All Schemes Projects


( As on 31-01-2026 )
Sr.No Project Name Executing Department Sanctioned Date Approved Cost
(₹ in Cr.)
Scheduled Completion Date Financial Expenditure as on 31-03-2025
(₹ in Cr.)
Financial Expenditure for current Financial Year 01-04-2025 to 31-01-2026
(₹ in Cr.)
Total Financial Expenditure
(₹ in Cr.)
U.C. Received
(₹ in Cr.)
1 ARUNACHAL PRADESH Education Construction of RCC framed structure at Govt. Higher Secondary School Building, Basar in Lepa Rada District in Arunachal Pradesh NESIDS-OTRI NESIDS Public works Department 2020-05-28 7.8538 2021-03-31 3.1415 0 3.1415 Ongoing
2 ARUNACHAL PRADESH Education Infrastructure Development for Govt. Higher Secondary School at Kanubari, Longding District in Arunachal Pradesh NESIDS-OTRI NESIDS Dept. of Education 2019-03-05 7.88 2020-03-31 7.3284 0 7.3284 2.9292 Ongoing
3 ARUNACHAL PRADESH Education Infrastructure of Sainik School at Niglok, Passighat, East Siang NESIDS-OTRI NESIDS Dept. of Education 2019-03-09 20 2020-03-31 18 0 18 14.4 Ongoing
4 ARUNACHAL PRADESH Education Project Infrastructure Development of Rangfrah Vidya Niketan Vidyalah at Changlang NESIDS-OTRI NESIDS Dept. of Education 2019-03-09 8.4461 2020-03-31 8.1633 0 8.1633 8.1631 Completed
5 ARUNACHAL PRADESH Health Procurement of equipment for District Hospitals & CHCs (Pakke Kessang, Likabali, Basar, Shi Yomi, Boleng, Raga, Doimukh, Palin, Koloriang, Daporijo, Anini, Roing, Anjaw and Longding) in Arunachal Pradesh NESIDS-OTRI NESIDS Dept. of Power 2021-01-18 18.18 2021-03-31 0.1 0 0.1 Ongoing
6 ARUNACHAL PRADESH Health Procurement of hospital equipments to prepare 10 District Hospitals (Tawang, Bomdila, Ziro, Aalo, Tezu, Namsai, Changlang, Khonsa, Seppa and Yingkiong) to fight COVID-19 NESIDS-OTRI NESIDS Dept. of Health & familly 2020-05-28 51.6861 2021-03-31 48.9792 0 48.9792 48.9792 Ongoing
7 ARUNACHAL PRADESH Miscellaneous Construction of Multi Sports Facility Outdoor stadium at Namsai HQ under Namsai District NESIDS-OTRI NESIDS Dept. of Power 2023-11-29 38 2028-01-31 9.49196 5 18.98392 Ongoing
8 ARUNACHAL PRADESH Agriculture and Allied Area Expansion Programme (AEP) on Areca nut intercropped with Banana, Assam Lemon intercropped with Banana, Pineapple and Large Cardamom gardens proposed for Tezu-Sunpura circle of Lohit District Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 5.17 2025-03-31 4.858 0.3102 5.1682 2.07 Ongoing
9 ARUNACHAL PRADESH Agriculture and Allied Bamboo Plantation at Hikam and Muro Area of Tadin village, Aalo, West Siang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2024-02-08 2.19 2026-02-08 2.06 0 2.06 1.1826 Ongoing
10 ARUNACHAL PRADESH Agriculture and Allied C/o Bamboo Plantation under NEC of North East Bamboo Development Council under Gepen Circle Schemes of NEC Schemes of NEC 2022-03-31 3.69 2025-03-31 3.686 0 3.686 1.48 Completed
11 ARUNACHAL PRADESH Agriculture and Allied Centre of Excellence for Development of Fish Farming at Geying, Jomo Village, PO/PS Rumgong under Siang District Schemes of NEC Schemes of NEC 2018-03-22 2.3454 2021-03-22 0.1 0 0.1 0.1 Foreclosed
12 ARUNACHAL PRADESH Agriculture and Allied Comercial & Traditional Vegetable crops under polyhouse to Augment tribal household under jang area, Tawang District Schemes of NEC Schemes of NEC 2023-03-27 5 2026-03-31 4.7 0.3 5 2.7 Ongoing
13 ARUNACHAL PRADESH Agriculture and Allied Construction of Government Upper Primary Girls Residential School, Pan under Mengio Block in Papumpare District Schemes of NEC Schemes of NEC 2020-09-18 2.76 2023-08-18 2.7595 0 2.7595 2.76 Completed
14 ARUNACHAL PRADESH Agriculture and Allied Cultivation of cash crops with intercropping of pineapple/ banana garden at Sika - Bramin Tode , Rani, Magnang, 12-Mile, Sille and Oyan under Sille, Oyan Circle of East Siang districts of Arunachal Pradesh Schemes of NEC Schemes of NEC 2016-04-13 3.99 2018-04-13 3.591 0 3.591 3.59 Completed
15 ARUNACHAL PRADESH Agriculture and Allied Cultivation of Large Cardamom at Dibbin under Nafra Circle in West Kameng District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2022-03-31 2.55 2025-03-31 2.549 0 2.549 1.02 Completed
16 ARUNACHAL PRADESH Agriculture and Allied Cultivation of Large cardamom in various districts of Arunachal Pradesh Schemes of NEC Schemes of NEC 2016-04-13 6.6287 2019-04-13 5.9658 0 5.9658 5.97 Completed
17 ARUNACHAL PRADESH Agriculture and Allied Cultivation of Large Cardamom Plantation in Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2004-05-07 1.04 2007-05-07 0.94 0 0.94 0.94 Completed
18 ARUNACHAL PRADESH Agriculture and Allied Cultivation of Orange at Hina Village of Chetam Circle, CD Block Giba Upper Subansiri District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2014-01-30 3.92 2017-01-30 3.53 0 3.53 3.53 Completed
19 ARUNACHAL PRADESH Agriculture and Allied Development of Fisheries in 31st Aalo East Assembly Constituency of West Siang District, AP Schemes of NEC Schemes of NEC 2024-01-03 6.38 2027-01-03 4.7844 1.5364 6.3208 3.2344 Ongoing
20 ARUNACHAL PRADESH Agriculture and Allied Development of Sericulture in Arunachal Pradesh. Schemes of NEC Schemes of NEC 2016-02-05 6.9675 2019-02-05 5.0164 0 5.0164 5.02 Completed
21 ARUNACHAL PRADESH Agriculture and Allied Development programme of identified backward block under 30 Central Sector Scheme, Siyum Block, Upper Subansiri District Schemes of NEC Schemes of NEC Dept. of Power 2020-09-23 2.53 2023-09-23 2.5337 0 2.5337 2.53 Ongoing
22 ARUNACHAL PRADESH Agriculture and Allied Establishment of 10 Ha Orange garden at Tarrijo under Dumporijo Schemes of NEC Schemes of NEC 2005-09-27 0.0732 2008-09-27 0.07 0 0.07 0.07 Completed
23 ARUNACHAL PRADESH Agriculture and Allied Establishment of arge cardamom garden at Nibi Leba village under Nyobia Circle of Kurung Kumey district, Arunachal Pradesh Schemes of NEC Choose... 2022-03-31 3.11 2025-03-31 3.11 0 3.11 1.25 Completed
24 ARUNACHAL PRADESH Agriculture and Allied Establishment of Bee Keeping Unit in Upper Siang District, A.P. Schemes of NEC Schemes of NEC 2023-03-22 4.55 2026-03-12 4.549 0 4.549 2.73 Completed
25 ARUNACHAL PRADESH Agriculture and Allied Establishment of large cardamom at Debing Rijo, Giba Circle, Upper Subansiri District, Daporijo, AP Schemes of NEC Schemes of NEC 2023-02-17 12 2026-02-17 12 0 12 4.8 Completed
26 ARUNACHAL PRADESH Agriculture and Allied Establishment of Large Cardamom Garden at Rissi village under Palin Circle of Kurung Kumey District Schemes of NEC Schemes of NEC 2010-01-20 1.1169 2013-01-20 1 0 1 1 Completed
27 ARUNACHAL PRADESH Agriculture and Allied Establishment of Large Cardamon garden at Nibi-Leba village under Nyobia Circle of Kurung Kumey district, Arunachal Pradesh Schemes of NEC Dept. of Power 2018-01-30 3.11 2023-06-02 3.11 0 3.11 1.25 Completed
28 ARUNACHAL PRADESH Agriculture and Allied Establishment of Orange and Cardamom garden at Chesing Rijo (Magria) village of Chetam circle, Upper Subansiri district, Arunachal Pradesh Schemes of NEC Schemes of NEC 2010-02-05 1.36 2013-02-05 1.22 0 1.22 1.22 Completed
29 ARUNACHAL PRADESH Agriculture and Allied Establishment of orange and cardamom plantation at Keojoring and Rava village under Nacho circle, Upper Subansiri district, A.P. Schemes of NEC Schemes of NEC 2023-03-17 1.9765 2026-03-17 1.98 0 1.98 0.79 Ongoing
30 ARUNACHAL PRADESH Agriculture and Allied Establishment of Orange garden (10 Ha) at Mecha Marde Village under Dumporijo Circle of Upper Subansiri Dist., Arunachal Pradesh. Schemes of NEC Schemes of NEC 2006-06-08 0.0302 2009-06-08 0.03 0 0.03 0.03 Completed
31 ARUNACHAL PRADESH Agriculture and Allied Establishment of Organic Kiwi and Large Cardamom Gardens at Hazalo, Gandhigram and Dawodi Village in Vijoynagar Circle of Changlang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2021-03-25 3 2023-03-25 3 0 3 3 Completed
32 ARUNACHAL PRADESH Agriculture and Allied Establishment of Poultry, Goaterry, Piggery, Dairy, Fisheries as a single component for the Community at Mai village, Lower Subansiri district, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2016-04-27 1.5427 2019-04-27 1.1293 0 1.1293 1.13 Completed
33 ARUNACHAL PRADESH Agriculture and Allied Fish-cum-Paddy Cultivation at Choba-I Area and taleha in Kra-Daadi District Schemes of NEC Schemes of NEC 2018-01-30 0.1 2021-01-30 0.1 0 0.1 0.1 Foreclosed
34 ARUNACHAL PRADESH Agriculture and Allied High Density Plantation of Apples Schemes of NEC Schemes of NEC 2004-08-28 2.2925 2007-08-28 2.06 0 2.06 2.06 Completed
35 ARUNACHAL PRADESH Agriculture and Allied Integrated Community Large Cardamom and Orange plantation in Jhum land at Restaring, Korapu, Tarak Langdi and Galang Putung Villages under Tarak Circle of Kurung Kumey District. Schemes of NEC Schemes of NEC 2010-01-08 2.4636 2013-03-31 2.22 0 2.22 2.22 Completed
36 ARUNACHAL PRADESH Agriculture and Allied Large cardamom cultivation at Pitam area of Sindak village under Siyum circle, Upper Subansiri district, Arunachal Pradesh Schemes of NEC Schemes of NEC 2017-04-12 4 2020-04-12 3.6 0 3.6 3.6 Completed
37 ARUNACHAL PRADESH Agriculture and Allied Marketing of Ginger by NERAMAC, Guwahati in the State of Arunachal Pradesh. Schemes of NEC Schemes of NEC 2007-03-31 0.75 2009-03-31 0.75 0 0.75 0.75 Completed
38 ARUNACHAL PRADESH Agriculture and Allied Promotion and Development of Cash Crop in Arunachal Pradesh Schemes of NEC Schemes of NEC 2014-12-16 4.978 2017-12-16 4.4802 0 4.4802 4.48 Completed
39 ARUNACHAL PRADESH Agriculture and Allied Promotion of arecanut as alternative crops and alternate income source against illegal cultivation of cannabis and opium in variuos areas of Lekang, Namsai and Chongkham Circles of Namsai Aspirational District, AP Schemes of NEC Schemes of NEC 2023-03-15 5.2313 2026-05-15 5.23 0 5.23 3.14 Completed
40 ARUNACHAL PRADESH Agriculture and Allied Promotion of Banana Plantation for income augmentation and commercialization in Dego Kamki under West Siang District, AP Schemes of NEC Schemes of NEC 2023-02-17 3.31 2026-02-17 2.084 1.23 3.314 0.8557861 Ongoing
41 ARUNACHAL PRADESH Agriculture and Allied Proposal of identified block for providing key identified service at Giba Block, Upper Subansiri District, Arunachal Pradesh Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.27 2025-03-31 4.268 0 4.268 Ongoing
42 ARUNACHAL PRADESH Agriculture and Allied Proposal of identified block for providing key identified service at Hunli Desali Block, Lower Dibang Valley District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2022-03-30 4.75 2026-03-30 4.75 0 4.75 Ongoing
43 ARUNACHAL PRADESH Agriculture and Allied Proposal of identified block for providing key identified service at Kullung village, Mengio Block, Papumpare, Arunachal Pradesh Schemes of NEC Schemes of NEC 2022-03-31 1.99 2025-03-31 1.99 0 1.99 1.99 Completed
44 ARUNACHAL PRADESH Agriculture and Allied Proposal of identified block for providing key identified service at Lemiking Block, Upper Subansiri District, Arunachal Pradesh Schemes of NEC Schemes of NEC Choose... 2022-03-24 3.6372 2025-03-24 3.6412 0 3.6412 Ongoing
45 ARUNACHAL PRADESH Agriculture and Allied Proposal of identified block for providing key identified service at Monigong Block, Shi Yomi District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2022-03-31 4.72 2025-03-31 4.72 0 4.72 4.72 Ongoing
46 ARUNACHAL PRADESH Agriculture and Allied Proposal of identified block for providing key identified service at Riaku village, Siyum Block, Upper Subansiri, Arunachal Pradesh Schemes of NEC Schemes of NEC Choose... 2022-03-31 1.67 2025-03-31 1.668 0 1.668 Ongoing
47 ARUNACHAL PRADESH Agriculture and Allied Strengthening of central hatchery, Nirjuli, Arunachal Pradesh Schemes of NEC Schemes of NEC 2014-12-17 3.8241 2017-12-17 2.7534 0 2.7534 2.75 Completed
48 ARUNACHAL PRADESH Agriculture and Allied Strengthening of KVK in Geku, Balek, Pampoli, Deomali, Jairampur Schemes of NEC Schemes of NEC 2022-03-31 6.8 2025-03-31 6.8 0 6.8 0.68 Ongoing
49 ARUNACHAL PRADESH Agriculture and Allied Strengthening of Veterinary Hospital in Naharlagun Arunahal Pradesh Schemes of NEC Schemes of NEC 2004-06-28 0.3147 2007-06-28 0.28 0 0.28 0.28 Completed
50 ARUNACHAL PRADESH Education Aspirational District Namsai, Arunachal Pradesh Schemes of NEC Schemes of NEC 2019-06-07 1 2022-06-07 1 0 1 1 Completed
51 ARUNACHAL PRADESH Education Backward Communities of Ollo Community in Tirap District, Lazu Circle, Arunachal Pradesh Schemes of NEC Schemes of NEC 2022-03-29 4.91 2025-03-29 4.906 0 4.906 2.41 Completed
52 ARUNACHAL PRADESH Education Construction of Double Storied School Building at Sagalee (Govt. Higher Secondary School), Arunachal Pradesh. Schemes of NEC Schemes of NEC 2015-09-17 10.48 2018-09-17 9.4334 0 9.4334 9.43 Completed
53 ARUNACHAL PRADESH Education Construction of Girls Hostel (G1) at JN College, Pasighat in East Siang District of Arunachal Pradesh Schemes of NEC Schemes of NEC 2022-03-24 4.2748725 2025-03-24 3.66 0.6111 4.2711 1.47 Ongoing
54 ARUNACHAL PRADESH Education Construction of Girls Hostel at Govt. Secondary School, Baririjo, Upper Subansari District AP Schemes of NEC Schemes of NEC 2017-09-27 3.3176 2020-09-27 3.3176 0 3.3176 3.32 Completed
55 ARUNACHAL PRADESH Education Construction of Government Higher Secondary School, Dirang, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2021-03-25 4.75 2024-03-25 4.23 0.5165538 4.7465538 2.61 Ongoing
56 ARUNACHAL PRADESH Education Construction of Mini outdoor stadium at Vijayanagar and Gandhigram in Changlang Distrcit, Arunachal Pradesh (Lisu Yobin Community) Schemes of NEC Schemes of NEC Choose... 2022-03-15 4.9 2025-03-15 2.6912 1 3.6912 0.83 Ongoing
57 ARUNACHAL PRADESH Education Construction of New Administrative Block at Dera Natung Government College, Itanagar, Arunachal Pradesh Schemes of NEC Schemes of NEC 2022-03-29 6.87 2025-03-29 6.52 0 6.52 4.51 Ongoing
58 ARUNACHAL PRADESH Education Construction of RCC boys and girls hostel with boundary wall at Govt. Higher Secondary School, Anini, Arunachal Pradesh Schemes of NEC Schemes of NEC 2016-04-25 3.73 2020-04-25 3.73 0 3.73 3.73 Completed
59 ARUNACHAL PRADESH Education Infrastructure Development of Govt. Secondary school at Parsi Parlo under Parsi Parlo Circle in Kurung Kumey District, Arunachal Pradesh. Schemes of NEC Schemes of NEC Dept. of Power 2015-05-18 4.27 2018-05-18 3.4073 0 3.4073 3.41 Completed
60 ARUNACHAL PRADESH Education Infrastructure Development of B.K. Mission School, Midphu Doimukh Papum Pare District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2016-07-21 2.6314 2019-07-21 2.6314 0 2.6314 2.63 Completed
61 ARUNACHAL PRADESH Education Infrastructure Development of Girls School at Katang under Tirap District , Arunachal Pradesh Schemes of NEC Schemes of NEC 2017-05-02 3.88 2020-05-02 0.1 0 0.1 0.1 Foreclosed
62 ARUNACHAL PRADESH Education Infrastructure Development of ITI at Yupia, Papum Pare District, Arunachal Pradesh. Schemes of NEC Schemes of NEC Dept. of Power 2015-05-18 1.41 2018-05-18 1.3622 0 1.3622 1.36 Completed
63 ARUNACHAL PRADESH Education Infrastructure Development of ME School, Longding Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2017-05-02 3.8511 2020-05-02 3.4709 0 3.4709 3.08 Ongoing
64 ARUNACHAL PRADESH Education Infrastructure Development of Model School at Paying Circle Hq, Upper Subansari District, Arunachal Pradesh. Schemes of NEC Schemes of NEC Dept. of Power 2016-03-17 3.88 2019-03-17 3.8844 0 3.8844 3.88 Completed
65 ARUNACHAL PRADESH Education Infrastructure Development Works at Mishing Inhabitat Area at Gadum-I, Gadum-II and Mer, Village in the East Siang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2022-03-22 4.7624 2025-03-22 4.765 0 4.765 1.91 Completed
66 ARUNACHAL PRADESH Education Multipurpose Community Hall at Dumporijo ADC HQ. Upper Subansari District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2017-10-06 3.59 2020-10-06 0.1 0 0.1 0.1 Foreclosed
67 ARUNACHAL PRADESH Education Promotion and Literary Development of Mother Languages of Arunachal Pradesh Schemes of NEC Schemes of NEC 2022-03-27 4.62 2025-03-27 1.473 0.6462 2.1192 0.66 Ongoing
68 ARUNACHAL PRADESH Sports Construction of Football stadium at Jairampur under Changlang District, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2012-04-25 4.94 2020-01-08 4.45 0 4.45 4.45 Completed
69 ARUNACHAL PRADESH Sports Construction of Football Stadium at Lumla, Tawang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2017-03-22 3.03 2022-06-16 3.03 0 3.03 3.03 Completed
70 ARUNACHAL PRADESH Sports Construction of Football Stadium at Sakiang, Papumpare District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2016-03-31 2.82 2019-03-31 2.538 0 2.538 2.54 Completed
71 ARUNACHAL PRADESH Sports Construction of Indoor Stadium at Toru under Papum Pare District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2011-09-16 2.78 2013-09-16 2.502 0 2.502 2.5 Completed
72 ARUNACHAL PRADESH Sports Construction of Indoor Stadium-cum-Auditorium at GHSS, Basar,Arunachal Pradesh Schemes of NEC Schemes of NEC 2016-06-15 2.9882 2019-06-15 2.6894 0 2.6894 2.69 Completed
73 ARUNACHAL PRADESH Sports Construction of Mini football Stadium at Chowkham, Namsai District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2023-03-15 9.78 2026-03-15 6.1 0 6.1 3 Ongoing
74 ARUNACHAL PRADESH Sports Construction of Mini Outdoor Stadium at Rijo Ground, Daporijo under Upper Subansiri District Schemes of NEC Schemes of NEC 2014-12-17 3.5808 2017-12-17 3.22 0 3.22 3.22 Completed
75 ARUNACHAL PRADESH Sports Construction of Mini Sports Stadium at Yachuli and Yazali, Lower Subansiri District. Schemes of NEC Schemes of NEC 2011-09-16 4.37 2014-10-16 4.365 0 4.365 4.37 Completed
76 ARUNACHAL PRADESH Sports Construction of Multipurpose Community Hall at Dumporijo ADC HQ, Upper Subansiri District, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2021-03-30 3.2117 2024-03-30 3.1746 0 3.1746 2.78 Ongoing
77 ARUNACHAL PRADESH Sports Construction of Multipurpose Indoor Stadium-cum-Badminton Hall at Langrh, Nyobia Circle under Kurung Kumey District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2018-01-23 2.59 2021-01-23 0.1 0 0.1 0.1 Completed
78 ARUNACHAL PRADESH Sports Construction of Outdoor Stadium and Boundary Wall at Government Higher Secondary School, Kanubari, Longding District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2015-02-09 2.4303 2019-02-09 2.4303 0 2.4303 2.43 Completed
79 ARUNACHAL PRADESH Sports Construction of Outdoor Stadium at Chayangtajo in East Kameng District, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2015-05-15 3.9234 2018-05-15 3.5311 0 3.5311 3.53 Completed
80 ARUNACHAL PRADESH Sports Construction of Outdoor Stadium at Jang in Tawang District, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2017-06-28 5.33 2020-06-28 5.325 0 5.325 5.325 Completed
81 ARUNACHAL PRADESH Sports Construction of Outdoor Stadium at Sagalee, Papum Pare District, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2014-12-17 3.5867 2017-12-17 3.5867 0 3.5867 3.59 Completed
82 ARUNACHAL PRADESH Sports Construction of Outdoor Stadium at Tezu, Lohit District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2014-12-17 2.2115 2018-12-17 1.99 0 1.99 1.99 Completed
83 ARUNACHAL PRADESH Sports Construction of playground, rostrum and gallery at Kendriya Vidyalaya, Tezu, Arunachal Pradesh Schemes of NEC Schemes of NEC 2017-08-04 6.22 2020-08-04 6.22 0 6.22 6.22 Completed
84 ARUNACHAL PRADESH Irrigation and Flood Control A/E work on Pare river at Midpu area under Papum Pare District. Schemes of NEC Schemes of NEC 2011-02-01 4.8319 2014-02-01 4.3487 0 4.3487 4.35 Completed
85 ARUNACHAL PRADESH Irrigation and Flood Control Anti Erosion Work at Mahadevpur Circle, Arunachal Pradesh, Lohit dist. Schemes of NEC Schemes of NEC 2013-03-25 4.8945 2016-03-25 4.4051 0 4.4051 4.41 Completed
86 ARUNACHAL PRADESH Irrigation and Flood Control Anti Erosion work at Senki river from Industrial colony to market area Chandranagar, Itanagar, Arunachal Pradesh Schemes of NEC Schemes of NEC 2018-03-14 5 2021-03-14 0.1 0 0.1 0.1 Completed
87 ARUNACHAL PRADESH Irrigation and Flood Control Anti erosion work on Senki river to protect Rajiv Gandhi Polytechnic Institute at Vivek Vihar, Papum Pare District, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2018-03-14 2.88 2021-03-14 0.1 0 0.1 0.1 Completed
88 ARUNACHAL PRADESH Irrigation and Flood Control Anti Erosion works on right bank of Sibo Korong river to protect Pasighat Township Ph-I, East Siang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2018-03-14 12.94 2021-03-14 0.1 0 0.1 0.1 Completed
89 ARUNACHAL PRADESH Irrigation and Flood Control Anti-Erosion Scheme on Tazang siya and Sikhe river (lower Subansiri Dist.) Schemes of NEC Schemes of NEC 2009-08-05 4.8 2012-08-05 3.6347 0 3.6347 3.63 Completed
90 ARUNACHAL PRADESH Irrigation and Flood Control Anti-Erosion work at Right Bank of Sissiri river Silluck area to protect Ngopok and its adjoining village areas, Agricultural land areas and Mebo-Dola road East Siang dist. Schemes of NEC Schemes of NEC 2006-03-07 4.4912 2009-03-07 4.0421 0 4.0421 4.04 Completed
91 ARUNACHAL PRADESH Irrigation and Flood Control Anti-erosion work on Siang River to protect Loki Partung agricul-tural land and nearby villages at Pashighat, East Siang district, Arunachal Pradesh Schemes of NEC Schemes of NEC 2014-02-28 4 2018-02-28 3.6 0 3.6 3.6 Completed
92 ARUNACHAL PRADESH Irrigation and Flood Control Anti-Erosion work on Tara Tamak river to protect Gadum and its adjoining villages of Arunachal Pradesh & Assam & Agricultural land areas, East Siang dist. Schemes of NEC Schemes of NEC 2006-02-27 4.2632 2009-02-27 3.8369 0 3.8369 3.84 Completed
93 ARUNACHAL PRADESH Irrigation and Flood Control Anti-Erosion Work to protect Parang,Pullung, Tatpu,Yaya, Nguriang-bung &Totpo Village at Papum Pare District Schemes of NEC Schemes of NEC 2011-12-26 4.4006 2014-12-26 1.7601 0 1.7601 1.76 Completed
94 ARUNACHAL PRADESH Irrigation and Flood Control Augmentation of Water Supply at Jairampur Township from Ngaphy Nallah, Changlang District, Arunachal Schemes of NEC Schemes of NEC 2018-03-14 7 2022-03-14 0.1 0 0.1 0.1 Completed
95 ARUNACHAL PRADESH Irrigation and Flood Control C/o Anti erosion work to protect Brokentang village and the adjoining areas in Tawang dist. Schemes of NEC Schemes of NEC 2010-09-22 4.8827 2013-09-22 4.39 0 4.39 4.39 Completed
96 ARUNACHAL PRADESH Irrigation and Flood Control C/o Anti-Erosion & protection wall at Raks and Hiya village at Nyapin Circle of Kurung Kumey Dist. Schemes of NEC Schemes of NEC 2010-01-28 2.38 2014-01-28 2.142 0 2.142 2.14 Completed
97 ARUNACHAL PRADESH Irrigation and Flood Control C/o Anti-erosion work on Right and Left Bank of Kolma River at Nirjuli to protect Kolmajuli village in Arunachal Pradesh Schemes of NEC Schemes of NEC 2012-11-26 4.95 2015-11-26 4.45 0 4.45 4.45 Completed
98 ARUNACHAL PRADESH Irrigation and Flood Control C/o Flood and Erosion management scheme at Injan to protect Kharsang and adjoining area under Miao sub-division in Changlang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2017-09-21 4.35 2020-09-21 3.915 0 3.915 3.92 Completed
99 ARUNACHAL PRADESH Irrigation and Flood Control C/o Flood protection work at Lebia River to protect agricultural field at Upper Karoi village under Sagalee Circle District Papumpare, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2017-06-23 2.97 2020-06-23 2.673 0 2.673 2.67 Completed
100 ARUNACHAL PRADESH Irrigation and Flood Control C/o RCC Retaining Wall at Tapik Nallah to protect Tapik Collony, Karsingsa, Papum Pare District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2018-03-14 2.32 2021-03-14 0.1 0 0.1 0.1 Completed
101 ARUNACHAL PRADESH Irrigation and Flood Control Construction of Flood Protection work at Karsingsa on Right Bank of Dikrong River and its adjoining Tributaries, Papumpare dist. Schemes of NEC Schemes of NEC 2009-08-05 4.9696 2012-08-05 4.47 0 4.47 4.47 Completed
102 ARUNACHAL PRADESH Irrigation and Flood Control Construction of land protection work at Siang river to protect Sigar, Motum, Borguli and Seram village, Arunachal Pradesh. Schemes of NEC Schemes of NEC Dept. of Power 2022-03-03 3.4653 2025-03-03 3.4653 0 3.4653 3.47 Completed
103 ARUNACHAL PRADESH Irrigation and Flood Control Construction of Water Supply at CO Dadam, Tirap District. Schemes of NEC Schemes of NEC 2017-04-25 7.9377 2020-04-25 7.1439 0 7.1439 7.14 Completed
104 ARUNACHAL PRADESH Irrigation and Flood Control Control Structure on both side of Noa-Dehing River to protect Namsai, Piyong & Lekang Circle, Namsai District, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2017-06-23 10 2020-06-23 0.1 0 0.1 0.1 Completed
105 ARUNACHAL PRADESH Irrigation and Flood Control Drinking Water Supply of Thinsa Village, Tirap District, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2018-03-14 2.9 2021-03-14 0.1 0 0.1 0.1 Completed
106 ARUNACHAL PRADESH Irrigation and Flood Control Flood Control measures at Patsing, Bomjir under Dambuk Sub-Division, Lower Dibang Valley District, Arunachal Schemes of NEC Schemes of NEC 2018-03-14 11 2021-03-14 0.1 0 0.1 0.1 Completed
107 ARUNACHAL PRADESH Irrigation and Flood Control Flood Control Works at Namsai in Arunachal Pradesh,Lohit dist Schemes of NEC Schemes of NEC 2014-02-28 4.944 2017-02-28 4.4496 0 4.4496 4.45 Completed
108 ARUNACHAL PRADESH Irrigation and Flood Control Flood protection of Pasighat Hydel Station assets and adjoining agriculture and horticulture field in East Siang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2023-03-28 1.4867 2026-03-28 0.49 0 0.49 0.49 Completed
109 ARUNACHAL PRADESH Irrigation and Flood Control Flood protection work at Dirang township, Dirang West Kameng dist. Schemes of NEC Schemes of NEC 2010-02-03 4.97 2013-02-03 4.473 0 4.473 4.47 Completed
110 ARUNACHAL PRADESH Irrigation and Flood Control Improvement and Augmentation of Water Supply at Swamy Camp Township Hayuliang Circle of Anjaw District. Schemes of NEC Schemes of NEC 2012-01-12 4.6284 2015-01-12 4.1656 0 4.1656 4.17 Completed
111 ARUNACHAL PRADESH Irrigation and Flood Control Improvement of minor irrigation channel &C/o FC work at Pyuchi Siigang at Supyu ziro Lower Subansiri Dist. Schemes of NEC Schemes of NEC 2011-03-14 4.95 2014-03-14 4.455 0 4.455 4.46 Completed
112 ARUNACHAL PRADESH Irrigation and Flood Control Land protection work at Govt.Primary School upper Holongi PapumPare District Schemes of NEC Schemes of NEC 2010-02-03 3.89 2013-02-03 3.5 0 3.5 3.5 Completed
113 ARUNACHAL PRADESH Irrigation and Flood Control Proposal of identified backward block for providing key identified services at Mengio CD Block, Papum Pare district, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2023-02-17 4.49 2026-02-17 0 Foreclosed
114 ARUNACHAL PRADESH Irrigation and Flood Control Proposal of identified backward block for providing key identified services at Nacho CD Block, Upper Subansiri District, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2023-02-17 3.23 2026-02-17 3.23 0 3.23 Ongoing
115 ARUNACHAL PRADESH Irrigation and Flood Control Proposal of identified backward block for providing key identified services at Siyum CD Block, Upper Subansiri District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2023-02-17 4.29 2025-12-31 4.29 0 4.29 Ongoing
116 ARUNACHAL PRADESH Irrigation and Flood Control Proposal of identified backward block for providing key identified services at Taliha CD Block, Upper Subansiri district, Arunachal Pradesh Schemes of NEC Schemes of NEC 2023-02-17 4.95 2026-12-17 3.71 0 3.71 Ongoing
117 ARUNACHAL PRADESH Irrigation and Flood Control Providing of Water Supply at JNV Roing, lower Dibang Valley District Schemes of NEC Schemes of NEC 2017-05-15 3.4756 2020-05-15 2.3596 0 2.3596 2.36 Completed
118 ARUNACHAL PRADESH Irrigation and Flood Control Providing WSS & Sewage / Drainage System to Jamiri Circle Hq & Adjoining Village. Schemes of NEC Schemes of NEC 2017-04-17 4.41 2020-04-17 3.969 0 3.969 3.97 Completed
119 ARUNACHAL PRADESH Irrigation and Flood Control Providing WSS at Ragle Hamlet Paktung, Govt. Middle School and Health Sub centre. Schemes of NEC Schemes of NEC 2017-04-18 4 2020-04-18 3.6 0 3.6 3.6 Completed
120 ARUNACHAL PRADESH Irrigation and Flood Control WSS at Lawnu Co Hq Kanubari, Longding Dist, Arunachal Pradesh Schemes of NEC Schemes of NEC 2016-07-26 1.9411 2018-07-26 1.75 0 1.75 1.75 Completed
121 ARUNACHAL PRADESH Industries Bamboo Auditorium at NIT, Arunachal Schemes of NEC Schemes of NEC 2018-03-21 0.746 2021-03-21 0.67 0 0.67 0.67 Completed
122 ARUNACHAL PRADESH Industries Construction of Multipurpose Shopping Complex at Hapoli, Lower Subansiri District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2016-02-17 7.3269 2019-02-17 6.5942 0 6.5942 6.59 Completed
123 ARUNACHAL PRADESH Industries Construction of State Emporium cum Artifacts House at Itanagar, Arunachal Pradesh Schemes of NEC Schemes of NEC 2014-02-05 3.6942 2017-02-06 3.3248 0 3.3248 3.32 Completed
124 ARUNACHAL PRADESH Industries Establishment of Entreprenuership Development Institute at Jote under Papum Pare District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2012-11-26 2.2956 2016-11-26 1.6564 0 1.6564 1.66 Completed
125 ARUNACHAL PRADESH Industries Establsihment of State of Art Crop Collection cum processing Unit at Simari Lower Dibang Valley (AP) Schemes of NEC Schemes of NEC 2023-03-27 3.74 2025-03-27 3.37 0.37 3.74 1.98 Ongoing
126 ARUNACHAL PRADESH Industries Integrated Development of Community Sericulture Garden at Solungyar Village, by Govt. of Arunachal Pradesh. Schemes of NEC Schemes of NEC 2012-03-19 4.8 2015-03-19 4.32 0 4.32 4.32 Completed
127 ARUNACHAL PRADESH Industries Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2020-08-17 2.6 2023-08-17 2.6 0 2.6 2.6 Completed
128 ARUNACHAL PRADESH Industries Setting up of a Manufacturing of CTC Black Tea Unit by M/s Mouling Tea Processing Unit, Ramsing Upper Siang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2006-05-15 1.9594 2009-05-15 1.4792 0 1.4792 1.48 Completed
129 ARUNACHAL PRADESH Information and Public Relatio Construction of Cultural-cum- Development Centre at Miao, Arunachal Pradesh Schemes of NEC Schemes of NEC 2016-04-13 3.8154 2019-04-13 3.4339 0 3.4339 3.43 Completed
130 ARUNACHAL PRADESH Information and Public Relatio Death & the Boatman a Sajolang Docu feature film Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 0.56 2025-03-31 0 Foreclosed
131 ARUNACHAL PRADESH Information and Public Relatio Documentation and Digitalization of Cultural Heritage of all Tribes of Arunachal Pradesh Schemes of NEC Schemes of NEC 2015-06-05 2.5006 2018-06-05 2.25 0 2.25 2.25 Completed
132 ARUNACHAL PRADESH Information and Public Relatio Extension & Modernization of Gallaries of J.N. State Museum, Itanagar Schemes of NEC Schemes of NEC 2012-04-25 4.95 2019-12-09 4.46 0 4.46 4.46 Completed
133 ARUNACHAL PRADESH Information and Public Relatio Protection/Preservation & Infrastructure Development of Archaeological Museum & Monument, Malinithan, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2013-02-27 4.95 2015-02-27 4.455 0 4.455 4.46 Completed
134 ARUNACHAL PRADESH Information and Public Relatio Protection/Preservation of Archaeological Park at Itafort (Southern Gate) Itanagar, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2010-12-06 3.7 2013-12-06 3.33 0 3.33 3.33 Completed
135 ARUNACHAL PRADESH Information and Public Relatio Strengthening of Hindi Section in the library of 18 government colleges of Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2021-01-19 1.8 2024-01-19 1.8 0 1.8 0.72 Ongoing
136 ARUNACHAL PRADESH Health Accident & Trauma Centre at Along, Arunachal Pradesh Schemes of NEC Schemes of NEC 2007-03-28 1.4711 2009-03-28 0.94 0 0.94 0.94 Completed
137 ARUNACHAL PRADESH Health Capital support for procurement of 5 Mobile lab in Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2021-08-24 3.85 2024-08-24 3.85 0 3.85 3.85 Completed
138 ARUNACHAL PRADESH Health Construction of 50 bedded hospital at Palin, Kurung Kumei District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2006-03-07 4.32 2009-03-07 3.89 0 3.89 3.89 Completed
139 ARUNACHAL PRADESH Health Construction of 50 bedded Hospital at Pistana, Lower Subansiri District Schemes of NEC Schemes of NEC Dept. of Power 2011-02-16 4.8374 2014-02-16 4.35 0 4.35 4.35 Completed
140 ARUNACHAL PRADESH Health Construction of 60 capacities Nursing Hostel for newly created Nursing College at TRIHMS, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2021-03-26 12.1409542 2024-03-20 10.23 1.91 12.14 5.23 Ongoing
141 ARUNACHAL PRADESH Health Construction of Hiya Primary Health Centre under ADC Hq Nyapin, AP Schemes of NEC Schemes of NEC 2016-03-08 3.6525 2019-03-08 3.29 0 3.29 3.29 Completed
142 ARUNACHAL PRADESH Health Construction of Infrastructure Development at PHC at Dadam, CO HQ in Tirap, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2016-07-20 3.48 2019-07-20 3.13 0 3.13 3.13 Ongoing
143 ARUNACHAL PRADESH Health Construction of Maternity & Child Care Centre at Miao Changlang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2023-03-31 5.1 2026-03-31 2.55 2.4225 4.9725 3.825 Ongoing
144 ARUNACHAL PRADESH Health Development of Health Information and Hospital Management System in Papumpare Distrit. Schemes of NEC Schemes of NEC Dept. of Power 2012-12-19 4.9779 2015-12-19 3.6 0 3.6 3.6 Completed
145 ARUNACHAL PRADESH Health Establishment of 30 bedded hospital at Pareng, Sagalee Admn. Circle, Papumpare District Schemes of NEC Schemes of NEC Dept. of Power 2011-06-21 4.9066 2014-06-21 3.8 0 3.8 3.8 Completed
146 ARUNACHAL PRADESH Health Establishment of Bio Medical Waste Management Plant in District Hospitals (6 nos.), Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2009-08-06 4.5 2011-08-06 4.05 0 4.05 4.05 Completed
147 ARUNACHAL PRADESH Health Infrastructure development of 50 bedded Hospital (Phase-II) at Palin Kurung Kumey District, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2010-02-01 4.92 2014-02-01 4 0 4 4 Foreclosed
148 ARUNACHAL PRADESH Health Infrastructure Development of Sagalee CHC, Papumpare District, AP Schemes of NEC Schemes of NEC 2016-03-08 4.37 2019-03-08 3.933 0 3.933 3.93 Completed
149 ARUNACHAL PRADESH Health Infrastructure of CHC Infrastructure at Seijosa in East Kameng District, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2017-04-18 9.3079 2020-04-18 1 0 1 1 Foreclosed
150 ARUNACHAL PRADESH Health Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Arunachal Pradesh for activities related to combating COVID-19 pandemic Schemes of NEC Schemes of NEC 2020-04-01 3.25 2021-12-06 3.25 0 3.25 3.25 Completed
151 ARUNACHAL PRADESH Health Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Arunachal Pradesh for meeting critical gap of the fallout of COVID-19 related problems faced by the NE People migrants/students stranded outside the NER Schemes of NEC Schemes of NEC 2020-04-17 0.3 2023-04-17 0.3 0 0.3 0.3 Completed
152 ARUNACHAL PRADESH Health Support to R.K. Mission Hospital, Arunachal Pradesh Schemes of NEC Schemes of NEC 2005-07-21 1.9338 2008-07-21 1.74 0 1.74 1.74 Completed
153 ARUNACHAL PRADESH Health Up-gradation of 40 bedded Hospital at Likabali in Lower Siang District, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2021-03-26 14.3782 2024-03-26 14.38 0 14.38 12.28 Ongoing
154 ARUNACHAL PRADESH Health Up-gradation of Mengio (Shakiang) PHC to 50 bedded Hospital, Papumpare District. (Revised) Schemes of NEC Schemes of NEC 2009-12-18 8.35 2012-12-18 7.515 0 7.515 7.52 Completed
155 ARUNACHAL PRADESH Health Upgradation of PHC at Raga/Boa Simla, Lower Subansiri Dist., Arunachal Pradesh Schemes of NEC Schemes of NEC 2007-03-01 2.9872 2009-03-01 2.67 0 2.67 2.67 Completed
156 ARUNACHAL PRADESH Power Augmentation & Improvement of Power Distribution System in and around Yangte Administrative Hq, Kurung Kumey District, A. Pradesh. Schemes of NEC Schemes of NEC 2011-12-21 2.1331 2013-12-21 1.919 0 1.919 1.92 Completed
157 ARUNACHAL PRADESH Power Augmentation and Improvement of existing T&D System in & around Sangram Administrative HQ in Kurung Kumey District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2011-03-25 4.6769 2013-03-25 4.209 0 4.209 4.21 Completed
158 ARUNACHAL PRADESH Power Augmentation and Improvement of LT distribution system in and around Hapoli township area (ZIRO), Arunachal Pradesh. Schemes of NEC Schemes of NEC 2009-03-06 4.6679 2012-03-06 4.2 0 4.2 4.2 Completed
159 ARUNACHAL PRADESH Power Construction of 132KV D/C Transmission line from Hoz to Itanagar (20 Km) including 2x20 MVA, 132/33 KV Substation at Chimpu, Itanagar, Arunachal Pradesh Schemes of NEC Schemes of NEC 2008-07-21 49.5 2012-07-21 44.55 0 44.55 44.55 Completed
160 ARUNACHAL PRADESH Power Construction of 33 KV Express Line from Khonsa to Changlang, Arunachal Pradesh Schemes of NEC Schemes of NEC 2009-01-29 4.9822 2012-01-29 4.98 0 4.98 4.98 Completed
161 ARUNACHAL PRADESH Power Construction of 33 KV Express Line from Migo-Zara to Pistana, Lower Subsansiri District, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2009-10-23 3.32 2012-10-23 2.98 0 2.98 2.98 Completed
162 ARUNACHAL PRADESH Power Construction of 33 KV Express Line from Nirjuli to Kimin via Hoz & Potin, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2010-01-22 4.9571 2013-01-22 4.46 0 4.46 4.46 Completed
163 ARUNACHAL PRADESH Power Construction of 33 KV Express Line from Pistana Substation to Mengio, Arunachal Pradesh Schemes of NEC Schemes of NEC 2010-02-03 4.9716 2013-02-03 4.47 0 4.47 4.47 Completed
164 ARUNACHAL PRADESH Power Construction of 33/11KV, 2X1 MVA, sub-station at Pistana, Lower Subansiri District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2010-09-08 3.81 2013-09-08 3.429 0 3.429 3.43 Completed
165 ARUNACHAL PRADESH Power Construction of 33/11kV, 2x1 MVA, Substation at Pania including construction of 33 KV Express Line from Palin to Pania, Arunachal Pradesh Schemes of NEC Schemes of NEC 2012-03-02 4.1972 2014-03-02 3.77 0 3.77 3.77 Completed
166 ARUNACHAL PRADESH Power Construction of 33KV Express line from Changlang Power Sub-Station to Khimiyang including providing of 2X1 MVA, 33/11 KV Power Sub-Station at Khimiyang. Schemes of NEC Schemes of NEC 2010-12-23 4.9632 2013-12-23 4.46 0 4.46 4.46 Completed
167 ARUNACHAL PRADESH Power Construction of 33kV Line from Pakke to Chayangtajo including 2x1 MVA, 33/11 kV Substation at Chayangtajo, East Kameng District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2012-11-08 4.8952 2014-11-08 4.405 0 4.405 4.41 Completed
168 ARUNACHAL PRADESH Power Construction of Express 33kV line from Dirang to Jang in West Kameng and Tawang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2017-04-19 13.49 2020-04-19 9 0 9 9 Completed
169 ARUNACHAL PRADESH Power Construction of System Improvement HT/LT Lines including Distribution S/s in and around Daporijo Township, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2009-12-09 4.72 2013-12-09 4.248 0 4.248 4.25 Completed
170 ARUNACHAL PRADESH Power Electrification of Tourist Destination in Lower Dibang Valley District Eze Breeze Tower (Jawaharlal Nehru Van Udyan) and Sally lake ( 4 km point on Roing Hunli Road), Arunachal Pradesh Schemes of NEC Schemes of NEC Power Department 2022-03-09 3.1087532 2025-03-09 3.11 0 3.11 3.11 Ongoing
171 ARUNACHAL PRADESH Power Improvement & Renovation including relignment of existing 33 KV line from Pasighat to Mebo and Construction of Tower over river Siang & Siku. Schemes of NEC Schemes of NEC 2007-11-29 2.4584 2009-11-29 2.21 0 2.21 2.21 Completed
172 ARUNACHAL PRADESH Power Installation of Solar Fencing with provision of chainlink fencing and angle iron post around crop fields of farmers in Tawang District, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2023-02-23 2.68 2026-02-23 2.68 0 2.68 1.1 Ongoing
173 ARUNACHAL PRADESH Power System Improvement in & around Bomdila Township including S/s, W Kameng Dist Schemes of NEC Schemes of NEC 2010-12-23 4.8558 2014-12-23 4.37 0 4.37 4.37 Completed
174 ARUNACHAL PRADESH Power System Improvement in & around Rupa Township including S/s for stability & voltage regulation of Rupa, Kalaktang Areas, W. Kameng Dist Schemes of NEC Schemes of NEC 2011-03-23 4.8663 2014-03-23 4.379 0 4.379 4.38 Completed
175 ARUNACHAL PRADESH Power System Improvement of 11 KV/LT Lines with upgradation of different capacities of Distribution Transformers i/c Auto Re-closures on 11 KV feeders under Tawang Electrical Sub-Division, Tawang, Arunachal Pradesh Schemes of NEC Schemes of NEC 2022-03-09 7.92 2025-03-09 7.92 0 7.92 5.08 Completed
176 ARUNACHAL PRADESH Power System improvement of power distribution network in Dambuk under Lower Dibang Valley District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2016-03-10 12.52 2019-03-10 8.9 0 8.9 8.9 Completed
177 ARUNACHAL PRADESH Power System improvement under Raga Electrical Sub-Division in Lower Subansiri District of Arunachal Pradesh Schemes of NEC Schemes of NEC 2009-01-23 4.8951 2013-01-23 4.4 0 4.4 4.4 Completed
178 ARUNACHAL PRADESH Power Upgradation, Improvement and Renovation of Electrical installation in and around Kalaktang Township, Arunachal Pradesh Schemes of NEC Schemes of NEC 2015-06-09 13.74 2018-06-09 12.366 0 12.366 12.37 Completed
179 ARUNACHAL PRADESH Science and Technology Decision Support System(DSS) for sustainable urban development of five selected towns of Arunachal Pradesh using Remote Sensing and GIS Arunachal Pradesh Schemes of NEC Schemes of NEC 2014-02-22 3.443 2017-02-22 3.0987 0 3.0987 3.1 Completed
180 ARUNACHAL PRADESH Science and Technology Development of Human Resource Management System (Arunachal Pradesh) Schemes of NEC Schemes of NEC 2011-03-22 2.727 2013-03-22 2 0 2 2 Foreclosed
181 ARUNACHAL PRADESH Science and Technology Developmental Planning and Application of Space Technology for Agro-Horticulture & Medicinal in Arunachal Pradesh Schemes of NEC Schemes of NEC 2011-03-26 2.7245 2014-03-26 2.45 0 2.45 2.45 Foreclosed
182 ARUNACHAL PRADESH Science and Technology Disaster Management System in Arunachal Pradesh Schemes of NEC Schemes of NEC 2005-03-31 3.1135 2008-03-31 3.1135 0 3.1135 3.11 Completed
183 ARUNACHAL PRADESH Science and Technology Establishment of NEC Cell in Planning Department, Govt of AP. Secretary (Planning), Planning Dept. Govt. of Arunachal Pradesh. Schemes of NEC Schemes of NEC 2015-11-20 0.6 2018-11-20 0.5297 0 0.5297 0.53 Completed
184 ARUNACHAL PRADESH Science and Technology Installation of CCTV cameras & Infrastructure Development of various Entry check gate of tax and Excise Department in AP. Commissioner, Tax & Excise Dept. Govt. of AP Schemes of NEC Schemes of NEC Dept. of Power 2015-06-12 1.9 2018-06-12 1.9 0 1.9 1.9 Completed
185 ARUNACHAL PRADESH Science and Technology Installation of Intelligent Character Recognition (ICR) System at Board of Secondary Education, Arunachal Pradesh Schemes of NEC Schemes of NEC 2007-03-30 0.47 2009-03-30 0.47 0 0.47 0.47 Completed
186 ARUNACHAL PRADESH Science and Technology IT infrastructure development in schools of Arunachal Pradesh.(Dept. of Information Technology, Govt. of Arunachal Pradesh) Schemes of NEC Schemes of NEC Dept. of Power 2015-06-12 3.784 2018-06-12 3.44 0 3.44 3.44 Completed
187 ARUNACHAL PRADESH Science and Technology IT School Education Programme for 4 Schools of Arunachal Pradesh by M/S G Informatics Ltd. Schemes of NEC Schemes of NEC 2005-03-31 0.4133 2008-03-31 0.4133 0 0.4133 0.41 Completed
188 ARUNACHAL PRADESH Science and Technology Mapping and Monitoring of Shifting Cultivation areas in A.P. for Sustainable Development using Remote Sensing & GIS Technique Schemes of NEC Dept. of Power 2012-03-05 2.6648 2015-03-05 2.4 0 2.4 2.4 Completed
189 ARUNACHAL PRADESH Science and Technology Mapping of Mineralized Zones & Development of Mines Lease (including Reconnaissance Permit License) Information System in Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2013-11-21 3.2188 2016-11-21 2.8969 0 2.8969 2.9 Completed
190 ARUNACHAL PRADESH Science and Technology Online connectivity of schools & process information management systems for Dept. of School Education, Govt. of A.P. Schemes of NEC Schemes of NEC 2010-03-17 2.84 2013-03-17 2.84 0 2.84 2.84 Completed
191 ARUNACHAL PRADESH Science and Technology Remote Sensing and GIS based identification of Hazardous Industries and Development of Emergency Planning & Response System. (Dept. of Industries, Govt. of Arunachal Pradesh) Schemes of NEC Schemes of NEC 2015-06-12 2.779 2018-06-12 2.5015 0 2.5015 2.5 Completed
192 ARUNACHAL PRADESH Science and Technology Statewide Telemedicine Programme for Health care Delivery in Arunachal Pradesh Schemes of NEC Schemes of NEC 2005-12-28 4.55 2008-12-28 4.52 0 4.52 4.52 Completed
193 ARUNACHAL PRADESH Science and Technology Upliftment and Infrastructure Development Works at Mishing Inhabited Area at Oyan, East Siang District, Arunachal Pradesh. Rural Works Department Pasighat Division , Govt. of AP Schemes of NEC Schemes of NEC 2023-03-29 4.9134 2025-03-31 4.91 0 4.91 1.1 Ongoing
194 ARUNACHAL PRADESH Science and Technology World Biodiversity Heritage Site - A Programme on Awareness and Conservation of climate indicator wild flower-Rhododendrons of Eastern Himalaya, North East India Schemes of NEC Schemes of NEC 2014-02-28 0.4172 2017-02-28 0.33 0 0.33 0.33 Foreclosed
195 ARUNACHAL PRADESH Transport and Communication Bordumsa-Borkhet Schemes of NEC Schemes of NEC 2017-04-10 11.3 2020-04-10 10.17 0 10.17 10.17 Completed
196 ARUNACHAL PRADESH Transport and Communication Construction of Longding-Nokajan road Schemes of NEC Schemes of NEC 2010-03-25 33.98 2014-03-26 30.57 0 30.57 30.57 Completed
197 ARUNACHAL PRADESH Transport and Communication Construction of Tezu Airport in Lohit District Schemes of NEC Schemes of NEC 2010-02-10 79 2013-02-10 77.484 0 77.484 77.48 Foreclosed
198 ARUNACHAL PRADESH Transport and Communication Digboi-Pengiri-Bordumsa-Mahadevpur road Schemes of NEC Schemes of NEC 2006-12-12 49.43 2009-12-12 44.49 0 44.49 44.49 Completed
199 ARUNACHAL PRADESH Transport and Communication Harmoti-Doimukh road Schemes of NEC Schemes of NEC 2007-03-02 4.9058 2010-03-02 4.42 0 4.42 4.42 Completed
200 ARUNACHAL PRADESH Transport and Communication Laimekuri-Nari-Telem-Rimi road Schemes of NEC Schemes of NEC 2004-08-18 78 2007-08-18 70.7 0 70.7 70.7 Completed
201 ARUNACHAL PRADESH Transport and Communication Motum-Tinali-Moktumghat road Schemes of NEC Schemes of NEC 2007-02-28 4.71 2010-02-28 4.24 0 4.24 4.24 Completed
202 ARUNACHAL PRADESH Transport and Communication Pakke-Seijosa-Itakhola Schemes of NEC Schemes of NEC Dept. of Power 2015-06-02 155.7 2018-06-02 126.81 0 126.81 123.9746 Ongoing
203 ARUNACHAL PRADESH Transport and Communication Passighat-Koyu-Ego road Schemes of NEC Schemes of NEC 2004-07-15 50.19 2007-07-15 46.2 0 46.2 46.2 Completed
204 ARUNACHAL PRADESH Transport and Communication Rupa-Kalaktang-Sikaridanga Schemes of NEC Schemes of NEC 2006-02-27 2.48 2008-03-31 2.23 0 2.23 2.23 Completed
205 ARUNACHAL PRADESH Transport and Communication Rural road from Nacho BRTF to Koba Village Schemes of NEC Schemes of NEC 2017-04-11 12.07 2020-04-11 10.86 0 10.86 10.86 Completed
206 ARUNACHAL PRADESH Transport and Communication Seppa-Chyangtajo road Schemes of NEC Schemes of NEC 2006-09-22 172.52 2009-09-22 153 0 153 153 Completed
207 ARUNACHAL PRADESH Transport and Communication Tamen-Dollungmukh Road Schemes of NEC Schemes of NEC 2010-12-16 139.62 2013-12-16 112 0 112 112 Foreclosed
208 ARUNACHAL PRADESH Tourism and Culture Beautification of Sela Lake in Tawang District, Arunachal Pradesh. Schemes of NEC Schemes of NEC 2010-03-22 3.4566 2013-03-22 3.111 0 3.111 3.11 Completed
209 ARUNACHAL PRADESH Tourism and Culture Capacity building for Rural Eco-Tourism Guides and Village Hospitality Service Providers Schemes of NEC Schemes of NEC 2014-03-05 0.223 2017-03-05 0.2 0 0.2 0.2 Completed
210 ARUNACHAL PRADESH Tourism and Culture Construction of Adventure Tourism Camping cum Recreation Site at Huto Village in Doimukh, Papum-Pare District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2015-11-12 3.666 2018-11-12 3.2994 0 3.2994 3.3 Completed
211 ARUNACHAL PRADESH Tourism and Culture Construction of Mega Festival cum Multipurpose Ground with Parking Facilities and Approach Road at Tawang, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2016-03-21 11.54 2019-03-21 11.3146 0 11.3146 11.31 Completed
212 ARUNACHAL PRADESH Tourism and Culture Construction of Permanent Stage-cum-Covered Gallery at Common Festival Ground, Naharlagun, Arunachal Pradesh Schemes of NEC Schemes of NEC 2013-06-11 1.7942 2016-06-11 1.6148 0 1.6148 1.61 Completed
213 ARUNACHAL PRADESH Tourism and Culture Construction of Tourism Amusement Park (Including Picnic Spot & Cottages) at Dollungmukh, Lower Subansari District, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2015-11-06 3.2082 2018-11-06 2.31 0 2.31 2.31 Ongoing
214 ARUNACHAL PRADESH Tourism and Culture Construction of Tourism Complex at Acheso (Dambuen) under Dibang Valley District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2023-03-31 3.58 2026-03-31 1.79 1.2535 3.0435 Ongoing
215 ARUNACHAL PRADESH Tourism and Culture Construction of Tourist Lodge and Rejuvenation of Maryland lake at 10th Mile, Oyan Circle, East Siang District, Arunachal Pradesh Schemes of NEC Schemes of NEC Dept. of Power 2017-09-21 5.2 2020-09-21 4.68 0 4.68 4.68 Completed
216 ARUNACHAL PRADESH Tourism and Culture Creation of Tourist Facilities Centre at Tippi, Arunachal Pradesh Schemes of NEC Schemes of NEC 2006-03-08 0.35 2009-03-08 0.18 0 0.18 0.18 Completed
217 ARUNACHAL PRADESH Tourism and Culture Development & Beautification of Thanghaphey Lakes in Tawang District Schemes of NEC Schemes of NEC 2011-02-23 4.8816 2020-03-03 4.39 0 4.39 4.39 Completed
218 ARUNACHAL PRADESH Tourism and Culture Development of Adventure Tourism Centre and Camping Site at Baririjo, Upper Subansiri District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2015-11-12 4.45 2018-11-12 4.005 0 4.005 4.01 Completed
219 ARUNACHAL PRADESH Tourism and Culture Development of Park, Angling and Picnic Spot at Basar, West Siang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2012-02-28 3.9978 2015-02-28 3.6 0 3.6 3.6 Completed
220 ARUNACHAL PRADESH Tourism and Culture Development of River Front on Tenga market West Kameng District, Arunachal Pradesh Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.865 2025-03-31 0 Completed
221 ARUNACHAL PRADESH Tourism and Culture Development of Wayside Amenities at Tago Putu, Yazali, Lower Subansiri District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2017-09-21 13.5 2021-09-30 12.15 0 12.15 12.15 Completed
222 ARUNACHAL PRADESH Tourism and Culture North East India Inter-State Friendship Car Rally from 7th April, 2022 to 22nd April, 2022. Schemes of NEC Schemes of NEC 2022-03-29 2.1 2025-03-29 2.1 0 2.1 2.1 Completed
223 ARUNACHAL PRADESH Tourism and Culture Scheme for Establishing Community Managed Rural Based Eco-Tourism Training Centre, AP Schemes of NEC Schemes of NEC 2005-03-27 0.25 2009-03-27 0.25 0 0.25 0.25 Completed
224 ARUNACHAL PRADESH Tourism and Culture Tourist Infrastructure Development of Sikar Lake at Tirbin under West Siang District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2011-03-24 4.2913 2014-03-24 3.86 0 3.86 3.86 Completed
225 ARUNACHAL PRADESH Tourism and Culture Upgradation of Forest Houses at important Tourist Destinations of Arunachal Pradesh. Schemes of NEC Schemes of NEC 2011-09-03 2.9781 2014-09-03 2.68 0 2.68 2.68 Completed
226 ARUNACHAL PRADESH Transport and Communication Construction of Rigid Pavements road in Tawang Township (SH: Nehru Gonpa to Tawang Monastry in Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2019-03-08 20 2020-03-31 19.9949 0 19.9949 19.995 Completed
227 ARUNACHAL PRADESH Transport and Communication Construction of Road from Babrang (Murga) Bridge point to Rho village (15 km) Tawang District NESIDS-ROADS NESIDS Public works Department 2019-03-05 26.5 2020-03-31 26.1518 0 26.1518 26.1504 Completed
228 ARUNACHAL PRADESH Transport and Communication Construction of road from Bomikoto village to Nilling Circle Hq via Sima-Dha (25.00 km) in Upper Subansiri District NESIDS-ROADS NESIDS Public works Department 2019-03-08 36.54 2020-03-31 35.66 0 35.66 35.6593 Completed
229 ARUNACHAL PRADESH Transport and Communication Construction of Road from BRTF Road to Pidi in West Siang District NESIDS-ROADS NESIDS Public works Department 2019-03-08 19.9 2020-03-31 14.67 2.5 17.17 7.4476 Completed
230 ARUNACHAL PRADESH Transport and Communication Construction of road from Chongkham to Meme via Namliang village (13.50 kms) in Namsai Districtin Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2019-03-08 21.12 2023-06-08 20.6992 0 20.6992 19.17 Completed
231 ARUNACHAL PRADESH Transport and Communication Construction of Road from Dari to Chambang CO HQ. in Kra Daadi District(38 km) in Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2020-03-24 33.69 2023-01-24 32.8254 0 32.8254 32.8356 Completed
232 ARUNACHAL PRADESH Transport and Communication Construction of road from Likwa Gyadi to Gyawepurang (10.86 kms) in East Kameng District) in Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2019-03-08 21.22 2020-03-31 15.92 3 18.92 10.52 Ongoing
233 ARUNACHAL PRADESH Transport and Communication Construction of road from Longkhow to Pumau in Longding District (SH: FC, culverts,RW, bridge) NESIDS-ROADS NESIDS Public works Department 2019-03-09 19.98 2023-06-09 19.98 0 19.98 19.9779 Completed
234 ARUNACHAL PRADESH Transport and Communication Construction of road from Lumdung NH-229 to connect 9.00 Km point of PMGSY Road to Nere Village at East Kameng district in Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2020-03-13 10 2022-03-13 9.84 0 9.84 4 Completed
235 ARUNACHAL PRADESH Transport and Communication Construction of road from Rumgong to connect Kaying (64 kms) Molom to Bogne village 23 kms in Siang district NESIDS-ROADS NESIDS Public works Department 2019-03-09 20 2022-03-09 5 5 10 Ongoing
236 ARUNACHAL PRADESH Transport and Communication Construction of Road from Terung to Sumsipathar in Tirap Districtin Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2019-03-08 20 2020-03-31 18.18 0 18.18 15.76 Completed
237 ARUNACHAL PRADESH Transport and Communication Improvement and extension of Likabali Township road (10 kms) in Lower Siang District in Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2019-03-08 10 2020-03-31 9.22 0 9.22 8.34 Completed
238 ARUNACHAL PRADESH Transport and Communication Project Construction of road from Kodum CO Hqr to Bam Tri-junction 16.50 Km under West Siang District in Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2022-04-20 19.6 2024-04-30 16.71 2.9 19.61 7.84 Completed
239 ARUNACHAL PRADESH Transport and Communication Project Construction of road from Marung Gika to Panior Bridge Point via Sarchgai, mate, Kusuk & Pan-21 km in Papum Pare District in Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2022-04-20 20 2024-04-30 8.48 6.5125 14.9925 Ongoing
240 ARUNACHAL PRADESH Transport and Communication Project Construction of Town Double Lane Road at Pokriang SDO Hq Langrh and Phassang Circle Hq. and adjoining Villages, Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2022-04-20 19.683 2024-04-30 19.68 0 19.68 7.83 Completed
241 ARUNACHAL PRADESH Transport and Communication Project Up-gradation of road from NH-13 to Ugyen Tsangpo Helipad at Tawang in Tawang district, Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2022-04-20 20.84 2024-04-30 20.84 0 20.84 8.34 Completed
242 ARUNACHAL PRADESH Transport and Communication Construction of Road from Bana EAC HQ via Old Sopung, Chijang Kajing Village East Kameng District in Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2023-11-30 64.95 2026-05-29 23.98 22.4 46.38 Ongoing
243 ARUNACHAL PRADESH Transport and Communication Construction of Road from PWD Road to Peki Modi NESIDS-ROADS NESIDS Public works Department 2024-01-12 69.35 2026-01-12 17.33 0 17.33 Ongoing
244 ARUNACHAL PRADESH Transport and Communication Construction of Road from thongleng PMGSY Road to Thangaphey Pilgrimage Centre in tawang District in Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2023-11-30 59.91 2026-04-30 14.82 13.42 28.24 Ongoing
245 ARUNACHAL PRADESH Transport and Communication Improvement and re-alignment of Road from Nafra to Integrated Development of Tourism Centre at Makhu Village in Arunachal Pradesh NESIDS-ROADS NESIDS Public works Department 2023-11-30 32.32 2025-11-29 3.67 6.67 10.34 Ongoing
246 ARUNACHAL PRADESH Transport and Communication Margherita-Deomali Road NESIDS-ROADS NERSDS Public works Department 2020-03-14 43.57 2022-11-30 42.96 0 42.96 Completed
247 ARUNACHAL PRADESH Transport and Communication Mirem-Mikong-Jonai Road NESIDS-ROADS NERSDS Public works Department 2020-02-28 36.22 2023-02-28 35.71 0 35.71 16.9 Completed
248 ARUNACHAL PRADESH Water Supply Augmentation of Water Supply at Hapoli Township in Lower Subansiri District NESIDS-OTRI NESIDS PHED/WS 2019-03-01 20 2020-03-31 19.9 0 19.9 19.9 Completed
249 ARUNACHAL PRADESH Water Supply Augmentation of Water supply at Miao Township (3.57 MLD) in Arunachal Pradesh NESIDS-OTRI NESIDS PHED/WS 2019-12-26 28.51 2021-12-26 22.8138 5.292 28.1058 20.224 Ongoing
250 ARUNACHAL PRADESH Water Supply Augmentation of Water Supply System at Bomdila Township (4.86 MLD) from Naga GG to Mandala Top (Phase-I) in West Kameng District NESIDS-OTRI NESIDS PHED/WS 2024-02-27 61.7747 2026-02-27 46.331 15.4428 61.7738 Ongoing
251 ARUNACHAL PRADESH Water Supply Augmentation of water supply to Bhalukpong town in West kameng District NESIDS-OTRI NESIDS PHED/WS 2019-03-08 19.82 2020-03-31 19.8136 0 19.8136 19.8136 Completed
252 ARUNACHAL PRADESH Water Supply Augumentation of water supply to Aalo Township in West Siang District in Arunachal Pradesh NESIDS-OTRI NESIDS PHED/WS 2019-03-08 20 2020-03-31 16.847 3.153 20 4.879 Ongoing
253 ARUNACHAL PRADESH Water Supply Integrated infrastructure Development for Tourism at Tawang with provision of sewage and water treatment plant at Tawang District in Arunachal Pradesh NESIDS-OTRI NESIDS Dept. of Power 2020-02-25 32.9759 2022-02-25 32.8347 0 32.8347 23.4386 Ongoing
254 ARUNACHAL PRADESH Water Supply Project Improvement of Water Supply System for Mechuka Township & Peripheral villages with Sewerage System and Riverfront development for boosting tourism in Mechuka Township Arunachal Pradesh NESIDS-OTRI NESIDS Public Health & Engg Depa 2022-04-20 34.6408 2024-04-30 17.3046 10 27.3046 Ongoing
255 ARUNACHAL PRADESH Water Supply Project Integrated Drinking Water project through hybrid of lift and gravity distribution system with value addition of Tourism components at Deomali, Tirap District Arunachal Pradesh NESIDS-OTRI NESIDS Public Health & Engg Depa 2022-04-20 13.48 2024-04-30 5.392 0 5.392 Ongoing
256 ARUNACHAL PRADESH Education Construction of 150 Borders Hostel at Higher Secondary School Kolariang NESIDS-OTRI NLCPR PWD 2005-12-23 0.95 2007-12-31 0.8301 0 0.8301 0.8301 Completed
257 ARUNACHAL PRADESH Education Construction of 200 seated Girls Hostel at J.N. College, Pasighat NESIDS-OTRI NLCPR PWD 2005-10-18 5.1511 2007-10-31 4.501 0 4.501 4.501 Completed
258 ARUNACHAL PRADESH Education Construction of Academic Block of Arunachal Pali Vidyapith, Chokham, Phase-I NESIDS-OTRI NLCPR PWD 2002-09-23 0.59 2004-09-30 0.531 0 0.531 0.59 Completed
259 ARUNACHAL PRADESH Education Construction of Academic Block of Arunachal Pali Vidyapith, Chokham, Phase-II NESIDS-OTRI NLCPR PWD 2004-09-29 0.81 2005-09-30 0.729 0 0.729 0.81 Completed
260 ARUNACHAL PRADESH Education Development of Rangfrah Government College Lumbusung Changlang District NESIDS-OTRI NLCPR UD 2013-04-29 14.8646 2014-04-29 12.5625 0 12.5625 12.5625 Completed
261 ARUNACHAL PRADESH Education Development of Shantideva Vidyalaya, Bomdila Monastry NESIDS-OTRI NLCPR Dept. of Power 2007-12-26 2.9745 2009-12-31 2.0997 0 2.0997 2.0997 Ongoing
262 ARUNACHAL PRADESH Education Establishment of VKV at Changlang, Changlang District NESIDS-OTRI NLCPR Dept. of Power 2011-09-23 5.0155 2013-09-30 4.3712938 0 4.3712938 1.7755 Ongoing
263 ARUNACHAL PRADESH Education Establishment of VKV at Ramsing, Upper Siang District NESIDS-OTRI NLCPR PWD 2011-03-08 3.4454 2013-02-28 3.04 0 3.04 3.04 Completed
264 ARUNACHAL PRADESH Education Establishment of VKV Girls Residential School at chayangtajo, East Kameng District in A.P. NESIDS-OTRI NLCPR PWD 2012-10-31 10.7444 2015-10-31 8.527 0 8.527 8.527 Completed
265 ARUNACHAL PRADESH Education Establishment of VKV Residential School at Longding in Longding District NESIDS-OTRI NLCPR Dept. of Education 2014-01-30 8.9719 2017-01-31 7.2428 0 7.2428 7.2428 Completed
266 ARUNACHAL PRADESH Education Financial assistance for commpletion of 532 incomplete school buildings, teachers quartes & Hostels. NESIDS-OTRI NLCPR PWD 2001-11-15 14.48 2003-03-31 4.986 0 4.986 5.54 Completed
267 ARUNACHAL PRADESH Education Furniture for 1557 Primary & Middle school. NESIDS-OTRI NLCPR Education 2001-08-23 1.63 2003-08-29 1.467 0 1.467 1.63 Completed
268 ARUNACHAL PRADESH Education Hostel buildings for 110 primary & middle sc NESIDS-OTRI NLCPR PWD 2000-07-28 22 2002-03-31 19.8 0 19.8 22 Completed
269 ARUNACHAL PRADESH Education Infrastructural Development of VKV Nyapin NESIDS-OTRI NLCPR PWD 2011-06-27 3.4355 2013-06-30 3.0313 0 3.0313 3.0313 Completed
270 ARUNACHAL PRADESH Education Infrastructure development of Givt. higher secondary school Hawai in Anjaw district NESIDS-OTRI NLCPR PWD 2012-12-21 10.84 2015-12-31 8.9948 0 8.9948 8.9948 Completed
271 ARUNACHAL PRADESH Education Infrastructure Development of various Schools under Palin Circle, Kurung Kumey District NESIDS-OTRI NLCPR PWD 2011-12-26 13.8212 2014-12-31 4.878 0 4.878 4.878 Foreclosed
272 ARUNACHAL PRADESH Education Infrastructure Development of Vivekananda Kendra Vidyalaya (VKV) at Dado NESIDS-OTRI NLCPR PWD 2011-02-07 7.1001 2013-12-31 5.1026 0 5.1026 5.1026 Ongoing
273 ARUNACHAL PRADESH Education Infrastructure development of VKV Koloriang (Phase-II) NESIDS-OTRI NLCPR PWD 2010-06-02 2.8148 2011-11-30 2.4836 0 2.4836 2.4836 Completed
274 ARUNACHAL PRADESH Education Infrastucrctural devlopment of 275 community schools running pre- primary classes in villages NESIDS-OTRI NLCPR PWD 2000-08-10 5.82 2002-03-31 4.95 0 4.95 5.5 Completed
275 ARUNACHAL PRADESH Education North Eastern Regional Institute of science & Techonolgy NESIDS-OTRI NLCPR NERIST 2000-03-31 40 2003-09-12 21.6 0 21.6 20 Completed
276 ARUNACHAL PRADESH Education Opening of Ramakrishna Sarada Mission School for girls at Khaso (Dirang) in West Kameng District NESIDS-OTRI NLCPR PWD 2007-12-26 5.8805 2009-12-31 5.1887 0 5.1887 5.1887 Completed
277 ARUNACHAL PRADESH Education Rama Krishna Mission Residential School at Narottam Nagar, Tirap District. NESIDS-OTRI NLCPR PWD 2001-09-10 12.2 2004-06-08 10.98 0 10.98 12.2 Completed
278 ARUNACHAL PRADESH Education Rama Krishna Mission School at Along. NESIDS-OTRI NLCPR PWD 2000-07-17 2.56 2004-07-31 1.9638 0 1.9638 2.182 Completed
279 ARUNACHAL PRADESH Education Rama Krishna Sarada Mission Middle School Khaso in West Kameng District to Higher Secondary School (Phase-II) NESIDS-OTRI NLCPR Dept. of Power 2014-06-13 2.661 2022-06-30 1.8204 0 1.8204 1.8201 Completed
280 ARUNACHAL PRADESH Education Rama Krishna Sarda Mission Girls School, Khonsa, Narottam Nagar, Tirap District. NESIDS-OTRI NLCPR PWD 2001-09-10 3 2004-06-08 2.7 0 2.7 3 Completed
281 ARUNACHAL PRADESH Education Reconstruction of Govt. Higher Secondary School at Anini NESIDS-OTRI NLCPR PWD 2005-12-23 3.0229 2008-12-23 2.6414 0 2.6414 2.6414 Completed
282 ARUNACHAL PRADESH Education Sarva Shiksha Abhiyan 2005-06 NESIDS-OTRI NLCPR Education 2006-03-28 8.201 2006-12-31 8.201 0 8.201 8.201 Completed
283 ARUNACHAL PRADESH Education Sarva Shiksha Abhiyan 2006-07 NESIDS-OTRI NLCPR Education 2006-09-26 14.2874 2008-03-31 14.2874 0 14.2874 14.2874 Ongoing
284 ARUNACHAL PRADESH Education Vivekananda Kendra Vidyalaya at Kitpi in Tawang District NESIDS-OTRI NLCPR PWD 2006-09-26 5.2084 2008-09-30 4.5511 0 4.5511 4.5511 Completed
285 ARUNACHAL PRADESH Education Vivekananda Kendra Vidyalaya, Koliarang, NESIDS-OTRI NLCPR PWD 2001-10-30 0.8 2004-10-31 0.72 0 0.72 0.8 Completed
286 ARUNACHAL PRADESH Irrigation and Flood Control Anti erosion works on kley river under Lower subansiri District. NESIDS-OTRI NLCPR WRD 2002-09-26 7.31 2004-03-31 6.543 0 6.543 6.9282 Completed
287 ARUNACHAL PRADESH Irrigation and Flood Control Flood Control & Anti Erosion Works (6 Nos) NESIDS-OTRI NLCPR WRD 2000-03-28 11.3 2002-03-31 10.17 0 10.17 11.3 Completed
288 ARUNACHAL PRADESH Irrigation and Flood Control Flood Control & Anti Erosion Works (8 Nos) NESIDS-OTRI NLCPR WRD 2000-07-06 46.33 2002-03-31 41.688 0 41.688 46.32 Completed
289 ARUNACHAL PRADESH Health Construction of In-Patient Department for District Hospital at Tawang NESIDS-OTRI NLCPR PWD 2013-03-26 14.3835 2016-03-31 12.564 0 12.564 12.1235 Completed
290 ARUNACHAL PRADESH Health Construction of well-equipped 50 bedded hospital at Yingkiong in Upper Siang District NESIDS-OTRI NLCPR PWD 2013-08-12 13.0762 2016-06-30 11.7686 0 11.7686 11.7686 Completed
291 ARUNACHAL PRADESH Health Corpus Fund for R.K. Mission Hospital, Itanagar NESIDS-OTRI NLCPR RK Mission 2008-05-01 22.2222 2008-08-31 20 0 20 20 Completed
292 ARUNACHAL PRADESH Health Infrastructure strengthening of Secondary Health care facilities in Arunachal Pradesh (General Hospital Naharlagun) NESIDS-OTRI NLCPR Heath 2007-03-26 4.7153 2008-03-31 4.1202 0 4.1202 4.1202 Completed
293 ARUNACHAL PRADESH Health New OPD Block of R.K. Mission Hospital NESIDS-OTRI NLCPR RK Mission 2005-08-03 3.8769 2007-08-31 3.3876 0 3.3876 3.3876 Completed
294 ARUNACHAL PRADESH Health Rama Krishna Mission Hospital, Itanagar and Repair, renovation and extension of GNM School of Nursing NESIDS-OTRI NLCPR RK Mission 2000-10-16 1.36 2005-07-31 1.224 0 1.224 1.36 Completed
295 ARUNACHAL PRADESH Health Upgradation of medical equipments at R.K Mission Hospital, Itanagar NESIDS-OTRI NLCPR RK Mission 2007-06-29 4.076 2008-06-30 3.6677 0 3.6677 3.6677 Completed
296 ARUNACHAL PRADESH Miscellaneous Construction of an Auditorium at Rajiv Gandhi University, Rono Hills, Papum Pare Distirct NESIDS-OTRI NLCPR Dept. of Power 2011-03-17 9.6343 2018-07-15 8.6709 0 8.6709 8.6709 Ongoing
297 ARUNACHAL PRADESH Miscellaneous Construction of Arunachal Pradesh Civil Secretariat Building at Itanagar NESIDS-OTRI NLCPR PWD 2009-08-31 91.8677 2012-08-31 82.0029 0 82.0029 82.0029 Completed
298 ARUNACHAL PRADESH Miscellaneous Construction of Police Officers Mess and accomodation to the Upper Subordinates and Police Officers in the Capital Complex (Papum Pare District) in Arunachal Pradesh NESIDS-OTRI NLCPR Police Housing 2010-06-14 8.791 2012-06-15 6.9641 0 6.9641 6.9641 Completed
299 ARUNACHAL PRADESH Miscellaneous Construction of State Legislative Assembly Building at Arunachal NESIDS-OTRI NLCPR PWD 2006-05-17 38.9219 2008-11-30 34.065 0 34.065 34.065 Completed
300 ARUNACHAL PRADESH Miscellaneous Infrastructure Development including Guest House at Biological Park/Zoo, Itanagar, Papumpare Dist. NESIDS-OTRI NLCPR Forest 2011-03-15 3.3081 2012-02-29 2.8003 0 2.8003 2.8003 Completed
301 ARUNACHAL PRADESH Miscellaneous Ropeway from Tawang Monestary to Ani Gompa (Tawang District) NESIDS-OTRI NLCPR PWD 2006-05-17 3.3089 2007-11-30 2.8919 0 2.8919 2.8919 Completed
302 ARUNACHAL PRADESH Miscellaneous Tourism infrastructure development at Hotspring at Dong which includes Yatri Nivas at Walong, Hawai and Hayuliang NESIDS-OTRI NLCPR PHED/WS 2007-10-25 4.0003 2010-10-31 3.5578 0 3.5578 3.5578 Completed
303 ARUNACHAL PRADESH Power 132 KV S/C Transmission line from Along to Pasighat NESIDS-OTRI NLCPR POWER 2005-08-03 29.0196 2008-08-01 25.3569 0 25.3569 21.426 Completed
304 ARUNACHAL PRADESH Power C/o 33 KV Express line from Tawang to Lumla with 33/11 KV, 2x1.6 MVA sub station at Lumla NESIDS-OTRI NLCPR POWER 2007-03-26 6.2176 2009-03-31 5.5958 0 5.5958 5.5958 Completed
305 ARUNACHAL PRADESH Power Construction of 11/KV Transmission lines from Hawai to Kibithu NESIDS-OTRI NLCPR POWER 2004-12-21 2.34 2006-12-31 2.0707 0 2.0707 2.1517 Completed
306 ARUNACHAL PRADESH Power Construction of 2x3.15 MVA, 33/11 kV S/S at Seppa i/c distribution transformer and assocaited 11 kV link, East Kameng District NESIDS-OTRI NLCPR POWER 2010-10-11 8.3562 2013-10-31 5.9572 0 5.9572 5.9572 Ongoing
307 ARUNACHAL PRADESH Power Construction of 33 kv Line from Mebo to Dambuk for Evacuation of Central Sector Power, Lower Dibang Valley district NESIDS-OTRI NLCPR POWER 2010-04-06 6.5283 2012-03-31 5.5564 0 5.5564 5.5564 Completed
308 ARUNACHAL PRADESH Power Construction of 33/11 kV 2X5 MVA Power sub-station at Deopani and providing Higher Voltage Distribution system in and around Roing Township under Lower Dibang Valley District NESIDS-OTRI NLCPR POWER 2014-02-20 14.0378 2016-02-28 11.2912 0 11.2912 11.2912 Completed
309 ARUNACHAL PRADESH Power Construction of 33kV S/C transmission line from Kimin to Dollungmukh & Construction of 2x5 MVA. 33/11 kV sub-sttion at Tanio villge in Lower Subansari district in Arunchal Pradesh under NLCPR Scheme NESIDS-OTRI NLCPR POWER 2017-08-14 12 2019-08-31 9.8979 0 9.8979 9.7979 Ongoing
310 ARUNACHAL PRADESH Power Electrification of Tribal villages. NESIDS-OTRI NLCPR POWER 2001-09-26 8.96 2003-10-31 8.064 0 8.064 8.96 Completed
311 ARUNACHAL PRADESH Power Implementation of High Voltage Distribution System in Mahadevpur Namsai and Piyong Circle in Arunachal Pradesh NESIDS-OTRI NLCPR POWER 2013-12-27 10.6638 2015-12-31 8.4485 0 8.4485 8.4485 Completed
312 ARUNACHAL PRADESH Power Kathalguri Deomali Transmission line NESIDS-OTRI NLCPR POWER 2000-06-29 29.45 2005-07-31 26.505 0 26.505 29.45 Completed
313 ARUNACHAL PRADESH Power Renovation, modernization and improvement of T & D system i/c Sub-station of Bhalukpong, Kalaktang & Dirang and their adjacent areas in West Kameng district in Arunachal Pradesh NESIDS-OTRI NLCPR Power 2017-08-30 25 2019-08-31 21.6272 0 21.6272 21.6259 Completed
314 ARUNACHAL PRADESH Power Sub- transmission and Distribution - 2x1 MVA Substation at Sangram NESIDS-OTRI NLCPR POWER 2000-10-16 0.55 2003-10-31 0.45 0 0.45 0.5 Completed
