing facility in Verteniary hospital at titaguri (Kokrajhar) Samthaibari(Chirang) and Bornagaon in Udalguri Distict.)(BTC Package-2) |
Special Packages |
BTC |
|
2011-01-28 |
9.02 |
2014-01-31 |
8.5927 |
0 |
8.5927 |
8.5927 |
Completed |
| 16 |
ASSAM |
Miscellaneous |
Integrated Skill Development Centre at Dima Hasao District of Assam. |
Special Packages |
DHATC |
|
2016-02-29 |
36.6 |
2020-02-28 |
34.9967972 |
0 |
34.9967972 |
30.3 |
Completed |
| 17 |
ASSAM |
Miscellaneous |
Proposed Integrated textile Park at Kharujan Mushalpur(BTC Package-2) |
Special Packages |
BTC |
|
2011-01-28 |
41 |
2015-01-31 |
40.9664563 |
0 |
40.9664563 |
39.7755 |
Completed |
| 18 |
ASSAM |
Miscellaneous |
Setting up of Integrated Agro- Processing Park at Lalpool (Udalguri))(BTC Package-2) |
Special Packages |
BTC |
|
2011-01-10 |
9.07 |
2014-01-10 |
8.4552 |
0 |
8.4552 |
8.4552 |
Completed |
| 19 |
ASSAM |
Miscellaneous |
Setting up of IT Park at Kokrajhar (BTC Package-2) |
Special Packages |
BTC |
|
2013-03-13 |
25.94 |
2016-03-31 |
24.5811 |
0 |
24.5811 |
24.5811 |
Completed |
| 20 |
ASSAM |
Miscellaneous |
Setting up of Model Dairy Fishery Horticulture Poultry Farm Training Centre at Kokilabari under Baksa Distt.(BTC Package -2) |
Special Packages |
BTC |
|
2012-03-20 |
11.46 |
2015-03-20 |
11.4226 |
0 |
11.4226 |
11.276 |
Completed |
| 21 |
ASSAM |
Power |
Strengthening of 11 kV HT and LT Line with 12 Meter Steel Tubular Pole including Illumination of Kokrajhar Town(BTC Package) |
Special Packages |
BTC |
|
2008-11-28 |
5.2 |
2010-11-30 |
5.0979 |
0 |
5.0979 |
5.0979 |
Completed |
| 22 |
ASSAM |
Roads and Bridges |
Bhergaon-Chouni-Khagrabari-Dimakuchi Road (BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
1.32 |
2007-12-31 |
1.3161 |
0 |
1.3161 |
1.3161 |
Completed |
| 23 |
ASSAM |
Roads and Bridges |
Bijni-Panbari Road(BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
15.59 |
2007-12-31 |
15.5858 |
0 |
15.5858 |
15.5857 |
Completed |
| 24 |
ASSAM |
Roads and Bridges |
Chapaguri-Khagrabari Road(BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
6.3 |
2007-12-31 |
6.3 |
0 |
6.3 |
6.2469 |
Completed |
| 25 |
ASSAM |
Roads and Bridges |
Construction of Borobazar Ulubari Road via Bagargaon including RCC Bridge & Cross drainage in Chirang District (BTC Package - 2) |
Special Packages |
BTC |
|
2012-09-10 |
18.69 |
2015-09-10 |
18.2855 |
0 |
18.2855 |
18.2855 |
Completed |
| 26 |
ASSAM |
Roads and Bridges |
Construction of Deori Tiniali to Deramukam road from 2nd km to 7th km under Clause 9.4 Mos signed between Govt. of India, Govt. of Assam and UPDS for the year 2017-18 under KAATC package |
Special Packages |
KAATC |
|
2018-12-11 |
4.38 |
2020-12-11 |
4.3836 |
0 |
4.3836 |
2.1918 |
Completed |
| 27 |
ASSAM |
Roads and Bridges |
Construction of Kashikotra Bamungaon Bengtol Road(BTC Package) |
Special Packages |
BTC |
|
2005-12-27 |
11.69 |
2008-12-27 |
11.69 |
0 |
11.69 |
11.69 |
Completed |
| 28 |
ASSAM |
Roads and Bridges |
Construction of Khanda Road from Dawdhara to Doomni via Nawputa in Baska Distt.(BTC Package-2) |