315 ARUNACHAL PRADESH Power Sub- transmission and Distribution - 2x3.15 MVA Substation at Nirjuli NESIDS-OTRI NLCPR POWER 2000-10-16 1.43 2003-10-31 1.287 0 1.287 1.43 Completed
316 ARUNACHAL PRADESH Power Sub- transmission and Distribution - 2x5 KVA Substation at Bomdila NESIDS-OTRI NLCPR POWER 2000-10-16 1.72 2003-10-31 1.548 0 1.548 1.72 Completed
317 ARUNACHAL PRADESH Power Sub- transmission and Distribution - 2x5 MVA Substation at Naharlagun NESIDS-OTRI NLCPR POWER 2000-10-16 1.69 2003-10-31 1.521 0 1.521 1.69 Completed
318 ARUNACHAL PRADESH Power Sub- transmission and Distribution - 2x5 MVA Substation at Old Ziro NESIDS-OTRI NLCPR POWER 2000-10-16 2.64 2003-10-31 2.376 0 2.376 2.64 Completed
319 ARUNACHAL PRADESH Power Sub- transmission and Distribution - 33 KV DC line from Geku-Along-Passighat. NESIDS-OTRI NLCPR POWER 2000-10-16 16.53 2003-10-31 16.5762 0 16.5762 15.802 Completed
320 ARUNACHAL PRADESH Power Sub- transmission and Distribution - 33 KV DC Line from Nirjuli to Itanagar NESIDS-OTRI NLCPR POWER 2000-10-16 2.8703 2008-07-31 2.5686 0 2.5686 2.7986 Completed
321 ARUNACHAL PRADESH Power Sub- transmission and Distribution - 33 KV Express line from Tago to Old Ziro NESIDS-OTRI NLCPR POWER 2000-10-16 0.68 2003-10-31 0.27 0 0.27 0.3 Completed
322 ARUNACHAL PRADESH Power Ziro-Doparijo-Along transmission Line NESIDS-OTRI NLCPR POWER 1999-03-31 53.17 2002-03-31 47.853 0 47.853 52.814 Completed
323 ARUNACHAL PRADESH Roads and Bridges C/o RCC bridge over river Dirang to connect Dirang HQ to Dirang township i/c approach road in Arunachal Pradesh under NLCPR NESIDS-OTRI NLCPR PWD 2017-08-14 18.6926 2019-08-31 16.695 0 16.695 16.695 Completed
324 ARUNACHAL PRADESH Roads and Bridges C/o road from BRO road (4 KM point) on Anini Dambuine road to Etabe (12 KM) NESIDS-OTRI NLCPR PWD 2009-03-28 22.1396 2012-03-30 15.6215 0 15.6215 15.6214 Ongoing
325 ARUNACHAL PRADESH Roads and Bridges C/o road from Dumporijo to Hali (45 Km) NESIDS-OTRI NLCPR PWD 2008-03-27 31.7636 2012-03-30 28.0267 0 28.0267 28.0267 Completed
326 ARUNACHAL PRADESH Roads and Bridges C/o road from Jop to Silsango in Lower Subansiri District (30 Km) NESIDS-OTRI NLCPR PWD 2007-06-28 34.4952 2010-03-31 30.1101 0 30.1101 30.11 Completed
327 ARUNACHAL PRADESH Roads and Bridges C/o road from Nafra to Nakhu and Nachiban in West Kameng District (11 Km) NESIDS-OTRI NLCPR PWD 2007-03-26 7.5401 2009-03-31 6.7861 0 6.7861 6.7864 Completed
328 ARUNACHAL PRADESH Roads and Bridges C/o road from Nakhu to Sanchipan under Nafra circle, west Kameng district under NLCPR NESIDS-OTRI NLCPR Dept. of Power 2017-08-23 22.2179 2019-08-31 19.9871 0 19.9871 19.4121 Ongoing
329 ARUNACHAL PRADESH Roads and Bridges C/o road from Nyorak to Rime Moku village in West Siang District (20 Km, Ph-I 9.20 km) NESIDS-OTRI NLCPR PWD 2007-06-28 9.8975 2010-03-31 8.9078 0 8.9078 8.9078 Completed
330 ARUNACHAL PRADESH Roads and Bridges C/o road from Parsi Parlo to Pipsorang Circle HQ in Kra Daadi district in Arunachal pradesh under NLCPR NESIDS-OTRI NLCPR PWD 2017-08-21 16.8486 2019-08-31 14.4933 0 14.4933 5.8242 Ongoing
331 ARUNACHAL PRADESH Roads and Bridges C/o road from Sille to Yagrung in East Siang district. (10KM) NESIDS-OTRI NLCPR RWD 2007-11-16 5.0094 2010-11-30 4.4201 0 4.4201 4.4201 Completed
332 ARUNACHAL PRADESH Roads and Bridges Constrcution of Road from Pugging to Palling NESIDS-OTRI NLCPR PWD 2010-02-15 15.3019 2013-01-31 13.5017 0 13.5017 13.5017 Completed
333 ARUNACHAL PRADESH Roads and Bridges Construction of 6 nos. bridges to provide connectivity to Admn. CO HQ, Palling with District HQ in Upper Siang District in Arunachal Pradesh NESIDS-OTRI NLCPR Public works Department 2016-05-05 32.4916 2019-04-30 29.241 0 29.241 17.6964 Ongoing
334 ARUNACHAL PRADESH Roads and Bridges Construction of Bailey /RCC bridge over river Buche and Bah of Litemore-Taramori road, West Siang District NESIDS-OTRI NLCPR PWD 2010-10-11 3 2013-10-31 2.7 0 2.7 2.7 Completed
335 ARUNACHAL PRADESH Roads and Bridges Construction of bridge over Siyom on Kaying to Paksing road (Span 122.00 mtr.) NESIDS-OTRI NLCPR PWD 2006-12-06 7.6382 2009-12-31 6.6741 0 6.6741 6.6741 Completed
336 ARUNACHAL PRADESH Roads and Bridges Construction of Gacham Morshing Road (24.50 Km) NESIDS-OTRI NLCPR PWD 2008-09-15 19.6249 2011-08-31 17.3161 0 17.3161 17.3161 Completed
337 ARUNACHAL PRADESH Roads and Bridges Construction of Internal/Sectoral Township road at Tani Happa (New Sagalee) (SH: Survey, Investigation, Jungle Clearance, Formation cutting, Pavement, CD Work, CC Drain & Protection Work NESIDS-OTRI NLCPR PWD 2014-12-29 12.1441 2017-12-31 9.9363 0 9.9363 7.952 Completed
338 ARUNACHAL PRADESH Roads and Bridges Construction of link road from Lhou Nallah to Mukto Circle HQ. via Mirba, Gomkelling and Serjong (15 Km) in Tawang District NESIDS-OTRI NLCPR PWD 2005-12-27 18.0297 2008-12-31 15.7541 0 15.7541 15.7541 Completed
339 ARUNACHAL PRADESH Roads and Bridges Construction of Motorable Bridge over Siyom River to connect left bank at Paya (span 120m) in West Siang District NESIDS-OTRI NLCPR PWD 2011-09-19 9.6853 2014-08-31 8.5459 0 8.5459 8.5459 Ongoing
340 ARUNACHAL PRADESH Roads and Bridges Construction of Motorable Steel Arch Bridge over river Yamne at Reglat under Mariyang Division span 90 Mtr. NESIDS-OTRI NLCPR PWD 2010-02-05 6.3439 2012-12-31 2.2838 0 2.2838 2.2838 Foreclosed
341 ARUNACHAL PRADESH Roads and Bridges Construction of Motorable Suspension Bridge over River Lohit to connect Manchal Administrative Circle (Span 156.55 m) NESIDS-OTRI NLCPR PWD 2005-12-27 13.0979 2008-12-31 11.4448 0 11.4448 11.4448 Completed
342 ARUNACHAL PRADESH Roads and Bridges Construction of Motorable Suspension Bridge over river Siang at the site of Gandhi Bridge NESIDS-OTRI NLCPR PWD 2006-03-27 48.43 2009-04-30 42.372 0 42.372 42.372 Completed
343 ARUNACHAL PRADESH Roads and Bridges Construction of Motorable Suspension Bridge over river Siang between BRTF road & Komsing village (Span 225 m) at Sangam point in East Siang District NESIDS-OTRI NLCPR PWD 2007-09-26 18.3441 2010-03-31 16.5097 0 16.5097 16.5097 Completed
344 ARUNACHAL PRADESH Roads and Bridges Construction of Namsang - Khela Road (45.30) NESIDS-OTRI NLCPR PWD 2009-12-29 4.9474 2010-12-31 4.3654 0 4.3654 4.3654 Completed
345 ARUNACHAL PRADESH Roads and Bridges Construction of Nyodu Sibe Siru Road (23km) in West Siang District NESIDS-OTRI NLCPR PWD 2014-06-27 19.4998 2017-07-31 17.3741 0 17.3741 13.8993 Ongoing
346 ARUNACHAL PRADESH Roads and Bridges Construction of porter Track from Nuranang to Mago NESIDS-OTRI NLCPR PWD 2004-01-15 2.59 2006-01-31 2.295 0 2.295 2.5523 Completed
347 ARUNACHAL PRADESH Roads and Bridges Construction of PSC Girder RCC Bridge over Poklek River and Tolon River at Pasighat - Ledum - Tene - Koyu Road in East Siang District NESIDS-OTRI NLCPR PWD 2014-02-28 18.0353 2017-02-28 15.907 0 15.907 12.7256 Ongoing
348 ARUNACHAL PRADESH Roads and Bridges Construction of RCC Bridge over river Kamphai under Wakro Circle (Span 80 mtr) NESIDS-OTRI NLCPR PWD 2010-12-23 6.081 2013-11-30 5.3656 0 5.3656 5.3656 Completed
349 ARUNACHAL PRADESH Roads and Bridges Construction of road from 10 km point of Likabali-Aalo BRTF road to connect Kane village via Magi (7.5 km) NESIDS-OTRI NLCPR PWD 2011-02-28 18.2332 2014-01-31 12.8705 0 12.8705 12.2032 Ongoing
350 ARUNACHAL PRADESH Roads and Bridges Construction of road from 168km point of Roing-Anini BRTF road to Echigo village (12km) in Dibang Valley District NESIDS-OTRI NLCPR PWD 2013-09-17 18.6121 2016-08-31 15.7601 0 15.7601 14.0597 Foreclosed
351 ARUNACHAL PRADESH Roads and Bridges Construction of road from 80 KM point on Kimin - Ziro BRTF road to Krishi Vigyan Kendra at Yachuli (5.50 KM) (Lower Subansiri) NESIDS-OTRI NLCPR PWD 2010-01-11 7.6905 2013-01-31 5.5302 0 5.5302 5.5302 Foreclosed
352 ARUNACHAL PRADESH Roads and Bridges Construction of road from Bameng to Lada (40 Km) NESIDS-OTRI NLCPR PWD 2005-12-27 8.9019 2007-12-31 7.7783 0 7.7783 7.7783 Completed
353 ARUNACHAL PRADESH Roads and Bridges Construction of road from BRTF road (32km) to Heya Mara via Poda Mara Merring Mara under Taliha Circle (Phase-I) - 15km upto WBM level Upper Subansari District NESIDS-OTRI NLCPR PWD 2013-03-25 15.4236 2016-08-31 10.2039 0 10.2039 10.2039 Ongoing
354 ARUNACHAL PRADESH Roads and Bridges CONSTRUCTION OF ROAD FROM BRTF ROAD TO ESSI YASE VILLAGE UNDER TIRBIN IN WEST SIANG DISTRICT NESIDS-OTRI NLCPR PWD 2017-06-27 17.0511 2019-06-27 15.2622 0 15.2622 6.1049 Ongoing
355 ARUNACHAL PRADESH Roads and Bridges Construction of road from BTK to Nam-Tsering connecting Zemithang to Dudanghar Administration Circle (11km) Tawang District NESIDS-OTRI NLCPR Dept. of Power 2013-09-17 13.1318 2016-08-31 11.5995 0 11.5995 11.5995 Ongoing
356 ARUNACHAL PRADESH Roads and Bridges Construction of road from Chambang to Phaa (30 km), Phase 1 NESIDS-OTRI NLCPR PWD 2010-12-23 11.7922 2013-11-30 4.2446 0 4.2446 4.2446 Foreclosed
357 ARUNACHAL PRADESH Roads and Bridges Construction of Road from Changlang to Khimiyang (36.10 Km) NESIDS-OTRI NLCPR PWD 2008-09-15 8.587 2011-08-31 7.5767 0 7.5767 7.5767 Completed
358 ARUNACHAL PRADESH Roads and Bridges Construction of road from Darak to Belo to Yomcha NESIDS-OTRI NLCPR PWD 2010-11-25 9.8081 2013-10-31 7.3198 0 7.3198 7.3198 Completed
359 ARUNACHAL PRADESH Roads and Bridges Construction of road from Digi to Panimuri via Sinyumrijo NESIDS-OTRI NLCPR PWD 2011-06-24 3.6924 2014-06-30 2.7951 0 2.7951 2.7951 Completed
360 ARUNACHAL PRADESH Roads and Bridges Construction of road from Dipulamgu bridge point to Pipu (14 Km) NESIDS-OTRI NLCPR PWD 2005-12-27 4.172 2007-12-31 3.6454 0 3.6454 3.6473 Completed
361 ARUNACHAL PRADESH Roads and Bridges CONSTRUCTION OF ROAD FROM GEKU TO MARIYANG IN UPPER SIANG DISTRICT NESIDS-OTRI NLCPR PWD 2017-06-27 19 2019-06-27 8.496 0 8.496 6.7968 Ongoing
362 ARUNACHAL PRADESH Roads and Bridges Construction of road from Itanagar to Seijosa (86 km) Phase 1: Road from Kampa to Tapiaso (30 km) NESIDS-OTRI NLCPR Dept. of Power 2010-11-25 43.1687 2013-10-31 30.4721 0 30.4721 30.4721 Ongoing
363 ARUNACHAL PRADESH Roads and Bridges Construction of road from J.N. College Pasighat to Balek, East Siang District NESIDS-OTRI NLCPR PWD 2010-06-02 5.0026 2013-01-31 1.7249 0 1.7249 1.7249 Foreclosed
364 ARUNACHAL PRADESH Roads and Bridges Construction of road from Janam to Okhasun under Wakka Circle Hq. (19 km) phase 1 NESIDS-OTRI NLCPR PWD 2010-12-23 10.8587 2013-11-30 9.5812 0 9.5812 9.5812 Completed
365 ARUNACHAL PRADESH Roads and Bridges Construction of road from Jengging to Ramsing in Upper Siang District (35 Km) NESIDS-OTRI NLCPR PWD 2006-09-25 5.3662 2009-09-30 4.8296 0 4.8296 4.8296 Completed
366 ARUNACHAL PRADESH Roads and Bridges Construction of road from Kanubari to Bogapani via Ranglua & Lawnu CO HQ (41km) (Phase-I) in Longding District NESIDS-OTRI NLCPR PWD 2014-02-20 20.69 2017-02-28 18.5712 0 18.5712 18.5712 Completed
367 ARUNACHAL PRADESH Roads and Bridges Construction of road from Kapu Ozakho (13.5km length complete upto Blacktopping level including culverts bridges etc) in Tirap District NESIDS-OTRI NLCPR Dept. of Power 2014-02-25 14.5691 2017-02-28 12.1407 0 12.1407 12.1407 Ongoing
368 ARUNACHAL PRADESH Roads and Bridges Construction of Road from Kaying-Gaseng Gate Road in West Siang District 70 km ( Part A of Phase-I) NESIDS-OTRI NLCPR PWD 2012-12-26 17.6283 2015-12-26 15.4742 0 15.4742 15.4742 Completed
369 ARUNACHAL PRADESH Roads and Bridges Construction of road from Kheti to Dadam (21 KM) NESIDS-OTRI NLCPR RWD 2009-03-30 10.8708 2011-03-31 9.5918 0 9.5918 9.5918 Completed
370 ARUNACHAL PRADESH Roads and Bridges Construction of road from Loffa to Pakoti village (8 km) NESIDS-OTRI NLCPR Dept. of Power 2010-06-14 6.7633 2013-06-15 4.774 0 4.774 4.774 Ongoing
371 ARUNACHAL PRADESH Roads and Bridges Construction of road from Lumba to Rayung via Gallang, Joru and Rissi villages (20 km), Phase 1 NESIDS-OTRI NLCPR PWD 2010-12-03 21.6004 2013-10-31 15.5386 0 15.5386 15.5386 Foreclosed
372 ARUNACHAL PRADESH Roads and Bridges Construction of road from Magopam to Bichom via Namfri, Ditching, Sacheda, Ramu-Sutu and Uchini (Phase-II) in West Kameng District NESIDS-OTRI NLCPR Dept. of Power 2011-12-28 20.5243 2014-12-31 14.7152 0 14.7152 14.7152 Ongoing
373 ARUNACHAL PRADESH Roads and Bridges Construction of road from Mahadevpur Town to Krishnapur Village Lekang Circle in Lohit District (4.5km) NESIDS-OTRI NLCPR PWD 2011-06-27 5.993 2013-06-30 5.1283 0 5.1283 5.1283 Completed
374 ARUNACHAL PRADESH Roads and Bridges Construction of Road from Murga Bridge point to Rho village Phase-I NESIDS-OTRI NLCPR PWD 2012-12-11 17.955 2015-12-11 15.393 0 15.393 15.393 Completed
375 ARUNACHAL PRADESH Roads and Bridges Construction of road from Neelam to Pistana (Phase-I) (5km length complete upto blacktopping level including culverts bridges etc.) in Lower Subansari District NESIDS-OTRI NLCPR PWD 2014-02-28 4.6978 2016-02-28 4.228 0 4.228 3.3824 Ongoing
376 ARUNACHAL PRADESH Roads and Bridges Construction of Road from New Mohong to Mahadevpur Township via Nongkhon (12 Km) NESIDS-OTRI NLCPR PWD 2008-09-15 3.554 2011-08-31 3.1359 0 3.1359 3.1359 Completed
377 ARUNACHAL PRADESH Roads and Bridges Construction of Road from NH 52 -A- to Pappu Hill Settlement (2 Km) NESIDS-OTRI NLCPR PWD 2007-06-28 3.9899 2008-06-30 3.3821 0 3.3821 3.3821 Completed
378 ARUNACHAL PRADESH Roads and Bridges Construction of road from NH-153 Longbi village point to Tengman village via Khetwa and Jotin Juda (35.00 km) NESIDS-OTRI NLCPR PWD 2011-02-28 21.336 2014-01-31 17.5636 0 17.5636 17.5636 Completed
379 ARUNACHAL PRADESH Roads and Bridges Construction of road from Pachi to Rigom via Fachang, Tabri Lochung and Bokar (33 km) NESIDS-OTRI NLCPR Dept. of Power 2010-12-24 14.1682 2013-11-30 5.0999 0 5.0999 5.0999 Ongoing
380 ARUNACHAL PRADESH Roads and Bridges Construction of road from Pakke to Wai (18.00 Km) NESIDS-OTRI NLCPR PWD 2006-02-17 13.3541 2009-02-27 11.6686 0 11.6686 11.6686 Completed
381 ARUNACHAL PRADESH Roads and Bridges Construction of road from Pakoti to Kamsha Village (6.50km) NESIDS-OTRI NLCPR PWD 2014-06-27 9.5081 2016-07-31 7.7015 0 7.7015 7.7015 Completed
382 ARUNACHAL PRADESH Roads and Bridges Construction of road from Parsi-Parlo (Patuk ADC HQ) (Phase-I 5km length complete upto blacktopping level including culverts bridges etc. NESIDS-OTRI NLCPR Dept. of Power 2014-06-27 5.0052 2017-07-31 4.41 0 4.41 4.41 Ongoing
383 ARUNACHAL PRADESH Roads and Bridges Construction of Road from Pilla to Sakiang (15 KM) upto WB M level in Arunachal Pradesh NESIDS-OTRI NLCPR PWD 2013-12-06 18.4 2016-11-30 14.5992 0 14.5992 14.5992 Completed
384 ARUNACHAL PRADESH Roads and Bridges Construction of road from PMGSY Bongleng road to Khet Village in Tawang District in Arunachal Pradesh NESIDS-OTRI NLCPR Public works Department 2015-09-28 14.2078 2017-09-30 12.2965 0 12.2965 12.2965 Completed
385 ARUNACHAL PRADESH Roads and Bridges Construction of Road from PWD road from Kamhua Noknu Village (Pongchau Circle) to Nginu - BRTF Road point (Wakka Circle) in Tirap District NESIDS-OTRI NLCPR PWD 2010-02-12 13.5318 2013-01-31 11.8808 0 11.8808 11.8808 Completed
386 ARUNACHAL PRADESH Roads and Bridges Construction of road from Rani to Oiramghat (Assam) via Sika Tode-Sika Bamin Village - Jampani and Anchalghat Camp road (25km) in East Siang District NESIDS-OTRI NLCPR PWD 2011-09-19 33.2547 2014-08-31 24.7153 0 24.7153 24.7153 Completed
387 ARUNACHAL PRADESH Roads and Bridges Construction of Road from Rayung to Rungte Rite via Deby Tudbath Patey Phalap and Gang (30km) Phase-I (0.00 to 10.00km) NESIDS-OTRI NLCPR PWD 2013-12-27 12.4447 2016-12-31 8.2072 0 8.2072 6.8169 Foreclosed
388 ARUNACHAL PRADESH Roads and Bridges Construction of road from Sangram to Parsi-Parlo (15km) upto WBM level in Kurung Kumey District NESIDS-OTRI NLCPR PWD 2013-09-17 19.1508 2016-08-31 16.8222 0 16.8222 16.8222 Completed
389 ARUNACHAL PRADESH Roads and Bridges Construction of road from Sangram to Phassang-Pallang via Nyapin (SDO HQ) Phase-I NESIDS-OTRI NLCPR PWD 2008-12-24 8.8172 2009-12-31 7.7799 0 7.7799 7.7799 Completed
390 ARUNACHAL PRADESH Roads and Bridges Construction of Road from Sumhak to Shalom via Upper Chintan (14km) upto WBM level NESIDS-OTRI NLCPR Dept. of Power 2014-02-20 18.4 2017-02-28 16.5263 0 16.5263 16.2855 Ongoing
391 ARUNACHAL PRADESH Roads and Bridges Construction of road from Yembung-Yemsing road to Tarak village (Phase-I) in East Siang District NESIDS-OTRI NLCPR PWD 2013-09-17 28.183 2016-08-31 25.3467 0 25.3467 25.3467 Completed
392 ARUNACHAL PRADESH Roads and Bridges Construction of Road from Yemsing to Mirem (15km) upto WBM level in East Siang District of Arunachal Pradesh NESIDS-OTRI NLCPR PWD 2013-09-23 18.3112 2016-08-31 15.656 0 15.656 15.656 Completed
393 ARUNACHAL PRADESH Roads and Bridges Construction of Satnaguri to Longding road via Kanubari, Banfera, Wanu and Zedua (Phase-I) (15.50 Km) NESIDS-OTRI NLCPR PWD 2008-03-26 5.6575 2010-03-31 4.9919 0 4.9919 4.9919 Completed
394 ARUNACHAL PRADESH Roads and Bridges Construction of Single lane bailey bridge (span 40 mtr) over Tasing river in between Borguli village and Seram in East Siang district NESIDS-OTRI NLCPR PWD 2009-03-28 3.4037 2011-03-31 2.2956 0 2.2956 2.2956 Completed
395 ARUNACHAL PRADESH Roads and Bridges Construction of Steel Bridge over river Wome at Pakke point NESIDS-OTRI NLCPR PWD 2010-11-25 2.3748 2012-10-31 1.7004 0 1.7004 1.7004 Completed
396 ARUNACHAL PRADESH Roads and Bridges Construction of Steel Suspension Bridge over Siang River and approach roads at Kodak near Tuting NESIDS-OTRI NLCPR Dept. of Power 2005-12-27 38.94 2008-12-31 34.3572 0 34.3572 33.54 Ongoing
397 ARUNACHAL PRADESH Roads and Bridges Construction of Steel Suspension Bridge over Subansiri river near Siyum (Span 174.00 Mtr) NESIDS-OTRI NLCPR PWD 2006-02-17 13.08 2009-02-27 11.5813 0 11.5813 11.5813 Completed
398 ARUNACHAL PRADESH Roads and Bridges Construction of Tamen-Tali Road From 49.00 km to 60 km (Phase-II) in Kurung Kumey District in A.P. NESIDS-OTRI NLCPR Dept. of Power 2012-11-07 14.4124 2015-11-07 10.377 0 10.377 10.377 Ongoing
399 ARUNACHAL PRADESH Roads and Bridges Construction of Tamen-Tali road via Yirkoum (60 KM) Phase-I 0-49 Km NESIDS-OTRI NLCPR PWD 2008-12-24 8.9811 2011-12-30 7.9245 0 7.9245 7.9245 Completed
400 ARUNACHAL PRADESH Roads and Bridges Construction of Wak Liromaba Road (78km) - Phase-II: 0-26Km in West siang District NESIDS-OTRI NLCPR PWD 2012-12-20 22.8018 2015-12-20 20.1164 0 20.1164 20.1164 Completed
401 ARUNACHAL PRADESH Roads and Bridges Construction of Wak Liromoba Road (78 Km) Phase I (15 Km) NESIDS-OTRI NLCPR PWD 2008-09-15 6.6004 2011-08-31 5.8239 0 5.8239 5.8239 Completed
402 ARUNACHAL PRADESH Roads and Bridges Constuction of Foot overbridge at various locations of State Capital at Itanagar Naharlagun and Nirjuli NESIDS-OTRI NLCPR Dept. of Power 2013-12-27 9.0992 2015-12-31 6.103 0 6.103 6.103 Ongoing
403 ARUNACHAL PRADESH Education Improvement & Extension of Dosing, Pareng, Sine, Yibuk, Liging road. (Phase-I) NESIDS-OTRI NLCPR PWD 2009-03-30 18.2608 2012-03-30 12.3151 0 12.3151 12.3151 Foreclosed
404 ARUNACHAL PRADESH Roads and Bridges Improvement and realignment of Porter Track from Jhang to Sulungthi (95 KMs) NESIDS-OTRI NLCPR PWD 2002-10-28 2.55 2004-10-29 2.295 0 2.295 2.55 Completed
405 ARUNACHAL PRADESH Roads and Bridges Improvement and Upgradation of Internal Road at Daporijo township in Upper Subansari District NESIDS-OTRI NLCPR PWD 2011-12-19 5.3469 2014-12-31 4.7179 0 4.7179 4.7179 Completed
406 ARUNACHAL PRADESH Roads and Bridges Improvement of Doimukh Toru Road 40 Km. (from NH-52A) Nirjuli to Sagalee NESIDS-OTRI NLCPR PWD 2005-12-27 21.869 2008-12-31 19.1452 0 19.1452 19.1452 Completed
407 ARUNACHAL PRADESH Roads and Bridges Improvement of Janagthung-Cherrong-Panchvati-Chhanda road, West Kameng District NESIDS-OTRI NLCPR PWD 2011-02-28 25.1017 2014-01-31 22.1486 0 22.1486 22.1486 Completed
408 ARUNACHAL PRADESH Roads and Bridges Improvement of Palizi Thrizino Road (17.00 Km) NESIDS-OTRI NLCPR PWD 2006-02-17 7.439 2009-02-27 6.6951 0 6.6951 6.6951 Completed
409 ARUNACHAL PRADESH Roads and Bridges Improvement of Porter Track from Tungri to Mago (70 Km) NESIDS-OTRI NLCPR PWD 2005-12-27 3.1056 2007-12-31 2.7136 0 2.7136 2.7136 Completed
410 ARUNACHAL PRADESH Roads and Bridges Improvement of Tawang Township road Network in Arunachal Pradesh NESIDS-OTRI NLCPR PWD 2010-02-15 4.8964 2013-01-31 4.3204 0 4.3204 4.3204 Completed
411 ARUNACHAL PRADESH Roads and Bridges Improvement/ Construction of Road from Sagalee to Sakiang (50 Km) NESIDS-OTRI NLCPR PWD 2006-02-17 42.887 2009-02-27 37.5514 0 37.5514 37.5514 Completed
412 ARUNACHAL PRADESH Roads and Bridges Improvement/ Upgradation of Menga-Giba Road (8 Km) NESIDS-OTRI NLCPR PWD 2006-03-27 3.5667 2009-04-30 3.21 0 3.21 3.21 Completed
413 ARUNACHAL PRADESH Roads and Bridges Infrastructure Development of ADC HQ at Kodokha (C/o 10km road upto blacktopping level i/c culverts bridges) in Upper Subansari Distric NESIDS-OTRI NLCPR PWD 2013-09-17 9.4234 2016-08-31 3.3924 0 3.3924 3.3924 Foreclosed
414 ARUNACHAL PRADESH Roads and Bridges Inter-District road connection for Chayangtajo of East Kameng District to Passang Co Circle of Kurung Kumey District, Pahse-I NESIDS-OTRI NLCPR Dept. of Power 2012-12-12 21.4061 2015-12-12 15.4124 0 15.4124 15.4124 Ongoing
415 ARUNACHAL PRADESH Roads and Bridges Maintenance of Foot track and Sustension Bridges NESIDS-OTRI NLCPR 2000-03-22 1 2001-03-31 0.9 0 0.9 1 Completed
416 ARUNACHAL PRADESH Roads and Bridges Restoration and upgradation of 32 KM internal road at Ziro Township NESIDS-OTRI NLCPR PWD 2009-03-28 13.9997 2012-02-29 12.3526 0 12.3526 12.3526 Completed
417 ARUNACHAL PRADESH Roads and Bridges Road from Magopam to Bichom via Namfri (50 KM) via Ditching, Sacheda, Ramu-Sotu and Lichini under Singchung sub-division. NESIDS-OTRI NLCPR PWD 2009-07-31 15.6717 2012-07-31 13.8279 0 13.8279 13.8279 Completed
418 ARUNACHAL PRADESH Roads and Bridges Strengthening & Improvement of Changlang to Khimyang Road Phase-II 0.00 to 14.50km in Changlang District NESIDS-OTRI NLCPR PWD 2013-10-23 6.934 2016-09-30 6.0602 0 6.0602 6.0602 Completed
419 ARUNACHAL PRADESH Roads and Bridges Upgradation of Namchik-Miao-MPen Road (37 km) NESIDS-OTRI NLCPR PWD 2011-09-19 20.7984 2014-08-31 17.3262 0 17.3262 17.3262 Completed
420 ARUNACHAL PRADESH Roads and Bridges Upgradation of road from Subansari bridge point to Segi CO(HQ) NESIDS-OTRI NLCPR PWD 2011-06-24 19.8205 2014-06-30 17.4887 0 17.4887 17.4887 Completed
421 ARUNACHAL PRADESH Sports Construction of High Altitude Sports Complex at Tawang NESIDS-OTRI NLCPR Dept. of Power 2010-10-11 13.066 2013-03-31 11.5288 0 11.5288 11.5284 Ongoing
422 ARUNACHAL PRADESH Sports Construction of Indoor Multi Sports Complex at Namsai in Lohit district NESIDS-OTRI NLCPR PWD 2014-12-29 3.1298 2016-12-31 2.7637 0 2.7637 2.7637 Completed
423 ARUNACHAL PRADESH Sports Construction of Sports Complex at Jengging in Upper Siang District NESIDS-OTRI NLCPR PWD 2014-02-20 12.7329 2015-08-31 11.3994 0 11.3994 9.1243 Completed
424 ARUNACHAL PRADESH Water Supply Augmentation of water supply at Khonsa township in Tirap District NESIDS-OTRI NLCPR PHED/WS 2012-03-23 19.8341 2015-03-31 17.4906 0 17.4906 17.4906 Completed
425 ARUNACHAL PRADESH Water Supply AUGMENTATION OF WATER SUPPLY AT PASIGHAT TOWNSHIP FROM SIRPO SOURCE PHASE-1 IN EAST SIANG DISTRICT NESIDS-OTRI NLCPR Dept. of Power 2017-06-27 19.5658 2019-06-27 17.5512 0 17.5512 17.5114 Ongoing
426 ARUNACHAL PRADESH Water Supply Augmentation of water supply under Boleng PHE Sub-Division East Siang District NESIDS-OTRI NLCPR PHED/WS 2013-11-06 7.5139 2016-10-31 2.704 0 2.704 2.704 Ongoing
427 ARUNACHAL PRADESH Water Supply Augmentation/Providing Water Supply connection to newly created C.O. HQ at Parang Valley, Papumpare Dist. NESIDS-OTRI NLCPR PHED/WS 2011-03-15 4.9294 2013-02-28 4.3494 0 4.3494 4.3494 Completed
428 ARUNACHAL PRADESH Water Supply Doparijo Water Supply Scheme NESIDS-OTRI NLCPR PHED/WS 2003-03-21 3.97 2005-03-31 3.3001 0 3.3001 3.6668 Completed
429 ARUNACHAL PRADESH Water Supply Improvement and augmentation of water supply at Yachuli (0.6 MLD), Lower Subansari District NESIDS-OTRI NLCPR PHED/WS 2011-05-19 13.19 2014-05-31 11.6383 0 11.6383 11.6383 Completed
430 ARUNACHAL PRADESH Water Supply Itanagar Water Supply project NESIDS-OTRI NLCPR PHED/WS 1999-03-31 10.59 2004-03-31 9.531 0 9.531 10.59 Completed
431 ARUNACHAL PRADESH Water Supply Naharlagun Water Supply Scheme NESIDS-OTRI NLCPR PHED/WS 2003-02-18 11.73 2005-02-28 10.0544 0 10.0544 11.0404 Completed
432 ARUNACHAL PRADESH Water Supply Potable drinking water supply scheme for the villages of Sille, Rani, Sikabamin, Sika Tode, Oyan at Sile NESIDS-OTRI NLCPR PHED/WS 2006-12-06 17.4242 2009-12-31 15.2251 0 15.2251 15.2251 Completed
433 ARUNACHAL PRADESH Water Supply Providing drinking water supply for Tezu township NESIDS-OTRI NLCPR PHED/WS 2010-10-11 23.4279 2013-10-31 20.6717 0 20.6717 20.6716 Completed
434 ARUNACHAL PRADESH Water Supply Providing drinking water supply to Jang township and its peripheral rural villages NESIDS-OTRI NLCPR PHED/WS 2010-12-14 5.6514 2013-11-30 4.9866 0 4.9866 4.9866 Completed
435 ARUNACHAL PRADESH Water Supply Providing potable drinking water supply to Mebo Sub-divisional Hq and adjoining villages, East Siang district in Arunachal Pradesh NESIDS-OTRI NLCPR PHED/WS 2010-03-22 20.5339 2013-03-15 18.1181 0 18.1181 18.1181 Completed
436 ARUNACHAL PRADESH Water Supply Providing water supply at Bameng administrative HQ (Phase-I) in East Kameng district in Arunachal pradesh under NLCPR NESIDS-OTRI NLCPR Dept. of Power 2017-12-14 13.4994 2020-12-14 12.0523 0 12.0523 7.3323 Ongoing
437 ARUNACHAL PRADESH Water Supply Providing Water Supply at Lumla Township in Tawang District NESIDS-OTRI NLCPR PHED/WS 2006-05-23 4.8825 2009-05-31 4.2662 0 4.2662 4.2662 Completed
438 ARUNACHAL PRADESH Water Supply Providing water supply at Yupia District Administrative Headquarter, Papum Pare District NESIDS-OTRI NLCPR PHED/WS 2011-05-19 6.118 2014-05-31 5.3981 0 5.3981 5.3981 Completed
439 ARUNACHAL PRADESH Water Supply Providing Water Supply to Yingkiong for 2.00 MLD (Phase-I) NESIDS-OTRI NLCPR PHED/WS 2014-12-29 7.3913 2017-12-31 6.3268 0 6.3268 6.3268 Completed
440 ARUNACHAL PRADESH Water Supply Providing water supply-cum-irrigation to Jangloom Area NESIDS-OTRI NLCPR Dept. of Power 2010-09-23 4.9152 2013-09-30 4.1129 0 4.1129 4.1129 Ongoing
441 ARUNACHAL PRADESH Water Supply Providing/ Augmenta-tion of Water Supply facilities to all the administrative HQs. and its villages under 14-Doimukh Assembly Constituency NESIDS-OTRI NLCPR PHED/WS 2007-10-01 12.7722 2009-09-30 10 0 10 10 Completed
442 ARUNACHAL PRADESH Water Supply Restoration of Water Supply Facilities at Tezu. NESIDS-OTRI NLCPR PHED/WS 2000-07-17 2 2002-07-31 1.8 0 1.8 2 Completed
443 ARUNACHAL PRADESH Water Supply Water Supply at Chayangtajo Township, East Kameng Dist. NESIDS-OTRI NLCPR PHED/WS 2011-03-15 14.8525 2014-02-28 13.3672 0 13.3672 13.3672 Completed
444 ARUNACHAL PRADESH Water Supply Water Supply at Tali in Arunachal Pradesh NESIDS-OTRI NLCPR Dept. of Power 2014-12-29 5.5399 2017-12-31 4.9859 0 4.9859 1.9943 Ongoing
445 ARUNACHAL PRADESH Water Supply Water supply project at Bomdila Township NESIDS-OTRI NLCPR PHED/WS 2004-10-20 17.0923 2007-10-31 14.935 0 14.935 15.4346 Completed
446 ARUNACHAL PRADESH Water Supply Water Supply Scheme for Sagalee Township (0.90 MLD) Papum Pare District in Arunachal Pradesh NESIDS-OTRI NLCPR PHED/WS 2013-06-04 10.5604 2016-05-31 9.5044 0 9.5044 9.5044 Completed
447 ARUNACHAL PRADESH Water Supply Water Supply schemes at Along NESIDS-OTRI NLCPR PHED/WS 2000-07-17 3.37 2002-07-31 2.7186 0 2.7186 3.0207 Completed
448 ARUNACHAL PRADESH Water Supply Water Supply schemes at Pasighat. NESIDS-OTRI NLCPR PHED/WS 2001-08-16 5.05 2003-08-31 4.365 0 4.365 4.8499 Completed
449 ARUNACHAL PRADESH Water Supply Water Supply schemes at Roing. NESIDS-OTRI NLCPR PHED/WS 2001-08-16 4.05 2003-08-31 3.4462 0 3.4462 3.8291 Completed
450 ARUNACHAL PRADESH Health Establishment of State Cancer Institute at Itanagar, Arunachal Pradesh PM-DevINE Dept. of Health & familly 2024-06-13 217.19 2026-12-31 53.3619 53.3619 106.7238 Ongoing
451 ARUNACHAL PRADESH Tourism and Culture Development of Signature View Point at Ziro on Potin-Pangin Road, Arunachal Pradesh Schemes of NEC Public Work Department, G 2024-06-21 3.32 2027-06-21 0.83 2.158 2.988 1.66 Ongoing
452 ARUNACHAL PRADESH Tourism and Culture Development of Tissa View Point near Tissa Camp, Tirap District, Arunachal Pradesh Schemes of NEC Public Work Department, G 2024-06-24 1.81 2027-06-24 0.45 1.3575 1.8075 1.2525 Ongoing
453 ARUNACHAL PRADESH Tourism and Culture Development of Pasighat-Yingkiong Road View point on NH513, Arunachal pradesh Schemes of NEC Public Work Department, G 2024-06-24 1.89 2027-06-24 0.4725 1.4175 1.89 0.4725 Ongoing
454 ARUNACHAL PRADESH Tourism and Culture Construction of Tourism Complex at Sapparijo (Kicho) under Raga, Kamle District, Arunachal Pradesh Schemes of NEC Water Resources Departmen 2024-08-29 4.97 2027-08-29 1.24 2.4839 3.7239 3.72195 Ongoing
455 ARUNACHAL PRADESH Science and Technology Infrastructure Development of Projects for Deprived Community namely Meyors of Anjaw District, Arunachal Pradesh Schemes of NEC Public Work Department, G 2024-08-27 4.78 2027-08-27 1.06 2.5231 3.5831 2.5231 Ongoing
456 ARUNACHAL PRADESH Water Supply Augmentation of Water Supply System at tezu Township (Phase II) in Lohit District NESIDS-OTRI Public Health & Engg Depa 2024-07-16 43.45 2026-07-16 10.7749 10.7749 21.5498 Ongoing
457 ARUNACHAL PRADESH Water Supply Intergrated Smart Drinking Water Supply to Basar Township and Its Peripheral settlement (1.6 MLD) with Tourism Components in Leparada District NESIDS-OTRI PHE & WS Department Govt. 2024-07-01 37.77 2026-01-31 9.4433 12.2356 21.6789 Ongoing
458 ARUNACHAL PRADESH Water Supply Augmentation of Water Supply System at Namsai Township (7.9 MLD) NESIDS-OTRI PHE & WS Department Govt. 2024-07-01 67.02 2026-07-31 16.7559 16.59608 33.35198 Ongoing
459 ARUNACHAL PRADESH Health Construction of Nursing Hostel at District Hospital, Yingkiong, Upper Siang Dist. Arunachal Pradesh Schemes of NEC Chief Engineer, Central Z 2025-01-13 10.1824 2027-01-13 2.54 2.539808 5.079808 2.54 Ongoing
460 ARUNACHAL PRADESH Water Supply Augmentation of Water supply system at Daporijo Township in Upper Subansiri District NESIDS-OTRI PHE & WS Department Govt. 2024-12-11 49.4691 2026-12-10 12.1817 12.1817 Ongoing
461 ARUNACHAL PRADESH Transport and Communication Construction of Road Riaga to Sango Village, Gangte Circle, Kra daadi District NESIDS-ROADS Public works Department 2025-02-19 21.1 2027-02-18 5.38 5.38 Ongoing
462 ARUNACHAL PRADESH Transport and Communication Construction of road from Amuli NH313 to Athuni via Leyaka Pass at Anini NESIDS-ROADS Public works Department 2025-02-19 94.45 2027-02-18 22.57 22.57 Ongoing
463 ARUNACHAL PRADESH Education Construction of Boys Hostel at DK College Tawang, Arunachal Pradesh Schemes of NEC PWD Tawang Division Gover 2025-02-11 8.1923 2027-02-11 2.05 2.05 Ongoing
464 ARUNACHAL PRADESH Tourism and Culture Construction of Integrated State of Art Convention Centre at Tawang, Arunachal Pradesh PM-DevINE ARC Test House & Consulta 2025-06-10 146.83 2028-06-30 36.3425 36.3425 Ongoing
465 ARUNACHAL PRADESH Industries Revival and promotion of Mon-Shugu, Handmade Paper of the Monpa Tribe of Arunachal Pradesh Schemes of NEC Department of Textiles & 2025-07-21 4.8553 2028-07-21 1.213825 1.213825 Ongoing
466 ARUNACHAL PRADESH Industries Setting up of Organic Turmeric Processing Unit cum Packaging Centre in New Lasum Patte of Dissing Passo Circle under Pakke Kessang District, Arunachal Pradesh Schemes of NEC District Horticulture Off 2025-07-28 2.4429 2027-07-28 0.610725 0.610725 Ongoing
467 ARUNACHAL PRADESH Industries Setting up of Common Facility Centre CFC for Persimmon Processing and Development of Value Chain in Dirang, West Kameng District, Arunachal Pradesh Schemes of NEC Horticulture Department, 2025-07-28 4.9566 2027-07-28 1.23915 1.23915 Ongoing
468 ARUNACHAL PRADESH Industries Technology intervention for development of Brokpa community through conservation of pure Dzomo for high milk production and clear value-added milk products Dirang, West Kameng district Arunachal Pradesh. Schemes of NEC Department of Veterinary 2025-09-29 4.9632 2028-09-29 0 Ongoing
469 ARUNACHAL PRADESH Industries Construction of Supermarket cum Parking Place at Kharsang Changlang District, Arunachal Pradesh. Schemes of NEC Urban Development Departm 2025-10-23 12.5238 2028-10-23 0 Ongoing
470 ARUNACHAL PRADESH Power Off-grid Electrification of Border Villages and Left Out Villages under RDSS PM-DevINE Dept. of Power 2026-01-14 69.5236 2027-01-31 0 Ongoing
471 ARUNACHAL PRADESH Education Construction of Girls Hostel G+1 at Donyi Polo Govt College Kamki, West Siang District, Arunachal Pradesh. Schemes of NEC Executive Engineer, Yomch 2026-01-14 4.8517796 2028-01-14 0 Ongoing
472 ASSAM Education Construction and renovation of Govt. HS school,Dibrugarh in Assam NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-03 1.7273 2023-06-03 1.7273 1.7273 Ongoing
473 ASSAM Education Construction and renovation of Cooton Collegiate Govt. HS school,Panbazar, Guwahati in Assam NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-03 2.9497 2023-06-03 0.1 0 0.1 Ongoing
474 ASSAM Education Construction and renovation of Dhubri Govt.Boy HS School ,Dhubri in Assam NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-03 1.7273 2023-06-03 0.1 0 0.1 Ongoing
475 ASSAM Education Construction and renovation of Kamrup Academy H.S. School, Chenikuthi, Guwahati, Assam NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 2.2277 2021-03-30 1.0927 0.4614 1.5541 1.0927 Ongoing
476 ASSAM Education Construction and renovation of Karimganj Govt. HS school,Karimganj in Assam NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-03 1.2337 2023-06-03 0.1 0.758304 0.858304 Ongoing
477 ASSAM Education Construction and renovation of Kuralguri Govt.Boy HS School ,Golaghat in Assam NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-04 1.2337 2023-06-04 0.1 0 0.1 Ongoing
478 ASSAM Education Construction and renovation of Panbazar Higher Secondary School, Panbazar, Guwahati, Assam NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 2.2277 2021-03-30 1.1894 0.4470079 1.6364079 1.472 Ongoing
479 ASSAM Education Construction and renovation of Silchar Govt. HS school,Cachar in Assam NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-04 1.2337 2023-06-04 0.1 0 0.1 Ongoing
480 ASSAM Education Construction and renovation of Sonaram Higher Secondary School, Bharalumukh, Guwahati, Assam NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 2.2277 2021-03-30 1.5701 0 1.5701 0.628 Ongoing
481 ASSAM Education Construction and renovation of Tarini Charan Govt. H.S. & M.P. School, Guwahati, Assam NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 2.2277 2021-03-30 0.6297 0.9444999 1.5741999 0.6196 Ongoing
482 ASSAM Education Construction and renovation of Tezpur Govt. HS school,Tezpur, Sonitpur in Assam NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-03 1.2337 2023-06-03 0.1 0 0.1 Ongoing
483 ASSAM Education Construction of Additional Classrooms at Borguri High School, Tinsukia, Assam NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 0.6216 2021-03-30 0.5906 0 0.5906 0.5905 Ongoing
484 ASSAM Education Construction of Additional Classrooms at Karanga Girls Higher Secondary School Jorhat, Assam NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 0.6216 2021-03-30 0.6215954 0 0.6215954 0.6215 Ongoing
485 ASSAM Education Construction of Additional Classrooms by Strengthening for Senairam Girls Higher Secondary School Tinsukia in Assam NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 0.6216 2021-03-30 0.2198 0 0.2198 0.193 Ongoing
486 ASSAM Education Construction of Girls Hostel at Jorhat Govt. Girls Higher Secondary and Multipurpose School located in Jorhat, Assam NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 2.1223 2021-03-30 0.682 0 0.682 0.2693 Ongoing
487 ASSAM Education Construction of Meeting Hall by Strengthening of Barkolai Higher Secondary School, Nagaon, Assam NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 0.6107 2021-03-30 0.57 0 0.57 0.57 Ongoing
488 ASSAM Education Constrution and Renovatioin of lakhimpur Govt.HS School, lakhimpur in Assam NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-04 1.2337 2023-06-04 0.1 0 0.1 Ongoing
489 ASSAM Education Transformation of school (50 nos) of the state as center of Excellence NESIDS-OTRI NESIDS PWD (Education and Health 2023-11-14 400 2025-11-14 93.7095 193.16 286.8695 9.37095 Ongoing
490 ASSAM Health Improvement / Special Infrastructure development of JSB Civil Hospital in Chirang District, Assam NESIDS-OTRI NESIDS Welfare of Bodoland Dept. 2019-02-12 22.9924 2020-03-31 22.8724813 0 22.8724813 22.8724 Completed
491 ASSAM Health Procurement of Ventilators (Newborn to Paediatric) for COVID-19 disease in Paediatric age group NESIDS-OTRI NESIDS Dept. of Health & familly 2021-09-30 28.7 2022-03-31 0.1 7.175 7.275 Ongoing
492 ASSAM Health Upgradation of 24 numbers of existing district hospitals for setting up of ICUs for treatment of COVID-19 patients in Assam NESIDS-OTRI NESIDS Dept. of Health & familly 2020-07-07 97.488 2021-01-07 38.9952 0 38.9952 38.6849 Ongoing
493 ASSAM Agriculture and Allied Agri-business centre with modern facilities including modest accommodation at Assam Agricultural University, Khanapara Campus, Assam Schemes of NEC Schemes of NEC 2017-12-29 14.5015 2020-12-29 14.5 0 14.5 14.5 Completed
494 ASSAM Agriculture and Allied Augmentation of Rubber Plantation and Production for Economic Development of Educated Unemployed Indigenous Tribal Communities in BTAD area, Chirang District (BTC), Assam Schemes of NEC Schemes of NEC 2017-02-28 0.968 2020-02-28 0.8712 0 0.8712 0.87 Completed
495 ASSAM Agriculture and Allied Community training centre on mushroom farming for livelihood and entreneurial development in the 6th Scheduled areas of BTR (Assam) and adjoining areas Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 4.99 2025-03-31 4.986 0 4.986 2 Ongoing
496 ASSAM Agriculture and Allied Construction of Market shed at Salbari Bazar at Mushalpur, Assam Schemes of NEC Schemes of NEC 2014-03-04 1.8755 2017-03-04 1.688 0 1.688 1.59 Completed
497 ASSAM Agriculture and Allied Cultivation of Boro Paddy in Non traditional Areas. (West Khasi Hills, West Garo Hills, Ri-Bhoi, East Garo Hills & Jaintia Hills districts) Schemes of NEC Schemes of NEC 2007-01-08 1 2011-01-21 0.9 0 0.9 0.9 Completed
498 ASSAM Agriculture and Allied Development of Daranggiri Banana Market at Daranggiri, Goalpara, Assam Schemes of NEC Schemes of NEC 2020-09-30 14.79 2023-09-30 3.7 6.6577073 10.3577073 5.3955 Ongoing
499 ASSAM Agriculture and Allied Development of Fruits and Vegetable wholesale Market at Pamohi (Garchuk) Kamrup, Phase-III, Assam Schemes of NEC Schemes of NEC 2016-05-20 12.98 2019-05-20 11.9438 0 11.9438 11.94 Completed
500 ASSAM Agriculture and Allied Development of the Socio-Economic status of Rural Tribal Women at Sidli Development Block of Kajal Gaon sub Division, Chirang District, Assam Schemes of NEC Schemes of NEC 2014-03-04 4.6676 2017-03-04 4.2008 0 4.2008 4.2 Completed
501 ASSAM Agriculture and Allied Establishment of 20000 (Twenty Thousand) Litres Capacity Milk Processing Effluent Treatment Plant along with all ancillary services and staff quarters at Patacharkuchi LAC Schemes of NEC Schemes of NEC 2023-03-31 7.3471 2026-03-26 2.57 4.194239 6.764239 0.61 Ongoing
502 ASSAM Agriculture and Allied Establishment of integrated plant for production of Agriculture Bio-inputs in Assam Agriculture University Schemes of NEC Schemes of NEC 2022-03-31 14.94 2025-03-31 14.936 0 14.936 9.96 Ongoing
503 ASSAM Agriculture and Allied Establishment of modern boar semen production centre and creation of extension facilities for capacity building of piggery stakeholders. (ICAR, NRC on Pig) Schemes of NEC Schemes of NEC 2016-09-06 4.31 2020-09-07 2.72 0 2.72 2.72 Completed
504 ASSAM Agriculture and Allied Establishment of Modern Hygienic fish market at Topatoli, Kamrup, Assam Schemes of NEC Schemes of NEC 2021-02-05 4.3491 2024-02-05 0.1 0 0.1 0.1 Completed
505 ASSAM Agriculture and Allied Improving livelihood benchmark of poor and ultra poor through Fishery Centric Growth and Employment Intervention in Nalbari district, Assam Schemes of NEC Schemes of NEC 2017-03-15 12.31 2020-03-15 12.31 0 12.31 12.31 Completed
506 ASSAM Agriculture and Allied Integrated Piggery Development Project, Setting up of Slaughtering firm Dhaligaon under BTC, Kokrajar, Area. Schemes of NEC Schemes of NEC 2005-03-24 0.7944 2008-03-24 0.71 0 0.71 0.71 Completed
507 ASSAM Agriculture and Allied Pig Farming through promotion of Farmer Producer Organization (FPO) Tamulpur Subdivision, Baska (BTAD) district, Assam. Schemes of NEC Schemes of NEC 2016-03-17 5.65 2019-03-17 5.65 0 5.65 5.65 Completed
508 ASSAM Agriculture and Allied Proposal of identified block for providing key identified service at Bokajan Block, Karbi Anglong District, Assam Schemes of NEC Schemes of NEC 2022-03-30 3.408 2025-12-31 2.5512 0.852 3.4032 1.7028 Ongoing
509 ASSAM Agriculture and Allied Proposal of identified block for providing key identified service at Boro Narainpur village, Harangajao ITDP Block, Dima Hasao, Assam Schemes of NEC Schemes of NEC 2022-03-31 1.94 2025-03-31 1.74 0.19 1.93 0.19 Ongoing
510 ASSAM Agriculture and Allied Proposal of identified block for providing key identified service at Chinthong Block, West Karbi Anglong District, Assam Schemes of NEC Schemes of NEC 2022-03-30 4.612 2025-03-31 3.4518 1.153 4.6048 2.3042 Ongoing
511 ASSAM Agriculture and Allied Proposal of identified block for providing key identified service at Harangajao ITDP Block, Dima Hasao, Assam Schemes of NEC Schemes of NEC 2022-03-31 5 2025-03-31 4.5 0.5 5 0.5 Ongoing
512 ASSAM Agriculture and Allied Proposal of identified block for providing key identified service at Lumbajong Block, Karbi Anglong District, Assam Schemes of NEC Schemes of NEC 2022-03-31 4.968 2025-03-31 3.7252 1.242 4.9672 2.4888 Ongoing
513 ASSAM Agriculture and Allied Proposal of identified block for providing key identified service at Nilip Block, Karbi Anglong District, Assam Schemes of NEC Schemes of NEC 2022-03-27 4.66 2025-12-26 3.499 1.165 4.664 2.331 Ongoing
514 ASSAM Agriculture and Allied Proposal of identified block for providing key identified service at Rongmowe Block, Karbi Anglong District, Assam Schemes of NEC Schemes of NEC 2022-03-27 4.945 2025-12-29 3.7118 1.2362 4.948 2.4708 Ongoing
515 ASSAM Agriculture and Allied Proposal of identified block for providing key identified service at Samelangso Block, Karbi Anglong District, Assam Schemes of NEC Schemes of NEC 2022-03-31 4.58 2025-03-31 3.4374 1.1456 4.583 2.2839 Ongoing
516 ASSAM Agriculture and Allied Proposal of identified block for providing key identified service at Sarmen Hanse village, Lumbajong Block, Karbi Anglong, Assam Schemes of NEC Schemes of NEC 2022-03-31 1.97 2025-12-31 1.4761 0.4935 1.9696 0.9909 Ongoing
517 ASSAM Agriculture and Allied Socheng Development Block, Jirikingding, West Karbi Anglong, Hamren(30 Central Sector Schemes of NEC) Schemes of NEC Schemes of NEC 2021-02-26 3.04 2024-02-29 3.04 0 3.04 3.04 Ongoing
518 ASSAM Agriculture and Allied The Construction of wayside amenities as a part of Prime Minister Swachh Bharat Abhiyan (Clean India Mission), on approved Tourist Circuit falling under NERCMP Project Area in Karbi Anglong district of Assam Schemes of NEC Schemes of NEC 2018-03-26 3.81 2021-03-26 2.6442 0 2.6442 2.64 Completed
519 ASSAM Agriculture and Allied Upgradation of Sericulture training institute at Titabor, Assam Schemes of NEC Schemes of NEC 2014-12-18 12.8181 2017-12-18 11.5363 0 11.5363 11.54 Completed
520 ASSAM Education Aspirational District Baksa, Assam Schemes of NEC Schemes of NEC 2019-07-02 1 2022-07-02 1 0 1 1 Completed
521 ASSAM Education Aspirational District Barpeta, Assam Schemes of NEC Schemes of NEC 2019-07-02 1 2022-07-02 1 0 1 1 Completed
522 ASSAM Education Aspirational District Darrang, Assam Schemes of NEC Schemes of NEC 2019-06-07 1 2022-06-07 1 0 1 1 Completed
523 ASSAM Education Aspirational District Dhubri, Assam Schemes of NEC Schemes of NEC 2019-06-11 1 2022-06-11 1 0 1 1 Ongoing
524 ASSAM Education Aspirational District Goalpara, Assam Schemes of NEC Schemes of NEC 2019-07-02 1 2022-07-02 1 0 1 1 Completed
525 ASSAM Education Aspirational District Hailakandi, Assam Schemes of NEC Schemes of NEC 2019-06-11 0.95 2022-06-11 0.9487 0 0.9487 1 Ongoing
526 ASSAM Education Aspirational District Udalguri, Assam Schemes of NEC Schemes of NEC 2019-06-07 1 2022-06-07 1 0 1 1 Completed
527 ASSAM Education Backward communities of Khasi-Jaintia Communities in the Cachar District, Assam Schemes of NEC Schemes of NEC 2022-03-15 4.8181 2025-03-31 0.9 0 0.9 0.1 Ongoing
528 ASSAM Education Backward communities of Singpho Community in Tinsukia, Assam Schemes of NEC Schemes of NEC 2022-03-24 4.62 2025-03-24 2.68 0.9794891 3.6594891 Ongoing
529 ASSAM Education Backward Communities Rongmei (Naga) Community in the Cachar District, Silchar, Assam Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.6887 2025-03-31 1.17 0 1.17 Ongoing
530 ASSAM Education Community Development Programme of Gorkha Community in Udalguri District, Assam Schemes of NEC Schemes of NEC 2020-12-15 2.31 2023-12-15 2.3028 0 2.3028 1.42 Ongoing
531 ASSAM Education Community development programme of Rabha Community in Udalguri District Schemes of NEC Schemes of NEC 2021-01-11 3.4293 2024-01-11 3.43 0 3.43 2.87 Ongoing
532 ASSAM Education Construction of Boys and Girls Hostel for Cotton University, Assam Schemes of NEC Schemes of NEC 2020-08-31 11.85 2023-08-31 11.0026 0.5499657 11.5525657 4.74 Ongoing
533 ASSAM Education Construction of Boys Hostel at Bineswar Brahma Engineering College, Kokrajhar, Assam Schemes of NEC Schemes of NEC 2023-03-29 4.93 2026-03-29 2.46225 1.23 3.69225 Ongoing
534 ASSAM Education Construction of bulding for the department of Geology in Cotton College, Guwahati, Assam Schemes of NEC Schemes of NEC 2018-03-30 5.22 2021-03-30 4.68 0.2442351 4.9242351 4.18 Ongoing
535 ASSAM Education Construction of Chandranath Sarmah Higher Secondary School at Bihaguri Sonitpur District, Assam. Schemes of NEC Schemes of NEC Dept. of Power 2015-05-03 2.8647 2018-05-03 2.8647 0 2.8647 2.86 Completed
536 ASSAM Education Construction of Composite Regional Centre(North East) for Disability Study and Action in Assam by Shishu Sarothi Schemes of NEC Schemes of NEC 2018-02-06 4.9 2021-02-06 3.633 0 3.633 2.84 Ongoing
537 ASSAM Education Construction of Multi-Storied college Building (G+2), Assam Type at Arya Vidyapith College, Guwahati, Assam Schemes of NEC Schemes of NEC Choose... 2023-03-30 9.28 2026-03-30 1.2 4.2128475 5.4128475 Ongoing
538 ASSAM Education Construction of New Academic building in Assam Women?s University, Jorhat, Assam Schemes of NEC Schemes of NEC Choose... 2023-03-31 9.9325 2026-03-31 2.48 2.9136476 5.3936476 Ongoing
539 ASSAM Education Construction of New Class Rooms & Laboratory of the Department of Life Science, Dibrugarh University, Assam Schemes of NEC Schemes of NEC 2020-09-16 4.36 2023-09-16 3.67 0.3139864 3.9839864 2.07 Ongoing
540 ASSAM Education Construction of RCC two (G2) building for seminar hall, computer centre and facilities for car parking at Darrang College, Tezpur, Assam Schemes of NEC Schemes of NEC Dept. of Power 2012-11-21 2.07 2015-11-11 2.0659 0 2.0659 1.64 Ongoing
541 ASSAM Education Construction of Saviour Orphan Children Home at Gossaigaon, Kokrajhar, Assam. Schemes of NEC Schemes of NEC Dept. of Power 2014-03-05 2.65 2017-03-05 2.11 0 2.11 2.11 Completed
542 ASSAM Education Construction/ Remodelling of RCC building including Development of Library, Vocational Centre etc. of Madhav Dev Higher Secondary School at Tulsimukh, Nagaon Schemes of NEC Schemes of NEC Dept. of Power 2016-06-27 2.87 2019-06-27 2.3 0 2.3 2.3 Completed
543 ASSAM Education Infrastructure Development of Omeo Kumar Das Institute of Social Chage and Development, Guwahati Schemes of NEC Schemes of NEC 2016-05-13 11.33 2019-05-13 11.33 0 11.33 11.33 Completed
544 ASSAM Education Setting up of Brahmaputra Studies Centre at Gauhati University Campus, Jalukbari, Gauhati Schemes of NEC Schemes of NEC 2018-07-31 27.9933 2024-01-31 27.9938 0 27.9938 23.95 Ongoing
545 ASSAM Education Setting up of the Central Instrumentation Facility of new CBCS Course at Dibrugarh Hanumanbax Surajmall Kanoi College, Dibrugarh Schemes of NEC Schemes of NEC 2020-10-20 4.9878 2023-10-20 4.99 0 4.99 4.99 Completed
546 ASSAM Sports Construction of Mini Stadium at Bihaguri, Sonitpur District. Schemes of NEC Schemes of NEC 2014-03-03 4.3181 2017-03-03 3.8859 0 3.8859 3.89 Completed
547 ASSAM Sports Construction of Titlagarh (Sonari) Sports Complex, Titlagarh, Assam Schemes of NEC Schemes of NEC Dept. of Power 2012-04-25 2.45 2015-04-25 2 0 2 2 Completed
548 ASSAM Irrigation and Flood Control Amring HEP (Karbi Anglong) 20 MW APGCL), Karbi Anglong dist. Schemes of NEC Schemes of NEC 2008-11-25 2.11 2012-11-25 0.9 0 0.9 0.9 Completed
549 ASSAM Irrigation and Flood Control Anti Erosion measures to protect BB of river Darranga at different reaches, Baksa Dist. Assam Schemes of NEC Schemes of NEC 2018-03-14 4.96 2021-03-14 4.3727 0 4.3727 2.37 Ongoing
550 ASSAM Irrigation and Flood Control Anti-Erosion measure to protect Village of Lantibari No.1 & 2 Porbotjhora and Pub-Amguri, Chirang District from erosion of River Karnataka on RB,Assam Schemes of NEC Schemes of NEC 2018-03-14 11.9 2021-03-14 0.1 0 0.1 0.1 Completed
551 ASSAM Irrigation and Flood Control Anti-Erosion measure to protect villages of Uma Nagar upstream and its Adjoining area from the erosion of river Gangia Kokrajhar , Assam Schemes of NEC Schemes of NEC 2018-03-14 4.05 2021-03-14 4.05 0 4.05 2.05 Completed
552 ASSAM Irrigation and Flood Control Anti-Erosion Measures at different reaches on both bank of river Pomra(Assam), Baska dist. Schemes of NEC Schemes of NEC 2014-06-04 2.2794 2017-06-04 2.0515 0 2.0515 2.05 Completed
553 ASSAM Irrigation and Flood Control Anti-Erosion Measures to protect Ranipur and its adjoining area from the erosion of river Pekua, Kokrajhar dist. Schemes of NEC Schemes of NEC 2012-03-23 3.4339 2015-03-23 3.0905 0 3.0905 3.09 Completed
554 ASSAM Irrigation and Flood Control Bank protection at Ouguri (RB), Amguri(RB) and Amlighat (LB) on the river Killing (Ph-I), Morigaon District, Assam Schemes of NEC Schemes of NEC 2018-03-14 4.5 2021-03-14 0.1 0 0.1 0.1 Completed
555 ASSAM Irrigation and Flood Control Bio-Diversity Conservation of Basistha Bahini Watershed, in South West part of greater Guwahati, Kamrup dist. Schemes of NEC Schemes of NEC 2009-08-25 4.9676 2012-08-25 4.4708 0 4.4708 4.47 Completed
556 ASSAM Irrigation and Flood Control Controlling of Jiadhal river in Dhemaji district in Assam, Phase-I Schemes of NEC Schemes of NEC 2006-02-27 14.9357 2009-02-27 9.4561 0 9.4561 9.46 Completed
557 ASSAM Irrigation and Flood Control Dhankhunda flow irrigation scheme, Kamrup dist. Schemes of NEC Schemes of NEC 2010-09-22 4.85 2013-09-22 4.365 0 4.365 4.37 Completed
558 ASSAM Irrigation and Flood Control Gilabwr - Flow Irrigation scheme (FIS), Chirang dist. Schemes of NEC Schemes of NEC 2012-03-23 4.18 2015-03-23 3.762 0 3.762 3.76 Completed
559 ASSAM Irrigation and Flood Control Modernization & extension of Langparpan MIS , Karbianglong dist. Schemes of NEC Schemes of NEC 2010-09-22 2.13 2013-09-22 1.92 0 1.92 1.92 Completed
560 ASSAM Irrigation and Flood Control Promotion of an Environmentally sound approach for sustainable water management optimizing usage Rain water Harvesting for Roof tops in institutions, Health centres & community centres in Assam in 4 dist. Schemes of NEC Schemes of NEC 2015-12-01 9.2 2018-12-01 8.282 0 8.282 8.28 Ongoing
561 ASSAM Irrigation and Flood Control Proposal of identified backward block for providing key identified services at Diyung Valley Maibang Dima Hasao, Assam Schemes of NEC Schemes of NEC 2023-03-02 3.6787 2026-03-02 2.76 0.82 3.58 Ongoing
562 ASSAM Irrigation and Flood Control Proposal of identified backward block for providing key identified services at Socheng Block of West Karbi Anglong District, Assam Schemes of NEC Schemes of NEC Choose... 2023-02-17 4.44 2026-02-17 2.56 2.56 Ongoing
563 ASSAM Irrigation and Flood Control Proposal of identified block for providing key identified services at Diyungbra ITDP, Dima Hasao District, Assam Schemes of NEC Schemes of NEC 2023-03-01 3.799 2026-03-01 3.799 0 3.799 Ongoing
564 ASSAM Irrigation and Flood Control Protection of Raimona Village and its adjoining area from the erosion of River Janali, Assam Schemes of NEC Schemes of NEC 2011-02-01 3.74 2014-02-01 3.37 0 3.37 3.37 Completed
565 ASSAM Irrigation and Flood Control Providing of Water Supply to Jawahar Navodaya Vidyalaya, Jalukie, Peren District, Nagaland. Schemes of NEC Schemes of NEC 2017-11-01 3.34 2020-11-01 0.1 0 0.1 0.1 Completed
566 ASSAM Irrigation and Flood Control Ram Enghee Minor Irrigation project, Karbi-anglong dist. Schemes of NEC Schemes of NEC 2017-03-25 4.947 2020-03-25 4.4523 0 4.4523 4.45 Completed
567 ASSAM Irrigation and Flood Control Retention and Rejuvenation of Dighali pukhuri at Guwahati, Kamrup Metro, Assam Schemes of NEC Schemes of NEC Choose... 2023-03-31 4.92 2026-03-31 1.23 1.23 Ongoing
568 ASSAM Industries Bamboo Plantation on Commercial Basis in BTC Area (Bodoland Territorial Areas) Schemes of NEC Schemes of NEC 2006-11-01 1.7105 2009-11-01 1.1 0 1.1 1.1 Completed
569 ASSAM Industries Danai Lunai Yojna-A Livelihood Project For Weavers on Eri Silk Hand-Woven Products of Bodoland Territorial Council Area Schemes of NEC Schemes of NEC 2018-02-14 0.2525 2021-02-14 0.23 0 0.23 0.23 Completed
570 ASSAM Industries Development & Standardization of an Improved Process for cooking & Reeling of Muga Coccon by Central Silk Board, Jorhat, Assam Schemes of NEC Schemes of NEC 2006-03-28 0.0795 2009-03-28 0.07 0 0.07 0.07 Completed
571 ASSAM Industries Empowering marginalised women of sixth scheduled areas of Assam through life skill education Schemes of NEC Schemes of NEC Choose... 2022-03-31 1.88 2025-03-31 0.942 0.94 1.882 0.1880759 Ongoing
572 ASSAM Industries Hahim Cluster Development Project under Boko Block, Kamrup, District, Assam Schemes of NEC Schemes of NEC 2021-02-26 4.9773 2024-02-26 3.8868299 0 3.8868299 0.89 Ongoing
573 ASSAM Industries Integrated Programme for Development for Water Hyacinth and Crafts in NER by NEDFI, Guwahati Schemes of NEC Schemes of NEC 2010-03-25 1.617 2013-03-25 1.617 0 1.617 1.62 Completed
574 ASSAM Industries Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19, in the state of Assam Schemes of NEC Schemes of NEC 2020-12-30 4.7932 2023-12-30 4.7508 0 4.7508 0.83 Ongoing
575 ASSAM Industries North East Bamboo Mission, Cane & Bamboo Technology Centre (CBTC), Narikal Basti, Zoo Narengi Road, Guwahati - 781024 Schemes of NEC Schemes of NEC 2004-10-08 2.6994 2007-10-08 2.6994 0 2.6994 2.7 Completed
576 ASSAM Industries Regional Handloom & Handicrafts Marketing Complex by M/s ARTFED, Gopinath Bordoloi Road, Ambari, Guwahati - 781001, Assam Schemes of NEC Schemes of NEC 2005-07-28 7.8534 2008-07-28 7.85 0 7.85 7.85 Completed
577 ASSAM Industries Setting up of a Black Tea Manufacturing Unit by M/s. Horujan Tea Company, P.o. Jeypore, District Dibrugarh, Assam Schemes of NEC Schemes of NEC 2009-09-09 1.9073 2012-09-09 0.48 0 0.48 0.48 Completed
578 ASSAM Industries Setting up of a chira manufacturing unit by M/s. Salasar Chira Industries, Golaghat Basti, P.O. Hojai, Assam Schemes of NEC Schemes of NEC 2007-01-02 0.5367 2009-01-02 0.48 0 0.48 0.48 Completed
579 ASSAM Industries Setting up of a Common Facility Centre for Gold and Assamese Traditional Jewellery, Assam Schemes of NEC Schemes of NEC 2017-02-20 5.7619989 2020-02-20 5.3391 0 5.3391 5.1893512 Completed
580 ASSAM Industries Setting up of a CTC Black Tea Manufacturing Unit by M/s Longtong Tea Company, 8th Mile, Parbitapur, P.O. Jagun, District Tinsukia, Assam Schemes of NEC Schemes of NEC 2009-09-09 2.3098 2011-09-09 0.5 0 0.5 0.5 Completed
581 ASSAM Industries Setting up of a CTC Black Tea Manufacturing Unit by M/s. Ever Assam Tea Pvt. Ltd., Village & P.O. Laipuli, District Tinsukia, Assam Schemes of NEC Schemes of NEC 2009-09-09 2.9317 2012-09-09 0.5 0 0.5 0.5 Completed
582 ASSAM Industries Setting up of a CTC Tea & Black Tea Manufacturing Unit by M/s. Regina Tea Company Pvt. Ltd., Changlang Road, P.O. Magherita, Rupai Siding, doom Dooma, Tinsukia District, Assam Schemes of NEC Schemes of NEC 2009-09-09 2.3098 2012-09-09 0.5 0 0.5 0.5 Completed
583 ASSAM Industries Setting up of a jute products industry for manufacturing fine jute yarn unit by M/s. Apex Yarn Pvt. Ltd., Lokhra Industrial Estate, West Boragaon, Guwahati Schemes of NEC Schemes of NEC 2006-10-31 3.284 2009-10-31 0.2007 0 0.2007 0.2 Completed
584 ASSAM Industries Setting up of a LAMC and coke breeze manufacturing unit by M/s. Sri Shyam Carbon Company, 12th Mile Village-Ambher Jorhat, District Kamrup, Assam Schemes of NEC Schemes of NEC 2006-12-19 2.1295 2009-12-19 1.92 0 1.92 1.92 Completed
585 ASSAM Industries Setting up of a LAMC breeze coke & hard coke manufacturing unit by M/s. K.D. Cokes, 11th Mile, Amerigog, Jorabat, G.S. Road, Kamrup District, Assam Schemes of NEC Schemes of NEC 2007-01-16 5.8256 2010-01-16 5.24 0 5.24 5.24 Completed
586 ASSAM Industries Setting up of a manufacturing of chira (rice flake) industry by M/s. Shree Om Chira Industries, Station Road, Lanka, Nagaon, Assam Schemes of NEC Schemes of NEC 2007-01-02 0.8208 2010-01-02 0.74 0 0.74 0.74 Completed
587 ASSAM Industries Setting up of a manufacturing of maida, atta, wheat, bran & other wheat products for processing and packaging unit by M/s. Nawka Food Industry, Furkating, District Golaghat, Assam Schemes of NEC Schemes of NEC 2006-06-12 0.8326 2009-06-12 0.75 0 0.75 0.75 Completed
588 ASSAM Industries Setting up of a manufacturing of Mustard Oil Processing and Pouch Packaging Unit by M/s. M.R. Agro Industries, Sakrahi, Narayanpur Schemes of NEC Schemes of NEC 2006-06-23 1.3634 2009-06-23 1.23 0 1.23 1.23 Completed
589 ASSAM Industries Setting up of a manufacturing of ready made garments unit by M/s. Mens clothing Company, shed No. A-6(A) & B-6(A), Mini Industrial Estate, Kalapahar, Guwahati. Schemes of NEC Schemes of NEC 2006-06-12 0.3038 2009-06-12 0.27 0 0.27 0.27 Completed
590 ASSAM Industries Setting up of a manufacturing of soapstone powder by M/s. Pashupati Mercantiles Pvt. Ltd., Kamarkuchi, P.O. Taopesia, Kamrup Schemes of NEC Schemes of NEC 2007-01-02 0.4706 2010-01-02 0.1172 0 0.1172 0.12 Completed
591 ASSAM Industries Setting up of a manufacturing of wheat products such as atta, maida, suji, etc. unit by M/s. Nav Manas Food Products, NH-37, Mohanbari, Hindugaon, Dibrugarh, Assam Schemes of NEC Schemes of NEC 2007-01-05 0.8081 2010-01-05 0.73 0 0.73 0.73 Completed
592 ASSAM Industries Setting up of a manufacturing unit for adhesive tapes, cello tapes, printed taped, box,etc by M/s Shree Balajee Enterprises, Jojadia Complex, Fancy Bazar, Guwahati Schemes of NEC Schemes of NEC 2006-12-19 0.345 2009-12-19 0.31 0 0.31 0.31 Completed
593 ASSAM Industries Setting up of a Medium Voltage Electrical Control and Distribution Panels as per IS:8623 unit by M/s. Assam Electricals, Village Laipuli, P.O. Panitola, District Tinsukia, Assam Schemes of NEC Schemes of NEC 2009-09-09 0.3026 2012-09-09 0.27 0 0.27 0.27 Completed
594 ASSAM Industries Setting up of a mild steel black wire & mild steel black annealed wire manufacturing by M/s. Koushal Steel, West Boragaon, P.O. Gotanagar, Kamrup, Assam Schemes of NEC Schemes of NEC 2007-01-02 0.8921 2009-01-02 0.324 0 0.324 0.32 Completed
595 ASSAM Industries Setting up of a mild steel ingots manufacturing unit by M/s. Cachar Ispat Pvt. Ltd., 12, M.S. Road, Fancy Bazar, Guwahati Schemes of NEC Schemes of NEC 2009-10-26 1.7927 2013-10-26 0.4482 0 0.4482 0.45 Completed
596 ASSAM Industries Setting up of a mustard oil processing and pouch packaging unit by M/s. Tirupati Food Products, Pancharatna Road, Goalpara, Assam Schemes of NEC Schemes of NEC 2009-11-11 0.506 2012-11-11 0.46 0 0.46 0.46 Completed
597 ASSAM Industries Setting up of a pharmaceutical liquid and ointment formulation manufacturing unit by M/s. Quality Pharma Products Pvt. Ltd., Industrial Area, Lahoal, Dibrugarh, Assam Schemes of NEC Schemes of NEC 2006-12-29 2.1534 2008-12-29 0.5 0 0.5 0.5 Completed
598 ASSAM Industries Setting up of a processed bottled drinking water manufacturing unit by M/s. Udayak Agro Products Pvt. Ltd., Udayan Vihar, Satgaon, Guwahati Schemes of NEC Schemes of NEC 2007-01-16 1.4168 2009-01-16 0.3542 0 0.3542 0.35 Completed
599 ASSAM Industries Setting up of a processed bottled drinking water, pet bottles & jars manufacturing unit by M/s. B.N. Industries Pvt. Ltd., Kamkhya Umananda Bhavan, A.T. Road, Guwahati Schemes of NEC Schemes of NEC 2009-10-15 0.9231 2013-10-15 0.2308 0 0.2308 0.23 Completed
600 ASSAM Industries Setting up of a Processing for mustard oil unit by M/s. A.R. Enterprises, Industrial Estate, Gopal Bazar, Nalbari, Assam Schemes of NEC Schemes of NEC 2006-06-24 0.4402 2008-06-24 0.4 0 0.4 0.4 Completed
601 ASSAM Industries Setting up of a processing of crushed stone chips unit by M/s. Yankee Crusher, Golaghat Basti, Hojai, Nagaon, Assam Schemes of NEC Schemes of NEC 2006-06-13 0.066 2009-06-13 0.06 0 0.06 0.06 Completed
602 ASSAM Industries Setting up of a PVC Pipes & PVC doors etc. manufacturing unit by M/s. Om Shree Products, 496, Lokhra Road, Saukuchi, Guwahati Schemes of NEC Schemes of NEC 2006-12-19 0.7775 2009-12-19 0.7 0 0.7 0.7 Completed
603 ASSAM Industries Setting up of a PVC pipes manufacturing unit by M/s. Kamakhya Poly Udyog, Amerigog Village, G.S. Road, Jorabat, Guwahati-781023 Schemes of NEC Schemes of NEC 2006-12-18 1.4078 2009-12-18 1.27 0 1.27 1.27 Completed
604 ASSAM Industries Setting up of a ready made shirts manufacturing unit by M/s. ACN Products & Marketing, Industrial Estate, Kalapahar, Guwahati, Assam Schemes of NEC Schemes of NEC 2007-01-18 0.1673 2009-01-18 0.15 0 0.15 0.15 Completed
605 ASSAM Industries Setting up of a Roller flour mill to manufacture wheat products such as atta, suji, maida, etc by M/s. Ishwar Food Products Pvt. Ltd., Pathiapathar Gaon, Tinsukia, Assam Schemes of NEC Schemes of NEC 2006-12-29 0.7271 2009-12-12 0.1818 0 0.1818 0.18 Completed
606 ASSAM Industries Setting up of a roller flour mill to manufacturing wheat products such as atta, suji maida, bran, etc. unit by M/s. Ganesh Roller Flour Mill, Barbethi, Haribargaon, Nagaon, Assam Schemes of NEC Schemes of NEC 2007-01-22 1.0553 2009-01-22 0.95 0 0.95 0.95 Completed
607 ASSAM Industries Setting up of an industry for manufacturing HDPE/PP Circular Woven Fabric and Industrial Sacks by M/s. Gattani Polymers, GB Gattani Industrial Estate, Mariani road, Cinamara, Jorhat, Assam Schemes of NEC Schemes of NEC 2006-06-12 1.3425 2009-06-12 1.21 0 1.21 1.21 Completed
608 ASSAM Industries Setting up of Chira (beaten rice) industry by M/s. Bajaj Industries, Station Road, Nalbari, Assam Schemes of NEC Schemes of NEC 2007-01-02 0.5402 2009-01-02 0.49 0 0.49 0.49 Completed
609 ASSAM Industries Setting up of Ice-cream & wafer cones unit by M/s Excellent Dairy & Farming Pvt. Ltd., Opp. Kamrup Weigh Bridge, Guwahati, Assam Schemes of NEC Schemes of NEC 2009-09-02 1.8801 2012-09-02 0.47 0 0.47 0.47 Completed
610 ASSAM Industries Setting up of plastic disposable glass and cups manufacturing unit by M/s. Siddhi Vinayak Papers (India) Pvt. Ltd., Lulangaon, Betkuchi, Lokhra, Guwahati- 781034 Schemes of NEC Schemes of NEC 2007-01-02 1.6521 2010-01-02 0.423 0 0.423 0.42 Completed
611 ASSAM Industries Setting up of the Handloom Trade Centre at Dibrugarh, Assam by the Directorate of Handloom and Textile, Government of Assam Schemes of NEC Schemes of NEC 2013-03-26 9.917 2016-03-31 8.9253 0 8.9253 8.93 Completed
612 ASSAM Industries Setting up of TMT Bars & Steel Structure Manufacturing Unit by M/s. Vision Ispat Pvt. Ltd., Saharia House, G.S. Modi Road, Jyotinagar, Dibrugarh, Assam Schemes of NEC Schemes of NEC 2009-09-09 2.3098 2012-09-09 0.5 0 0.5 0.5 Completed
613 ASSAM Industries Setting up of wheat products mills for manufacturing maida, atta, wheat bran processing & packaging unit by M/s. B.K. Roller Flour Mills, Haribargoan, Nagaon, Assam Schemes of NEC Schemes of NEC 2006-06-12 1.192 2009-06-12 1.07 0 1.07 1.07 Completed
614 ASSAM Industries Tea Blending, Packaging and Value Addition unit for small tea growers of North Eastat Lahoal Dibrugar Schemes of NEC Schemes of NEC 2023-02-07 2.97 2026-02-07 2.9675 0 2.9675 2.75 Completed
615 ASSAM Industries Upgradation/Replacement of Machineries of the Spinning Unit at Tulsibari, Assam Schemes of NEC Schemes of NEC 2011-11-22 4.5734 2014-11-28 4.12 0 4.12 4.12 Completed
616 ASSAM Information and Public Relatio 49th Annual National Conference of Nutrition Society of India organised by Assam University Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.04 2021-10-01 0 Completed
617 ASSAM Information and Public Relatio Audio Visual Hub of Jyoti, Chitraban Film Studio, Kamrup, Assam Schemes of NEC Schemes of NEC 2018-03-29 10 2020-03-29 10 0 10 10 Completed
618 ASSAM Information and Public Relatio Conclave on Brahmaputra River Basin organised by Guwahati University Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.25 2021-04-01 0 Completed
619 ASSAM Information and Public Relatio Conclave on Brahmaputra River Basin organised by NEC and Guwahati University Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.25 2021-04-01 0 Completed
620 ASSAM Information and Public Relatio Construction of Cultural Complex of Shankardev Shishu Niketan at Hajongbari, Kamrup Schemes of NEC Schemes of NEC 2022-03-31 14.1747 2025-03-31 12.7599 0 12.7599 5.67 Ongoing
621 ASSAM Information and Public Relatio Construction of Regional Multi-Utility and Town Hall and Cultural Centre, Tinsukia, Assam. Schemes of NEC Schemes of NEC 2014-02-28 7.98 2018-02-28 7.18 0 7.18 7.18 Completed
622 ASSAM Information and Public Relatio Construction of the Nepali/Gorkha Cultural cum Multi-purpose Centre at Guwahati Schemes of NEC Schemes of NEC Choose... 2022-03-31 14.4416 2025-03-31 10.8266 0 10.8266 Ongoing
623 ASSAM Information and Public Relatio Demonstration of Crafts & Textiles of the North Eastern at NEHHDC?s Craft Promotion Centre (CPC), Guwahati organised by NEHHDC Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.168 2021-04-01 0 Completed
624 ASSAM Information and Public Relatio Destination Himachalorganised by NERAMAC Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0355 2021-04-01 0 Completed
625 ASSAM Information and Public Relatio Emerging North East from 25th to 27th October, 2017 of Assam organised by Govt. of Assam Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.099 2021-04-01 0 Completed
626 ASSAM Information and Public Relatio Establishment of Deori Tribal Cultural Complex, Narayanpur, Lakhimpur District, Upper Assam. Schemes of NEC Schemes of NEC 2012-04-25 4.97 2015-04-25 4.4686 0 4.4686 3.37 Ongoing
627 ASSAM Information and Public Relatio Geographical indication (GI) Registration on Sikkimese Lepcha Hat of Sikkim organised by NEHHDC Schemes of NEC Schemes of NEC Choose... 2019-06-27 0.075 2022-06-27 0 Completed
628 ASSAM Information and Public Relatio Global Conference on Cyber Space (GCCS) organised by IIT Guwahati Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.04 2021-04-01 0 Completed
629 ASSAM Information and Public Relatio Government Achievements & Schemes Expo organised by NERAMAC Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0202 2021-04-01 0 Completed
630 ASSAM Information and Public Relatio International Conference on Scientific and Indigenous bio-cultural knowledge organised by Assam University Silchar Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.05 2021-04-01 0 Completed
631 ASSAM Information and Public Relatio Purchasing Gifts during DNE 2017 organised by NEHHDC Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0225 2021-04-01 0 Completed
632 ASSAM Information and Public Relatio Seminar cum Youths meet on Digitalization and Rural Development in NE India organised by Assam University Silchar Schemes of NEC Schemes of NEC 2018-04-01 0.03 2021-04-01 0.0225 0 0.0225 0.02 Completed
633 ASSAM Information and Public Relatio Strengthening of Hindi Section in the Library of Assam Science & Technology University, Jalukbhari, Guwahati, Assam Schemes of NEC Schemes of NEC 2021-01-21 0.1 2024-01-31 0.1 0 0.1 0.04 Ongoing
634 ASSAM Information and Public Relatio Strengthening of Hindi Section in the Library of Cotton University, Guwahati, Assam Schemes of NEC Schemes of NEC 2021-01-21 0.1 2024-01-21 0.04 0 0.04 0.04 Ongoing
635 ASSAM Information and Public Relatio Support of qualified visual Merchandisers in NEHHDC Emporia & Regional Sales Promotion Offices organised by NEHHDC Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1811 2021-04-01 0 Completed
636 ASSAM Information and Public Relatio Tai Educational and Cultural Centre, Dibrugarh, Assam. Schemes of NEC Schemes of NEC 2014-02-25 3.3349 2017-02-25 3.0014 0 3.0014 2.4 Ongoing
637 ASSAM Information and Public Relatio Technique 2017, Guwahati organised by IIT, Guwahati Schemes of NEC Schemes of NEC 2018-04-01 0.04 2021-04-01 0.03 0 0.03 0.03 Completed
638 ASSAM Information and Public Relatio Thailand-India travel fair, Bangkok, Thailand organised by NEHHDC Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0829 2021-04-01 0 Completed
639 ASSAM Information and Public Relatio Two workshops on utilisation of Bamboo as Building Material in NER at Guwahati organised by CBRI, Roorkee Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.09 2021-04-01 0 Completed
640 ASSAM Information and Public Relatio Upgradation of Tourist Facilities at Kaziranga Schemes of NEC Schemes of NEC 2022-03-31 14.3276 2025-03-31 13.465359 0.862251 14.32761 7.860259 Ongoing
641 ASSAM Health Assam Medical College, Dibrugarh, Assam Schemes of NEC Schemes of NEC 2005-03-15 8.2297 2008-03-15 4.96 0 4.96 4.96 Completed
642 ASSAM Health Construction of Vertical Extension of 1st Floor (Part), 2nd & 3rd Floors of MDS building at Regional Dental College, Guwahati, Assam Schemes of NEC Schemes of NEC 2012-09-03 4.6182 2015-09-03 2.92 0 2.92 2.92 Completed
643 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- III) Schemes of NEC Schemes of NEC 2007-07-06 7.61 2009-07-06 7.61 0 7.61 7.61 Completed
644 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- III) Schemes of NEC Schemes of NEC 2009-09-18 8.04 2011-09-18 8.04 0 8.04 8.04 Completed
645 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- III) Schemes of NEC Schemes of NEC 2008-08-06 5 2012-08-06 5 0 5 5 Completed
646 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- III) Schemes of NEC Schemes of NEC 2010-06-12 16.5 2012-06-12 16.5 0 16.5 16.5 Completed
647 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- III) Schemes of NEC Schemes of NEC 2004-12-16 1 2007-12-16 1 0 1 1 Completed
648 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- III) Schemes of NEC Schemes of NEC 2005-06-30 3.5 2008-06-30 3.5 0 3.5 3.5 Completed
649 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- III) Schemes of NEC Schemes of NEC 2013-05-09 11 2015-05-09 11 0 11 11 Completed
650 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- III) Schemes of NEC Schemes of NEC 2006-05-11 9.4 2008-05-11 9.4 0 9.4 9.4 Completed
651 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV) Schemes of NEC Schemes of NEC 2014-11-28 4.775 2017-11-28 4.775 0 4.775 4.78 Completed
652 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV) Schemes of NEC Schemes of NEC 2015-08-21 4.775 2018-08-21 4.775 0 4.775 4.78 Completed
653 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV) Schemes of NEC Schemes of NEC 2013-03-25 8.8653 2016-03-25 8.8653 0 8.8653 8.87 Completed
654 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV) Schemes of NEC Schemes of NEC 2016-07-26 8.1231 2019-07-26 8.1231 0 8.1231 8.12 Completed
655 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV) Schemes of NEC Schemes of NEC 2017-08-17 8 2020-08-17 8 0 8 8 Completed
656 ASSAM Health Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV) Schemes of NEC Schemes of NEC 2014-05-03 0.5 2016-05-03 0.5 0 0.5 0.5 Completed
657 ASSAM Health Establishment of a Hospital Ship on the river Brahmaputra by C-NES, Guwahati, Assam Schemes of NEC Schemes of NEC 2009-11-30 4 2012-11-30 2.4 0 2.4 2.4 Completed
658 ASSAM Health Establishment of Community Ophthalmology and School of Optometry and Ophthalmic Asstt. Technology at Sri Sankaradeva Nethralaya, Guwahati Schemes of NEC Schemes of NEC 2009-02-26 4.7375 2012-02-26 4.49 0 4.49 4.49 Completed
659 ASSAM Health Establishment of New Govt. Nursing College at Jorhat, Assam Schemes of NEC Schemes of NEC 2024-01-04 12.75 2027-01-04 3.19 3.19 Ongoing
660 ASSAM Health Gauhati Medical College, Guwahati, Assam Schemes of NEC Schemes of NEC 2005-09-09 12.3535 2008-09-09 11.11 0 11.11 11.11 Completed
661 ASSAM Health Phase-I Extension of Sri Sankaradeva Nethralaya, Guwahati, Assam for procurment of equipment of Vitrectomy and OCT Schemes of NEC Schemes of NEC 2011-03-23 1.778 2016-03-23 1.78 0 1.78 1.78 Completed
662 ASSAM Health Regional College of Nursing, Guwahati, Assam Schemes of NEC Schemes of NEC 2005-03-16 5.7314 2008-03-16 5.16 0 5.16 5.16 Completed
663 ASSAM Health Regional Dental College, Guwahati, Assam Schemes of NEC Schemes of NEC 2005-03-16 13.1094 2008-03-16 7.18 0 7.18 7.18 Completed
664 ASSAM Health Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Assam for activities related to combating COVID-19 pandemic Schemes of NEC Schemes of NEC 2020-04-01 4.99 2023-04-01 4.99 0 4.99 4.99 Completed
665 ASSAM Health Silchar Medical College, Silchar, Assam Schemes of NEC Schemes of NEC 2005-09-09 13.9709 2008-09-09 6.43 0 6.43 6.43 Completed
666 ASSAM Health Support to Sankar Madhab Rural charity Hospital, Panikheti, Assam Schemes of NEC Schemes of NEC 2006-02-14 4.98 2009-02-14 4.48 0 4.48 4.48 Completed
667 ASSAM Health Up-gradation of Academic Facilities at Down Town College of Allied Health Sciences, Panikheri (near Guwahati)., Assam Schemes of NEC Schemes of NEC 2010-03-23 4.6 2013-03-23 3 0 3 3 Completed
668 ASSAM Health Up-gradation of Civil Hospital, Sonari, Sibasagar District , Assam Schemes of NEC Schemes of NEC 2005-01-03 4.1731 2008-01-03 3.01 0 3.01 3.01 Completed
669 ASSAM Health Upgradation of services of Makunda Christian Leprosy and General Hospital, Bazaricherra, Karimganj Schemes of NEC Schemes of NEC 2020-09-11 4.6 2023-09-11 4.6 0 4.6 4.6 Completed
670 ASSAM Power 132 KV S/C Trans. Line from Mariani to Nazira along with132/33 KV, 2 x25 MVA S/s at Nazira Schemes of NEC Schemes of NEC 2009-06-23 22.61 2012-06-23 20.34 0 20.34 20.34 Completed
671 ASSAM Power Augmentation of transformer capacity of 132/33kV Biswanath Charali (Pavoi) Sub-Station from 2X16 MVA to 2X40 MVA, Assam Schemes of NEC Schemes of NEC 2016-05-20 5.67 2019-05-20 5.1 0 5.1 5.1 Completed
672 ASSAM Power Augmentation of transformer capacity of 220X132 kV BTPS Sub-Station from 1X160 MVA 1X80MVA to 2X160, Kokrajhar District, Assam Schemes of NEC Schemes of NEC 2016-05-20 6.78 2018-05-20 6.102 0 6.102 6.1 Completed
673 ASSAM Power Construction of 132/33KV, 1x16MVA 1X25MVA, Umrangshu S/s , North Cachar Hills District. Schemes of NEC Schemes of NEC 2011-03-01 13.44 2013-03-01 12.09 0 12.09 12.09 Completed
674 ASSAM Power Construction of 2X5Mva, 33/11Kv Substation at Garmur, Majuli in Jorhat, Assam Schemes of NEC Schemes of NEC Choose... 2018-01-15 6.81 2021-01-15 0 Foreclosed
675 ASSAM Power Construction of 33/11kV, 2X5 MVA Sub-Station alongwith associated 33kV, 11kV & LT Feeders at Bishnupur Panchali under Dhemaji Electrical Division, APDCL, Dhemaji, Assam Schemes of NEC Schemes of NEC 2016-05-20 10.25 2019-05-20 9.225 0 9.225 9.23 Completed
676 ASSAM Science and Technology A Study on Hydro carbon pollution in Lentic Eco systems in and around oilfield areas and effect of hydrocarbon contamination of flora and fauna, (IASST) Guwahati, Institute of Advanced Study in Science & Technology (IASST) Schemes of NEC Schemes of NEC 2013-03-22 0.2454 2016-03-22 0.2454 0 0.2454 0.25 Completed
677 ASSAM Science and Technology Afforestation of Denuded Hills in DimaHasao District of Assam. Schemes of NEC Schemes of NEC Choose... 2022-03-28 2.0069 2025-03-28 2.0068882 0 2.0068882 Ongoing
678 ASSAM Science and Technology Afforestation of Denuded Hills in KarbiAnglong District of Assam. Schemes of NEC Schemes of NEC Choose... 2022-03-28 2.0422 2025-03-28 0 Foreclosed
679 ASSAM Science and Technology Assessment of Risk due to Intake of artificial colours through foodstuffs available in the North Eastern States (including Sikkim) Assam Schemes of NEC Schemes of NEC 2009-12-07 0.19 2012-12-07 0.19 0 0.19 0.19 Completed
680 ASSAM Science and Technology Computer Training for Teachers of Assam State for 10 PC System in 6 Schools Schemes of NEC Schemes of NEC 2005-03-31 0.0277 2008-03-31 0.0277 0 0.0277 0.03 Completed
681 ASSAM Science and Technology IT College Education Programme at North Lakhimpur College for Library,books,etc Schemes of NEC Schemes of NEC 2005-03-31 0.0051 2008-03-31 0.0051 0 0.0051 0.01 Completed
682 ASSAM Science and Technology Online/Realtime Seismic Network for Disaster Mitigation in North East India Schemes of NEC Schemes of NEC 2005-03-31 1.7 2008-03-31 1.7 0 1.7 1.7 Completed
683 ASSAM Science and Technology Seismic Vulnerability Assessment of Major Cities in North Eastern India (NEIST), Jorhat Schemes of NEC Schemes of NEC 2013-01-11 1.8425 2015-01-11 1.8425 0 1.8425 1.84 Completed
684 ASSAM Science and Technology Setting up of model rain water harvesting system in NIRD-NERC Guwahati (NIRD) Schemes of NEC Schemes of NEC 2013-01-11 0.0703 2016-01-11 0.0703 0 0.0703 0.07 Completed
685 ASSAM Science and Technology Strengthening on Geo-Informatic Application for Rural Development (C-GARD) laboratory (NIRD), National Institute of Rural Development (NIRD&PR), Guwahati Schemes of NEC Schemes of NEC 2011-02-28 1.8197 2014-02-28 1.8197 0 1.8197 1.82 Completed
686 ASSAM Transport and Communication 5 Nos. road in Silchar Town Schemes of NEC Schemes of NEC 2004-11-18 4.99 2007-11-18 4.66 0 4.66 4.66 Completed
687 ASSAM Transport and Communication Agia-Medhipara-Phulbari-Tura Schemes of NEC Schemes of NEC 2005-12-16 19.9896 2008-12-16 17.99 0 17.99 17.99 Completed
688 ASSAM Transport and Communication Amingaon-North Guwahati Schemes of NEC Schemes of NEC 2004-08-16 4.85 2007-08-16 4.85 0 4.85 4.85 Completed
689 ASSAM Transport and Communication Baramara-Rangagarh road Schemes of NEC Schemes of NEC 2004-08-04 4.7318 2007-08-04 4.73 0 4.73 4.73 Completed
690 ASSAM Transport and Communication Bhawanipur NH-31 to Manas National Park via Saudarvitha Ananda Bazar Road Schemes of NEC Schemes of NEC 2013-02-19 57.77 2016-02-19 51.993 0 51.993 51.99 Completed
691 ASSAM Transport and Communication Bridge over Gaglacherra road Schemes of NEC Schemes of NEC 2006-08-24 13.91 2009-08-24 13.32 0 13.32 13.32 Completed
692 ASSAM Transport and Communication Bridge over river Barak at Fulertal Schemes of NEC Schemes of NEC 2005-03-01 19.27 2008-03-01 17.636 0 17.636 17.64 Completed
693 ASSAM Transport and Communication Construction of Hangars and Apron at LGBI Airport, Guwahati Schemes of NEC Schemes of NEC 2013-02-20 32.06 2016-02-20 18.35 0 18.35 18.35 Completed
694 ASSAM Transport and Communication Construction of Majuli-Bangaon(Dakchin Pat Satra) Road Schemes of NEC Schemes of NEC 2018-03-13 14.91 2021-03-13 0.1 0 0.1 0.1 Completed
695 ASSAM Transport and Communication Digboi-Pengiri-Bordumsa-Mohadevpur road Schemes of NEC Schemes of NEC 2006-09-05 42.89 2009-09-05 38.6 0 38.6 38.6 Completed
696 ASSAM Transport and Communication Extension of Apron at Jorhat Airport Schemes of NEC Schemes of NEC 2013-02-20 9.51 2016-02-20 5.71 0 5.71 5.71 Completed
697 ASSAM Transport and Communication Extention of Runway to 7500 feet and construction of Isolation bay and Taxi way at Dibrugarh Airport Schemes of NEC Schemes of NEC 2013-02-20 56.34 2016-02-20 31.6959 0 31.6959 31.7 Completed
698 ASSAM Transport and Communication Hajo-Nalbari-Sarthebari Schemes of NEC Schemes of NEC 2004-08-18 66.31 2007-08-18 59.68 0 59.68 59.68 Completed
699 ASSAM Transport and Communication Improvement of Mairang-Ranigodown-Azra Road Schemes of NEC Schemes of NEC 2010-12-22 24.94 2013-12-22 22.45 0 22.45 22.45 Completed
700 ASSAM Transport and Communication Improvement of Silchar-Kalain road connecting NH-53 to NH-44 Schemes of NEC Schemes of NEC 2010-02-18 59.25 2013-02-18 53 0 53 53 Completed
701 ASSAM Transport and Communication ISBT Jorhat Schemes of NEC Schemes of NEC 2006-08-24 11.3779 2009-08-24 9.9 0 9.9 9.9 Completed
702 ASSAM Transport and Communication ISTT Guwahati Schemes of NEC Schemes of NEC 2005-05-09 9.6027 2008-05-09 8.64 0 8.64 8.64 Completed
703 ASSAM Transport and Communication Jowai-Nartiang-Khanduli-Baithalangso Schemes of NEC Schemes of NEC 2011-02-23 71 2011-02-23 63 0 63 63 Completed
704 ASSAM Transport and Communication Laimekuri-Nari-Telem-Rimi road Schemes of NEC Schemes of NEC 2004-08-18 2.2363 2008-08-18 2.01 0 2.01 2.01 Completed
705 ASSAM Transport and Communication Lanka-Garampani road Schemes of NEC Schemes of NEC 2004-07-15 47.5333 2008-07-15 42.78 0 42.78 42.78 Completed
706 ASSAM Transport and Communication Na Ali Road Schemes of NEC Schemes of NEC 2006-09-05 52.8 2009-09-05 47.52 0 47.52 47.52 Completed
707 ASSAM Transport and Communication Pakke-Seijosa-Itakhola Schemes of NEC Schemes of NEC 2015-06-02 13.76 2018-06-02 12.384 0 12.384 12.38 Completed
708 ASSAM Transport and Communication Pandit-Hemchandra road Schemes of NEC Schemes of NEC 2006-11-09 30.68 2009-11-09 27.61 0 27.61 27.61 Completed
709 ASSAM Transport and Communication Rampur-Belsor road Schemes of NEC Schemes of NEC 2005-03-01 16.41 2008-03-01 15.37 0 15.37 15.37 Completed
710 ASSAM Transport and Communication Rehabilitation of Silchar-Kalain road Schemes of NEC Schemes of NEC 2008-05-20 4.9284 2011-05-20 4.43 0 4.43 4.43 Completed
711 ASSAM Transport and Communication Saphekati-Pethakuti road Schemes of NEC Schemes of NEC 2007-09-21 19.9 2010-09-21 16.5 0 16.5 16.5 Completed
712 ASSAM Transport and Communication Silchar-Dwarband-Gaglacherra Road Schemes of NEC Schemes of NEC 2004-08-18 85.8159 2007-08-18 77.5343 0 77.5343 77.53 Completed
713 ASSAM Transport and Communication Tuensang-Longleng-Ladaigarh road Schemes of NEC Schemes of NEC 2006-12-15 14.14 2009-12-15 12.73 0 12.73 12.73 Completed
714 ASSAM Transport and Communication Upgradation of Bhanga-Anipur-Kanaibazar Schemes of NEC Schemes of NEC 2004-08-18 86.4988 2007-08-18 76.7 0 76.7 76.7 Completed
715 ASSAM Transport and Communication Wokha-Merapani road Schemes of NEC Schemes of NEC 2006-02-09 34.83 2009-02-27 31.35 0 31.35 31.35 Completed
716 ASSAM Tourism and Culture Construction of Yatriniwas-cum-NEC Guest House at Paltan Bazar, Guwahati Schemes of NEC Schemes of NEC 2005-07-25 11.2447 2008-07-25 10.12 0 10.12 10.12 Completed
717 ASSAM Tourism and Culture Creation of Facilities for Tourists at Mahamaya Temple, Dhubri, Assam Schemes of NEC Schemes of NEC Choose... 2023-03-31 11.76 2026-03-31 2.94 5.88 8.82 5.88 Ongoing
718 ASSAM Tourism and Culture Establishment of a Yatri Niwas and a Guest House at Silghat, Nagaon, Assam Schemes of NEC Schemes of NEC Choose... 2023-03-31 8.95 2026-03-31 2.24 2.2375 4.4775 Ongoing
719 ASSAM Tourism and Culture Integrated Development of Agnigarh with development of adjacent Riverfront Park towards Ganeshghat at Tezpur, Assam Schemes of NEC Schemes of NEC Choose... 2023-03-31 10.96 2026-03-31 5.48 5.48 10.96 2.74 Ongoing
720 ASSAM Tourism and Culture Preparation of Project Profiles for Tourism Infrastructure in the Bodoland Territorial Council Areas, Assam Schemes of NEC Schemes of NEC 2006-08-29 2 2009-08-29 1.8 0 1.8 0.9 Ongoing
721 ASSAM Tourism and Culture Tea Museum at Dibrugarh, Assam Schemes of NEC Schemes of NEC 2014-03-05 3.1441 2017-03-05 2.8297 0 2.8297 2.83 Completed
722 ASSAM Tourism and Culture The Buddhist Destination Centre at Sivasagar Buddha Vihar, Sivasagar District, Assam Schemes of NEC Schemes of NEC 2016-07-27 3.4 2019-07-27 3.4 0 3.4 3.4 Completed
723 ASSAM Education Transformation of 20 schools as Centre of Excellence in the Kamrup District PM-DevINE Dept. of Education 2023-03-27 132.86 2025-11-30 63.93 38.0786 102.0086 31.965 Ongoing
724 ASSAM Tourism and Culture Development of Maa Kamakhya Access corridor at Guwahati in the capital region PM-DevINE Public works Department 2024-01-04 498.37 2026-03-15 0 Ongoing
725 ASSAM Roads and Bridges Upgradation/widening of existing 2 lane road to 4 lane road connecting LGB International Airport From VIP junction to Dharapur Junction, including (i) 4 lane grade separated junction at Dharapur (ii) 2 lane excess road from SOS junction to existing terminal building and (iii) 2 lane temporary exit from existing terminal building PM-DevINE Public works Department 2024-01-24 271.45 2026-02-26 135.72 135.73 271.45 167.1493 Ongoing
726 ASSAM Health Construction of medical college (100 admissions) at Sivasagar District PM-DevINE Dept. of Health & familly 2024-01-04 499.82 2026-03-14 56 117.722 173.722 Ongoing
727 ASSAM Power Construction of 2x50 MVA, 132/33KV GIS (Gas Insulated Substation) at 220/132 KV Amingaon GIS, Assam NESIDS-OTRI NESIDS Dept. of Power 2022-04-20 30.5397 2024-04-30 7.7349 15.26985 23.00475 Ongoing
728 ASSAM Transport and Communication Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tinali and Panimur NESIDS-ROADS NESIDS Public works Department 2019-05-01 227.17 2022-07-31 227.17 0 227.17 227.168 Completed
729 ASSAM Transport and Communication Construction of RCC Bridge No. 3/1 on the road from NH-39 Silonijan State Dispensary to Dhansiri Par Ghat via Panika Basti (including approach), Assam. NESIDS-ROADS NESIDS Public works Department 2022-04-20 20.59 2024-04-30 17.7 2.8964 20.5964 0.1 Completed
730 ASSAM Transport and Communication Construction of RCC Bridge No. 3/1 over River Dikhow at Chiripuria Ghat along with road from Chiripuria via Ajanpeer Dorgarh road to NH 37 in assam NESIDS-ROADS Public works Department 2019-08-14 17.99 2020-03-31 16.8991 0 16.8991 15.2 Completed
731 ASSAM Transport and Communication Construction of RCC Bridge over river Aie at Aie Powali including approach & protection work in Chirang District NESIDS-ROADS NESIDS Public works Department 2019-02-14 69.74 2020-03-31 69.7389 0 69.7389 64.3494 Completed
732 ASSAM Transport and Communication Construction of three lane Road over Bridge at Jorhat in replacement of Railway LC gate No ST-58 on Na-Ali, Jorhat District in Assam during 2018-19 NESIDS-ROADS NESIDS Public works Department 2018-08-30 67.75 2020-03-31 67.75 0 67.75 67.7392 Completed
733 ASSAM Transport and Communication Improvement & Upgradation of Jamuguri to Nagsankar connected Road (Ch.0.00 Km to 12.50 Km) in Sonitpur District, Assam under NESIDS for F.Y. 2021-22. NESIDS-ROADS NESIDS Public works Department 2022-04-20 22.73 2024-04-30 22.72 0 22.72 21.18 Completed
734 ASSAM Transport and Communication Improvement & Widening of Lokopriya Gopinath Bordoloi Road, SH-3 B from Ch.0.00 Km to Ch. 18.65 Km, Assam under NESIDS for the year 2021-22. NESIDS-ROADS NESIDS Public works Department 2022-04-20 79.13 2024-04-30 79.1264 0 79.1264 71.65 Completed
735 ASSAM Transport and Communication Widening & Improvement of Bhadoi Panch Ali to Joypur Khonsa Road via Tipom, Assam NESIDS-ROADS NESIDS Public works Department 2022-04-20 57.99 2024-04-30 43.5007 0 43.5007 30.87 Ongoing
736 ASSAM Transport and Communication Widening and Strengthening of Nalbari Palla road at Solmara to Bangaon Jagra road via Billeswar Devalaya in Assam NESIDS-ROADS NESIDS Public works Department 2022-04-20 21.14 2024-04-30 17.0175 0 17.0175 15.71 Completed
737 ASSAM Transport and Communication Development & improvement of Jagun Namchik Miao road (Assam portion) including Br.No. 9/1 over river Namchik in Tinsukia District NESIDS-ROADS NERSDS Public works Department 2020-01-30 24.89 2023-01-31 24.6047 0.95 25.5547 20.01 Completed
738 ASSAM Transport and Communication Improvement and Widening of Road from Chaygaon to ukium in Assam NESIDS-ROADS NESIDS Public works Department 2023-10-16 102.69 2026-10-31 89.93 11.78 101.71 22 Completed
739 ASSAM Transport and Communication Mawshynrut-Boko-Hahim Road NESIDS-ROADS NERSDS Public works Department 2020-01-24 23.37 2021-08-31 23.37 0 23.37 23.03 Completed
740 ASSAM Transport and Communication Upgradation on Interstate Road from Sonapur to Byrnihat in the State of Assam and Meghalaya(LO-17-95 km) NESIDS-ROADS NESIDS Public works Department 2023-10-16 62.24 2026-04-30 42.16 11 53.16 22 Completed
741 ASSAM Water Supply Digboi Town Water Supply Scheme in Assam NESIDS-OTRI NESIDS Public Health & Engg Depa 2019-08-29 41.688 2020-03-31 14.1344 0 14.1344 Ongoing
742 ASSAM Water Supply Infrstructure Development of Greater Kheroni Piped water Supply Scheme in Karbi Anglong , Assam NESIDS-OTRI NESIDS Hill Areas Dept 2019-02-21 21.8772 2020-03-31 21.2786 0 21.2786 19.0414 Ongoing
743 ASSAM Water Supply Water Supply Projects in Tinsukia Town (Phase-III) Tinsikia District in Assam NESIDS-OTRI NESIDS Department of Housing and 2019-03-01 27.1952 2020-03-31 0.1 6.0371 6.1371 0.1 Ongoing
744 ASSAM Transport and Communication Mukroh-Umspar linking Jrikyndeng Road NESIDS-ROADS NERSDS Public works Department 2019-07-30 58.01 2021-12-23 57.34 0 57.34 57.34 Completed
745 ASSAM Transport and Communication Construction of RCC Bridge No. 17/1 over river Dhansikri on Udalguri Bhairabkunda road NESIDS-ROADS NERSDS Public works Department 2022-03-15 41.75 2024-03-15 41.75 0 41.75 38.02 Completed
746 ASSAM Education Assam University Silchar (including Diphu Campus) - CS NESIDS-OTRI NLCPR Assam University 1999-04-01 13 2005-07-31 11.7 0 11.7 13 Completed
747 ASSAM Education Bodo Language Research and Development centre for Gauhati University Kokrajhar(BTC Package-2) Special Packages BTC 2011-01-28 2.96 2014-01-31 2.5337 0 2.5337 2.5337 Completed
748 ASSAM Education Construction of 15 HSS Buildings (BAC Area) NESIDS-OTRI NLCPR PWD building 2001-01-31 1.5 2003-03-31 1.35 0 1.35 1.5 Completed
749 ASSAM Education construction of academic - cum - Administrative building of K.K Handique Government Sanskrit College NESIDS-OTRI NLCPR PWD building 2007-06-21 2.3809 2009-06-30 1.6971 0 1.6971 1.6971 Ongoing
750 ASSAM Education Construction of Govt college of Arts & Crafts in Kamrup District NESIDS-OTRI NLCPR Cultural Affairs Dept 2011-06-27 5 2013-12-31 1.7861 0 1.7861 Ongoing
751 ASSAM Education Construction of RCC Multistoried Auditorium Building attached to Haflong Government College at Haflong in Dima Hasao District NESIDS-OTRI NLCPR Hill Areas Dept 2013-01-16 2.3021 2015-01-31 2.063 0 2.063 2.063 Ongoing
752 ASSAM Education Development of infrastructure facilities of Kahrupetia college, i.e construction of class rooms , computer labratory with Ac, hostel for tennis, elctricity facilities, water supply and sanitary installation in darrang distt. NESIDS-OTRI NLCPR DC darrang 2007-10-24 1.7568 2008-11-29 1.1227 0 1.1227 0.5533 Ongoing
753 ASSAM Education Guwahati University Campus. Kokrajhar NESIDS-OTRI NLCPR PWD building 2003-01-30 5 2004-03-31 4.365 0 4.365 4.61 Completed
754 ASSAM Education I.I.T. Guwahati-CS NESIDS-OTRI NLCPR IIT Guwahati 1999-04-01 34 2005-07-31 30.6 0 30.6 34 Completed
755 ASSAM Education Infrastructure Development of Assam Institute of Management, Guwahati NESIDS-OTRI NLCPR PWD building 2010-07-23 14.6111 2012-07-31 8.2916 0 8.2916 6.7689 Ongoing
756 ASSAM Education Infrastructure Development of Assam SLET Commission NESIDS-OTRI NLCPR Higher Education Dept 2010-11-15 3.3446 2012-11-30 1.1804 0 1.1804 1.1804 Ongoing
757 ASSAM Education Infrastructure Development of Haflong Government College Halflong NESIDS-OTRI NLCPR Hill Areas Dept 2014-12-29 10.0549 2017-01-31 9.0494 0 9.0494 7.2 Ongoing
758 ASSAM Education Infrastructure Development of North Eastern Judicial Officers Training Institute, Guwahati (Assam) NESIDS-OTRI NLCPR PWD building 2005-12-27 3.5428 2007-12-31 3.1199 0 3.1199 3.1199 Completed
759 ASSAM Education Modernisation & Augmentation of Infrastructure Development of Assam Textile Institute at Guwahati NESIDS-OTRI NLCPR PWD building 2006-09-12 7.4149 2009-09-30 2.3357 0 2.3357 2 Ongoing
760 ASSAM Education New Infrastrucutre for Cotton College. NESIDS-OTRI NLCPR PWD building 2000-02-28 3 2001-06-30 2.7 0 2.7 3 Completed
761 ASSAM Education Sarva Shiksha Abhiyan for Assam NESIDS-OTRI NLCPR Elementary Education Dept 2006-03-28 27.7 2006-12-29 27.7 0 27.7 27.7 Completed
762 ASSAM Education Sarva Shiksha Abhiyan for Assam (2006-07) NESIDS-OTRI NLCPR Elementary Education Dept 2006-06-29 102.9341 2007-03-31 102.9294 0 102.9294 102.9267 Completed
763 ASSAM Education Tezpur University-CS NESIDS-OTRI NLCPR Tezpur University 1999-04-01 24.33 2005-07-31 21.997 0 21.997 24.33 Completed
764 ASSAM Irrigation and Flood Control 89 Nos. of minor irrigation schemes NESIDS-OTRI NLCPR Irrigation Dept 1999-02-15 25.2 2005-07-31 22.68 0 22.68 25.2 Completed
765 ASSAM Irrigation and Flood Control A/E measures to protect Naharkatia Town from the erosion of river Burhi-Dehing at Jagun Gaon area. NESIDS-OTRI NLCPR Water Resource Dept 2012-12-28 7.311 2013-08-31 6.5799 0 6.5799 2.63 Completed
766 ASSAM Irrigation and Flood Control Amreng Minor irrigation Scheme (Karbi Anglong) NESIDS-OTRI NLCPR Hill Areas Dept 2001-09-18 12 2005-03-31 10.8 0 10.8 12 Completed
767 ASSAM Irrigation and Flood Control Anti Erosion measures to protect Dehingpuria Area near Margherita Town from the erosion of River Buridehing. NESIDS-OTRI NLCPR Water Resource Dept 2012-12-28 5.3999 2013-08-31 4.86 0 4.86 1.944 Completed
768 ASSAM Irrigation and Flood Control Anti-Erosion/Flood control Schemes in 25 different locations of Brahmaputra and Barak Valley NESIDS-OTRI NLCPR Water Resource Dept 1999-02-15 60.6661 2007-03-31 54.4301 0 54.4301 60.6661 Completed
769 ASSAM Irrigation and Flood Control Belsiri Lift Irrigation Scheme NESIDS-OTRI NLCPR Irrigation Dept 2007-09-28 2.1742 2008-06-30 0.6848 0 0.6848 0.6842 Ongoing
770 ASSAM Irrigation and Flood Control Borjan Composite Irrigation Scheme in Assam (Karbi Anglong) NESIDS-OTRI NLCPR Hill Areas Dept 2005-10-28 22.2864 2009-10-31 20.0578 0 20.0578 20.0578 Completed
771 ASSAM Irrigation and Flood Control Burinagar Lift Irrigation scheme (Nalbari Division) NESIDS-OTRI NLCPR Irrigation Dept 2011-06-27 2.1569 2013-07-31 0.7347 0 0.7347 0.7347 Ongoing
772 ASSAM Irrigation and Flood Control Champamati Irrigation Project (BTC Package) Special Packages BTC 2005-10-31 43.85 2007-12-31 43.85 0 43.85 43.85 Completed
773 ASSAM Irrigation and Flood Control Construction of dakhindol Lift Irrigation Scheme at Sonitpur and Joisidhi, Assam NESIDS-OTRI NLCPR Irrigation Dept 2007-09-28 2.1121 2008-06-30 1.8636 0 1.8636 1.5207 Completed
774 ASSAM Irrigation and Flood Control D.T.W. Irrigation Scheme at 30 points under Borsola Development Block in Sonitpur District NESIDS-OTRI NLCPR Dept. of Power 2014-12-29 18.0846 2017-01-31 16.081 0 16.081 16.081 Ongoing
775 ASSAM Irrigation and Flood Control Deithor Minor Irrigation cum Community Development Project(Karbi Anglong) NESIDS-OTRI NLCPR Hill Areas Dept 2010-03-22 2.222 2013-04-30 0.7842 0 0.7842 0.6 Ongoing
776 ASSAM Irrigation and Flood Control Dikangshi Irrigation Project NESIDS-OTRI NLCPR Hill Areas Dept 2014-02-18 10.2576 2016-02-29 9.1992 0 9.1992 9.1992 Completed
777 ASSAM Irrigation and Flood Control Farkongcho Irrigation Scheme NESIDS-OTRI NLCPR Hill Areas Dept 2013-09-23 10.2196 2015-09-30 9.1756 0 9.1756 9.1756 Completed
778 ASSAM Irrigation and Flood Control Flood Control scheme (5 No.) - Protection of different reaches from the erosion of river Dhansiri at Assam, K.A. Distt. Phase-I NESIDS-OTRI NLCPR Water Resource Dept 2002-02-27 2.1 2003-03-31 1.89 0 1.89 2.1 Completed
779 ASSAM Irrigation and Flood Control Flood Control scheme (5 No.) - Protection of different reaches from the erosion of river Dhansiri at Assam, K.A. Distt. Phase-II NESIDS-OTRI NLCPR Water Resource Dept 2002-02-27 1.65 2003-03-31 1.485 0 1.485 1.65 Completed
780 ASSAM Irrigation and Flood Control Flood Control scheme (5 No.) - Protn. Of Harinagar Pt-III area cum dyke along R/B of river Surma (international boundary) from Harinagar to Nathanpur NESIDS-OTRI NLCPR Water Resource Dept 2002-02-27 3.6498 2003-03-31 3.2848 0 3.2848 3.6498 Completed
781 ASSAM Irrigation and Flood Control Flood Control scheme (5 No.) - Strengthening of Kahai spur (stone spur no. 2) to protect Dibrugarh town from the erosion of river Brahmaputra NESIDS-OTRI NLCPR Water Resource Dept 2002-02-27 6.55 2003-03-31 5.6249 0 5.6249 6.2498 Completed
782 ASSAM Irrigation and Flood Control Flood Control Scheme (5 No.) - Protn. of Guwahati town from erosion of river Brahmaputra from Kachari Bazaar to D.C. Court NESIDS-OTRI NLCPR Water Resource Dept 2002-02-27 3.3321 2003-03-31 2.9989 0 2.9989 3.3321 Completed
783 ASSAM Irrigation and Flood Control Flow Irrigation Scheme from River Kulsik at Palashgarh NESIDS-OTRI NLCPR Irrigation Dept 2011-05-31 19.2788 2013-06-30 17.3366 0 17.3366 17.3366 Completed
784 ASSAM Irrigation and Flood Control Installation of one Lakh Shallow tube wells NESIDS-OTRI NLCPR Irrigation Dept 2000-01-25 68.95 2002-03-31 62.055 0 62.055 68.95 Completed
785 ASSAM Irrigation and Flood Control Kaku Basti Irrigation Scheme NESIDS-OTRI NLCPR Irrigation Dept 2012-06-28 8.7165 2013-10-31 7.7958 0 7.7958 7.7958 Completed
786 ASSAM Irrigation and Flood Control Khowra flow Irrigation Scheme NESIDS-OTRI NLCPR Hill Areas Dept 2012-06-28 3.5533 2013-10-31 3.1869 0 3.1869 3.1869 Completed
787 ASSAM Irrigation and Flood Control Langkhailu Irrigation Scheme NESIDS-OTRI NLCPR Hill Areas Dept 2013-09-26 10.3768 2015-09-30 9.3184 0 9.3184 9.3184 Completed
788 ASSAM Irrigation and Flood Control LIS over river Buridihing in Sassoni Mouza in Dibrugarh Dist. NESIDS-OTRI NLCPR Irrigation Dept 2007-12-26 2.3979 2009-12-31 2.1158 0 2.1158 2.1158 Completed
789 ASSAM Irrigation and Flood Control LIS over river Buriduhing in Tengakhat Kheremia Mouza in Dibrugarh Distt. NESIDS-OTRI NLCPR Irrigation Dept 2007-12-26 2.9163 2009-12-31 2.5732 0 2.5732 2.5732 Completed
790 ASSAM Irrigation and Flood Control Newzoar Flow Irrigation scheme NESIDS-OTRI NLCPR Hill Areas Dept 2015-06-26 3.1478 2017-12-30 2.7698 0 2.7698 2.2202 Ongoing
791 ASSAM Irrigation and Flood Control Phangcho Basti Irrigation Scheme NESIDS-OTRI NLCPR Hill Areas Dept 2012-10-17 9.5269 2014-04-30 8.4405 0 8.4405 8.4405 Completed
792 ASSAM Irrigation and Flood Control Phumen Phangcho Minor Irrigation Scheme (Karbi anglong) NESIDS-OTRI NLCPR Hill Areas Dept 2011-06-27 6.0941 2012-10-31 5.4693 0 5.4693 5.4693 Completed
793 ASSAM Irrigation and Flood Control Raising & strengthening Brahmaputra Dyke from Dizmore to Sonarigaon from 14th to23.15th including closing of Amguri and Arney Nalla. NESIDS-OTRI NLCPR Water Resource Dept 2004-01-07 11.51 2006-03-31 9.3238 0 9.3238 9.8238 Completed
794 ASSAM Irrigation and Flood Control Rajendrapur Flow Irrigation Scheme NESIDS-OTRI NLCPR Irrigation Dept 2013-02-25 21.4695 2016-02-29 19.3225 0 19.3225 19.3225 Completed
795 ASSAM Irrigation and Flood Control Sukla Irrigation Project (BTC Package) Special Packages BTC 2005-10-31 8.13 2007-12-31 8.1272 0 8.1272 8.1272 Completed
796 ASSAM Irrigation and Flood Control Thengkhari Barhola Pathar Irrigation Scheme NESIDS-OTRI NLCPR Irrigation Dept 2014-06-27 4.1032 2016-06-30 2.7052 0 2.7052 2.7052 Ongoing
797 ASSAM Irrigation and Flood Control Washillinghadi ELIS, NC Hills minor irrigation schemes. NESIDS-OTRI NLCPR Hill Areas Dept 2001-09-18 2.7 2005-03-31 2.43 0 2.43 2.7 Completed
798 ASSAM Health Assam Medical College (HOPE) NESIDS-OTRI NLCPR PWD building 2003-03-21 20 2005-12-31 18 0 18 18.401 Completed
799 ASSAM Health College of Nursing at Kokrajhar NESIDS-OTRI NLCPR PWD building 2013-05-17 14.2721 2015-05-30 12.8429 0 12.8429 12.83339 Completed
800 ASSAM Health Construction of 100 bedded hospital at Kajalgaon in BTC area(BTC Package) Special Packages BTC 2005-01-27 38.52 2008-01-31 37.7169 0 37.7169 38.5161 Completed
801 ASSAM Health Construction of Medical College at Nalbari under NLCPR in Assam NESIDS-OTRI NLCPR PWD building 2017-12-07 217.821 2019-12-07 190.3389 0 190.3389 190.3389 Completed
802 ASSAM Health Construction of two storeyed building of SJN Government Homoeopathic Medical College and Hospital at Panjabari, Guwahati NESIDS-OTRI NLCPR PWD building 2008-11-12 2.6571 2010-10-31 2.3444 0 2.3444 2.3444 Completed
803 ASSAM Health Conversion of 100 bedded Civil Hospital to 200 Bedded Hospital with construction of Staff Quarters and improvement & renovation of existing buildings at Haflong(NC Hills) NESIDS-OTRI NLCPR PWD building 2004-07-29 11.1981 2006-12-31 9.7064 0 9.7064 10.1264 Completed
804 ASSAM Health Renovation/Re-construction of RNB Civil Hospital at Kokrajhar (BTC Package) Special Packages BTC 2005-10-31 7.58 2007-10-31 7.5809 0 7.5809 7.5809 Completed
805 ASSAM Health Sankaradeva Netralaya NESIDS-OTRI NLCPR Sankaradeva Netralaya 2000-05-11 1 2003-02-25 0.9 0 0.9 1 Completed
806 ASSAM Health Shankar Dev Netralaya (equipments) NESIDS-OTRI NLCPR Sankaradeva Netralaya 2002-11-12 0.82 2003-05-31 0.738 0 0.738 0.82 Completed
807 ASSAM Health Shankar Dev Netralaya (OT) NESIDS-OTRI NLCPR Sankaradeva Netralaya 2003-03-26 1.53 2003-09-30 1.377 0 1.377 1.53 Completed
808 ASSAM Health Upgradation of Guwahati Medical College. NESIDS-OTRI NLCPR PWD building 2000-02-10 8 2003-03-31 7.2 0 7.2 8 Completed
809 ASSAM Health Upgradation of hospital at Udalguri to 100 bedded Hospital. NESIDS-OTRI NLCPR PWD buildings 2001-02-22 1.69 2003-03-31 1.521 0 1.521 1.69 Completed
810 ASSAM Miscellaneous 1250 Capacity Auditorium at Guwahati. NESIDS-OTRI NLCPR PWD building 2001-03-15 20 2005-07-31 18.1182 0 18.1182 19.9182 Completed
811 ASSAM Miscellaneous Bodoland Bhawan at Dwarka New Delhi(BTC Package-2) Special Packages BTC 2011-01-10 9.1 2014-01-10 8.4416 0 8.4416 8.4416 Completed
812 ASSAM Miscellaneous Bodoland Indigenous Tribal Art & Cultural Complex-cumFilm Studio at Kathalguri, Kokrajhar NESIDS-OTRI NLCPR Cultural Affairs Dept 2007-12-24 4.9514 2009-12-31 3.2037 0 3.2037 3.2037 Ongoing
813 ASSAM Miscellaneous C/o Community hall at Diyungbra (Digendu) under PWD(Building), Haflong division (DHATC) Special Packages DHATC 2017-07-26 2.94 2024-10-10 2.902 0 2.902 1.4705 Ongoing
814 ASSAM Miscellaneous C/o Community hall at Mahur under PWD ( Building), Haflong division (DHATC) Special Packages DHATC 2017-07-26 2.94 2018-08-31 2.9319478 0 2.9319478 1.4705 Ongoing
815 ASSAM Miscellaneous C/o Community Hall at Nobdiangting under PWD (Building), Haflong division (DHATC) Special Packages DHATC 2017-07-26 2.94 2018-08-31 2.9018824 0 2.9018824 1.4705 Ongoing
816 ASSAM Miscellaneous Cashew processing Plant at Mankachar in Dhubri District in Assam NESIDS-OTRI NLCPR NERAMAC 2010-01-14 2.4834 2011-01-31 2.0344 0 2.0344 1.648 Ongoing
817 ASSAM Miscellaneous Centre for Plasma Physics, Guwahati. NESIDS-OTRI NLCPR Institute for Plasma Rese 2000-03-14 4.5 2003-03-31 4.05 0 4.05 4.5 Completed
818 ASSAM Miscellaneous Comprehensive Development Plan for college of Fisheries for augmenting Human Resources in Assam NESIDS-OTRI NLCPR Department of Fisheries 2010-06-28 8.7482 2012-06-30 3.0876 0 3.0876 3.0876 Ongoing
819 ASSAM Miscellaneous Construction of Auditorium at Songpijang in Haflong, Dima Hasao District, NCHAC. Special Packages DHATC 2016-02-29 2.38 2018-08-31 2.3037 0 2.3037 2.3037 Completed
820 ASSAM Miscellaneous Construction of Bodofa Cultural Complex at Kokrajhar (BTC Package) Special Packages BTC 2005-02-07 18.44 2007-03-31 17.94 0 17.94 18.44 Completed
821 ASSAM Miscellaneous Construction of Bus Terminals at Barpeta town NESIDS-OTRI NLCPR Department of Housing and 2010-10-11 1.8596 2012-03-31 1.4208 0 1.4208 1.2997 Ongoing
822 ASSAM Miscellaneous construction of cold storage ar Barama (Baska))(BTC Package-2) Special Packages BTC 2011-01-10 8.9 2014-01-10 8.5888 0 8.5888 8.5888 Completed
823 ASSAM Miscellaneous Construction of Cold storage at Kokrajahar district(BTC Package) Special Packages BTC 2005-12-27 4.14 2008-12-27 4.1365 0 4.1365 4.1365 Completed
824 ASSAM Miscellaneous Construction of Cold Storage at Udalguri district(BTC Package) Special Packages BTC 2005-12-27 4.14 2008-12-27 4.1365 0 4.1365 4.1365 Completed
825 ASSAM Miscellaneous Construction of Community Hall at Dehangi Bazar under PWD ( Building), Haflong division (DHATC) Special Packages DHATC 2017-07-26 2.94 2018-08-31 1.4705 0 1.4705 1.4705 Ongoing
826 ASSAM Miscellaneous Construction of Cultural Centre/Complex at Dotma in Kokrajhar NESIDS-OTRI NLCPR Cultural Affairs Dept 2007-12-26 2.2106 2009-12-31 0.9905 0 0.9905 0.9905 Ongoing
827 ASSAM Miscellaneous Construction of Home for orphans and destitute children at Haflong along with staff quarters including one Vocational Training Centre for children NESIDS-OTRI NLCPR PWD building 2013-06-11 2.9848 2014-11-30 2.6572 0 2.6572 2.128 Completed
828 ASSAM Miscellaneous Construction of Infrastructure (Vertical Extension) of District Centre Building at Mushalpur in Baksa District Special Packages BTC 2020-02-25 3.85 2022-02-25 3.6012 0 3.6012 3.6012 Completed
829 ASSAM Miscellaneous Construction of Joisingh Doloi Audotorium Hall at Diphu (Karbi Anglong) NESIDS-OTRI NLCPR Hill Areas Dept 2007-02-01 3.7938 2010-01-01 3.3622 0 3.3622 3.3622 Completed
830 ASSAM Miscellaneous Construction of Karmachari Bhawan at Panjabari, Guwahati under NLCPR Scheme. NESIDS-OTRI NLCPR PWD building 2017-05-11 8.8515 2019-05-11 2.724 0 2.724 2.724 Ongoing
831 ASSAM Miscellaneous Construction of Multi-Storey Secretariat Complex NESIDS-OTRI NLCPR PWD building 2003-02-18 69 2005-07-31 62.1045 0 62.1045 68.3295 Completed
832 ASSAM Miscellaneous Construction of Multistoried Car Parking cum City Hall, Jorhat NESIDS-OTRI NLCPR PWD building 2010-12-13 10.5133 2013-12-31 7.3448 0 7.3448 3.7106 Ongoing
833 ASSAM Miscellaneous Construction of North East Gate Way Bus Terminus at Srinwgai Gossaigaon(BTC Package) Special Packages BTC 2005-12-27 1.44 2008-12-27 1.4442 0 1.4442 1.4038 Completed
834 ASSAM Miscellaneous Construction of Roadside drain cum footpath and provision of roadside streetlight illumination in Naharkatia town in Dibrugarh Rural Road Division NESIDS-OTRI NLCPR Dept. of Power 2008-09-30 6.4473 2010-02-28 5.0206 0 5.0206 4.9453 Ongoing
835 ASSAM Miscellaneous Construction of S.R. Thaosen Media Centre at Haflong, Dima Hasao District. Special Packages DHATC 2016-03-28 8.16 2018-02-28 5.8531 2.1442 7.9973 4 Ongoing
836 ASSAM Miscellaneous Construction of Sankar Madhab Cultural Complex at Letekupukhuri at Bhogpur Chariali Lakhimpur iDistrict n Assam NESIDS-OTRI NLCPR Cultural Affairs Dept 2007-10-25 4.0145 2009-10-31 1.2645 0 1.2645 1.2645 Ongoing
837 ASSAM Miscellaneous Construction of super market complex at Moran revenue Town. NESIDS-OTRI NLCPR PWD building 2013-12-20 6.838 2015-06-30 2.4603 0 2.4603 Foreclosed
838 ASSAM Miscellaneous Construction of Vertical Extension of District Centre Building (Assam Type with Dyna roofing on second floor of the building). Special Packages BTC 2020-02-25 3.85 2022-02-25 3.6014 0 3.6014 3.6014 Completed
839 ASSAM Miscellaneous Development and Upgradation of Jyoti Chitraban Film and Television Institute NESIDS-OTRI NLCPR PWD building 2007-12-20 13.4677 2009-12-31 12.0352 0 12.0352 6.9348 Ongoing
840 ASSAM Miscellaneous Enhancement of existing facility in Verteniary hospital at titaguri (Kokrajhar) Samthaibari(Chirang) and Bornagaon in Udalguri Distict.)(BTC Package-2) Special Packages BTC 2011-01-28 9.02 2014-01-31 8.5927 0 8.5927 8.5927 Completed
841 ASSAM Miscellaneous Establishment of Bamboo Industrial Park (BIP) at Manderdisa, NC Hills, Assam sanctioned under DHATC Package Special Packages DHATC 2020-03-13 49.43 2024-12-31 42.1088 0 45.186 24.71 Ongoing
842 ASSAM Miscellaneous Establishment of clean meat selling booths with slaughtering facilities for pork, mutton/chevon & chicken at different markets of Karbi Anglong Special Packages KAATC 2021-02-22 4.5 2023-02-22 2.25 0 2.25 2.25 Ongoing
843 ASSAM Miscellaneous Infrastructure Development of Road Transport system under Karbi Anglong Autonomous Council (Karbi Anglong) - Part-I NESIDS-OTRI NLCPR Hill Areas Dept 2010-11-10 1.8328 2012-04-30 1.3196 0.3299 1.6495 1.3196 Ongoing
844 ASSAM Miscellaneous Integrated Skill Development Centre at Dima Hasao District of Assam. Special Packages DHATC 2016-02-29 36.6 2020-02-28 34.9967972 0 34.9967972 30.3 Completed
845 ASSAM Miscellaneous Kamakhya Temple Road Development NESIDS-OTRI NLCPR PWD Roads 2003-02-18 4.89 2003-12-31 4.401 0 4.401 4.89 Completed
846 ASSAM Miscellaneous Multi Level Parking in different parts of Guwahati NESIDS-OTRI NLCPR Guwahati Development Depa 2008-08-14 20.24 2010-01-31 15.9077 0 15.9077 15.3281 Ongoing
847 ASSAM Miscellaneous Preservation of cultural Heritage of Majuli Natun Kamalabari satra (Phase-I) NESIDS-OTRI NLCPR Cultural Affairs Dept 2009-11-05 6.1897 2011-04-30 4.3692 0 4.3692 2.1846 Ongoing
848 ASSAM Miscellaneous Project Enhancement of Rural Socio-Economy with sustainable livelihood through piggery farming in Dima Hasao in Assam Special Packages DHATC 2022-05-19 4 2022-05-20 2 2 4 2 Ongoing
849 ASSAM Miscellaneous Proposed Integrated textile Park at Kharujan Mushalpur(BTC Package-2) Special Packages BTC 2011-01-28 41 2015-01-31 39.8238 0 39.8238 39.7755 Completed
850 ASSAM Miscellaneous Proposed Town Hall at Dibrugarh. NESIDS-OTRI NLCPR Department of Housing and 2013-12-09 14.0817 2015-11-30 5.0665 0 5.0665 5.0665 Ongoing
851 ASSAM Miscellaneous Setting up of Integrated Agro- Processing Park at Lalpool (Udalguri))(BTC Package-2) Special Packages BTC 2011-01-10 9.07 2014-01-10 8.4552 0 8.4552 8.4552 Completed
852 ASSAM Miscellaneous Setting up of IT Park at Kokrajhar (BTC Package-2) Special Packages BTC 2013-03-13 25.94 2016-03-31 24.5811 0 24.5811 24.5811 Completed
853 ASSAM Miscellaneous Setting up of Model Dairy Fishery Horticulture Poultry Farm Training Centre at Kokilabari under Baksa Distt.(BTC Package -2) Special Packages BTC 2012-03-20 11.46 2015-03-20 11.4226 0 11.4226 11.276 Completed
854 ASSAM Miscellaneous Socio-Literary Cultural Complex of Bodo Sahitya Sabha at Bathooupuri, Gorchuk, Guwahati NESIDS-OTRI NLCPR Cultural Affairs Dept 2010-12-13 8.4101 2013-12-31 5.9364 0 5.9364 5.9364 Ongoing
855 ASSAM Miscellaneous Srimanta Sankardev Kalakshtra project NESIDS-OTRI NLCPR PWD building 1998-12-31 4.85 1999-11-09 4.365 0 4.365 4.85 Completed
856 ASSAM Miscellaneous Street Lighting in Jorhat City leading to Jorhat Airport NESIDS-OTRI NLCPR Dept. of Power 2010-04-05 2.1347 2011-09-30 1.8835 0 1.8835 1.5405 Ongoing
857 ASSAM Power 220 KV/DC Kathalguri Tinsukia line (30 Kms.) NESIDS-OTRI NLCPR Power Dept 1999-02-15 6.4 2004-09-30 5.76 0 5.76 6.4 Completed
858 ASSAM Power 2x50 MVA , 220/132 KV Balipara (Tezpur ) Sub-station and a 132 KV Gohpur-Depota Line NESIDS-OTRI NLCPR Power Dept 2002-10-08 13.71 2005-12-31 12.4122 0 12.4122 13.3622 Completed
859 ASSAM Power Augmentation of 1x63 and 1x59 MVA, 20/132 kv Transformer by 2x100 mva at sarusajai sub station NESIDS-OTRI NLCPR Power Dept 2002-10-07 7.8 2005-10-30 7.1621 0 7.1621 7.8 Completed
860 ASSAM Power Augmentation of 220/132 kv 2x50 mva s/s to 2x100 s/s at mariani NESIDS-OTRI NLCPR Power Dept 2002-02-27 6.37 2004-10-30 5.8267 0 5.8267 6.2464 Completed
861 ASSAM Power Augmentation of Transformer Capacity of 132/33 KV Panchgram Sub Station from 2x16 MVA to 2x25 MVA in Cachar District NESIDS-OTRI NLCPR Power Dept 2008-03-05 4.4 2011-12-01 3.96 0 3.96 3.96 Completed
862 ASSAM Power Construction of 132 KV BTPS - Kokrajhar S/C line and 132 KV Kokrajhar S/C line 132 Kv/33Kv S/S at Kokrajhar NESIDS-OTRI NLCPR Power Dept 2010-11-29 43.5775 2013-11-30 36.5107 0 36.5107 36.5107 Ongoing
863 ASSAM Power Construction of 220/132 Kv, 1x50 MVA, 132/33 Kv and 1x16 MVA Agia S/S NESIDS-OTRI NLCPR Power Dept 2007-03-28 7.3868 2008-05-30 6.498 0 6.498 6.498 Completed
864 ASSAM Power Construction of 220/132 KV, 2x50 MVA and 220/33 KV, 2x40 MVA Azara Sub - Station with 220 Kv LILO line from one circuit of 220 KV DC Agia - Sarusajia line along with construction of 132 KV SC line to Boko with terminal bay at 132/33 Boko Sub-station NESIDS-OTRI NLCPR Power Dept 2007-09-26 36.2207 2010-03-31 29.2686 0 29.2686 29.2686 Ongoing
865 ASSAM Power Construction of new 33/11 kV, 2x5 MVA S/S at Thirubari with 45 Km 11 kV lines and 55 Km 33 kV lines from Dhiligaon to Thirubari NESIDS-OTRI NLCPR Power Dept 2012-11-23 8.9094 2013-11-26 3.2065 0 3.2065 3.2065 Foreclosed
866 ASSAM Power Electrification of Tribal Villages NESIDS-OTRI NLCPR Power Dept 2002-01-28 1.36 2004-03-31 1.35 0 1.35 1.36 Completed
867 ASSAM Power Installation of 2x31.5 MVA 132/33 KV transformers at Sarusajai Sub Station NESIDS-OTRI NLCPR Power Dept 2002-12-10 5.26 2004-11-30 4.7554 0 4.7554 5.2154 Completed
868 ASSAM Power Installation of Street Lights from Lokpriya Gopinath Bordoloi International Airport upto Jalukbari near Guwahati University for National Games 2005 NESIDS-OTRI NLCPR PWD roads 2004-12-24 2.3916 2005-12-31 2.0854 0 2.0854 2.1524 Completed
869 ASSAM Power Namrup Sub- station 2x50 MVA, 220/132 kV NESIDS-OTRI NLCPR Power Dept 1999-01-19 0.1057 2007-03-31 0.1057 0 0.1057 0.1057 Ongoing
870 ASSAM Power Powerline to Balipara Industrial Growth Centre, Sonitpur NESIDS-OTRI NLCPR Power Dept 2004-09-30 8.7289 2005-04-30 5.9602 0 5.9602 6.2661 Ongoing
871 ASSAM Power Renovation of BTPS-Agia-Sarusajai 220 kV D/C Transmission Line NESIDS-OTRI NLCPR Power Dept 2003-01-30 28.38 2004-05-31 25.542 0 25.542 28.2051 Completed
872 ASSAM Power Replacement of old 11 KV MCCB by VCB at Beheting, Hezalbank,doomdooma, Duliajan, North Lakhimpur, Meherpur, karimganj, Tangla, Amingaon, Narangi, Nagaon,Kaliabor, Kathiatoli, rupohi, Samaguri, bokajan, jorhat, Balipara, Tezpur,chapaguri & Diphu S/S NESIDS-OTRI NLCPR Power Dept 2003-02-18 5.1 2007-07-31 5.1 0 5.1 5.1 Completed
873 ASSAM Power ST&D - Augmentation of 33/11 kV Garbhanga S/S from 2x5 MVA to 2x10 MVA NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.96 2005-03-30 0.96 0 0.96 0.96 Completed
874 ASSAM Power ST&D - Augmentation of Dibrugarh 33 kV S/S from (3x5 1x2.5) MVA to 2x10 MVA NESIDS-OTRI NLCPR Power Dept 2005-06-30 0.76 2006-07-31 0.76 0 0.76 0.76 Completed
875 ASSAM Power ST&D - Augmentation of Duliajan 33 kV S/S from 1x2.5 MVA to 1x5 MVA NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.9 2005-07-31 0.9 0 0.9 0.9 Completed
876 ASSAM Power ST&D - Augmentation of Hailakandi 33 kV S/S from 2x2.5 MVA to 2x5 MVA NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.2 2005-03-31 0.8 0 0.8 0.8 Completed
877 ASSAM Power ST&D - Augmentation of Hojai 33 kV S/S from 1x2.5 MVA to 2x2.5 MVA NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.6 2005-03-31 0.35 0 0.35 0.35 Completed
878 ASSAM Power ST&D - Augmentation of Karimganj 33 kV S/S from 1x5 1x3.16 MVA to 2x5 MVA NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.75 2005-07-31 0.75 0 0.75 0.75 Completed
879 ASSAM Power ST&D - Augmentation of Tezpur 33 kV S/S from (1x2.55) MVA to 2x5 MVA NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.9 2005-07-31 0.5 0 0.5 0.5 Completed
880 ASSAM Power ST&D - Augmentation of Titabor 33 kV S/S from 2x2.5 MVA to 2x5 MVA NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.05 2004-03-31 1.05 0 1.05 1.05 Completed
881 ASSAM Power ST&D - Construction of 12 km 33 kV Baitamari to Chapar line with construction of 2x2.5 MVA S/S at Chapar NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.72 2004-03-31 0.72 0 0.72 0.72 Completed
882 ASSAM Power ST&D - Construction of 14.5 km 33 kV Pathsala-Nathkuchi line with augmentation of Pathsala S/S from 2x2.5 MVA to 2x5 MVA NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.81 2005-07-31 1.81 0 1.81 1.81 Completed
883 ASSAM Power ST&D - Construction of 16 km long 33 kV line from Jorhat to Kakajan alongwith installation of 2x2.5 MVA S/S at Kakajan NESIDS-OTRI NLCPR Power Dept 2005-06-30 0.9 2006-07-31 0.9 0 0.9 0.9 Completed
884 ASSAM Power ST&D - Construction of 18 km long 33 kV line from Garmur to Pulibor alongwith 2x2.5 MVA S/S at Publibor NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.24 2005-07-31 1.24 0 1.24 1.24 Completed
885 ASSAM Power ST&D - Construction of 18 km long 33 KV line from Latka tapping poing to Agamoni alongwith installation of 2.5 MVA S/S at Agamoni NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.77 2005-07-31 0.77 0 0.77 0.77 Completed
886 ASSAM Power ST&D - Construction of 1x2.5 MVA, 33 kV S/S at Gogamukh NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.45 2005-07-31 0.3 0 0.3 0.3 Completed
887 ASSAM Power ST&D - Construction of 22 km long 33 kV line from Bordubi to Tengakhat with construction of 1x2.5 MVA transformer NESIDS-OTRI NLCPR Power Dept 2005-06-30 1.22 2007-06-30 1.22 0 1.22 1.22 Completed
888 ASSAM Power ST&D - Construction of 23 km 33 kV line from Rangia to Tamulpur NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.47 2005-07-31 0.47 0 0.47 0.47 Completed
889 ASSAM Power ST&D - Construction of 26 km 33 kV Agia - Mornoi line with construction of 2x2.5 MVA S/S at Mornoi NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.63 2005-07-31 1.63 0 1.63 1.63 Completed
890 ASSAM Power ST&D - Construction of 37 km 33 kV line from Patharkandi to Karimganj NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.19 2005-07-31 1.19 0 1.19 1.19 Completed
891 ASSAM Power ST&D - Construction of 38 km, 33 kV line from Balipara to Dhalukpung NESIDS-OTRI NLCPR Power Dept 2005-06-30 1.33 2007-07-31 1.33 0 1.33 1.33 Foreclosed
892 ASSAM Power ST&D - Construction of 45 km long 33 kV line from Rowta Grid S/S to Paneri and augmentation of Paneri S/S from 2x3.16 MVA to 2x5 MVA NESIDS-OTRI NLCPR Power Dept 2003-02-18 3.62 2005-07-31 3.62 0 3.62 3.62 Completed
893 ASSAM Power ST&D - Construction of 5 MVA 33 kV S/S at Biswanath Chariali NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.98 2005-07-31 0.734 0 0.734 0.734 Completed
894 ASSAM Power ST&D - Construction of 5 MVA, 33 kV S/S at Missamari NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.85 2005-07-31 0.55 0 0.55 Completed
895 ASSAM Power ST&D - Construction of11/0.4 KV distribution S/S 11 KV lines and LT lines-LT lines- 100 km NESIDS-OTRI NLCPR Power Dept 2000-11-07 1 2002-12-31 1 0 1 1 Completed
896 ASSAM Power ST&D - Installation of 11 KV Auto Reclosers in S/S (40 Nos.) NESIDS-OTRI NLCPR Power Dept 2003-02-18 3.17 2005-07-31 3.17 0 3.17 3.17 Completed
897 ASSAM Power ST&D - Reconductoring of KahiliPara-Ulubari 33 kV feeder from raccoon to wolf conductor NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.05 2005-07-31 0.05 0 0.05 Completed
898 ASSAM Power ST&D -Construction of 28 km line from Rowta to Dhekiajuli on double pole suspension with wolf conductor NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.51 2005-07-31 1.51 0 1.51 1.5 Completed
899 ASSAM Power ST&D -Construction of 30 km 33 kV line from Pailapool to Kabuganj NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.97 2005-07-31 0.97 0 0.97 0.97 Completed
900 ASSAM Power ST&D -Construction of 33/11 kV, 1x2.5 MVA S/S with auto recloser at Manzai NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.28 2005-07-31 0.28 0 0.28 0.28 Completed
901 ASSAM Power ST&D- Construction of 11/.4 KV distribution S/S 11 KV lines and LT lines - 11/0.4 KV substation (500 KVA - 10 Nos., 315 KVA - 10 Nos., 250 KVA - 100 Nos., 100 KVA - 100 Nos., & 63 KVA - 50 Nos. NESIDS-OTRI NLCPR Power Dept 2000-11-07 6.88 2002-12-31 6.88 0 6.88 6.86 Completed
902 ASSAM Power ST&D- Construction of 20 km 33 KV line From Garbhanga to Borjhar and interlink with the existing 33 KV Mirza-Rani line along with augmentation of 33/11 KV Mirza S/S to 2x5 MVA NESIDS-OTRI NLCPR Power Dept 2003-02-18 2.14 2005-07-31 2.14 0 2.14 2.14 Completed
903 ASSAM Power ST&D-Construction of 11/0.4 KV distribution S/S 11 KV lines and LT lines - 11 KV line - 100km NESIDS-OTRI NLCPR Power Dept 2000-11-07 1 2002-12-31 1 0 1 1 Completed
904 ASSAM Power Strengthening of 11 kV HT and LT Line with 12 Meter Steel Tubular Pole including Illumination of Kokrajhar Town(BTC Package) Special Packages BTC 2008-11-28 5.2 2010-11-30 5.0979 0 5.0979 5.0979 Completed
905 ASSAM Power Sub-transmission and Distribution lines (ST&D)-Construction of 33 KV, 30 Km D/C line from Chandrapur to Narengi NESIDS-OTRI NLCPR Power Dept 2000-11-07 2 2002-12-31 2 0 2 2 Completed
906 ASSAM Power Tinsukia Sub-Station 2x50 MVA , 220/132 kV NESIDS-OTRI NLCPR Power Dept 1999-02-15 19.64 2002-09-30 17.19 0 17.19 19.1 Completed
907 ASSAM Roads and Bridges Ambagaon - Barigaon Road NESIDS-OTRI NLCPR Border road organisation 2003-02-18 7.63 2005-07-31 6.867 0 6.867 5.0655 Ongoing
908 ASSAM Roads and Bridges Barangajuli-Khairabari road NESIDS-OTRI NLCPR Border road organisation 2003-02-18 2.1 2005-07-31 0.5337 0 0.5337 0.0236 Ongoing
909 ASSAM Roads and Bridges Barpeta Basbari Road, Barpeta NESIDS-OTRI NLCPR Border road organisation 2001-10-31 0.9 2004-03-31 0.783 0 0.783 0.1058 Ongoing
910 ASSAM Roads and Bridges Bhergaon-Chouni-Khagrabari-Dimakuchi Road (BTC Package) Special Packages BTC 2005-10-31 1.32 2007-12-31 1.3161 0 1.3161 1.3161 Completed
911 ASSAM Roads and Bridges Bijni-Panbari Road(BTC Package) Special Packages BTC 2005-10-31 15.59 2007-12-31 15.5858 0 15.5858 15.5857 Completed
912 ASSAM Roads and Bridges Causeway Over Kulsi, Darrang NESIDS-OTRI NLCPR Border road organisation 2004-02-11 1 2005-07-31 0.9 0 0.9 Ongoing
913 ASSAM Roads and Bridges Chamuapara - Purandia Road NESIDS-OTRI NLCPR PWD Roads 2004-02-11 4.85 2007-03-31 2.6966 0 2.6966 2.6532 Completed
914 ASSAM Roads and Bridges Chapaguri-Khagrabari Road(BTC Package) Special Packages BTC 2005-10-31 6.3 2007-12-31 6.3 0 6.3 6.2469 Completed
915 ASSAM Roads and Bridges Charuali - Nagarijuli Road NESIDS-OTRI NLCPR PWD Roads 2003-02-18 5.38 2005-07-31 4.842 0 4.842 5.5813 Completed
916 ASSAM Roads and Bridges Const of RCC Br. No. Over river Aie at Chillapara Kahibari villages on the road from Kokoijana 31-National High way to Nagaon.Manikpur 31 National Highway via Kirtanpara Numbarpara villages under Bongaigaon rural road Divn. NESIDS-OTRI NLCPR Dept. of Power 2010-11-29 40.0126 2013-11-30 35.6486 0 35.6486 35.6486 Completed
917 ASSAM Roads and Bridges Const of RCC Br. No.9/8 over Laska on Dauluguri Dotma road NESIDS-OTRI NLCPR Dept. of Power 2013-07-02 1.7503 2015-07-31 1.5752 0 1.5752 1.5741 Ongoing
918 ASSAM Roads and Bridges Const. of Rangia Dhamdhama Road including RCC Br. No 18/1.18/2,19/2,20/1 & 20/3. NESIDS-OTRI NLCPR Dept. of Power 2012-08-22 10.5477 2014-07-31 9.4477 0 9.4477 9.4252 Ongoing
919 ASSAM Roads and Bridges Const. Of RCC Br.No.29/1 (at Brg.) at Kuhimari Bordowa road (SH-15) with RCC Bridge. NESIDS-OTRI NLCPR PWD Roads 2012-06-28 5.0137 2014-06-30 4.06 0 4.06 1.8044 Ongoing
920 ASSAM Roads and Bridges Const. of RCC. Br. No. 2/1 over river Belsiri on Dhekipelua to Belsiri T.E., Connecting NH-52, under Sonitpur Rural Road Division NESIDS-OTRI NLCPR PWD Roads 2013-02-25 5.525 2015-02-28 3.975 0 3.975 3.975 Completed
921 ASSAM Roads and Bridges Const. of road from Udharbond to Banaskandi Under Silchar Rural Road Division NESIDS-OTRI NLCPR Dept. of Power 2013-12-09 3.1219 2015-11-30 2.5162 0 2.5162 2.5161 Ongoing
922 ASSAM Roads and Bridges Constn of road from 52.0 km point of NH 154 - Katlicherra Grant of District Hailakandi to Veterbond - Dullavcherra NEC road of Dist Karimganj NESIDS-OTRI NLCPR PWD Roads 2014-06-27 16.1658 2015-12-31 14.5491 0 14.5491 14.5492 Completed
923 ASSAM Roads and Bridges Constn. of Br.No. 28/1 on Dehangi Dayangmukh Road over thaijuwari Nala & Langlodisa Nala (PWD Roads Haflong Division)(NC Hills) NESIDS-OTRI NLCPR Hill Areas Dept 2009-03-30 3.55 2010-09-30 1.1176 0 1.1176 1.1176 Ongoing
924 ASSAM Roads and Bridges Constn. of RCC Br. No. 22/1 over river Diffoloo on Chowkihola Panjan Deithor Malasi Dirring Kohora (CPDMDK) Road with approaches and protection works(Karbi Anglong) NESIDS-OTRI NLCPR PWD Roads 2009-03-30 3.0382 2011-04-30 0.9487 0 0.9487 0.9487 Ongoing
925 ASSAM Roads and Bridges Construction / improvement of Batabari Kopati road NESIDS-OTRI NLCPR PWD Roads 2007-10-26 2.1372 2009-10-31 1.8858 0 1.8858 1.8858 Completed
926 ASSAM Roads and Bridges Construction and widening of road from Khowang Chariali to Chenimari NESIDS-OTRI NLCPR Dept. of Power 2014-02-20 8.542 2016-02-29 7.5607 0 7.5607 6.1472 Ongoing
927 ASSAM Roads and Bridges Construction of 4 lane Tripura road including electrical works from NH - 37 to GS Road NESIDS-OTRI NLCPR PWD Roads 2008-03-28 11.365 2009-09-30 10.2285 0 10.2285 10.2285 Completed
928 ASSAM Roads and Bridges Construction of 4 Nos. road including box culverts and pucca drainage in Lakhipur Town NESIDS-OTRI NLCPR PWD Roads 2011-12-29 14.2477 2013-06-30 10.1876 0 10.1876 10.1876 Ongoing
929 ASSAM Roads and Bridges Construction of Additional Two Lane Rail-Over-Bridge (ROB) on A.T. Road at Maligaon, Guwahati (Assam) NESIDS-OTRI NLCPR PWD Roads 2005-12-27 13.5592 2007-11-30 12.0229 0 12.0229 12.0229 Completed
930 ASSAM Roads and Bridges Construction of Alternative Road to Kamakhya Temple at Guwahati in Kamrup (Metro) District (Phase-1 restricted to Hill Cutting and retaining wall) under NLCPR in Assam. NESIDS-OTRI NLCPR Public works Department 2017-05-11 13.8539 2019-05-11 12.4671 0 12.4671 12.4671 Completed
931 ASSAM Roads and Bridges Construction of approach road leading to Industrial Growth Centre at Balipara in Sonitpur District (Assam) NESIDS-OTRI NLCPR PWD Roads 2005-12-27 2.6865 2006-12-31 2.4179 0 2.4179 2.4179 Completed
932 ASSAM Roads and Bridges Construction of Borobazar Ulubari Road via Bagargaon including RCC Bridge & Cross drainage in Chirang District (BTC Package - 2) Special Packages BTC 2012-09-10 18.69 2015-09-10 18.2855 0 18.2855 18.2855 Completed
933 ASSAM Roads and Bridges Construction of Br. no 2/1&4/1 on Raha Barapujia road over river Botamari and Hatibandha with approaches in Nagoan District NESIDS-OTRI NLCPR PWD Roads 2011-02-22 3.69 2013-03-31 3.1752 0 3.1752 3.0951 Ongoing
934 ASSAM Roads and Bridges Construction of Bridge No. 1/1 including approaches and protection work over Jatinga at Borkhola on Mahasadak to Borkhola road NESIDS-OTRI NLCPR PWD Roads 2013-02-22 14.3223 2015-08-31 12.8813 0 12.8813 12.8164 Completed
935 ASSAM Roads and Bridges Construction of Bridge No. 1/2 & Bridge No. 4/1 on old AT Road under Dibrugarh Rural Road Division in Dibrugarh Distt. NESIDS-OTRI NLCPR PWD Roads 2010-11-10 2.9037 2013-11-30 2.5876 0 2.5876 2.5876 Completed
936 ASSAM Roads and Bridges Construction of Deori Tiniali to Deramukam road from 2nd km to 7th km under Clause 9.4 Mos signed between Govt. of India, Govt. of Assam and UPDS for the year 2017-18 under KAATC package Special Packages KAATC 2018-12-11 4.38 2020-12-11 4.3836 0 4.3836 2.1918 Completed
937 ASSAM Roads and Bridges Construction of Dibrugarh Sapekhati road from km 12 to Km 18 along with 2 RCC bridges No. 18/1 and 19/1 with approches (Bridge over river Buridihing at Saraighat) NESIDS-OTRI NLCPR Dept. of Power 2007-12-19 21.1645 2011-11-30 18.8596 0 18.8596 18.7981 Ongoing
938 ASSAM Roads and Bridges Construction of Digheeripar Bardoulguri Barachuba road from Ch. 0.00Km to Ch. 4.120Km and from Ch. 4.560 Km to Ch. 10.100 Km (Length9.660Km) including Cross Drainage Works in Darrang District under NLCPR in Assam NESIDS-OTRI NLCPR Dept. of Power 2017-12-08 11.4212 2019-12-08 10 0 10 9.1671 Ongoing
939 ASSAM Roads and Bridges Construction of Flyover at the Intersection of Pramathesh Barua Road and N.F Railway Track at Bijni Town in Assam NESIDS-OTRI NLCPR PWD Roads 2011-12-29 19.6335 2013-06-30 16.6683 0 16.6683 16.6683 Completed
940 ASSAM Roads and Bridges Construction of Guidebund near RCC bridge No.8/2 over river Tonganee on the road from NH-52 to Kuwaripukhuri via Fakirpara NESIDS-OTRI NLCPR PWD Roads 2013-02-25 2.0876 2013-10-31 0.751 0 0.751 Foreclosed
941 ASSAM Roads and Bridges Construction of Kaliapani RCC bridge No.21/1 over River Dibru on Domdoma Dighaltarang Natun Gaon road with approach Road in Tinsukia NESIDS-OTRI NLCPR PWD Roads 2012-08-22 13.2294 2015-07-31 11.509 0 11.509 11.5089 Completed
942 ASSAM Roads and Bridges Construction of Kashikotra Bamungaon Bengtol Road(BTC Package) Special Packages BTC 2005-12-27 11.69 2008-12-27 11.69 0 11.69 11.69 Completed
943 ASSAM Roads and Bridges Construction of Khanda Road from Dawdhara to Doomni via Nawputa in Baska Distt.(BTC Package-2) Special Packages BTC 2012-03-20 10.75 2015-03-20 10.75 0 10.75 10.739 Completed
944 ASSAM Roads and Bridges Construction of Khetri Dharmapur to Hajo Nalbari Road at Morowa via Piplibari, Kakaya,Jagara, Goalpara,Baguhati & Kalakuchi NESIDS-OTRI NLCPR PWD Roads 2013-12-09 10.3922 2015-11-30 9.0661 0 9.0661 9.0661 Completed
945 ASSAM Roads and Bridges Construction of Maijan Thakurbari road to Malukbari road in Dibrugarh District NESIDS-OTRI NLCPR PWD Roads 2012-05-21 8.11 2014-05-31 2.8623 0 2.8623 2.177 Completed
946 ASSAM Roads and Bridges Construction of Mohmora Ali with RCC Bridge No. 9/2 in Sibsagar District NESIDS-OTRI NLCPR PWD Roads 2010-11-12 7.7196 2013-02-28 2.718 0 2.718 1.5453 Ongoing
947 ASSAM Roads and Bridges Construction of Moran Netai Road Dibrugarh NESIDS-OTRI NLCPR PWD Roads 2010-11-10 3.0342 2012-11-30 2.1439 0 2.1439 2.1382 Foreclosed
948 ASSAM Roads and Bridges Construction of railway over Br. at Dhing gate on Nagaon Bhurgaon via Dhing at Nagaon under NLCPR NESIDS-OTRI NLCPR PWD Roads 2012-08-22 21.0546 2014-01-31 18.2624 0 18.2624 18.2624 Ongoing
949 ASSAM Roads and Bridges Construction of RCC Br. (a) No. 1/1 and 2/1 on Deroi Rongoli road (b) No. 2/1 on Deopling Ramuagar road and No. 3/1 ghilaguri Road NESIDS-OTRI NLCPR PWD Roads 2010-12-13 3.9118 2012-12-31 3.3169 0 3.3169 3.3169 Completed
950 ASSAM Roads and Bridges Construction of RCC Br. No. 1/1 over regular Channel Gadadhar on Silerpar - Borshijhora Road in dhubri District NESIDS-OTRI NLCPR PWD Roads 2008-03-28 4.5073 2010-03-31 4.0566 0 4.0566 4.0566 Completed
951 ASSAM Roads and Bridges Construction of RCC Br. No. 1/1 over River Kalang on Ghahi - Borjhora Road under Nagaon Rural Road Division (Nagaon District) NESIDS-OTRI NLCPR PWD Roads 2011-06-27 2.8112 2013-07-31 2.5057 0 2.5057 2.5057 Completed
952 ASSAM Roads and Bridges Construction of RCC Br. No. 1/1 over River Pota on Hazuwa Nalbari Road in Baska District in Assam NESIDS-OTRI NLCPR PWD Roads 2008-03-27 2.6401 2009-09-30 2.3526 0 2.3526 1.9006 Completed
953 ASSAM Roads and Bridges Construction of RCC Br. No. 1/1 over Santijan on Srimanta Sankardev Govesona Kendra Road in Nagaon Road NESIDS-OTRI NLCPR PWD Roads 2008-03-28 2.8055 2009-03-31 2.4999 0 2.4999 2.4999 Completed
954 ASSAM Roads and Bridges Construction of RCC Br. No. 2/2 and 2/3 (Renamed as Br. Nos. 3/1 and 4/6) on Shyamaprasadpur to Dossgram Road via Swapnargul over stream Singrai in Cachar District NESIDS-OTRI NLCPR PWD Roads 2010-11-29 2.57 2012-07-31 2.2901 0 2.2901 2.2901 Completed
955 ASSAM Roads and Bridges Construction of RCC Br. No. 32/1 on AT road (old) including approaches with protection works in Goalpara NESIDS-OTRI NLCPR Dept. of Power 2009-03-30 7.3912 2010-09-30 4.6102 0 4.6102 3.354 Ongoing
956 ASSAM Roads and Bridges construction of RCC Br. No. 4/1 & 6/1 with approaches on J.B road in Jorhat distt. NESIDS-OTRI NLCPR PWD Roads 2007-06-21 3.244 2009-06-30 2.8907 0 2.8907 2.8907 Completed
957 ASSAM Roads and Bridges construction of RCC Br. No. 4/1 on Belguri - Satrasal Road in Dhrubri District NESIDS-OTRI NLCPR PWD Roads 2008-03-27 2.7331 2010-03-31 2.4598 0 2.4598 2.4598 Completed
958 ASSAM Roads and Bridges Construction of RCC Br. No. 5/1 on Jajari - Chabukdhara Road over River Sonai under Nagaon Rural Road Division NESIDS-OTRI NLCPR PWD Roads 2010-02-03 2.3638 2012-02-29 2.1063 0 2.1063 2.0875 Completed
959 ASSAM Roads and Bridges Construction of RCC Br. No. 6/1, 9/1 & 10/1 on Ambagaon Kathpara Solmari Singiari Road (NG-M-17) in Nagaon District NESIDS-OTRI NLCPR PWD Roads 2010-02-03 2.3902 2012-02-29 2.1379 0 2.1379 2.1379 Completed
960 ASSAM Roads and Bridges Construction of RCC Br. No. 7/1 on Dharamtul Dandua Road with approaches NESIDS-OTRI NLCPR PWD Roads 2009-03-30 2.4842 2010-08-31 2.2136 0 2.2136 2.2136 Completed
961 ASSAM Roads and Bridges Construction of RCC Br. No. 7/1 on Sissibargaon Amguri Road over Singimari steam in Dhemaji District NESIDS-OTRI NLCPR Dept. of Power 2013-02-22 4.2932 2014-08-31 3.8491 0 3.8491 1.545 Completed
962 ASSAM Roads and Bridges Construction of RCC Br. No. 8/1 on Bhalukmari in Mikirbheta Bhurbandha Road with approaches and protection work in Morigaon District NESIDS-OTRI NLCPR PWD Roads 2010-02-03 2.5462 2012-02-29 2.2689 0 2.2689 2.2689 Completed
963 ASSAM Roads and Bridges Construction of RCC Br. No. 8/1 over Saral Bhanga on Dotma Balajan Road NESIDS-OTRI NLCPR Dept. of Power 2011-12-19 12.0231 2013-08-31 10.7144 0 10.7144 10.7138 Ongoing
964 ASSAM Roads and Bridges Construction of RCC Br. No.6/1 over Numbor river from BBDC to Rongkimi Road under Clause 9.2 of MoS signed between Govt. of India, Govt. of Assam & UPDS for the year 2017-18. under KAATC package Special Packages KAATC 2018-12-11 3.84 2020-12-12 3.8337 0 3.8337 1.917 Ongoing
965 ASSAM Roads and Bridges Construction of RCC Br.No.1/1 over river Kaldia on Sarumanikpur Maharani road. NESIDS-OTRI NLCPR PWD Roads 2013-02-22 4.6156 2015-02-28 4.154 0 4.154 4.154 Ongoing
966 ASSAM Roads and Bridges Construction of RCC bridge at 7th Km of Kathal Road over river Ghagra including approaches and protection work in Cachar District. NESIDS-OTRI NLCPR Dept. of Power 2008-03-28 2.5 2009-03-31 2.249 0 2.249 2.2354 Ongoing
967 ASSAM Roads and Bridges Construction of RCC bridge No 15/2 over river Burisuti on Patdadaha Panbari Road NESIDS-OTRI NLCPR PWD Roads 2014-02-20 7.1917 2015-07-31 6.3917 0 6.3917 6.3917 Completed
968 ASSAM Roads and Bridges Construction of RCC Bridge No. 1/1 and 4/1 with approaches on Nilbagan-Hojai Road in Nagaon District (Assam) NESIDS-OTRI NLCPR PWD Roads 2006-06-02 1.9167 2007-11-30 1.7079 0 1.7079 1.7079 Completed
969 ASSAM Roads and Bridges Construction of RCC Bridge No. 1/1 on Mohmoria to Kuruabahi via Bebejia Road over river Kalang under Nagaon Rural Road Division NESIDS-OTRI NLCPR PWD Roads 2013-06-05 2.7408 2014-11-30 2.2073 0 2.2073 2.2072 Completed
970 ASSAM Roads and Bridges Construction of RCC Bridge No. 1/1 over river Barak at Sadarghat, Silchar on Silchar - Kumbhigram Road NESIDS-OTRI NLCPR PWD Roads 2013-11-07 59.0106 2016-04-30 52.6676 0 52.6676 52.6676 Completed
971 ASSAM Roads and Bridges Construction of RCC Bridge No. 1/1 over River Doomdooma on old AT Road NESIDS-OTRI NLCPR PWD Roads 2012-09-26 4.2187 2014-09-30 1.518 0 1.518 1.518 Ongoing
972 ASSAM Roads and Bridges Construction of RCC Bridge No. 1/1 over Targhat channel on NH-31 (Targhat to Asharikandi Ghegeralga Road) NESIDS-OTRI NLCPR PWD Roads 2012-08-22 3.249 2014-07-31 2.9241 0 2.9241 2.9241 Completed
973 ASSAM Roads and Bridges Construction of RCC Bridge No. 1/1, 3/1 and 5/1 on Bahirjonai Berachapari Road in Dhemaji District (Assam) with approaches NESIDS-OTRI NLCPR Dept. of Power 2006-02-21 5.5217 2007-08-31 4.8035 0 4.8035 3.7335 Completed
974 ASSAM Roads and Bridges Construction of RCC Bridge No. 1/1, 3/1, 3/2 and 4/1 on Bhairabpur to Kulibazar Road in Dhemaji District (Assam) with approaches NESIDS-OTRI NLCPR PWD Roads 2005-12-27 4.6644 2007-05-31 4.1563 0 4.1563 4.1563 Completed
975 ASSAM Roads and Bridges Construction of RCC Bridge No. 1/1, 4/1 and 5/1 on Sripani Jengrai Road in Dhemaji District (Assam) with approaches NESIDS-OTRI NLCPR PWD Roads 2006-02-21 3.0178 2007-08-31 2.1691 0 2.1691 2.1691 Completed
976 ASSAM Roads and Bridges Construction of RCC Bridge No. 1/1, 4/1, 8/1 and 9/2 on Fakiragram Sapatgram Road in Dhubri District with approaches NESIDS-OTRI NLCPR PWD Roads 2005-10-28 5.1451 2007-02-28 4.5848 0 4.5848 4.5848 Completed
977 ASSAM Roads and Bridges Construction of RCC Bridge No. 1/2 and 3/1 on Sarupeta Bhuyapara in Barpeta District NESIDS-OTRI NLCPR PWD Roads 2004-09-30 1.7736 2005-12-31 1.5553 0 1.5553 1.6176 Completed
978 ASSAM Roads and Bridges Construction of RCC Bridge No. 1/3, 2/1 and 3/1 on Namti Ali in Sivasagar District NESIDS-OTRI NLCPR PWD Roads 2004-09-21 0.8968 2005-12-31 0.7855 0 0.7855 0.8155 Completed
979 ASSAM Roads and Bridges Construction of RCC bridge no. 10/1 & 18/1 on Bagals Road in Nalbari District with approaches NESIDS-OTRI NLCPR PWD Roads 2008-09-30 3.0811 2010-01-31 2.7455 0 2.7455 2.7455 Completed
980 ASSAM Roads and Bridges Construction of RCC Bridge No. 10/1 and approaches on Khowang Bhamun Road in Dibrugarh District of Assam NESIDS-OTRI NLCPR PWD Roads 2005-12-27 1.0325 2007-05-31 0.9203 0 0.9203 0.9203 Completed
981 ASSAM Roads and Bridges Construction of RCC Bridge No. 10/1 on Gogamukh Ghilamara Road in Dhemaji District (Assam) with approaches NESIDS-OTRI NLCPR PWD Roads 2006-01-25 1.0841 2007-09-30 0.9501 0 0.9501 0.7445 Completed
982 ASSAM Roads and Bridges Construction of RCC Bridge No. 11/1 on Teok Boloma Nakachari Road in Jorhat District (Assam) with approaches NESIDS-OTRI NLCPR PWD Roads 2006-01-03 1.0917 2007-06-30 0.9746 0 0.9746 0.9746 Completed
983 ASSAM Roads and Bridges Construction of RCC Bridge No. 12/1 on Goroimari -Dewaguri Laharighat Road with approaches in assam NESIDS-OTRI NLCPR PWD Roads 2009-09-30 3.1734 2011-03-31 2.2562 0 2.2562 2.2562 Ongoing
984 ASSAM Roads and Bridges Construction of RCC Bridge No. 156/2, 159/1, 163/2, 165/3, 172/2, 174/2, 177/1 and 182/2 on Dhodar Ali Road in Sivasagar District NESIDS-OTRI NLCPR PWD Roads 2004-09-30 3.5251 2005-12-31 3.09 0 3.09 3.2125 Completed
985 ASSAM Roads and Bridges Construction of RCC Bridge No. 16/1, 19/1 and 19/3 on Bagals Road in Nalbari District with approaches NESIDS-OTRI NLCPR PWD Roads 2005-10-31 4.0473 2007-02-28 3.5525 0 3.5525 3.5525 Completed
986 ASSAM Roads and Bridges Construction of RCC Bridge No. 17/4, 19/4, 20/2 and 26/1 on Mt. Sepon Sunpura Road in Sivasagar District (Assam) with approaches NESIDS-OTRI NLCPR PWD Roads 2005-10-28 3.7786 2007-02-28 3.3672 0 3.3672 3.3672 Completed
987 ASSAM Roads and Bridges Construction of RCC bridge no. 18/2 over stream Bahanigaon & bridge no. 19/1 over river Kachikata on Laluk-Narayanpur via Bihpuria Road in Lakhimpur District NESIDS-OTRI NLCPR PWD Roads 2008-09-30 2.087 2010-07-31 1.6697 0 1.6697 1.4998 Completed
988 ASSAM Roads and Bridges Construction of RCC Bridge No. 2/1 on Bamunbari to Jariguri Road in Dibrugarh District of Assam with approaches NESIDS-OTRI NLCPR PWD Roads 2005-12-21 1.0805 2007-05-31 0.9421 0 0.9421 0.778 Completed
989 ASSAM Roads and Bridges Construction of RCC Bridge No. 2/1 on Kokrajhar Monakocha Road over River Gaurang in Kokrajhar District with approaches NESIDS-OTRI NLCPR PWD Roads 2005-10-28 9.9063 2007-02-28 8.8274 0 8.8274 8.8274 Completed
990 ASSAM Roads and Bridges Construction of RCC Bridge No. 2/1 on Nandini Karaimari Road in Assam NESIDS-OTRI NLCPR PWD Roads 2009-07-14 6.5813 2011-01-01 5.8356 0 5.8356 5.8356 Completed
991 ASSAM Roads and Bridges Construction of RCC Bridge No. 2/2 - Haripur Sansarghat Road in Nalbari District NESIDS-OTRI NLCPR PWD Roads 2004-02-20 2.2637 2005-06-30 1.7035 0 1.7035 1.8299 Completed
992 ASSAM Roads and Bridges Construction of RCC Bridge No. 2/3 on river Bhulla, 3/2 on river Lakhi and 7/2 on river Lakhimorasuti on Bengbari Ambagaon Road in Udalguri District, Assam NESIDS-OTRI NLCPR PWD Roads 2006-06-27 6.3285 2007-12-31 5.6393 0 5.6393 5.6393 Completed
993 ASSAM Roads and Bridges Construction of RCC Bridge No. 2/3, 5/1, 9/1, 11/1, 15/3, 16/1, 18/1 and 19/4 on Itakhola Pavoi Road in Sonitpur District (Assam) with approaches NESIDS-OTRI NLCPR PWD Roads 2005-10-28 8.7542 2007-02-28 7.6123 0 7.6123 7.6123 Completed
994 ASSAM Roads and Bridges Construction of RCC Bridge No. 2/4, 6/1 and 8/1 on river Kaldia including approaches on Dr. Jina Ram Das Road in Barpeta District (Assam) NESIDS-OTRI NLCPR PWD Roads 2006-06-27 5.3585 2007-12-31 4.6543 0 4.6543 4.6543 Completed
995 ASSAM Roads and Bridges Construction of RCC Bridge No. 20/1 - Nalbari Palla Road in Nalbari District NESIDS-OTRI NLCPR PWD Roads 2004-02-20 1.4436 2005-06-30 1.063 0 1.063 1.1374 Completed