Special Packages |
BTC |
|
2012-03-20 |
10.75 |
2015-03-20 |
10.75 |
0 |
10.75 |
10.739 |
Completed |
| 29 |
ASSAM |
Roads and Bridges |
Construction of RCC Bridge No. 6/3 over Gongia river on Dotoma - Bhawraguri Road)(BTC Package-2) |
Special Packages |
BTC |
|
2010-12-14 |
8 |
2013-12-14 |
7.9887 |
0 |
7.9887 |
7.9887 |
Completed |
| 30 |
ASSAM |
Roads and Bridges |
construction of RCC Bridge No. 8/1 over Gurufella river on Gossaigaon - Sapatgram Road)(BTC Package-2) |
Special Packages |
BTC |
|
2010-12-14 |
7.92 |
2013-12-14 |
7.919 |
0 |
7.919 |
7.919 |
Completed |
| 31 |
ASSAM |
Roads and Bridges |
Construction of RCC Bridge No.1/5(L18.00m) and 5/3 (L26.00m) over river Telehor and Dera respectively on Deori Tiniali to Deramokam Road (KAATC Package) |
Special Packages |
KAATC |
|
2015-03-26 |
4.1 |
2017-06-26 |
4 |
0 |
4 |
2.0496 |
Completed |
| 32 |
ASSAM |
Roads and Bridges |
Construction of road from Ambagaon to Kundarbil in Udalguri District (BTC Package -2) |
Special Packages |
BTC |
|
2014-09-12 |
12.75 |
2016-09-11 |
12.6961 |
0 |
12.6961 |
12.6946 |
Completed |
| 33 |
ASSAM |
Roads and Bridges |
Construction of Road from Birla (Taranglaso) to Ronkimi near NH-36 including RCC Bridge No. 24/1 (L25.00 km) in Assam under KAATC package |
Special Packages |
KAATC |
|
2018-06-06 |
44.15 |
2020-06-06 |
43.1599 |
0 |
43.1599 |
43.1599 |
Completed |
| 34 |
ASSAM |
Roads and Bridges |
Construction of road from Kumarikata to Nayabasti (Kumarikata Jalah Road) in Baksa District (BTC Package-2) |
Special Packages |
BTC |
|
2014-09-26 |
12.79 |
2016-09-25 |
12.6641 |
0 |
12.6641 |
12.6641 |
Completed |
| 35 |
ASSAM |
Roads and Bridges |
Construction of Road from NH-31 at Barama to Masalpur Baska(BTC Package) |
Special Packages |
BTC |
|
2005-02-07 |
14.43 |
2007-03-31 |
13.387 |
0 |
13.387 |
13.93 |
Completed |
| 36 |
ASSAM |
Roads and Bridges |
Construction of Road from NH-39 to BBDC Road via Langmili, L10.70 Km under KAATC package |
Special Packages |
KAATC |
|
2021-05-10 |
12.05 |
|
12.0476 |
0 |
12.0476 |
6.0238 |
Completed |
| 37 |
ASSAM |
Roads and Bridges |
Conversion of SPT Bridge 20/1 over River Gangia into RCC Bridge on Gosaigaon Sapatgram Road in Kokrajhar District(BTC Package) |
Special Packages |
BTC |
|
2008-11-28 |
10.83 |
2010-11-30 |
10.7129 |
0 |
10.7129 |
10.7129 |
Completed |
| 38 |
ASSAM |
Roads and Bridges |
Goreswar to Khoirabari Road (BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
6.57 |
2007-12-31 |
6.5728 |
0 |
6.5728 |
6.5727 |
Completed |
| 39 |
ASSAM |
Roads and Bridges |
Gossaigaon to Kazigaon via Bhukka Tipkai Road(BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
11 |
2007-12-31 |
11 |
0 |
11 |
10.8166 |
Completed |
| 40 |
ASSAM |
Roads and Bridges |
Improvement / Upgradation by M&BT of Road from Kathalguri village to Wirwar via Parkup Pahar from Ch.2500.00m to 9000.00m (KAATC Package) |
Special Packages |
KAATC |
|
2015-03-26 |
3.5 |
2016-11-26 |
3.3335 |
0 |
3.3335 |
3.3335 |
Completed |
| 41 |
ASSAM |
Roads and Bridges |