996 ASSAM Roads and Bridges Construction of RCC Bridge No. 24/1 on Morigaon Moirabari Road in Morigaon District NESIDS-OTRI NLCPR Dept. of Power 2011-01-25 3.1554 2012-07-31 2.7974 0 2.7974 2.7829 Completed
997 ASSAM Roads and Bridges Construction of RCC Bridge No. 24/2 and 32/2 on Mt. Golaghat Merapani Road in Golaghat District (Assam) with approaches and protection work NESIDS-OTRI NLCPR PWD Roads 2006-01-03 1.8567 2007-06-30 1.6545 0 1.6545 1.6545 Completed
998 ASSAM Roads and Bridges Construction of RCC Bridge No. 3/1 on Majgaon Shantipur Road over River Sonai under Nagaon rural road Division NESIDS-OTRI NLCPR PWD Roads 2010-06-17 3.3319 2012-06-30 2.7786 0 2.7786 2.3754 Completed
999 ASSAM Roads and Bridges Construction of RCC Bridge No. 3/1 over Puthimari river at Dolonghat (Dhulabari))(BTC Package-2) Special Packages BTC 2010-12-14 8 2013-12-14 4 0 4 4 Ongoing
1000 ASSAM Roads and Bridges Construction of RCC Bridge No. 3/1 over River Pagladia on U.C Baruah Road in Nalbari District including Approaches and Protection Work NESIDS-OTRI NLCPR PWD Roads 2012-08-21 7.3015 2015-07-31 6.5313 0 6.5313 6.527 Completed
1001 ASSAM Roads and Bridges Construction of RCC Bridge No. 3/2 over River Mansiri on Charduar Road with approaches in Sonitpur District NESIDS-OTRI NLCPR PWD Roads 2005-10-28 1.6575 2007-02-28 1.477 0 1.477 1.477 Completed
1002 ASSAM Roads and Bridges Construction of RCC Bridge No. 4/1 and 15/1 including approaches on Nagaon - Bhuragaon Road in Nagaon District NESIDS-OTRI NLCPR PWD Roads 2006-05-16 4.344 2007-11-30 3.8708 0 3.8708 3.8708 Completed
1003 ASSAM Roads and Bridges Construction of RCC Bridge No. 4/1 on Dimou-Raidongia Road over river Sonai under Nagaon Rural Road Division (Nagaon District) NESIDS-OTRI NLCPR PWD Roads 2010-04-05 2.7098 2012-04-30 1.884 0.1633 2.0473 1.884 Completed
1004 ASSAM Roads and Bridges Construction of RCC Bridge No. 4/1 on Garmari Gagalmari Road NESIDS-OTRI NLCPR PWD Roads 2009-07-14 2.3344 2011-07-29 2.0802 0 2.0802 1.6192 Completed
1005 ASSAM Roads and Bridges Construction of RCC Bridge No. 4/1, 6/1 and 14/1 on North Lakhimpur Kamalabari Road NESIDS-OTRI NLCPR PWD Roads 2005-10-28 4.5527 2007-02-28 4.0569 0 4.0569 3.1641 Completed
1006 ASSAM Roads and Bridges Construction of RCC bridge No. 4/1, 7/1, 8/1 and 11/1 over field canal / River Sakati on Abhyapuri Tilungia Road with approaches and protection works in Bongaigaon District NESIDS-OTRI NLCPR PWD Roads 2008-11-07 3.3809 2010-10-31 3.0127 0 3.0127 2.362 Completed
1007 ASSAM Roads and Bridges Construction of RCC Bridge No. 4/2, 9/2, 10/2 and 17/1 on Met Na-Ali Jorhat Titabor in Jorhat District NESIDS-OTRI NLCPR PWD Roads 2004-09-30 1.426 2005-12-31 1.2539 0 1.2539 1.3033 Completed
1008 ASSAM Roads and Bridges Construction of RCC Bridge No. 4/3 on NH-36 -O- Point to Horaghat Karkok Road at Kanki Eagti Gaon via Monsing Rongchehon Gaon NESIDS-OTRI NLCPR PWD Roads 2013-07-02 2.2056 2015-01-30 1.98 0 1.98 1.584 Ongoing
1009 ASSAM Roads and Bridges Construction of RCC Bridge No. 42/5 & 74/1 on DLHS Road in Karbi Anglong District NESIDS-OTRI NLCPR PWD Roads 2004-03-19 1.4325 2005-03-31 1.0527 0 1.0527 1.1266 Completed
1010 ASSAM Roads and Bridges Construction of RCC Bridge No. 5/1 on Burhagohain Tinthengia Road in Dibrugarh District of Assam NESIDS-OTRI NLCPR PWD Roads 2005-12-21 0.9881 2007-05-31 0.8806 0 0.8806 0.8806 Completed
1011 ASSAM Roads and Bridges Construction of RCC Bridge No. 5/1 on river Bharalkunda, 7/1 on Sister-par Beel, 8/1 on Dulani Beel, 9/9 on Distributary of river Champamati and 11/1 on Hill Canal including approaches on Jogighopa Chapar Road in Bongaigaon District in Assam. NESIDS-OTRI NLCPR PWD Roads 2006-06-27 7.0941 2007-12-31 6.3216 0 6.3216 6.3216 Completed
1012 ASSAM Roads and Bridges Construction of RCC Bridge No. 5/1 on Sonakhira Bubrighat Road in Karimganj District (Assam) with approaches and protection work NESIDS-OTRI NLCPR PWD Roads 2006-01-03 0.9726 2007-06-30 0.8667 0 0.8667 0.8667 Completed
1013 ASSAM Roads and Bridges Construction of RCC Bridge no. 5/1 over river Manas connecting Goalpara and Numberpara village on the road from Tulungia at NH-31(B) to Manikpur at NH-31 via Borghola -Kirtanpara and Chakla NESIDS-OTRI NLCPR Dept. of Power 2013-07-02 18.7199 2016-07-30 16.1445 0 16.1445 16.1445 Completed
1014 ASSAM Roads and Bridges Construction of RCC Bridge no. 5/3 on Bhorbhogia Mikirbheta Dhing Road with approaches in Morigaon District NESIDS-OTRI NLCPR PWD Roads 2008-11-25 2.4117 2010-11-30 2.149 0 2.149 2.149 Completed
1015 ASSAM Roads and Bridges Construction of RCC bridge No. 57/1 on Gaurisagar Moran Road and construction of RCC bridge no. 15/2 over River Disam on Naharkatia - Tinkhong Road under Dibrugarh Rural Road Division NESIDS-OTRI NLCPR PWD Roads 2008-12-10 4.0612 2010-05-31 3.4723 0 3.4723 3.4723 Completed
1016 ASSAM Roads and Bridges Construction of RCC Bridge No. 6/1 on Chariali Pavoi Road in Sonitpur District with approaches, protection work and sub-way NESIDS-OTRI NLCPR PWD Roads 2005-10-25 0.8853 2007-02-28 0.789 0 0.789 0.789 Completed
1017 ASSAM Roads and Bridges Construction of RCC Bridge No. 6/1, 7/1, 8/1, 8/2, 9/1, 11/1 and 11/2 on Sepon Suffry Road in Sivasagar District (Assam) with approaches NESIDS-OTRI NLCPR PWD Roads 2005-12-27 4.1117 2007-05-31 3.6086 0 3.6086 3.6016 Ongoing
1018 ASSAM Roads and Bridges Construction of RCC Bridge No. 6/2 7/3 8/1 8/2 10/1 and 11/1 over branches of river Kaloo on A.P.S. Road under Dhubri rural Road Division NESIDS-OTRI NLCPR PWD Roads 2012-08-22 13.9149 2014-07-31 12.5234 0 12.5234 12.5109 Completed
1019 ASSAM Roads and Bridges Construction of RCC Bridge No. 6/3 over Gongia river on Dotoma - Bhawraguri Road)(BTC Package-2) Special Packages BTC 2010-12-14 8 2013-12-14 7.9887 0 7.9887 7.9887 Completed
1020 ASSAM Roads and Bridges Construction of RCC Bridge No. 7/115/1 and 19/1 on Nagaon Barapujia Road(NH-38) Road division NESIDS-OTRI NLCPR PWD Roads 2009-08-18 4.6583 2011-08-31 4.0367 0 4.0367 4.0367 Completed
1021 ASSAM Roads and Bridges construction of RCC Bridge No. 8/1 over Gurufella river on Gossaigaon - Sapatgram Road)(BTC Package-2) Special Packages BTC 2010-12-14 7.92 2013-12-14 7.919 0 7.919 7.919 Completed
1022 ASSAM Roads and Bridges Construction of RCC Bridge No. 8/6 over river Dirring, (b) Bridge No. 18/1 over river Borjan, (c) Bridge No. 19/1 over River Borjan,(d) Bridge No. 23/3 over River Donjon, (e) Bridge No. 27/3 Over River Kokosang (2) Br. No. 2/1 ovr river Kohra (KarbiAnglon NESIDS-OTRI NLCPR PWD Roads 2009-07-14 11.3837 2011-07-29 9.66 0 9.66 9.66 Ongoing
1023 ASSAM Roads and Bridges Construction of RCC Bridge No. 9/1 on Mancotta Khamtighat road along with approaches and Protection work and strengthening of damaged road pavement from ch. 8308.00m to ch. 32600.00m via Saraighat Bridge up to Bamunbari Tiniali connecting Moran Naharkatia road (Sh-27) under PWD, Dibrugarh Rural Road Division in Dibrugarh District of Assam NESIDS-OTRI NLCPR Public works Department 2017-05-11 13.87 2019-05-11 12.483 0 12.483 12.4528 Completed
1024 ASSAM Roads and Bridges Construction of RCC Bridge No. 9/2 on Borbhogia Mikirbhata Road in Morigaon District with approaches NESIDS-OTRI NLCPR PWD Roads 2005-10-28 2.3896 2007-02-28 2.1293 0 2.1293 2.1293 Completed
1025 ASSAM Roads and Bridges Construction of RCC bridge No.1/1, 2/1 and 2/2 on Jonnai Silapathar Road in Dhimaji District NESIDS-OTRI NLCPR PWD Roads 2004-07-29 1.9 2005-12-31 1.6667 0 1.6667 1.7337 Completed
1026 ASSAM Roads and Bridges Construction of RCC bridge No.1/2 on Manja to Hidim Teron Road in Karbi Anglong District NESIDS-OTRI NLCPR Dept. of Power 2004-07-28 1.7812 2005-12-31 1.5618 0 1.5618 1.6027 Ongoing
1027 ASSAM Roads and Bridges Construction of RCC Bridge No.1/5(L18.00m) and 5/3 (L26.00m) over river Telehor and Dera respectively on Deori Tiniali to Deramokam Road (KAATC Package) Special Packages KAATC 2015-03-26 4.1 2017-06-26 4 0 4 2.0496 Completed
1028 ASSAM Roads and Bridges Construction of RCC bridge No.12/1 and 12/2 on Bangaon Jagara Road in Nalbari District NESIDS-OTRI NLCPR PWD Roads 2004-07-29 1.7481 2005-12-31 1.533 0 1.533 1.599 Completed
1029 ASSAM Roads and Bridges Construction of RCC bridge No.12/3 on Balkulia Rajapathar Road in Karbi Anglong District NESIDS-OTRI NLCPR Hill Areas Dept 2004-07-28 1.7351 2005-12-31 1.5214 0 1.5214 1.5677 Completed
1030 ASSAM Roads and Bridges Construction of RCC bridge No.13/1, 14/1, 15/1, 20/3 and 22/1 on Silchar Kumbhirgram Road in Cachar District NESIDS-OTRI NLCPR PWD Roads 2004-07-29 5.6787 2005-12-31 4.9743 0 4.9743 5.1752 Completed
1031 ASSAM Roads and Bridges Construction of RCC Bridge No.2/1 on the road from NH-52 to Kuwaripukhuri via Fakirpara and RCC Bridge No. 7/1 on Nimtoli Kachomari road including approach and protection work NESIDS-OTRI NLCPR PWD Roads 2015-06-22 4.9566 2017-06-30 3.4891 0.4044 3.8935 3.4891 Ongoing
1032 ASSAM Roads and Bridges Construction of RCC Bridge No.2/2 and 4/2 including approaches on Gurnagar Tikrikilla Road in Goalpara District NESIDS-OTRI NLCPR Dept. of Power 2006-05-16 3.5519 2007-11-30 3.0355 0 3.0355 3.03548 Ongoing
1033 ASSAM Roads and Bridges Construction of RCC Bridge No.2/4 over Bornewria river at Men Teron under KAATC package Special Packages KAATC 2019-07-31 3.45 2019-07-31 3.0935 0 3.0935 1.709 Ongoing
1034 ASSAM Roads and Bridges Construction of RCC bridge No.24/1 on Barpathar-Bokajan Deithor-Chowkihola (BBDC) Road in Karbi Anglong District NESIDS-OTRI NLCPR Hill Areas Dept 2004-07-28 0.5442 2005-12-31 0.468 0 0.468 0.4887 Completed
1035 ASSAM Roads and Bridges Construction of RCC bridge No.26/3 on Samar Ali Das Road in Karbi Anglong District in Assam NESIDS-OTRI NLCPR Hill Areas Dept 2004-07-28 1.6754 2005-12-31 1.4744 0 1.4744 1.0121 Completed
1036 ASSAM Roads and Bridges Construction of RCC Bridge No.27/2, 28/1,29/1,30/2,32/2,35/1 and 45/1 including approaches on Dhubri-Kachugaon Road in Kokrajhar NESIDS-OTRI NLCPR PWD Roads 2006-05-16 5.164 2007-11-30 4.6017 0 4.6017 4.5938 Completed
1037 ASSAM Roads and Bridges Construction of RCC Bridge No.3/1 including approaches on Pukia Silapathar Road in Dhemaji District. NESIDS-OTRI NLCPR PWD Roads 2006-05-16 1.3678 2007-11-30 1.2189 0 1.2189 1.2189 Completed
1038 ASSAM Roads and Bridges Construction of RCC bridge No.3/1, 3/2,6/3,6/4, 6/6,10/5,12/1, 13/1, 21/2 and 23/2 on Border Roads (Gar Ali) in Jorhat District NESIDS-OTRI NLCPR PWD Roads 2004-07-29 3.9756 2005-12-31 3.4884 0 3.4884 3.6284 Completed
1039 ASSAM Roads and Bridges Construction of RCC bridge No.35/2 and 53/2 on Moran Naharkatia Road in Dibrugarh District NESIDS-OTRI NLCPR PWD Roads 2004-07-29 1.1416 2005-12-31 1.0018 0 1.0018 0.8423 Completed
1040 ASSAM Roads and Bridges Construction of RCC Bridge No.38/1, 43/1,43/3 and 44/2 including approaches and subway on Silchar - Hailakandi Road in Hailakandi District NESIDS-OTRI NLCPR PWD Roads 2006-05-16 3.5313 2007-11-30 3.0595 0 3.0595 2.9866 Ongoing
1041 ASSAM Roads and Bridges Construction of RCC Bridge No.4/3, 10/2 and 14/1 on Pengeri Philobari Road in Tinsukia District with approaches NESIDS-OTRI NLCPR PWD Roads 2004-07-07 2.3366 2006-12-31 2.0493 0 2.0493 1.8426 Ongoing
1042 ASSAM Roads and Bridges Construction of RCC bridge No.40/1 on Bagals Road in Kamrup District NESIDS-OTRI NLCPR PWD Roads 2004-07-28 1.2888 2005-12-30 1.1292 0 1.1292 1.1732 Completed
1043 ASSAM Roads and Bridges Construction of RCC bridge No.40/2 on CPDMDK Road in Karbi Anglong District NESIDS-OTRI NLCPR Hill Areas Dept 2004-07-28 1.3182 2005-12-31 1.156 0 1.156 1.2027 Completed
1044 ASSAM Roads and Bridges Construction of RCC Bridge No.6/1 on Udalguri Barbengera Road in Darrang District with approaches NESIDS-OTRI NLCPR PWD Roads 2004-07-08 1.0403 2006-01-31 0.9116 0 0.9116 0.9616 Completed
1045 ASSAM Roads and Bridges Construction of RCC Bridge No.6/1 over river Katakhal at Ratanpur Ferryghat on Hailakandi Ratanpur road(MDR) NESIDS-OTRI NLCPR PWD Roads 2013-03-25 22.9405 2015-09-30 20.6454 0 20.6454 20.3813 Completed
1046 ASSAM Roads and Bridges Construction of RCC bridge No.8/2, 20/1, 21/1, 23/3, 29/2, 32/1, 36/1 and 40/1 on Mangaldoi Bhutiachang Road in Darrang District NESIDS-OTRI NLCPR PWD Roads 2004-07-29 6.847 2005-12-31 5.9188 0 5.9188 6.1589 Completed
1047 ASSAM Roads and Bridges Construction of RCC Bridge over Deopani river at Bahakangtui upper Deopani, Karbi Anglong under clause 9.2 of MoS signed between Govt. of India, Govt. of Assam & UPDS for the year 2017-18 under KAATC package Special Packages KAATC 2018-12-11 4.1 2020-12-12 4.0722 0 4.0722 2.0506 Ongoing
1048 ASSAM Roads and Bridges Construction of RCC Bridge over River Aie NESIDS-OTRI NLCPR PWD Roads 2010-11-10 78.8365 2013-11-30 70.2503 0 70.2503 70.2503 Completed
1049 ASSAM Roads and Bridges Construction of RCC Bridges and Slab Culverts by Replacing Old Bridge and slab culverts on Kamarbondha Road upto 22nd Km NESIDS-OTRI NLCPR PWD Roads 2012-06-15 7.285 2013-12-31 6.0578 0 6.0578 5.1467 Ongoing
1050 ASSAM Roads and Bridges construction of road and minor bridge from Motinagar to Buban hill Temple - Phase I NESIDS-OTRI NLCPR PWD Roads 2007-10-24 3.2607 2009-10-31 2.9287 0 2.9287 2.8661 Ongoing
1051 ASSAM Roads and Bridges Construction of road from Ambagaon to Kundarbil in Udalguri District (BTC Package -2) Special Packages BTC 2014-09-12 12.75 2016-09-11 12.6961 0 12.6961 12.6946 Completed
1052 ASSAM Roads and Bridges Construction of road from Banamali Tiniali to Rongagorh Tiniali with RCC Br. No. 2/2 over river Desang and Br. No. 8/2 on Mohmora Ali NESIDS-OTRI NLCPR PWD Roads 2013-02-25 14.2231 2015-05-31 12.788 0 12.788 12.788 Ongoing
1053 ASSAM Roads and Bridges Construction of Road from Beltola Chariali to Sarusajai (Bishnu Rabha Path), Guwahati (Assam) NESIDS-OTRI NLCPR PWD Roads 2005-12-27 7.7731 2007-12-31 6.9266 0 6.9266 6.9266 Completed
1054 ASSAM Roads and Bridges Construction of Road from Bhangarpar to Chandranathppur via babur bazar (Length 5.5 KM) NESIDS-OTRI NLCPR PWD Roads 2007-12-20 2.4905 2008-12-31 2.1906 0 2.1906 2.1906 Completed
1055 ASSAM Roads and Bridges Construction of road from Bijni Subhaijhar road at village Nayapara No.2 to Kathalguri via Sanyasiguri including construction of RCC bridge No.1/2 over river Chara in Chirang district. NESIDS-OTRI NLCPR PWD Roads 2015-06-22 3.9584 2017-06-30 3.56 0 3.56 3.56 Completed
1056 ASSAM Roads and Bridges Construction of Road from Birla (Taranglaso) to Ronkimi near NH-36 including RCC Bridge No. 24/1 (L25.00 km) in Assam under KAATC package Special Packages KAATC 2018-06-06 44.15 2020-06-06 43.1599 0 43.1599 43.1599 Completed
1057 ASSAM Roads and Bridges Construction of Road from Borobazar to Gumergaon via Chawdhuripara in Chirang District NESIDS-OTRI NLCPR PWD Roads 2014-12-29 16.6839 2017-01-31 14.9844 0 14.9844 14.9844 Ongoing
1058 ASSAM Roads and Bridges Construction of Road from DillaiBazar to Mon Bahadur Tamang-Koilajan, Longvoku Model Village, Vokekaj to Manja at NH-36 (L30 km) under KAATC Packages Special Packages KAATC 2018-08-01 32.4 2020-03-31 31.4945 0 31.4945 31.4945 Ongoing
1059 ASSAM Roads and Bridges Construction of Road from Gopalpur (Kekerikuchi) to Niz-Kaurbaha(13.50kmlength) including construction of RCC Br.No5/1(15.00m) under PWD,Musalpur(R&B)Division. NESIDS-OTRI NLCPR PWD Roads 2013-02-25 11.7083 2015-02-28 10.5372 0 10.5372 10.5372 Completed
1060 ASSAM Roads and Bridges Construction of road from Hidipi to Lahorijan - goutom Basti road in Karbi anglong NESIDS-OTRI NLCPR Hill Areas Dept 2010-11-10 4.8541 2012-04-30 4.2828 0 4.2828 4.2828 Ongoing
1061 ASSAM Roads and Bridges Construction of road from Kanuri to Binnachora (Satgaharipara) via Nalia including protection works and 4 RCC bridges NESIDS-OTRI NLCPR Dept. of Power 2013-12-09 38.5505 2015-11-30 34.6954 0 34.6954 34.6943931 Completed
1062 ASSAM Roads and Bridges Construction of road from Kumarikata to Nayabasti (Kumarikata Jalah Road) in Baksa District (BTC Package-2) Special Packages BTC 2014-09-26 12.79 2016-09-25 12.6641 0 12.6641 12.6641 Completed
1063 ASSAM Roads and Bridges Construction of Road from NH-31 at Barama to Masalpur Baska(BTC Package) Special Packages BTC 2005-02-07 14.43 2007-03-31 13.387 0 13.387 13.93 Completed
1064 ASSAM Roads and Bridges CONSTRUCTION OF ROAD FROM NH-31 TO KASHIMPUR SUPLEKUCHI VIA PURBAHARATI NESIDS-OTRI NLCPR Public works Department 2017-06-19 5.6257 2019-06-19 1.7515 0 1.7515 Ongoing
1065 ASSAM Roads and Bridges Construction of Road from NH-39 to BBDC Road via Langmili, L10.70 Km under KAATC package Special Packages KAATC 2021-05-10 12.05 2023-05-10 12.0476 0 12.0476 6.0238 Ongoing
1066 ASSAM Roads and Bridges Construction of Road from Paoriputa to Natun Panbari with black topping and construction of RCC Bridge over river Pasnai in Udalguri Rural Road Division (Length - 2.30 Km) in Assam (BTC Area) NESIDS-OTRI NLCPR PWD Roads 2013-05-17 7.6794 2014-11-30 5.5265 0 5.5265 3.746 Ongoing
1067 ASSAM Roads and Bridges Construction of road from Ramhari to Bherbheri via Chamuakhat(Ch.8.00 Km to 11.50 KM) including cross drainage works (Darrang) NESIDS-OTRI NLCPR PWD Roads 2013-02-25 3.4568 2014-08-31 2.4776 0 2.4776 2.4776 Completed
1068 ASSAM Roads and Bridges Construction of road from rangamati to kalaigaon road janaram chowka to aaola chowka NESIDS-OTRI NLCPR PWD Roads 2012-01-31 5.7535 2014-05-31 4.9247 0 4.9247 4.5233 Completed
1069 ASSAM Roads and Bridges Construction of Road from Rongaichara to Bhola Bazar NESIDS-OTRI NLCPR PWD Roads 2012-12-26 3.6559 2014-06-30 3.1945 0 3.1945 3.139 Completed
1070 ASSAM Roads and Bridges Construction of road from Rongjuli IB to Kherkuta via Bechimari road with RCC Bridge 1/1, 1/3 and 5/3 under Goalpara Rural Road Division NESIDS-OTRI NLCPR Dept. of Power 2013-09-19 7.3373 2015-11-30 6.6013 0 6.6013 6.6013 Ongoing
1071 ASSAM Roads and Bridges Construction of Road from Subhaijhar to Uttar Ballamguri via Kumarshali at Bijni in Chirang District, Assam NESIDS-OTRI NLCPR Public works Department 2017-03-09 14.3488 2019-03-09 12.9136 0 12.9136 12.9136 Completed
1072 ASSAM Roads and Bridges Construction of road side drainage system including improvement of town roads in Nagaon Urban area. NESIDS-OTRI NLCPR Department of Housing and 2012-09-25 19.245 2014-09-30 12.8961 0 12.8961 11.3839 Ongoing
1073 ASSAM Roads and Bridges CONSTRUCTION OF ROAD WITH M & BT FROM CHEK ARTU TO BELENDING TO DERA-ARLOK, L 9.35KM, UNDER KAATC PACKAGE Special Packages KAATC 2020-12-03 7.56 2022-02-02 5.7309 0 5.7309 3.7812 Ongoing
1074 ASSAM Roads and Bridges Construction of Road with Mealling and Black Topping from NH-36 at Disobai to Batlok towards Thekarajan (Lenght12 km ) under KAATC in Assam Special Packages KAATC 2019-07-31 15 2021-01-11 7.5 0 7.5 7.5 Ongoing
1075 ASSAM Roads and Bridges Construction of road with Metalling and Black Topping from Era Gaon to Tikoklangso towards Langchitung (Length12.40 km) under KAATC package Special Packages KAATC 2019-11-01 15.12 2021-11-01 7.5614 0 7.5614 7.5614 Ongoing
1076 ASSAM Roads and Bridges Construction of Road with MTBT from UT Road at Dimakuchi Donbosco School to Badlapara via Kalikhola Road, Udalguri in Assam NESIDS-OTRI NLCPR PWD Roads 2011-12-14 6.2091 2014-06-30 5.5791 0 5.5791 5.542 Completed
1077 ASSAM Roads and Bridges Construction of road with RCC Bridges (2Nos.) from Pazipur Dhurkuchi to Borbori Narpara Road under Nalbari Rural Road Division NESIDS-OTRI NLCPR PWD Roads 2013-10-04 5.8627 2015-12-31 5.2324 0 5.2324 5.2324 Completed
1078 ASSAM Roads and Bridges Construction of Roads at Tinsukia Town NESIDS-OTRI NLCPR Department of Housing and 2014-02-20 14.6065 2016-02-29 11.3542 0 11.3542 11.3542 Ongoing
1079 ASSAM Roads and Bridges Construction of Tiphuk Jajolipukhuri Road with RCC Bridge No. 3/3 in Sibsagar District NESIDS-OTRI NLCPR Dept. of Power 2010-11-10 5.5991 2012-11-30 4.9423 0 4.9423 4.9018 Ongoing
1080 ASSAM Roads and Bridges Construction of Two Lane RoB in between Barpeta Railway Station and Surupeta Railway Station replacing L.C gate No. SK-37 at Barpeta District NESIDS-OTRI NLCPR Public works Department 2017-10-24 35.4046 2019-10-24 30.7464 0 30.7464 12.2986 Ongoing
1081 ASSAM Roads and Bridges Construction of Umpoo to Deori Tiniali Road via Longle Ethan upto Mulahin with cross drainage structure under clause 9.4 MoS signed between Govt. of India, Govt. of Assam and UPDS for the year 2017- 18 under KAATC package Special Packages KAATC 2018-12-11 11.56 2016-11-26 9.0273 0 9.0273 5.779 Ongoing
1082 ASSAM Roads and Bridges Construction of Zoo Japorigog Road (CH.0.00 to 1865.00 m from R.G. Baruah Road near State Zoo to Junction Point of Dispur Narengi Road including electrical works NESIDS-OTRI NLCPR PWD Roads 2010-12-13 6.1986 2012-12-31 4.6966 0 4.6966 4.6066 Completed
1083 ASSAM Roads and Bridges Constyruction of RCC bridge no. 13/1 13/2 and 30/2 on Mohbondha Road NESIDS-OTRI NLCPR PWD Roads 2011-01-25 6.1433 2013-01-31 5.2396 0 5.2396 4.3714 Ongoing
1084 ASSAM Roads and Bridges Conversion of SPT Bridge 20/1 over River Gangia into RCC Bridge on Gosaigaon Sapatgram Road in Kokrajhar District(BTC Package) Special Packages BTC 2008-11-28 10.83 2010-11-30 10.7129 0 10.7129 10.7129 Completed
1085 ASSAM Roads and Bridges Conversion of SPT Bridge No. 10/1, 12/3, 14/2 and 16/1 into RCC Bridge on metd. Kokrajhar Bahalpur road NESIDS-OTRI NLCPR PWD Roads 2013-09-23 6.9894 2015-09-30 6.2282 0 6.2282 6.2282 Completed
1086 ASSAM Roads and Bridges Conversion of washed out STP Bridge No. 2/1 over river Hell into RCC Bridge on Shialmari Moinaguri Road in Kokrajhar District NESIDS-OTRI NLCPR PWD Roads 2012-12-28 19.6753 2014-12-31 17.7077 0 17.7077 17.7079 Completed
1087 ASSAM Roads and Bridges Development of Roads for Dhemaji Town NESIDS-OTRI NLCPR Dept. of Power 2013-12-09 11.9811 2015-11-30 10.2028 0 10.2028 10.2028 Completed
1088 ASSAM Roads and Bridges Diguncherra-Airport Road NESIDS-OTRI NLCPR PWD Roads 1998-04-01 0.25 2000-03-31 0.225 0 0.225 0.25 Completed
1089 ASSAM Roads and Bridges Goreswar to Khoirabari Road (BTC Package) Special Packages BTC 2005-10-31 6.57 2007-12-31 6.5728 0 6.5728 6.5727 Completed
1090 ASSAM Roads and Bridges Gossaigaon to Kazigaon via Bhukka Tipkai Road(BTC Package) Special Packages BTC 2005-10-31 11 2007-12-31 11 0 11 10.8166 Completed
1091 ASSAM Roads and Bridges Hardutta-Birudatta road NESIDS-OTRI NLCPR PWD Roads 2003-02-18 1.33 2005-07-31 1.1831 0 1.1831 1.3146 Completed
1092 ASSAM Roads and Bridges Improvement & Strengthening of hard crust road from Laisong to Laiko Border Road (length 30km) under Mahur Road Division NESIDS-OTRI NLCPR Hill Areas Dept 2012-12-28 8.3529 2014-06-30 7.5174 0 7.5174 7.5174 Ongoing
1093 ASSAM Roads and Bridges Improvement / Upgradation by M&BT of Road from Kathalguri village to Wirwar via Parkup Pahar from Ch.2500.00m to 9000.00m (KAATC Package) Special Packages KAATC 2015-03-26 3.5 2016-11-26 3.3335 0 3.3335 3.3335 Completed
1094 ASSAM Roads and Bridges Improvement and Development of Goalpara Town Road Network in Goalpara District NESIDS-OTRI NLCPR Department of Housing and 2013-05-17 17.2385 2014-11-30 12.4118 2.8026 15.2144 12.4118 Ongoing
1095 ASSAM Roads and Bridges Improvement and M & BT of Road from Donkamokam (Artukelang Charali) to Fangtrengfang upto PMGSY Road (Portion from ch. 3803.00 m to 5510.00 m & 6010.00 m to 8303.00 m, length 4.00 km) (KAATC Package) Special Packages KAATC Public works Department 2017-02-21 3.29 2019-03-31 3.2858 0 3.2858 3.2858 Completed
1096 ASSAM Roads and Bridges Improvement and M&BT of road near Satgaon Don Bosco School to Mugasong Tiniali road(length 4.00 Km) (KAATC Package) Special Packages KAATC 2015-03-26 3.25 2017-03-31 3.1313 0 3.1313 3.1313 Completed
1097 ASSAM Roads and Bridges Improvement and upgradation of Chencoories Elgin Road including construction of Major RCC bridge over river Ghagra NESIDS-OTRI NLCPR Dept. of Power 2009-10-15 11.8091 2011-10-31 10.2253 0 10.2253 10.2132 Ongoing
1098 ASSAM Roads and Bridges Improvement and upgradation of Kashikotra to Basugaon Road(BTC Package) Special Packages BTC 2004-12-31 5.51 2007-12-31 5.2289 0 5.2289 5.3465 Completed
1099 ASSAM Roads and Bridges Improvement and widening of Bishmuri Saralpara Sarbhanga Road (BTC Package -2) Special Packages BTC 2012-03-20 26.79 2015-03-20 26.2595 0 26.2595 26.2595 Completed
1100 ASSAM Roads and Bridges Improvement including Metalling & Black Topping at Chaitsema-Rongmandu Road from Monjuli to Longpai (ch. From 0.00m to 3900.00m) (KAATC Package) Special Packages KAATC 2015-03-26 3.57 2017-03-26 3.5035 0 3.5035 3.4653746 Ongoing
1101 ASSAM Roads and Bridges Improvement of Sujit Narzary road from Tihu Chowk to Barimakha via Belguri Pathar NESIDS-OTRI NLCPR PWD Roads 2015-02-24 31.3582 2017-01-31 28.2224 0 28.2224 28.2187 Completed
1102 ASSAM Roads and Bridges Improvement of Badlapara to Dharamjuli Road under Udalguri Rural Road division NESIDS-OTRI NLCPR PWD Roads 2009-03-31 4.0335 2010-09-30 3.559 0 3.559 3.559 Completed
1103 ASSAM Roads and Bridges Improvement of Banglagarh Jaberikuchi Road including cross drainage works in Darrang District NESIDS-OTRI NLCPR PWD Roads 2013-07-02 20.4655 2015-07-31 18.4189 0 18.4189 16.2519 Ongoing
1104 ASSAM Roads and Bridges Improvement of Barnagaon Pakribari road Udalguri (BTC Package) Special Packages BTC 2005-02-07 1.5 2007-03-31 1.425 0 1.425 1.4638 Completed
1105 ASSAM Roads and Bridges Improvement of Barpeta Bashibari Road leading to Manas Sanctuary from km. 1st to Km. 21st in Barpeta District in Assam NESIDS-OTRI NLCPR PWD Roads 2006-12-31 12.3565 2008-06-30 10.9863 0 10.9863 10.8452 Completed
1106 ASSAM Roads and Bridges Improvement of BBDC Road at 31 Km (Karbi Anglong) NESIDS-OTRI NLCPR Hill Areas Dept 2009-06-16 40.1723 2011-06-30 22.6053 12.3982 35.0035 22.6028 Ongoing
1107 ASSAM Roads and Bridges Improvement of Bezera Balikuchi road NESIDS-OTRI NLCPR PWD Roads 2011-02-22 3.7065 2013-03-31 3.2704 0 3.2704 2.6162 Completed
1108 ASSAM Roads and Bridges Improvement of Bhangagarh - Bharalumukh VIP Road for National Games 2005 NESIDS-OTRI NLCPR PWD Roads 2005-03-17 9.828 2005-11-30 8.5859 0 8.5859 8.9299 Completed
1109 ASSAM Roads and Bridges Improvement of Bhowraguri Kachugaon Road in Kokrajhar (BTC Package) Special Packages BTC 2004-12-31 23.73 2007-12-31 22.539 0 22.539 23.7344 Completed
1110 ASSAM Roads and Bridges Improvement of Charigaon Road under Jorhat Road Division NESIDS-OTRI NLCPR PWD Roads 2010-03-22 5.5698 2012-04-30 4.9423 0 4.9423 4.9423 Completed
1111 ASSAM Roads and Bridges Improvement of Chintagaon Botiamari Road in Udalguri District NESIDS-OTRI NLCPR PWD Roads 2011-09-15 8.9826 2013-06-30 8.0444 0 8.0444 8.0444 Completed
1112 ASSAM Roads and Bridges Improvement of Dalgaon Kopti Road (Orang - Dalgaon Road) NESIDS-OTRI NLCPR PWD Roads 2007-10-26 2.3571 2009-10-31 1.697 0 1.697 1.697 Completed
1113 ASSAM Roads and Bridges Improvement of Dhamdhama Tupalia Subankhata (DTS) Road (Metalling and black-topping of remaining stretches including improvement of existing metalled surface(BTC Package) Special Packages BTC 2004-12-31 13.72 2007-03-31 13.4255 0 13.4255 13.72 Completed
1114 ASSAM Roads and Bridges Improvement of Drainage system of Dibrugarh Town in Assam NESIDS-OTRI NLCPR Department of Housing and 2014-02-28 23.8148 2017-02-28 19.9888 0 19.9888 17.0583 Ongoing
1115 ASSAM Roads and Bridges Improvement of Jalah Rupahi Saudarbhitha Gobardhana road Baska(BTC Package) Special Packages BTC 2005-02-07 10 2007-03-31 9.5 0 9.5 9.9599 Completed
1116 ASSAM Roads and Bridges Improvement of Jalah to Kumarikata including 2 Nos. of Bridges over River Kaldia and Diring in Baska District(BTC Package) Special Packages BTC 2010-10-08 21.21 2011-10-07 21.0012 0 21.0012 21.0012 Completed
1117 ASSAM Roads and Bridges Improvement of JB Road NESIDS-OTRI NLCPR PWD Roads 2011-05-26 2.9737 2013-06-30 2.639 0 2.639 2.639 Completed
1118 ASSAM Roads and Bridges Improvement of Kadamtal Nikashi Road from Kuchighar to Bhaluk donga NESIDS-OTRI NLCPR PWD Roads 2013-10-21 4.1575 2015-07-31 3.5851 0 3.5851 2.9933 Ongoing
1119 ASSAM Roads and Bridges Improvement of Kalaigaon Kundarbil road Udalguri (BTC Package) Special Packages BTC 2005-02-07 1.32 2007-03-31 1.2539 0 1.2539 1.2896 Completed
1120 ASSAM Roads and Bridges Improvement of Kanimara Nannatary Road in Nalbari District NESIDS-OTRI NLCPR Dept. of Power 2012-12-26 4.35 2014-06-30 3.9105 0 3.9105 3.7022 Completed
1121 ASSAM Roads and Bridges Improvement of Kaurbaha-Nagrijuli Road by metalling and black-topping including conversion of SPT Bridges into RCC Minor Bridges (BTC Package) Special Packages BTC 2004-12-31 14.5 2007-12-31 14.1695 0 14.1695 14.455 Completed
1122 ASSAM Roads and Bridges Improvement of Kharupetia Udalguri Road from Ch.0.00km to 15.00km (EW GSB BM & SDBC Pavement length15.00km carriage way width5.50m) including RCC drains in the Bazar Portion under Darrang District. NESIDS-OTRI NLCPR Dept. of Power 2015-03-25 27.1287 2017-02-28 24.3464 0 24.3464 23.3302 Completed
1123 ASSAM Roads and Bridges Improvement of Kheroni Rongpongbong Road from 37.10th Km to 46.10 th Km(Widening, Lowering and strengthening of existing hard crust and Providing H.P. Culvert). Special Packages KAATC 2016-02-29 3.2 2018-02-28 1.6 0.75 2.35 1.6 Ongoing
1124 ASSAM Roads and Bridges Improvement of Khoirabari MPK road (Andherighat) to Harisinga via Bhergaon Tangla and Purandia 42.25 km length with conversion of 11 SPT bridges to RCC(BTC Package) Special Packages BTC 2005-12-27 26.5 2008-12-27 26.5026 0 26.5026 26.5026 Completed
1125 ASSAM Roads and Bridges Improvement of Kollanga Sildibi Road from 7th km to 10th km (L3.25 km) with Construction of RCC Bridge No. 8/2 over river Dera) (KAATC Package) Special Packages KAATC Public works Department 2017-02-21 3.59 2019-03-31 3.5856 0 3.5856 3.5856 Completed
1126 ASSAM Roads and Bridges Improvement of Lahorijan Gautom basti Road( Ph-II, L-5.50Km from Ch 9000.0m to Ch 145000.0 M) NESIDS-OTRI NLCPR Hill Areas Dept 2013-07-02 5.1735 2015-03-31 3.7228 0 3.7228 3.6623 Ongoing
1127 ASSAM Roads and Bridges Improvement of Mahilapara Dongapara Barangajuli PWD Road. NESIDS-OTRI NLCPR PWD Roads 2010-12-14 8.3519 2012-12-31 7.4423 0 7.4423 7.4423 Completed
1128 ASSAM Roads and Bridges Improvement of Morigaon - Pachatia-Damal-Dharamtul Road including construction of RCC bridge No. 5/1 over river Kolong NESIDS-OTRI NLCPR PWD Roads 2013-12-09 7.3255 2015-11-30 2.6345 0 2.6345 2.6345 Foreclosed
1129 ASSAM Roads and Bridges Improvement of Mridongpara Road under NLCPR in Sibsagar District NESIDS-OTRI NLCPR PWD Roads 2013-06-05 6.7152 2014-11-30 6.0402 0 6.0402 4.6506 Ongoing
1130 ASSAM Roads and Bridges Improvement of Municipal Roads in Narayanpur Town in Assam NESIDS-OTRI NLCPR Department of Housing and 2010-01-20 4 2012-01-31 3.5294 0 3.5294 3.5294 Completed
1131 ASSAM Roads and Bridges Improvement of Nagaon Morikolong Nanoi dakhinpath Road under Nagaon district NESIDS-OTRI NLCPR PWD Roads 2007-11-26 1.9903 2008-11-30 1.7735 0 1.7735 1.7735 Completed
1132 ASSAM Roads and Bridges Improvement of Nagaon-Barapujia Road under Nagaon Dist. NESIDS-OTRI NLCPR PWD Roads 2007-11-22 2.98 2009-11-30 2.6554 0 2.6554 2.6554 Completed
1133 ASSAM Roads and Bridges Improvement of Naginimora Jajoli Road from Ch. 8.346 Km to Ch. 13.650 Km including conversion of SPT bridge no. 14/1 to RCC Bridge NESIDS-OTRI NLCPR PWD Roads 2012-08-21 4.8543 2014-01-31 4.3679 0 4.3679 4.3679 Completed
1134 ASSAM Roads and Bridges Improvement of Namati to Sukani Road under PWD Dibrugarh Rural Road Division NESIDS-OTRI NLCPR PWD Roads 2014-02-20 6.3158 2016-02-29 2.2725 0 2.2725 2.2725 Foreclosed
1135 ASSAM Roads and Bridges Improvement of North Kajolgaon Bengtol Sonitpur road Chirang(BTC Package) Special Packages BTC 2005-02-07 8.1 2007-03-31 7.6947 0 7.6947 8.1 Completed
1136 ASSAM Roads and Bridges Improvement of North Kajolgaon Dangtol Road (BTC Package) Special Packages BTC 2004-12-31 5.93 2007-03-31 5.6275 0 5.6275 5.925 Completed
1137 ASSAM Roads and Bridges Improvement of PGHJ road from 19th to 74th km (Umrangso to Dilhnagi) under PWD (Roads), Haflong Division (DHATC) Special Packages DHATC 2017-08-08 34.98 2018-09-30 34.605 0 34.605 34.6044 Completed
1138 ASSAM Roads and Bridges Improvement of Rampur Model Road starting from NH - 37 in Kamrup District NESIDS-OTRI NLCPR PWD Roads 2008-03-05 2.2458 2009-03-31 2.0013 0 2.0013 1.9999 Completed
1139 ASSAM Roads and Bridges Improvement of Road between Hatigaon Bhetapara Road for National Games 2005 NESIDS-OTRI NLCPR PWD Roads 2005-03-17 4.5626 2005-11-30 3.9867 0 3.9867 4.1467 Completed
1140 ASSAM Roads and Bridges Improvement of Road Bye Lanes of Chabua Town NESIDS-OTRI NLCPR Department of Housing and 2013-09-23 9.0603 2015-09-30 6.1751 0 6.1751 6.1751 Foreclosed
1141 ASSAM Roads and Bridges Improvement of Road from 1st Km of Demow Dehing Road to Dhaoma Pukhuri (Length - 10.125 Km) with R.C.C. Bridge (Length 18.75 m) in Demow Rural Road sub - Division NESIDS-OTRI NLCPR PWD Roads 2012-05-28 7.6 2014-05-30 5.4165 0 5.4165 4.3524 Ongoing
1142 ASSAM Roads and Bridges Improvement of Road from Amsoi Tiniali to Sinani Bridge via Borgaon, Morten (From 0.00 Km to 17th Km). Special Packages KAATC 2016-02-29 7.1 2018-02-28 6.8094 0 6.8094 3.55 Completed
1143 ASSAM Roads and Bridges Improvement of Road from Barama-Dhamdhama-Tamulpur under Non Lapsable Central pool of Resources. NESIDS-OTRI NLCPR PWD Roads 2014-03-03 8.4655 2016-02-29 7.5152 0 7.5152 7.5152 Completed
1144 ASSAM Roads and Bridges Improvement of road from Bashbari to Gossaigaon via Dingdinga Kokrajhar District (D.K. Road)(BTC Package-2) Special Packages BTC 2012-03-20 25 2015-03-20 24.3911 0 24.3911 24.3911 Completed
1145 ASSAM Roads and Bridges Improvement of road from Budura to Parbhuchuba Dimakuchi PWD Road at Batabari via Khasiachuba, Barangabari NESIDS-OTRI NLCPR PWD Roads 2013-07-02 11.09 2015-01-31 9.9809 0 9.9809 9.9701 Completed
1146 ASSAM Roads and Bridges Improvement of Road from Joysingh Doloi Auditorium Hall to Bijoy Teron Village approach road via Cotton Ginning Mill by widening of road formation including construction of RCC Bridge No.1/1 (KAATC PAckage) Special Packages KAATC 2015-03-26 3.6 2016-11-26 3.5543 0 3.5543 1.8 Completed
1147 ASSAM Roads and Bridges Improvement of road from Kahilipara to Don Bosco School at Guwahati in Assam NESIDS-OTRI NLCPR PWD Roads 2007-12-31 2.5216 2009-12-31 2.2694 0 2.2694 2.2694 Completed
1148 ASSAM Roads and Bridges Improvement of Road from Khairabari to Jamuguri in Udalguri NESIDS-OTRI NLCPR PWD Roads 2013-10-28 13.2918 2016-10-31 4.783 0 4.783 4.783 Completed
1149 ASSAM Roads and Bridges Improvement of Road Network at Sonari Town under Charaideo Rural Road Division NESIDS-OTRI NLCPR Dept. of Power 2010-12-13 7.2374 2012-06-29 6.3621 0 6.3621 6.352 Ongoing
1150 ASSAM Roads and Bridges Improvement of Road Network leading towards Dibru- Chaikhowa National Park under Dibrugarh Rural Road division NESIDS-OTRI NLCPR PWD Roads 2010-03-22 7.4742 2013-04-30 6.5927 0 6.5927 6.6017 Ongoing
1151 ASSAM Roads and Bridges Improvement of Roads and Natural Drainage System within Greater Tezpur Town NESIDS-OTRI NLCPR PWD Roads 2007-03-28 25.5178 2009-05-29 3.4813 0 3.4813 3.4813 Foreclosed
1152 ASSAM Roads and Bridges Improvement of Roads in Biswanath Chariali Town NESIDS-OTRI NLCPR PWD Roads 2011-02-22 11.7443 2013-03-31 8.1283 0 8.1283 4.1435 Ongoing
1153 ASSAM Roads and Bridges Improvement of roads in Jorhat Town NESIDS-OTRI NLCPR PWD Roads 2007-12-20 2.5 2009-06-30 2.2395 0 2.2395 2.2395 Completed
1154 ASSAM Roads and Bridges Improvement of Roads in Sivasagar Town NESIDS-OTRI NLCPR PWD Roads 2007-12-20 2.4246 2009-12-31 2.1605 0 2.1605 2.1605 Completed
1155 ASSAM Roads and Bridges Improvement of Roads of Tinsukia Master Plan Area,Tinsukia NESIDS-OTRI NLCPR PWD Roads 2014-03-03 15.4574 2016-09-30 13.7545 0 13.7545 7.2408 Ongoing
1156 ASSAM Roads and Bridges Improvement of Rongkhang Basti to Thekerajan Road (KAADC) NESIDS-OTRI NLCPR Hill Areas Dept 2011-12-29 14.1814 2013-06-30 12.5914 0 12.5914 10.0694 Ongoing
1157 ASSAM Roads and Bridges Improvement of Rowta Station Feeder Road in Udalguri District(BTC Package -2) Special Packages BTC 2012-09-10 1.53 2014-09-10 1.5262 0 1.5262 1.5262 Completed
1158 ASSAM Roads and Bridges Improvement of Singimari-Sualkuchi Road including cross drainage works & road side drains in Kamrup district NESIDS-OTRI NLCPR PWD Roads 2013-03-25 18.2776 2015-03-31 16.4498 0 16.4498 16.4498 Completed
1159 ASSAM Roads and Bridges Improvement of Sundari Bidyapur via Kakragaon Road(BTC Package) Special Packages BTC 2004-12-31 9.21 2007-12-31 8.7483 0 8.7483 8.9454 Completed
1160 ASSAM Roads and Bridges Improvement of Tangla Bhergaon Ramgaon Road from Ch.00 M to 9400 M including cross drainage works in Udalguri NESIDS-OTRI NLCPR PWD Roads 2010-02-05 10.4334 2013-02-28 9.2059 0 9.2059 9.2059 Completed
1161 ASSAM Roads and Bridges Improvement of Tangla Kachubil Road (BTC area) NESIDS-OTRI NLCPR PWD Roads 2010-11-15 10.7986 2012-11-30 9.6212 0 9.6212 9.6212 Completed
1162 ASSAM Roads and Bridges Improvement of Tihu Doomni Road leading to Indo-Bhutan foot hills from 7th to 25 km in Baska district(BTC Package) Special Packages BTC 2005-12-27 9.95 2008-12-27 9.95 0 9.95 9.95 Completed
1163 ASSAM Roads and Bridges Improvement of Udalguri Bhakatpara road via Bhairaguri Udalguri(BTC Package) Special Packages BTC 2005-02-07 4.44 2007-03-31 4.2179 0 4.2179 4.3347 Completed
1164 ASSAM Roads and Bridges Improvement of Udalguri Sapekhaity Bhakatpara Road in Udalguri Rural Road Division under NLCPR in Assam NESIDS-OTRI NLCPR Public works Department 2017-05-11 31.0305 2019-05-11 27.9274 0 27.9274 27.9262 Completed
1165 ASSAM Roads and Bridges Improvement with M&BT of Disagisim Sibnagar Road (L7.448 KM) (KAATC PAckage) Special Packages KAATC 2015-03-26 3.01 2016-11-26 3.0096 0 3.0096 3.0096 Completed
1166 ASSAM Roads and Bridges Improvement/Upgradation of Mangaldoi Bhutiachang Samrang road from CH-47722M to CH-48292 and fromCH-50000 to CH-62500M including cross drainage works NESIDS-OTRI NLCPR PWD Roads 2013-06-11 29.9166 2014-06-30 26.9192 0 26.9192 26.9192 Completed
1167 ASSAM Roads and Bridges Jagun-Kharsang Road(11 KM) NESIDS-OTRI NLCPR PWD Roads 2003-12-24 3.0394 2005-03-31 2.4161 0 2.4161 2.5661 Completed
1168 ASSAM Roads and Bridges Kachubari-Naokata-Patharighat Road, Nalbari & Darrang NESIDS-OTRI NLCPR PWD Roads 2001-10-31 3.96 2004-03-31 3.5641 0 3.5641 3.96 Completed
1169 ASSAM Roads and Bridges Kaithalkuchi-Barama Subankhata Road, North Kamrup NESIDS-OTRI NLCPR PWD Roads 2001-12-06 0.61 2005-08-31 0.549 0 0.549 0.61 Completed
1170 ASSAM Roads and Bridges Khowrang Mahanpur Road (BTC Package) Special Packages BTC 2005-10-31 2.5 2007-12-31 2.5 0 2.5 2.4629 Completed
1171 ASSAM Roads and Bridges Kumarikata- Jalah Road, Nalbari. NESIDS-OTRI NLCPR PWD Roads 2001-10-31 15.08 2004-03-31 13.4676 0 13.4676 14.964 Completed
1172 ASSAM Roads and Bridges Lailongpara-Kopati Road Via Boro Bazar(BTC Package) Special Packages BTC 2005-10-31 1.31 2007-12-31 1.3104 0 1.3104 1.2723 Completed
1173 ASSAM Roads and Bridges M & BT AND CONSTRUCTION FROM UMKHIRMI TO SOMATON MUKROH, UNDER KAATC PACKAGE Special Packages KAATC 2020-12-08 7.34 2022-12-07 3.6722 0 3.6722 3.6722 Ongoing
1174 ASSAM Roads and Bridges Mangaldai- Bhutiachang Road, Darrang. NESIDS-OTRI NLCPR PWD Roads 2003-02-18 1.207 2003-10-31 1.0863 0 1.0863 1.207 Completed
1175 ASSAM Roads and Bridges Met. And Blacktopping raod from Lalmati to Manglajhora in Kokrajhar District.(BTC Package -2) Special Packages BTC 2012-03-20 6 2014-03-20 5.7869 0 5.7869 5.7869 Completed
1176 ASSAM Roads and Bridges Metalling & Black topping of Assalu to Diduki Road including WBM (Length 18km) under Mahur Road Division NESIDS-OTRI NLCPR Hill Areas Dept 2012-06-28 6.3957 2014-06-30 2.302 0 2.302 2.302 Ongoing
1177 ASSAM Roads and Bridges Metalling & Black Topping of Road from Circuit House Tinsukia to NH-37 via Okanimuria Borguri Okanimuria Nakhrai and Lunpuria Kaibortogaon in Tinsukia Rural Road Subdivision/ Division NESIDS-OTRI NLCPR Dept. of Power 2010-10-29 5.241 2012-02-29 4.6509 0 4.6509 4.493 Ongoing
1178 ASSAM Roads and Bridges Metalling and backtopping of Gossaigaon to Saraibil Road including improvement of existing hard crust and conversion of STP bridge to Rcc bridges(BTC Package) Special Packages BTC 2005-02-07 19.39 2007-03-31 18.3488 0 18.3488 19.39 Completed
1179 ASSAM Roads and Bridges Metalling and Black Topping of Swapanpur to Ramchandi Road of Hailakandi District. NESIDS-OTRI NLCPR PWD Roads 2008-03-27 3.7975 2009-03-31 2.7312 0 2.7312 2.7312 Ongoing
1180 ASSAM Roads and Bridges Metalling and Black-topping of Narabari Dawkibari Road (Narabari to Florican Garden via Malgaon)(BTC Package) Special Packages BTC 2004-12-31 15.95 2007-12-31 15.1525 0 15.1525 15.381 Completed
1181 ASSAM Roads and Bridges Metalling and Blacktopping of Gunjung Maibang Road from 17th to 28.78 KM(NC Hills) NESIDS-OTRI NLCPR Hill Areas Dept 2009-08-18 6.408 2011-01-31 1.9871 0 1.9871 1.9871 Foreclosed
1182 ASSAM Roads and Bridges Metalling and Blacktopping of Road from Borhapjan samdang via Nahoroni road to Sukanguri L.P School in Tinsukia Rural Road Subdivision / Division NESIDS-OTRI NLCPR PWD Roads 2010-09-15 3.2145 2012-03-31 2.8644 0 2.8644 2.9706 Completed
1183 ASSAM Roads and Bridges Metalling and Blacktopping of Road from Dr. Fakaruddin Ali Ahmed Path To Doulgobindapur via Nalbari Hindu Smashan, Nalbari along with Pucca Drain and RCC Slab culverts NESIDS-OTRI NLCPR PWD Roads 2010-02-05 2.2785 2012-02-29 2.0297 0 2.0297 1.6242 Completed
1184 ASSAM Roads and Bridges Mt. & Bt. of Road from Jaipur NH-31 C to Amguri JD Road (Dumbruguri to Amguri) including construction of RCC Bridges & Culverts NESIDS-OTRI NLCPR PWD Roads 2014-12-29 14.7147 2017-01-31 13.192 0 13.192 13.192 Completed
1185 ASSAM Roads and Bridges Namati-Masalpur Road, Nalbari NESIDS-OTRI NLCPR PWD Roads 2001-12-06 0.31 2006-07-31 0.279 0 0.279 0.31 Completed
1186 ASSAM Roads and Bridges Project for Road Network of Jorhat Master Plan Area in Jorhat District NESIDS-OTRI NLCPR PWD Roads 2006-09-12 4.61 2008-09-30 4.0284 0 4.0284 4.0284 Completed
1187 ASSAM Roads and Bridges Rangiya Goreswar Road NESIDS-OTRI NLCPR PWD Roads 2003-02-18 1.52 2004-03-31 1.3674 0 1.3674 1.5168 Completed
1188 ASSAM Roads and Bridges RCC Bridge 4/1 on Hatigaon -Betapara NESIDS-OTRI NLCPR PWD Roads 2004-01-07 1.5384 2005-06-30 1.2397 0 1.2397 1.3397 Completed
1189 ASSAM Roads and Bridges Rcc Bridge on Additional Approach to Airport road(2nos) NESIDS-OTRI NLCPR PWD Roads 2003-12-24 1.7339 2005-03-31 1.5219 0 1.5219 1.6368 Completed
1190 ASSAM Roads and Bridges Rcc Bridge on Mandakata North Guwahati Road(2 nos) NESIDS-OTRI NLCPR PWD Roads 2004-01-07 2.4019 2005-03-31 1.7636 0 1.7636 1.8917 Completed
1191 ASSAM Roads and Bridges Recce of Road in BAC Area NESIDS-OTRI NLCPR PWD Roads 2000-10-31 0.03 2005-07-31 0.027 0 0.027 0.028 Completed
1192 ASSAM Roads and Bridges Road from Jarighat to Lakhichhera. NESIDS-OTRI NLCPR PWD Roads 2000-03-28 0.92 2002-08-31 0.828 0 0.828 0.92 Completed
1193 ASSAM Roads and Bridges Road from Hatichhera Dudpati Mudrennamukh. NESIDS-OTRI NLCPR PWD Roads 2000-03-28 0.43 2001-12-31 0.387 0 0.387 0.43 Completed
1194 ASSAM Roads and Bridges Road improvement projects in NC Hills (6 No.) NESIDS-OTRI NLCPR PWD Roads 2000-03-10 4.98 2003-05-30 4.482 0 4.482 4.98 Completed
1195 ASSAM Roads and Bridges Rowta- Udalguri Road, Darrang. NESIDS-OTRI NLCPR PWD Roads 2001-10-31 8.32 2004-03-31 7.488 0 7.488 8.32 Completed
1196 ASSAM Roads and Bridges Rupshir Ali (Construction of Bridge Nos. 3/25/2 &5/4) NESIDS-OTRI NLCPR PWD roads 2009-07-14 2.1 2011-03-31 1.8839 0 1.8839 1.6507 Ongoing
1197 ASSAM Roads and Bridges Sessa T.E to Timona road in Dibrugarh NESIDS-OTRI NLCPR PWD Roads 2012-05-21 4.01 2014-05-31 3.5395 0 3.5395 3.5395 Completed
1198 ASSAM Roads and Bridges Tamulpur-Goreswar Road, Nalbari. NESIDS-OTRI NLCPR PWD Roads 2001-10-31 4.7341 2004-03-31 4.2607 0 4.2607 4.73 Completed
1199 ASSAM Roads and Bridges tangla - Dimakuchi Road NESIDS-OTRI NLCPR PWD Roads 2003-02-18 2.51 2005-07-31 2.259 0 2.259 2.51 Completed
1200 ASSAM Roads and Bridges Tihu-Barama Road, Nalbari. NESIDS-OTRI NLCPR PWD Roads 2001-12-06 0.64 2005-07-31 0.576 0 0.576 0.64 Completed
1201 ASSAM Roads and Bridges Tulsijhyora-Kailamaila Road via Amguri(BTC Package) Special Packages BTC 2005-10-31 9 2007-12-31 9 0 9 8.8774 Completed
1202 ASSAM Roads and Bridges Udalguri - Kahibari road NESIDS-OTRI NLCPR PWD Roads 2001-10-31 3.66 2005-03-31 3.294 0 3.294 3.66 Completed
1203 ASSAM Roads and Bridges Udalguri- Bhairabkunda Road, Darrang. NESIDS-OTRI NLCPR PWD Roads 2001-10-31 5.86 2004-03-31 5.274 0 5.274 5.86 Completed
1204 ASSAM Roads and Bridges Udalguri-Tamulpur Road, Darrang. NESIDS-OTRI NLCPR PWD Roads 2003-02-18 36.32 2008-03-31 32.184 0 32.184 33.4599 Completed
1205 ASSAM Roads and Bridges Upgradation of Dalgaon Town to Sialmari via Dekerigaon NESIDS-OTRI NLCPR PWD roads 2007-10-24 2.5173 2009-10-31 2.1192 0 2.1192 1.7982 Completed
1206 ASSAM Roads and Bridges Upgradation of Nagaon - Bhuragaon Road via Dhing (SH-10) under Nagaon State Road Division (Nagaon District) NESIDS-OTRI NLCPR PWD Roads 2010-03-22 11.5191 2011-04-30 10.2678 0 10.2678 10.2573 Completed
1207 ASSAM Roads and Bridges upgradation of NT road through Ramphalbil Bazar to all weather road with conversion of SPT bridges into RCC bridge(International Border Areas) NESIDS-OTRI NLCPR PWD Roads 2011-06-27 7.6418 2014-07-31 6.7144 0 6.7144 6.6731 Completed
1208 ASSAM Roads and Bridges Upgradation of Road from NH-31 (C) via Serfanguri, Nepalpara, Athiabari, Ebargaon, Thaigiriguri and No. 2 Hazarikapara to Kapuragaon NESIDS-OTRI NLCPR PWD Roads 2011-12-14 7.597 2013-12-31 6.5321 0 6.5321 6.5321 Completed
1209 ASSAM Roads and Bridges Widening & Strengthening of Lahowal- Bordubi-Tinsukia Road (L.B.T.Road) in Tinsukia District. NESIDS-OTRI NLCPR PWD Roads 2013-12-09 9.9821 2015-11-30 8.9838 0 8.9838 8.6564 Completed
1210 ASSAM Roads and Bridges Widening and improvement of Barbora-Minirgon-Chapakhowa Road including conversion of SPT bridge No.7/1 in Tinsukia District NESIDS-OTRI NLCPR Dept. of Power 2014-02-20 9.8869 2016-02-29 8.8975 0 8.8975 7.118 Ongoing
1211 ASSAM Roads and Bridges Widening and Raising of Nazirakhat Sonapur Road (Length 6.00 km) NESIDS-OTRI NLCPR PWD Roads 2007-12-20 2.6508 2008-12-31 2.3857 0 2.3857 2.3855 Completed
1212 ASSAM Roads and Bridges Widening and Strengthening of Fakiragram-Serfanguri Road including conversion of STP bridge to Rcc bridges(BTC Package) Special Packages BTC 2005-02-07 20.49 2007-03-31 19.4595 0 19.4595 20.4915 Completed
1213 ASSAM Sports Apex Stadium at Kokrajhar, BAC NESIDS-OTRI NLCPR PWD building 2001-01-31 9.3 2006-03-31 8.361 0 8.361 8.911 Completed
1214 ASSAM Sports Construction of Chandi Barua Stadium at Barpeta NESIDS-OTRI NLCPR PWD building 2009-02-10 2.9036 2010-07-31 1.5124 0 1.5124 1.5142 Ongoing
1215 ASSAM Sports Construction of District Sports Complex at Jhagrapar in Dhubri District NESIDS-OTRI NLCPR PWD building 2008-12-10 3.7777 2010-04-30 1.1666 0 1.1666 1.1666 Foreclosed
1216 ASSAM Sports Construction of Indoor Stadium at Donkamokam Town (under Hamren Sub Division) of Karbi Anglong under NLCPR in Assam NESIDS-OTRI NLCPR Hill Areas Dept 2017-05-11 6.1939 2019-05-11 5.5728 0 5.5728 2.2291 Ongoing
1217 ASSAM Sports Construction of Indoor stadium at Silchar NESIDS-OTRI NLCPR PWD building 2007-06-20 4.9433 2009-06-30 4.3617 0 4.3617 4.3617 Completed
1218 ASSAM Sports Construction of Moran Sports Complex at Moran NESIDS-OTRI NLCPR PWD building 2014-02-28 8.8816 2016-02-29 7.5925 0 7.5925 3.8444 Ongoing
1219 ASSAM Sports Construction of Multi Disciplinary Sports Complex at Khanikar, Dibrugarh District under NLCPR in Assam NESIDS-OTRI NLCPR PWD building 2017-12-07 139.8223 2019-12-07 103.8869 13.8459 117.7328 93.8366 Ongoing
1220 ASSAM Sports CONSTRUCTION OF N.L DAULAGUPU SPTS STADIUM WITH 3 STIED RCC DMITARY BUILDING AT HAFLONG IN DIMAHASAO NESIDS-OTRI NLCPR Hill Areas Dept 2017-12-07 16.11 2019-12-07 12.7293 0 12.7293 5.0917 Ongoing
1221 ASSAM Sports Construction of proposed stadium at Mushalpur in Baska District NESIDS-OTRI NLCPR PWD building 2010-11-15 9 2013-11-30 7.9411 0 7.9411 7.9411 Completed
1222 ASSAM Sports Construction of RCC Gallery of District Sports Association(Stadium Complex,Hailakandi) NESIDS-OTRI NLCPR PWD building 2010-05-17 1.7713 2012-05-31 0.9564 0 0.9564 0.9533 Ongoing
1223 ASSAM Sports Creation of Main Athletic Stadium Complex alongwith a multi-purpose Indoor Hall at Guwahati for National Games 2005 NESIDS-OTRI NLCPR PWD building 2004-03-22 75.1 2005-12-31 67.59 0 67.59 73.1 Completed
1224 ASSAM Sports Development of Jorhat stadium at jorhat NESIDS-OTRI NLCPR PWD building 2007-07-30 2.6893 2009-07-31 2.3503 0 2.3503 2.3503 Completed
1225 ASSAM Sports Diphu Sports Complex at Diphu in Karbi Anglong District NESIDS-OTRI NLCPR Hill Areas Dept 2004-07-29 5.0122 2005-03-31 4.511 0 4.511 1.75 Ongoing
1226 ASSAM Sports Establishment of Sports Complex at Salbari under additional 250.00 crore BTC package Special Packages BTC 2013-02-04 5 2018-03-31 3.6797 0 3.6797 3.6797 Ongoing
1227 ASSAM Sports i)Const. of Hojai Stadium ii)Const. of swimming pool type - II with RCC Building iii) Indoor Hall type-II NESIDS-OTRI NLCPR PWD building 2013-06-11 5.7131 2014-09-30 2.053 0 2.053 2.053 Ongoing
1228 ASSAM Sports Mini Stadium at Chapaguri, Bongaigaon NESIDS-OTRI NLCPR PWD building 2001-01-31 0.2 2005-07-31 0.1783 0 0.1783 0.1883 Completed
1229 ASSAM Sports Up-gradation of Sports complex at Kajalgaon in chirang (chirang)(BTC Package-2) Special Packages BTC 2011-01-10 5 2014-01-10 4.7416 0 4.7416 4.7416 Completed
1230 ASSAM Tourism and Culture Construction of Center for Ethnic Community Cultural Practice (Dilaobra Sangibra Samathuraoni Nodrang) at Haflong. Special Packages DHATC 2016-02-29 10 2019-02-28 9.708 0 9.708 9.708 Ongoing
1231 ASSAM Tourism and Culture Construction of Model Village at Longkhor, Maibang, Dima Hasao Special Packages DHATC 2023-11-29 6 2025-12-15 3 2.93225 5.93225 Ongoing
1232 ASSAM Tourism and Culture Construction of Rajkumari Dishrudi Community Home Stay and Ecotourism at Panimur in Dima Hasao District Special Packages DHATC 2016-02-29 17.49 2019-02-28 16.486 0 16.486 16.486 Completed
1233 ASSAM Tourism and Culture Construction of Veer Sambhudhan Phonglo Memorial Park at Maibang Special Packages DHATC 2023-11-29 15 2026-12-31 7.38795 3.94353 11.33148 Ongoing
1234 ASSAM Tourism and Culture Development of Tourism Infrastructure at Bagori Entry Point of Kaziranga National Park(Karbi Anglong) NESIDS-OTRI NLCPR Tourism Dept 2010-02-08 3.2957 2012-07-31 2.908 0 2.908 2.908 Completed
1235 ASSAM Tourism and Culture Mahapurush Shri Shri Madhav Deb Kalashetra at Dhekia Khowain Jorhat District NESIDS-OTRI NLCPR Cultural Affairs Dept 2013-07-02 2.2511 2015-07-31 0.8095 0.3024 1.1119 0.8087 Ongoing
1236 ASSAM Tourism and Culture Project Development of Diphu Town Lake for Recreation under KAATC package Special Packages KAATC 2021-12-31 15.6 2023-03-31 15.6469 0 15.6469 7.7995 Ongoing
1237 ASSAM Tourism and Culture Srimanta Sankardev Bhavan & Research Centre at Rup Nagar, Guwahati NESIDS-OTRI NLCPR PWD building 2014-02-20 9.9774 2016-02-29 8.6792 0 8.6792 8.0734 Ongoing
1238 ASSAM Water Supply Augmentation of Greater Diphu Water Supply Scheme in Karbi Anglong District(Karbi Anglong) NESIDS-OTRI NLCPR Hill Areas Dept 2008-08-19 27.6744 2011-07-31 8.5464 0 8.5464 8.5464 Ongoing
1239 ASSAM Water Supply Augumentation of Donka-Mokam Piped Water Supply Scheme in Karbi Anglong NESIDS-OTRI NLCPR Hill Areas Dept 2012-10-15 7.0664 2014-10-31 6.3283 0 6.3283 2.543 Ongoing
1240 ASSAM Water Supply Bheragaon Piped Water Supply Scheme(BTC Package) Special Packages BTC 2006-12-11 2.47 2007-12-31 2.4663 0 2.4663 2.4663 Completed
1241 ASSAM Water Supply Bongaigaon Town Water Supply scheme (Bongaigaon District) NESIDS-OTRI NLCPR Department of Housing and 2011-01-21 32.0224 2014-02-28 13.8285 0 13.8285 11.2946 Foreclosed
1242 ASSAM Water Supply Dhubri Town Water Supply Scheme NESIDS-OTRI NLCPR Department of Housing and 2006-09-12 10.2653 2008-09-30 9.2388 0 9.2388 8.8051 Ongoing
1243 ASSAM Water Supply Drinking Water supply, Gossigaon NESIDS-OTRI NLCPR Department of Housing and 2000-12-01 3.63 2005-07-31 2.3964 0 2.3964 2.5715 Ongoing
1244 ASSAM Water Supply Golaghat Town Water Supply Scheme NESIDS-OTRI NLCPR Dept. of Power 2007-05-28 5.0461 2009-05-31 4.4093 0 4.4093 4.4093 Completed
1245 ASSAM Water Supply Greater Bokajan Water Supply Scheme (Karbi anglong) NESIDS-OTRI NLCPR Hill Areas Dept 2008-12-17 10.0387 2010-12-31 7.0861 1.9472 9.0333 3.1002 Ongoing
1246 ASSAM Water Supply Greater dokmoka Tekelangjan Water supply scheme for fluoride, Arsenic / iron affected areas from river Dikrut(KA) NESIDS-OTRI NLCPR Hill Areas Dept 2011-09-15 18.6589 2014-10-14 6.7074 0 6.7074 6.5908 Ongoing
1247 ASSAM Water Supply Greater Mahur Town Water Supply Scheme in Assam (NC Hills) NESIDS-OTRI NLCPR Hill Areas Dept 2006-12-31 5.1226 2007-12-31 1.6136 0 1.6136 1.6136 Ongoing
1248 ASSAM Water Supply Greater Silchar Town Water Supply Scheme NESIDS-OTRI NLCPR Hill Areas Dept 2003-01-30 12.3 2005-03-31 10.6482 0 10.6482 11.5882 Completed
1249 ASSAM Water Supply Greater Sildharampur - Buragohain PWSS (under special economic package as per Mos) Karbi Anglong, Assam under KAATC package Special Packages KAATC 2018-12-11 15.07 2020-12-11 14.7283 0 14.7283 14.7284 Completed
1250 ASSAM Water Supply Greater Umswai Water Supply Scheme under KAATC package Special Packages KAATC 2021-05-10 17.15 2023-05-10 8.5744 4.34 12.9144 8.5744 Ongoing
1251 ASSAM Water Supply Haflong Water Supply Scheme (NC Hills) NESIDS-OTRI NLCPR Hill Areas Dept 2004-02-20 1.4182 2005-07-31 0.648 0 0.648 0.7182 Ongoing
1252 ASSAM Water Supply Kharupetia Water Supply Scheme NESIDS-OTRI NLCPR Department of Housing and 2011-01-21 19.8115 2014-02-28 13.9846 0 13.9846 6.9923 Ongoing
1253 ASSAM Water Supply kokrajhar water supply scheme (BTC Package) Special Packages BTC 2005-02-07 23.12 2007-03-31 21.964 0 21.964 23.1122 Completed
1254 ASSAM Water Supply Langklangvong Water Supply Scheme (Karbi Anglong) NESIDS-OTRI NLCPR Hill Areas Dept 2009-12-02 5.9647 2012-12-31 2.1051 0 2.1051 Ongoing
1255 ASSAM Water Supply Mangaldoi Water Supply Scheme NESIDS-OTRI NLCPR Department of Housing and 2010-03-22 12.6105 2013-04-30 8.9014 2.438 11.3394 4.4506 Ongoing
1256 ASSAM Water Supply Margherita Water Supply Scheme in Tinsukia District NESIDS-OTRI NLCPR Department of Housing and 2010-03-22 9.3366 2012-04-30 3.2873 0 3.2873 3.2873 Ongoing
1257 ASSAM Water Supply Sarupathar Piped water Supply scheme NESIDS-OTRI NLCPR Department of Housing and 2011-01-25 10.2935 2013-02-28 9.264 0 9.264 7.4112 Ongoing
1258 ASSAM Water Supply Sibsagar Town Water Supply Scheme NESIDS-OTRI NLCPR Department of Housing and 2007-05-28 16.3935 2009-05-31 14.6068 0 14.6068 11.7943 Ongoing
1259 ASSAM Water Supply Stabilisation of Dispur Water Supply Scheme NESIDS-OTRI NLCPR Department of Housing and 2008-08-19 7.2952 2010-02-28 6.4369 0 6.4369 6.4369 Completed
1260 ASSAM Water Supply Stabilisation of Silchar Water Supply Scheme NESIDS-OTRI NLCPR Department of Housing and 2004-12-20 3.86 2007-03-29 3.3704 0 3.3704 3.5054 Completed
1261 ASSAM Water Supply Storm water drainage system for Margherita town. NESIDS-OTRI NLCPR Department of Housing and 2015-03-25 21.5848 2018-02-28 13.4596 5.9323 19.3919 7.7705 Ongoing
1262 ASSAM Water Supply Subankhata Water Supply Scheme (BTC Package) Special Packages BTC 2005-10-31 3.28 2007-12-31 3.2763 0 3.2763 3.2763 Completed
1263 ASSAM Water Supply Tamulpur Piped Water Supply Scheme NESIDS-OTRI NLCPR Department of Housing and 2011-12-15 2.937 2013-12-31 2.6171 0 2.6171 2.0937 Completed
1264 ASSAM Water Supply Tinsukia Town Water supply Scheme (Phase -II) NESIDS-OTRI NLCPR Department of Housing and 2013-12-20 35.8125 2016-12-30 25.6438 0.8214 26.4652 12.7515 Ongoing
1265 ASSAM Water Supply Tinsukia Town Water Supply Scheme (Phase-I) NESIDS-OTRI NLCPR Department of Housing and 2013-12-20 35.8296 2016-12-30 31.4908 0.1499 31.6407 25.7971 Ongoing
1266 ASSAM Water Supply Udalguri Piped Water Supply Scheme(BTC Package) Special Packages BTC 2006-12-11 5.34 2007-12-31 5.337 0 5.337 5.337 Completed
1267 ASSAM Water Supply Uttarpar Piped Water Supply Scheme(BTC Package) Special Packages BTC 2006-12-11 8.64 2007-12-31 8.6439 0 8.6439 8.5583 Completed
1268 ASSAM Roads and Bridges Construction and improvement of Hamren town Interal Road (length 15.66 km) Special Packages KAATC 2024-03-15 62.8 2027-03-15 25.5201 36.5604 62.0805 31.04 Ongoing
1269 ASSAM Roads and Bridges Widening & Improvement of existing 2 lane to 4 lane road from Mahatma Gandhi Park Road to Lumding road University campus(L-8.300 Km) Special Packages KAATC 2024-03-15 105.16 2027-03-15 49.5366 53.3496 102.8862 51.0366 Ongoing
1270 ASSAM Information and Public Relatio Development of Sepoy Mutiny War Memorial Complex at Rontilla, Hailakandi Schemes of NEC Schemes of NEC 2024-03-15 3.52 2026-03-15 0.7839073 0.7839073 Ongoing
1271 ASSAM Transport and Communication Construction of Road from NH-515 at Lakhi Nepali to Junakarong via Rayang Army camp (L-14.08 Km.) NESIDS-ROADS NESIDS Public works Department 2024-03-15 66.84 2026-09-30 11.72 8 19.72 Ongoing
1272 ASSAM Miscellaneous Legacy Waste Treatment in 39 ULBS in Assam NESIDS-OTRI NESIDS Department of Housing and 2024-03-14 71.9289 2026-03-13 16.3954 16.3954 Ongoing
1273 ASSAM Transport and Communication Construction of Road from Bogamati to Umananda via Naobandha and Khaagrabari Village (L-25.10 Km.) NESIDS-ROADS NESIDS Public works Department 2024-03-15 131.71 2027-03-31 51.86 57 108.86 Ongoing
1274 ASSAM Health Skill Development Centre at Dr. B. Borooah Cancer Institute (BBCI), Guwahati, Assam PM-DevINE Other 2024-06-13 35.12 2026-03-31 0.73 2.9122 3.6422 Ongoing
1275 ASSAM Infrastructure Development of industrial estates for setting up of Small/Medium industries at Ramphalbil (Kokrajhar) Special Packages Public works Department 2024-08-28 14.3998 2026-08-28 3.4788 0 3.4788 Ongoing
1276 ASSAM Science and Technology Construction of College and Hostel Building at Haflong for Heraka Community identified as among deprived/neglected communities of Assam Schemes of NEC Deputy Commissioner, Hafl 2024-08-27 4.6 2027-08-27 1.15 1.15 Ongoing
1277 ASSAM Transport and Communication C/o New Road from Chowkikhola to Tarapung via Borpung in Assam (L : 50.52KM) NESIDS-ROADS Public works Department 2024-07-30 201.4 2027-07-31 49.13 20 69.13 Ongoing
1278 ASSAM Transport and Communication Improvement and Upgradation of road from Rajagaon to Dalimbari in West Karbi Anglong District in Assam (L-24.72KM) NESIDS-ROADS Public works Department 2024-07-30 80.09 2027-01-31 33.59 12.63 46.22 Ongoing
1279 ASSAM Industries Industrial Estate, Lakhibazar at Kokilabari , District Baksa Special Packages Public works Department 2024-09-17 18.3971 2026-03-17 4.2775 0 4.2775 Ongoing
1280 ASSAM Tourism and Culture Bodoland Movement Memorial Museum at Salbari, Baksa Special Packages Public works Department 2024-10-08 29.9947 2027-10-08 0 Ongoing
1281 ASSAM Education Infrastructure Development of 65 Secondary School for construction of new school building in Assam NESIDS-OTRI Public works Department 2025-01-03 455 2026-01-03 108.54 108.54 Ongoing
1282 ASSAM Sports Construction of Sports Academy at Udalguri district under BTC, SDP Govt. of Assam Special Packages BTC IBA Deptt, BTC 2025-05-07 171.86 2028-05-07 0 Ongoing
1283 ASSAM Science and Technology Handloom weaving production for weavers in Backward areas at Lakhimpur District Deori Tribe, Assam. Schemes of NEC Deori Autonomous Council, 2025-06-26 4.95 2028-06-26 1.2375 1.2375 Ongoing
1284 ASSAM Tourism and Culture Construction of Hotel and Tourism Management Institute of Chirang, SDP, Govt. of Assam under BTC Package. Special Packages BTC IBA Deptt, BTC 2025-05-13 44.7234 2027-05-13 0 Ongoing
1285 ASSAM Education Smart Tech-Enhancing Learning Through Technology integration in Assam under NESIDS OTRI Scheme Phase III NESIDS-OTRI Samagra Shiksha Assam 2025-07-02 36.32 2026-04-02 0 0 Ongoing
1286 ASSAM Education Smart Tech-Enhancing Learning Through Technology integration in Assam under NESIDS OTRI Scheme Phase II NESIDS-OTRI Samagra Shiksha Assam 2025-07-02 43.52 2026-04-02 0 0 Ongoing
1287 ASSAM Education Smart Tech-Enhancing Learning Through Technology integration in Assam under NESIDS OTRI Scheme Phase I NESIDS-OTRI Samagra Shiksha Assam 2025-07-03 44 2026-04-03 0 0 Ongoing
1288 ASSAM Agriculture and Allied Food Processing Plant with cold storage facilities at Goladangi in Kokrajhar District Assam Special Packages BTC Executive engineer PWD Ko 2025-07-17 41.3325 2027-01-14 0 Ongoing
1289 ASSAM Agriculture and Allied Food Processing Plant with cold storage facilities at Lalpool, Udalguri District Special Packages BTC Executive engineer PWD Ko 2025-07-18 39.6003 2027-01-18 0 Ongoing
1290 ASSAM Agriculture and Allied Food Processing Plant with cold storage facilities at Nakuchi, Baksa District Assam Special Packages BTC Executive engineer PWD Ko 2025-07-21 42.8546 2027-01-21 0 Ongoing
1291 ASSAM Transport and Communication Improvement and Upgradation of Mangaldoi-Mazikuchi road from Km 11+000 to 26+000 NESIDS-ROADS Public works Department 2025-08-11 45.31 2027-08-11 0 Ongoing
1292 ASSAM Education Construction of 100 Capacity 3 storied RCC Girls Hostel for Bineswar Brahma Engineering College Kokrajhar, Assam. Schemes of NEC Bodoland Territorial Coun 2025-08-04 8.200688116 2028-08-04 0 Ongoing
1293 ASSAM Power 42MW solar project at Bong long Terang village Karbi Anglong Special Packages KAATC M/s Blue bell group of co 2025-09-29 201.83 2027-03-29 0 Ongoing
1294 ASSAM Tourism and Culture Hotel and Tourism Management Institute at Diphu, in Karbi Anglong Special Packages KAATC Karbi Anglong Autonomous 2025-10-07 63.4559 2027-04-07 0 Ongoing
1295 ASSAM Roads and Bridges Construction of Roads from 5th KM of DLHS road to Langkaijan- Ch. 0.00 Km to 14 Km Special Packages KAATC PWD 2025-11-10 47.29 2027-11-09 0 Ongoing
1296 DELHI Education Hostel for NER Student at JNU NESIDS-OTRI NLCPR 1999-04-01 3.95 2000-03-31 0.9 0 0.9 Completed
1297 DELHI Education Indira Gandhi National Open University NESIDS-OTRI NLCPR 1999-04-01 8 2000-03-31 7.2 0 7.2 Completed
1298 DELHI Miscellaneous Creation of Export Development Fund (EDF) for NER NESIDS-OTRI NLCPR 2000-04-01 5 2001-03-31 4.5 0 4.5 Completed
1299 DELHI Miscellaneous Software Devolpoment for AIR and Doordarshan NESIDS-OTRI NLCPR 2000-04-01 4.46 2001-03-31 4.014 0 4.014 Completed
1300 MANIPUR Education Construction of buildings for 52 Anganwadi centres with one toilet and rain water harvesting, Chandel District in Manipur NESIDS-OTRI NESIDS Dept. of Education 2020-01-22 3.0949 2022-01-22 3.033 0 3.033 0.003 Ongoing
1301 MANIPUR Health Construction of District Hospital Imphal West at Mayang, Imphal,Manipur NESIDS-OTRI NESIDS Dept. of Health & familly 2021-02-10 53.4 2023-02-10 51.8599 0 51.8599 20.744 Ongoing
1302 MANIPUR Health Establishment of Blood Bank at CHC Nungba, Noney District in Manipur NESIDS-OTRI NESIDS Department of Health and 2022-04-20 2.35 2024-04-30 0.214 0 0.214 0.001 Ongoing
1303 MANIPUR Health Establishment of Infectious Disease Centre at Porompat, Imphal East NESIDS-OTRI NESIDS Dept. of Health & familly 2018-12-10 20.04 2020-03-31 10.5345 0 10.5345 5.7004 Ongoing
1304 MANIPUR Health Establishment of Trauma Care Centre at CHC Nungba, Noney District in Manipur NESIDS-OTRI NESIDS Department of Health and 2022-04-20 3.787 2024-04-30 0.9627 0 0.9627 0.001 Ongoing
1305 MANIPUR Health Infrastructure Development of Maternity & Child Hospital, Imphal East in Manipur NESIDS-OTRI NESIDS Department of Health and 2022-04-20 34.64 2024-04-30 8.66145 15.3295 23.99095 0.1 Ongoing
1306 MANIPUR Health Porvision of paid/private Ward in Jawaharlal Nehru Institute of Medical Science (JNIMS) Imphal East, Manipur NESIDS-OTRI NESIDS Public Health & Engg Depa 2019-08-13 12.9325 2020-03-31 12.6911 0 12.6911 12.6911 Ongoing
1307 MANIPUR Health Procurement of 17 ALS ambulances for 16 Districts and 1 Central Pool (Medical Directorate) in Manipur NESIDS-OTRI NESIDS Dept. of Health & familly 2021-08-27 4.25 2023-09-01 3.5 0 3.5 3.4 Completed
1308 MANIPUR Health Procurement of 2000 Nos. Oxygen Concentrators and Procurement of Oxygen Cylinder -D Type-2000 No. and 1000 No. D/B type in Manipur NESIDS-OTRI NESIDS Dept. of Health & familly 2021-08-27 18.7392 2023-09-01 0.1 0 0.1 Foreclosed
1309 MANIPUR Health Project Strengthening for Covid-19 testing (RT-PCR, RAT and TrueNat) in Manipur NESIDS-OTRI NESIDS Department of Health and 2021-09-30 19.2508 2022-09-30 2.5132 0 2.5132 0.1 Ongoing
1310 MANIPUR Health Setting up/installation of Liquid Medical Oxygen Tank and Vaporizer 3 Nos. (one 10KL and two no. of 20 KL) at JNIMS, Imphal East in Manipur NESIDS-OTRI NESIDS Dept. of Health & familly 2021-08-27 5.6863 2023-09-01 0.74186 0 0.74186 0.1 Ongoing
1311 MANIPUR Agriculture and Allied Adoption of Milch buffalo (Murrah) in and around Loktak Lake of Manipur Schemes of NEC Schemes of NEC 2013-11-20 5.1671 2016-11-20 4.6504 0 4.6504 4.65 Completed
1312 MANIPUR Agriculture and Allied Alternative Farming System for Tribal Jhumias/Poppy Planters in CCP Pherzawl, Noney, TML, SPT and Kangpokpi Districts and Alternative Farming System for Tribal Jhumias/ Poppy Planters in UKL, KMJ, TPL and CDL Districts Schemes of NEC Schemes of NEC 2022-03-31 12.19 2025-03-31 12.19 0 12.19 4.88 Completed
1313 MANIPUR Agriculture and Allied Community based approach for commercialization and increasing export potential of some economic important horticultural crops in Ukhrul district of Manipur(ICAR) Schemes of NEC Schemes of NEC 2017-03-15 1.0896 2020-03-31 0.37 0 0.37 0.37 Foreclosed
1314 MANIPUR Agriculture and Allied Construction & establishment of Subji Mandi/ Marketing Complex at Wino Bazar, Ukhrul, Manipur Schemes of NEC Schemes of NEC 2016-03-21 4.5 2019-03-21 3.5 0 3.5 3.5 Completed
1315 MANIPUR Agriculture and Allied Construction of Agro Market Complex at Mayang Imphal Bazar, Imphal West, Manipur. Schemes of NEC Schemes of NEC 2016-07-25 6.977 2019-07-25 3.51 0 3.51 3.51 Completed
1316 MANIPUR Agriculture and Allied Construction of farmers hostel for ICAR, Lamphelpat, Imphal West district, Manipur(ICAR) Schemes of NEC Schemes of NEC 2017-03-14 13.7617 2020-03-14 13.76 0 13.76 13.76 Completed
1317 MANIPUR Agriculture and Allied Construction of five (5) Slaughter Houses in five different places, 2 in Ukhrul District, 1 each in IE, IW and CCP Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 9.9 2025-03-31 3.96 3.465 7.425 2.8910704 Ongoing
1318 MANIPUR Agriculture and Allied Construction of Khashimla Women Market Complex near Naga Gate, Hungpung, Ukhrul district, Manipur Schemes of NEC Schemes of NEC 2017-04-11 13.9688 2022-03-07 13.9688 0 13.9688 13.97 Completed
1319 MANIPUR Agriculture and Allied Construction of Modern Agro Market Complex at Kyamgei Village, Imphal East District, Manipur Schemes of NEC Schemes of NEC Dept. of Power 2023-03-22 7.67 2026-03-26 5.75 1.1505 6.9005 Ongoing
1320 MANIPUR Agriculture and Allied Construction of Multi- Level Parking- Inter State & District Agricultural and Economic Transportation Hub at Senapati Bazar, Senapati District, Manipur Schemes of NEC Schemes of NEC Dept. of Power 2023-01-20 14.91 2026-01-30 13.46 1.45 14.91 7.46 Ongoing
1321 MANIPUR Agriculture and Allied Construction of Public Toilet Complex at PMKVY Training Centre, Ukhrul, Manipur Schemes of NEC Schemes of NEC 2017-09-25 0.1594 2020-09-25 0.16 0 0.16 0.16 Completed
1322 MANIPUR Agriculture and Allied Construction of retaining wall and approach road at UDCRMS Resource Centre, Ukhrul, Manipur. Schemes of NEC Schemes of NEC 2018-03-19 1.6 2021-03-19 0.74 0 0.74 0.74 Completed
1323 MANIPUR Agriculture and Allied Construction of Sub-division level tribal market complex Schemes of NEC Schemes of NEC 2016-07-13 13.22 2019-07-13 13.22 0 13.22 13.22 Completed
1324 MANIPUR Agriculture and Allied Construction of way side amenities as part of Prime Minister Swachh Bharat Abhiyan (Clean India Mission) on approved Tourist Circuit falling under NERCMP Project Area in Ukhrul, Chandel and Senapati districts of Manipur. Schemes of NEC Schemes of NEC Dept. of Power 2016-10-20 13 2019-10-20 13 0 13 13 Completed
1325 MANIPUR Agriculture and Allied Construction of Women market at Khuman Lampak (Dingku Road) Opposite ISBT, Imphal East, Manipur Schemes of NEC Schemes of NEC Choose... 2014-03-04 9.846 2017-03-04 3.28 0 3.28 Ongoing
1326 MANIPUR Agriculture and Allied Dairy Farming-A way of life for scheduled caste farmers of Manipur Schemes of NEC Schemes of NEC Choose... 2022-03-31 14.2577 2025-03-31 4.34 6.3514 10.6914 Ongoing
1327 MANIPUR Agriculture and Allied Demonstration through animal based integrated indigenous farming systems for sustained livelihood in and around Khoupum areas of Tamenglong district of Manipur, KVK, Tamenglong under ICAR.(ICAR) Schemes of NEC Schemes of NEC 2017-02-28 2.1371 2020-02-28 1.71 0 1.71 1.71 Foreclosed
1328 MANIPUR Agriculture and Allied Development of demonstration plots on integrated farming system in Ukhrul district, Manipur Schemes of NEC Schemes of NEC 2016-04-27 1.6 2019-04-27 1.44 0 1.44 1.44 Completed
1329 MANIPUR Agriculture and Allied Development of Duncan Park at Somsai, Ukhrul, Manipur Schemes of NEC Schemes of NEC 2016-05-11 8.06 2019-05-11 7.254 0 7.254 7.25 Completed
1330 MANIPUR Agriculture and Allied Development of Floriculture in Manipur Schemes of NEC Schemes of NEC 2013-02-27 1.9823 2016-02-27 1.78 0 1.78 1.78 Completed
1331 MANIPUR Agriculture and Allied Development of identified backward block under 30 Central Sector Scheme in Churachandpur District Schemes of NEC Schemes of NEC 2020-09-18 2.9 2023-09-18 2.9 0 2.9 2.9 Completed
1332 MANIPUR Agriculture and Allied Development of Inland fisheries and aquaculture by constructing ponds in Manipur Schemes of NEC Schemes of NEC Dept. of Power 2017-03-21 13.65 2020-03-21 13.6509 0 13.6509 13.65 Completed
1333 MANIPUR Agriculture and Allied Development of Model Farm for fish based integrated system in Lamphelpat, Manipur(Implemented by Central Agricultural University, Imphal through Manipur Tribal Development Corporation Ltd., (A Govt. of Manipur undertaking). Schemes of NEC Schemes of NEC Dept. of Power 2016-07-14 13.22 2019-07-14 13.22 0 13.22 13.22 Completed
1334 MANIPUR Agriculture and Allied Development of Paddy-cum-Pisciculture Scheme in 5 (five) Hill Districts, Manipur Schemes of NEC Schemes of NEC 2013-11-21 5.5973 2016-11-21 5.04 0 5.04 5.04 Completed
1335 MANIPUR Agriculture and Allied Development programme of identified backward block under 30 Central Sector Scheme in Chandel District, Manipur Schemes of NEC Schemes of NEC 2020-10-21 2.86 2024-10-21 2.86 0 2.86 2.86 Completed
1336 MANIPUR Agriculture and Allied Establishment of Magfruit factory, Manipur Schemes of NEC Schemes of NEC 2015-06-16 9.52 2018-06-29 8.57 0 8.57 8.57 Completed
1337 MANIPUR Agriculture and Allied Establishment of Model Floriculture Centre at Leingangching, Kamjong District, Sendra Bishnupur District and Panam Garden, Andro Imphal East District, Manipur Schemes of NEC Schemes of NEC 2018-02-26 8.58 2021-02-26 7.72 0 7.72 7.72 Completed
1338 MANIPUR Agriculture and Allied Establishment of Poultry breeding farm at Ningthoukhong, Manipur Schemes of NEC Schemes of NEC 2016-03-14 11.5588 2019-03-14 10.4029 0 10.4029 10.4 Completed
1339 MANIPUR Agriculture and Allied Establishment of Resource Centre, Ukhrul, NERCMP Schemes of NEC Schemes of NEC 2016-03-17 4.9073 2019-03-17 3.7481 0 3.7481 3.75 Completed
1340 MANIPUR Agriculture and Allied Gap funding for watershed and springshed for watershed village in Manipur. Schemes of NEC Schemes of NEC 2017-03-21 6.052 2020-03-21 4.84 0 4.84 4.84 Completed
1341 MANIPUR Agriculture and Allied Integrated approach for enhancing ecosystem services of Nungkot Sarbei Machengpat at Andro, Imphal East, Manipur Schemes of NEC Schemes of NEC 2018-02-26 13.29 2021-02-26 11.96 0 11.96 11.96 Completed
1342 MANIPUR Agriculture and Allied Integrated traditional farming for improvement of rural economy and sustainable livelihood, Manipur. Schemes of NEC Schemes of NEC 2016-10-17 0.8149 2019-10-30 0.81 0 0.81 0.81 Foreclosed
1343 MANIPUR Agriculture and Allied Model Horticulture Centre at three locations: Ngarumphung, Tupul and Haipi, Manipur Schemes of NEC Schemes of NEC 2016-03-16 12 2019-03-15 10.8 0 10.8 10.8 Completed
1344 MANIPUR Agriculture and Allied Project on rejuvenation of orange and Tree Bean cultivation in TML and Noney Districts Schemes of NEC Schemes of NEC 2022-03-31 3.83 2025-03-31 3.45 0.3447 3.7947 1.95 Ongoing
1345 MANIPUR Agriculture and Allied Promotion of Animal Husbandry based micro-enterprises for self employment of the BPL tribal women and youth in the blocks of Kangpokpi and Senapati District of Manipur Schemes of NEC Schemes of NEC 2017-07-13 8.55 2020-07-13 8.55 0 8.55 8.55 Completed
1346 MANIPUR Agriculture and Allied Promotion of Integrated Horticulture Farming System in Shifting Cultivation Areas of Manipur Schemes of NEC Schemes of NEC 2016-10-26 13.45 2019-10-26 10.44 0 10.44 10.44 Completed
1347 MANIPUR Agriculture and Allied Promotion of small holder value chain system for organic horticulture crops cultivation in Manipur Schemes of NEC Schemes of NEC 2020-09-30 4.9 2023-09-30 4.9 0 4.9 4.9 Completed
1348 MANIPUR Agriculture and Allied Promotion of smallholders value chain system for Kiwi cultivation in Manipur Schemes of NEC Schemes of NEC 2023-03-31 3.48 2026-03-31 3.13 0.3132 3.4432 1.83 Ongoing
1349 MANIPUR Agriculture and Allied Proposal of identified block for providing key identified service at Sangaikot, Churachandpur District, Manipur Schemes of NEC Schemes of NEC 2022-03-31 4.97 2025-03-31 3.728 1.2425 4.9705 4.9725 Ongoing
1350 MANIPUR Agriculture and Allied Proposal of identified block for providing key identified service at Singngat, Churachandpur District, Manipur Schemes of NEC Schemes of NEC 2022-03-31 4.65 2025-03-31 3.49 1.1625 4.6525 3.49 Ongoing
1351 MANIPUR Agriculture and Allied Proposal of identified block for providing key identified service at Vangai Range, Pherzawl District, Manipur Schemes of NEC Schemes of NEC 2022-03-31 5 2025-03-31 3.75 1.2471248 4.9971248 2 Ongoing
1352 MANIPUR Agriculture and Allied Revival of progeny Orchard-cum-Nurseries (maram, Gelzang, Thawai Mahadev and Jiribam) in Manipur Schemes of NEC Schemes of NEC 2011-05-24 3.4442 2014-05-24 3.1 0 3.1 3.1 Completed
1353 MANIPUR Agriculture and Allied Setting up of Common facility centre for processing of fruits & vegetable including spices at Shirui village, Ukhrul district, Manipur (ICAR) Schemes of NEC Schemes of NEC 2017-03-15 1.28 2020-03-13 0.48 0 0.48 0.48 Foreclosed
1354 MANIPUR Agriculture and Allied Watershed Management and Sustainable livelihood in 12 districts (TPL, KMJ, KPI, PZI, UKL, Jiribam, Kakching, IE, IW, TBL, BPR) Schemes of NEC Schemes of NEC 2022-03-26 6.1536 2025-03-26 4.62 0 4.62 0.1 Ongoing
1355 MANIPUR Education Aspirational District Chandel, Manipur Schemes of NEC Schemes of NEC 2019-06-11 1 2022-06-11 1 0 1 1 Ongoing
1356 MANIPUR Education Backward Communities of Nepali Community in Kangpokpi District, Manipur Schemes of NEC Schemes of NEC Choose... 2022-03-21 3.5468 2025-03-21 0.8867 0.8867 Ongoing
1357 MANIPUR Education Backward Community of Zeme of Tousem Sub-Divison, Tamenglong District, Manipur Schemes of NEC Schemes of NEC 2022-03-21 4.26 2025-03-21 3.2 0.63 3.83 1.21 Ongoing
1358 MANIPUR Education Community Development Programme of Tarao Community Tribe, TD Block, Chandel District, Manipur Schemes of NEC Schemes of NEC 2020-12-15 2.41 2023-12-15 2.408 0 2.408 2.41 Completed
1359 MANIPUR Education Construction of Girls Hostel Chaoyaima H.S School at Manipur Schemes of NEC Schemes of NEC 2016-07-19 2.3426 2020-07-17 2.3426 0 2.3426 2.34 Completed
1360 MANIPUR Education Construction of Auditorium and Compound Wall of Sainik School, Imphal Manipur Schemes of NEC Schemes of NEC Dept. of Power 2016-04-05 6.2 2019-04-05 6.2 0 6.2 6.2 Completed
1361 MANIPUR Education Construction of Boys & Girls Hostel at Mayorumtang (GreenLand), Ukhrul district, Manipur. Schemes of NEC Schemes of NEC 2014-11-28 4.751 2017-11-28 4.751 0 4.751 4.75 Completed
1362 MANIPUR Education Construction of Boys & Girls Hostel at St. Anthonys School, Muirei, Ukhrul Dist. Manipur. Schemes of NEC Schemes of NEC 2016-04-26 7.06 2019-04-26 7.06 0 7.06 7.06 Completed
1363 MANIPUR Education Construction of Boys and Girls Hostel Poirukhongjil H.S School at Manipur Schemes of NEC Schemes of NEC 2016-07-19 3.92 2019-07-19 3.9245 0 3.9245 3.92 Completed
1364 MANIPUR Education Construction of Cultural Hall cum Multi-purpose building for Senapati District Village Chief Association at Senapati District Heafdquarter, Manipur Schemes of NEC Schemes of NEC Choose... 2023-03-28 3.02 2026-03-28 2 0.92 2.92 2 Ongoing
1365 MANIPUR Education Construction of Girls Hostel at Wangkhei Girls High School, Imphal East, Manipur Schemes of NEC Schemes of NEC 2016-04-27 5.96 2019-04-27 5.96 0 5.96 5.96 Completed
1366 MANIPUR Education Construction of Model Library building at Pettegrew College, Ukhrul District Manipur Schemes of NEC Schemes of NEC 2017-05-08 2.27 2020-05-08 1.70595 0 1.70595 0.95 Ongoing
1367 MANIPUR Education Construction of Modern Library building at Modern College, Imphal, Manipur Schemes of NEC Schemes of NEC 2017-05-08 2.2763 2020-05-08 2.2763 0 2.2763 2.28 Completed
1368 MANIPUR Education Construction of Multipurpose cultural cum Indoor Hall for the Youth in the Hill area of Manipur at Purul, Senapati Dist, Manipur Schemes of NEC Schemes of NEC 2016-04-26 5.98 2019-04-26 5.9764 0 5.9764 5.98 Completed
1369 MANIPUR Education Construction of Multipurpose Cultural cum Indoor Hall for the youth in the hill area of Manipur, Longmai, Tamenglong District Schemes of NEC Schemes of NEC Dept. of Power 2016-05-13 5.8537 2019-05-13 5.8537 0 5.8537 4.6 Completed
1370 MANIPUR Education Construction of Scheduled Tribe Boys & Girls Hostel at Noney, Tamenglong District. Schemes of NEC Schemes of NEC Dept. of Power 2016-03-22 8.54 2019-03-22 8.5384 0 8.5384 8.54 Completed
1371 MANIPUR Education Construction of Science Lab (G2) Block of United College Chandel, Manipur Schemes of NEC Schemes of NEC 2011-09-16 4.25 2014-09-16 4.248 0 4.248 4.25 Completed
1372 MANIPUR Education Construction of ST Boys & Girls Hostel Auditorium etc. at Chandel District. Schemes of NEC Schemes of NEC 2016-04-25 9.67 2019-04-25 9.667 0 9.667 9.67 Completed
1373 MANIPUR Education Construction of Tangkhul Headman's Guest House cum administrative building at Ukhrul District, Manipur Schemes of NEC Schemes of NEC Choose... 2023-03-28 2.84 2026-03-28 2 0.76 2.76 2 Ongoing
1374 MANIPUR Education Infrastructure Development of Moreh College, Moreh Chandel District Manipur Schemes of NEC Schemes of NEC 2017-05-08 7.25 2019-05-08 7.2475 0 7.2475 7.25 Completed
1375 MANIPUR Education Upgradation of Science Laboratories and Library Assistance in High and Higher Secondary Schools, Manipur Schemes of NEC Schemes of NEC 2013-03-01 3.71 2016-03-01 2.96 0 2.96 2.08 Ongoing
1376 MANIPUR Sports Construction of Mini Outdoor Stadium at Senapati Public Ground, Senapati District, Manipur Schemes of NEC Schemes of NEC 2016-09-26 7.41 2023-06-02 7.4101 0 7.4101 7.41 Completed
1377 MANIPUR Sports Construction of Mini Stadium at Luangrang (Nungnang) Noney District, Manipur Schemes of NEC Schemes of NEC 2023-03-24 4.04 2026-03-24 1 2 3 2 Ongoing
1378 MANIPUR Sports Construction of Multipurpose Indoor Stadium at Haotabi Lampak, Thoubal, Manipur Schemes of NEC Schemes of NEC 2017-03-22 11.7384 2020-03-22 11.7384 0 11.7384 11.74 Completed
1379 MANIPUR Sports Construction of Pakang Mini Stadium, Henglep Sports Complex, Churachandpur, Manipur Schemes of NEC Schemes of NEC 2016-08-11 4.1255 2019-08-11 4.1255 0 4.1255 4.13 Completed
1380 MANIPUR Sports Construction of Playground at Parbung, Churachandpur, Manipur Schemes of NEC Schemes of NEC 2016-08-09 3.568 2019-08-09 3.568 0 3.568 3.57 Completed
1381 MANIPUR Sports Construction of Sports Complex at Indira Gandhi National Tribal University- Regional Campus. (IGNTU) Schemes of NEC Schemes of NEC 2014-03-05 9.43 2021-03-31 9.4332 0 9.4332 9.43 Completed
1382 MANIPUR Sports Construction of Synthetic Football Turf at Senapati Public Ground, Senapati District, Manipur Schemes of NEC Schemes of NEC Dept. of Power 2022-03-30 5.62 2025-03-30 5.1758 0 5.1758 5.18 Completed
1383 MANIPUR Sports Development of Infrastructure & Amenities of Lamka Public Ground, Churachandpur, Manipur Schemes of NEC Schemes of NEC 2016-05-09 6.456 2019-05-09 6.456 0 6.456 6.46 Completed
1384 MANIPUR Sports Skill Cum Rural Entrepreneurship Development Centre Schemes of NEC Schemes of NEC 2018-01-18 3.9665 2021-03-18 3.2666 0.6985 3.9651 1.59 Ongoing
1385 MANIPUR Sports Tensile Roofing and Stadium Chairs (Phase I) Cricket Stadium, Luwangsangbam, Imphal East Schemes of NEC Schemes of NEC 2012-11-21 4.95 2019-10-30 4.45 0 4.45 4.45 Completed
1386 MANIPUR Irrigation and Flood Control A/E & flood control scheme on Thoubal river ph.VI, Thoubal dist. Schemes of NEC Schemes of NEC 2009-12-18 2.5 2012-12-18 1 0 1 1 Completed
1387 MANIPUR Irrigation and Flood Control Anti-erosion & Flood control works of Thoubal River on LBB & RBB from Rd 10,713m to41,078m Thoubal Dist., Manipur. Schemes of NEC Schemes of NEC 2016-04-21 3.98 2019-04-21 0.0633 0 0.0633 0.06 Completed
1388 MANIPUR Irrigation and Flood Control Anti-Erosion & Flood Control Scheme along Terakhongsangbi stream in Bishnupur District, Manipur Schemes of NEC Schemes of NEC 2018-10-10 4.3 2021-10-10 0.1 0 0.1 0.1 Completed
1389 MANIPUR Irrigation and Flood Control Anti-erosion & Flood Control scheme on Imphal river on 9.60km U/S of Korengei bridge (RD0.00km) at Awang Sekmai, Imphal West District. Schemes of NEC Schemes of NEC 2017-04-17 6.6 2020-04-17 5.94 0 5.94 5.94 Completed
1390 MANIPUR Irrigation and Flood Control Anti-Erosion & Flood Control works along Chakpi River (LBB & RBB) at Serou, Thoubal District, Schemes of NEC Schemes of NEC 2018-02-28 13.87 2021-02-28 0.1 0 0.1 0.1 Completed
1391 MANIPUR Irrigation and Flood Control Anti-Erosion & Flood Control works on Chakpi River, Chandel District for Chakpikarong Bazaar to Hringphe Village & along United College stretch Manipur Schemes of NEC Schemes of NEC 2018-10-10 4.64 2021-10-10 0.1 0 0.1 0.1 Completed
1392 MANIPUR Irrigation and Flood Control Anti-Erosion Scheme on Langdangkong Stream, Ukhrul District, Manipur Schemes of NEC Schemes of NEC 2014-03-05 4.95 2017-03-05 4.455 0 4.455 4.46 Completed
1393 MANIPUR Irrigation and Flood Control Anti-Erosion Scheme on Sippi River Saitu Ganphazol Sub Division, Senapati District, Manipur Schemes of NEC Schemes of NEC 2014-03-05 4.72 2018-03-05 4.248 0 4.248 4.25 Completed
1394 MANIPUR Irrigation and Flood Control Augmentation of Top Dusara Water Supply Scheme, Imphal East District. Schemes of NEC Schemes of NEC 2017-04-25 5 2020-04-25 1.2983 0 1.2983 1.3 Completed
1395 MANIPUR Irrigation and Flood Control Composite Water Supply at Ramrei and its surrounding areas, Ukhrul District Schemes of NEC Schemes of NEC 2017-04-24 14.95 2020-04-24 0.171 0 0.171 0.17 Completed
1396 MANIPUR Irrigation and Flood Control Composite Water Supply Project at Kozhiirii and Likhurii Valleys, Phase-I Senapati District, Manipur Schemes of NEC Schemes of NEC 2018-03-14 2.8 2020-05-20 0.1 0 0.1 0.1 Completed
1397 MANIPUR Irrigation and Flood Control Composite Water Supply Scheme at Oklong in Senapati District, Manipur Schemes of NEC Schemes of NEC 2015-03-23 5.7598 2018-03-23 5.1838 0 5.1838 5.18 Completed
1398 MANIPUR Irrigation and Flood Control Composite Water Supply Scheme for Mualnuam & Songtal Churachandpur District in Manipur Schemes of NEC Schemes of NEC 2012-11-26 4.2982 2015-11-26 3.8684 0 3.8684 3.87 Completed
1399 MANIPUR Irrigation and Flood Control Composite Water Supply Scheme for Tumukhong Moirangpurel and its surrounding areas, Imphal East District Schemes of NEC Schemes of NEC 2017-04-19 5.93 2020-04-19 5.3338 0.07 5.4038 4.147 Ongoing
1400 MANIPUR Irrigation and Flood Control Constn. Of cross regulator across Chowki-darkhong stream and improvement /re-sectioning of parent channels (Kom-lakhong Thoubal dist.) Schemes of NEC Schemes of NEC 2010-09-10 4.59 2013-09-10 3.5382 0 3.5382 3.54 Completed
1401 MANIPUR Irrigation and Flood Control Construction of A/E scheme on Khuga river at Zoummunnuam Churachanpur district Schemes of NEC Schemes of NEC 2016-03-17 7.3272 2019-03-17 6.5945 0 6.5945 6.59 Completed
1402 MANIPUR Irrigation and Flood Control Construction of Buffer Water Reservoir at Shirui Village, Ukhrul District, Manipur Schemes of NEC Schemes of NEC 2015-06-10 5 2018-06-10 4.5 0 4.5 4.5 Completed
1403 MANIPUR Irrigation and Flood Control Construction of concrete Dam across Heirok Litan Makhong, Thoubal District, Manipur Schemes of NEC Schemes of NEC 2013-10-08 4.6509 2015-10-08 4.1858 0 4.1858 4.19 Completed
1404 MANIPUR Irrigation and Flood Control Construction of Concrete weir across Sekmai River at Sekmai Old Bridge, Imphal West District, Manipur Schemes of NEC Schemes of NEC 2011-03-17 4.42 2015-03-17 3.978 0 3.978 3.98 Completed
1405 MANIPUR Irrigation and Flood Control Construction of Gated Weir across Yaralkhong at Gurupat, Imphal East District in Manipur Schemes of NEC Schemes of NEC 2016-09-30 2.55 2019-09-30 2.3 0 2.3 2.3 Completed
1406 MANIPUR Irrigation and Flood Control Construction of Mini Barage across Langathel river nearby Lamlong Khunou, Thoubal District. Schemes of NEC Schemes of NEC Dept. of Power 2017-04-18 3.85 2021-04-30 3.47 0 3.47 3.47 Completed
1407 MANIPUR Irrigation and Flood Control Construction of Pick up weir a/c Loklai River at Pengjang, Churachanpur in Manipur Schemes of NEC Schemes of NEC 2016-04-21 6.354 2019-04-21 5.7186 0 5.7186 5.72 Completed
1408 MANIPUR Irrigation and Flood Control Construction of pick up weir and pucca canal a/c Thoubal river at Hungpung Chihui, Kaziphung village, Ukhrul District Schemes of NEC Schemes of NEC 2016-03-18 3.8 2019-03-18 1.899 0 1.899 1.9 Completed
1409 MANIPUR Irrigation and Flood Control Construction of pick up weir Irrigation Canal across Sengwal river at Khuningman Loukol, Tengnoupal Block, Tengnoupal District, Manipur Schemes of NEC Schemes of NEC 2021-03-26 4.91 2024-03-26 4.91 0 4.91 4.91 Completed
1410 MANIPUR Irrigation and Flood Control Development of Naga Nallah Drainage System in Manipur, Imphal East Schemes of NEC Schemes of NEC 2011-12-23 4.1772 2015-12-23 3.7595 0 3.7595 3.76 Completed
1411 MANIPUR Irrigation and Flood Control Implementation of Rain Water Harvesting Scheme at JNV Ramv (Lmbui), Ukhrul District, Manipur Schemes of NEC Schemes of NEC 2014-11-28 2.82 2018-11-28 2.538 0 2.538 2.54 Completed
1412 MANIPUR Irrigation and Flood Control Improvement and Upgradation of water supply scheme for Churachandpur Town, Zone-III, Manipur Schemes of NEC Schemes of NEC 2013-11-07 5.2317 2016-11-07 4.7085 0 4.7085 4.71 Completed
1413 MANIPUR Irrigation and Flood Control Installation of Water ATM in Manipur (Imphal East, Imphal West, Bishnupur, Thoubal, Senapati, Kakching, Chandel, Kangpokpi) Manipur. Schemes of NEC Schemes of NEC 2022-03-31 4.2152 2026-03-31 3.53 0.6852 4.2152 2.13 Ongoing
1414 MANIPUR Irrigation and Flood Control Proposal of identified backward block for providing key identified services at Henglep Block, Churachandpur District, Manipur Schemes of NEC Schemes of NEC 2023-02-17 4.79 2026-02-17 3.42 1.37 4.79 2.38 Ongoing
1415 MANIPUR Irrigation and Flood Control Waishel Drainage Scheme, Imphal West, Manipur Schemes of NEC Schemes of NEC 2012-11-26 4.875 2015-11-26 4.3875 0 4.3875 4.39 Completed
1416 MANIPUR Irrigation and Flood Control Water Supply Scheme at Laisoipat, Yenapat and Awangsoi Bishnupur dist, Manipur Schemes of NEC Schemes of NEC 2015-06-09 14.916 2018-06-09 5.1838 0 5.1838 5.18 Completed
1417 MANIPUR Industries Construction of Common Facility Centre in Hill Districts of Manipur for Processing of Agriculture and Horticulture Products Schemes of NEC Schemes of NEC 2015-06-16 7.06 2017-06-16 6.35 0 6.35 6.35 Completed
1418 MANIPUR Industries Development of Work Sheds/Factory Sheds at Takyelpat Industrial Estate in Imphal West District, Manipur Schemes of NEC Schemes of NEC 2014-02-07 7.4 2017-02-07 1.7919 0 1.7919 1.79 Completed
1419 MANIPUR Industries Development of Work Sheds/Factory Sheds at Industrial Estate, Bishnupur, Manipur Schemes of NEC Schemes of NEC 2015-06-09 12.03 2018-06-09 10.83 0 10.83 10.83 Completed
1420 MANIPUR Industries Development of Work Sheds/Factory Sheds at Industrial Estate, Thoubal, Manipur Schemes of NEC Schemes of NEC 2015-06-09 12.03 2018-06-09 10.83 0 10.83 10.83 Completed
1421 MANIPUR Industries Establishment of New Industrial Estate (Construction of Worksheds) at T.M. Kasom, Ukhrul, Manipur Schemes of NEC Schemes of NEC Dept. of Power 2017-03-21 12.315 2020-03-21 12.315 0 12.315 12.31 Ongoing
1422 MANIPUR Industries Implementation of Handloom for Employment Generation in Tamenglong District, Manipur Schemes of NEC Schemes of NEC 2017-06-02 6.7286 2020-06-02 3.1103 0 3.1103 3.11 Completed
1423 MANIPUR Industries Income Generation of Rural Poor Women Through Handloom Development Programme, Manipur by M/s. Sega Road Maning Takhel Leikai, Khadi and Village Association, Imphal, Manipur Schemes of NEC Schemes of NEC 2006-03-30 0.11 2009-03-31 0.11 0 0.11 0.11 Completed
1424 MANIPUR Industries Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Manipur Schemes of NEC Schemes of NEC 2020-09-01 2.27 2023-09-01 1.8125 0 1.8125 0.1588 Ongoing
1425 MANIPUR Industries Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19 to the state of Manipur Phase-II Schemes of NEC Schemes of NEC 2021-02-25 2.3 2024-02-25 0.5649 0 0.5649 0.2374886 Ongoing
1426 MANIPUR Industries Manufacturing of Bags of all types, Raincoats, etc by M/s. Romi Bag Industries, Thangmeibad, Thau, Leirak, Imphal, Manipur Schemes of NEC Schemes of NEC 2006-03-30 0.15 2009-03-30 0.14 0 0.14 0.14 Completed
1427 MANIPUR Industries Renovation of Panthoibi (Govt. of Manipur) Emporium in Emporia Complex in New Delhi by the Govt. of Manipur Schemes of NEC Schemes of NEC 2011-02-23 2.9134 2014-02-23 0.522 0 0.522 0.52 Completed
1428 MANIPUR Industries Setting up of a Common Facility centre for Manufacturing of Furniture and Wood Craft by M/s. Volunteers for Rural Health & Action, Lamding, Wanging, Manipur Schemes of NEC Schemes of NEC 2006-02-02 0.1697 2009-02-02 0.15 0 0.15 0.15 Completed
1429 MANIPUR Industries Setting up Processing Units for Cashew Nut at Tura , West Garo Hills, Ginger Dehydration Unit at Haflong, Assam and Cattle & poultry Feed Production Unit at Ukhrul, Manipur Schemes of NEC Schemes of NEC 2012-06-18 0.58 2015-06-18 0.52 0 0.52 0.52 Completed
1430 MANIPUR Industries Special Type of Pottery and Stone Chip Allied Products Production at Nungbi, Ukhrul District, Manipur Schemes of NEC Schemes of NEC Dept. of Power 2014-03-05 3.4175 2017-03-05 2.5936 0 2.5936 2.59 Completed
1431 MANIPUR Information and Public Relatio Construction of Boys Hotsel with Toilets at Jawaharlal Nehru Manipur Dance Academy, Imphal, Manipur Schemes of NEC Schemes of NEC 2017-08-04 4.86 2020-08-04 4.855 0 4.855 4.8550984 Completed
1432 MANIPUR Information and Public Relatio Construction of Hill(Tribal) Chief Guest House at Palace Compound, Imphal East Schemes of NEC Schemes of NEC 2021-03-22 6.5000564 2024-03-22 4.9895 1.5133964 6.5028964 4.98714 Ongoing
1433 MANIPUR Information and Public Relatio Construction of Museum-cum-Library, Tribal Research Institute at Manipur Schemes of NEC Schemes of NEC 2016-11-21 6.4 2019-11-21 4.5 0 4.5 4.5 Ongoing
1434 MANIPUR Information and Public Relatio Heritage Protection in Hill and Plain districts of Manipur Schemes of NEC Schemes of NEC 2015-05-06 3.4894 2018-05-06 2.5062 0 2.5062 2.51 Ongoing
1435 MANIPUR Information and Public Relatio Infrastructure Development for Preservation of Panam Ningthou Immortal Fire and Different Historical Monuments in and around Andro, Imphal East, Manipur Schemes of NEC Schemes of NEC 2016-07-22 1.93 2019-07-22 1.1225 0.6145 1.737 1.12 Ongoing
1436 MANIPUR Information and Public Relatio Infrastructure Development of Heritage Complex Rajbari, Manipur Schemes of NEC Schemes of NEC Choose... 2023-03-31 14.76 2026-03-31 5.9 2 7.9 5.9 Ongoing
1437 MANIPUR Information and Public Relatio North East-ASEAN Business Summit organised by Govt. of Manipur Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.4 2021-04-01 0 Completed
1438 MANIPUR Information and Public Relatio Renovation of Auditorium & Classrooms of Jawaharlal Nehru Manipur Dance Academy, Imphal, Manipur Schemes of NEC Schemes of NEC 2013-02-27 4.0229 2016-02-27 3.1126 0 3.1126 3.11 Ongoing
1439 MANIPUR Information and Public Relatio Strengthening of Hindi Section in the library of 10 government colleges of Manipur Schemes of NEC Schemes of NEC 2021-02-05 1 2024-02-05 0.4 0 0.4 0.4 Ongoing
1440 MANIPUR Health Construction of Nursing School with Hostel at Phungre, Ukhrul as an Extension of Leishiphung Christian Hospital, Ukhrul, Manipur Schemes of NEC Schemes of NEC 2017-04-11 11.02 2020-04-11 9.92 0 9.92 9.92 Ongoing
1441 MANIPUR Health Establishment of Blood Bank by Shija Health Care & Research Institute, Langol, Imphal Schemes of NEC Schemes of NEC 2010-03-23 3.4389 2013-03-23 3.09 0 3.09 3.09 Completed
1442 MANIPUR Health Establishment of Shija Regional Oxygen Plant and Generation Unit, Langol, Imphal, Manipur Schemes of NEC Schemes of NEC 2012-02-27 3.7092 2015-02-27 3.3383 0 3.3383 3.34 Completed
1443 MANIPUR Health Infrastructure support to Nursing School, Lamphelpat, Imphal, Manipur. Schemes of NEC Schemes of NEC 2005-12-08 4.8762 2008-12-08 4.39 0 4.39 4.39 Completed
1444 MANIPUR Health Procurement of 16 (sixteen) portable X-Ray Machine with DR System in Manipur Schemes of NEC Schemes of NEC Dept. of Power 2022-03-30 1.7 2025-03-30 1.7 0 1.7 1.7 Ongoing
1445 MANIPUR Health Procurement of Advanced Medical Devices and Equipment at Sky Hospital and Research Centre, Imphal, Manipur Schemes of NEC Schemes of NEC 2013-12-20 5.1367 2016-12-20 4.62 0 4.62 4.62 Completed
1446 MANIPUR Health Procurement of Ambulances for 102 Maternity services ? 33 Ambulances Schemes of NEC Schemes of NEC Choose... 2022-03-30 3.2 2025-03-30 0 0 0 Ongoing
1447 MANIPUR Health Proposal for setting up of Emergency and Trauma Care unit at Jivan Hospital, Kakching, Thoubal Dist., Manipur Schemes of NEC Schemes of NEC 2013-12-20 4.6713 2015-12-20 3.97 0 3.97 3.97 Completed
1448 MANIPUR Health Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Manipur for activities related to combating COVID-19 pandemic Schemes of NEC Schemes of NEC 2020-04-01 3 2022-04-01 3 0 3 3 Completed
1449 MANIPUR Health Strengthening of Dental Care in District Hospitals and CHCs in Manipur Schemes of NEC Schemes of NEC 2012-12-11 4.8566 2015-12-11 4.11 0 4.11 4.11 Completed
1450 MANIPUR Health Support for Procurement of Advanced Medical Devices and Equipment at Christian Hospital, Imphal, Manipur Schemes of NEC Schemes of NEC 2011-03-16 2.7746 2013-03-16 2.15 0 2.15 2.15 Completed
1451 MANIPUR Health Support to District Hospital, Churachandpur, Manipur Schemes of NEC Schemes of NEC 2005-12-08 4.3535 2008-12-08 3.91 0 3.91 3.91 Completed
1452 MANIPUR Health Support to J.N. Hospital, Imphal (Private Paying Ward), Manipur Schemes of NEC Schemes of NEC 2004-07-16 4.9606 2007-07-16 4.46 0 4.46 4.46 Completed
1453 MANIPUR Health Up-gradation of Regional Childrens Heart Surgical Unit at Sky Hospital & Research Centre Pvt. Ltd., Imphal West, Manipur Schemes of NEC Schemes of NEC 2017-04-11 8 2020-04-11 7.2 0 7.2 7.2 Completed
1454 MANIPUR Health Upgradation of Govt. GNM School to College of Nursing, Lamphelpat, Imphal, Manipur Schemes of NEC Schemes of NEC 2010-03-22 4.5256 2013-03-22 3.86 0 3.86 3.86 Completed
1455 MANIPUR Power 25kWp (each) Standalone SPV Power Plant(s) at the office (s) of Deputy Commissioners of Manipur (9x25KW) Schemes of NEC Schemes of NEC 2012-03-13 2.4138 2015-03-13 2.17 0 2.17 2.17 Completed
1456 MANIPUR Power 25kWp SPV Power Plant at tribal Market Compex, New Lambulance, Imphal, Manipur Schemes of NEC Schemes of NEC 2012-03-13 0.2675 2015-03-13 0.24 0 0.24 0.24 Completed
1457 MANIPUR Power Electrification of 10 Tribal Villages (left out) of Tousem Sub-Division in Tamenglong, Manipur Schemes of NEC Schemes of NEC 2011-12-21 4.0331 2013-12-21 2.9 0 2.9 2.9 Completed
1458 MANIPUR Power Electrification of 12 Tribal villages (left out) of Nungba Sub-Division in Tamenglong District, Manipur Schemes of NEC Schemes of NEC 2012-03-13 4.3234 2014-03-13 3.11 0 3.11 3.11 Completed
1459 MANIPUR Power Installation of 132/33 KV Substation at Kongba Schemes of NEC Schemes of NEC 2005-03-21 14.3635 2008-03-21 14.09 0 14.09 14.09 Completed
1460 MANIPUR Power Installation of 1X10kW each capacity. Wind-Solar Hybrid systems for (i) Lamdan Village, Churrachanpur (ii) Hongbei Village, Ukhrul (iii) Lamdangmei Village, Tamenglong (iv) Dolangkhunou Village, Senapati, Manipur Schemes of NEC Schemes of NEC 2008-03-25 0.9416 2011-03-25 0.85 0 0.85 0.85 Completed
1461 MANIPUR Power Installation of 2X 20 MVA, 132 kV Sub-Station along with associated 132kV LILO lines & related works at Thoubal, Manipur Schemes of NEC Schemes of NEC 2015-05-02 35.6158 2019-03-31 32.06 0 32.06 32.06 Completed
1462 MANIPUR Power Installation of 2X5 MVA 33/11 KV Sub-Station along with the associated line & related works at Power House site of LDS HE project, Manipur. Schemes of NEC Schemes of NEC 2013-01-10 7.79 2017-01-10 7.01 0 7.01 7.01 Foreclosed
1463 MANIPUR Power Installation of 2X5 MVA, 33 KV Sub-Station along with the associated 33kV LILO line & related works at Mayangkhang, Senapati District, Manipur Schemes of NEC Schemes of NEC 2015-12-21 7.6868 2017-12-21 6.82 0 6.82 6.82 Completed
1464 MANIPUR Power Installation of 2X5 MVA, 33 KV Sub-Station along with the associated 33kV line & related works at Mao, Senapati District, Manipur Schemes of NEC Schemes of NEC 2015-12-21 7.822 2017-12-21 7.04 0 7.04 7.04 Completed
1465 MANIPUR Power Installation of 2x5 MVA, 33kV substation associated with 132kV substation at Chandel, Manipur Schemes of NEC Schemes of NEC 2012-03-13 3.1048 2015-03-13 2.8 0 2.8 2.8 Completed
1466 MANIPUR Power Installation of 6680 Sq M of solar thermal (Solar Water Heaters) collector area at various institutions, hospitals and individual households, Manipur Schemes of NEC Schemes of NEC 2012-03-13 2.3547 2015-03-13 2.12 0 2.12 2.12 Completed
1467 MANIPUR Power Renovation & Modernisation of 132/33KV Substation at Yurembam in Manipur Schemes of NEC Schemes of NEC 2006-03-23 9.636 2009-03-23 8.67 0 8.67 8.67 Completed
1468 MANIPUR Power Seven Nos. of Schemes in the capacity of 10kW (5W 5SPV) in Manipur Schemes of NEC Schemes of NEC 2009-10-28 2.4108 2012-10-28 2.169 0 2.169 2.17 Completed
1469 MANIPUR Power Stringing of 132kV s/c line (Second Circuit on D/C Towers from Kakching to Churachandpur, Manipur Schemes of NEC Schemes of NEC 2014-11-28 10.18 2017-11-28 9.16 0 9.16 9.16 Completed
1470 MANIPUR Science and Technology (a) Construction of Multi Utility Building for Thangal Tribe at Senapati District, Headquarter (b) Construction of 25 bedded Residential Hostel for Girls at Makeng Chejinba Village, Senapati District, Manipur (c ) Construction of Common Community Pond at Angkailongdi Village, Senapati District, Manipur. : District Rural Development Agency (DRDA), Senapati District Govt. of Manipur Schemes of NEC Schemes of NEC 2023-03-31 4.66 2026-03-31 2.14 1.36 3.5 1.5 Ongoing
1471 MANIPUR Science and Technology Afforestation of Denuded Hills in Churachandpur and Tamenglong District of Manipur Schemes of NEC Schemes of NEC 2020-11-25 4 2023-11-25 4 0 4 4 Ongoing
1472 MANIPUR Science and Technology Disaster Management system of Manipur (MARSAC) Manipur Remote Sensing Application Centre Govt. of Manipur Schemes of NEC Schemes of NEC 2012-12-10 2.23 2015-12-10 2.007 0 2.007 2.01 Completed
1473 MANIPUR Science and Technology Implementation of Chief Minister Dasboard-Real Time Monitoring of all Government Programme, Specially Beneficiary Oriented Programme Schemes of NEC Schemes of NEC 2021-02-12 13.5 2024-02-12 13.5 0 13.5 12.3221609 Ongoing
1474 MANIPUR Science and Technology IT College Education Programme in Liberal College, Manipur by M/S BMG Informatics Schemes of NEC Schemes of NEC 2005-03-31 0.1746 2008-03-31 0.1746 0 0.1746 0.17 Completed
1475 MANIPUR Science and Technology IT Education Programme for 7 Schools in Manipur for 2009-10 Schemes of NEC Schemes of NEC 2010-01-14 0.3263 2013-01-14 0.3263 0 0.3263 0.33 Completed
1476 MANIPUR Science and Technology Setting up of 50 seats Digital Planetarium at Manipur Science Centre Schemes of NEC Schemes of NEC 2012-03-15 2.45 2015-03-15 1.63 0 1.63 1.63 Completed
1477 MANIPUR Science and Technology Setting up of Science Centre and Planetarium at Ukhrul, Manipur, Dept of Science & Technology, Govt. of Manipur Schemes of NEC Schemes of NEC 2017-07-20 8.02 2020-07-20 8.02 0 8.02 5.92 Ongoing
1478 MANIPUR Science and Technology Setting up of Science Centre and Planetarium at Churachandpur, Manipur, Dept of Science & Technology, Govt. of Manipur Schemes of NEC Schemes of NEC 2017-07-20 7.85 2020-07-20 7.85 0 7.85 7.85 Ongoing
1479 MANIPUR Science and Technology State wide Telemedicine Programme for Healthcare delivery in Manipur- State Health Society, Manipur Schemes of NEC Schemes of NEC 2006-03-14 2.9957 2009-03-14 2.85 0 2.85 2.85 Completed
1480 MANIPUR Transport and Communication Bishnupur - Nungba Road Schemes of NEC Schemes of NEC 2012-12-27 142.85 2015-12-27 128.57 0 128.57 128.57 Completed
1481 MANIPUR Transport and Communication Churachandpur-Singhat road Schemes of NEC Schemes of NEC 2009-10-28 27.32 2013-10-28 24.59 0 24.59 24.59 Completed
1482 MANIPUR Transport and Communication Const. of Inter State Truck Terminus at Imphal, Sekmai Schemes of NEC Schemes of NEC 2016-09-23 12.29 2019-09-23 11.0583 0 11.0583 11.06 Completed
1483 MANIPUR Transport and Communication Const. of Yaripok Bazar to Chagangpat. Schemes of NEC Schemes of NEC 2017-08-16 6.41 2020-08-16 6 0 6 6 Completed
1484 MANIPUR Transport and Communication Construction of Boundary Wall surrounding the newly acquired land at Imphal Airport Schemes of NEC Schemes of NEC 2013-02-20 14.81 2017-02-20 8.89 0 8.89 8.89 Completed
1485 MANIPUR Transport and Communication Construction of hangar, associated apron and link taxiway works at Imphal Airport Schemes of NEC Schemes of NEC 2016-01-12 35.9 2019-01-12 17.5 0 17.5 17.5 Foreclosed
1486 MANIPUR Transport and Communication Improvement of road from Mualdak to Kolhen Diversion road via Munlui Schemes of NEC Schemes of NEC 2016-09-23 11.96 2019-09-23 10.76 0 10.76 10.76 Completed
1487 MANIPUR Transport and Communication Improvement of road Koirengei to Sangakpham via Achangbigei, Kontha Khabam and Ahallup village, 7.33 Km, Manipur Schemes of NEC Schemes of NEC 2020-08-21 7.35 2023-08-21 6.61 0 6.61 6.61 Completed
1488 MANIPUR Transport and Communication Improvemnet of NH-150/NH-202 (New) to Chadong (near Maphou Dam) via Muirei, Ngaramphung & Lamlai Khunou, Manipur Schemes of NEC Schemes of NEC 2016-05-23 10 2019-05-23 9 0 9 9 Completed
1489 MANIPUR Transport and Communication ISBT at Dewlaland, Imphal Schemes of NEC Schemes of NEC 2009-03-05 26.4 2013-03-05 23.76 0 23.76 23.76 Completed
1490 MANIPUR Transport and Communication Kangpokpi-Tamei Road Schemes of NEC Schemes of NEC 2014-04-07 89.95 2017-04-07 80.96 0 80.96 80.96 Completed
1491 MANIPUR Transport and Communication Re-carpeting of Mahadev-Tolloi-Pfutsero Road Schemes of NEC Schemes of NEC 2017-01-05 12.83 2020-01-05 12.83 0 12.83 12.83 Completed
1492 MANIPUR Transport and Communication Tamenglong-Khongsang road Schemes of NEC Schemes of NEC 2005-03-31 12.992 2008-03-31 12.9 0 12.9 12.9 Completed
1493 MANIPUR Transport and Communication Tamenglong-Tamei Road Schemes of NEC Schemes of NEC 2010-03-25 69.69 2013-03-25 62.72 0 62.72 62.72 Completed
1494 MANIPUR Tourism and Culture Construction of Circuit House Churachandpur, Churachandpur Town, Manipur. Schemes of NEC Schemes of NEC 2011-10-20 4.6667 2015-10-20 4.2 0 4.2 4.2 Completed
1495 MANIPUR Tourism and Culture Construction of Tourism Park at Koide Zho of Senapati District, Manipur Schemes of NEC Schemes of NEC 2018-03-12 3.5 2021-03-12 3.15 0 3.15 3.15 Ongoing
1496 MANIPUR Tourism and Culture Construction/Renovation of Tourism Infrastructure Development around Mahabali Temple, Imphal East, Manipur Schemes of NEC Schemes of NEC 2014-03-03 4.4088 2017-03-03 3.1715 0 3.1715 3.17 Ongoing
1497 MANIPUR Tourism and Culture Development of Eco-Tourism Park at Kakching Khunou Lamkhai, Manipur Schemes of NEC Schemes of NEC 2023-03-27 2.9458 2025-03-31 1.47 0 1.47 Ongoing
1498 MANIPUR Tourism and Culture Development of Heritage Tourism at Yangkhullen village, Senapati District, Manipur Schemes of NEC Schemes of NEC 2018-05-02 3.6 2021-05-02 2.6562 0 2.6562 2.66 Ongoing
1499 MANIPUR Tourism and Culture Establishment of Eco-Tourism Park at Andro, Imphal East District, Manipur Schemes of NEC Schemes of NEC 2018-03-14 5.36 2021-03-14 5.36 0 5.36 5.36 Completed
1500 MANIPUR Tourism and Culture Establishment of Eco-Tourism Park at Shovako, Ukhrul District, Manipur Schemes of NEC Schemes of NEC 2018-03-14 5.33 2021-03-14 5.334 0 5.334 4.26 Ongoing
1501 MANIPUR Tourism and Culture Infrastructure Development of Tourist Destination at Shanthei Natural Park, Andro, Imphal East District, Manipur Schemes of NEC Schemes of NEC 2014-02-27 4.78 2018-05-27 4.302 0 4.302 4.3 Completed
1502 MANIPUR Tourism and Culture Renovation of Yatri-Niwas, at Moreh, Manipur Schemes of NEC Schemes of NEC 2011-03-28 4.0782 2014-03-28 3.57 0 3.57 3.57 Completed
1503 MANIPUR Education Development of Infrastructure for Manipur Technical University (MTU), Imphal West District PM-DevINE Dept. of Education 2024-01-23 54.16 2026-01-25 22.1966 11.0983 33.2949 Ongoing
1504 MANIPUR Infrastructure Development of Infrastructure of the Processing Zone of Manipur IT SEZ at Mantripukhri, Imphal PM-DevINE Other 2024-02-08 120 2026-08-06 29.196 29.196 58.392 Ongoing
1505 MANIPUR Health Construction and Equipping of 60 Bedded State Mental Hospital in Lamphelpat, Imphal West, Manipur PM-DevINE Dept. of Health & familly 2024-02-10 70.47 2026-10-06 15.4839 15.48 30.9639 Ongoing
1506 MANIPUR Transport and Communication Development of Road Connectivity from Khabam Lamkhai to Hannaching Heingang via Marjing Polo Complex, Heingang Ching, Imphal East for promoting Tourism NESIDS-ROADS NESIDS Public works Department 2018-12-10 25.4802 2020-03-31 25.4802 0 25.4802 25.4802 Ongoing
1507 MANIPUR Roads and Bridges Infrastructure Development in and around the Polo Ground at Ibudhou Marjing, Heingang, Imphal East NESIDS-OTRI NESIDS Tourism Department 2022-04-20 26.03 2024-04-30 0.1 5.8211 5.9211 Ongoing
1508 MANIPUR Transport and Communication Upgradation of Moirang Sendra Road upto Sendra Hillock and Road from Moirang Sendra Road to Omba Hillock and Keina Bazar on Moirang Khunou to Thanga Keibul Road-8.50 km for promoting Tourism Bishnupur in Manipur NESIDS-ROADS NESIDS Public works Department 2019-07-29 20.32 2020-03-31 12.8 1.94 14.74 6.9365 Completed
1509 MANIPUR Transport and Communication Construction of PSC Bridge(50M Span) OVER LEIMAKHONG River in front of ISTT including Approach Road to proposed PSC Bridge(Length 2.4 km) and proposed Bridge to PHC khurkhul(length 1.23 km) NESIDS-ROADS NESIDS Public works Department 2023-10-16 31.13 2025-10-16 5.4315 15.11 20.5415 Ongoing
1510 MANIPUR Transport and Communication Improvement/Upgradation of Road connecting Tadubi to Chowainamei Kunao and maopung Dung, Senapati District(LO-10.046 km) in Manipur NESIDS-ROADS NESIDS Public works Department 2023-10-16 43.79 2026-10-16 10.41 30.2462 40.6562 Ongoing
1511 MANIPUR Transport and Communication Rehabilitation and upgradation of Kamjong to Kongkan Thana via Pilong NESIDS-ROADS NERSDS Public works Department 2019-08-05 118.2 2022-09-30 116.78 0 116.78 116.78 Completed
1512 MANIPUR Transport and Communication Upgradation/Improvement of Henglep-Thingkhew Tipaimukh road NESIDS-ROADS NERSDS Public works Department 2022-03-16 89.62 2024-03-31 22.6062 28.05 50.6562 13.33 Ongoing
1513 MANIPUR Water Supply Augmentation of Moreh Water Supply Scheme for promoting Tourism Tengnoupal District in Manipur NESIDS-OTRI NESIDS Public Health & Engg Depa 2019-08-13 21.3105 2020-03-31 21.3105 0 21.3105 21.3105 Completed
1514 MANIPUR Water Supply Augmentation of Senapati District Head Quarter Water Supply Scheme for promoting tourism NESIDS-OTRI NESIDS Public Health & Engg Depa 2018-09-14 29.94 2020-03-31 29.94 0 29.94 29.94 Completed
1515 MANIPUR Water Supply Construction of six overhead Tank & ground sump & necessary pipelines in the Thongju and its adjoining areas in Imphal East District for promoting Tourism NESIDS-OTRI NESIDS Public Health & Engg Depa 2018-09-14 41.9164 2020-03-31 41.9164 0 41.9164 41.9164 Ongoing
1516 MANIPUR Water Supply Water supply distribution network for Churachandpur for promoting tourism in Manipur NESIDS-OTRI NESIDS Public Health & Engg Depa 2018-09-14 19.8026 2020-03-31 19.8026 0 19.8026 19.8026 Ongoing
1517 MANIPUR Agriculture and Allied Construction of Bamboo shoot processing Centre at Noney under Integrated Horti/Agri Project NESIDS-OTRI HADP Horticulture Department 2019-08-07 1.22 2021-09-02 1.09519 0 1.09519 0.8446 Ongoing
1518 MANIPUR Agriculture and Allied Construction of Chilly/Spices processing Centre at Khoupum under Integrated Horti/Agri Project NESIDS-OTRI HADP Horticulture Department 2019-08-07 2.01 2021-10-30 1.9968 0 1.9968 1.4597 Ongoing
1519 MANIPUR Agriculture and Allied Construction of feed plant at Lukhambi under Integrated Horti/Agri Project NESIDS-OTRI HADP Veterinary Department 2019-08-07 1.15 2021-10-30 0.3507 0 0.3507 0.3507 Ongoing
1520 MANIPUR Agriculture and Allied Construction of incubation centre under Integrated Horti/Agri Project NESIDS-OTRI HADP Horticulture Department 2019-08-07 1.03 2021-10-30 0.6743 0.2182 0.8925 0.6743 Ongoing
1521 MANIPUR Agriculture and Allied Construction of Market shed with storage at Lukhambi NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 2.19 2021-10-30 1.592 0 1.592 0.684 Ongoing
1522 MANIPUR Agriculture and Allied Construction of Pack House at 20 places under Integrated Horti/Agri Project NESIDS-OTRI HADP Horticulture Department 2019-08-07 1.6 2021-09-02 1.4154 0 1.4154 1.4154 Ongoing
1523 MANIPUR Agriculture and Allied Construction of Pack House at 24 Locations NESIDS-OTRI HADP Horticulture Department 2019-08-07 1.92 2021-09-15 1.6984 0 1.6984 1.6984 Ongoing
1524 MANIPUR Agriculture and Allied Construction of Suspension bridge over Barak River, Tuiphai Village NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 0.33 2020-12-15 0.2565 0 0.2565 0.2565 Completed
1525 MANIPUR Agriculture and Allied Construction of Suspension bridge over Chengthuitok River, Sempat Naga Village NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 0.27 2020-12-05 0.2025 0 0.2025 0.2025 Completed
1526 MANIPUR Agriculture and Allied Construction of Suspension bridge over Ijei River, Numgang Village NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 0.8 2020-11-25 0.6268 0 0.6268 0.6268 Completed
1527 MANIPUR Agriculture and Allied Construction of Suspension bridge over Irang River, Tamlok Village NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 0.52 2020-12-28 0.3824 0 0.3824 0.3824 Completed
1528 MANIPUR Agriculture and Allied Construction of Women Marketing Complex at Tamenglong HQ NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-19 5.97 2021-10-30 5.677 0 5.677 2.2708 Ongoing
1529 MANIPUR Agriculture and Allied Convention Centre / Training Hall at Tamenglong NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 6.87 2021-10-30 2.8311 0 2.8311 2.264 Ongoing
1530 MANIPUR Agriculture and Allied Development & Promotion of Eco-Tourism Centres at Zeilad Lake & Tharon Cave, Tamenglong NESIDS-OTRI HADP Forest Department 2019-08-07 3.52 2022-01-04 3.4 0 3.4 3.4 Completed
1531 MANIPUR Agriculture and Allied Engaging local vibrant NGO for community mobilization and instituitional building under integrated Horti/Agri project NESIDS-OTRI HADP DC Noney 2019-08-07 0.35 2021-09-06 0.35 0 0.35 0.35 Ongoing
1532 MANIPUR Agriculture and Allied Establishment of bamboo processing Centre at Tamenglong Headquarter NESIDS-OTRI HADP Forest Department 2019-08-07 3.84 2021-09-02 3.7982 0 3.7982 2.2017 Ongoing
1533 MANIPUR Agriculture and Allied Establishment of cold storage Chain at Temenglong NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 2 2021-10-30 1.8894 0 1.8894 1.8894 Completed
1534 MANIPUR Agriculture and Allied Fruits and vegetables processing Plant at Azuram NESIDS-OTRI HADP Horticulture Department 2019-08-07 2 2021-10-03 1.4633 0 1.4633 1.4633 Ongoing
1535 MANIPUR Agriculture and Allied Fruits and vegetables processing Plant at Tamenglong NESIDS-OTRI HADP Horticulture Department 2019-08-07 2 2021-10-03 1.4633 0.32144 1.78474 1.4633 Ongoing
1536 MANIPUR Agriculture and Allied Spice Processing Unit at Tamei NESIDS-OTRI HADP Horticulture Department 2019-08-07 2 2021-10-30 1.4597 0.33322 1.79292 1.4597 Ongoing
1537 MANIPUR Agriculture and Allied Sustainable Agro-Livestock Technology (SALT) 4-Model village. NESIDS-OTRI HADP Veterinary Department 2019-08-07 2.41 2022-08-30 2.41 0 2.41 2.41 Completed
1538 MANIPUR Agriculture and Allied Tea processing centre under integrated Horti/Agri project NESIDS-OTRI HADP TCI MANIDCO 2019-08-07 1.33 2021-09-03 1.1842 0 1.1842 0.4736 Ongoing
1539 MANIPUR Agriculture and Allied Tea processing Unit at Tamenglong Headquarter NESIDS-OTRI HADP TCI MTDC 2019-08-07 3.09 2021-09-02 2.382 0 2.382 2.382 Ongoing
1540 MANIPUR Agriculture and Allied Upgradation of connecting Roads under Noney District Headquarter (L-5.4km) (SH: P/L DSB, WBM &PC) NESIDS-OTRI HADP PWD 2019-08-07 3.34 2020-12-28 2.3846 0 2.3846 2.3846 Ongoing
1541 MANIPUR Education Basic Minimum services - Construction of 40 primary schools under ADC NESIDS-OTRI NLCPR Education Department 1999-12-30 1.18 2002-12-26 1.062 0 1.062 1.18 Completed
1542 MANIPUR Education Basic Minimum services- Construction of 32 primary schools NESIDS-OTRI NLCPR Education Department 1999-12-30 1.25 2002-12-26 1.125 0 1.125 1.25 Completed
1543 MANIPUR Education Construction 2 (Two) class rooms for 205 schools without Building. NESIDS-OTRI NLCPR Education Department 2000-03-31 1.6 2003-03-31 1.44 0 1.44 1.6 Completed
1544 MANIPUR Education Construction of 5 Nos. of Model Primary School Building for Sadar Hills Autonomous District Council, Sadar Hills district in Manipur Phase-I (Construction of 300 Nos. of Model Primary School under the Autonomous District Council of Manipur) NESIDS-OTRI NLCPR Education Department 2014-02-21 2.3645 2017-01-31 2.1281 0 2.1281 2.1281 Completed
1545 MANIPUR Education Construction of 5 Nos. of Model Primary School Building for Tamenglong Autonomous District Council Tamenglong district in Manipur- Phase I (Construction of 300 Nos. of Model Primary School under the Autonomous District Council of Manipur) NESIDS-OTRI NLCPR Education Department 2014-02-21 2.3645 2014-02-24 2.1146 0 2.1146 2.1146 Completed
1546 MANIPUR Education Construction of 5 Nos. of Model Primary School buildings for Chandel ADC in Chandel district NESIDS-OTRI NLCPR Education Department 2011-07-04 2.1603 2012-04-30 1.9062 0 1.9062 1.9062 Completed
1547 MANIPUR Education Construction of 5 Nos. of Model Primary School buildings for Churanchandpur ADC, Churachandpur district NESIDS-OTRI NLCPR Education Department 2011-07-04 2.1603 2012-04-30 1.9062 0 1.9062 1.9062 Completed
1548 MANIPUR Education Construction of 5 Nos. of Model Primary School Buildings for Senapati ADC in Senapati district NESIDS-OTRI NLCPR Education Department 2011-07-04 2.1603 2012-04-30 1.9062 0 1.9062 1.9062 Completed
1549 MANIPUR Education Construction of 5 Nos. of Model Primary School buildings for Ukhrul ADC in Ukhrul district NESIDS-OTRI NLCPR Education Department 2011-07-04 2.1603 2012-04-30 1.9062 0 1.9062 1.9062 Completed
1550 MANIPUR Education Construction of 8 Classrooms in Rengkai Government High School, Churachandpur NESIDS-OTRI NLCPR Education Department 2005-09-27 0.6 2006-12-31 0.5241 0 0.5241 0.5241 Completed
1551 MANIPUR Education Construction of Government College of Technology NESIDS-OTRI NLCPR Education Department 2004-07-09 10 2007-07-31 8.7372 0 8.7372 9 Completed
1552 MANIPUR Education Construction of Nungba PHC Operation Theatre NESIDS-OTRI HADP Department of Health and 2019-08-07 0.38 2020-02-07 0.221 0 0.221 0.221 Ongoing
1553 MANIPUR Education Construction of Tribal Boys Hostel at Adimjati Shiksha Ashram Campus, Imphal (150 boys capacity) in Manipur NESIDS-OTRI NLCPR Manipur Tribal Developmen 2017-07-28 8.3 2019-07-28 7.3234 0 7.3234 7.3234 Completed
1554 MANIPUR Education Establishment of a model residential Govenment School (VI-XII) at Jiribam Imphal East Manipur NESIDS-OTRI NLCPR Education Department 2010-12-15 14.0421 2012-12-15 12.3901 0 12.3901 12.3901 Completed
1555 MANIPUR Education Extension of 2 (Two) Class rooms for 172 State Govt. Secondary Schools NESIDS-OTRI NLCPR Education Department 2000-03-31 8.6 2004-12-31 7.74 0 7.74 8.6 Completed
1556 MANIPUR Education Extension of 2 (Two) Class rooms for the State Govt. Secondary Schools including 21 newly upgraded Higher Secondary Schools. NESIDS-OTRI NLCPR Education Department 2000-03-31 2.15 2004-12-31 1.935 0 1.935 2.15 Completed
1557 MANIPUR Education Girls Hostel at 2 Schools NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-19 3.64 2021-12-31 1.24308 0 1.24308 Ongoing
1558 MANIPUR Education Infrastructure Development of 9 Govt. colleges in valley/ hills in Manipur NESIDS-OTRI NLCPR Education Department 2010-12-23 9.7207 2012-12-31 8.0133 0 8.0133 8.0133 Completed
1559 MANIPUR Education Infrastructure Development of Manipur University Phase II NESIDS-OTRI NLCPR Education Department 2004-10-29 3.88 2006-10-31 3.0551 0 3.0551 3.1651 Completed
1560 MANIPUR Education Sarva Shiksha Abhiyan NESIDS-OTRI NLCPR Education Department 2006-03-27 2.6549 2007-03-31 2.6549 0 2.6549 2.6549 Completed
1561 MANIPUR Education Sarva Shiksha Abhiyan (2006-07) NESIDS-OTRI NLCPR Education Department 2006-06-29 3.7805 2007-06-29 3.7805 0 3.7805 3.7805 Completed
1562 MANIPUR Education Teachers Quarters (Barrak type) at 2 Schools NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 2.27 2021-12-31 1.14668 0 1.14668 0.1 Ongoing
1563 MANIPUR Education University and 60 Affiliated Colleges from Manipur NESIDS-OTRI NLCPR Education Department 2000-03-31 20 2004-03-31 16.902 0 16.902 17.7821 Completed
1564 MANIPUR Irrigation and Flood Control Construction of Barrage across Itam river at Kharason, Impahl East NESIDS-OTRI NLCPR Minor Irrigation 2008-11-04 3.6134 2010-10-31 3.1883 0 3.1883 3.1883 Completed
1565 MANIPUR Irrigation and Flood Control Construction of Barrage over Itok river at Chandrakhong at ThoubalManpur NESIDS-OTRI NLCPR Minor Irrigation 2010-12-15 4.9831 2012-12-31 4.3689 0 4.3689 4.3689 Completed
1566 MANIPUR Irrigation and Flood Control Construction of Mini Barrage across Wangjing river at Wangjing Canteen Lampak in Thoubal Manipur NESIDS-OTRI NLCPR Minor Irrigation 2010-12-15 4.9828 2012-12-31 4.3169 0 4.3169 4.3169 Completed
1567 MANIPUR Irrigation and Flood Control Construction of Pick up weir across Namia river at Konkan Thana in Ukhrul Manipur NESIDS-OTRI NLCPR Minor Irrigation 2010-12-15 3.0632 2012-12-31 2.6596 0 2.6596 2.6596 Completed
1568 MANIPUR Irrigation and Flood Control Modernisation of Kakching Ithei Maru Main Canal NESIDS-OTRI NLCPR Minor Irrigation 2008-03-28 3.4064 2010-03-31 3.0057 0 3.0057 3.0057 Completed
1569 MANIPUR Health Basic Minimum services - Construction of primary health service centre NESIDS-OTRI NLCPR Department of Health and 1999-12-30 5.92 2002-12-26 5.328 0 5.328 5.92 Completed
1570 MANIPUR Health Construction and Equipping of 50 Bedded Hospital at Chandel District NESIDS-OTRI NLCPR Department of Health and 2006-11-30 13.1577 2008-11-28 11.497 0 11.497 11.497 Completed
1571 MANIPUR Health Construction and Equipping of 50 bedded Hospital at Jiribam Sub Division NESIDS-OTRI NLCPR Department of Health and 2006-11-30 15.6426 2009-11-30 14.0783 0 14.0783 14.0783 Completed
1572 MANIPUR Health Construction and Equipping of 50 bedded Hospital at Senapati District NESIDS-OTRI NLCPR Department of Health and 2006-11-30 14.261 2008-11-28 12.4699 0 12.4699 12.4699 Completed
1573 MANIPUR Health Construction and Equipping of 50 bedded Hospital at Tamenglong District NESIDS-OTRI NLCPR Department of Health and 2006-11-30 14.3672 2008-11-28 12.5538 0 12.5538 12.5538 Completed
1574 MANIPUR Health Construction and equipping of 50 bedded hospital at Ukhrul District NESIDS-OTRI NLCPR Department of Health and 2006-11-30 13.9657 2008-11-30 12.176 0 12.176 12.176 Completed
1575 MANIPUR Health Construction of 10 PHCs in valleys NESIDS-OTRI NLCPR Department of Health and 2007-11-20 7.8571 2008-11-28 6.9325 0 6.9325 6.9125 Completed
1576 MANIPUR Health Construction of 18 PHSCs in valley areas NESIDS-OTRI NLCPR Department of Health and 2007-11-20 2.565 2008-11-28 2.2632 0 2.2632 2.2632 Completed
1577 MANIPUR Health Construction of 32 PHCs in Hill areas in Manipur NESIDS-OTRI NLCPR Department of Health and 2007-11-21 5.4539 2008-11-28 4.8124 0 4.8124 4.8124 Completed
1578 MANIPUR Health Construction of CHC Napet Palli, Jiribum sub division in Imphal East, Manipur NESIDS-OTRI NLCPR Department of Health and 2010-11-04 5.0492 2012-10-31 4.4552 0 4.4552 4.4552 Ongoing
1579 MANIPUR Health Construction of Dharmasala Building at Regional Institute of Medical Sciences (RIMS) NESIDS-OTRI NLCPR Regional Institute of Med 2006-09-11 2.8212 2008-09-30 1.8777 0 1.8777 1.8777 Ongoing
1580 MANIPUR Health Construction of Thoubal District Hospital NESIDS-OTRI NLCPR Department of Health and 2005-01-01 1.86 2006-01-31 0 Completed
1581 MANIPUR Health Construction of Veterinary Hospitals in 9 Districts NESIDS-OTRI NLCPR Veterinary Department 2007-12-31 7.4892 2009-12-31 6.6082 0 6.6082 6.6082 Completed
1582 MANIPUR Health Purchase of Hospital Equipments for Tamenglong Dist. Hospital NESIDS-OTRI HADP Department of Health and 2019-08-07 2.03 2021-09-02 1.9053 0 1.9053 1.9053 Completed
1583 MANIPUR Health Strengthening of Health equipments in Govt Hospitals NESIDS-OTRI NLCPR Department of Health and 2005-03-17 8.27 2006-09-30 7.4403 0 7.4403 7.5399 Completed
1584 MANIPUR Health Telemedicine at District Hospital 3 PHC NESIDS-OTRI HADP Department of Health and 2019-08-07 0.21 2021-01-06 0.08 0.1079 0.1879 0.08 Ongoing
1585 MANIPUR Health Upgradation and Equipping of 480 Bed JN Hospital at Imphal NESIDS-OTRI NLCPR Department of Health and 2007-12-31 17.5475 2009-12-31 11.8375 0 11.8375 8.7075 Foreclosed
1586 MANIPUR Miscellaneous Basic Minimum services - Construction of 156 houses for tribals NESIDS-OTRI NLCPR Education S 1999-12-30 0.25 2001-12-31 0.225 0 0.225 0.25 Completed
1587 MANIPUR Miscellaneous Basic Minimum services - Construction of rural shelters NESIDS-OTRI NLCPR Education 1999-12-30 0.4 2001-12-31 0.36 0 0.36 0.4 Completed
1588 MANIPUR Miscellaneous Construction of Transit Hostel cum -Qtr for Govt. Employee /Doctor/Teacher at Haochong NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 1.1 2021-08-31 0.9631 0 0.9631 0.9631 Completed
1589 MANIPUR Miscellaneous Construction of Transit Hostel cum -Qtr for Govt. Employee /Doctor/Teacher at Nungba HQ. NESIDS-OTRI HADP Public Health & Engg Depa 2019-08-07 1.12 2021-08-31 0.9776 0 0.9776 0.9776 Completed
1590 MANIPUR Miscellaneous Construction of Transit Hostel cum -Qtr for Govt. Employees /Doctor/Teachers at Noney HQ. NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 0.99 2021-01-29 0.9479 0 0.9479 0.9479 Completed
1591 MANIPUR Miscellaneous Construction of Transit Hostel for Doctor and Nurses at PHC Noney NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-19 1.09 2021-10-30 0.9726 0 0.9726 0.388 Ongoing
1592 MANIPUR Miscellaneous Construction of Transit Quarter /hostel at Nungba Hr. Secondary School NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 1.12 2021-08-31 0.9809 0 0.9809 0.9809 Completed
1593 MANIPUR Miscellaneous Construction of Transit Quarter/Hostel at Khangsilung Hr. Secondary School, Khoupum NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 1.11 2021-08-31 0.9742 0 0.9742 0.9742 Completed
1594 MANIPUR Miscellaneous Construction of Tribal Markets in Manipur NESIDS-OTRI NLCPR Tribal Affairs and Hills 2010-12-23 12.3042 2012-12-31 10.8566 0 10.8566 8.859 Ongoing
1595 MANIPUR Miscellaneous Construction of Tribal Working Women Hostel (50 working women) Imphal in Manipur NESIDS-OTRI NLCPR Tribal Affairs and Hills 2015-06-23 2.3775 2017-12-31 2.1396 0 2.1396 2.1396 Completed
1596 MANIPUR Miscellaneous Improvement of Pemikhong Drainage System from Khurai Konsam Leikai to Porompat Thawanthaba Leikai. NESIDS-OTRI NLCPR IFCD 2017-12-18 11.34 2019-12-18 8.2064 0 8.2064 8.2064 Completed
1597 MANIPUR Miscellaneous Integrated project on Health, Education and Training Programme for peace & Goodwill in senapati Hqrs. NESIDS-OTRI NLCPR Tribal Affairs and Hills 2012-06-26 4.0187 2013-12-31 3.6168 0 3.6168 3.6168 Completed
1598 MANIPUR Miscellaneous Management of Solid Waste on Regional Basis (Cluster- B) NESIDS-OTRI NLCPR MAHUD 2017-12-05 13.52 2019-06-05 10.3149 0 10.3149 10.315 Completed
1599 MANIPUR Miscellaneous Restoration of (i) Manipur Legislative Assembly,(ii) CM Secretariate Building Complex and (iii) Speaker's Bungalow and Annexxe NESIDS-OTRI NLCPR PWD 2002-03-31 1.6 2002-09-30 1.44 0 1.44 1.6 Completed
1600 MANIPUR Miscellaneous Transit/working Hostel for District Level Officers at 3 Sub Stations HQ (TML, Tamei, Tousem) NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 6.6 2021-08-31 4.665 0 4.665 2.148 Ongoing
1601 MANIPUR Miscellaneous Upgradation of Cricket Stadium at Lauwangsangbam (Construction of southern Gallery) NESIDS-OTRI NLCPR Youth Affairs and Sports 2017-12-05 11.14 2019-06-05 9.4133 0 9.4133 9.4133 Completed
1602 MANIPUR Power 2nd Phase electrification of 29 tribal villages NESIDS-OTRI NLCPR Power 2005-12-21 4.5988 2007-03-31 4.1389 0 4.1389 4.1389 Completed
1603 MANIPUR Power Construction of 33 kv sub-station at Tousem NESIDS-OTRI NLCPR Power 2003-03-17 2.54 2007-12-31 2.367 0 2.367 2.367 Completed
1604 MANIPUR Power Construction of 33/11 kv sub-station at Noney NESIDS-OTRI NLCPR Power 2003-03-17 3.82 2005-12-31 3.3887 0 3.3887 3.7443 Completed
1605 MANIPUR Power Construction of 33/11 kv sub-station at Tamei NESIDS-OTRI NLCPR Power 2003-02-28 2.91 2005-07-31 2.62 0 2.62 2.7076 Completed
1606 MANIPUR Power Construction of 33/11 kv, 2x5 MVA sub-station at Maram (Senapati Dist.) NESIDS-OTRI NLCPR Power 2003-03-17 2.81 2005-03-31 2.529 0 2.529 2.81 Completed
1607 MANIPUR Power Construction of 33/11 kv, 2x5 MVA substation at Singhat NESIDS-OTRI NLCPR Dept. of Power 2003-03-21 4.1 2007-12-31 3.6953 0 3.6953 3.7787 Completed
1608 MANIPUR Power Construction of 400 KV Line on D/C Towers initially charged at 132 KV from Yurembam to Thoubal via Nambol in Manipur NESIDS-OTRI NLCPR Dept. of Power 2015-12-22 123.15 2018-12-31 110.835 0 110.835 110.835 Completed
1609 MANIPUR Power Construction of 400/132/33 KV SS at Thoubal in Manipur NESIDS-OTRI NLCPR Dept. of Power 2015-03-30 128.24 2018-03-31 115.416 0 115.416 115.416 Completed
1610 MANIPUR Power Electrification of tribal Villages NESIDS-OTRI NLCPR Power 2002-01-28 11.29 2005-01-31 10.161 0 10.161 11.29 Completed
1611 MANIPUR Power Installation of 132/33 KV substation at Rengpang (Tamelong District) NESIDS-OTRI NLCPR Power 2003-02-28 6.44 2005-02-28 5.796 0 5.796 6.35 Completed
1612 MANIPUR Power Installation of 2.12.5 MVA 132/33 KV Sub-station at Moreh along with the associated 132 lines NESIDS-OTRI NLCPR Dept. of Power 2014-12-29 31.6164 2016-12-31 28.4547 0 28.4547 28.4547 Completed
1613 MANIPUR Power Installation of 2x1 MVA 33 KV S/S along with associated 33 KV line at Henglep in Churachandpur NESIDS-OTRI NLCPR Power 2009-03-30 4.1073 2011-03-01 3.6463 0 3.6463 3.6463 Completed
1614 MANIPUR Power Installation of 2x1 MVA 33 KV Sub-station with 33 KV line at Chakpikarong in Chandel NESIDS-OTRI NLCPR Power 2009-03-30 5.549 2011-03-01 4.9286 0 4.9286 4.9286 Completed
1615 MANIPUR Power Installation of 2x12.5 MVA 132 KV Sub Station along with the associated 132 KV line & related works at Chandel in Manipur NESIDS-OTRI NLCPR Power 2008-04-30 13.2598 2010-03-30 11.7482 0 11.7482 11.7482 Completed
1616 MANIPUR Power Installation of 2x12.5 MVA 132/33KV S/S at Thanlon with associated 132 line in Manipur NESIDS-OTRI NLCPR Power 2014-02-20 59.9782 2017-01-31 53.9804 0 53.9804 53.9804 Completed
1617 MANIPUR Power Installation of 2x2.5 MVA 33/11 KV Sub Station at Willong along with 33 KV S/C line from Maram Sub Station to Wilong Sub Station in Manipur NESIDS-OTRI NLCPR Power 2008-04-30 5.4489 2010-03-30 4.904 0 4.904 4.904 Completed
1618 MANIPUR Power Installation of 2x2.5MVA 33/11 KV sub-station along with the associated 33KV line and related works at Gelnel in Senapati district in Manipur. NESIDS-OTRI NLCPR Power 2014-02-28 3.8013 2017-01-31 3.4212 0 3.4212 3.4212 Completed
1619 MANIPUR Power Installation of 2x3.15 MVA 33 KV Sub-station along with the associated 33 KV line & related works at Sagolmang in Impahl West NESIDS-OTRI NLCPR Power 2009-03-30 3.3986 2011-03-01 3.0214 0 3.0214 3.0214 Completed
1620 MANIPUR Power Installation of 2x5 MVA 33 KV Sub- station at Moreh Town NESIDS-OTRI NLCPR Power 2000-01-18 4.6 2002-01-31 4.131 0 4.131 4.59 Completed
1621 MANIPUR Power Installation of 2x5 MVA 33 KV Sub-station along with the associated 33 KV line & related works at Sekmaijin in Imphal West NESIDS-OTRI NLCPR Power 2009-03-30 3.7751 2011-03-01 3.3529 0 3.3529 3.3529 Completed
1622 MANIPUR Power Installation of 2x5 MVA 33 KV Sub-station with associated 33 KV line & related works at Ukhrul Khunjao in Ukhrul NESIDS-OTRI NLCPR Power 2009-03-30 4.2059 2011-03-01 3.7369 0 3.7369 3.7369 Completed
1623 MANIPUR Power Installation of 2x5 MVA 33/11 KV Sub-station along with the associated 33 KV line & releated work at Gumnom in Ukhrul district in Manipur NESIDS-OTRI NLCPR Dept. of Power 2015-03-04 4.8399 2017-02-28 4.3559 0 4.3559 4.3559 Completed
1624 MANIPUR Power Installation of 2x5 MVA 33/11 KV sub-station along with the associated 33 KV line and related works at Khongjom in Thoubal district in Manipur NESIDS-OTRI NLCPR Power 2014-02-26 4.7949 2017-01-31 4.3154 0 4.3154 4.3154 Completed
1625 MANIPUR Power Installation of 2x5 MVA 33/11 KV sub-station along with the associated 33 KV line related works at Nungbi Khullen in Ukhrul District in Manipur NESIDS-OTRI NLCPR Power 2014-02-28 5.3888 2017-01-31 4.8499 0 4.8499 4.8499 Completed
1626 MANIPUR Power Installation of 2x5 MVA 33/11KV sub-station along with the associated 33KV LILO line and related works at Sekmai in Imphal west district in Manipur NESIDS-OTRI NLCPR Power 2014-02-28 4.6464 2017-01-31 4.1818 0 4.1818 4.1818 Completed
1627 MANIPUR Power Installation of 2x5MVA 33/11 KV sub-station along with the associated 33KV line and related works at Sugnu in Thoubal district in Manipur NESIDS-OTRI NLCPR Power 2014-02-28 5.3888 2017-01-31 4.8499 0 4.8499 4.8499 Completed
1628 MANIPUR Power Installation of Sub Station at Lakhamai NESIDS-OTRI NLCPR Power 2005-03-15 2.87 2007-03-15 2.5811 0 2.5811 2.6811 Completed
1629 MANIPUR Power Installation of Sub Station at Namare NESIDS-OTRI NLCPR Power 2005-03-15 3.75 2007-03-15 3.3709 0 3.3709 3.5019 Completed
1630 MANIPUR Power Installation of Sub Station at Thanlon NESIDS-OTRI NLCPR Power 2005-03-15 5.44 2007-03-15 4.8977 0 4.8977 5.0877 Completed
1631 MANIPUR Power Installation of Sub Station at Thinkew NESIDS-OTRI NLCPR Power 2005-03-15 3.15 2007-03-15 2.831 0 2.831 2.941 Completed
1632 MANIPUR Power Laimakhong Heavy Fuel Bassed Power project. NESIDS-OTRI NLCPR Power 1999-02-15 117.61 2000-11-30 105.849 0 105.849 117.605 Completed
1633 MANIPUR Power Loktak Downstream H.E. Project (2x33 MW) NESIDS-OTRI NLCPR Power 2008-11-24 109.5867 2010-11-30 34.5 0 34.5 Foreclosed
1634 MANIPUR Power Renovation & Modernisation of 2 (two) nos. 132/33 KV Sub stations at Yaingangpokpi Ningthoukhong in Manipur- Phase I NESIDS-OTRI NLCPR Power 2011-12-22 34.2555 2013-12-31 30.83 0 30.83 30.83 Completed
1635 MANIPUR Power renovation and Modernaisation of 132 KV SSlocated at Kakching, Karong an dChurachandpur phase -II, thoubal , Senapati, Churachandpu in Manipur NESIDS-OTRI NLCPR Power 2013-07-19 46.2027 2015-07-31 41.5824 0 41.5824 41.5824 Completed
1636 MANIPUR Power ST&D - 2x1MVA Sub Station at Saikul NESIDS-OTRI NLCPR Power 2000-11-17 1.49 2002-11-30 1.341 0 1.341 1.49 Completed
1637 MANIPUR Power ST&D - 2x1MVA Sub Station at Shivapurikhan NESIDS-OTRI NLCPR Power 2002-10-21 1.32 2004-10-31 1.188 0 1.188 1.32 Completed
1638 MANIPUR Power ST&D - 33 KV DC line from Leimakhong to Iroisemba. NESIDS-OTRI NLCPR Power 2002-02-13 4.31 2005-02-28 3.619 0 3.619 3.879 Completed
1639 MANIPUR Power ST&D - 33 KV DC line from yaingangpokpi to Kongba NESIDS-OTRI NLCPR Power 2002-10-21 0.6 2004-10-31 0 Completed
1640 MANIPUR Power ST&D - 33 KV DC line from Yurembam to Mongsangei NESIDS-OTRI NLCPR Power 2000-11-17 1.72 2005-07-30 1.548 0 1.548 1.72 Completed
1641 MANIPUR Power ST&D- 33 KV DC line from Mongsangei to Khumanlampak via kongba NESIDS-OTRI NLCPR Power 2002-10-21 4.52 2005-10-31 4.068 0 4.068 4.128 Completed
1642 MANIPUR Power Trial Run of Laimakhong Heavy Fuel Based Power project. NESIDS-OTRI NLCPR Power 2001-09-18 4.32 2002-09-30 3.888 0 3.888 4.32 Completed
1643 MANIPUR Roads and Bridges Construction of Bally Suspension Bridge (360 ft. span) over Barak River on Tamenglong - Tousem - Haflong Road NESIDS-OTRI NLCPR PWD 2005-12-26 3.3878 2007-03-31 2.9659 0 2.9659 2.9659 Completed
1644 MANIPUR Roads and Bridges Construction of Bridge at Babu Bazar NESIDS-OTRI NLCPR PWD 2006-11-30 2.9266 2008-11-28 2.5572 0 2.5572 2.5572 Completed
1645 MANIPUR Roads and Bridges Construction of Bridge at Irong Ichin NESIDS-OTRI NLCPR PWD 2006-11-30 3.3421 2008-11-28 2.9203 0 2.9203 2.9203 Completed
1646 MANIPUR Roads and Bridges Construction of bridge over Challow river between Chingai (Kuingai) and Tusom in Manipur NESIDS-OTRI NLCPR PWD 2011-06-28 3.0238 2013-06-30 2.6675 0 2.6675 2.6675 Completed
1647 MANIPUR Roads and Bridges Construction of Bridge over Imphal River at Kiyamgei Mang Mapa NESIDS-OTRI NLCPR PWD 2006-11-30 4.7122 2008-11-28 4.1174 0 4.1174 4.1174 Completed
1648 MANIPUR Roads and Bridges Construction of Bridge over Iril river at Tinseed Road, Imphal East in Manipur NESIDS-OTRI NLCPR PWD 2013-12-27 6.408 2016-12-31 5.7672 0 5.7672 5.7672 Completed
1649 MANIPUR Roads and Bridges Construction of bridge over Jaduiki river on Tamei Kuilong Road NESIDS-OTRI NLCPR PWD 2009-09-30 2.2648 2011-09-30 1.9983 0 1.9983 1.9983 Completed
1650 MANIPUR Roads and Bridges Construction of bridge over Layii river on Kharasom Lazo to Layii Road NESIDS-OTRI NLCPR PWD 2009-09-30 3.5321 2011-09-30 3.1165 0 3.1165 3.1165 Completed
1651 MANIPUR Roads and Bridges Construction of Bridge over thoubal River at Haokha NESIDS-OTRI NLCPR PWD 2006-11-30 2.756 2008-11-28 2.4082 0 2.4082 2.4089 Completed
1652 MANIPUR Roads and Bridges Construction of Bridge over Thoubal River at Leishangthem NESIDS-OTRI NLCPR PWD 2006-11-30 3.407 2008-11-28 2.977 0 2.977 2.977 Completed
1653 MANIPUR Roads and Bridges Construction of Brodge over Heirok river at Heirok Chingdongpok NESIDS-OTRI NLCPR PWD 2007-05-25 2.2045 2009-05-29 1.9263 0 1.9263 1.9263 Completed
1654 MANIPUR Roads and Bridges Construction of Keishmathong Bridge NESIDS-OTRI NLCPR PWD 2006-02-17 3.47 2008-02-29 3.029 0 3.029 3.029 Completed
1655 MANIPUR Roads and Bridges Construction of Kumbi Bridge over Khuga River at km 10.75 of Moirang-Kumbi Road NESIDS-OTRI NLCPR PWD 2007-01-04 4.32 2008-11-30 3.774 0 3.774 3.774 Completed
1656 MANIPUR Roads and Bridges Construction of Lamlong Bridge NESIDS-OTRI NLCPR PWD 2006-02-17 4.54 2008-02-29 3.9701 0 3.9701 3.9701 Completed
1657 MANIPUR Roads and Bridges Construction of RCC bridge (60 m) over Thoubal River at Thoubal Mathak Leikai Keirambi in Manipur NESIDS-OTRI NLCPR PWD 2010-04-13 5.0573 2012-03-31 4.4623 0 4.4623 4.4623 Completed
1658 MANIPUR Roads and Bridges Construction of RCC Bridge over Imphal river at Moirangkhom (Old Thumbuthong) in Imphal West Manipur NESIDS-OTRI NLCPR PWD 2011-06-28 7.132 2013-06-30 6.293 0 6.293 6.293 Completed
1659 MANIPUR Roads and Bridges Construction of RCC bridge over Imphal river at Mongkhang Lambi NESIDS-OTRI NLCPR PWD 2010-06-24 5.7904 2012-06-15 5.1092 0 5.1092 5.1092 Completed
1660 MANIPUR Roads and Bridges Construction of RCC bridge over Iril river at Chingaren Mapa in Imphal East Manipur NESIDS-OTRI NLCPR PWD 2011-06-28 6.3712 2013-06-30 5.6215 0 5.6215 5.6217 Completed
1661 MANIPUR Roads and Bridges Construction of RCC bridge over Iril River at Keiro Litan Makhong in Manipur NESIDS-OTRI NLCPR PWD 2010-04-13 6.2519 2012-03-31 5.5164 0 5.5164 5.5164 Completed
1662 MANIPUR Roads and Bridges Construction of Road from Aibulon to Bungpilon in Churachandpur NESIDS-OTRI NLCPR PWD 2011-03-15 11.1886 2013-03-31 9.8723 0 9.8723 9.8723 Completed
1663 MANIPUR Roads and Bridges Construction of Singjamei bridge NESIDS-OTRI NLCPR PWD 2004-10-29 3.69 2006-10-31 3.2247 0 3.2247 3.3547 Completed
1664 MANIPUR Roads and Bridges Foot-path suspension bridge(11) NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 3.74 2020-03-30 3.0507 0 3.0507 3.0507 Completed
1665 MANIPUR Roads and Bridges Improvement of Koirengei- Sekmai Road i/c bridge approach from Sangakpham to Salanthong NESIDS-OTRI NLCPR PWD 2017-12-18 16.5411 2019-12-18 14.7395 0 14.7395 14.7395 Completed
1666 MANIPUR Roads and Bridges Improvement of Jiri - Tipaimukh Road (8-48 Km) NESIDS-OTRI NLCPR PWD 2007-12-31 18.5633 2009-12-30 16.3795 0 16.3795 16.3795 Completed
1667 MANIPUR Roads and Bridges Improvement of Lamsong-Khonghampat Road NESIDS-OTRI NLCPR PWD 2008-03-07 2.6834 2009-03-30 2.3678 0 2.3678 2.3678 Completed
1668 MANIPUR Roads and Bridges Improvement of Sawombung-Sagolmang Road from 0-12 Km NESIDS-OTRI NLCPR PWD 2009-06-03 2.2276 2011-05-31 1.9655 0 1.9655 1.9655 Completed
1669 MANIPUR Roads and Bridges Improvement of Tamenglong District Hospital Approach Road (L- 0.6km) i/c parking NESIDS-OTRI HADP DC Tamenglong 2019-08-01 0.4497 2020-06-02 0.4095 0 0.4095 0.4095 Completed
1670 MANIPUR Roads and Bridges Senapati-Phaibung Road (128.90 Kms.) NESIDS-OTRI NLCPR PWD 2000-03-31 167.73 2005-03-31 147.958 0 147.958 150.4794 Ongoing
1671 MANIPUR Roads and Bridges Widening and Improvement of road from Khongman Mangjil to Khongman Okram Chuthek at Imphal East in Manipur NESIDS-OTRI NLCPR PWD 2013-02-26 11.1839 2015-02-28 9.7902 0 9.7902 9.7902 Completed
1672 MANIPUR Sports Construction of District Sports Complex at Bishnupur in Manipur NESIDS-OTRI NLCPR Youth Affairs and Sports 2010-12-15 9.4035 2013-12-15 6.6378 0 6.6378 3.385 Ongoing
1673 MANIPUR Sports Construction of District Sports Complex at Churachandpur in Manipur NESIDS-OTRI NLCPR Youth Affairs and Sports 2010-11-09 8.6201 2013-10-31 7.606 0 7.606 7.606 Completed
1674 MANIPUR Sports Construction of District Sports Complex at Tamenglong in Manipur NESIDS-OTRI NLCPR Youth Affairs and Sports 2010-11-09 7.4867 2013-10-31 5.315 0 5.315 5.315 Ongoing
1675 MANIPUR Sports Construction of District Sports Complex at Ukhrul NESIDS-OTRI NLCPR Youth Affairs and Sports 2009-09-01 9.1987 2012-08-31 7.0773 0 7.0773 5.6618 Ongoing
1676 MANIPUR Sports Establishment of National Sports Academy at Khuman Lampak Sports complex,Imphal. NESIDS-OTRI NLCPR Youth Affairs and Sports 2006-11-30 18.4317 2010-03-31 16.0908 0 16.0908 16.0908 Completed
1677 MANIPUR Sports Infrastucrctural devlopment for national games NESIDS-OTRI NLCPR Youth Affairs and Sports 1999-02-15 10 2004-05-25 9 0 9 10 Completed
1678 MANIPUR Tourism and Culture Development of Cave Tourism project at the prominent tourist sites at Khangkui Cave, Ukhrul District. NESIDS-OTRI NLCPR Tourism Department 2017-12-18 7.5 2019-12-18 6.5534 0 6.5534 6.5534 Completed
1679 MANIPUR Tourism and Culture Development of Eco-Tourism projects at Cheirao Ching, Thangmeiband. NESIDS-OTRI NLCPR Tourism Department 2017-12-18 13.3 2019-12-18 11.6282 0 11.6282 11.6282 Ongoing
1680 MANIPUR Water Supply Augmentation of Konthoujam Water Supply Scheme (Imphal West District) NESIDS-OTRI NLCPR PHED 2007-12-31 8.8576 2009-06-30 7.8156 0 7.8156 7.8156 Completed
1681 MANIPUR Water Supply Augmentation of Leimaching Water Supply Scheme, Imphal East NESIDS-OTRI NLCPR PHED 2011-12-22 11.0168 2014-12-31 9.7207 0 9.7207 9.7207 Completed