Improvement and M & BT of Road from Donkamokam (Artukelang Charali) to Fangtrengfang upto PMGSY Road (Portion from ch. 3803.00 m to 5510.00 m & 6010.00 m to 8303.00 m, length 4.00 km) (KAATC Package) |
Special Packages |
KAATC |
Public works Department |
2017-02-21 |
3.29 |
2019-03-31 |
3.2858 |
0 |
3.2858 |
3.2858 |
Completed |
| 42 |
ASSAM |
Roads and Bridges |
Improvement and M&BT of road near Satgaon Don Bosco School to Mugasong Tiniali road(length 4.00 Km) (KAATC Package) |
Special Packages |
KAATC |
|
2015-03-26 |
3.25 |
2017-03-31 |
3.1313 |
0 |
3.1313 |
3.1313 |
Completed |
| 43 |
ASSAM |
Roads and Bridges |
Improvement and upgradation of Kashikotra to Basugaon Road(BTC Package) |
Special Packages |
BTC |
|
2004-12-31 |
5.51 |
2007-12-31 |
5.2289 |
0 |
5.2289 |
5.3465 |
Completed |
| 44 |
ASSAM |
Roads and Bridges |
Improvement and widening of Bishmuri Saralpara Sarbhanga Road (BTC Package -2) |
Special Packages |
BTC |
|
2012-03-20 |
26.79 |
2015-03-20 |
26.2595 |
0 |
26.2595 |
26.2595 |
Completed |
| 45 |
ASSAM |
Roads and Bridges |
Improvement of Barnagaon Pakribari road Udalguri (BTC Package) |
Special Packages |
BTC |
|
2005-02-07 |
1.5 |
2007-03-31 |
1.425 |
0 |
1.425 |
1.4638 |
Completed |
| 46 |
ASSAM |
Roads and Bridges |
Improvement of Bhowraguri Kachugaon Road in Kokrajhar (BTC Package) |
Special Packages |
BTC |
|
2004-12-31 |
23.73 |
2007-12-31 |
22.539 |
0 |
22.539 |
23.7344 |
Completed |
| 47 |
ASSAM |
Roads and Bridges |
Improvement of Dhamdhama Tupalia Subankhata (DTS) Road (Metalling and black-topping of remaining stretches including improvement of existing metalled surface(BTC Package) |
Special Packages |
BTC |
|
2004-12-31 |
13.72 |
2007-03-31 |
13.4255 |
0 |
13.4255 |
13.72 |
Completed |
| 48 |
ASSAM |
Roads and Bridges |
Improvement of Jalah Rupahi Saudarbhitha Gobardhana road Baska(BTC Package) |
Special Packages |
BTC |
|
2005-02-07 |
10 |
2007-03-31 |
9.5 |
0 |
9.5 |
9.9599 |
Completed |
| 49 |
ASSAM |
Roads and Bridges |
Improvement of Jalah to Kumarikata including 2 Nos. of Bridges over River Kaldia and Diring in Baska District(BTC Package) |
Special Packages |
BTC |
|
2010-10-08 |
21.21 |
2011-10-07 |
21.0012 |
0 |
21.0012 |
21.0012 |
Completed |
| 50 |
ASSAM |
Roads and Bridges |
Improvement of Kalaigaon Kundarbil road Udalguri (BTC Package) |
Special Packages |
BTC |
|
2005-02-07 |
1.32 |
2007-03-31 |
1.2539 |
0 |
1.2539 |
1.2896 |
Completed |
| 51 |
ASSAM |
Roads and Bridges |
Improvement of Kaurbaha-Nagrijuli Road by metalling and black-topping including conversion of SPT Bridges into RCC Minor Bridges (BTC Package) |
Special Packages |
BTC |
|
2004-12-31 |
14.5 |
2007-12-31 |
14.1695 |
0 |
14.1695 |
14.455 |
Completed |
| 52 |
ASSAM |
Roads and Bridges |
Improvement of Khoirabari MPK road (Andherighat) to Harisinga via Bhergaon Tangla and Purandia 42.25 km length with conversion of 11 SPT bridges to RCC(BTC Package) |
Special Packages |
BTC |
|
2005-12-27 |
26.5 |
2008-12-27 |
26.5026 |
0 |
26.5026 |
26.5026 |
Completed |
| 53 |
ASSAM |
Roads and Bridges |