1682 MANIPUR Water Supply Augmentation of Leimaram Irengham area Water Supply Scheme at Bishnupur NESIDS-OTRI NLCPR PHED 2010-02-05 2.5969 2012-02-15 2.2738 0 2.2738 2.2738 Completed
1683 MANIPUR Water Supply Augmentation of Water Supply at Chakpikarong NESIDS-OTRI NLCPR PHED 2005-03-15 1.15 2007-03-31 1.0022 0 1.0022 1.0582 Completed
1684 MANIPUR Water Supply Augmentation of Water Supply at Khoupum NESIDS-OTRI NLCPR PHED 2005-03-15 1.49 2007-03-31 1.2977 0 1.2977 1.3717 Completed
1685 MANIPUR Water Supply Augmentation of water supply at Langthabal Puramkhong in Imphal West NESIDS-OTRI NLCPR PHED 2009-09-07 7.6417 2011-09-06 6.7427 0 6.7427 6.7427 Completed
1686 MANIPUR Water Supply Augmentation of Water Supply at Litan and surrounding five villages in Ukhrul District in Manipur. NESIDS-OTRI NLCPR Dept. of Power 2017-08-16 5.15 2019-08-16 4.7076 0 4.7076 4.7076 Completed
1687 MANIPUR Water Supply Augmentation of Water Supply at Tamei NESIDS-OTRI NLCPR PHED 2005-03-15 1 2007-03-31 0.8698 0 0.8698 0.9188 Completed
1688 MANIPUR Water Supply Augmentation of Water Supply for Chandel HQ and surrounding areas NESIDS-OTRI NLCPR PHED 2003-02-28 5.64 2006-02-28 5.076 0 5.076 5.558 Completed
1689 MANIPUR Water Supply Augmentation of Water Supply for Churachandpur town from Khuga dam (Khuga river source) - Zone-III NESIDS-OTRI NLCPR PHED 2003-02-28 8.15 2006-03-31 7.3369 0 7.3369 7.837 Completed
1690 MANIPUR Water Supply Augmentation of Water Supply for Churachandpur town from Koite and Loklao river sources-Zone-I NESIDS-OTRI NLCPR PHED 2003-02-28 14.17 2006-03-31 12.753 0 12.753 13.97 Completed
1691 MANIPUR Water Supply Augmentation of Water Supply for Ukhrul District Headquarter NESIDS-OTRI NLCPR PHED 2003-02-28 5.29 2006-06-30 4.761 0 4.761 5.026 Completed
1692 MANIPUR Water Supply Augmentation of water supply scheme at Changpikot in Churachandpur NESIDS-OTRI NLCPR PHED 2009-09-30 1.0453 2011-09-30 0.9223 0 0.9223 0.9223 Completed
1693 MANIPUR Water Supply Augmentation of Water Supply Scheme at Chingai, block Headquarter (0.17 MLD) at Ukhrul in Manipur NESIDS-OTRI NLCPR PHED 2012-12-27 4.4263 2014-12-30 3.9837 0 3.9837 3.9837 Completed
1694 MANIPUR Water Supply Augmentation of Water Supply Scheme at Dampi in Churanchandpur NESIDS-OTRI NLCPR PHED 2011-03-17 5.5398 2014-03-31 4.8881 0 4.8881 4.8881 Completed
1695 MANIPUR Water Supply Augmentation of Water Supply Scheme at Hengbung Senapati NESIDS-OTRI NLCPR PHED 2011-02-21 4.2276 2013-02-28 3.7302 0 3.7302 3.7302 Completed
1696 MANIPUR Water Supply Augmentation of Water Supply Scheme at Kamjong Sub-Divisional head quarter in Ukhrul (0.22 MLD) NESIDS-OTRI NLCPR PHED 2011-12-19 5.2482 2013-10-31 4.6308 0 4.6308 4.6308 Completed
1697 MANIPUR Water Supply Augmentation of Water Supply Scheme at Kangpokpi NESIDS-OTRI NLCPR PHED 2004-10-28 2.12 2006-10-31 1.8489 0 1.8489 1.9359 Completed
1698 MANIPUR Water Supply Augmentation of Water Supply Scheme at Keibul Lamjao (0.418 MLED) in Bishnupur, Manpur NESIDS-OTRI NLCPR PHED 2010-12-15 2.5557 2012-12-31 2.255 0 2.255 2.3067 Completed
1699 MANIPUR Water Supply Augmentation of Water Supply Scheme at Komlathabi in Chandel NESIDS-OTRI NLCPR PHED 2009-07-16 3.7858 2011-07-31 3.2992 0 3.2992 3.2992 Completed
1700 MANIPUR Water Supply Augmentation of Water Supply Scheme at Mao NESIDS-OTRI NLCPR PHED 2004-10-28 5.65 2006-10-31 4.9176 0 4.9176 5.1496 Completed
1701 MANIPUR Water Supply Augmentation of Water Supply Scheme at Maram NESIDS-OTRI NLCPR PHED 2004-10-28 3.06 2006-09-30 2.6638 0 2.6638 2.7898 Completed
1702 MANIPUR Water Supply Augmentation of Water Supply Scheme at Noney NESIDS-OTRI NLCPR PHED 2004-10-28 1.42 2006-06-30 1.2348 0 1.2348 1.2928 Completed
1703 MANIPUR Water Supply Augmentation of Water Supply Scheme at Nunghar in Ukhrul NESIDS-OTRI NLCPR PHED 2011-12-19 5.4406 2013-10-31 4.7794 0 4.7794 4.7794 Completed
1704 MANIPUR Water Supply Augmentation of Water Supply Scheme at Phungyar Sub Divisional HDQR. at Ukhrul NESIDS-OTRI NLCPR PHED 2013-02-27 3.8187 2016-02-29 3.4118 0 3.4118 3.4118 Completed
1705 MANIPUR Water Supply Augmentation of Water Supply Scheme at Purul Sub Division HQ NESIDS-OTRI NLCPR PHED 2007-12-31 4.2886 2009-06-30 3.7841 0 3.7841 3.7841 Completed
1706 MANIPUR Water Supply Augmentation of water supply scheme at Riha Loute and surrounding villages in Manipur NESIDS-OTRI NLCPR PHED 2008-09-30 3.492 2010-09-30 3.0812 0 3.0812 3.0812 Completed
1707 MANIPUR Water Supply Augmentation of Water Supply Scheme at Saikot Block HQr. in Churachandpur NESIDS-OTRI NLCPR PHED 2009-07-16 2.9733 2011-07-31 2.6235 0 2.6235 2.6235 Completed
1708 MANIPUR Water Supply Augmentation of Water Supply Scheme at Saikul NESIDS-OTRI NLCPR PHED 2004-10-28 1.68 2006-09-30 1.492 0 1.492 1.56 Completed
1709 MANIPUR Water Supply Augmentation of Water Supply Scheme at Sajik Tampak in Chandel NESIDS-OTRI NLCPR PHED 2010-04-13 2.6372 2012-02-15 2.327 0 2.327 2.327 Completed
1710 MANIPUR Water Supply Augmentation of Water Supply Scheme at Sanakeithel and surrounding four villages in Ukhrul District in Manipur. NESIDS-OTRI NLCPR Dept. of Power 2017-08-16 4.68 2019-08-16 4.2559 0 4.2559 4.2559 Completed
1711 MANIPUR Water Supply Augmentation of water supply scheme at Sanghshak in Ukhrul NESIDS-OTRI NLCPR PHED 2009-09-04 6.9069 2011-09-03 6.0943 0 6.0943 6.0943 Completed
1712 MANIPUR Water Supply Augmentation of water supply scheme at Sangpikot in Churachandpur NESIDS-OTRI NLCPR PHED 2009-09-30 1.2501 2011-09-30 1.103 0 1.103 1.103 Completed
1713 MANIPUR Water Supply Augmentation of Water Supply Scheme at Singhat in Churachandpur NESIDS-OTRI NLCPR PHED 2009-07-20 2.0464 2011-07-31 1.8057 0 1.8057 1.8057 Completed
1714 MANIPUR Water Supply Augmentation of Water Supply Scheme at Tadubi NESIDS-OTRI NLCPR PHED 2004-10-28 4.3 2006-09-30 3.6954 0 3.6954 3.8704 Completed
1715 MANIPUR Water Supply Augmentation of Water Supply Scheme at Thanga (1.014 MLD) in Bishnupur, Manipur NESIDS-OTRI NLCPR PHED 2010-12-15 5.3126 2012-12-31 4.6875 0 4.6875 4.6875 Completed
1716 MANIPUR Water Supply Augmentation of Water Supply Scheme at Thanlong in Churachandpur NESIDS-OTRI NLCPR PHED 2009-07-16 2.1326 2011-07-31 1.8817 0 1.8817 1.8817 Completed
1717 MANIPUR Water Supply Augmentation of Water Supply Scheme at Tolloi in Ukhrul NESIDS-OTRI NLCPR PHED 2011-12-19 3.2293 2013-10-31 2.8104 0 2.8104 2.8104 Completed
1718 MANIPUR Water Supply Augmentation of Water Supply Scheme at Tungjoy NESIDS-OTRI NLCPR PHED 2007-12-31 2.1575 2009-06-30 1.9037 0 1.9037 1.9037 Completed
1719 MANIPUR Water Supply Augmentation of Water Supply Scheme at Unopat and Surrounding village NESIDS-OTRI NLCPR PHED 2008-03-31 2.9705 2010-03-31 2.6209 0 2.6209 2.6209 Completed
1720 MANIPUR Water Supply Augmentation of water supply to Imphal City Phase-1 (29.5 MLD) NESIDS-OTRI NLCPR PHED 1999-12-30 43.29 2004-12-31 38.957 0 38.957 42.532 Completed
1721 MANIPUR Water Supply Basic Minimum services - Rural water supply NESIDS-OTRI NLCPR PHED 1999-12-30 7 2002-12-26 6.3 0 6.3 7 Completed
1722 MANIPUR Water Supply Composite Water Supply at Motbung in Senapati NESIDS-OTRI NLCPR PHED 2009-07-20 2.5645 2011-07-31 2.2628 0 2.2628 2.2628 Completed
1723 MANIPUR Water Supply Composite water supply for Senapati District Headquarter NESIDS-OTRI NLCPR PHED 2003-02-28 4.68 2006-04-30 4.212 0 4.212 4.5138 Completed
1724 MANIPUR Water Supply Composite water supply for Tamenglong District Headquarter NESIDS-OTRI NLCPR PHED 2003-02-28 4.7 2005-12-31 4.23 0 4.23 4.463 Completed
1725 MANIPUR Water Supply Rehabilitation of Khomidolk Water Supply System at Imphal East NESIDS-OTRI NLCPR PHED 2010-02-05 4.5994 2012-02-15 4.0583 0 4.0583 4.0583 Completed
1726 MANIPUR Water Supply Rehabilitation of Water Supply Scheme at Liyai Khullen in Senapati NESIDS-OTRI NLCPR PHED 2009-07-16 3.4298 2011-07-31 3.0262 0 3.0262 3.0262 Completed
1727 MANIPUR Water Supply Rural Water Supply Scheme at Nungba Sub-Division Headquarter NESIDS-OTRI HADP Dept. of Power 2019-08-07 6.9 2021-09-17 5.3553 0 5.3553 5.3553 Ongoing
1728 MANIPUR Water Supply Rural Water Supply Scheme for Haochong Sub-Division Headquarter & adjoining areas NESIDS-OTRI HADP Dept. of Power 2019-08-07 4.78 2021-08-20 3.7297 0 3.7297 3.7297 Ongoing
1729 MANIPUR Water Supply Upgradation of existing treatment plant at Bungmual from Lanva river source (Churachandpur District)-Zone-II NESIDS-OTRI NLCPR PHED 2003-02-28 1.08 2006-03-31 0.918 0 0.918 1.0167 Completed
1730 MANIPUR Water Supply Waithou Pat Water Supply Scheme NESIDS-OTRI NLCPR PHED 2005-03-23 59.71 2008-03-31 52.4168 0 52.4168 52.8757 Completed
1731 MANIPUR Water Supply Water Supply Scheme at Sapam in Thobal District, Manipur NESIDS-OTRI NLCPR PHED 2010-10-13 2.5731 2012-10-15 2.2576 0 2.2576 2.2576 Completed
1732 MANIPUR Water Supply Water Supply scheme at Tamah, Tamei Sub-Division, Tamenglong Dist. NESIDS-OTRI HADP Dept. of Power 2019-08-07 9 2021-10-02 7.0924 0 7.0924 7.0924 Ongoing
1733 MANIPUR Water Supply Water Supply Scheme by water conservation at Tamenglong HQ (Hangoipat at Carpentry area and Zelian lake) and Joulen NESIDS-OTRI NLCPR PHED 2017-12-19 39.32 2019-12-19 35.063 0 35.063 35.063 Completed
1734 MANIPUR Water Supply Water Supply Scheme in Government Polytechnic Campus, Takyel in Imphal West. NESIDS-OTRI NLCPR PHED 2013-12-27 4.7904 2016-11-30 4.3113 0 4.3113 4.3113 Completed
1735 MANIPUR Education Infrastructure Development for Dhanamanjuri University (DMU) PM-DevINE Dept. of Higher & Technic 2024-06-13 70 2027-01-15 16 32 48 Ongoing
1736 MANIPUR Tourism and Culture Establishment of an Artist's Village for promotion of world's most unique Pottery Art form Longpi Black Pottery of Manipur PM-DevINE Other 2024-06-24 32.32 2027-01-15 8.0793 0 8.0793 Ongoing
1737 MANIPUR Education Infrastructure Development for Manipur University of Culture at Wakha, Imphal East PM-DevINE Dept. of Higher & Technic 2024-09-24 31.1864 2027-09-24 6.3907 12.7814 19.1721 Ongoing
1738 MANIPUR Agriculture and Allied Women's Market at Tera Bazar, Manipur Schemes of NEC Department of Municipal A 2024-09-04 2.94 2027-09-04 2.2098 2.2098 0.74 Ongoing
1739 MANIPUR Transport and Communication C/o of RCC Bridge at Kenseng Ashang Khullen(Kaka) over Maklang River Connecting international border NESIDS-ROADS Public works Department 2024-09-06 11.96 2027-01-31 0.7018 0.7018 Ongoing
1740 MANIPUR Transport and Communication Improvement of road from Bishnupur Chingdong to Khuman via Prengba Village, Loukiopat, Bishnupur, Awwangleikai, Maning Leikai, and Makha Leikai in Manipur NESIDS-ROADS Public works Department 2024-09-09 11.01 2027-01-31 1.049 1.049 Ongoing
1741 MANIPUR Education strengthening of 120 High School & Higher Secondary School in Manipur NESIDS-OTRI Dept. of Education 2024-10-11 134.363 2026-10-31 0 18.075 Ongoing
1742 MANIPUR Health Providing Superspeciality and assured speciality health care in remote and hill districts (infrastructure & equipment) in Manipur PM-DevINE Dept. of Health & familly 2024-11-20 104.6611 2026-12-31 11.8448 11.8448 Ongoing
1743 MANIPUR Tourism and Culture Development of Barak Heritage Festival and Tourism Infrastructure at Koide Biisho Village, Senapati, Manipur Schemes of NEC Tourism Corporation of Ma 2024-11-01 4.41 2027-11-01 0 Ongoing
1744 MANIPUR Education Provision for furniture and fixture for the Science Lab Block at United College, Chandel, Manipur Schemes of NEC Tribal Affairs & Hills, M 2024-12-11 1.18 2027-12-11 0.5781 0 0.5781 Ongoing
1745 MANIPUR Education Provision for furniture and fixture for Construction of ST boys and Girls Hostel including the auditorium at St. Peter's Higher Secondary School, Chandel, Manipur Schemes of NEC Tribal Affairs & Hills, M 2024-12-26 1.78 2024-12-26 0 Ongoing
1746 MANIPUR Power Installation of grid connected SPV Power Plant of capacity 600kWP at 132/33 kv Elangkhangpokpi, Power sub-station, Kakching district in Manipur NESIDS-OTRI Manipur Renewal Energy De 2025-01-20 33.394 2026-01-19 8.3485 8.3485 Ongoing
1747 MANIPUR Tourism and Culture Development of Eco- Tourism site at Mantripukhri Khongnang Makhong, Imphal East District, Manipur Schemes of NEC Tourism Corporationn of M 2025-03-25 2.7895 2028-03-25 0 Ongoing
1748 MANIPUR Agriculture and Allied Integrated Farming for Upliftment of Huishu Village, Ukhrul District, Manipur Schemes of NEC Department of Horticultur 2025-03-24 4 2028-03-24 1 1 Ongoing
1749 MANIPUR Education Infrastructure Development of Oriental College, Takyel, Imphal West, Manipur Schemes of NEC Director of University an 2025-03-11 6.225 2028-03-11 0 Ongoing
1750 MANIPUR Transport and Communication Improvement of Road from Kamjong to Phungyar Junction via Bhungpakhunou NESIDS-ROADS Public works Department 2025-05-19 27.73 2027-05-19 0 Ongoing
1751 MANIPUR Transport and Communication Up-gradation of road from Mantripantha to Sapok, Charlong village NESIDS-ROADS Public works Department 2025-05-22 39.99 2027-05-21 0 Ongoing
1752 MANIPUR Sports Construction of multipurpose indoor stadium at Khuman lampak sports complex Imphal NESIDS-OTRI PWD, Manipur 2025-07-03 36.2487 2026-05-31 0 0 Ongoing
1753 MANIPUR Transport and Communication Up-gradation of road from NH-202 at Lamlai to Thoubal Dam in Manipur NESIDS-ROADS Public works Department 2025-07-16 48.87 2027-07-16 0 Ongoing
1754 MANIPUR Education Development of Allied infrastructure in Sainik School, Imphal NESIDS-OTRI Sainik School Imphal 2025-10-06 21.81405 2028-10-06 0 Ongoing
1755 MANIPUR Infrastructure Construction of Manipur International Convention Centre, Imphal, Phase-I PM-DevINE Dept of Planning 2025-12-08 110.52 2027-12-08 0 Ongoing
1756 MANIPUR Sports Construction of Football Stadium at Khoupum, Noney District, Manipur. Schemes of NEC Youth Affairs & Sports De 2025-12-10 10.7735 2027-12-10 0 Ongoing
1757 MEGHALAYA Education Construction of 23 Anganwadi Centre Building in Meghalaya NESIDS-OTRI NESIDS Dept. of Power 2020-03-30 1.6 2024-12-31 1.1633 0 1.1633 1.1633 Ongoing
1758 MEGHALAYA Health Procurement of Advance Life Support Ambulances (ALS) with equipment at an estimated cost of Rs. 3.65 crore in Meghalaya under NESIDS NESIDS-OTRI NESIDS Dept. of Health & familly 2021-09-17 3.65 2021-09-17 0.7378 0 0.7378 Ongoing
1759 MEGHALAYA Health Setting up of Corona Care Centre for Management of Covid-19 in Meghalaya NESIDS-OTRI NESIDS Directorate of Health Ser 2020-06-03 10.0247 2021-03-31 8.2413 0 8.2413 5.8026 Ongoing
1760 MEGHALAYA Health Strengthening of Diagnostic Services: State of the Art Diagnostic Centre at Pasteur Institute in Meghalaya NESIDS-OTRI NESIDS Public Health & Engg Depa 2019-03-08 20 2024-12-31 9.955 9.755 19.71 7.784 Ongoing
1761 MEGHALAYA Agriculture and Allied Construction of school/college buildings under 30 Central Sector Scheme of NEC in Mawshyrut C&RD Block, West Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC 2020-10-09 2.9 2023-10-09 2.9 0 2.9 2.9 Completed
1762 MEGHALAYA Agriculture and Allied Construction of suspension footbridge connecting Bibrage to Rampragre across River Dareng(Span 100 Metres) Schemes of NEC Schemes of NEC 2020-09-03 3 2023-09-03 3 0 3 3 Completed
1763 MEGHALAYA Agriculture and Allied Construction of U Tirot Sing Market Complex, Mairang, West Khasi Hill district, Meghalaya Schemes of NEC Schemes of NEC 2017-03-22 12.86 2020-03-22 12.86 0 12.86 12.86 Completed
1764 MEGHALAYA Agriculture and Allied Creation of adequate infrastructure for scaling up spawn production in Meghalaya under Mushroom Mission Schemes of NEC Schemes of NEC 2022-03-31 9.91 2025-03-31 9.914 0 9.914 7.92 Ongoing
1765 MEGHALAYA Agriculture and Allied Development of a clustered livestock based integration network to ensure production of safe milk and meat in the state of Meghalaya (ICAR) Schemes of NEC Schemes of NEC 2017-12-05 2.8525 2020-12-04 2.28 0 2.28 2.28 Foreclosed
1766 MEGHALAYA Agriculture and Allied Establishment of poultry breeding farm-cum-hatchery with 3000 layers parent stock and 2000 broilers parent stock at Phulbari, West Garo Hills, District, Meghalaya. Schemes of NEC Schemes of NEC 2015-06-16 5.6225 2018-06-16 4.0482 0 4.0482 4.05 Completed
1767 MEGHALAYA Agriculture and Allied Honey Bee Mission Schemes of NEC Schemes of NEC 2022-03-23 3 2025-03-23 4.8 0 4.8 3 Completed
1768 MEGHALAYA Agriculture and Allied Honey Bee Mission(2023) Schemes of NEC Schemes of NEC 2023-03-06 4.964 2026-03-31 4.9656 0 4.9656 4.96 Completed
1769 MEGHALAYA Agriculture and Allied Horticulture Development Project in Nokrek Region of East Garo Hills District Schemes of NEC Schemes of NEC 2010-03-23 4.3994 2013-03-23 3.96 0 3.96 3.96 Completed
1770 MEGHALAYA Agriculture and Allied Ideal Fish and Fish Seed Production Farm and Multipurpose Development Project at Ishamati Village, Shella Bholaganj Block, Sohra Sub-Division, East Khasi Hills Schemes of NEC Schemes of NEC 2010-03-23 1.1035 2014-03-23 1 0 1 1 Completed
1771 MEGHALAYA Agriculture and Allied Poultry Entrepreneurship Programme under Meghalaya Livestock Mission Schemes of NEC Schemes of NEC Choose... 2023-03-07 10 2026-03-07 0.1 0 0.1 Ongoing
1772 MEGHALAYA Agriculture and Allied Promotion of Organic plantation of Khasi Mandarin Orange in Meghalaya Schemes of NEC Schemes of NEC 2021-01-29 7.81 2024-03-29 7.81 0 7.81 7.81 Completed
1773 MEGHALAYA Agriculture and Allied Proposal of identified block for providing key identified service at Bilkona village, Gasuapara Block, South Garo Hils, Meghalaya Schemes of NEC Schemes of NEC 2022-03-31 1.99 2025-03-31 1.99 0 1.99 0.8 Completed
1774 MEGHALAYA Agriculture and Allied Proposal of identified block for providing key identified service at Gasuapara, South Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC 2022-03-31 4.52 2025-03-31 4.522 0 4.522 1.81 Ongoing
1775 MEGHALAYA Agriculture and Allied Proposal of identified block for providing key identified service at Langdongdai village, Mawshynrut Block, West Khasi Hills, Meghalaya Schemes of NEC Schemes of NEC 2022-03-31 1.97 2025-03-31 1.4795 0.44 1.9195 0.6895 Ongoing
1776 MEGHALAYA Agriculture and Allied Proposal of identified block for providing key identified service at Rongara, South Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC 2022-03-31 5 2025-03-31 5 0 5 5 Completed
1777 MEGHALAYA Agriculture and Allied Rural Backyard Goatery under Meghalaya Livestock Mission Schemes of NEC Schemes of NEC 2023-03-21 5 2025-03-21 0.1 0 0.1 Ongoing
1778 MEGHALAYA Agriculture and Allied Rural Backyard Piggery under Meghalaya Livestock Mission Schemes of NEC Schemes of NEC Choose... 2023-03-07 10 2026-03-07 0.1 0 0.1 Ongoing
1779 MEGHALAYA Agriculture and Allied Setting up of 10 farmers' Markets @ Rs. 1.00 crore each Schemes of NEC Schemes of NEC Choose... 2022-03-30 9.9 2025-03-30 2.97 4.455 7.425 2.97 Ongoing
1780 MEGHALAYA Agriculture and Allied Setting up of 20 farmers market @ Rs. 50.00 Lakh each (in all districts of the state) Schemes of NEC Schemes of NEC 2021-02-18 10.9 2024-02-18 10.9 0 10.9 4.36 Ongoing
1781 MEGHALAYA Agriculture and Allied Setting up of 20 farmers' Markets @ Rs. 50.00 lakh each Schemes of NEC Schemes of NEC Choose... 2022-03-31 9.94 2025-03-31 2.982 4.473 7.455 2.982 Ongoing
1782 MEGHALAYA Agriculture and Allied Setting up of a Seed Testing Laboratory in Meghalaya Schemes of NEC Schemes of NEC 2013-03-22 5.7542 2016-03-22 5.1788 0 5.1788 5.18 Completed
1783 MEGHALAYA Agriculture and Allied Setting up of Bio-Curcumin Extraction Unit at Lashkein Block, West Jaintia Hills District, Meghalaya Schemes of NEC Schemes of NEC 2023-03-06 1.5 2026-03-18 1.5 0 1.5 0.6 Completed
1784 MEGHALAYA Agriculture and Allied Strawberry Cultivation in Meghalaya. Schemes of NEC Schemes of NEC 2004-08-20 3.08 2007-08-20 2.77 0 2.77 2.77 Completed
1785 MEGHALAYA Agriculture and Allied Strengthening of Vocational Training Centre Under Kyrdemkulai Schemes of NEC Schemes of NEC 2004-08-23 0.471 2007-08-23 0.42 0 0.42 0.42 Completed
1786 MEGHALAYA Agriculture and Allied Strengthening of Vocational Training Centre, Rongkhom, Tura, Meghalaya. Schemes of NEC Schemes of NEC 2006-02-28 0.1525 2009-02-28 0.14 0 0.14 0.14 Completed
1787 MEGHALAYA Agriculture and Allied Tumeric Providing sustainable livelihood scientific method of organic production of turmeric (Curcuma longa along with crtification as organic produce C&RD Block, Ri-Bhoi district, Meghalaya Schemes of NEC Schemes of NEC 2022-03-31 0.93 2025-03-31 0.9317834 0 0.9317834 0.37 Ongoing
1788 MEGHALAYA Agriculture and Allied Upscaling the cultivation, post-harvest management processing of Lakadong Turmeric under Lakadong Mission Schemes of NEC Schemes of NEC 2022-03-22 9.9654 2025-03-21 9.7462 0 9.7462 9.7538 Ongoing
1789 MEGHALAYA Education Aspirational District Ri Bhoi District, Meghalaya Schemes of NEC Schemes of NEC 2019-06-11 1 2022-06-11 1 0 1 1 Completed
1790 MEGHALAYA Education Community Development Programme for Tiwa(lalung) Ri-Bhoi District, C&RD Block, Umsning Schemes of NEC Schemes of NEC 2020-09-09 2.9478 2023-09-09 2.78 0.1719765 2.9519765 1.88 Ongoing
1791 MEGHALAYA Education Construction of 2 storied Guest House (Phase I) at Shillong, Meghalaya Schemes of NEC Schemes of NEC 2022-03-25 9.23 2025-03-25 1.3845 0 1.3845 1.3845 Ongoing
1792 MEGHALAYA Education Construction of 54m Bailey Bridge over river Khynriem between Saibual and Moulasei, a Community Development Programme for BIATE Tribes East Jaintia Hills, C&RD Block, Saipung, Meghalaya Schemes of NEC Schemes of NEC 2020-12-23 4.77 2023-12-23 1.91 0 1.91 0.01 Ongoing
1793 MEGHALAYA Education Construction of Boarding School and Hostel Building for disabled students of Lynti Jam Welfare and Development Association at Mawtnum, Nongpoh, Ri Bhoi District Schemes of NEC Schemes of NEC 2011-03-26 2.2714 2014-03-26 2.05 0 2.05 2.05 Completed
1794 MEGHALAYA Education Construction of Boys & Girls Hostel of NEIMAs Orphanage-cum-Boarding School at Lad Mynrieng, Pynursla, East Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC 2018-04-10 1.9 2021-04-10 0.1 0 0.1 0.1 Completed
1795 MEGHALAYA Education Construction of G4 building for Skill Development at Ramakrishna Mission Vivekananda Cultural Centre, Shillong Schemes of NEC Schemes of NEC 2016-03-17 3.9312 2019-03-17 3.54 0 3.54 3.54 Completed
1796 MEGHALAYA Education Construction of New Building in Capt.Williamson Sangma Memorial College, Baghmara, South Garo Hills Schemes of NEC Schemes of NEC 2021-01-06 1.67 2024-01-06 1.6666 0 1.6666 1.0485 Completed
1797 MEGHALAYA Education Construction of New Hostel Building for Girls in Nongtalang College, West Jaintia Hills Schemes of NEC Schemes of NEC 2021-01-06 1.1029 2024-01-06 1.1029 0 1.1029 0.44 Completed
1798 MEGHALAYA Education Construction of Nongkharai Christian Secondary School Building at Umsohpieng village, West Khasi Hills Distirct, Meghalaya Schemes of NEC Schemes of NEC 2017-06-29 4.095 2020-06-29 4.095 0 4.095 4.1 Completed
1799 MEGHALAYA Education Construction of RCC Bridge over river Lunar to connect Khaddum to Brichyrnot Village, East Jaintia Hills, Meghalaya for Hmar Community Schemes of NEC Schemes of NEC 2022-03-27 4.91 2025-03-27 0.9 2.5 3.4 1 Ongoing
1800 MEGHALAYA Education Construction of School Buildings at Mawthadraishan, West Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC 2022-03-15 4.7543 2025-03-31 4.27 0.4887 4.7587 1.97 Ongoing
1801 MEGHALAYA Education Focused Development of Deprived Areas Deprived Sections of the society by Promotion of Literacy by upgrading selected RKMission Schools in C&RD Block Mawsynram/Shella-Bholaganj in East Khasi Hills District & Ranikor C&RD Block in South West Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC 2020-12-29 4.3 2023-12-29 4.2988 0 4.2988 1.72 Completed
1802 MEGHALAYA Education Focused Development of Deprived Areas Deprived Sections of the society by Promotion of Literacy by upgrading selected RKMission Schools in C&RD Block Mawsynram/Shella-Bholaganj in East Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC 2020-12-29 4.61 2023-12-29 4.6058 0 4.6058 1.84 Completed
1803 MEGHALAYA Education Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Jalaphet and RKM School, Laitlyngkot) Schemes of NEC Schemes of NEC 2022-03-25 4.45 2025-03-25 2.9728 1.4737 4.4465 1.42 Ongoing
1804 MEGHALAYA Education Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Laitlyndop and RKM School, Mylliem) Schemes of NEC Schemes of NEC 2022-03-24 4.23 2025-03-24 3.1536 1.0764 4.23 1.35 Ongoing
1805 MEGHALAYA Education Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Mawsmai) Schemes of NEC Schemes of NEC 2022-03-25 2.2504 2025-03-25 1.52 0.7304 2.2504 0.72 Ongoing
1806 MEGHALAYA Education Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Umploh and RKM School, Mawkynrew) Schemes of NEC Schemes of NEC 2022-03-24 4.48 2025-03-24 3.2327 1.2452 4.4779 1.43 Ongoing
1807 MEGHALAYA Education Introduction of Interactive Digital Classroom for Development of Science and Mathematics in 24 Schools (3 classroom each) in the State of Meghalaya Schemes of NEC Schemes of NEC 2014-03-05 4.5586 2017-03-05 4.11 0 4.11 4.11 Completed
1808 MEGHALAYA Education Procurement of equipments, Furniture and Fixture etc. for the Skill Development Centre at Ramakrishna Mission, Shillong. Schemes of NEC Schemes of NEC 2016-10-28 2.5 2019-10-28 2.25 0 2.25 2.25 Completed
1809 MEGHALAYA Education Strengthening and Restructuring of College of Teacher of Education (PGT), Shillong. Schemes of NEC Schemes of NEC 2014-03-05 2.8885 2019-03-05 2.8885 0 2.8885 2.89 Completed
1810 MEGHALAYA Sports Construction of Multipurpose Indoor Stadium at Garobadha, South West Garo Hills District, Meghalaya. Schemes of NEC Schemes of NEC 2014-03-05 7.42 2017-03-31 6.0697 0 6.0697 6.07 Foreclosed
1811 MEGHALAYA Sports Construction of building for accomodation of Sports persons, officials, etc at JNS Complex, Polo Ground, Shillong Schemes of NEC Schemes of NEC 2014-03-05 3.68 2019-09-02 3.31 0 3.31 3.31 Completed
1812 MEGHALAYA Sports Construction of Football Ground at Saitsnad, Mawlangwir, SW Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC 2017-03-21 3.9611 2020-06-08 3.9611 0 3.9611 3.96 Completed
1813 MEGHALAYA Sports Construction of Indoor Stadium at Madan Tukhon, Jongksha, Meghalaya. Schemes of NEC Schemes of NEC 2017-04-20 13.4503 2023-12-29 9.98 2.3006 12.2806 9.3706 Ongoing
1814 MEGHALAYA Sports Construction of Indoor Stadium Sports Hall at Tpep Pale, Jowai, Jaintia Hills District, Meghalaya Schemes of NEC Schemes of NEC 2014-03-05 2.0176 2017-03-05 1.82 0 1.82 1.82 Completed
1815 MEGHALAYA Sports Construction of infrastructure for integrated training of the youth and sports cum convention Hall, Lower Chandmari, West Garo Hills District, Tura. Schemes of NEC Schemes of NEC 2014-03-05 5.237 2018-03-05 4.7133 0 4.7133 4.71 Completed
1816 MEGHALAYA Sports Construction of Mini Football Stadium at Dalu, West Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC 2018-03-07 2.9 2021-03-07 2.899 0 2.899 2.9 Completed
1817 MEGHALAYA Sports Construction of Mini Outdoor Stadium at Gambegre, West Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC 2018-02-28 4.04 2021-02-28 3.026 0.8 3.826 3.03 Ongoing
1818 MEGHALAYA Sports Construction of V.I.P Gallery, RCC Covered Public Sitting Gallery, Sitting Arrangements Including of Improvement of Playground at Chondon Nokat, South Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC 2018-02-28 2.15 2021-02-28 2.1545 0 2.1545 2.15 Completed
1819 MEGHALAYA Irrigation and Flood Control Construction of embankment cum road including sluice gates and protection works on the left bank of river Galwang on the Mandagre to Salsella-Balachanda road at Haldibari (3.35 km), West Garo Hills District, Meghalaya. Schemes of NEC Schemes of NEC 2017-06-23 10.4 2020-06-23 9.36 0 9.36 9.36 Completed
1820 MEGHALAYA Irrigation and Flood Control Construction of Seinraij Jowai Community Hall cum Recreational Centre at Loompyrdi Iongpiah, West Jaintia Hills District, Jowai, Meghalaya Schemes of NEC Schemes of NEC Dept. of Power 2023-03-31 4.17 2026-03-31 1.04 1.04 Ongoing
1821 MEGHALAYA Irrigation and Flood Control Creating necessary Infrastructure for Storage of water to meet the Emergency needs of the State capital(Meghalaya), East Khasi Hills Dist. Schemes of NEC Schemes of NEC 2014-02-28 15 2017-02-28 13.5 0 13.5 13.5 Completed
1822 MEGHALAYA Irrigation and Flood Control Integrated programme for water impounding and creation of water body for recharging catchment areas, restoring depleting water table and improving river hydrology at Belbari village across Wanangjhora stream, South West Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC 2017-06-28 3.09 2020-06-28 0.1 0 0.1 0.1 Completed
1823 MEGHALAYA Irrigation and Flood Control Integrated programme for water impounding and creation of water body for recharging catchment areas, restoring depleting water table and improving river hydrology at Chandagre village across Ringre stream, West Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC 2017-06-28 1.79 2020-06-28 0.1 0 0.1 0.1 Completed
1824 MEGHALAYA Irrigation and Flood Control Integrated programme for water impounding and creation of water body for recharging catchment areas, restoring depleting water table and improving river hydrology at Chondon Nokat village across Chondon stream, South West Garo Hills District, Meghalaya. Schemes of NEC Schemes of NEC 2017-06-29 2.09 2020-06-29 1.881 0 1.881 1.88 Completed
1825 MEGHALAYA Irrigation and Flood Control Integrated programme for water impounding and creation of water body for recharging catchment areas, restoring depleting water table and improving river hydrology at Matkolgre village across Sona stream, South West Garo Hills District, Meghalaya. Schemes of NEC Schemes of NEC 2017-06-28 5.36 2019-06-28 4.824 0 4.824 4.82 Completed
1826 MEGHALAYA Irrigation and Flood Control Irrigation cum Management Works at Umtrew Umkta Village, Ri-Bhoi District, Meghalaya. Schemes of NEC Schemes of NEC 2015-10-06 8.2344 2018-10-06 7.41 0 7.41 7.41 Completed
1827 MEGHALAYA Irrigation and Flood Control Mawshbuit Combined Water Supply Project Phase-I, East Khasi Hills District. Schemes of NEC Schemes of NEC 2017-04-17 6.6 2020-04-17 5.9371 0 5.9371 5.94 Completed
1828 MEGHALAYA Irrigation and Flood Control Proposal of identified backward block for providing key identified services at Chokpot Block, South Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC 2023-02-17 4.74 2026-02-17 3.896 0 3.896 3.9 Ongoing
1829 MEGHALAYA Irrigation and Flood Control Proposal of identified backward block for providing key identified services under 30 PC Component at Mawshynrut C&RD Block, Meghalaya Schemes of NEC Schemes of NEC Choose... 2023-02-17 4.88 2026-02-17 2.27 2.615 4.885 Ongoing
1830 MEGHALAYA Irrigation and Flood Control Survey & Investigation and preparation of DPR of Umngot HEP(3X70MW), Stage-I, east Khasi Hills & West Jaintia Hills District, Megahalaya Schemes of NEC Schemes of NEC 2006-10-26 8.35 2008-10-24 7.411 0 7.411 7.41 Completed
1831 MEGHALAYA Irrigation and Flood Control Survey & Investigation of Ganol St-II HEP (3x5 MW), Meghalaya Schemes of NEC Schemes of NEC 2008-11-19 2.11 2011-11-19 1.9 0 1.9 1.9 Completed
1832 MEGHALAYA Industries C/o of Khadi Plaza/ Market complex of Meghalaya Khadi & Village Industres Board at Barik Point Schemes of NEC Schemes of NEC 2021-03-31 2.7377 2024-03-31 2.7377 0 2.7377 2.13 Completed
1833 MEGHALAYA Industries Construction of a Rural Market Complex at Sohiong Village in the East Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC 2016-10-20 11.73 2019-10-20 10.557 0 10.557 10.56 Completed
1834 MEGHALAYA Industries Construction of RCC G4 Commercial Building of Iewdak Laban Municipal Market, Shillong for sale of Agriculture, Horticulture, Handicraft, Piggery, Floriculture Products, etc Schemes of NEC Schemes of NEC 2022-03-31 14.275 2025-03-31 7.1375 7.1375 14.275 10.350625 Ongoing
1835 MEGHALAYA Industries Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Meghalaya Schemes of NEC Schemes of NEC 2020-08-17 3 2023-08-17 3 0 3 3 Completed
1836 MEGHALAYA Industries Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19, in the state of Meghalaya PHASE-II Schemes of NEC Schemes of NEC 2020-11-24 3 2023-11-24 3 0 3 3 Completed
1837 MEGHALAYA Industries Setting up of a lime manufacturing factory by M/s. Pillar Nongkhlaw Lime Factory, Laitsohpliah, Sohra Syiemship, East Khasi Hills, Meghalaya Schemes of NEC Schemes of NEC 2006-09-28 0.3584 2008-09-28 0.32 0 0.32 0.32 Completed
1838 MEGHALAYA Industries Setting up of a Manufacturing of Wax Candls Industry by M/s Resa Candles Industries, Riat Laban, Shillong, Schemes of NEC Schemes of NEC 2006-09-28 0.1417 2009-09-28 0.13 0 0.13 0.13 Completed
1839 MEGHALAYA Industries Setting up of a Modern Rice Mill by M/s. V.M. Modern Rice Mill, Umiam Industrial Area, Ri-Bhoi District Schemes of NEC Schemes of NEC 2006-03-11 0.8865 2009-03-11 0.8 0 0.8 0.8 Completed
1840 MEGHALAYA Industries Setting up of Livelihood Centre and Design, Innovation & Training Workshops on Water Hyacinth Craft Cluster in Meghalaya Schemes of NEC Schemes of NEC 2023-03-17 3.69 2026-03-17 3.582844 0.1125382 3.6953822 1.112844 Ongoing
1841 MEGHALAYA Industries Setting up of Model Handloom Production Centre at Marngar, Ri-Bhoi District, Meghalaya Schemes of NEC Schemes of NEC 2017-12-29 1.43 2020-12-29 1.43 0 1.43 1.43 Completed
1842 MEGHALAYA Industries Setting up of Model Handloom Production Centre at Phulbari, West Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC 2017-12-29 2.1 2020-12-29 2.1 0 2.1 0.76 Ongoing
1843 MEGHALAYA Industries Setting up of Rural EntrepreneurshipCentre at Sohparu, West Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC Dept. of Power 2017-06-29 2.96 2020-06-29 2.96 0 2.96 2.96 Completed
1844 MEGHALAYA Industries Setting up of Rural EntrepreneurshipCentre East Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC Dept. of Power 2017-06-29 3.01 2020-06-29 3.01 0 3.01 3 Completed
1845 MEGHALAYA Industries Setting up of Rural EntrepreneurshipCentre North Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC Dept. of Power 2017-06-29 3.02 2020-06-29 3.02 0 3.02 3.02 Completed
1846 MEGHALAYA Industries Setting up of Rural EntrepreneurshipCentre South Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC Dept. of Power 2017-06-29 3 2020-06-29 3 0 3 3 Completed
1847 MEGHALAYA Industries Upgradation, Improvement and Widening of roads within Industrial Estate at Umiam, Ri Bhoi District, Meghalaya Schemes of NEC Schemes of NEC 2017-03-23 13.5327 2020-03-23 12.18 0 12.18 12.18 Completed
1848 MEGHALAYA Information and Public Relatio Construction of Cultural Infrastructure of Six(6) Sien Raij in East and West Jaintia Hills Districts, Meghalaya Schemes of NEC Schemes of NEC 2023-03-31 1.73 2026-03-31 1.549 0.18 1.729 0.96 Ongoing
1849 MEGHALAYA Information and Public Relatio Development of Culture Complex of Seng Khasi Ri Raid Laban at Lum Shat Sngi, Kenches Trace, Shillong, Meghalaya Schemes of NEC Schemes of NEC 2024-01-30 9.28 2027-01-30 4.56 1.5 6.06 4.56 Ongoing
1850 MEGHALAYA Information and Public Relatio Don Bosco Community Information Centre, Mawlai, Shillong Schemes of NEC Schemes of NEC 2012-05-01 3.3901 2015-05-01 3.051 0 3.051 3.05 Completed
1851 MEGHALAYA Information and Public Relatio Don Bosco Community Information Centre, Mawlai, Shillong Schemes of NEC Schemes of NEC 2012-05-01 3.39 2015-05-01 3.05 0 3.05 3.05 Completed
1852 MEGHALAYA Information and Public Relatio North East Green Summit organised by North Eastern Hill University Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.075 2021-04-01 0 Completed
1853 MEGHALAYA Information and Public Relatio Providing Show Case/ Galleries, Lighting, etc in the New building of Williamson Sangma State Museum, Shillong, Meghalaya Schemes of NEC Schemes of NEC 2015-06-05 6.1755 2018-06-05 5.558 0 5.558 4.08 Ongoing
1854 MEGHALAYA Information and Public Relatio Providing Sound and Light to Multipurpose Hall at Shillong International Centre for Performing Arts & Culture(SICPAC), Mawkasiang, East Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC 2021-02-22 9.8044 2026-01-30 9.8018 0 9.8018 9.7 Completed
1855 MEGHALAYA Health Accident & Trauma Center, Jowai, Meghalaya Schemes of NEC Schemes of NEC 2007-03-27 0.8 2009-03-27 0.72 0 0.72 0.72 Completed
1856 MEGHALAYA Health Accident & Trauma Center, Tura, Meghalaya Schemes of NEC Schemes of NEC 2007-03-27 0.8 2009-03-27 0.72 0 0.72 0.72 Completed
1857 MEGHALAYA Health Establishment of 6 bedded ICUs each at Civil Hospital, Tura and Ganesh Das Hospital, Shillong, Meghalaya Schemes of NEC Schemes of NEC 2010-01-15 4.7703 2013-01-15 4.05 0 4.05 4.05 Completed
1858 MEGHALAYA Health Improvement and Up-gradation of SAN-KER, Shillong, Meghalaya Schemes of NEC Schemes of NEC 2016-07-20 3.25 2019-07-20 2.925 0 2.925 2.93 Completed
1859 MEGHALAYA Health Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Meghalaya for activities related to combating COVID-19 pandemic Schemes of NEC Schemes of NEC 2020-04-01 3 2020-04-01 3 0 3 3 Completed
1860 MEGHALAYA Health Support for Procurment of an M.R.I. (1.5 T) machine at Civil Hospital, Shillong, Meghalaya Schemes of NEC Schemes of NEC 2012-07-08 4.98 2015-07-08 4.48 0 4.48 4.48 Completed
1861 MEGHALAYA Health Support of (1.5T) MRI Machine at Tura Civil Hospital, Meghalaya Schemes of NEC Schemes of NEC Choose... 2023-03-31 6.69 2026-03-31 5.02 5.02 Ongoing
1862 MEGHALAYA Health Support of Bawri Nethralaya, Shillong, Meghalaya Schemes of NEC Schemes of NEC 2005-07-28 0.75 2009-07-28 0.675 0 0.675 0.68 Completed
1863 MEGHALAYA Health Up-gradation of Equipment Infrastructure and Development of District Hospitals, Meghalaya Schemes of NEC Schemes of NEC 2012-11-16 9.4967 2015-11-16 8.547 0 8.547 8.55 Completed
1864 MEGHALAYA Health Up-gradation of Laboratory and Diagnostic facilities and setting up of Orthopedic Operation Theatre at Civil Hospital, Tura, Meghalaya Schemes of NEC Schemes of NEC 2012-01-03 4.9491 2015-01-03 3 0 3 3 Completed
1865 MEGHALAYA Health Upgradation of Equipment infrastructure for establishment of Dialiasis Unit, Endoscopy Unit, Major OT upgradation & 10 bedded Casualty & Emergency Ward at Civil Hospital, Shillong, Meghalaya Schemes of NEC Schemes of NEC 2011-03-31 4.984 2014-03-31 4.25 0 4.25 4.25 Completed
1866 MEGHALAYA Power 2nd Circuit 132 kV S/C Transmission Line between Stage III and Stage IV in Meghalaya Schemes of NEC Schemes of NEC 2007-02-08 4.212 2009-02-08 3.79 0 3.79 3.79 Completed
1867 MEGHALAYA Power Augmentation of 132/33kV Substation from 20 MVA 3x3.5mVA to 2x20 MVA2x5mVA at Ronkhong, West Garo District Hills Schemes of NEC Schemes of NEC 2010-09-08 4.69 2013-09-08 4.22 0 4.22 4.22 Completed
1868 MEGHALAYA Power Construction of 132 KV D/C on LILO on Mawlai-Cherra S/C Line at Mawngap Sub-Station, Meghalaya. Schemes of NEC Schemes of NEC 2010-01-19 4.9674 2014-01-19 4.47 0 4.47 4.47 Completed
1869 MEGHALAYA Power Construction of 132 KV LILO of Sumer NEHU Line at 132/33 KV, 2x20 MVA Substation at Umiam, Meghalaya. Schemes of NEC Schemes of NEC 2009-01-23 4.94 2012-01-23 4.45 0 4.45 4.45 Completed
1870 MEGHALAYA Power Construction of 132 KV S/c Transmission line on D/C tower from Agia (Assam) to Nangalbibra (Megh), (110 KM). Schemes of NEC Schemes of NEC 2007-03-19 43.32 2010-03-19 38.988 0 38.988 38.99 Completed
1871 MEGHALAYA Power Construction of 132/33 KV , 2X20 MVA S/s at Mendipathar (Ph-II), East Garo Hills, Meghalaya Schemes of NEC Schemes of NEC 2012-01-04 4.85 2015-01-04 4.37 0 4.37 4.37 Completed
1872 MEGHALAYA Power Construction of 132/33 KV , 2X20 MVA S/s at Umiam in Meghalaya. Schemes of NEC Schemes of NEC 2008-08-07 4.7972 2012-08-07 4.32 0 4.32 4.32 Completed
1873 MEGHALAYA Power Construction of 132/33 KV, 2 X 20 MVA Sub-Station at Mendipathar, Meghalaya. Schemes of NEC Schemes of NEC 2009-10-21 4.71 2012-10-21 4.24 0 4.24 4.24 Completed
1874 MEGHALAYA Power Construction of 33kV Line from Byrnihat to Nongpoh with a provision of D/C line, Ribhoi, Meghalaya Schemes of NEC Schemes of NEC 2013-12-20 4.4455 2018-03-31 4 0 4 4 Completed
1875 MEGHALAYA Power Construction of Lakhroh Mini Hydel Project (1x1500kW), W. Jaintia Hills, Meghalaya Schemes of NEC Schemes of NEC 2008-03-25 5 2012-03-25 4.5 0 4.5 4.5 Completed
1876 MEGHALAYA Power Construction of LILO on 132 KV Agia-Nangalbibra Line at Mendipathar, Meghalaya. Schemes of NEC Schemes of NEC 2009-12-09 4.9965 2012-12-09 4.5 0 4.5 4.5 Completed
1877 MEGHALAYA Power Construction of LILO on 132 KV Mawlai-Nangalbibra Line at Mawngap S/s Schemes of NEC Schemes of NEC 2011-03-22 4.94 2014-03-22 4.45 0 4.45 4.45 Completed
1878 MEGHALAYA Power Construction of new 33KV line on ST pole with Raccoon conductor from Khiehtyrshi to Wahiajer 33/11KV, 5.0 MVA substation with control room, Meghalaya Schemes of NEC Schemes of NEC 2012-11-21 3.4037 2015-11-21 3.06 0 3.06 3.06 Completed
1879 MEGHALAYA Power Improvement of Power supply in Dadenggre area by construction of new 33kV S/C line from Rongkhon to Dadenggre and strengthening of the 11kV and LT network under West Garo Hills (D) Division. Schemes of NEC Schemes of NEC 2016-03-18 5.7 2019-03-18 1 0 1 1 Completed
1880 MEGHALAYA Power Installation & Commissioning of Communication Network & remote terminal unit at 132KV Sub-Station for supervisory control and data acquisition of MeECL, Meghalaya Schemes of NEC Schemes of NEC 2010-12-23 3.9543 2013-12-23 3.56 0 3.56 3.56 Completed
1881 MEGHALAYA Power Installation of 220/132kV, 1x100 MVA Auto transformer at Agia (Assam) for Meghalya Schemes of NEC Schemes of NEC 2011-03-08 11.43 2014-03-08 10.29 0 10.29 10.29 Completed
1882 MEGHALAYA Power Installation of Capacitor Bank at 33 KV Umtru Switchyard & 132 KV EPIP-I at Byrnihat, Meghalaya. Schemes of NEC Schemes of NEC 2008-03-25 3.1 2010-03-25 2.79 0 2.79 2.79 Completed
1883 MEGHALAYA Science and Technology Computerisation of Educational Research & Training and District Institutes of Education & Training in Meghalaya Schemes of NEC Schemes of NEC 2011-03-30 0.4807 2014-03-30 0.4807 0 0.4807 0.48 Completed
1884 MEGHALAYA Science and Technology Establishment of NE RS & GIS Resource Network (NeSDR), North Eastern Space Application Centre (NESAC), Umiam, Shillong Schemes of NEC Schemes of NEC 2017-02-15 4.0137 2020-02-15 4.0137 0 4.0137 4.01 Completed
1885 MEGHALAYA Science and Technology Financial Assistance for Setting up of Community Information & Education Centres in NERCMP Project Districts Schemes of NEC Schemes of NEC 2011-08-24 0.25 2014-08-24 0.25 0 0.25 0.25 Completed
1886 MEGHALAYA Science and Technology Financial Assistance for Setting Up of Community Information and education Centre in NERCMP Project Districts Schemes of NEC Schemes of NEC 2009-03-31 0.35 2012-03-31 0.35 0 0.35 0.35 Completed
1887 MEGHALAYA Science and Technology Financial Assistance towards Procurement of Computers & Peripherals for NERCMP Schemes of NEC Schemes of NEC 2009-02-28 0.2534 2012-02-28 0.2534 0 0.2534 0.25 Completed
1888 MEGHALAYA Science and Technology Geophysical Studies in Southern Part of Shillong Plateau, Meghalaya using Micro-earthquake Technique Schemes of NEC Schemes of NEC 2012-03-12 0.9 2015-03-12 0.9 0 0.9 0.9 Completed
1889 MEGHALAYA Science and Technology Hi-tech seed production in Potato through Tissue Culture & Aeroponic System in NEH Region by Central Potato Research Station, Shillong .ICAR UNIT CPRI, SHIMLA Schemes of NEC Schemes of NEC 2017-01-02 0.97 2020-01-02 0.97 0 0.97 0.97 Completed
1890 MEGHALAYA Science and Technology IT based science & technology education programme at 100 schools in Meghalaya Schemes of NEC Schemes of NEC 2010-03-25 1.48 2013-03-25 1.48 0 1.48 1.48 Completed
1891 MEGHALAYA Science and Technology IT College Education Programme at Synod College for library, books, etc Schemes of NEC Schemes of NEC 2005-03-31 0.0051 2008-03-31 0.0051 0 0.0051 0.01 Completed
1892 MEGHALAYA Science and Technology IT Education Infrastructure at 100 Schools in 11 Districts of Meghalaya (Dept. of Information Technology, Govt. of Meghalaya) Schemes of NEC Schemes of NEC 2013-12-19 4.9728 2016-12-19 4.4755 0 4.4755 4.48 Completed
1893 MEGHALAYA Science and Technology IT Education Programme at 100 schools in Meghalaya, Meghalaya Information Technology Society, Shillong Meghalaya Schemes of NEC Schemes of NEC 2012-02-28 4.4155 2015-02-28 4.4155 0 4.4155 4.42 Completed
1894 MEGHALAYA Science and Technology IT Education Programme for 25 Schools in Meghalaya for 2009-10 Schemes of NEC Schemes of NEC 2009-08-07 1.1655 2011-08-07 1.1655 0 1.1655 1.17 Completed
1895 MEGHALAYA Science and Technology IT School Education Programme for 14 Schools by M/S Nice Infotech, Shillong Schemes of NEC Schemes of NEC 2005-03-31 0.3462 2008-03-31 0.3462 0 0.3462 0.35 Completed
1896 MEGHALAYA Science and Technology Master Plan of Action for Utilization of Space Technology in North Eastern Region by NESAC, Umiam Schemes of NEC Schemes of NEC 2011-03-30 0.95 2014-03-30 0.95 0 0.95 0.95 Completed
1897 MEGHALAYA Science and Technology MBOSE eGovernance & Online Connectivity (Meghalaya) Schemes of NEC Schemes of NEC 2010-03-15 2.303 2013-03-15 2.303 0 2.303 2.3 Completed
1898 MEGHALAYA Science and Technology North Eastern District Natural Resources Plan (NEDRP) for North Eastern Region NER Schemes of NEC Schemes of NEC 2013-03-25 1.4425 2016-03-25 1.4425 0 1.4425 1.44 Completed
1899 MEGHALAYA Science and Technology Office of Automation of SMELC (Social Mobilization Experimentation & Learning Centre) Building at Tura, Weat Garo Hills Schemes of NEC Schemes of NEC 2012-06-14 0.4 2015-06-14 0.4 0 0.4 0.4 Completed
1900 MEGHALAYA Science and Technology Procurement of Multi-functional Color Photocopier for Social Mobilization Experimentation and Learning Centre (SMELC) under NERCMP, at Tura, Meghalaya Schemes of NEC Schemes of NEC 2005-03-31 0.0475 2008-03-31 0.0475 0 0.0475 0.05 Completed
1901 MEGHALAYA Science and Technology Recalling the Great Shillong Earthquake Quest for a reliable & effective mitigation and post disaster response strategies on 12th June, 2017 Schemes of NEC Schemes of NEC 2017-06-19 0.04 2020-06-19 0.04 0 0.04 0.04 Completed
1902 MEGHALAYA Science and Technology Setting up of 50 Community Information & Education Centres in NERCMP Project Districts Schemes of NEC Schemes of NEC 2010-01-18 0.5 2013-01-18 0.5 0 0.5 0.5 Completed
1903 MEGHALAYA Science and Technology Setting up of digital planetarium at NEHU Campus, Tura (henceforth been named Setting up of digital planetarium in the Shillong Science Centre.) Schemes of NEC Schemes of NEC 2012-11-30 2.4751 2015-11-30 2.2176 0 2.2176 1.35 Completed
1904 MEGHALAYA Science and Technology To Support IT Education Programme in Meghalaya Schemes of NEC Schemes of NEC 2011-03-26 2.212 2014-03-26 2.212 0 2.212 2.21 Completed
1905 MEGHALAYA Science and Technology Use of Unmanned Aerial Vehicle (UAV) Remote Sensing (UAV-RS) for the States of NE Region (NER), Shillong Schemes of NEC Schemes of NEC 2017-01-02 0.75 2020-01-02 0.75 0 0.75 0.75 Completed
1906 MEGHALAYA Transport and Communication Agia-Medhipara-Phulbari-Tura Schemes of NEC Schemes of NEC 2010-01-19 65.65 2013-01-20 59.09 0 59.09 59.09 Completed
1907 MEGHALAYA Transport and Communication Barapani-Umroi-Mawlasnai Schemes of NEC Schemes of NEC 2009-10-21 20.53 2012-10-21 19.38 0 19.38 19.38 Completed
1908 MEGHALAYA Transport and Communication Cherra-Mawsmai-Shella raod Schemes of NEC Schemes of NEC 2006-09-25 38.42 2009-09-25 35.43 0 35.43 35.43 Completed
1909 MEGHALAYA Transport and Communication Improvement of Jowai-Khanduli-Baithalangsu road Schemes of NEC Schemes of NEC 2011-02-23 67.36 2014-02-23 60.62 0 60.62 60.62 Completed
1910 MEGHALAYA Transport and Communication Improvement of Mankachar-Mahendraganj road Schemes of NEC Schemes of NEC 2006-03-17 28.67 2009-03-17 25.8 0 25.8 25.8 Completed
1911 MEGHALAYA Transport and Communication ISBT Mawlai - Mawiong Schemes of NEC Schemes of NEC 2013-01-28 48.31 2016-01-28 41.952 0 41.952 41.95 Completed
1912 MEGHALAYA Transport and Communication Lad Moolamanoh-Mushut Schemes of NEC Schemes of NEC 2005-10-15 3.6777 2008-10-15 3.31 0 3.31 3.31 Completed
1913 MEGHALAYA Transport and Communication Metalling & Black toping of Rymbai-Jalalpur Schemes of NEC Schemes of NEC 2005-07-14 4.94 2008-07-14 4.5 0 4.5 4.5 Completed
1914 MEGHALAYA Transport and Communication Rymbai-Bataw-Borsora-Jalalpur road Schemes of NEC Schemes of NEC 2005-12-26 40.3149 2008-12-27 36.28 0 36.28 36.28 Completed
1915 MEGHALAYA Transport and Communication Safety and Security infrastructure at Barapani Airport Schemes of NEC Schemes of NEC 2013-02-20 28.45 2016-02-20 17.07 0 17.07 17.07 Completed
1916 MEGHALAYA Transport and Communication Silchar-Dwarband-Gaglacherra-Phaisen Road Schemes of NEC Schemes of NEC 2004-08-18 9.68 2007-08-19 9.11 0 9.11 9.11 Completed
1917 MEGHALAYA Transport and Communication Sutnga-Sumer Schemes of NEC Schemes of NEC 2009-12-09 4.88 2012-12-12 4.5 0 4.5 4.5 Completed
1918 MEGHALAYA Transport and Communication Upgradation Agia-Medhipra-Phulbari-Tura road (Balance work) Schemes of NEC Schemes of NEC 2010-03-23 90.64 2013-03-23 81.58 0 81.58 81.58 Completed
1919 MEGHALAYA Tourism and Culture Construction of Eco-Tourism Park at Langkawet, East Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC 2015-06-16 1.374 2018-06-16 1.24 0 1.24 1.24 Completed
1920 MEGHALAYA Tourism and Culture Construction of guest house and wayside amenities at Swangngrei Hamegaon, West Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC 2017-03-22 4.045 2020-03-22 3.6405 0 3.6405 3.64 Completed
1921 MEGHALAYA Tourism and Culture Construction of tea boutique and eco-tourist lodge in Umsning, Ri Bhoi District, Meghalaya for promotion of Tea Tourism Schemes of NEC Schemes of NEC 2020-11-25 2.77 2024-03-31 2.77 0 2.77 1.86 Completed
1922 MEGHALAYA Tourism and Culture Construction of Tourism Infrastructure at Laitlyngkot (Lamlyer) in East Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC Choose... 2023-03-31 4.65 2026-03-31 1.16 3.0225 4.1825 2.1889 Ongoing
1923 MEGHALAYA Tourism and Culture Development of Ballonggre Songitcham in West Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC 2017-03-22 1.6851 2020-03-22 1.2144 0 1.2144 1.21 Completed
1924 MEGHALAYA Tourism and Culture Development of Omed Ni Jamdap at Rajasimla, North Garo Hills District, Meghalaya Schemes of NEC Schemes of NEC 2017-03-22 0.9061 2020-03-22 0.8154 0 0.8154 0.82 Completed
1925 MEGHALAYA Tourism and Culture Eco-Resort at Nongkhlaw, West Khasi Hills District, Meghalaya Schemes of NEC Schemes of NEC 2017-03-22 1.2887 2020-03-22 0.9278 0 0.9278 0.93 Completed
1926 MEGHALAYA Tourism and Culture Orchid Lake Resort Development, Umiam, Ri Bhoi District, Meghalaya Schemes of NEC Schemes of NEC 2014-03-05 7.6061 2016-03-05 6.85 0 6.85 6.85 Completed
1927 MEGHALAYA Tourism and Culture Rural Eco Tourism Circuit in Garo Hills (East Garo Hills, West Garo Hills and South West Garo Hills), Meghalaya Schemes of NEC Schemes of NEC Dept. of Power 2017-03-22 14.39 2020-03-22 12.951 0.3129608 13.2639608 12.4329608 Ongoing
1928 MEGHALAYA Tourism and Culture Village/Rural Tourism under Cooperative Sector for Wahkdait Pashum Ropeway Transport, Fruit and Vegetable Processing Unit & Livestock Cooperative society Ltd. in Pynursla C&RD Block East Khasi Hills District. Schemes of NEC Schemes of NEC 2017-12-28 0.3791 2020-12-28 0.136 0 0.136 0.14 Completed
1929 MEGHALAYA Infrastructure Construction of IT Park at Tura, West Garo Hills District, Meghalaya PM-DevINE Other 2024-02-10 126.94 2027-05-27 63.47 31.735 95.205 55.8536 Ongoing
1930 MEGHALAYA Roads and Bridges Construction of new four-lane road and conversion of existing two-lane road into four-lane with cycling tracks, utility ducts, footpaths, etc. at New Shillong Township by Directorate of Urban Affairs, Government of Meghalaya PM-DevINE Public works Department 2024-02-01 146.79 2026-07-14 73.4 36.6925 110.0925 28.3677336 Ongoing
1931 MEGHALAYA Power Augmentation of the 132/33 KV Mawlai substation from 3x20 MVA to 3x50 MVA, along with re-engineering of the 132 KV bus bar in Meghalaya NESIDS-OTRI NESIDS Power Department 2019-03-08 49.8 2020-03-31 0.1 0 0.1 Ongoing
1932 MEGHALAYA Transport and Communication Construction including MBT of Pynursla-Latangriwan road towards Mawlynnong NESIDS-ROADS NESIDS Public works Department 2019-03-08 29.97 2020-03-31 20.92 8.88 29.8 20.92 Completed
1933 MEGHALAYA Transport and Communication Construction of a road from Shillong city to Umroi Airport under Ri-Bhoi district (Length: 14.279 KM) at a cost of Rs. 50.00 crore NESIDS-ROADS NESIDS Public works Department 2022-04-19 50 2024-04-20 17.38 11.69 29.07 8.74 Ongoing
1934 MEGHALAYA Transport and Communication Improvement including widening of Agia Medhipara Phulbari Tura Road (Portion from 67/600 to 100/200 Km 32.60 Kms) at an estimated cost of Rs. 66.54 crores NESIDS-ROADS NESIDS Public works Department 2022-04-19 52.87 2024-04-20 52.87 0 52.87 28.1 Completed
1935 MEGHALAYA Transport and Communication Upgradation of Mawsmai-Shella Road from km8/00 (Laittyra village )upto km15/500 (Kynrem falls) in Meghalaya NESIDS-ROADS NESIDS Public works Department 2019-03-08 15.48 2020-03-31 15.3835 0 15.3835 15.3835 Completed
1936 MEGHALAYA Transport and Communication 9th Mile (on East West corridor in Assam) to Umsen via Killing Pilangkata Road NESIDS-ROADS NERSDS Public works Department 2019-08-06 84.01 2022-11-08 77.2256 0 77.2256 77.23 Completed
1937 MEGHALAYA Transport and Communication Mawshynrut-Hahim-Boko Road NESIDS-ROADS NERSDS Public works Department 2021-01-28 108.48 2023-01-28 97.4 9.675 107.075 76.37 Completed
1938 MEGHALAYA Transport and Communication Upgradation/Improvement of Borkhat-Sonapur road NESIDS-ROADS NERSDS Public works Department 2022-03-14 126.88 2024-04-14 73.54 17.9 91.44 28.8 Ongoing
1939 MEGHALAYA Water Supply Bulk Water supply to Adjoining Rural Villages of Tura town NESIDS-OTRI NESIDS PHE 2023-11-14 97.77 2025-11-14 73.3275 24.4393 97.7668 Ongoing
1940 MEGHALAYA Water Supply Greater Baghmara Water Supply Scheme NESIDS-OTRI NESIDS Dept of Planning 2021-01-27 47.54 2023-01-27 47.54 0 47.54 47.54 Completed
1941 MEGHALAYA Water Supply Greater Sohra(Cherrapunjee) water supply Scheme NESIDS-OTRI NESIDS Public works Department 2019-02-22 24.8125 2020-03-31 24.8125 0 24.8125 24.8125 Ongoing
1942 MEGHALAYA Water Supply Laying of new feeder mains under Tura Phase-I&II Water Supply Scheme NESIDS-OTRI NESIDS Public works Department 2019-02-22 34.7394 2020-03-31 34.7394 0 34.7394 34.7394 Completed
1943 MEGHALAYA Education Additional requirement of R.K. Mission, Cherrapunjee for construction of School Building, Library, Laboratory & Computer Classes NESIDS-OTRI NLCPR Directorate of School Edu 2004-09-03 2 2006-09-30 1.7354 0 1.7354 1.8054 Completed
1944 MEGHALAYA Education Campus Development Project of Building Infrastructure of Thomas Jones Synod College, Jowai NESIDS-OTRI NLCPR Dept. of Power 2005-11-02 3.3658 2024-12-31 3.0292 0 3.0292 2.0602 Ongoing
1945 MEGHALAYA Education College of Science & Commerce at Mahendraganj in Meghalaya NESIDS-OTRI NLCPR Dept. of Power 2017-06-30 36.31 2025-07-31 23.7168 6.5141822 30.2309822 12.204 Ongoing
1946 MEGHALAYA Education College of Science and Commerce at Mawphlang in Meghalaya NESIDS-OTRI NLCPR Directorate of Higher Tec 2017-06-30 36.55 2019-06-30 31.1685 0 31.1685 31.1675 Ongoing
1947 MEGHALAYA Education Construction of Bormanik College Building at Laimer, Upper Shillong NESIDS-OTRI NLCPR Directorate of Higher Tec 2009-09-29 2.5052 2012-09-30 2.2047 0 2.2047 2.2047 Ongoing
1948 MEGHALAYA Education Construction of Laban Bengalee Girls HSS NESIDS-OTRI NLCPR Directorate of School Edu 2013-10-04 2.15 2017-09-30 1.7415 0 1.7415 1.7415 Completed
1949 MEGHALAYA Education Construction of Nongstoin College Building, Boys & Girls Hostel, Library at Nongpyngdeng, Nongstoin, West Khasi Hills NESIDS-OTRI NLCPR Directorate of Higher Tec 2010-02-02 6.1962 2013-06-30 5.5766 0 5.5766 5.5766 Completed
1950 MEGHALAYA Education Construction of RCC Building at Govt. Girls Higher Secondary School Shillong. NESIDS-OTRI NLCPR Directorate of School Edu 2010-03-17 2.5014 2012-03-31 2.1806 0 2.1806 2.1806 Completed
1951 MEGHALAYA Education Construction of RK Mission Ashram School Building, Teacher's Quarters and Student's Home at Cherrapunji. NESIDS-OTRI NLCPR Directorate of School Edu 2001-03-08 1.56 2004-03-31 1.404 0 1.404 1.56 Completed
1952 MEGHALAYA Education Construction of School Building for Sutnga Presbyterian Higher Secondary School NESIDS-OTRI NLCPR Directorate of School Edu 2006-02-16 2.3356 2007-08-31 2.1021 0 2.1021 2.1021 Completed
1953 MEGHALAYA Education Construction of School Building of O.M. Roy Memorial School at Kynton Massar, Mawlai, Shillong NESIDS-OTRI NLCPR Directorate of School Edu 2006-07-03 2.2584 2008-01-01 1.9734 0 1.9734 1.9734 Completed
1954 MEGHALAYA Education Construction of School Building, Mawthawpdah Presbyterian Secondary School, West Khasi Hills NESIDS-OTRI NLCPR Directorate of School Edu 2010-07-07 3.271 2012-03-31 2.3552 0 2.3552 2.3552 Ongoing
1955 MEGHALAYA Education Construction of School Building, Mendipathar Secondary School, East Garo Hills NESIDS-OTRI NLCPR Directorate of School Edu 2008-09-19 1.214 2010-03-31 0.3824 0 0.3824 0.3824 Foreclosed
1956 MEGHALAYA Education Construction of School Building, Pohskur Secondary School, Jaintia Hills NESIDS-OTRI NLCPR Directorate of School Edu 2006-12-06 1.7536 2009-12-31 1.527 0 1.527 1.2626 Ongoing
1957 MEGHALAYA Education Construction of School Building, Ri-Bhoi Presbyterian Higher Secondary School, Nongpoh, Ri-Bhoi District in Meghalaya NESIDS-OTRI NLCPR Directorate of School Edu 2008-07-29 3.6508 2010-07-31 2.9306 0 2.9306 2.4642 Ongoing
1958 MEGHALAYA Education Construction of Schools Building, Hostels, Basketball Court etc of Nongpathaw Secondary School, East Khasi Hills NESIDS-OTRI NLCPR Directorate of School Edu 2010-07-07 2.707 2012-06-30 2.3885 0 2.3885 2.3885 Ongoing
1959 MEGHALAYA Education Construction of Tikrikilla College Complex, West Garo Hills District NESIDS-OTRI NLCPR Directorate of Higher Tec 2006-12-06 5.4283 2009-12-31 1.7099 0 1.7099 1.7099 Foreclosed
1960 MEGHALAYA Education Construction/renovation of school building of DNS Wahlang Memorial Secondary School, East Khasi Hills,Shillong in Meghalaya NESIDS-OTRI NLCPR Dept. of Power 2011-02-17 3.057 2013-02-28 2.4761 0 2.4761 2.4761 Completed
1961 MEGHALAYA Education Infrastructural Requirements of Mawsynram Border Area College NESIDS-OTRI NLCPR Directorate of Higher Tec 2005-11-02 2.863 2007-10-02 2.5767 0 2.5767 2.5767 Completed
1962 MEGHALAYA Education North Eastern Hill Univesity, Shillong NESIDS-OTRI NLCPR No information Available 2000-03-30 6 2004-03-31 5.4 0 5.4 6 Completed
1963 MEGHALAYA Education Primary School Buildings NESIDS-OTRI NLCPR Directorate of School Edu 2000-11-17 14.4 2003-12-31 12.96 0 12.96 14.4 Completed
1964 MEGHALAYA Education Rymbai Presbyterian Higher Secondary School, Rymbai, Meghalaya NESIDS-OTRI NLCPR Dept. of Power 2010-09-30 3.8144 2013-09-30 3.6656 0 3.6656 3.4012 Completed
1965 MEGHALAYA Education SAC Expansion Programme - Developing the Employment Potential of NE Region in the New Economy & Promoting and Documenting Regional talent NESIDS-OTRI NLCPR Directorate of Higher Tec 2006-12-08 4.2354 2010-12-31 2.3259 0 2.3259 2.3259 Ongoing
1966 MEGHALAYA Education Sarva Shiksha Abhiyan (2005-06) NESIDS-OTRI NLCPR Directorate of School Edu 2006-03-28 3.8516 2006-12-31 3.8516 0 3.8516 3.8516 Completed
1967 MEGHALAYA Education Sarva Shiksha Abhiyan (2006-07) NESIDS-OTRI NLCPR Directorate of School Edu 2006-09-26 8.588 2007-03-31 8.588 0 8.588 8.588 Completed
1968 MEGHALAYA Education Upper Primary School Buildings NESIDS-OTRI NLCPR Directorate of School Edu 2000-11-17 8 2003-12-31 7.2 0 7.2 8 Completed
1969 MEGHALAYA Miscellaneous Construction and Development of the Iawmusiang Multi Purpose Market Complex, Jowai NESIDS-OTRI NLCPR PWD(Buildings),Meghalaya 2006-07-03 20.0963 2008-01-01 6.3303 0 6.3303 6.3303 Foreclosed
1970 MEGHALAYA Miscellaneous Construction of Airport at Baljek, Tura NESIDS-OTRI NLCPR Transport Department 2000-11-13 3.21 2001-11-30 2.862 0 2.862 3.18 Completed
1971 MEGHALAYA Miscellaneous Construction of New Nongstoin Market Complex at Nongstoin in Meghalaya NESIDS-OTRI NLCPR Community & Rural Develop 2009-03-02 5.2926 2012-03-31 4.287 0 4.287 4.287 Completed
1972 MEGHALAYA Miscellaneous Construction of Shopping Complex cum Auditorium near Lumshad, Lad Mawgap NESIDS-OTRI NLCPR Community & Rural Develop 2009-02-20 2.31 2011-02-28 0.5205 0.791 1.3115 0.916 Ongoing
1973 MEGHALAYA Miscellaneous Integrated Police Welfare Complex Baghmara in South Garo Hills in Meghalaya NESIDS-OTRI NLCPR Home Police Department 2015-06-25 12.852 2018-06-30 11.5668 0 11.5668 4.6267 Ongoing
1974 MEGHALAYA Miscellaneous Updating facilities of Ginger Processing Plant at Byrnihat for commercial production NESIDS-OTRI NLCPR Industries Depatment 2007-07-11 0.5121 2008-07-31 0.5121 0 0.5121 0.5121 Completed
1975 MEGHALAYA Miscellaneous Upgradation of Market at Mowphlong NESIDS-OTRI NLCPR Community & Rural Develop 2003-03-21 1.9 2004-03-31 1.71 0 1.71 1.9 Completed
1976 MEGHALAYA Power Construction of 132 kV D/C line from Sarusajai to Byrnihat NESIDS-OTRI NLCPR Power Department 2004-03-10 9.7824 2005-06-30 8.8042 0 8.8042 9.7824 Completed
1977 MEGHALAYA Power Construction of 132/33 kV S/S at Lumshnong with LILO from Khleirhiat to Badarpur NESIDS-OTRI NLCPR Power Department 2004-09-28 4.63 2006-09-30 4.1677 0 4.1677 4.3297 Completed
1978 MEGHALAYA Power Construction of 220 KV D/C Transmission Line from Misa (Assam) to Byrnihat (Meghalaya) NESIDS-OTRI NLCPR Power Department 2007-09-28 63.37 2010-03-31 56.03 0 56.03 56.03 Completed
1979 MEGHALAYA Power Construction of DC line from Rongkhon to Ampati along with 2x20 MVA, 132/33 KV Sub-Station at Ampati NESIDS-OTRI NLCPR Power Department 2010-03-25 30.7933 2012-03-31 27.1705 0 27.1705 27.1705 Completed
1980 MEGHALAYA Power Construction of new 132 kv S/C line connecting Khleihriat S/S (PGCIL) and Khliehriat (MeSEB) at Khleihriat NESIDS-OTRI NLCPR Power Department 2004-12-28 2.52 2006-12-31 2.1986 0 2.1986 2.2924 Completed
1981 MEGHALAYA Power Electrification of Tribal Villages NESIDS-OTRI NLCPR Power Department 2000-10-06 1.5 2003-10-31 1.341 0 1.341 1.49 Completed
1982 MEGHALAYA Power Lilo of one circuit of palatana-Bongaigaon at Killing with 400/220 KV 2315 MVA GIS Sub-Station in Meghalaya NESIDS-OTRI NLCPR Power Department 2011-07-06 99.6665 2013-12-31 88.1609 0 88.1609 88.1609 Completed
1983 MEGHALAYA Power Sanction of 30 Grant in the Project Construction of Ganol Hydro Electric Project (22.5 MW) at Tura, West Garo Hills NESIDS-OTRI NLCPR Dept of Planning 2008-09-30 36.7238 2011-02-28 33.0436 0 33.0436 33.0436 Ongoing
1984 MEGHALAYA Power Sanction of 30 Grant in the Project New Umtru Hydro Electric Project (2x20 MW) at Ri Bhoi District NESIDS-OTRI NLCPR Power Department 2008-09-30 48.2884 2011-03-31 43.32 0 43.32 43.32 Completed
1985 MEGHALAYA Power Sub Transmission & Distribution Scheme - Master plan for distribution of power in Meghalaya NESIDS-OTRI NLCPR Power Department 2003-01-30 24 2005-06-30 20.8692 0 20.8692 22.8362 Completed
1986 MEGHALAYA Power Sub Transmission & Distribution Scheme - Improvement of power supply in Shillong NESIDS-OTRI NLCPR Power Department 2000-10-16 6.33 2003-03-31 5.697 0 5.697 6.33 Completed
1987 MEGHALAYA Power Sub Transmission & Distribution Scheme - Improvement of power supply in Tura NESIDS-OTRI NLCPR Power Department 2000-10-16 12.03 2003-03-31 10.827 0 10.827 12.03 Completed
1988 MEGHALAYA Power Sub Transmission & Distribution Scheme - T&D scheme - commissioning of transformer at Khliehriat NESIDS-OTRI NLCPR Power Department 2003-01-30 1.64 2003-12-24 1.476 0 1.476 1.64 Completed
1989 MEGHALAYA Power Sub Transmission & Distribution Scheme - T&D scheme - commissioning of transformer at NEHU NESIDS-OTRI NLCPR Power Department 2002-04-22 2 2004-04-30 1.8 0 1.8 2 Completed
1990 MEGHALAYA Roads and Bridges Construction and Strengthening of Jakrem - Ranikor Road ( 6-15 Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-07-13 4.164 2010-03-31 3.3324 0 3.3324 3.3324 Completed
1991 MEGHALAYA Roads and Bridges Construction including M & BT of a road from G. S. Road NH 40 to Nongthymmai Umsning (4.311 Km) Ri-Bhoi Distt. in Meghalaya NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2011-09-16 4.2615 2014-08-31 3.6414 0 3.6414 3.6414 Completed
1992 MEGHALAYA Roads and Bridges Construction including M&BT of Intermediate lane on Rongjeng Mangsang Adokgre Road from 0.00 Km to 32.00 Km. including 90.00 m bridge over lldek river at 44th Km in Meghalaya NESIDS-OTRI NLCPR Public works Department 2017-06-19 123.28 2019-06-30 99.7614 4.8268 104.5882 91.8375 Ongoing
1993 MEGHALAYA Roads and Bridges Construction including metalling and black topping of Lumshnong - Umlong Road (0-8 km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-09-26 6.0176 2010-03-31 5.31 0 5.31 5.31 Completed
1994 MEGHALAYA Roads and Bridges Construction including Metalling and Blacktopping of a road from Khliehtrshi (near ATS) to meet Jowai Bypass (4.03 KM) in jaintia Hills District NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2013-02-27 5.3094 2015-12-31 4.6651 0 4.6651 4.6651 Completed
1995 MEGHALAYA Roads and Bridges Construction including metalling and blacktopping of a Road from Mushut to Lumputhoi via Rngad (12 Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-12-26 4.8721 2009-12-31 4.2989 0 4.2989 4.2989 Completed
1996 MEGHALAYA Roads and Bridges Construction including metalling and Blacktopping of Bandapara-Mallangkona of Shallang road (52 KM) phase- I 10.00 Km- West Garo Hills Distt. in Meghalaya NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2011-07-08 10.7209 2014-06-30 9.4338 0 9.4338 9.4338 Completed
1997 MEGHALAYA Roads and Bridges Construction length of possengagre to Anangpara including Metalling and Blacktopping upto Anchenggre in Meghalaya NESIDS-OTRI NLCPR Dept. of Power 2012-03-12 6.8894 2012-03-12 5.4937 0 5.4937 5.4937 Ongoing
1998 MEGHALAYA Roads and Bridges construction of an approach road from Chokpot in South Garo Hills to Jetra (jetragre) (0-17 Km) NESIDS-OTRI NLCPR Dept. of Power 2014-06-09 17.6476 2014-06-24 15.8829 0 15.8829 15.8828 Ongoing
1999 MEGHALAYA Roads and Bridges Construction of including Metalling and Blacktopping of a Road from Sohbar to Tharia (13Km) in Meghalaya NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2012-06-28 6.6585 2015-07-31 5.9927 0 5.9927 5.9927 Completed
2000 MEGHALAYA Roads and Bridges Construction of major bridge over River Daru on Jholgaon-Katuli in Meghalaya NESIDS-OTRI NLCPR Public works Department 2017-06-19 14.7 2019-06-30 12.8321 0 12.8321 12.8321 Completed
2001 MEGHALAYA Roads and Bridges Construction of RCC Bridge over River Daru on Ampati-Purkashia Road (2nd km) to Ampati Village NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2005-12-23 5.068 2007-12-31 3.4261 0 3.4261 3.4261 Completed
2002 MEGHALAYA Roads and Bridges Construction of RCC bridges No. 3/1 7/1 7/2 and 8/1 on Ampati - Mankchar Road NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2012-02-15 5.0004 2012-02-15 4.4121 0 4.4121 4.4121 Completed
2003 MEGHALAYA Roads and Bridges Construction of remaining portion of Mawsahew- Nongsteng-Umblai-Mawphu Road (6th to 13th Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2008-09-30 9.5388 2010-10-31 6.8679 0 6.8679 3.2811 Foreclosed
2004 MEGHALAYA Roads and Bridges Construction of road from Rongjeng-Mangsang-Adorgre road including metalling and blacktopping (33rd to 38th Km) with bridges (5.16 Km) NESIDS-OTRI NLCPR Dept. of Power 2010-03-25 4.3924 2012-03-31 3.041 0 3.041 3.041 Ongoing
2005 MEGHALAYA Roads and Bridges Construction of Road from Rongsang A.Bagre to Bandalkona connection Betasing-Mellim Road with bridges in the State of Meghalaya NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2017-05-25 13.7608 2019-05-25 12.3847 0 12.3847 12.3847 Completed
2006 MEGHALAYA Roads and Bridges Improvement including Metalling & Blacktopping of road from Sonapur (NH-44) to Lad Borsora (10 Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2008-10-10 8.3299 2011-10-31 7.3499 0 7.3499 7.3499 Completed
2007 MEGHALAYA Roads and Bridges Improvement including metalling and blacktopping of Mawkyrwat - Rangblang Road (12th to 19th Km) (8 Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-09-27 4.8 2010-03-31 4.32 0 4.32 4.32 Completed
2008 MEGHALAYA Roads and Bridges Improvement including metalling and blacktopping of Mukhaialong Lumshyrmit Road (19 km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-11-16 9.11 2010-11-30 8.0383 0 8.0383 8.0383 Completed
2009 MEGHALAYA Roads and Bridges Improvement, Metalling & Blacktopping of a road from NH-51 to Rongsigre (4.725 Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-12-31 3.2708 2009-12-31 2.8868 0 2.8868 2.8868 Completed
2010 MEGHALAYA Roads and Bridges Improvement, widening including metalling and blacktopping of Dkhiah - Sutnga - Saipung - Mouslei - Halflong Road (16 Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-03-26 7.2208 2010-03-31 6.3094 0 6.3094 6.3094 Completed
2011 MEGHALAYA Roads and Bridges Improvement, Widening, Strengthening including Metalling & Blacktopping of a road from 9th Mile of NH-37 (Guwahati - Shillong road) to Killing ? Pilangkata (6.00KM) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-09-28 3.1273 2009-03-31 2.7594 0 2.7594 2.7594 Completed
2012 MEGHALAYA Roads and Bridges Improvement, widening, strengthening including Metalling and Blacktopping of a road 9th Mile NH-37 Guwahati-Shillong road to Killing Pillankata (7th to21.50km) in Meghalaya NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2010-12-23 10.9617 2014-01-31 9.2309 0 9.2309 9.2309 Completed
2013 MEGHALAYA Roads and Bridges Improvement, Widening, Strengthening including Reconstruction of Bridges and Culverts of Rymbai - Iapmala - Suchen Road (1-17 Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2005-12-28 18.7749 2007-12-31 16.4053 0 16.4053 16.4053 Completed
2014 MEGHALAYA Roads and Bridges Improvement/construction including Metalling and Blacktopping of a double lane road from Rymbai to Deichynrum (7Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2009-02-20 6.0256 2012-02-29 5.3167 0 5.3167 5.3167 Completed
2015 MEGHALAYA Roads and Bridges Missing approaches of bridge over Kalipai river on Rymbai-Lampala-Suchen road in Jaintia Hills district NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2014-03-27 4.6761 2017-02-28 4.2084 0 4.2084 4.2084 Completed
2016 MEGHALAYA Roads and Bridges Providing passing places in portion from 0 to 9-th Km. Of Smit- Mawkynrew- Mawlat Road etc. NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2001-07-11 4.93 2004-07-31 4.437 0 4.437 4.93 Completed
2017 MEGHALAYA Roads and Bridges Re-Construction of SPT bridge No. 14/1 over Umngi River to Permanent RCC Bridge at 14th km of Laitmawsiang-Mawthawpdah road including approaches - West Khasi Hills Distt. in Meghalaya NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2010-12-23 7.0661 2014-01-31 5.9 0 5.9 5.9 Completed
2018 MEGHALAYA Roads and Bridges Reconstruction of bridge over river Leiten (Bridge No-31/1) on Dkhiah-Sutnga-Saipung-Mawblei-Halflong Road NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-09-27 2.4315 2010-03-31 2.1454 0 2.1454 2.1454 Completed
2019 MEGHALAYA Roads and Bridges Reconstruction of Bridges and Approaches on Damalgre - Mellim Boldamgiri road, Tura (Bridge No.5/3, 8/5, 9/1 and 10/2) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2009-09-30 11.4694 2011-09-30 10.1201 0 10.1201 10.1201 Completed
2020 MEGHALAYA Roads and Bridges Reconstruction of Bridges and Approaches on Mawphlang - Balat Road NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2005-10-18 9.0053 2008-11-18 7.8686 0 7.8686 7.8686 Completed
2021 MEGHALAYA Roads and Bridges Reconstruction of bridges on Kherapara to Dekubazar (Br.No.2/5, 5/3 & 10/2) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2010-02-02 8.5289 2013-01-31 7.0465 0 7.0465 7.0465 Foreclosed
2022 MEGHALAYA Roads and Bridges Reconstruction of BUG bridge No. 9/3 and 9/4 with RCC pemanent bridge including approavhes on Rongrenggre-Simsanggre-Nengkhra Road - East Garo Hills Distt. in Meghalaya NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2012-05-21 3.7336 2016-04-30 3.1341 0 3.1341 3.1341 Completed
2023 MEGHALAYA Roads and Bridges Rehabilitation of Lyngkhat - Dawki Road (9.75 km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2009-09-30 11.6085 2012-09-30 10.2429 0 10.2429 10.2429 Completed
2024 MEGHALAYA Roads and Bridges Strengthening improvement including metalling & blacktopping of road from Bholaganj to Nongiri, including construction of a major bridge at Tharia over river Wahrew NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2012-01-02 29.3689 2012-01-02 25.9137 0 25.9137 25.7537 Completed
2025 MEGHALAYA Roads and Bridges Strengthening including widening of existing pavement into Intermediate Lane of 4.75 m. width of Mawshynrut- Nongchau Rd. NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2001-07-11 7.3261 2004-03-31 6.5935 0 6.5935 7.3261 Completed
2026 MEGHALAYA Roads and Bridges Strengthening of Baghmara-Maheshkhola Road (Strengthening of weak pavement from 35th Km. To 74th Km. In diff. Kms-15). NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2001-07-11 1.86 2004-03-31 1.674 0 1.674 1.86 Completed
2027 MEGHALAYA Roads and Bridges Sutnga-Sumer Road (20 km)- Widening Metalling and Blacktopping in Jaintia Hills District NESIDS-OTRI NLCPR Public works Department 2014-12-29 21.1972 2017-12-31 19.0775 0 19.0775 19.3275 Completed
2028 MEGHALAYA Roads and Bridges Upgradation and Strengthening of Garobadha - Betasing Raod via Rangasakhona (from 6th Km of GR road upto 6th Km of BM road via Khasibil) in Tura District (7.833 Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-12-31 11.3756 2009-12-31 10.0372 0 10.0372 10.0372 Completed
2029 MEGHALAYA Roads and Bridges Upgradation of Double Lane and Strengthening of Dkhiah - Sutnga - Saipung - Moulsei - Haflong Road (9th to 16th km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2005-10-18 4.4588 2008-11-18 3.896 0 3.896 3.896 Completed
2030 MEGHALAYA Roads and Bridges Widening & Strengthening of Damara-Mendipathar-Songsak-Williamnagar Road (Conversion of SPT bridges to RCC bridges) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2012-01-02 5.9483 2012-01-02 4.8839 0 4.8839 4.8839 Completed
2031 MEGHALAYA Roads and Bridges Widening and Strengthening of hard crust on Mawngap-Mairang Road (5th to 24th Km.) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2001-07-11 4.52 2004-03-31 4.068 0 4.068 4.52 Completed
2032 MEGHALAYA Roads and Bridges Widening of road to double lane from Araimile to Dakopgre of Tura town (4 Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-09-27 3.1383 2010-03-31 2.7691 0 2.7691 2.7691 Completed
2033 MEGHALAYA Roads and Bridges Widening of roads into double lane in Williamnagar town (8 Km) NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2008-03-28 15.1267 2011-03-31 13.3471 0 13.3471 13.3471 Completed
2034 MEGHALAYA Roads and Bridges Widening to double lane standard including M&BT of Dkhiah-Sutanga-Saipung-Moulsei-Halflong Road (portion 1st to 8th and 18th Km), Jaintia Hills District, Meghalaya NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2010-11-09 15.775 2013-10-31 13.2459 0 13.2459 13.2459 Completed
2035 MEGHALAYA Sports Football Stadium at Ampati NESIDS-OTRI NLCPR Dept of Planning 2016-03-15 38.2068 2019-03-31 34.3861 0 34.3861 27.5088 Ongoing
2036 MEGHALAYA Tourism and Culture International centre for performing Arts & Culture,Shillong NESIDS-OTRI NLCPR Dept. of Power 2014-03-27 151.3331 2017-02-28 136.1938 0 136.1938 136.1938 Completed
2037 MEGHALAYA Water Supply Greater Raliang Water Supply Project NESIDS-OTRI NLCPR Dept. of Power 2010-02-16 21.562 2013-02-28 19.0253 0 19.0253 19.0253 Ongoing
2038 MEGHALAYA Water Supply Greater Selsella Water Supply Scheme (Tura North Division) NESIDS-OTRI NLCPR PHE 2012-12-26 12.04 2015-12-31 10.836 0 10.836 10.836 Completed
2039 MEGHALAYA Water Supply Greater Shilong Water Supply Scheme, Shilong NESIDS-OTRI NLCPR PHE 1999-01-01 35.79 2002-03-31 32.211 0 32.211 35.79 Completed
2040 MEGHALAYA Water Supply Greater Sohrybgkham Water Supply Scheme (Hills Division) NESIDS-OTRI NLCPR PHE 2010-03-04 6.7024 2013-02-28 5.8515 0 5.8515 5.8515 Completed
2041 MEGHALAYA Water Supply Greater Umsning Water Supply Scheme (Umsning Division) NESIDS-OTRI NLCPR PHE 2010-03-04 11.2828 2013-02-28 9.9554 0 9.9554 9.9554 Completed
2042 MEGHALAYA Water Supply Ialong Combined Water Supply Scheme (Jowai Division) Meghalaya NESIDS-OTRI NLCPR PHE 2010-08-26 4.5984 2012-07-31 4.0574 0 4.0574 4.0574 Completed
2043 MEGHALAYA Water Supply Jowai Water Supply Project NESIDS-OTRI NLCPR PHE 2003-03-21 15.41 2005-03-31 12.8456 0 12.8456 13.2756 Completed
2044 MEGHALAYA Water Supply Mairang Water Supply Scheme NESIDS-OTRI NLCPR PHE 2005-12-27 7.6927 2008-12-31 6.7218 0 6.7218 6.7219 Completed
2045 MEGHALAYA Water Supply Mawsynram Water Supply Scheme (Hills Division) NESIDS-OTRI NLCPR PHE 2010-03-09 3.8838 2013-03-31 3.4268 0 3.4268 3.4268 Completed
2046 MEGHALAYA Water Supply Nongpoh Urban Water Supply Scheme NESIDS-OTRI NLCPR PHE 2007-03-26 17.4672 2010-03-31 15.2626 0 15.2626 15.2616 Completed
2047 MEGHALAYA Water Supply Tura Phase-III Water Supply Project NESIDS-OTRI NLCPR PHE 2003-03-21 21.58 2006-03-31 18.531 0 18.531 19.7858 Completed
2048 MEGHALAYA Water Supply Umroi Water Supply Scheme (Umsning Division), Meghalaya NESIDS-OTRI NLCPR PHE 2010-08-26 9.2036 2013-07-31 8.1208 0 8.1208 8.1208 Completed
2049 MEGHALAYA Water Supply Upper Shillong Water Supply Project NESIDS-OTRI NLCPR Dept. of Power 2010-12-23 33.0236 2014-01-31 29.1412 0 29.1412 29.1412 Ongoing
2050 MEGHALAYA Agriculture and Allied Integrated farming on Piggery-cum-fish Culture in villages under Umling, Jirang C&RD Blocks in Ri-Bhoi district, Meghalaya Schemes of NEC Schemes of NEC 2024-03-13 2.03 2026-03-13 0.51 1.525875 2.035875 2.0359 Ongoing
2051 MEGHALAYA Education Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Laitdiengsai and Nongkynrih) Schemes of NEC Dept. of Power 2024-03-13 4.99 2027-03-31 2 1.5 3.5 1.996 Ongoing
2052 MEGHALAYA Education Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Laitryngew and Wahlong) Schemes of NEC Social Welfare Department 2024-03-13 4.97 2027-03-13 1.99 1.5 3.49 1.9898 Ongoing
2053 MEGHALAYA Education Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Mawrah and Pomsohmen) Schemes of NEC Social Welfare Department 2024-04-13 4.4 2027-04-13 1.76 1.5 3.26 1.758 Ongoing
2054 MEGHALAYA Education Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Nongjngi) Schemes of NEC Social Welfare Department 2024-04-13 4.87 2027-04-13 1.95 0 1.95 1.9498 Ongoing
2055 MEGHALAYA Education Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Nongjri in Pynursla) Schemes of NEC Social Welfare Department 2024-04-13 4.08 2027-04-13 1.63 1.428775 3.058775 1.6328 Ongoing
2056 MEGHALAYA Tourism and Culture Development of Skywalk and Tourist Hub at Mawkdok, Sohra, Meghalaya under PM-DevINE PM-DevINE Tourism Department, Govt. 2024-10-29 50.9031 2026-10-30 12.5626 12.5626 Ongoing
2057 MEGHALAYA Tourism and Culture Gap funding for Passenger Ropeway Project at Shillong Peak, Shillong, Meghalaya PM-DevINE Tourism Department, Govt. 2025-01-09 70.11 2027-01-30 17.5275 17.5275 Ongoing
2058 MEGHALAYA Education Construction of RCC building for workshop laboratories, Examination Centre & Cell, Smart Class, Teachers Room, etc at Shillong Polytechnic Schemes of NEC Executive Engineer PWD B, 2025-01-31 14.3133 2027-01-31 3.58 3.58 Ongoing
2059 MEGHALAYA Sports Construction of Synthetic Athletic Track NESIDS-OTRI State Sports Council Govt 2025-01-20 41.9 2027-01-05 0 0 Ongoing
2060 MEGHALAYA Transport and Communication Upgradation of Meghalaya State Wide Area Network MSWAN NESIDS-OTRI IT & Communication Depart 2025-01-28 34.99 2026-01-31 0 0 Ongoing
2061 MEGHALAYA Infrastructure Establishment of a Regional Campus of Indian Institute of Corporate Affairs IICA at Shillong, Meghalaya PM-DevINE Indian Institute of Corpo 2025-03-05 100.95 2028-03-31 0 Ongoing
2062 MEGHALAYA Transport and Communication Construction of Major Bridge including immediate approaches over river Umngot on Jongksha-Kharang-Diengleng-Nongjrong-Moodymmai-Wahiajer road NESIDS-ROADS Public works Department 2025-03-24 21.86 2027-03-23 5 5 Ongoing
2063 MEGHALAYA Industries Construction of footpath, Laying of tiles, re-alignment of pipelines and provision of utility ducts inside the Iewduh market, Shillong Schemes of NEC Shillong Municipal Board 2025-06-25 14.6984 2028-06-25 3.6746 3.6746 Ongoing
2064 MEGHALAYA Infrastructure Gap funding for Unity Mall, New Shillong Township, Umasawli, Meghalaya PM-DevINE Dept of Planning 2025-06-10 72.93 2027-06-30 18.23 36.46 Ongoing
2065 MEGHALAYA Power Construction of 2 x 50 MVA, 132/33kV Substation at Mawkhan, East Khasi District, Meghalaya, alongwith the construction of 132kV D/C Saiseij-Mawkhan Kine and GIS Bay at Saiseij, Meghalaya PM-DevINE Department of Power, Megh 2025-08-25 72.48 2028-08-31 0 Ongoing
2066 MEGHALAYA Tourism and Culture Development of Sohra Tourism Circuit PM-DevINE TOURISM DEPARTMENT 2025-10-31 233.75 2027-10-31 0 Ongoing
2067 MEGHALAYA Industries Setting up of Integrated Entrepreneurship & Livelihood Centre for Tribal Youths, Women Entrepreneurs & Farmers in Meghalaya. Schemes of NEC Meghalaya Basin Managemen 2025-12-22 10 2027-12-22 0 Ongoing
2068 MEGHALAYA Education Construction of RK Mission School, Sohra, Meghalaya, under Focused Development of Deprived Areas; Deprived Sections of Society By Promotion Of Literacy By Upgrading Selected RK Mission Schools in Meghalaya. Schemes of NEC Directorate Of Social Wel 2026-01-07 9.1547 2028-01-07 0 Ongoing
2069 MEGHALAYA Transport and Communication Construction of road from Shkentalang NH206 to Lumshyrmit including major bridge on Myntdu river for connectivity to NH6 at Kongong Length-18.64 km NESIDS-ROADS PWD Roads 2026-01-05 70.14 2028-07-05 0 Ongoing
2070 MIZORAM Health Construction of 100 Bedded Kolasib District Hospital and Procurement of Hospital and procurement of Hospital Equipment, Kolasib, Mizoram NESIDS-OTRI NESIDS PUBLIC WORK DEPARTMENT 2022-03-16 22 2025-03-21 14.2903 3 17.2903 5.9883 Ongoing
2071 MIZORAM Health Construction of 50 Bedded District Hospital Complex and Procurement of Equipment at Hnahthial District NESIDS-OTRI NESIDS PUBLIC WORK DEPARTMENT 2024-01-01 17.85 2028-01-01 3.4471 3.4471 Ongoing
2072 MIZORAM Health Construction of 50 Bedded District Hospital Complex and Procurement of Equipment at Khawzawl, Mizoram NESIDS-OTRI NESIDS PUBLIC WORK DEPARTMENT 2023-12-15 17.7505 2025-12-15 3.3037 3.3038 6.6075 Ongoing
2073 MIZORAM Health Construction of 50 Bedded District Hospital Complex and Procurement of Equipment at Saitual Mizoram NESIDS-OTRI NESIDS PUBLIC WORK DEPARTMENT 2023-12-15 16.9605 2025-12-15 3.7853 3.7853 Ongoing
2074 MIZORAM Health Construction of State Resource Centre for HIV/AIDS at Aizawl, Mizoram NESIDS-OTRI NESIDS PUBLIC WORK DEPARTMENT 2022-03-16 4 2024-03-21 2.8038 0.8013 3.6051 1.342 Ongoing
2075 MIZORAM Health Construction of two Residential Hostels at Zoram Medical College,Falkawn,Mizoram NESIDS-OTRI NESIDS Public Health & Engg Depa 2021-03-09 20 2023-03-09 19.3728 0.6272 20 17.7 Ongoing
2076 MIZORAM Health Purchase of 2 (two) Truenat Quattro machines in Mizoram to combat pandemic Covid-19 (for Lawngtlai and Serchhip District) NESIDS-OTRI NESIDS Dept. of Health & familly 2021-09-30 0.2912 2022-09-30 0.2912 0 0.2912 0.2912 Completed
2077 MIZORAM Health Purchase of RT-PCR reagents & RNA extraction kits to last for approximately six months for Zoram Medical College, Falkawn, Mizoram in combating Covid-19. NESIDS-OTRI NESIDS Dept. of Health & familly 2021-09-30 2.5317 2022-09-30 2.2266 0 2.2266 2.2235 Completed
2078 MIZORAM Health Renovation/Upgradation of NICU/PICU and HDU at Zoram Medical College, Falkawn, Mizoram NESIDS-OTRI NESIDS Dept. of Health & familly 2021-08-27 2.7731 2023-09-01 2.1994 0 2.1994 0.1 Ongoing
2079 MIZORAM Health Strengthening Health Infrastructure for Comprehensive response to possible Outbreak of COVID-19 in Mizoram under NESIDS NESIDS-OTRI NESIDS DIRECTORIATE OF HEALTH &M 2020-05-28 16.1626 2024-03-21 12.7493 0 12.7493 11.8219 Ongoing
2080 MIZORAM Health Up-gradation of Cardiology, Department at Civil Hospital, Aizwal in Mizoram NESIDS-OTRI NESIDS DIRECTORIATE OF HEALTH &M 2022-04-20 10.45 2024-04-30 0.9942 8.6742 9.6684 0.3976 Ongoing
2081 MIZORAM Agriculture and Allied Bamboo development project in Mizoram Schemes of NEC Schemes of NEC 2021-01-05 11.14 2023-01-05 11.14 0 11.14 11.14 Completed
2082 MIZORAM Agriculture and Allied Community Bio-diversity conservation project, Mizoram. Schemes of NEC Schemes of NEC 2005-02-22 0.7414 2008-02-22 0.68 0 0.68 0.68 Completed
2083 MIZORAM Agriculture and Allied Cultivation of Aloe Vera in Chhanchhuhna Khawpui in Darlawan RD Block, Mizoram (Location: Saiha dist) Schemes of NEC Schemes of NEC 2012-11-29 4.466 2015-11-29 4.41 0 4.41 4.41 Completed
2084 MIZORAM Agriculture and Allied Cultivation of Mushroom at Chite, Mizoram. Schemes of NEC Schemes of NEC 2006-10-18 0.2276 2009-10-18 0.2 0 0.2 0.2 Completed
2085 MIZORAM Agriculture and Allied Development of Identified Backward Blocks under 30 PC Central Sector Scheme of NEC in Bunghmun W Block of Lunglei District, Mizoram , Mizoram Schemes of NEC Schemes of NEC Dept. of Power 2020-11-08 2.6353245 2023-11-08 2.99 0 2.99 1.6435 Completed
2086 MIZORAM Agriculture and Allied Development of Identified Backward Blocks under 30 PC Central Sector Scheme of NEC in Chawngte RD Block, Lawngtlai District, Mizoram Schemes of NEC Schemes of NEC 2020-12-01 2.99 2023-12-01 2.99 0 2.99 2.99 Completed
2087 MIZORAM Agriculture and Allied Development of Potato Seed Farm in Mizoram- Quality Seed Production of Potato through Tissue Culture & Apical Rooted Cuttings (ARC) Schemes of NEC Schemes of NEC 2022-03-31 1.98 2026-03-31 1.452 0 1.452 1.45 Ongoing
2088 MIZORAM Agriculture and Allied Establishment of Integrated Horticulture Training Centre at Chite, Aizawl(Location: Aizawl dist) Schemes of NEC Schemes of NEC 2011-05-25 2.66 2014-05-25 2.394 0 2.394 2.39 Completed
2089 MIZORAM Agriculture and Allied Establishment of Piggery farm at TNT Area, Zuangtui, Aizawl, Mizoram. Schemes of NEC Schemes of NEC 2006-06-13 0.2148 2009-06-13 0.19 0 0.19 0.19 Completed
2090 MIZORAM Agriculture and Allied Establishment of Rootstock bank for Grapes at Mualkawi village, Champai district and Scion Bank and Rootstock Bank for Citrus at Maudarh, Lunglei district, Mizoram Schemes of NEC Schemes of NEC 2016-03-18 6.4714 2019-03-18 3.1006 0 3.1006 3.1 Completed
2091 MIZORAM Agriculture and Allied Establishment of State Veterinary Information & Resource Centre, Mizoram Schemes of NEC Schemes of NEC 2023-02-02 9.0185 2026-02-02 2.25 5.5228691 7.7728691 1.1136 Ongoing
2092 MIZORAM Agriculture and Allied Improvement of Mandarin Orange Orchard at Leng Village, Serchhip District Schemes of NEC Schemes of NEC 2017-04-18 1.1701 2020-04-18 1.05 0 1.05 1.05 Completed
2093 MIZORAM Agriculture and Allied Integrated Piggery and Poultry Farming at Ailawng, Mizoram Schemes of NEC Schemes of NEC 2023-03-15 2.92 2026-03-13 2.92 0 2.92 0.1 Ongoing
2094 MIZORAM Agriculture and Allied Integrated Piggery Farming at Lengpui Schemes of NEC Schemes of NEC 2023-03-31 4.9686 2026-03-31 3.73 1.2421 4.9721 2.42 Ongoing
2095 MIZORAM Agriculture and Allied Livestock Rearing for economically backward people of Sinlung Hills Council area,Mizoram Schemes of NEC Schemes of NEC 2023-03-31 4.29 2026-03-31 3.22 0.19825 3.41825 1.6 Ongoing
2096 MIZORAM Agriculture and Allied Management system for controlling milking and animal monitoring solutions, Thuampui, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2017-03-20 2.24 2020-03-20 1.792 0 1.792 1.79 Completed
2097 MIZORAM Agriculture and Allied Marketing of Ginger, Mizoram Schemes of NEC Schemes of NEC 2007-03-08 0.875 2010-03-08 0.79 0 0.79 0.79 Completed
2098 MIZORAM Agriculture and Allied Mithun Multiplication Centre at Lungkawlh Mizoram Schemes of NEC Schemes of NEC Choose... 2022-03-31 5.44 2025-03-31 5.316 0 5.316 3.1378 Ongoing
2099 MIZORAM Agriculture and Allied Plantation of Black Pepper at Sairum, Sihphir, Mizoram Schemes of NEC Schemes of NEC 2017-04-11 0.57 2020-04-11 0.57 0 0.57 0.57 Foreclosed
2100 MIZORAM Agriculture and Allied Proposal of identified block for providing key identified service at Bungtlang South Block, Lawngtlai district, Mizoram Schemes of NEC Schemes of NEC 2022-03-31 4.83 2025-03-31 4.832 0 4.832 2.4227 Completed
2101 MIZORAM Agriculture and Allied Proposal of identified block for providing key identified service at Bungtlang South village, Bungtlang South Block, Lawngtlai district, Mizoram Schemes of NEC Schemes of NEC 2022-03-31 2 2025-03-31 2 0 2 0.8 Completed
2102 MIZORAM Agriculture and Allied Proposal of identified block for providing key identified service at Chawngte Block, Lawngtlai district, Mizoram Schemes of NEC Schemes of NEC 2022-03-31 4.55 2025-03-31 4.55 0 4.55 4.55 Completed
2103 MIZORAM Agriculture and Allied Proposal of identified block for providing key identified service at Marpara South village, West Bunghmun Block, Lunglei district, Mizoram Schemes of NEC Schemes of NEC 2022-03-31 1.87 2025-03-31 1.868 0 1.868 1.868 Completed
2104 MIZORAM Agriculture and Allied Proposal of identified block for providing key identified service at West Bunghmun Block, Lunglei district, Mizoram Schemes of NEC Schemes of NEC 2022-03-31 4.92 2025-03-31 4.92 0 4.92 Completed
2105 MIZORAM Agriculture and Allied Rubber based settlement project village & strategic development initiative in Lai Autonomous district Council, Mizoram Schemes of NEC Schemes of NEC 2017-04-12 4.04 2020-04-12 3.217 0 3.217 3.22 Completed
2106 MIZORAM Agriculture and Allied Setting-up of fish Seed Hatchery-cum-Fish Farming at Darlak, Mamit District, Mizoram. Schemes of NEC Schemes of NEC 2006-10-31 0.1239 2009-10-31 0.11 0 0.11 0.11 Completed
2107 MIZORAM Agriculture and Allied Training on cultivation of kiwi in Mizoram. Schemes of NEC Schemes of NEC 2007-03-01 0.0128 2010-03-01 0.01 0 0.01 0.01 Completed
2108 MIZORAM Education Aspirational District Mamit District, Mizoram Schemes of NEC Schemes of NEC 2019-06-11 1 2022-06-11 1 0 1 1 Completed
2109 MIZORAM Education Backward Community of Lai Community, Lawngtlai District, Mizoram Schemes of NEC Schemes of NEC 2022-03-02 4.7970292 2025-03-02 4.798 0 4.798 3.63 Completed
2110 MIZORAM Education Backward Community of Mara Community, Siaha District (Tipa Block), Mizoram Schemes of NEC Schemes of NEC 2022-03-15 4.9168 2025-03-15 2.3167 1.3741 3.6908 3.5594486 Ongoing
2111 MIZORAM Education Community development progarme for Chakmas Autonomous District Council, Kamalanagar, Lawngtlai District, Mizoram for construction of school building Schemes of NEC Schemes of NEC 2020-10-16 3.09 2023-10-16 3.0913 0 3.0913 2.46 Completed
2112 MIZORAM Education Community development programme for Bru& Chakmas in Mamit District Schemes of NEC Schemes of NEC Dept. of Power 2020-09-18 3.86 2023-09-18 3.8597 0 3.8597 3.14 Completed
2113 MIZORAM Education Community development programme for Bru& Chakmas in Mamit District, C&RD Blocks, West Phaileng Schemes of NEC Schemes of NEC Dept. of Power 2020-09-18 1.5522 2023-09-18 1.5522 0 1.5522 1.22 Completed
2114 MIZORAM Education Community development programme for Chakmas Autnomous District Council, Kamalanagar, Lawngtlai District, Mizoram for rice area expansion Schemes of NEC Schemes of NEC 2020-10-16 2.96 2023-10-16 2.3727 0.5841 2.9568 1.37 Completed
2115 MIZORAM Education Community Hall at Chandmari West, Aizawl Mizoram Schemes of NEC Schemes of NEC 2016-03-17 4.7528 2019-03-17 4.27 0 4.27 4.27 Completed
2116 MIZORAM Education Construction of Comprehensive Spastic Children Care Complex at Bawngkawn, Aizawl Mizoram Schemes of NEC Schemes of NEC 2016-07-21 7.7417 2019-07-21 3.97 0 3.97 3.97 Completed
2117 MIZORAM Education Construction of Multi-Utility cum Community Centre at Tuikual North, Aizawl, Mizoram. Schemes of NEC Schemes of NEC 2022-03-31 2.9991 2025-03-31 2.12 0.4526 2.5726 Ongoing
2118 MIZORAM Education Construction of Observation Home / Special Home Complex at Pukpui Mizoram Schemes of NEC Schemes of NEC 2017-03-21 4.2272 2019-03-21 3.8044 0 3.8044 3.8 Completed
2119 MIZORAM Education Construction of Research Scholars Hostel for Boys & Girls at Mizoram University Schemes of NEC Schemes of NEC 2016-08-26 11.8747 2019-08-26 11.8747 0 11.8747 11.87 Completed
2120 MIZORAM Education Construction of Zomi Cultural Centre and Preservation of ZOMI Historical sites at Champhai, Mizoram Schemes of NEC Schemes of NEC 2022-03-31 4.79 2025-03-31 4.26 0.5285 4.7885 0.76 Ongoing
2121 MIZORAM Education Establishment of Sinlung Hills Council Administrative Complex Mizoram Schemes of NEC Schemes of NEC Choose... 2020-11-17 3.82 2023-11-17 2.11 1.7073628 3.8173628 1.36 Ongoing
2122 MIZORAM Sports Construction of Community Complex at Edenthar, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2016-04-26 4.8152 2019-04-26 4.34 0 4.34 4.34 Completed
2123 MIZORAM Sports Construction of Multipurpose Sports Complex at Aizawl West Joint YMA Field, Vaivakawn, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2016-06-02 9.6 2019-06-02 8.1675 0 8.1675 8.17 Completed
2124 MIZORAM Sports Construction of Youth Recreation Centre-cum- Amalgamated office Complex for Sports & Youth Services Department at New Secretariat Complex, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2016-05-05 10.17 2021-03-31 8.32 0 8.32 8.32 Completed
2125 MIZORAM Sports Establishment of Multipurpose Indoor Hall at Sihphir, Mizoram Schemes of NEC Schemes of NEC 2016-09-26 12.7779 2020-09-17 12.7779 0 12.7779 12.78 Completed
2126 MIZORAM Sports Laying of Artificial Turf at Hnahthial, Mizoram Schemes of NEC Schemes of NEC 2017-08-04 6.829 2020-08-04 5.47 0 5.47 5.47 Completed
2127 MIZORAM Sports Laying of Artificial Turf at Saitual, Mizoram Schemes of NEC Schemes of NEC 2017-07-28 5.3881 2020-07-28 4.316 0 4.316 4.32 Completed
2128 MIZORAM Irrigation and Flood Control Bualpui NG & Lunzarhtum combined WSS, Lawngtlai dist. Schemes of NEC Schemes of NEC 2011-03-11 4.93 2013-03-11 0.2273 0 0.2273 0.23 Completed
2129 MIZORAM Irrigation and Flood Control Constn. Of Check Dam/retaining wall and drainage network to prevent major landslide at the cemetery in Dawrpui Vengthar in Aizawl dist. Schemes of NEC Schemes of NEC 2011-02-01 2.58 2014-02-01 2.32 0 2.32 2.32 Completed
2130 MIZORAM Irrigation and Flood Control Darlawn Water Supply Scheme (Augmen-tation) in Mizoram, Aizawl dist. Schemes of NEC Schemes of NEC 2012-11-26 4.852 2014-11-26 4.37 0 4.37 4.37 Completed
2131 MIZORAM Irrigation and Flood Control East Lungdar Multi village Water Supply Scheme (Pumping), Serchhip District, Mizoram Schemes of NEC Schemes of NEC 2018-02-09 11 2021-02-09 0.1 0 0.1 0.1 Completed
2132 MIZORAM Irrigation and Flood Control FC & Irrigation potential of agricultura areas of Ngopa RD Block, Champhai dist. Schemes of NEC Schemes of NEC 2009-10-07 4.3216 2012-10-07 4.05 0 4.05 4.05 Completed
2133 MIZORAM Irrigation and Flood Control Implementation of Sangau WSS (pumping) Ph.I, Lawngtlai dist. Schemes of NEC Schemes of NEC 2010-01-18 4.84 2013-01-18 3.9915 0 3.9915 3.99 Completed
2134 MIZORAM Irrigation and Flood Control Phuaihbuang Pumping WSS in Mizoram, Aizawl dist. Schemes of NEC Schemes of NEC 2010-09-22 3.915 2013-09-22 3.52 0 3.52 3.52 Completed
2135 MIZORAM Irrigation and Flood Control Sangau Water Supply Scheme (Pumping) Phase-II in Mizoram,Lawngtlai dist. Schemes of NEC Schemes of NEC 2012-11-29 4.716 2015-11-29 4.24 0 4.24 4.24 Completed
2136 MIZORAM Irrigation and Flood Control Sewage Canal-cum-Check dam at Kanan-Dawrpui Vengtahr Aizawl, Mizoram Schemes of NEC Schemes of NEC 2017-08-02 6.62 2020-08-02 5.959 0 5.959 4.8 Ongoing
2137 MIZORAM Irrigation and Flood Control Vairangte Water Supply Scheme, Kolasib dist. Schemes of NEC Schemes of NEC 2013-10-08 7.8311 2016-10-08 0.522 0 0.522 0.52 Completed
2138 MIZORAM Industries Construction of Approach Road and Internal Roads of Industrial Growth Centre at Luangmual, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2016-09-29 9.23 2019-09-29 8.31 0 8.31 8.31 Completed
2139 MIZORAM Industries Construction of Handloom and Weaving Centre at Council Vaih, Saiha Town, Saiha District Schemes of NEC Schemes of NEC 2020-12-14 4.3941 2023-12-14 4.4745 0 4.4745 3.95 Ongoing
2140 MIZORAM Industries Construction of Lunglei Market and Trade Centre at Electric/ Chanmari Veng, Lunglei, Mizoram. Schemes of NEC Schemes of NEC 2022-03-28 14.03 2025-03-28 5.2562159 8.4078 13.6640159 7.89 Ongoing
2141 MIZORAM Industries Construction of Market Building at West Phaileng, Mamit District, Mizoram Schemes of NEC Schemes of NEC Choose... 2023-03-31 2.7825 2026-03-31 0.7 0.695625 1.395625 1.39 Ongoing
2142 MIZORAM Industries Construction of Mission Veng Bazar Complex at Mission Veng, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2014-03-03 5.9841 2018-03-03 5.39 0 5.39 5.39 Completed
2143 MIZORAM Industries Construction of New Market Building at Dawrpui Veng, Aizawl Schemes of NEC Schemes of NEC 2015-06-16 13 2018-06-16 8.712 0 8.712 8.71 Completed
2144 MIZORAM Industries Creation of Passion Fruit Processing Unit at IIDC, Zote, Champhai, Mizoram Schemes of NEC Schemes of NEC 2022-03-27 6.85 2025-03-27 6.35 0 6.35 0.1 Ongoing
2145 MIZORAM Industries Enhancing the value of post-harvest Mizo Ginger to improve socio-economic conditions of marginal tribal farmers in Mizoram Schemes of NEC Schemes of NEC 2020-10-19 2.67 2023-10-19 2.67 0 2.67 2.67 Completed
2146 MIZORAM Industries Establishment of Handloom Production cum training Centre at Phuaibuang, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2020-12-24 3.5 2023-12-24 3.5 0 3.5 3.5 Completed
2147 MIZORAM Industries Fostering Indurtsy Innovation, Infrastructure and Livelihood Opportunities (SDG No. 9) at Lungleng-I and Sialhawk, Mizoram and Strengthening of Food Testing Laboratory Schemes of NEC Schemes of NEC Choose... 2023-03-29 4.84 2026-03-29 3.63 0 3.63 Ongoing
2148 MIZORAM Industries Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19, Phase-II Mizoram Schemes of NEC Schemes of NEC 2020-12-09 2.7036 2023-12-09 2.7036 0 2.7036 2.7 Completed
2149 MIZORAM Industries Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Mizoram under creation of capital assets Schemes of NEC Schemes of NEC 2020-10-16 1.71 2023-10-16 0.1 0 0.1 0.1 Completed
2150 MIZORAM Industries Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Mizoram under Grant-in Aid Schemes of NEC Schemes of NEC 2020-10-16 1.29 2023-10-12 1.29 0 1.29 1.3 Completed
2151 MIZORAM Industries Marketing of Handloom Handicrafts Products of Mizoram by the Mizoram Handloom & Handicrafts Developmet Corporation Ltd. (ZOHANDCO), Aizawl, Mizoram Schemes of NEC Schemes of NEC 2006-03-28 0.4095 2009-03-28 0.37 0 0.37 0.37 Completed
2152 MIZORAM Industries Multi Purpose Post-Harvest Management Project in Mizoram for Post-COVID- Economic Revival Schemes of NEC Schemes of NEC 2021-01-21 4.6136 2024-01-21 4.6136 0 4.6136 4.61 Ongoing
2153 MIZORAM Industries Setting up of a Bamboo Technology Park at Sairang by Bamboo Development Agency, Govt. of Mizoram. Schemes of NEC Schemes of NEC 2006-11-01 2.33 2008-11-01 2.1 0 2.1 2.1 Completed
2154 MIZORAM Industries Setting up of a manufacturing of Round Bamboo Stick, Toothpicks, Splits etc., unit, Mizoram by M/s. MULIT-BAMTEC, Sesawng Village, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2006-06-08 0.8223 2009-06-08 0.74 0 0.74 0.74 Completed
2155 MIZORAM Industries Setting up of a manufacturing of Round Bamboo Stick, Toothpicks, Splits etc., unit, Mizoram by M/s. Zo-BAMTEC, Sesawng Village, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2006-06-08 0.869 2008-03-31 0.78 0 0.78 0.78 Completed
2156 MIZORAM Industries Setting up of a manufacturing of Water Storage Tanks unit, Mizoram by M/s. Zoram Plastic Industry, 28-29 Industrial Area, Zungtui, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2006-03-23 1.0453 2009-03-23 0.94 0 0.94 0.94 Completed
2157 MIZORAM Industries Setting up of a Quality Bakery Products (Mechanized) Industry, Lunglei by M/s. Diki Bakery, Lunglei, Mizoram Schemes of NEC Schemes of NEC 2006-07-28 0.1226 2009-07-28 0.11 0 0.11 0.11 Completed
2158 MIZORAM Industries Upgradation of Mizoram Handloom & Handicrafts Development Corporation Ltd. Schemes of NEC Schemes of NEC 2011-12-07 3.0704 2014-12-07 2.76 0 2.76 2.76 Completed
2159 MIZORAM Information and Public Relatio Construction of Aizawl Institute of Arts & Music for the NER, Tuivamit Tlang, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2023-03-27 6.9 2026-03-27 2.3 3.9111463 6.2111463 3.976488 Ongoing
2160 MIZORAM Information and Public Relatio Construction of Auditorium at bethel veng, Mizoram Schemes of NEC Schemes of NEC Choose... 2023-10-17 14.44 2026-10-17 1.7688897 4.7110103 6.4799 3.23995 Ongoing
2161 MIZORAM Information and Public Relatio Construction of Cultural Centre-cum-Auditorium at Vaivakawn, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2013-01-31 6.1901 2015-01-31 5.57 0 5.57 5.57 Completed
2162 MIZORAM Information and Public Relatio Construction of Lianchhiari Run (A multi-facility Centre) Schemes of NEC Schemes of NEC 2017-04-11 10 2020-04-14 9 0 9 9 Completed
2163 MIZORAM Information and Public Relatio Establishment of Lai Cultural Centre-cum-Auditorium at Lawngtlai, Mizoram Schemes of NEC Schemes of NEC 2017-04-17 4.6662 2022-09-13 4.19 0 4.19 4.19 Completed
2164 MIZORAM Information and Public Relatio Seminar in Nine Different Location in Mizoram organised by Govt.of Mizoram Schemes of NEC Schemes of NEC 2018-04-01 0.27 2021-04-01 0.2 0 0.2 0.2 Completed
2165 MIZORAM Information and Public Relatio Strengthening of Hindi Section in the library of government colleges of Mizoram Schemes of NEC Schemes of NEC 2021-02-03 0.3 2025-03-27 0.3 0 0.3 0.3 Ongoing
2166 MIZORAM Health Accident & Trauma Center, Kolasib, Mizoram Schemes of NEC Schemes of NEC 2005-12-19 1.4105 2008-12-19 1.2695 0 1.2695 1.27 Completed
2167 MIZORAM Health Accident & Trauma Center, Serchhip, Mizoram Schemes of NEC Schemes of NEC 2005-12-19 1.4105 2008-12-19 1.27 0 1.27 1.27 Completed
2168 MIZORAM Health Bio-Medical Waste Management Incinerators System for District Hospital, Lawngtlai, Champhai, Mamit & Serchhip in Mizoram Schemes of NEC Schemes of NEC 2016-07-20 4.68 2019-07-20 4.212 0 4.212 4.21 Completed
2169 MIZORAM Health Construction of 60 Bedded intern hospital at Zoram Medical Collge, Falkawn, Mizoram Schemes of NEC Schemes of NEC 2022-03-17 6.79 2025-03-17 5.1 1.69 6.79 4.42 Ongoing
2170 MIZORAM Health Construction of Central Medical Warehouse at Muallungthu, Mizoram Schemes of NEC Schemes of NEC Choose... 2023-03-31 13 2026-03-31 3.25 1.85 5.1 Ongoing
2171 MIZORAM Health Construction of Main Building of School of Nursing, Synod Hospital, Durtlang, Mizoram Schemes of NEC Schemes of NEC 2017-08-08 8.33 2020-08-08 7.497 0 7.497 7.5 Completed
2172 MIZORAM Health Construction of Mizoram Ayush Development Centre at New Capital Complex (MINECO), Aizawl, Mizoram Schemes of NEC Schemes of NEC 2022-02-23 2.6416 2025-02-23 1.98 0.66 2.64 1.08 Ongoing
2173 MIZORAM Health Construction of Patient Lodging and Staff Quarters (Type-III & IV) at Mawdiangdiang near NEIGRIHMS, Shillong Schemes of NEC Schemes of NEC Choose... 2020-12-23 4.1967 2023-12-23 1.68 2.4143 4.0943 1.47 Ongoing
2174 MIZORAM Health Establishment of 6 bedded ICU at Presbyterian Hospital, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2007-05-02 2.2952 2010-05-02 2.0657 0 2.0657 2.07 Completed
2175 MIZORAM Health Establishment of Dialysis Unit at 50 Bedded Hospital, Lawngtlai Schemes of NEC Schemes of NEC 2021-01-06 0.548 2024-01-06 0.5438052 0 0.5438052 0.25 Completed
2176 MIZORAM Health Establishment of State Medical Library at Civil Hospital, Aizawl Schemes of NEC Schemes of NEC 2014-02-12 3.6118 2017-02-12 3.25 0 3.25 3.25 Completed
2177 MIZORAM Health Purchase of CT Scan Machine (16 Slices) for Civil Hospital, Lunglei, Mizoram Schemes of NEC Schemes of NEC 2016-07-20 2.28 2019-07-26 2.05 0 2.05 2.05 Completed
2178 MIZORAM Health Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Mizoram for activities related to combating COVID-19 pandemic Schemes of NEC Schemes of NEC 2020-04-01 3 2023-04-01 3 0 3 3 Completed
2179 MIZORAM Health Release of grants to the Government of Mizoram for procurement of PPE Suits and Test Kits related to combating COVID-19 pandemic Schemes of NEC Schemes of NEC 2020-09-07 0.8 2023-09-07 0.8 0 0.8 0.8 Completed
2180 MIZORAM Health Strengthening & Improvement of CSSD in District Hospitals (5 nos.), Mizoram Schemes of NEC Schemes of NEC 2009-08-18 3 2012-08-18 2.7 0 2.7 2.7 Completed
2181 MIZORAM Health Strengthening of Cardiology Department at Civil Hospital, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2012-11-26 4.99 2015-11-26 4.491 0 4.491 4.49 Completed
2182 MIZORAM Health Strengthening of Dental Departments at Civil Hospital, Aizawl and District Hospitals in Mizoram Schemes of NEC Schemes of NEC 2018-10-29 4.418 2019-09-17 3.98 0 3.98 3.98 Completed
2183 MIZORAM Health Support for Development & Implementation of Hospital Management Information System (HMIS) at Civil Hospital, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2011-03-14 4.6651 2014-03-14 4.1986 0 4.1986 4.2 Completed
2184 MIZORAM Health Support for Procurement of CT Scan (16 Slices) machine at Civil Hospital, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2012-01-03 2.8 2015-01-03 2.52 0 2.52 2.52 Completed
2185 MIZORAM Power 132 KV Central Sub-Station at Melriat Schemes of NEC Schemes of NEC 2006-03-17 13.4144 2008-03-17 12.07 0 12.07 12.07 Completed
2186 MIZORAM Power Construction 132kV khumtung -1 Bay at Melriat Schemes of NEC Schemes of NEC 2010-09-20 3.96 2013-09-20 3.56 0 3.56 3.56 Completed
2187 MIZORAM Power Construction 132kV khumtung -I1 Bay at Melriat Schemes of NEC Schemes of NEC 2011-03-22 2.32 2013-03-22 2.09 0 2.09 2.09 Completed
2188 MIZORAM Power Construction of 132 KV S/C line on D/C tower from Bairabi to W. Phaileng via Mamit with associated bays (74 Ckm) in Mizoram Schemes of NEC Schemes of NEC 2017-06-19 54.95 2020-06-19 49.455 0 49.455 49.46 Completed
2189 MIZORAM Power Construction of 132 KV S/C Transmission line from Melriat Substation (14.5 Ckm) to Luangmual and 132 KV Bay at Luangmual, Aizawl Schemes of NEC Schemes of NEC 2009-01-29 4.9935 2012-01-29 4.49 0 4.49 4.49 Completed
2190 MIZORAM Power Construction of 1X2.5 MVA, 33/11KV S/s at Buarpui & Saiphai with associated lines, Mizoram Schemes of NEC Schemes of NEC 2014-02-26 13.7 2017-02-26 12.33 0 12.33 12.33 Completed
2191 MIZORAM Power Construction of 33 KV Transmission line from Serchhip Substation to Sialsuk with 33 KV Substation at Sialsuk, Mizoram Schemes of NEC Schemes of NEC 2009-01-23 4.97 2013-01-23 4.47 0 4.47 4.47 Completed
2192 MIZORAM Power Construction of 33/11kV Sub-Station at Durtlang with 9kms 33kV line from 132kV Zuangtui Sub-Station, Mizoram Schemes of NEC Schemes of NEC 2012-02-29 4.8079 2012-02-29 4.33 0 4.33 4.33 Completed
2193 MIZORAM Power Construction of 33kV S/C on DC Tower from Aibawk substation to Sialsuk Substation with Associated Bays & 11kV Lines, Mizoram Schemes of NEC Schemes of NEC 2016-02-26 14.78 2019-02-26 13.3 0 13.3 13.3 Completed
2194 MIZORAM Power Construction of new 132kV substation for shifting 132kV Zuangtui substation with associated interlinking 132kV Lines, Aizawl, Mizoram Schemes of NEC Schemes of NEC 2012-07-31 20.77 2015-07-31 18.69 0 18.69 18.69 Completed
2195 MIZORAM Power Construction of Tuiriza(100KW) and Tuiching (100KW) Micro Hydel Project 2X100 KW in Phullen and Hrianghmun, Mizoram Schemes of NEC Schemes of NEC 2012-02-28 1.9557 2015-02-28 1.76 0 1.76 1.76 Completed
2196 MIZORAM Power Improvement of 33kV Sub-Station at Ngopa with associated lines, Mizoram. Schemes of NEC Schemes of NEC 2011-12-26 4.02 2014-12-26 3.62 0 3.62 3.62 Completed
2197 MIZORAM Power Renovation & modernization of 132KV S/s at Bukpuii, Serchhip. Schemes of NEC Schemes of NEC 2011-03-22 4.57 2014-03-22 4.11 0 4.11 4.11 Completed
2198 MIZORAM Power Strengthening of 33/11kV Sub-Station at Zaizawhtlang and Thenhlum with associated, Mizoram Schemes of NEC Schemes of NEC 2017-04-19 5.25 2020-04-19 3.8 0 3.8 3.8 Completed
2199 MIZORAM Power Strengthening of 33/11kV substation at Vairengte (2.5 MVA) and Thingsulthliah (1.6MVA), Mizoram Schemes of NEC Schemes of NEC 2015-09-06 5.72 2018-09-06 5.15 0 5.15 5.15 Completed
2200 MIZORAM Science and Technology Afforestation of Denuded Hills in Champhai District of Mizoram Schemes of NEC Schemes of NEC 2020-11-23 2 2023-11-23 1.5 0.45 1.95 1.1 Ongoing
2201 MIZORAM Science and Technology Computerization of Cadastral Mapping, Lunglei District Schemes of NEC Schemes of NEC 2005-03-31 2.0883 2009-03-31 2.0883 0 2.0883 2.09 Completed
2202 MIZORAM Science and Technology Delineation of Urban Development Zones with special reference to Landslide Risk & Slope stability of AizawlCity, Mizoram Schemes of NEC Schemes of NEC 2014-05-27 2.381 2017-05-27 2.14 0 2.14 2.14 Completed
2203 MIZORAM Science and Technology Development of Comprehensive and Integrated GIS based System for maintenance and Management of Land Records in Mizoram Schemes of NEC Schemes of NEC 2022-03-21 6.4 2025-03-30 3.97 0 3.97 3.97 Ongoing
2204 MIZORAM Science and Technology Digital 3D Terrain Mapping and Modelling of Eight Districts of Mizoram using Geospatial Techniques, Mizoram Schemes of NEC Schemes of NEC 2015-06-18 1.991 2018-06-18 1.79 0 1.79 1.79 Completed
2205 MIZORAM Science and Technology Disaster Management System Project in Mizoram Schemes of NEC Schemes of NEC 2009-01-30 1.85 2013-01-30 1.85 0 1.85 1.85 Completed
2206 MIZORAM Science and Technology E-Governance of Mizoram Board of School Education & Online connectivity with selected schools in Mizoram Schemes of NEC Schemes of NEC 2010-02-08 2.13 2013-02-08 2.13 0 2.13 2.13 Completed
2207 MIZORAM Science and Technology Enhancement of State Revenue through application of information Technology in monitoring Mineral Exploitations & Resource Mapping, Mizoram Schemes of NEC Schemes of NEC 2022-03-31 4.69 2025-03-31 2.8216 1.24628 4.06788 2.54 Ongoing
2208 MIZORAM Science and Technology Establishment of Digital Planetarium at Lunglei, Mizoram. (Mizoram Science, Technology & Innovation Council, Govt. of Mizoram) Schemes of NEC Schemes of NEC 2017-04-19 3.14 2020-03-03 2.826 0 2.826 2.83 Completed
2209 MIZORAM Science and Technology Establishment of Rural Information Kiosks in 300 villages in the state of Mizoram Schemes of NEC Schemes of NEC 2012-03-01 4.8985 2015-03-01 4.41 0 4.41 4.41 Completed
2210 MIZORAM Science and Technology Hazard Risk and Vulnerability Analysis for Eight District Headquarters of Mizoram using Remote Sensing and GIS. (Mizoram Remote Sensing Application Centre. Govt. of Mizoram) Schemes of NEC Schemes of NEC 2016-03-11 2.19 2019-03-11 1.97 0 1.97 1.97 Completed
2211 MIZORAM Science and Technology Infrastructure Development for Biotechnology Cell in Mizoram Schemes of NEC Schemes of NEC Choose... 2022-03-30 3.23 2025-03-30 1.6594 0 1.6594 Ongoing
2212 MIZORAM Science and Technology IT Education and Science & Technology Awareness Programme at 100 schools in Mizoram Schemes of NEC Schemes of NEC 2011-10-21 4.5701 2013-10-21 4.11 0 4.11 4.11 Completed
2213 MIZORAM Science and Technology IT Education Programme for 150 Schools in Mizoram, Mizoram State e-Governance Society (MSeGS), Aizawl Schemes of NEC Schemes of NEC Dept. of Power 2016-03-17 11.08 2019-03-17 11.08 0 11.08 11.08 Ongoing
2214 MIZORAM Science and Technology IT Entrepreneurship Development Programme for Unemployed Youths Schemes of NEC Schemes of NEC 2005-03-31 4.0939 2008-03-31 4.0939 0 4.0939 4.09 Completed
2215 MIZORAM Science and Technology Large Scale Mapping of Wet Rice Cultivation (WRC) Potential area in Mizoram Using Geospatial Techniques. Schemes of NEC Schemes of NEC 2022-03-21 2.1042 2025-03-31 2.11 0 2.11 2.1073 Ongoing
2216 MIZORAM Science and Technology Mizoram Infrastructure Information & Monitoring System Schemes of NEC Schemes of NEC 2012-12-10 2.01 2015-12-10 1.809 0 1.809 1.81 Completed
2217 MIZORAM Science and Technology NER Online Job Portal. Mizoram Youth Commission, Govt. of Mizoram Schemes of NEC Schemes of NEC Choose... 2023-03-31 3 2026-03-31 0 Ongoing
2218 MIZORAM Science and Technology Project Proposal for Internet Connectivity to all Government Offices at District Level, Mizoram, Mizoram State e-Governance Society (MSeGS) Schemes of NEC Schemes of NEC 2017-01-18 1.5035 2020-01-18 1.5035 0 1.5035 1.5 Completed
2219 MIZORAM Science and Technology Rural Monitoring& Information Syatem (RMIS), Mizoram Schemes of NEC Schemes of NEC 2022-03-31 2.49 2025-03-31 2.489 0 2.489 0.99 Ongoing
2220 MIZORAM Transport and Communication Bamboo Resource link road Schemes of NEC Schemes of NEC 2006-03-08 1.09 2009-03-08 0.98 0 0.98 0.98 Completed
2221 MIZORAM Transport and Communication Chalfilh(Vanzau) Tourist centre Schemes of NEC Schemes of NEC 2006-09-08 4.02 2009-09-08 3.8 0 3.8 3.8 Completed
2222 MIZORAM Transport and Communication Chalfilh(Vanzau) Tourist centre Schemes of NEC Schemes of NEC 2004-12-17 3.45 2007-12-17 3.11 0 3.11 3.11 Completed
2223 MIZORAM Transport and Communication Construction of approach road to PSC bridge over River Tlawang on Bairabi Zamuang road Schemes of NEC Schemes of NEC 2016-09-27 4.4493 2019-09-27 4 0 4 4 Completed
2224 MIZORAM Transport and Communication Khedacherra - Damcherra - Kwarthah- Tuilutkawn Schemes of NEC Schemes of NEC 2013-01-09 183.27 2016-01-08 164.937 0 164.937 164.94 Completed
2225 MIZORAM Transport and Communication Lengpui Airport Schemes of NEC Schemes of NEC 2008-07-08 14.92 2011-08-08 13.42 0 13.42 13.42 Completed
2226 MIZORAM Transport and Communication Mamit-Bhairabi Road Schemes of NEC Schemes of NEC 2004-10-19 36.75 2007-10-20 33.57 0 33.57 33.57 Completed
2227 MIZORAM Transport and Communication Saitual-Phullen Schemes of NEC Schemes of NEC 2004-08-18 57.95 2007-08-18 52.65 0 52.65 52.65 Completed
2228 MIZORAM Transport and Communication Saitual-Saichal-NE-Bualpui Schemes of NEC Schemes of NEC 2004-09-27 40.97 2007-09-27 36.74 0 36.74 36.74 Completed
2229 MIZORAM Transport and Communication Serkhan-Baghabazar road Schemes of NEC Schemes of NEC 2011-02-22 187.04 2014-02-22 168.341 0 168.341 168.34 Completed
2230 MIZORAM Transport and Communication Thanlon Singhat (Ngopa Tuivai) Schemes of NEC Schemes of NEC 2010-08-17 67.67 2013-08-17 60.9 0 60.9 60.9 Completed
2231 MIZORAM Transport and Communication Tlabung-Kawpuichhuah road Schemes of NEC Schemes of NEC 2006-12-16 14.94 2009-12-16 13.65 0 13.65 13.65 Completed
2232 MIZORAM Transport and Communication Upgradation at Bhairabi-Zamuang Schemes of NEC Schemes of NEC 2004-10-27 37.68 2007-10-27 35.01 0 35.01 35.01 Completed
2233 MIZORAM Transport and Communication Upgradation of Kaitum-Artahkawn Schemes of NEC Schemes of NEC 2004-09-16 32.3 2007-09-16 30.07 0 30.07 30.07 Completed
2234 MIZORAM Transport and Communication Vaikhawtlang-Khuangphah road Schemes of NEC Schemes of NEC 2005-03-29 4.8582 2008-03-29 4.23 0 4.23 4.23 Completed
2235 MIZORAM Tourism and Culture Biate Tea Tourism Circuit and Nature Camp in Mizoram Schemes of NEC Schemes of NEC Choose... 2023-03-28 3.6962 2026-03-29 2.091 0 2.091 Ongoing
2236 MIZORAM Tourism and Culture Development of Mount Mawma Ecological Park Chakhei Mizoram Schemes of NEC Schemes of NEC Choose... 2022-03-31 2.36 2025-03-31 2.36 0 2.36 Ongoing
2237 MIZORAM Tourism and Culture Discovering Mizoram-for promotion of tourism in the state of Mizoram Schemes of NEC Schemes of NEC 2020-09-29 0.2 2023-09-29 0.2 0 0.2 0.2 Completed
2238 MIZORAM Tourism and Culture Establishing Mizo Cultural Heritage Centre for Protecting the Historical and Natural Heritage of Mizoram at Kawlri, Serchhip District, Mizoram Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.8647 2025-03-31 1.3161 2.4321 3.7482 2.4322 Ongoing
2239 MIZORAM Tourism and Culture Integrated Tourist Circuit, Serchhip, Mizoram Schemes of NEC Schemes of NEC 2020-05-28 4.38 2023-05-28 4.38 0 4.38 4.38 Completed
2240 MIZORAM Tourism and Culture Samthang Zo Phulpui Nature Park, Mizoram Schemes of NEC Schemes of NEC 2021-03-30 3.5921 2024-03-30 3.5921 0 3.5921 3.59 Completed
2241 MIZORAM Tourism and Culture Tourism promotion and capacity building training in Mizoram Schemes of NEC Schemes of NEC 2020-05-29 0.54 2023-05-29 0.5397 0 0.5397 0.54 Completed
2242 MIZORAM Roads and Bridges Construction of Aizawl By-pass on Western Side PM-DevINE Public works Department 2024-02-10 500 2027-11-30 112.95 0 112.95 Ongoing
2243 MIZORAM Roads and Bridges Pilot project for the construction of Bamboo Link Roads at different locations in various districts in the State of Mizoram - (i) Tuirial Airfield to North Chaltlang (18 km) at a cost of Rs. 33.58 Crore and (ii) Lengpui to Saiphal Bamboo Plantation (41 km) at a cost of Rs. 66.42 crore PM-DevINE Public works Department 2023-02-06 100 2025-12-11 36.9348 18.4673 55.4021 9.5434 Ongoing
2244 MIZORAM Power Construction of 2x10 MVA, 33/11 KV Sub-Station Chite with Associated Linking Lines in Mizoram NESIDS-OTRI NESIDS POWER & ELECTRICITY DEPAR 2022-04-20 10.49 2024-04-30 10.2858 0 10.2858 4.1143 Ongoing
2245 MIZORAM Power Construction of 2X6.3 MVA, 132/33 KV Sub-Station at Mamit with associated 33 KV tower line up to Zawlnuam via Zamuang, Mizoram NESIDS-OTRI NESIDS POWER & ELECTRICITY DEPAR 2018-12-04 40.3384 2020-03-31 40.3384 0 40.3384 38.4989 Ongoing
2246 MIZORAM Transport and Communication Component I of Development of Immediately Required Infrastructure for Tourism Development at Reiek and Reiek Tlang in Mizoram under NESIDS NESIDS-ROADS NESIDS Public works Department 2019-12-17 5.6 2020-03-31 5.6 0 5.6 5.6 Completed
2247 MIZORAM Roads and Bridges Development of Village based Eco-Tourism at Khamrang in Mizoram NESIDS-OTRI NESIDS TOURISM DEPARTMENT 2022-04-20 7.8 2024-04-30 0.1 1.85 1.95 0.1 Ongoing
2248 MIZORAM Transport and Communication Improvement & Up-gradation of difference at Lengpui Airport ,Mizoram NESIDS-ROADS NESIDS Public works Department 2021-03-03 19.59 2023-03-03 19.583178 0 19.583178 13.17 Completed
2249 MIZORAM Transport and Communication Improvement and Upgradation of Lawngtlai to Tuipui Ferry Road, Lawgtlai District in Mizoram NESIDS-ROADS NESIDS Public works Department 2019-03-08 26.33 2020-03-31 25.1129 1.21 26.3229 25.1203 Completed
2250 MIZORAM Transport and Communication Daido Vawngkawt Road NESIDS-ROADS NESIDS Public works Department 2024-01-12 33.19 2026-01-12 8.13 8.13 16.26 Ongoing
2251 MIZORAM Transport and Communication Upgradation of Zote-Farthlang-Bunali-Tuipui-Tawnzang Road NESIDS-ROADS NERSDS Public works Department 2021-01-29 29.26 2024-04-29 23.2 0 23.2 14.72 Completed
2252 MIZORAM Transport and Communication Upgradation and improvement of Hnahlan-Hmunlui-Tuimang-Singngei Road (Hnahlan to river Tiau Mizoram NESIDS-ROADS NERSDS Public works Department 2021-01-29 44.17 2023-01-31 34.15 0 34.15 19.22 Completed
2253 MIZORAM Transport and Communication Upgradation and improvement of Saiha-Lungbun-Tluangram-Haka Road (Lungbun to R.Kolodyne Mizoram) NESIDS-ROADS NERSDS Public works Department 2021-01-29 50.21 2024-10-01 33.86 8.58 42.44 10.65 Completed
2254 MIZORAM Water Supply Alternate Gravity Water Supply Scheme of Aizawl,Mizoram NESIDS-OTRI NESIDS Public Health & Engg Depa 2018-12-04 114.1965 2020-03-31 112.4988 0 112.4988 107.1358 Ongoing
2255 MIZORAM Water Supply Augmentation of Greater Mamit Water Supply Scheme Part-II NESIDS-OTRI NESIDS PUBLIC HEALTH ENGINEERING 2022-04-20 37.8571 2024-04-30 28.06 0 28.06 8.06 Ongoing
2256 MIZORAM Water Supply Augmentation of North Vanlaiphai Water Supply Scheme in Mizoram NESIDS-OTRI NESIDS PUBLIC HEALTH ENGINEERING 2022-04-20 19.4017 2024-04-30 12.7606 5 17.7606 7.7606 Ongoing
2257 MIZORAM Agriculture and Allied Bamboo processing industry. NESIDS-OTRI NLCPR Dept. of Power 2000-12-20 4 2004-05-29 3.6 0 3.6 4 Completed
2258 MIZORAM Agriculture and Allied Establishment of 8 Units of Fish seed farms in Mizoram. NESIDS-OTRI NLCPR FISHERIES 2000-01-14 5.28 2005-05-18 4.752 0 4.752 5.28 Completed
2259 MIZORAM Agriculture and Allied Integrated piggery development project NESIDS-OTRI NLCPR AH&VETY 2000-01-14 6.57 2003-03-31 5.913 0 5.913 6.57 Completed
2260 MIZORAM Agriculture and Allied Marketing facilities and marketing of Tung Seeds and Oil within Country & Abroad. NESIDS-OTRI NLCPR AGRI 2000-01-24 0.5 2004-07-24 0.45 0 0.45 0.5 Completed
2261 MIZORAM Agriculture and Allied Mobilisation and development of feed & foder project, modafer NESIDS-OTRI NLCPR AH&VETY 2000-01-14 7.25 2005-01-31 3.924 0 3.924 4.36 Ongoing
2262 MIZORAM Education Construction & Renovation of School Building. NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2000-07-27 21.43 2005-07-31 18.648 0 18.648 20.72 Completed
2263 MIZORAM Education Construction of Boys and Girls Hostel at Saitual and Thingsulthliah in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-07-04 1.8999 2013-06-30 1.6926 0 1.6926 1.6807 Completed
2264 MIZORAM Education Construction of Examination Hall for MPSC Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-23 2.8832 2012-12-31 2.5577 0 2.5577 1.9197 Completed
2265 MIZORAM Education Construction of Government Aizawl College New Campus Building at Mualpui, Aizawl in Mizoram NESIDS-OTRI NLCPR Dept. of Education 2017-12-18 12 2019-12-18 10.7999 0 10.7999 10.7999 Completed
2266 MIZORAM Education Construction of Higher Secondary School Building at Kawlkulh and Kawlbem in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-12-26 1.9588 2014-12-31 1.7629 0 1.7629 1.7629 Completed
2267 MIZORAM Education Construction of Hostels for Students of Higher Secondary Schools at Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-12-29 5.2048 2015-06-30 4.6843 0 4.6843 4.6843 Completed
2268 MIZORAM Education Construction of Mara Student Hostel at Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2013-09-26 5.3836 2016-09-30 4.8452 0 4.8452 4.8452 Completed
2269 MIZORAM Education Construction of Mizoram Law College at Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-02-27 2.8958 2010-08-31 2.5551 0 2.5551 2.5551 Completed
2270 MIZORAM Education Construction of Multi Complex Building Auditorium at Pachhunga University College, Aizawl, Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-23 2.8526 2012-10-31 2.5673 0 2.5673 2.5673 Completed
2271 MIZORAM Education Construction of Post-Matric Students Hostel at Aizawl in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-02-22 1.901 2013-02-28 1.6618 0 1.6618 1.6618 Completed
2272 MIZORAM Education Construction of School Building within LADC (Phase-II), Lai Autonomous District Council NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2013-09-23 11.0985 2016-09-30 9.2584 0 9.2584 9.2584 Completed
2273 MIZORAM Education Construction of School Buildings in Mara Autonomous District Council NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2007-12-19 2.1242 2008-12-31 1.9118 0 1.9118 1.9118 Completed
2274 MIZORAM Education Construction of Schools within LADC NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2008-03-28 2.3686 2010-02-28 2.1106 0 2.1106 2.1106 Completed
2275 MIZORAM Education Construction of Secondary School Buildings in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-09-14 9.6853 2007-12-31 8.3028 0 8.3028 8.3028 Completed
2276 MIZORAM Education Construction of Student Hostel at Aizawl in respect of Chakma Autonomous District Council NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-10-25 5.65 2019-10-25 5.085 0 5.085 3.9332 Ongoing
2277 MIZORAM Education Construction of Students Hostel for Lai Autonomous District Council at Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-10-17 5.9672 2014-10-31 5.3704 0 5.3704 5.3704 Completed
2278 MIZORAM Education Construction of Teachers Training Complex at Lunglei in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-11-22 10.4 2019-11-22 9.36 0 9.36 9.36 Completed
2279 MIZORAM Education Establishment of Sainik School at Chhingchhip, Serchhip District, Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-02-29 50.6423 2015-02-28 44.6842 0 44.6842 44.6842 Completed
2280 MIZORAM Education Infrastricture Development of Lawngtlai College, Lawngtlai, Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-05-04 1.3609 2013-04-30 1.0729 0 1.0729 1.0729 Completed
2281 MIZORAM Education Infrastructure development of 4 college in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-09-18 5.4632 2011-02-28 4.7251 0 4.7251 4.7251 Completed
2282 MIZORAM Education Infrastructure Development of Govt. Champhai College at Champhai, Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-03-17 9.5129 2013-03-31 8.455 0 8.455 8.455 Completed
2283 MIZORAM Education Infrastructure Development of Kamalanagar College in CADC NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-09-14 2.24 2015-09-30 2.016 0 2.016 2.016 Completed
2284 MIZORAM Education Infrastructure Development of Mizoram University (additional) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-02-20 23.26 2007-06-30 20.934 0 20.934 21.3889 Completed
2285 MIZORAM Education Infrastructure Development of various colleges (10 Nos.) in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-06-24 13.6764 2013-06-30 11.7362 0 11.7362 11.5931 Completed
2286 MIZORAM Education Mizoram University NESIDS-OTRI NLCPR MZU 2001-08-18 1.74 2004-08-31 1.566 0 1.566 1.74 Completed
2287 MIZORAM Education Sarva Shiksha Abhiyan NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-03-28 5.1183 2007-03-31 5.1183 0 5.1183 5.1183 Completed
2288 MIZORAM Education Sarva Shiksha Abhiyan (2006-07) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-06-29 6.8834 2007-06-29 6.8834 0 6.8834 6.8834 Completed
2289 MIZORAM Education Secondary Schools Improvement Project NESIDS-OTRI NLCPR HIGHER & TECHNICAL EDUCAT 2001-03-07 12.48 2004-05-28 11.232 0 11.232 12.48 Completed
2290 MIZORAM Health 200 Bedded Hospital at Lunglai. NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-02-22 7.62 2005-02-28 6.5056 0 6.5056 7.1776 Completed
2291 MIZORAM Health Construction of 100 bedded Civil Hospital at Saiha NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2013-09-26 15.9252 2016-09-30 14.3327 0 14.3327 11.4661 Completed
2292 MIZORAM Health Construction of 50 Bedded Hospital in Lawngtlai in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-12-29 11.9151 2016-12-31 10.6987 0 10.6987 10.6987 Completed
2293 MIZORAM Health Construction of Medical Staff Quarters for CHC at Saitual and Thingsulthliah in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-05-03 1.3221 2012-10-31 0.4666 0 0.4666 0.4666 Completed
2294 MIZORAM Health Construction of Out-Patient Department Block, Civil Hospital, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-03-21 3.71 2006-03-31 3.2704 0 3.2704 3.4454 Completed
2295 MIZORAM Health Six bedded ICU at Civil Hospital, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-03-21 1.42 2004-06-25 1.278 0 1.278 1.42 Completed
2296 MIZORAM Health State Referral Hospital, Aizawl. NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 1999-02-15 40.53 2004-02-29 36.4775 0 36.4775 40.0165 Completed
2297 MIZORAM Health Veterinary Polyclinic at Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-03-02 4.823 2014-02-28 4.2442 0 4.2442 4.2442 Completed
2298 MIZORAM Miscellaneous Allotment of BADP funds for Lai Autonomous District Council NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2001-06-11 1 2004-07-19 0.9 0 0.9 1 Completed
2299 MIZORAM Miscellaneous BMS NESIDS-OTRI NLCPR 1999-12-30 14.91 2004-07-19 13.419 0 13.419 14.91 Completed
2300 MIZORAM Miscellaneous Construction of 10 Nos. of Helipads NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-09-12 2.582 2013-09-30 2.1438 0 2.1438 2.1438 Completed
2301 MIZORAM Miscellaneous Construction of Community Halls at Various Places in Mizoram (Part-II) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-02-23 2.0649 2012-02-29 1.6949 0 1.6949 1.6949 Completed
2302 MIZORAM Miscellaneous Construction of Community halls in various locations in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2008-03-07 4.7 2009-02-28 4.23 0 4.23 4.23 Completed
2303 MIZORAM Miscellaneous Construction of Dam Reservoir and Development of Recreation Centre at Keilungliah, Champhai in Mizoram NESIDS-OTRI NLCPR Public Health & Engg Depa 2017-12-05 19.88 2019-12-05 17.3133 0 17.3133 17.3133 Ongoing
2304 MIZORAM Miscellaneous Construction of High Court Building at New Sectt. Complex in Aizaw (Mizoram)l NESIDS-OTRI NLCPR Dept. of Power 2016-03-18 46.2412 2019-02-18 44.2659 0 44.2659 33.2927 Ongoing
2305 MIZORAM Miscellaneous Construction of market building - Banglakawn Market, Kolasib NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.25 2005-07-31 0.225 0 0.225 0.25 Completed
2306 MIZORAM Miscellaneous Construction of market building - Bara Bazar Market Complex, Aizawl Block-I NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 1.69 2004-07-31 1.521 0 1.521 1.69 Completed
2307 MIZORAM Miscellaneous Construction of market building - Bara Bazar Market Complex, Aizawl Block-II NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 1.25 2006-12-31 1.125 0 1.125 1.25 Completed
2308 MIZORAM Miscellaneous Construction of market building - Bara Bazar Market Complex, Aizawl Block-III (A) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.47 2006-12-31 0.423 0 0.423 0.47 Completed
2309 MIZORAM Miscellaneous Construction of market building - Bara Bazar Market Complex, Aizawl Block-III (B) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.76 2006-12-31 0.684 0 0.684 0.76 Completed
2310 MIZORAM Miscellaneous Construction of market building - Bazar Veng Market, Hnahthial NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.77 2005-07-31 0.693 0 0.693 0.77 Completed
2311 MIZORAM Miscellaneous Construction of market building - Bethel Market, Champhai NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.34 2005-07-31 0.306 0 0.306 0.34 Completed
2312 MIZORAM Miscellaneous Construction of market building - Bungkawn Market, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.45 2004-07-31 0.405 0 0.405 0.45 Completed
2313 MIZORAM Miscellaneous Construction of market building - Car Parking at Bara Bazar Market Complex, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.03 2006-12-31 0.027 0 0.027 0.03 Completed
2314 MIZORAM Miscellaneous Construction of market building - Chanmari Market, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.23 2004-07-31 0.207 0 0.207 0.23 Completed
2315 MIZORAM Miscellaneous Construction of market building - Chanmari Market, Hnahthial NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.27 2005-07-31 0.243 0 0.243 0.27 Completed
2316 MIZORAM Miscellaneous Construction of market building - Chanmari Market, Lunglei NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 1 2004-07-31 0.9 0 0.9 1 Completed
2317 MIZORAM Miscellaneous Construction of market building - Dawrkawn Market, Serchhip NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.95 2005-07-31 0.855 0 0.855 0.95 Completed
2318 MIZORAM Miscellaneous Construction of market building - Dismantling Old Building at Bara Bazar, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.13 2004-07-31 0.117 0 0.117 0.13 Completed
2319 MIZORAM Miscellaneous Construction of market building - Mamit Market, Mamit NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.41 2005-07-31 0.369 0 0.369 0.41 Completed
2320 MIZORAM Miscellaneous Construction of market building - Rahsi Veng Market, Champhai NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 1.18 2004-07-31 1.062 0 1.062 1.18 Completed
2321 MIZORAM Miscellaneous Construction of market building - Ramhlun Market, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.54 2004-07-31 0.486 0 0.486 0.54 Completed
2322 MIZORAM Miscellaneous Construction of market building - Serkawn Market, Lunglei NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.11 2004-07-31 0.099 0 0.099 0.11 Completed
2323 MIZORAM Miscellaneous Construction of market building - Sihphir Market, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.5 2006-12-31 0.45 0 0.45 0.5 Completed
2324 MIZORAM Miscellaneous Construction of market building - Storm Drain at Bara Bazar, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.19 2006-12-31 0.171 0 0.171 0.19 Completed
2325 MIZORAM Miscellaneous Construction of market building - Strengthening of Administration NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.04 2005-07-31 0.036 0 0.036 0.04 Completed
2326 MIZORAM Miscellaneous Construction of market building - Tanhril Ramrikawn Market, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.36 2005-07-31 0.324 0 0.324 0.36 Completed
2327 MIZORAM Miscellaneous Construction of market building - Thakthing Market, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-19 0.17 2005-07-31 0.153 0 0.153 0.17 Completed
2328 MIZORAM Miscellaneous Construction of market building - Thuampui Market, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.76 2006-12-31 0.684 0 0.684 0.76 Completed
2329 MIZORAM Miscellaneous Construction of market building - Vaivakawn Market, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.62 2004-07-31 0.558 0 0.558 0.62 Completed
2330 MIZORAM Miscellaneous Construction of market building - Venglai Market, Kolasib NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.74 2006-12-31 0.666 0 0.666 0.74 Completed
2331 MIZORAM Miscellaneous Construction of market building - Zemabawk Market, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.47 2004-07-31 0.423 0 0.423 0.47 Completed
2332 MIZORAM Miscellaneous Construction of Market Building at Vairengte in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2013-07-01 3.8765 2015-06-30 3.4207 0 3.4207 3.4207 Completed
2333 MIZORAM Miscellaneous Construction of Mizoram State Account and Treasury Office Building at New Secretariat Complex, Aizawal. NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-05-05 11.1 2019-05-05 9.9899 0 9.9899 9.9899 Completed
2334 MIZORAM Miscellaneous Construction of Multi Level Car Parking at New Secretariat Complex, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-05-05 39.89 2019-05-05 34.34 0 34.34 34.34 Completed
2335 MIZORAM Miscellaneous Construction of Multi Shopping Complex at Saitual NESIDS-OTRI NLCPR Public works Department 2015-11-16 3.1033 2017-12-31 2.793 0 2.793 2.793 Completed
2336 MIZORAM Miscellaneous Construction of Multi-Level Parking, Community Centre and Office Complex at Aizawl North in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-12-15 12.9826 2013-10-31 9.9109 0 9.9109 9.9109 Completed
2337 MIZORAM Miscellaneous Construction of Multipurpose Centre at Ramthar North, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-02-21 1.8494 2017-02-20 1.6645 0 1.6645 1.6645 Completed
2338 MIZORAM Miscellaneous Construction of Police Headquarters Buildings at Khatla in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-12-29 15.5579 2017-06-30 14.0021 0 14.0021 14.0021 Completed
2339 MIZORAM Miscellaneous Construction of RA Lorrain Market Centre at Saiha in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-04-08 3.8087 2012-03-31 3.3764 0 3.3764 3.3764 Completed
2340 MIZORAM Miscellaneous Infrastructure Requirement of Mizoram Police ( Establishment of 3rd IR Battalion HQRTs at Thingkah), Lawngtlai NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-03-05 28.4228 2017-03-04 25.5805 0 25.5805 25.5805 Completed
2341 MIZORAM Miscellaneous Intensive and Strengthening of Central Rural Sanitation Programme in Mara Autonomous District Council Area of Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-10-28 0.4686 2010-09-30 0.4218 0 0.4218 0.4312 Completed
2342 MIZORAM Miscellaneous Modernization of Kamalanagar Town NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-10-23 19.8882 2014-10-31 14.3196 0 14.3196 14.3196 Foreclosed
2343 MIZORAM Miscellaneous Solid Waste Management at Lunglei (under SAP) NESIDS-OTRI NLCPR URBAN DEVELOPMENT & POVER 2017-12-18 6 2019-06-18 3.7949 0.6601 4.455 1.782 Ongoing
2344 MIZORAM Miscellaneous State Capital Project, Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 5.18 2004-07-19 4.662 0 4.662 5.18 Completed
2345 MIZORAM Miscellaneous Strengthening of Government Press, Aizawl, Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-03-14 8.4247 2012-03-31 7.3033 0 7.3033 7.3033 Completed
2346 MIZORAM Miscellaneous Upgradation of Central Jail Aizawl for construction of Separate Women Jail in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-12-29 13.0695 2017-12-31 11.7625 0 11.7625 11.7625 Completed
2347 MIZORAM Miscellaneous Upgradation of Lawngtlai Town in the Lai Autonomous District Council in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-05-03 11.8069 2014-04-30 10.4271 0 10.4271 10.4271 Completed
2348 MIZORAM Miscellaneous Upgradation of Lengpui Airport in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-03-15 24.8162 2013-02-28 16.2046 0 16.2046 16.2046 Completed
2349 MIZORAM Power Construction of 110 km 132 KV S/C Aizawl (Melriat S/S) - Lunglei line including one out-going bay at Melriat and one incoming bay at Lunglei NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2012-09-11 41.7607 2015-09-30 37.5845 0 37.5845 37.5845 Completed
2350 MIZORAM Power Construction of 132 kV S/C line on D/C towers from Kolasib to Aizawl (Melriat) with LILO of one circuit at Aizawl (Zuangtui) 132 kV Sub Station NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2005-12-22 21.511 2008-12-31 17.0367 0 17.0367 17.0367 Completed
2351 MIZORAM Power Construction of 132 kV single circuit Line from Khawzawl to Champai NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2006-12-01 5.9 2009-11-30 5.306 0 5.306 5.306 Completed
2352 MIZORAM Power Construction of 2 X 2.5 MVA, 33/11 KV S/s at P & E Complex with associated 33 KV line ai Saiha Town NESIDS-OTRI NLCPR Dept. of Power 2017-05-05 7.66 2019-05-05 6.6749 0 6.6749 6.6749 Completed
2353 MIZORAM Power Construction of 2 X 2.5 MVA, 33/11 KV S/s at P & E Complex with associated 33 KV lines in the heart of Lawngtlai Town NESIDS-OTRI NLCPR Dept. of Power 2017-05-05 6.78 2019-05-05 6.0752 0 6.0752 6.0752 Completed
2354 MIZORAM Power Construction of 33 kv D/C line tower from 3 MW Kautlabung SHP to Thenhlum 33 kv Sub-Station (17 kms) in Mizoram NESIDS-OTRI NLCPR Dept. of Power 2017-12-12 7.82 2019-12-12 7.038 0 7.038 2.8152 Completed
2355 MIZORAM Power Construction of 33 Kv D/C transmission line (Tower type) Lawngtalai to Saiha NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2007-06-22 7.4369 2009-06-30 6.6932 0 6.6932 6.6932 Completed
2356 MIZORAM Power Construction of 33KV D/C Serlui 'B' Kolasib switchyard at Serlui 'B' & incoming bay at 132 KV S/s at Kolasib (bawktlang) NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2005-05-10 3.151 2007-03-31 2.7508 0 2.7508 1.99 Completed
2357 MIZORAM Power Electrification of 3 Tribal villages. NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2002-01-28 0.68 2004-03-31 0.612 0 0.612 0.68 Completed
2358 MIZORAM Power HFO bassed 20 MW DG thermal plant at Bhairabi NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2001-12-20 91.59 2003-06-30 82.422 0 82.422 91.58 Completed
2359 MIZORAM Power Power Evacuation from Thermal Power Plant, Bairabi NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2003-02-27 4.56 2004-09-30 4.104 0 4.104 4.56 Completed
2360 MIZORAM Power Sub- transmision and Distribution Lines - Aizwal Town NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2000-11-17 25.83 2004-05-27 23.247 0 23.247 25.83 Completed
2361 MIZORAM Power Sub- transmision and Distribution Lines - Lunglei Town NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2002-10-21 8.3 2004-05-14 7.47 0 7.47 8.3 Completed
2362 MIZORAM Roads and Bridges Bridge over River Chawngte(P to C)(LAI&Chakma ADC) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-01-07 2.5553 2006-01-31 2.196 0 2.196 2.4379 Completed
2363 MIZORAM Roads and Bridges Bridge over River Chawngtelui on Diltlang to Chawngte Road(LAI ADC) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-01-07 2.0349 2006-01-31 1.746 0 1.746 1.94 Completed
2364 MIZORAM Roads and Bridges Bridge over River Tuisih on Tuipang-Zwangling-Chheihhlu Road(Mara ADC) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-01-07 1.1406 2006-01-31 0.981 0 0.981 1.087 Completed
2365 MIZORAM Roads and Bridges Bridge over River Vanva on Haulawng-Bualpui-Chhiphir Road NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-01-07 1.4567 2006-01-31 1.251 0 1.251 1.3872 Completed