Improvement of Kollanga Sildibi Road from 7th km to 10th km (L3.25 km) with Construction of RCC Bridge No. 8/2 over river Dera) (KAATC Package) |
Special Packages |
KAATC |
Public works Department |
2017-02-21 |
3.59 |
2019-03-31 |
3.5856 |
0 |
3.5856 |
3.5856 |
Completed |
| 54 |
ASSAM |
Roads and Bridges |
Improvement of North Kajolgaon Bengtol Sonitpur road Chirang(BTC Package) |
Special Packages |
BTC |
|
2005-02-07 |
8.1 |
2007-03-31 |
7.6947 |
0 |
7.6947 |
8.1 |
Completed |
| 55 |
ASSAM |
Roads and Bridges |
Improvement of North Kajolgaon Dangtol Road (BTC Package) |
Special Packages |
BTC |
|
2004-12-31 |
5.93 |
2007-03-31 |
5.6275 |
0 |
5.6275 |
5.925 |
Completed |
| 56 |
ASSAM |
Roads and Bridges |
Improvement of PGHJ road from 19th to 74th km (Umrangso to Dilhnagi) under PWD (Roads), Haflong Division (DHATC) |
Special Packages |
DHATC |
|
2017-08-08 |
34.98 |
2018-09-30 |
34.605 |
0 |
34.605 |
34.6044 |
Completed |
| 57 |
ASSAM |
Roads and Bridges |
Improvement of Road from Amsoi Tiniali to Sinani Bridge via Borgaon, Morten (From 0.00 Km to 17th Km). |
Special Packages |
KAATC |
|
2016-02-29 |
7.1 |
2018-02-28 |
6.8094 |
0 |
6.8094 |
3.55 |
Completed |
| 58 |
ASSAM |
Roads and Bridges |
Improvement of road from Bashbari to Gossaigaon via Dingdinga Kokrajhar District (D.K. Road)(BTC Package-2) |
Special Packages |
BTC |
|
2012-03-20 |
25 |
2015-03-20 |
24.3911 |
0 |
24.3911 |
24.3911 |
Completed |
| 59 |
ASSAM |
Roads and Bridges |
Improvement of Road from Joysingh Doloi Auditorium Hall to Bijoy Teron Village approach road via Cotton Ginning Mill by widening of road formation including construction of RCC Bridge No.1/1 (KAATC PAckage) |
Special Packages |
KAATC |
|
2015-03-26 |
3.6 |
2016-11-26 |
3.5543 |
0 |
3.5543 |
1.8 |
Completed |
| 60 |
ASSAM |
Roads and Bridges |
Improvement of Rowta Station Feeder Road in Udalguri District(BTC Package -2) |
Special Packages |
BTC |
|
2012-09-10 |
1.53 |
2014-09-10 |
1.5262 |
0 |
1.5262 |
1.5262 |
Completed |
| 61 |
ASSAM |
Roads and Bridges |
Improvement of Sundari Bidyapur via Kakragaon Road(BTC Package) |
Special Packages |
BTC |
|
2004-12-31 |
9.21 |
2007-12-31 |
8.7483 |
0 |
8.7483 |
8.9454 |
Completed |
| 62 |
ASSAM |
Roads and Bridges |
Improvement of Tihu Doomni Road leading to Indo-Bhutan foot hills from 7th to 25 km in Baska district(BTC Package) |
Special Packages |
BTC |
|
2005-12-27 |
9.95 |
2008-12-27 |
9.95 |
0 |
9.95 |
9.95 |
Completed |
| 63 |
ASSAM |
Roads and Bridges |
Improvement of Udalguri Bhakatpara road via Bhairaguri Udalguri(BTC Package) |
Special Packages |
BTC |
|
2005-02-07 |
4.44 |
2007-03-31 |
4.2179 |
0 |
4.2179 |
4.3347 |
Completed |
| 64 |
ASSAM |
Roads and Bridges |
Improvement with M&BT of Disagisim Sibnagar Road (L7.448 KM) (KAATC PAckage) |
Special Packages |
KAATC |
|
2015-03-26 |
3.01 |
2016-11-26 |
3.0096 |
0 |
3.0096 |
3.0096 |
Completed |
| 65 |
ASSAM |
Roads and Bridges |
Khowrang Mahanpur Road (BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
2.5 |
2007-12-31 |
2.5 |
0 |
2.5 |
2.4629 |
Completed |
| 66 |
ASSAM |
Roads and Bridges |
Lailongpara-Kopati Road Via Boro Bazar(BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
1.31 |
2007-12-31 |
1.3104 |
0 |
1.3104 |
1.2723 |
Completed |
| 67 |
ASSAM |
Roads and Bridges |
Met. And Blacktopping raod from Lalmati to Manglajhora in Kokrajhar District.(BTC Package -2) |
Special Packages |
BTC |
|
2012-03-20 |
6 |
2014-03-20 |
5.7869 |
0 |
5.7869 |
5.7869 |
Completed |
| 68 |
ASSAM |
Roads and Bridges |
Metalling and backtopping of Gossaigaon to Saraibil Road including improvement of existing hard crust and conversion of STP bridge to Rcc bridges(BTC Package) |
Special Packages |
BTC |
|
2005-02-07 |
19.39 |
2007-03-31 |
18.3488 |
0 |
18.3488 |
19.39 |
Completed |
| 69 |
ASSAM |
Roads and Bridges |
Metalling and Black-topping of Narabari Dawkibari Road (Narabari to Florican Garden via Malgaon)(BTC Package) |
Special Packages |
BTC |
|
2004-12-31 |
15.95 |
2007-12-31 |
15.1525 |
0 |
15.1525 |
15.381 |
Completed |
| 70 |
ASSAM |
Roads and Bridges |
Tulsijhyora-Kailamaila Road via Amguri(BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
9 |
2007-12-31 |
9 |
0 |
9 |
8.8774 |
Completed |
| 71 |
ASSAM |
Roads and Bridges |
Widening and Strengthening of Fakiragram-Serfanguri Road including conversion of STP bridge to Rcc bridges(BTC Package) |
Special Packages |
BTC |
|
2005-02-07 |
20.49 |
2007-03-31 |
19.4595 |
0 |
19.4595 |
20.4915 |
Completed |
| 72 |
ASSAM |
Sports |
Up-gradation of Sports complex at Kajalgaon in chirang (chirang)(BTC Package-2) |
Special Packages |
BTC |
|
2011-01-10 |
5 |
2014-01-10 |
4.7416 |
0 |
4.7416 |
4.7416 |
Completed |
| 73 |
ASSAM |
Tourism and Culture |
Construction of Rajkumari Dishrudi Community Home Stay and Ecotourism at Panimur in Dima Hasao District |
Special Packages |
DHATC |
|
2016-02-29 |
17.49 |
2019-02-28 |
16.486 |
0 |
16.486 |
16.486 |
Completed |
| 74 |
ASSAM |
Water Supply |
Bheragaon Piped Water Supply Scheme(BTC Package) |
Special Packages |
BTC |
|
2006-12-11 |
2.47 |
2007-12-31 |
2.4663 |
0 |
2.4663 |
2.4663 |
Completed |
| 75 |
ASSAM |
Water Supply |
Greater Sildharampur - Buragohain PWSS (under special economic package as per Mos) Karbi Anglong, Assam under KAATC package |
Special Packages |
KAATC |
|
2018-12-11 |
15.07 |
2020-12-11 |
14.7283 |
0 |
14.7283 |
14.7284 |
Completed |
| 76 |
ASSAM |
Water Supply |
kokrajhar water supply scheme (BTC Package) |
Special Packages |
BTC |
|
2005-02-07 |
23.12 |
2007-03-31 |
21.964 |
0 |
21.964 |
23.1122 |
Completed |
| 77 |
ASSAM |
Water Supply |
Subankhata Water Supply Scheme (BTC Package) |
Special Packages |
BTC |
|
2005-10-31 |
3.28 |
2007-12-31 |
3.2763 |
0 |
3.2763 |
3.2763 |
Completed |
| 78 |
ASSAM |
Water Supply |
Udalguri Piped Water Supply Scheme(BTC Package) |
Special Packages |
BTC |
|
2006-12-11 |
5.34 |
2007-12-31 |
5.337 |
0 |
5.337 |
5.337 |
Completed |
| 79 |
ASSAM |
Water Supply |
Uttarpar Piped Water Supply Scheme(BTC Package) |
Special Packages |
BTC |
|
2006-12-11 |
8.64 |
2007-12-31 |
8.6439 |
0 |
8.6439 |
8.5583 |
Completed |