2366 MIZORAM Roads and Bridges Chawngte-Borapansury Road within Chakma Autonomous District Council NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-10-21 10.46 2006-10-31 8.9501 0 8.9501 9.7501 Completed
2367 MIZORAM Roads and Bridges Construction of 3 Bailey Bridges in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-09-26 6.4942 2008-09-30 4.9821 0 4.9821 4.9821 Completed
2368 MIZORAM Roads and Bridges Construction of Approach Road to Tuival from Mimbung and approach road to Godown at Kawlkulh, Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-06-24 3.6709 2012-12-31 2.9206 0 2.9206 2.9206 Completed
2369 MIZORAM Roads and Bridges Construction of Bamboo Plantation Link road from tuiral airfield to Bukpui Phase - II (40 - 84) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-12-01 25.125 2008-12-31 7.9144 0 7.9144 7.9144 Completed
2370 MIZORAM Roads and Bridges Construction of Bamboo Plantation Link Road to proposed Bamboo Plantation Areas from tuirial Airfield to Bukpui (0-40) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-12-01 22.3902 2008-12-31 7.0529 0 7.0529 7.0529 Completed
2371 MIZORAM Roads and Bridges Construction of Bridge over Tuichang on Keituam - Artahkawn road in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2008-04-30 2.5949 2010-04-30 0.81 0 0.81 0.81 Completed
2372 MIZORAM Roads and Bridges Construction of Hnahthial - Haulawng via Zotui Road Phase-I (14.393 Km. upto WBM & Bituminous works) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-12-29 15.1578 2017-12-31 13.2043 0 13.2043 13.2043 Completed
2373 MIZORAM Roads and Bridges Construction of Jeepable Suspension Bridge over R. Chhimtuipui at Darzokai on Hnahthial to Sangau Road NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-03-02 2.1621 2013-02-28 1.9078 0 1.9078 1.9078 Completed
2374 MIZORAM Roads and Bridges Construction of Khanpui to Tualbung road NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-07-04 1.9721 2012-06-30 1.2431 0 1.2431 1.2431 Completed
2375 MIZORAM Roads and Bridges Construction of Lawngtlai By-Pass Road, Phase-I (13 km) in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-11-27 11.4385 2014-11-30 6.7176 0 6.7176 6.7176 Foreclosed
2376 MIZORAM Roads and Bridges Construction of Link Road to Bamboo Plantation Areas from Saiphal to Hortoki (0-27.5km) in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-11-24 12.9967 2008-12-31 8.188 0 8.188 8.188 Completed
2377 MIZORAM Roads and Bridges Construction of Link Roads to Bamboo Plantation - Plot No. A from W.Serzawl Saiphal/Saitlaw 18 kms NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-09-29 5.82 2006-09-30 5.238 0 5.238 5.5 Completed
2378 MIZORAM Roads and Bridges Construction of Link Roads to Bamboo Plantation - Plot No. B from Dur Lui - Sairum and Dur Lui - Mualkhang NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-09-29 6.1662 2006-09-30 5.553 0 5.553 6.1662 Completed
2379 MIZORAM Roads and Bridges Construction of Longpuighat - Kukurduleya Road NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-02-03 11.5245 2010-02-28 10.1687 0 10.1687 6.8938 Ongoing
2380 MIZORAM Roads and Bridges Construction of Road from Chuhvel to Sihthiang in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-02-23 2.2353 2013-02-28 1.9723 0 1.9723 1.9723 Completed
2381 MIZORAM Roads and Bridges Construction of Road from Ramthar N to Ramhlum Sport Complex in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-23 2.0223 2012-12-31 1.7844 0 1.7844 1.7844 Completed
2382 MIZORAM Roads and Bridges Construction of Sihpui to Thuampui Road in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-13 2.4823 2012-12-31 2.1903 0 2.1903 2.1903 Completed
2383 MIZORAM Roads and Bridges Improvement and widening of Bawngkawn to Durtland Road NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-03-21 6.81 2004-05-29 6.129 0 6.129 6.81 Completed
2384 MIZORAM Roads and Bridges Lungtian-Mamte Road via Vartek Kai within Lai ADC NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-10-21 26.65 2006-10-31 22.8305 0 22.8305 24.7745 Completed
2385 MIZORAM Roads and Bridges Road formation and restoration works at Lawngtlai Slided loctaion NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-02-18 2.237 2011-02-28 1.9738 0 1.9738 1.9738 Completed
2386 MIZORAM Roads and Bridges Upgradation of Parva-I to Simenasora Road NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2007-09-26 12.264 2008-02-29 10.8211 0 10.8211 10.367 Completed
2387 MIZORAM Sports Construction of Additional Works for Indoor Stadium at Pitarte Tlang, Aizawl in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2013-02-21 2.4511 2014-08-31 2.1874 0 2.1874 2.1874 Completed
2388 MIZORAM Sports Construction of Aizawl Cricket Stadium at Sihhmui, Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-12-21 11.2816 2011-03-31 9.9543 0 9.9543 9.9543 Completed
2389 MIZORAM Sports Construction of Indoor Stadium at Aizawl NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2007-06-20 13.0522 2009-06-30 11.4048 0 11.4048 11.4048 Completed
2390 MIZORAM Sports Construction of Indoor Stadium at Bungtlang in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-23 1.7375 2012-12-31 1.4947 0 1.4947 1.4947 Completed
2391 MIZORAM Sports Construction of Indoor Stadium at Champhai NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-07-31 11.5999 2008-01-01 10.1358 0 10.1358 10.1358 Completed
2392 MIZORAM Sports Construction of Indoor Stadium at Chanmari, Lunglei NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-02-21 4.9619 2017-02-20 4.1408 0 4.1408 4.1408 Completed
2393 MIZORAM Sports Construction of Indoor Stadium at Keitum in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-23 1.7375 2012-12-31 1.4947 0 1.4947 1.4947 Completed
2394 MIZORAM Sports Construction of Mini Sports Complex at Aibawk NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-05-05 4 2019-05-05 3.6 0 3.6 3.6 Completed
2395 MIZORAM Sports Construction of Mini Sports Complex at E. Lungdar NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2015-09-17 4.3496 2017-09-17 3.9146 0 3.9146 4.0016 Completed
2396 MIZORAM Sports Construction of Mini Sports Complex at Khawbung (Mizoram) NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2016-03-07 3.6989 2018-03-07 3.329 0 3.329 3.329 Completed
2397 MIZORAM Sports Construction of Mini Sports Complex, Sakawrdai in Mizoram NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-10-25 3.5 2019-10-25 3.15 0 3.15 3.15 Completed
2398 MIZORAM Sports Construction of Table Tennis TrainingCentre at Mission Vengthlang in Aizawl NESIDS-OTRI NLCPR Public works Department 2015-10-13 3.6987 2017-12-31 3.3288 0 3.3288 3.3288 Completed
2399 MIZORAM Sports Construction of Zauva Sailo Memorial Tennis Centre Lunglei NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2015-09-14 4.26 2017-09-14 3.834 0 3.834 3.834 Completed
2400 MIZORAM Sports State Sports Academy, Zobawk NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2010-08-02 17.5124 2012-07-31 14.809 0 14.809 14.809 Completed
2401 MIZORAM Water Supply Aibawk Water Supply scheme NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2013-09-26 9.7942 2016-09-30 8.8147 0 8.8147 8.8147 Completed
2402 MIZORAM Water Supply Aizawl Water Supply Scheme (Phase-2) NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 1999-03-31 71.8 2004-03-31 59.62 0 59.62 64.12 Completed
2403 MIZORAM Water Supply Bairabi Water Supply Scheme in Mizoram NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2011-07-04 4.9037 2013-06-30 4.3268 0 4.3268 4.3268 Completed
2404 MIZORAM Water Supply Bilkhwthlir Water Supply Scheme, Kolasib District in Mizoram NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2011-05-03 7.8047 2013-04-30 6.9182 0 6.9182 6.9182 Completed
2405 MIZORAM Water Supply Greater Champhai Water Supply Scheme. NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2000-03-23 13.71 2005-03-31 12.3402 0 12.3402 13.5302 Completed
2406 MIZORAM Water Supply Greater Hnahthial Water Supply Scheme in Mizoram NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2010-11-29 8.256 2013-11-30 7.2576 0 7.2576 7.2576 Completed
2407 MIZORAM Water Supply Greater Lawngtlai Water Supply Scheme in Mizoram NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2010-10-08 25.645 2013-10-15 22.628 0 22.628 22.628 Completed
2408 MIZORAM Water Supply Greater Mamit Water Supply Scheme NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2003-10-13 5.7681 2006-10-31 4.8543 0 4.8543 5.2896 Completed
2409 MIZORAM Water Supply Greater Saitual Water Supply Scheme in Mizoram NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2010-10-08 21.532 2013-10-15 18.9988 0 18.9988 18.9988 Completed
2410 MIZORAM Water Supply Lower Sakawrdai Water Supply scheme NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2007-07-10 1.3372 2009-07-31 1.1799 0 1.1799 1.1799 Completed
2411 MIZORAM Water Supply Sairang Water Supply Scheme in Mizoram NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2012-03-20 2.2114 2014-06-28 1.9512 0 1.9512 1.9512 Completed
2412 MIZORAM Water Supply South Khawbung Water Supply Scheme in Mizoram NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2011-12-15 8.2738 2013-12-31 7.4322 0 7.4322 7.4322 Completed
2413 MIZORAM Water Supply Tuipang Water Supply Scheme Mara Autonomous District Council in Mizoram NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2010-12-24 9.4113 2012-11-30 8.304 0 8.304 8.304 Completed
2414 MIZORAM Water Supply W.Phaileng Water Supply Scheme (Pumping) in Mizoram NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2011-06-24 9.9519 2013-06-30 8.9567 0 8.9567 8.9567 Completed
2415 MIZORAM Water Supply Water supply to Sainik School Chhingchhip,Mizoram NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2017-05-23 7.87 2019-05-23 6.993 0 6.993 2.7972 Completed
2416 MIZORAM Industries Setting up of Mechanized Brick Industry at Buchang, Kolasib Disrtict, Mizoram Schemes of NEC Schemes of NEC Dept. of Power 2020-11-24 3.54 2023-11-23 3.51 0 3.51 Ongoing
2417 MIZORAM Information and Public Relatio Our Heritage, Our Heritage at Vangchhia Tourist spot, Champhai, Mizoram Schemes of NEC Art & Culture Department. 2024-08-30 2 2027-08-30 0.5 0.5 Ongoing
2418 MIZORAM Agriculture and Allied Enhancement of the economic value of existing arecanut plantation in kolasib and Mamit District in Mizoram Schemes of NEC Land resources, Soil and 2024-09-19 7.44 2027-09-19 3.719 3.719 1.8595 Ongoing
2419 MIZORAM Sports Upgradation of Sports Infrastructure of Ngopa Playground at Saitual District, Mizoram Schemes of NEC Mizoram Public Works Depa 2024-11-05 3.94 2027-11-05 0.936095 0.936095 Ongoing
2420 MIZORAM Health Purchase of New CT Simulator at Mizoram State Cancer Institute, Mizoram Schemes of NEC Directorate of Hospital & 2024-12-04 10.12 2027-12-04 8.08 0 8.08 8.08 Ongoing
2421 MIZORAM Agriculture and Allied Fish Farmer Training Centre at Lengpui, Mizoram Schemes of NEC Fisheries Department, Gov 2025-01-27 9.72 2028-01-27 4.86 4.86 2.43 Ongoing
2422 MIZORAM Transport and Communication Construction of Thenzawl -Sialsuk via Sathlur and Lau river NESIDS-ROADS Public works Department 2025-02-17 45.03 2027-02-16 8.18 8.18 Ongoing
2423 MIZORAM Transport and Communication Construction of Khankawn to Rongura Hmun in Serchhip District NESIDS-ROADS Public works Department 2025-03-24 31.98 2027-03-23 5.54 5.54 Ongoing
2424 MIZORAM Education Implementation of Education Infrastructure related to IT projects in 220 Schools NESIDS-OTRI Samagra Shiksha, Mizoram 2025-03-01 23.73 2025-09-30 0 0 Ongoing
2425 MIZORAM Power Strengthening of Transmission & Transformation system for sustainable Power Supply in Mizoram NESIDS-OTRI Electricity Department Mi 2025-06-03 48.87 2027-06-03 0 0 Ongoing
2426 MIZORAM Transport and Communication Development of Heliport and Helipads in Thenzawl, Mizoram NESIDS-OTRI PWD 2025-10-13 12 2027-10-13 0 Ongoing
2427 MIZORAM Health Construction of 50 Bedded Psychiatry Block at Kulikawn Hospital, Aizawal, Mizoram NESIDS-OTRI PWD Mizoram 2025-10-23 19.72 2028-10-31 0 Ongoing
2428 MIZORAM Health Construction of 50 Bedded Hospital complex at Kulikawn Hospital, Aizawl Mizoram NESIDS-OTRI PWD Mizoram 2025-10-24 34.75 2028-10-31 0 Ongoing
2429 MULTI STATE Agriculture and Allied Livelihood Improvement project (Multi State) - Value chain on utilization of Banana Pseudo Stem for Value-Added Products PM-DevINE Other 2023-02-14 67 2026-03-31 5.83335 13.7016 19.53495 5.8833 Ongoing
2430 MULTI STATE Agriculture and Allied Promoting Scientific Organic Agriculture in North-East India (Multi-State) PM-DevINE PM-DevINE Other 2023-02-17 44.99 2026-03-31 9.6889 14.02 23.7089 4.355 Ongoing
2431 MULTI STATE Miscellaneous Proposal ot Set up a Digital Design and 3D Printing Center of Excellence in the Electronic Mfg. Cluster (EMC) in collaboration with other Govt Agencies at Tech City, Guwahati PM-DevINE PM-DevINE Other 2024-02-10 54.9 2025-01-31 53.842 0 53.842 41.1298 Completed
2432 MULTI STATE Health Establishment of Dedicated Services for the Management of Paediatric and Adult Haematolymphoid Cancers in North East India, Guwahati PM-DevINE PM-DevINE Other 2023-05-31 129 2026-03-31 15 67.2794 82.2794 15 Ongoing
2433 MULTI STATE Transport and Communication Upgradation of Harmuti Doimukh road NESIDS-ROADS NERSDS Public works Department 2017-01-09 58.25 2019-01-01 58.25 0 58.25 58.25 Completed
2434 MULTI STATE Transport and Communication Upgradation of Tura Mankachar road NESIDS-ROADS NERSDS Public works Department 2017-01-09 4.71 2018-01-06 4.71 0 4.71 Completed
2435 MULTI STATE Transport and Communication Wokha Merapani Road NESIDS-ROADS NERSDS Public works Department 2016-02-24 151.01 2023-08-31 151.01 0 151.01 151.01 Completed
2436 MULTI STATE Agriculture and Allied Engineered Bamboo Products Promotion through Cluster Strenghtening and Export Facilitation in NER PM-DevINE NECBDC 2025-12-08 70.9803 2028-12-08 0 Ongoing
2437 MULTI STATE Agriculture and Allied Agarwood Cluster Development Project in Kadamtala, Tripura and Golaghat, Assam PM-DevINE NERAMAC 2026-01-12 64.5517 2029-01-11 0 Ongoing
2438 NAGALAND Education Construction of 92 no. of Separate Girls Toilet in Government Schools in Nagaland NESIDS-OTRI NESIDS Department of School Educ 2020-03-29 1.4651 2021-03-30 1.4651 0 1.4651 1.4651 Completed
2439 NAGALAND Education Implementation of Educational Infrastructure related to IT projects in 190 schools across Nagaland NESIDS-OTRI NESIDS Dept. of Power 2022-05-10 18.9527 2025-06-30 18.951 0 18.951 Completed
2440 NAGALAND Education In Service Teachers Training cum Examination Centre with Residential Facilitiesin Nagaland under NESIDS NESIDS-OTRI NESIDS Dept. of Power 2021-03-31 15.5 2025-03-31 11.625 3.875 15.5 6.2 Ongoing
2441 NAGALAND Health Strengthening health Infrastructure for Comprehensive response to possible Outbreak of COVID19 IN Nagaland NESIDS-OTRI NESIDS Dept. of Health & familly 2020-07-02 17.9562 2024-09-30 15.5218884 0 15.5218884 7.1825 Ongoing
2442 NAGALAND Health Strengthening of Health Infrastructure of various Health Facilities in Nagaland in Nagaland under NESIDS NESIDS-OTRI NESIDS Dept. of Power 2021-03-24 21.0024 2025-12-31 4.3191 3.8574368 8.1765368 Ongoing
2443 NAGALAND Health Strengthening of health systems for the management of COVID-19 pandemic with special reference to combat the impending 3rd wave of the pandemic in Nagaland NESIDS-OTRI NESIDS Dept. of Health & familly 2022-04-20 19.9619 2024-09-24 4.92935 9.49935 14.4287 Ongoing
2444 NAGALAND Agriculture and Allied Agri Development in cluster basis at Peren, Mokokchung and Mon districts, Nagaland Schemes of NEC Schemes of NEC 2016-02-05 6.6 2019-02-05 5.94 0 5.94 5.94 Completed
2445 NAGALAND Agriculture and Allied Alder based large cardamom cultivation at Sotokur under Tuensang District, Nagaland Schemes of NEC Schemes of NEC 2018-04-16 2 2021-04-16 2 0 2 2 Completed
2446 NAGALAND Agriculture and Allied Bee Keeping and Honey Development in Nagaland. Schemes of NEC Schemes of NEC 2010-03-23 4.5 2013-03-23 4.05 0 4.05 4.05 Completed
2447 NAGALAND Agriculture and Allied Beekeeping and Honey Development in Nagaland Phase-II Schemes of NEC Schemes of NEC 2014-12-18 4.95 2017-12-18 4.455 0 4.455 4.46 Completed
2448 NAGALAND Agriculture and Allied Conservation & Propagation of Indigenous Fodder for sustainable livestock development in Nagaland Schemes of NEC Schemes of NEC 2024-02-01 0.89 2026-02-01 0.22 0.445 0.665 0.2225 Ongoing
2449 NAGALAND Agriculture and Allied Construction of Community based Fishery Project at Beiswapmpui, Peren district, Nagaland (Location: Peren dist) Schemes of NEC Schemes of NEC 2012-12-03 4.9909 2014-12-03 4.49 0 4.49 4.49 Completed
2450 NAGALAND Agriculture and Allied Construction of Govt. Higher Secondary School Building at Tizit, Mon District, Nagaland Schemes of NEC Schemes of NEC 2020-09-29 2.8 2023-09-29 2.8 0 2.8 2.8 Completed
2451 NAGALAND Agriculture and Allied Construction of Security Fencing Patrolling Road, Culvert, Protection Camps, Watch Towers and Barrack at Singphan Wildlife Sanctuary, Nagaland Schemes of NEC Schemes of NEC 2018-03-22 5.14 2020-03-22 1.85 0 1.85 1.85 Completed
2452 NAGALAND Agriculture and Allied Construction of Security Fencing, Patrolling Road, Culvert, Protection Camps, Watch Towers and barrack at Singpham Wildlife Sanctuary Schemes of NEC Schemes of NEC 2018-03-22 1.85 2020-03-22 1.67 0 1.67 1.67 Completed
2453 NAGALAND Agriculture and Allied Construction of table fish production farm at Duilongua village, New Jalukie, Peren district, Nagaland Schemes of NEC Schemes of NEC 2017-02-28 6.125 2020-02-28 6.125 0 6.125 6.13 Completed
2454 NAGALAND Agriculture and Allied Creation of Botanical garden and recreational park at Jalukie, Nagaland Schemes of NEC Schemes of NEC 2017-04-12 2.87 2020-04-12 2.583 0 2.583 2.58 Completed
2455 NAGALAND Agriculture and Allied Cultivation of Cashewnut at Peren district, Nagaland Schemes of NEC Schemes of NEC 2017-12-28 5 2020-12-28 5 0 5 5 Completed
2456 NAGALAND Agriculture and Allied Developing 100 Vegetable Villages for 10,000 households: Replication of Longkhum and Zhavame village modelCost per household Schemes of NEC Schemes of NEC 2020-11-23 3.98 2024-11-23 3.98 0 3.98 3.98 Completed
2457 NAGALAND Agriculture and Allied Developing 200 Value Addition Units for fruits and Vegetable across 11 districts Per unit cost: INR 2,00,000 Schemes of NEC Schemes of NEC 2021-11-23 4 2024-11-23 4 0 4 4 Completed
2458 NAGALAND Agriculture and Allied Development 100 Pack Houses Schemes of NEC Schemes of NEC 2021-02-26 3.97 2024-02-26 3.97 0 3.97 3.97 Completed
2459 NAGALAND Agriculture and Allied Development of Chabou Fishery Project at Rio Colony, Dimapur (Location: Dimapur) Schemes of NEC Schemes of NEC 2011-03-22 3.6344 2014-03-22 3.271 0 3.271 3.27 Completed
2460 NAGALAND Agriculture and Allied Development of Community based Aquaculture in Yajang Village, Mokokchung District, Nagaland. Schemes of NEC Schemes of NEC 2005-03-28 1.2376 2008-03-28 1.11 0 1.11 1.11 Completed
2461 NAGALAND Agriculture and Allied Development of Eri culture for sustainable livelihood of Eri farmers in Dimapur Nagaland Schemes of NEC Schemes of NEC 2018-03-22 2.78 2021-03-22 2.51 0 2.51 2.51 Completed
2462 NAGALAND Agriculture and Allied Development of fish seed and table fish farm at Ghowoto village, Dimapur, Nagaland Schemes of NEC Schemes of NEC 2017-04-12 5.99 2020-07-29 4.3138 0 4.3138 4.31 Completed
2463 NAGALAND Agriculture and Allied Development of Paddy cum Fish Culture, Nagaland. Schemes of NEC Schemes of NEC 2015-02-25 4.6085 2018-02-25 4.2085 0 4.2085 4.21 Completed
2464 NAGALAND Agriculture and Allied Development of Passion fruit cultivation in Nagaland Phase - I. Schemes of NEC Schemes of NEC 2004-06-28 0.735 2007-06-28 0.66 0 0.66 0.66 Completed
2465 NAGALAND Agriculture and Allied Development of Passion fruit cultivation in Nagaland Phase - II Schemes of NEC Schemes of NEC 2005-03-31 0.735 2008-03-31 0.66 0 0.66 0.66 Completed
2466 NAGALAND Agriculture and Allied Development of Pineapple Cultivation in Nagaland. Schemes of NEC Schemes of NEC 2005-08-16 1 2008-08-16 0.9 0 0.9 0.9 Completed
2467 NAGALAND Agriculture and Allied Development programme of identified backward block under 30 Central Sector Scheme of NEC in Pungro Town, Kiphire District, Nagaland Schemes of NEC Schemes of NEC 2020-10-06 2.77 2023-10-06 2.77 0 2.77 2.77 Completed
2468 NAGALAND Agriculture and Allied Establishment of Bio Village for Sustainable & inclusive growth of small farmers and community in Nagaland Schemes of NEC Schemes of NEC 2013-03-28 2.5097 2016-03-28 2.26 0 2.26 2.26 Completed
2469 NAGALAND Agriculture and Allied Establishment of Chick Rearing Farm & Satellite Farms at Siethekema-C, Dimapur. Schemes of NEC Schemes of NEC Dept. of Power 2022-03-21 3.26 2025-03-31 3.26 0 3.26 Completed
2470 NAGALAND Agriculture and Allied Establishment of Cold Storage at Gosaigaon. Schemes of NEC Schemes of NEC 2004-04-12 3.488 2007-04-12 3.14 0 3.14 3.14 Completed
2471 NAGALAND Agriculture and Allied Establishment of Mini Honey Industrial Unit, Apitherapy Cell, Museum & Showroom at 6th Mile Dimapur, Nagaland Schemes of NEC Schemes of NEC 2017-06-15 2.4516 2020-06-15 2.2064 0 2.2064 2.21 Completed
2472 NAGALAND Agriculture and Allied Establishment of Modern Dairy Cattle at SASRD, Medziphema Campus, Nagaland University Schemes of NEC Schemes of NEC Dept. of Power 2017-02-28 13.4418 2020-02-28 13.4418 0 13.4418 13.44 Ongoing
2473 NAGALAND Agriculture and Allied Expansion of Dragon Fruit farming at Shitovi village, Dimapur, Nagaland Schemes of NEC Schemes of NEC 2017-04-11 1.718 2020-04-11 1.24 0 1.24 1.24 Foreclosed
2474 NAGALAND Agriculture and Allied Fish Seed and Table Fish Production Farm at Naga United Village, Dimapur, Nagaland. Schemes of NEC Schemes of NEC 2005-08-18 0.3685 2008-08-18 0.33 0 0.33 0.33 Completed
2475 NAGALAND Agriculture and Allied Fish Seed Production Farm, Dimapur, Nagaland. Schemes of NEC Schemes of NEC 2005-08-10 0.9564 2007-10-25 0.86 0 0.86 0.86 Completed
2476 NAGALAND Agriculture and Allied Fish Seed Table Fish Production Farm at Chumukedima, Dimapur, Nagaland. Schemes of NEC Schemes of NEC 2006-09-18 1.7127 2009-08-18 1.54 0 1.54 1.54 Completed
2477 NAGALAND Agriculture and Allied Fishery project at Lamhai Dunki village Peren district, Nagaland Schemes of NEC Schemes of NEC 2016-03-17 3.34 2019-03-17 3.34 0 3.34 3.34 Completed
2478 NAGALAND Agriculture and Allied Fishery Project at Molongyimsen, Mokokchung district, Nagaland Schemes of NEC Schemes of NEC 2016-03-17 2.413 2019-03-17 2.17 0 2.17 2.17 Completed
2479 NAGALAND Agriculture and Allied Food Processing Centre at Mokokchung, Nagaland Schemes of NEC Schemes of NEC 2017-12-19 2.69 2020-12-19 2.13 0 2.13 2.13 Completed
2480 NAGALAND Agriculture and Allied Hayali integrated agricultural and Allied development Nagaland (Location: Wokha dist) Schemes of NEC Schemes of NEC 2012-09-19 4.375 2015-09-19 3.94 0 3.94 3.94 Completed
2481 NAGALAND Agriculture and Allied Infrastructure Development of Green Park at State Horticulture Nursery(SHN), Dimapur Schemes of NEC Schemes of NEC 2018-03-22 0.1 2021-03-22 0.1 0 0.1 0.1 Completed
2482 NAGALAND Agriculture and Allied Integrated Eri & Muga Culture for sustainable livelihood of rural farmers Schemes of NEC Schemes of NEC 2022-03-28 3 2025-03-28 3 0 3 1.2 Completed
2483 NAGALAND Agriculture and Allied Integrated organic Pineapples farming in Nagaland Schemes of NEC Schemes of NEC 2017-12-20 4.78 2020-12-20 4.78 0 4.78 4.78 Completed
2484 NAGALAND Agriculture and Allied Integrated Processing Unit & Pack House for Pineapple at State Horticulture Nursery Schemes of NEC Schemes of NEC 2023-03-28 2 2026-03-28 1 1 2 0.866 Ongoing
2485 NAGALAND Agriculture and Allied Livelihood Enhancement through Horticulture Intervention under Small Farmers Agribusiness Consortium Schemes of NEC Schemes of NEC 2023-03-28 4.34 2026-03-28 3.25 1.085 4.335 2.47 Ongoing
2486 NAGALAND Agriculture and Allied Marketing infrastructure in Nagaland Schemes of NEC Schemes of NEC 2017-12-20 3.968 2020-12-20 3.968 0 3.968 3.97 Completed
2487 NAGALAND Agriculture and Allied Marketing Support to Horticultural produces in Nagaland. Schemes of NEC Schemes of NEC 2006-03-23 1.0756 2009-03-23 0.97 0 0.97 0.97 Completed
2488 NAGALAND Agriculture and Allied Mushroom Cultivation (Oyster and Shitake) across 9 districts as revovling fund to SHGs:Rs. 30000 for Oyster per Group for 500 SHGs Schemes of NEC Schemes of NEC Dept. of Power 2021-03-01 4.8 2024-03-01 4.8 0 4.8 4.8 Completed
2489 NAGALAND Agriculture and Allied Piggery Infrastructures feed and fodder development in Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2016-04-19 4.6352 2019-04-19 4.17 0 4.17 4.17 Completed
2490 NAGALAND Agriculture and Allied Post harvest management of horticulture crops (cold rooms, pack houses, marketing infrastructure) in Dimapur, Mokokchung, Peren, Tuensang, Phek and Wokha, Nagaland Schemes of NEC Schemes of NEC 2017-12-28 7.179 2020-12-28 7.18 0 7.18 7.18 Completed
2491 NAGALAND Agriculture and Allied Promotion & Development of Medicinal and Aromatic plants in Nagaland. Schemes of NEC Schemes of NEC 2022-03-28 1.9181 2025-03-28 1.9195 0 1.9195 0.48 Completed
2492 NAGALAND Agriculture and Allied Promotion and Development of Medicinal and Aromatic Plants in Nagaland Schemes of NEC Schemes of NEC 2012-03-25 2.24 2015-03-25 2.02 0 2.02 2.02 Completed
2493 NAGALAND Agriculture and Allied Promotion of Organic Food Production during 2004-05 in Nagaland. Schemes of NEC Schemes of NEC 2005-03-18 1.07 2008-03-18 0.96 0 0.96 0.96 Completed
2494 NAGALAND Agriculture and Allied Proposal of identified block for providing key identified service at Bhandari Block, Wokha district, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 4.659 2025-03-31 4.6636 0 4.6636 1.86 Completed
2495 NAGALAND Agriculture and Allied Proposal of identified block for providing key identified service at Lotsu village, Wokha Block, Mon district, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 1.967 2025-03-31 1.9668 0 1.9668 0.79 Completed
2496 NAGALAND Agriculture and Allied Proposal of identified block for providing key identified service at Sanis Block, Wokha district, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 4.857 2026-03-31 4.8528 0 4.8528 1.94 Completed
2497 NAGALAND Agriculture and Allied Proposal of identified block for providing key identified service at Tamlu Block, Longleng district, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 4.72 2025-03-25 4.718 0 4.718 1.89 Completed
2498 NAGALAND Agriculture and Allied Proposal of identified block for providing key identified service at Tizit Block, Mon district, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 5 2025-03-31 5 0 5 5 Completed
2499 NAGALAND Agriculture and Allied Proposal of identified block for providing key identified service at Tizit village, Tizit Block, Mon district, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 1.433 2025-03-31 1.4332 0 1.4332 1.43 Completed
2500 NAGALAND Agriculture and Allied Reclamation & Renovation of old Ponds and Tanks in Nagaland (Location: Dimapur dist) Schemes of NEC Schemes of NEC 2012-03-23 5 2015-03-23 4.5 0 4.5 4.5 Completed
2501 NAGALAND Agriculture and Allied Rubber Plantation, Nagaland. Schemes of NEC Schemes of NEC 2014-02-15 9.08 2017-02-15 8.18 0 8.18 8.18 Completed
2502 NAGALAND Agriculture and Allied Sericulture project in the State of Nagaland Schemes of NEC Schemes of NEC 2014-02-15 4.886 2017-02-15 4.4 0 4.4 4.4 Completed
2503 NAGALAND Agriculture and Allied Setting up 2 units of piglet production farm, Dimapur district. Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 5.257 2025-03-31 2.1 3.1542 5.2542 1.8431 Ongoing
2504 NAGALAND Agriculture and Allied Setting up of 1 Poultry Breeding Farm & 30 Satellite Farms at Dimapur, Nagaland Schemes of NEC Schemes of NEC 2017-07-13 3.0766 2020-07-13 3.0766 0 3.0766 3.08 Completed
2505 NAGALAND Agriculture and Allied Setting up of 2 State Pig Breeding Farms at Medziphema and Jalukie, Nagaland Schemes of NEC Schemes of NEC 2010-01-08 3.98 2013-01-08 3.58 0 3.58 3.58 Completed
2506 NAGALAND Agriculture and Allied Setting up of cold storage unit at Dimapur, Nagaland (5000 MT). Schemes of NEC Schemes of NEC 2006-01-12 0.6375 2009-01-12 0.57 0 0.57 0.57 Completed
2507 NAGALAND Agriculture and Allied Setting up of Cold Storages implemented by Director Horticulture, Nagaland Schemes of NEC Schemes of NEC 2023-03-15 9.05 2026-03-15 4.53 4.2988 8.8288 4.415 Ongoing
2508 NAGALAND Agriculture and Allied Setting up of Dairy Farm at Dimapur, Nagaland Schemes of NEC Schemes of NEC 2017-07-13 2.51 2020-07-13 2.51 0 2.51 2.51 Completed
2509 NAGALAND Agriculture and Allied Setting up of Demonstration units (Hazelnut, Kiwi, Peach, Nectarine, Apricot & Plum) & value chain development in Nagaland Schemes of NEC Schemes of NEC 2023-03-28 8.18 2026-03-28 4.09 4.09 8.18 2.863 Ongoing
2510 NAGALAND Agriculture and Allied Setting up of Model Dairy farm in Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2017-04-18 3.64 2020-04-18 3.28 0 3.28 3.28 Completed
2511 NAGALAND Agriculture and Allied Strengthening the existing 6 Mushroom Seed Laboratory in six districts Schemes of NEC Schemes of NEC 2020-11-23 0.3 2023-11-23 0.3 0 0.3 0.3 Completed
2512 NAGALAND Agriculture and Allied Sustainable Bee keeping and Honey Development in Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 2 2025-03-31 2 0 2 0.8 Completed
2513 NAGALAND Agriculture and Allied Table fish production Schemes of NEC Schemes of NEC 2022-03-26 4.9417 2025-03-26 4.9442 0 4.9442 3.46 Ongoing
2514 NAGALAND Agriculture and Allied Vermicomposting Projects in Nagaland. Schemes of NEC Schemes of NEC 2005-11-01 4.12 2008-11-01 3.7 0 3.7 3.7 Completed
2515 NAGALAND Agriculture and Allied Vertical (Multi Layered) farming of turmeric at Niuland Dimapur Schemes of NEC Schemes of NEC 2023-03-30 1.03 2026-03-30 1.03 0 1.03 Completed
2516 NAGALAND Agriculture and Allied Watershed management for sustainable agriculture production and improved livelihood, Nagaland. Schemes of NEC Schemes of NEC 2016-05-02 4.1 2019-05-02 3.69 0 3.69 3.69 Completed
2517 NAGALAND Education Aspirational District Kiphire, Nagaland Schemes of NEC Schemes of NEC 2019-06-07 1 2022-06-07 1 0 1 1 Completed
2518 NAGALAND Education Community Development Programme Construction of Multi Utility Community Hall at Mao Community Centre, Kuda Village, Dimapur, Nagaland Schemes of NEC Schemes of NEC 2020-12-01 4.3615 2023-12-01 4.3615 0 4.3615 4.36 Completed
2519 NAGALAND Education Construction of Auditorium and Basic Amenities at Phek GHS, Nagaland Schemes of NEC Schemes of NEC 2023-03-31 1.92 2026-03-31 1.67 0.25 1.92 0.7 Ongoing
2520 NAGALAND Education Construction of Auditorium at GHS, Yongnyah, Longleng District, Nagaland Schemes of NEC Schemes of NEC 2023-03-31 1.85 2026-03-31 1.61 0.2395 1.8495 0.75 Ongoing
2521 NAGALAND Education Construction of College Hostel at Patkai Christian College Chumukedima, Seithekiema, Nagaland. Schemes of NEC Schemes of NEC 2017-08-04 2.34 2020-08-04 1.42 0 1.42 1.42 Completed
2522 NAGALAND Education Construction of Government High Secondary School and Hostel Building at Sangratsu village Mokokchung, Nagaland Schemes of NEC Schemes of NEC 2017-07-07 2.54 2020-07-07 2.54 0 2.54 2.54 Completed
2523 NAGALAND Education Construction of Govt. High School Auditorium/Multi-Utility Hall at Longsa, Nagaland. Schemes of NEC Schemes of NEC Dept. of Power 2014-06-13 2.94 2017-06-13 2.94 0 2.94 2.94 Ongoing
2524 NAGALAND Education Construction of Multipurpose Hall at Nagaland University, Medziphema, Nagaland Schemes of NEC Schemes of NEC 2016-10-20 11.5021 2020-10-20 11.5021 0 11.5021 11.5 Completed
2525 NAGALAND Education Construction of Rongmei Multi-Purpose Complex at Jalukie, Peren District, Nagaland Schemes of NEC Schemes of NEC 2022-03-31 4.68 2025-03-31 3.505 0 3.505 0.7 Ongoing
2526 NAGALAND Education Construction of School, Science & Computer Building for the Childrens Christian School, Mission Road, Kohima. Schemes of NEC Schemes of NEC 2016-04-22 3.4899 2019-04-22 3.4899 0 3.4899 3.49 Completed
2527 NAGALAND Education Construction of Skill Development Centre Cum Garo Community, Dimapur, Nagaland Schemes of NEC Schemes of NEC 2022-03-21 4.8141 2025-03-31 1.61 1.1716 2.7816 1.6062 Ongoing
2528 NAGALAND Education Construction of Working Women Hostel at Kohima Nagaland Schemes of NEC Schemes of NEC 2017-09-27 6.05 2020-09-27 4 1.5 5.5 4 Ongoing
2529 NAGALAND Education Infrastructure Development at Kohima Orphanage Home Schemes of NEC Schemes of NEC 2018-03-01 2.84 2020-03-01 0.1 0 0.1 0.1 Foreclosed
2530 NAGALAND Education Infrastructure Development at Kohima Orphanage Home at Kohima, Nagaland Schemes of NEC Schemes of NEC 2022-03-28 3.6045 2025-03-31 2.7 0.9012 3.6012 Ongoing
2531 NAGALAND Education Infrastructure Development at Mayangnokcha Govt. Higher Secondary School, Mokokchung, Nagaland. Schemes of NEC Schemes of NEC 2014-06-13 6.7 2017-06-13 6.6986 0 6.6986 6.28 Completed
2532 NAGALAND Education Infrastructure Development of Government High School at Noksen Town , Nagaland Schemes of NEC Schemes of NEC 2018-04-10 4.36 2020-04-10 0.1 0 0.1 0.1 Foreclosed
2533 NAGALAND Education Infrastructure Developmet for newly upgraded Govt. Hr. Sec. School in Meluri, Phek District and Medzhiphema, Dimapur District, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2016-07-21 4.01 2019-07-21 4.01 0 4.01 3.94 Ongoing
2534 NAGALAND Sports Academy of Wrestling, Akara at Dimapur, Nagaland Schemes of NEC Schemes of NEC 2017-04-19 4.65 2020-04-19 4.185 0 4.185 4.19 Completed
2535 NAGALAND Sports Augmentation of Water Supply through stream water sources in Japukong Range, Mokokchung Dist Schemes of NEC Schemes of NEC 2013-12-18 4.85 2016-12-18 4.36 0 4.36 4.36 Completed
2536 NAGALAND Sports Construction of Auditorium at Government Higher Secondary School, Mon Town Schemes of NEC Schemes of NEC 2021-02-26 2.92 2024-02-26 2.92 0 2.92 2.92 Completed
2537 NAGALAND Sports Construction of Auditorium at Govt. Higher Secondary School Mon Town, Nagaland Schemes of NEC Schemes of NEC 2018-01-16 3.15 2021-01-16 2.83 0 2.83 2.83 Completed
2538 NAGALAND Sports Construction of Dr.T.Ao Regional Football Academy at Seithekiema, Dimapur, Nagaland (Phase-II) Schemes of NEC Schemes of NEC 2022-03-26 8.96 2025-03-26 8.8324 0.1238 8.9562 3.58 Ongoing
2539 NAGALAND Sports Construction of Football Ground at Chiephobozou, Nagaland Schemes of NEC Schemes of NEC 2017-11-10 3.2 2019-11-10 3.2 0 3.2 3.2 Completed
2540 NAGALAND Sports Construction of Indoor Stadium Shooting Range and Procurement of equipment and appliances for Nagaland State Rifle Association. Schemes of NEC Schemes of NEC 2016-04-27 4.7896 2021-01-27 4.7896 0 4.7896 4.79 Completed
2541 NAGALAND Sports Construction of Kumbani Stadium at Mangkolemba town, Mokokchung, Nagaland Schemes of NEC Schemes of NEC 2017-06-27 3.9471 2023-08-21 3.5524 0 3.5524 3.55 Completed
2542 NAGALAND Sports Construction of Mini Stadium Englan, Wokha, Nagaland Schemes of NEC Schemes of NEC 2017-05-02 3.2 2020-05-02 2.306 0 2.306 2.31 Completed
2543 NAGALAND Sports Construction of Multipurpose Hall at JNV School, Zuketsa, Phek District, Nagaland Schemes of NEC Schemes of NEC 2017-09-12 5.91 2021-09-15 5.91 0 5.91 5.91 Completed
2544 NAGALAND Sports Construction of Multipurpose Hall at JNV, Wakching, Mon District, Nagaland Schemes of NEC Schemes of NEC 2017-11-13 8.05 2020-11-13 8.05 0 8.05 6.53 Completed
2545 NAGALAND Sports Construction of Multipurpose Hall at MLA Hostel Kohima, Nagaland Schemes of NEC Schemes of NEC 2016-05-09 6.4754 2021-12-21 5.8278 0 5.8278 5.83 Completed
2546 NAGALAND Sports Construction of Multipurpose Sports Indoor Stadium at Pfutsero Town, Phek District Schemes of NEC Schemes of NEC 2011-09-05 4.16 2013-09-05 3.744 0 3.744 3.74 Completed
2547 NAGALAND Sports Construction of Multipurpose stadium at G. Rio, Kohima Schemes of NEC Schemes of NEC 2014-03-05 2.6954 2017-03-05 2.4259 0 2.4259 2.43 Completed
2548 NAGALAND Sports Construction of Outdoor Multi-utility Sports Complex at Impur junction under Kubolong sub-division Mokokchung, Nagaland Schemes of NEC Schemes of NEC 2017-09-14 3.916 2021-12-21 1.566 0 1.566 1.57 Completed
2549 NAGALAND Sports Construction of Outdoor Stadium at Mon District Headquarters, Nagaland. Schemes of NEC Schemes of NEC 2014-12-17 5.02 2018-12-17 5.0187 0 5.0187 5.02 Completed
2550 NAGALAND Sports Construction of Outdoor Stadium in Pughoboto Sub-Divisional Headquarter, Zunheboto District, Nagaland. Schemes of NEC Schemes of NEC 2014-12-17 5.58 2018-12-20 5.5784 0 5.5784 5.58 Completed
2551 NAGALAND Sports Construction of Urban Recreational & Resource Centre Kohima, Nagaland Schemes of NEC Schemes of NEC 2016-03-17 10.3743 2019-03-17 10.37 0 10.37 8.15 Completed
2552 NAGALAND Sports Development of Music and Youth Activity Centre at Yasogei, Kohima, Nagaland Schemes of NEC Schemes of NEC 2017-03-06 9.1742 2020-03-06 8.844 0.3291 9.1731 4.11 Ongoing
2553 NAGALAND Irrigation and Flood Control Anti erosion works on Tizu river at Zunheboto district, Nagaland. Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 2.97 2025-03-31 2.97 0 2.97 0.75 Completed
2554 NAGALAND Irrigation and Flood Control Chathe Minor Irrigation Project at Sochunoma Village, Dimapur District, Govt. of Nagaland. Schemes of NEC Schemes of NEC 2016-06-03 3.79 2019-06-03 2.052 0 2.052 2.05 Completed
2555 NAGALAND Irrigation and Flood Control Conducting a detailed survey on water resource potential in Nagaland, including preparation of report on potentail of river, Inter-dist. Nagaland. Schemes of NEC Schemes of NEC 2016-03-23 1.35 2018-03-23 1.215 0 1.215 1.22 Completed
2556 NAGALAND Irrigation and Flood Control Integrated Nzu Valley Irrigation Project at Phenshunyu Village, Kohima District, Nagaland. Schemes of NEC Schemes of NEC 2017-06-23 4.0129 2019-06-23 3.6116 0 3.6116 3.61 Completed
2557 NAGALAND Irrigation and Flood Control Providing Water Supply to Akuk old Village by Pumping under Wokha District, Nagaland Schemes of NEC Schemes of NEC 2014-02-28 2.8522 2018-02-28 2.2505 0 2.2505 2.25 Completed
2558 NAGALAND Irrigation and Flood Control Providing Water Supply to Kejanglwa village in Peren dist Nagaland Schemes of NEC Schemes of NEC 2018-03-14 4.47 2021-03-14 0 Completed
2559 NAGALAND Irrigation and Flood Control Rain Water Harvesting Project at Pughoboto Ghatashe and Asukiqa area under Pughoboto Sub-division, Kohima District, Nagaland Schemes of NEC Schemes of NEC 2016-03-23 2 2019-03-23 1.8 0 1.8 1.8 Completed
2560 NAGALAND Irrigation and Flood Control Rain water reservoir for fire safety at regional border & skill training centre for fire safety officers, Nagaland Schemes of NEC Schemes of NEC 2023-03-09 3.8179 2027-03-31 3.82 0 3.82 3.82 Completed
2561 NAGALAND Irrigation and Flood Control Rutsa multipurpose irrigation project, Kohima dist, Nagaland Schemes of NEC Schemes of NEC 2016-03-23 6.95 2019-03-23 6.2537 0 6.2537 6.25 Completed
2562 NAGALAND Irrigation and Flood Control Sietsaru Multi-pupose Irrigation project at Phesama village, kohima dist., Nagaland Schemes of NEC Schemes of NEC 2018-03-08 2.68 2021-03-08 1 0 1 1 Completed
2563 NAGALAND Irrigation and Flood Control Soil Erosion protection of Kielierue Kam River at Jalukie in Nagaland Schemes of NEC Schemes of NEC 2017-05-02 2.832 2020-05-02 2.55 0 2.55 2.55 Completed
2564 NAGALAND Irrigation and Flood Control Storm Water Drainage at Shamator Town, Tuensang District, Nagaland. Schemes of NEC Schemes of NEC 2017-06-27 3.506 2020-06-27 3.16 0 3.16 3.16 Completed
2565 NAGALAND Irrigation and Flood Control Watershed Treatment for Flood Mitigation and Livelihood, Kohima dist. Schemes of NEC Schemes of NEC 2012-03-17 4.5 2017-11-23 0.522 0 0.522 0.52 Completed
2566 NAGALAND Industries 1000 rubber rollers to immediately procured, Nagaland Schemes of NEC Schemes of NEC 2020-10-27 3.5 2023-10-27 3.15 0 3.15 3.15 Completed
2567 NAGALAND Industries 1100 technicians per district to be trained in construction sector, Nagaland Schemes of NEC Schemes of NEC 2020-09-29 1.2395 2023-09-29 1.24 0 1.24 1.2395 Ongoing
2568 NAGALAND Industries 600 coffee pulping machines to be provided for processing/value addition to cofee growers Schemes of NEC Schemes of NEC 2020-10-27 3 2023-10-27 3 0 3 3 Completed
2569 NAGALAND Industries Bamboo Incense and Tooth Pick Manufacturing Unit at Jalukie, Nagaland Schemes of NEC Schemes of NEC Choose... 2023-03-30 4.55 2026-03-30 2.2775 0 2.2775 Ongoing
2570 NAGALAND Industries Construction of CFC for Emporium for Handloom & Handicrafts at Agri Expo, Nagaland Schemes of NEC Schemes of NEC 2022-03-29 4.8464 2025-03-28 4.8463 0 4.8463 3.94 Ongoing
2571 NAGALAND Industries Develop the Rea-nut based industry for production of Areca Plates as replacement for plastic, training & dying etc., Nagaland Schemes of NEC Schemes of NEC 2020-10-06 0.35 2023-10-06 0.32 0 0.32 0.32 Completed
2572 NAGALAND Industries Establishment of State of the Art Cane and Bamboo Technology Park at Nagaland Bamboo Resource Centre, Dimapur, Nagaland Schemes of NEC Schemes of NEC 2022-03-29 4.976 2025-03-29 4.97 0 4.97 1.77 Ongoing
2573 NAGALAND Industries Ginger Processing Unit in all 11 Districts i.e., Kohima, Phek, Kiphire, Wokha, Tuensang, Zunheboto, Mokoching, Longleng, Mon, Peren, Dimapur (1000 kg capacity) through CBOs/ Entrepreneurs/ Cooperative Schemes of NEC Schemes of NEC Dept. of Power 2021-02-26 1.958 2024-02-26 1.958 0 1.958 0.74 Ongoing
2574 NAGALAND Industries Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19 to the state of Nagaland(Phase-II) Schemes of NEC Schemes of NEC 2021-01-21 2.94 2021-01-21 2.94 0 2.94 2.94 Completed
2575 NAGALAND Industries Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Nagland Schemes of NEC Schemes of NEC 2020-08-22 3 2023-08-22 3 0 3 3 Completed
2576 NAGALAND Industries Multi Disciplinary Skill Development Nagaland, Schemes of NEC Schemes of NEC 2022-03-21 3.7791 2025-03-21 3.5 0.12804 3.62804 Ongoing
2577 NAGALAND Industries Post harvest Support on rubber Sheet Processing for value Addition, Nagaland Schemes of NEC Schemes of NEC 2023-03-03 2.5 2026-03-04 2.5 0 2.5 0.63 Ongoing
2578 NAGALAND Industries Promotion of Handloom and Handicraft at Diezephe Village, Dimapur , Nagaland Schemes of NEC Schemes of NEC 2022-03-28 2.9688 2025-03-28 2.9675 0 2.9675 2.39 Ongoing
2579 NAGALAND Industries Setting up of a Bamboo Shoot Processing Unit by M/s Nagaland Food Pvt. Ltd. C-26/3, Half Nagarjan, Dimapur City-797112 Schemes of NEC Schemes of NEC 2006-12-13 1.8247 2009-12-13 1.7601 0 1.7601 1.76 Completed
2580 NAGALAND Industries Setting up of a Ramie Rhizome Fibre Unit by M/s Longnaktsu Multipurpose Co-Operative Society Ltd., Longsa, Govt. of Nagaland Schemes of NEC Schemes of NEC 2006-03-07 1.1735 2008-03-07 1.06 0 1.06 1.06 Completed
2581 NAGALAND Industries Skill training on machineries, processing and business management, Nagaland Schemes of NEC Schemes of NEC 2020-09-29 1.98 2023-09-29 1.98 0 1.98 1.976 Ongoing
2582 NAGALAND Industries Train 1100 youths/entrepreneurs in maintenance and repai of tools and machineries covering all 11 districts, Nagaland Schemes of NEC Schemes of NEC 2020-09-29 1.98 2023-09-29 1.98 0 1.98 1.976 Ongoing
2583 NAGALAND Industries Value Addition on Coffee/ procurement of roasting machines and training of entrepreneurs, Nagaland Schemes of NEC Schemes of NEC 2023-03-17 4 2025-03-31 4 0 4 1.6 Ongoing
2584 NAGALAND Information and Public Relatio 4th North East Connectivity Summit, Kohima organised by Govt. of Nagaland Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.099 2021-04-01 0 Completed
2585 NAGALAND Information and Public Relatio Abiogenesis Centre for Performing Arts & Culture at Dimapur, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2017-07-03 1.49 2020-07-03 1.341 0 1.341 1.34 Completed
2586 NAGALAND Information and Public Relatio Construction of Amphi theatre for cultural tourism at Surumi village Zunheboto, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 2.9214 2025-03-31 2.9185 0 2.9185 1.17 Completed
2587 NAGALAND Information and Public Relatio Construction of Cultural Complex at Aboi, Nagaland Schemes of NEC Schemes of NEC 2018-03-14 2.5 2022-03-14 0.1 0 0.1 0.1 Foreclosed
2588 NAGALAND Information and Public Relatio Construction of Konyak Heritage Complex at Mon District, Nagaland Schemes of NEC Schemes of NEC 2023-03-30 22.79 2026-03-30 15.0293 7.7595173 22.7888173 11.73 Ongoing
2589 NAGALAND Information and Public Relatio Construction of Library-cum-Museum at Ungma, Mokokchung, Nagaland Schemes of NEC Schemes of NEC Other 2017-04-11 3.9733191 2020-04-11 3.5498 0 3.5498 3.55 Completed
2590 NAGALAND Information and Public Relatio Construction of Naga Indigenous Inn cum Learning Centre at Phesama village, Kohima, Nagaland Schemes of NEC Schemes of NEC 2023-03-15 1.67 2026-03-15 0.77 1.00038 1.77038 Ongoing
2591 NAGALAND Information and Public Relatio Nagaland College of Music & Fine Arts auditorium Schemes of NEC Schemes of NEC 2023-03-31 2.63 2025-03-31 1.98 0.65 2.63 2.635 Ongoing
2592 NAGALAND Information and Public Relatio Setting up of a Film Studio, Dimapur, Nagaland, Govt. of Nagaland Schemes of NEC Schemes of NEC 2017-11-03 2.03 2021-03-31 2.032 0 2.032 0.81 Ongoing
2593 NAGALAND Information and Public Relatio Setting up of Multi Media cum Convention Centre at Dimapur, Nagaland Schemes of NEC Schemes of NEC 2017-04-11 10.52 2020-04-11 7.09 0 7.09 7.09 Ongoing
2594 NAGALAND Information and Public Relatio The stories of our ancestors(narrative retelling by the Nagas of NE India Schemes of NEC Schemes of NEC Dept. of Power 2020-07-06 0.67 2023-07-06 0.0852 0 0.0852 0.09 Foreclosed
2595 NAGALAND Health Accident and Trauma Centre at Dimapur, Nagaland Schemes of NEC Schemes of NEC 2005-03-23 1.4139 2008-03-23 1.27 0 1.27 1.27 Completed
2596 NAGALAND Health Accident and Trauma Centre at Mokokchung, Nagaland Schemes of NEC Schemes of NEC 2005-03-23 1.4436 2008-03-23 1.2993 0 1.2993 1.3 Completed
2597 NAGALAND Health Establishment of 5 bedded ICU, HDU, Dialysis Unit & Major OT Up-gradation of Woodland Nursing Home, Mokokchung, Mokokchung Dist., Nagaland Schemes of NEC Schemes of NEC 2011-03-16 2.53 2014-03-16 2.277 0 2.277 2.28 Completed
2598 NAGALAND Health Establishment of 50 bedded Hospital at Mon, Mon District Schemes of NEC Schemes of NEC 2009-12-18 4.6557 2013-12-18 1.7 0 1.7 1.7 Completed
2599 NAGALAND Health Establishment of a 20 bedded CCU/ICU at Naga Hospital, Kohima, Nagaland Schemes of NEC Schemes of NEC 2006-06-03 4.55 2009-06-03 4.095 0 4.095 4.1 Completed
2600 NAGALAND Health Modernization of Bethel Medical Centre, Kohima, Nagaland Schemes of NEC Schemes of NEC 2009-02-26 3.75 2012-02-26 3.375 0 3.375 3.38 Completed
2601 NAGALAND Health Procurement of MRI Machine in the Faith Hospital at Dimapur, Nagaland Schemes of NEC Schemes of NEC 2016-02-22 5.408 2019-02-22 4.867 0 4.867 4.87 Completed
2602 NAGALAND Health Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Nagaland for activities related to combating COVID-19 pandemic Schemes of NEC Schemes of NEC 2020-04-01 3 2023-04-01 3 0 3 3 Completed
2603 NAGALAND Health Setting up of North East Regional Multi-disciplinary Paramedical Institute, Dimapur, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2014-02-26 49.8131 2017-02-26 44.83 0 44.83 44.83 Completed
2604 NAGALAND Health Support for construction of 2 Nos. of PHCs in difficult areas of Touphema (Kohima Dist.) & Ruzazho (Phek Dist.), Nagaland Schemes of NEC Schemes of NEC 2007-01-03 1.3104 2009-01-03 1.1794 0 1.1794 1.18 Completed
2605 NAGALAND Health Support for Procurement of Equipment & Machineries at Zion Hospital, Dimapur, Nagaland Schemes of NEC Schemes of NEC 2006-08-22 4.8239 2009-08-22 4.34 0 4.34 4.34 Completed
2606 NAGALAND Health Up-gradation of Equipment Infrastructure at Aine Nursing Home and Diagnositic Center, Jalukie, Peren District, Nagaland Schemes of NEC Schemes of NEC 2012-12-11 4.9088 2015-12-11 1.75 0 1.75 1.75 Completed
2607 NAGALAND Health Up-Gradation of Equipment infrastructure at Oking Hospital & Research & Clinic, Kohima, Nagaland Schemes of NEC Schemes of NEC 2011-06-21 4.3711 2014-06-21 3.93 0 3.93 3.93 Completed
2608 NAGALAND Health Up-gradation of Infrastructure of Impur Christian Hospital, Impur, Mokokchung Dist., Nagaland Schemes of NEC Schemes of NEC 2012-07-08 4.8458 2014-07-08 3.5 0 3.5 3.5 Completed
2609 NAGALAND Health Up-gradation of Naga Hospital, Kohima for OPD, Casualty and Diagnostic Centre Complex, Nagaland Schemes of NEC Schemes of NEC 2009-10-14 4.568 2012-10-14 3.11 0 3.11 3.11 Completed
2610 NAGALAND Health Up-gradation of Zion Hospital, Dimapur for Casualty & Physio-Therapy Block and Paediatric Nursing Unit, Nagaland Schemes of NEC Schemes of NEC 2009-10-16 4.5382 2012-10-16 4.08 0 4.08 4.08 Completed
2611 NAGALAND Power Construction of 1 No. 33/11kV, 1X1.6MVA unmanned sub-station at Longmatra under Kiphire Division, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2017-04-19 5.9334 2020-04-19 5.34 0 5.34 4.5 Completed
2612 NAGALAND Power Construction of 220/132/33kV Substation at Chiephobozou Block (Zhadima)(Part-II), Nagaland. Schemes of NEC Schemes of NEC 2012-08-21 68.58 2015-08-21 61.72 0 61.72 61.72 Completed
2613 NAGALAND Power Construction of 2X500kW Ponglefo SHEP, Nagaland Schemes of NEC Schemes of NEC 2016-02-26 13.3251 2019-02-26 11.9926 0 11.9926 11.99 Completed
2614 NAGALAND Power Construction of 33kV Transmission lines, 33/11kV Substation,11kV lines, 11/0.4kV Distribution substation and LT Lines in Kohima, Nagaland Schemes of NEC Schemes of NEC 2013-12-20 14.97 2015-12-20 13.47 0 13.47 13.47 Completed
2615 NAGALAND Power Construction of 66/33/11 KV, 5MVA Sub station at MON Schemes of NEC Schemes of NEC 2005-02-01 7.7848 2009-02-01 7.01 0 7.01 7.01 Completed
2616 NAGALAND Power Construction of SLDC Building at Nagarjan,Dimapur, Nagaland Schemes of NEC Schemes of NEC 2016-03-17 2.3 2018-03-17 2.07 0 2.07 2.07 Completed
2617 NAGALAND Power Conversion of 33kV pole structure to Lattice tower of the Ringmain Feeder at Kohima, Nagaland Schemes of NEC Schemes of NEC 2015-06-09 14.31 2018-06-09 3.29 0 3.29 3.29 Completed
2618 NAGALAND Power Development of Hydroger, Nagaland Schemes of NEC Schemes of NEC 2017-06-29 1.7263 2020-06-29 1.2 0 1.2 1.2 Completed
2619 NAGALAND Power Off Grid solar power plants with an aggregate capacity of 855 KWP at Government Deptts. Office building in Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2017-04-19 6.6139 2020-04-19 5.9525 0 5.9525 4 Completed
2620 NAGALAND Power Setting up of Noiroi Mini Hydro Electric Project Stage-I & Stage-II (4X75KW -2 units each) in Paren District, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2012-03-14 4.04 2015-03-14 3.63 0 3.63 3.63 Completed
2621 NAGALAND Power Tsutsung Small/Mini HEP (4x250kW1000KW) Mokokchung, Nagaland Schemes of NEC Schemes of NEC 2012-11-21 5.16 2015-11-21 4.64 0 4.64 4.64 Completed
2622 NAGALAND Power Up-gradation of 66kV to 132kV S/C Kiphire- Tuensang- Mokokchung Transmission Line (Phase-I), Nagaland Schemes of NEC Schemes of NEC 2012-01-04 4.9857 2015-01-04 4.49 0 4.49 4.49 Completed
2623 NAGALAND Power Upgradation & Modernization of 132/33 KV Meluri S/s. Nagaland. Schemes of NEC Schemes of NEC 2008-08-12 4.9551 2015-03-31 4.46 0 4.46 4.46 Completed
2624 NAGALAND Power Upgradation of 66/33/11 kV Chumukedima Substation from 10MVA to 30 MVA, Nagaland. Schemes of NEC Schemes of NEC 2012-01-04 4.9451 2016-01-04 4.45 0 4.45 4.45 Completed
2625 NAGALAND Power Upgradation of 66KV TO 132KV S/C Kiphire-Tuensang -Mokokchung transmission line ( Phase- II) Schemes of NEC Schemes of NEC 2019-09-27 5.83 2022-09-27 5.25 0 5.25 5.25 Completed
2626 NAGALAND Science and Technology Afforestation of Denuded Hills in Peren District in Nagaland. Schemes of NEC Schemes of NEC 2022-03-27 3 2025-03-27 3 0 3 1.2 Ongoing
2627 NAGALAND Science and Technology Afforestation of Denuded Hills in Phek District in Nagaland. Schemes of NEC Schemes of NEC 2022-03-27 3.0007 2025-03-31 3.0007 0 3.0007 1.2 Ongoing
2628 NAGALAND Science and Technology Building of IT Infrastructure and Modernization of Motor Vehicle Department, Nagaland, Motor Vehicle Dept. Govt. of Nagaland Schemes of NEC Schemes of NEC 2017-06-29 3 2020-06-29 2.7 0 2.7 2.7 Completed
2629 NAGALAND Science and Technology Computerization Networking & Modernization of Nagaland Legislative Assembly. Nagaland Legislative Assembly Secretariat, Govt. of Nagaland Schemes of NEC Schemes of NEC 2016-04-29 2.89 2019-04-29 2.601 0 2.601 2.6 Ongoing
2630 NAGALAND Science and Technology Computerization of NSCB (Nagaland State Cooperative Bank) on CBS Platform with Financial inclusion Technology, Nagaland. Nagaland State Co-operative Bank Ltd. Schemes of NEC Schemes of NEC 2016-03-11 1.967 2019-03-11 1.7703 0 1.7703 1.77 Completed
2631 NAGALAND Science and Technology Computerization/Strengthening of NEC Cell under Planning Department, Govt. of Nagaland Schemes of NEC Schemes of NEC 2010-03-25 0.4668 2013-03-25 0.4668 0 0.4668 0.47 Completed
2632 NAGALAND Science and Technology Construction of Fire Station, Central Workshop-cum-Garage, Water Reservoir and Fire Fighting Equipments and Appliance. Schemes of NEC Schemes of NEC 2013-11-15 4.27 2016-11-15 3.8467 0 3.8467 3.85 Foreclosed
2633 NAGALAND Science and Technology Developing Information Technology Infrastracture in Schools for promoting Biodiversity Conservation, Nagaland(Nagaland State Biodiversity Board) Schemes of NEC Schemes of NEC 2016-11-23 0.6422 2019-11-23 0.6422 0 0.6422 0.64 Completed
2634 NAGALAND Science and Technology Development of IT Infrastructure Computerization and Networking for Planning & Co-ordination Department Schemes of NEC Schemes of NEC 2013-11-21 2.34 2016-11-21 2.1092 0 2.1092 2.11 Completed
2635 NAGALAND Science and Technology Development of School Information System in selected High/Higher Secondary Schools in Nagaland Schemes of NEC Schemes of NEC 2005-03-31 2.12 2008-03-31 1.908 0 1.908 1.91 Completed
2636 NAGALAND Science and Technology Establishment of State Soil Testing Laboratory Buildings & Equipments at Kohima, Nagaland, Soil and Water Conservation Dept, Govt. of Nagaland Schemes of NEC Schemes of NEC 2017-06-29 3.717 2020-06-29 3.3453 0 3.3453 3.35 Completed
2637 NAGALAND Science and Technology GIS Biodiversity & Vegetation Mapping Assessment of Endemic and Threatened Species of Nagaland Schemes of NEC Schemes of NEC 2010-03-23 3.34 2013-03-23 3.11 0 3.11 3.11 Foreclosed
2638 NAGALAND Science and Technology High Security Video Conferencing LAN Chief Ministers Secretariat, Nagaland. (Joint Secretary, Chief Ministers Secretariat, Govt. of Nagaland) Schemes of NEC Schemes of NEC 2012-03-05 3.527 2015-03-05 3.1743 0 3.1743 3.17 Completed
2639 NAGALAND Science and Technology IT Education Programme in Rural Govt. Middle Schools throughout Nagaland Schemes of NEC Schemes of NEC 2010-03-25 0.6048 2013-03-25 0.6048 0 0.6048 0.6 Completed
2640 NAGALAND Science and Technology IT Training for 360 Educated Unemployed Youths in Nagaland by Intensive Care Study Centre, Kohima Schemes of NEC Schemes of NEC 2006-03-30 0.252 2009-03-30 0.252 0 0.252 0.25 Completed
2641 NAGALAND Science and Technology Modern Equipments (IT Infrastructure) at all customary court in all 11 districts of Nagaland. Dept. of Justice & Law, Govt. of Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2016-04-29 3.3 2019-04-29 2.97 0 2.97 2.97 Ongoing
2642 NAGALAND Science and Technology Modernization of Department of Legal Metrology & Consumer Protection Schemes of NEC Schemes of NEC 2013-11-15 1.74 2016-11-15 1.5628 0 1.5628 1.56 Completed
2643 NAGALAND Science and Technology Nagaland State Spatial Data Infrastructure & Natural Hazard Zonation Mapping of Nagaland Schemes of NEC Schemes of NEC 2009-02-05 3.72 2012-02-05 3.72 0 3.72 3.72 Completed
2644 NAGALAND Science and Technology Online Connectivity of Secondary and Higher Secondary Schools with the Nagaland Board of School Education (NBSE) Schemes of NEC Schemes of NEC 2009-01-29 2.13 2012-01-29 2.13 0 2.13 2.13 Completed
2645 NAGALAND Science and Technology Preparation of Geo-spatial Plan for Governance & Sustainable Development for the State of Nagaland. Nagaland GIS & Remote Sensing Centre, Govt. of Nagaland Schemes of NEC Schemes of NEC 2023-03-14 4.8 2026-03-14 4.7986 0 4.7986 2.89155 Ongoing
2646 NAGALAND Science and Technology Preparatory Equipments under Management of Natural Calamities for the State of Nagaland Schemes of NEC Schemes of NEC 2012-04-24 2.36 2015-04-24 2.122 0 2.122 2.12 Completed
2647 NAGALAND Science and Technology Regional and State Requirement of Fire & Emergency Services Phase Wise at Nagaland. Department of Fire & Emergency Services Govt. of Nagaland Schemes of NEC Schemes of NEC 2017-06-29 5.4752 2020-06-29 4.9277 0 4.9277 4.93 Completed
2648 NAGALAND Science and Technology Secure, Scalable and Intelligent network e-frastructure solution for SIRD (State Institute of Rural Development) Kohima, Nagaland, Societies for Training & Research on Rural Development (STRD) State Institute of Rural Devp & Planning & Co-ordination Dept Govt. of Nagaland. Schemes of NEC Schemes of NEC 2016-09-29 0.4848 2019-09-29 0.44 0 0.44 0.44 Completed
2649 NAGALAND Science and Technology Strengthening of fire & Emergency services at Dimapur & Jalukie, Nagaland. Deputy Inspector General, Directorate of Fire & Emergency Services. Govt. of Nagaland Schemes of NEC Schemes of NEC 2016-05-20 3.759 2019-05-20 3.3831 0 3.3831 3.38 Completed
2650 NAGALAND Science and Technology Upgradation of Nagaland GIS and Remote Sensing Centres Infrastructure and Development of Training and Capacity Building Division Schemes of NEC Schemes of NEC 2013-03-25 2.572 2016-03-25 2.572 0 2.572 2.57 Completed
2651 NAGALAND Transport and Communication Cheiphobozou-Touphema Via Chiethu road Schemes of NEC Schemes of NEC 2007-03-02 4.48 2010-03-02 3.8 0 3.8 3.8 Completed
2652 NAGALAND Transport and Communication Construction of Longding-Nokajan road Schemes of NEC Schemes of NEC 2010-03-25 54.18 2013-03-25 48.76 0 48.76 48.76 Completed
2653 NAGALAND Transport and Communication ISBT Kohima Schemes of NEC Schemes of NEC 2006-03-22 9.1227 2009-03-22 8.03 0 8.03 8.03 Completed
2654 NAGALAND Transport and Communication ISBT Mokokchung Schemes of NEC Schemes of NEC 2006-03-22 7.503 2009-03-22 6.75 0 6.75 6.75 Completed
2655 NAGALAND Transport and Communication ISTT at Kohima Schemes of NEC Schemes of NEC 2014-11-28 12.0093 2017-11-29 10.81 0 10.81 10.81 Completed
2656 NAGALAND Transport and Communication Khaghoboto-Vishiyi-Luzhoto-Ghohito road Schemes of NEC Schemes of NEC 2006-02-23 4.2193 2009-02-23 3.8 0 3.8 3.8 Completed
2657 NAGALAND Transport and Communication Longleng-Ladaigarh Road Schemes of NEC Schemes of NEC 2006-09-22 79.49 2009-10-22 71.54 0 71.54 71.54 Completed
2658 NAGALAND Transport and Communication Medziphema-Jalukie-Athebong raod Schemes of NEC Schemes of NEC 2006-01-04 44.66 2009-01-04 40.19 0 40.19 40.19 Completed
2659 NAGALAND Transport and Communication Mokokchung (NH-155), NH-202 Junction to Aghunato via Longsa-Suruhoto road Schemes of NEC Schemes of NEC 2012-11-23 158.31 2015-11-23 133 0 133 133 Completed
2660 NAGALAND Transport and Communication Pukhungri-Avanku-Layshi road Schemes of NEC Schemes of NEC Dept. of Power 2005-07-29 23.39 2008-07-29 20 0 20 20 Completed
2661 NAGALAND Transport and Communication Viswema-Kedima-Zuketsa road Schemes of NEC Schemes of NEC 2010-08-16 79.99 2013-08-16 71.99 0 71.99 71.99 Completed
2662 NAGALAND Transport and Communication Wokha-Merapani road Schemes of NEC Schemes of NEC 2006-09-22 44.45 2009-09-22 40.01 0 40.01 40.01 Completed
2663 NAGALAND Transport and Communication Yimchenkimong-Woromong road Schemes of NEC Schemes of NEC 2005-08-18 2.3192 2008-08-18 2.08 0 2.08 2.08 Completed
2664 NAGALAND Tourism and Culture Capacity Building & Developing Infrastructure for Offroad Tourism in Tourism Schemes of NEC Schemes of NEC 2022-03-31 4.98 2026-03-19 3.9934 0 3.9934 1.99 Ongoing
2665 NAGALAND Tourism and Culture Construction of Approach Road and Security Fencing at IHM, Dimapur, Nagaland. Schemes of NEC Schemes of NEC 2012-03-21 3.5224 2015-03-21 3.1702 0 3.1702 3.17 Completed
2666 NAGALAND Tourism and Culture Construction of Eco-Tourism destination at Sendenyu Bio-diversity and wildlife conservation area, Kohima, Nagaland Schemes of NEC Schemes of NEC 2016-10-18 2.84 2020-10-18 2.556 0 2.556 2.56 Completed
2667 NAGALAND Tourism and Culture Construction of Guest House at Longleng District Head Quarter, Longleng, Nagaland Schemes of NEC Schemes of NEC 2016-09-27 3.16 2019-09-27 2.8452 0 2.8452 2.28 Completed
2668 NAGALAND Tourism and Culture Construction of Multilevel Parking at Rullinou, Kohima, Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2017-09-21 3.39 2020-09-21 1.22 0 1.22 1.22 Foreclosed
2669 NAGALAND Tourism and Culture Construction of Tourist Lodge at Jalukie, Peren, Nagaland Schemes of NEC Schemes of NEC 2017-12-28 2.95 2020-12-28 2.655 0 2.655 2.66 Completed
2670 NAGALAND Tourism and Culture Construction of Tourist Resort at Dzukou, Viswema Range, Nagaland Schemes of NEC Schemes of NEC 2014-03-03 2.8584 2018-03-03 2.5726 0 2.5726 2.57 Completed
2671 NAGALAND Tourism and Culture Development of Kohima view point Aradura Schemes of NEC Schemes of NEC 2022-03-03 4.5 2025-03-03 3.6 0.9 4.5 3.6 Ongoing
2672 NAGALAND Tourism and Culture Development of Lavi Lake in Niuland at Dimapur, Nagaland Schemes of NEC Schemes of NEC 2011-03-24 3.1331 2013-03-24 2.8198 0 2.8198 2.82 Completed
2673 NAGALAND Tourism and Culture Development of Sungkotenem Lake at Mopungchuket in Mokukchung District, Nagaland Schemes of NEC Schemes of NEC 2012-02-29 3.5102 2015-02-28 3.1592 0 3.1592 3.16 Completed
2674 NAGALAND Tourism and Culture Development of trekking & base camp at Mt. Saramati, Thanamir Village, Kiphire District Nagaland Schemes of NEC Schemes of NEC 2016-10-18 7.2 2019-10-18 6.48 0 6.48 6.48 Completed
2675 NAGALAND Tourism and Culture Eco-Tourism Destination and Development of Trekking Route at Phusachodu Village, Phek District, Nagaland Schemes of NEC Schemes of NEC 2017-03-22 3.1983 2021-03-22 2.8785 0 2.8785 2.88 Completed
2676 NAGALAND Tourism and Culture Establishment of Enopen Tourist Resort at Khonoma, Kohima Nagaland Schemes of NEC Schemes of NEC 2016-10-05 4.828 2019-10-05 4.3452 0 4.3452 4.35 Completed
2677 NAGALAND Tourism and Culture Establishment of Services Block (Enopen Tourist Resort) at Khonoma, Kohima, Nagaland Schemes of NEC Schemes of NEC 2021-03-31 1.88 2025-03-31 1.88 0 1.88 1.88 Completed
2678 NAGALAND Tourism and Culture Infrastructure Development for Pilgrimage Destination at Molungyimsen, Mokukchung District, Nagaland. Schemes of NEC Schemes of NEC 2012-06-07 4.6154 2015-06-07 4.1538 0 4.1538 4.15 Completed
2679 NAGALAND Tourism and Culture Institute of Hotel Management and Catering at Dimapur, Nagaland Phase - II. Schemes of NEC Schemes of NEC 2013-03-26 4.9822 2015-03-26 4.484 0 4.484 4.48 Completed
2680 NAGALAND Tourism and Culture Integrated Tourism Project in Englan Range, Wokha, Nagaland Schemes of NEC Schemes of NEC 2014-03-03 3.0071 2017-03-03 2.7063 0 2.7063 2.71 Completed
2681 NAGALAND Tourism and Culture Seri - Tourism Model Farming Centre, in Mokokchung, Dimapur and Phek, Nagaland Schemes of NEC Schemes of NEC 2023-02-28 4.8718 2025-02-27 4.7787 0.09744 4.87614 4.87614 Completed
2682 NAGALAND Tourism and Culture Tourist amenity Center at Dzu River Schemes of NEC Schemes of NEC 2022-03-28 4.84 2026-03-19 4.836 0 4.836 4.836 Completed
2683 NAGALAND Tourism and Culture Tourist Destination at Tsuza Erya Pangti Village, Wokha District, Nagaland Schemes of NEC Schemes of NEC 2023-03-30 2.1642 2026-03-30 1.62315 0 1.62315 0.1 Ongoing
2684 NAGALAND Tourism and Culture Upgradation of Nagaland House at Shillong Schemes of NEC Schemes of NEC 2017-02-07 1.8134 2020-02-07 1.632 0 1.632 1.63 Completed
2685 NAGALAND Power Construction of 220/132 kV (2x100 MVA) & 132/33 kV (2x50 MVA) Sub-station at Tsitrongse-Dimapur with Associated lines in Nagaland PM-DevINE PM-DevINE Dept. of Power 2024-02-16 132.37 2026-09-30 33.09 33.0925 66.1825 Ongoing
2686 NAGALAND Agriculture and Allied Livelihood projects relating to Special Development of Eastern Nagaland PM-DevINE PM-DevINE Other 2023-03-23 180 2025-12-31 51.18 25.5872 76.7672 Ongoing
2687 NAGALAND Power Scheme for Providing Stable Power Supply to Mon District in Nagaland NESIDS-OTRI NESIDS Dept. of Power 2019-08-29 20.9607 2020-03-31 20.684 0 20.684 20.684 Completed
2688 NAGALAND Power Up-gradation of Transformation capacity at 132 kv sub-station Nagarjan, Dimapur(132/66 kv, 100 MVA-1Nos. and 66/33, kv, 50 MVA -1 nos.) NESIDS-OTRI NESIDS Dept. of Power 2023-12-22 24.46 2028-01-31 24.3341 0 24.3341 Ongoing
2689 NAGALAND Transport and Communication Construction and up gradation of Glory Peak Tourist Road under Phek District NESIDS-ROADS NESIDS Public works Department 2022-10-05 32.5 2024-05-31 24.374 4 28.374 7.96 Ongoing
2690 NAGALAND Roads and Bridges Construction of Widening of road from NH 29 (Sovima village Gate)- Sovima Cricket Ground upto Thahekhu village, Dimapur in Nagaland NESIDS-ROADS NESIDS Public works Department 2019-08-29 21.9614 2020-03-31 21.9081 0 21.9081 21.9081 Completed
2691 NAGALAND Transport and Communication Development of Tourism related infrastructure (Road with Heliport) at Tuophema tourist village NESIDS-ROADS NESIDS Public works Department 2019-07-10 17.13 2020-03-31 17.0831 0 17.0831 17.0831 Completed
2692 NAGALAND Transport and Communication Providing connectivity to places of tourist interest in the district Hq. of Tuensang District in Nagaland NESIDS-ROADS NESIDS Public works Department 2019-08-30 25.38 2020-03-31 25.33 0 25.33 10.13 Completed
2693 NAGALAND Transport and Communication Upgradation of Longnak-Mangkolemba road in Nagaland NESIDS-ROADS NESIDS Public works Department 2022-04-20 28.53 2024-04-30 21.4 7.1373 28.5373 3.77 Ongoing
2694 NAGALAND Transport and Communication Upgradation of road and bridge from NH-29 at 7th Mile Model Vilage to Siethekema C tourist destination onwards to Governors Camp from Ch.0.00 to 10.5 kms NESIDS-ROADS NESIDS Public works Department 2019-10-07 32.89 2020-03-31 28.82 3 31.82 20.81 Ongoing
2695 NAGALAND Roads and Bridges Upgradation of road from Kiphire to Tourist Destination at Zungki River, Kiphire District in Nagaland NESIDS-ROADS NESIDS Public works Department 2019-08-30 20.4432 2020-03-31 20.3937 0 20.3937 20.3937 Completed
2696 NAGALAND Transport and Communication Upgradation of road from Naga Lempong to Ahom Cave trekking point, Longleng in Nagaland NESIDS-ROADS NESIDS Public works Department 2019-08-29 12.99 2020-03-31 12.967 0 12.967 9.62 Completed
2697 NAGALAND Transport and Communication Upgradation of road from Wokha HQ to N. Longidang in Nagaland NESIDS-ROADS NESIDS Public works Department 2019-08-29 22.89 2020-03-31 22.8435 0 22.8435 22.8435 Completed
2698 NAGALAND Transport and Communication Dikhu Bridge to Amguri NESIDS-ROADS NERSDS Public works Department 2019-07-31 59.77 2024-04-24 55.3 3.41 58.71 39.65 Completed
2699 NAGALAND Transport and Communication Tenning to Lekie road NESIDS-ROADS NERSDS Public works Department 2019-08-05 136.96 2021-08-05 56.7872 5 61.7872 36.57 Ongoing
2700 NAGALAND Transport and Communication Upgradation of AT road from Tsuranga to Impur Junction NESIDS-ROADS NERSDS Public works Department 2019-08-05 93.98 2021-08-05 92.77 0 92.77 72.86 Completed
2701 NAGALAND Transport and Communication Upgradation of road from Chendang Saddle to Noklak (Length - 17.13 Km) NESIDS-ROADS NERSDS Public works Department 2021-03-24 62.2 2024-04-24 60.82 0.595 61.415 52.11 Completed
2702 NAGALAND Transport and Communication Upgradation of road from Chendang Saddle to Noklak (Phase-II) NESIDS-ROADS NERSDS Public works Department 2022-03-27 45.59 2024-09-27 36.57 8.38 44.95 44.71 Completed
2703 NAGALAND Transport and Communication Upgradation of road from Tuensang-to Longleng NESIDS-ROADS NERSDS Public works Department 2019-08-05 217.13 2022-05-05 162.84 20 182.84 137 Ongoing
2704 NAGALAND Water Supply Development of Tourism related infrastructure at Tuophema Tourist Village, Kohima District in Nagaland NESIDS-OTRI NESIDS Dept. of Agriculture & An 2019-09-03 3.0823 2020-03-31 3.0823 0 3.0823 1.2329 Completed
2705 NAGALAND Industries Community Trade Link Centre (CLTC) Project at Jalukie Peren District, Nagaland Schemes of NEC Choose... 2024-01-11 4.75 2027-01-11 1.19 0 1.19 1.187375 Ongoing
2706 NAGALAND Information and Public Relatio Construction of Museum Cum Library & Guest House at Chungliyimti Schemes of NEC Choose... 2024-01-08 3.12 2027-01-08 1.25 1.782157 3.032157 2.1876 Ongoing
2707 NAGALAND Education Additional facilities (false ceiling) forr sainik School at Punglwa NESIDS-OTRI NLCPR Department of School Educ 2007-09-27 0.5858 2009-02-27 0.5187 0 0.5187 0.5187 Completed
2708 NAGALAND Education Additional Facilities to Sainik School at Punglwa, Nagaland NESIDS-OTRI NLCPR Department of School Educ 2006-12-13 2.08 2008-05-30 0.9115 0 0.9115 0.9115 Completed
2709 NAGALAND Education Computerisation & Computer Education in Schools. NESIDS-OTRI NLCPR Department of School Educ 2000-03-31 1.62 2003-03-31 1.458 0 1.458 1.62 Completed
2710 NAGALAND Education Construction of School Buildings NESIDS-OTRI NLCPR Department of School Educ 2000-09-01 32.24 2001-03-30 29.016 0 29.016 32.24 Completed
2711 NAGALAND Education Construction of Senayangpa School Building at Ungma Mokokchung in Nagaland NESIDS-OTRI NLCPR Department of School Educ 2014-02-20 5.6924 2017-01-31 5.1232 0 5.1232 5.1232 Completed
2712 NAGALAND Education Construction of Tribal Boys Hostel near Fazl Ali College, Mokokchung Town, Mokokchung District in Nagaland NESIDS-OTRI NLCPR Department of School Educ 2014-02-20 4.4498 2017-01-31 3.8882 0 3.8882 3.8882 Completed
2713 NAGALAND Education Improvement and upgradation of 11 Government High School Buildings NESIDS-OTRI NLCPR Department of School Educ 2008-11-05 9.9894 2010-10-31 8.8141 0 8.8141 8.8141 Completed
2714 NAGALAND Education Improvement of Science Education. NESIDS-OTRI NLCPR Department of School Educ 2000-04-01 2.24 2003-03-31 2.016 0 2.016 2.24 Completed
2715 NAGALAND Education Nagaland University NESIDS-OTRI NLCPR Nagaland University 2001-09-02 4.03 2005-07-31 4.03 0 4.03 4.03 Completed
2716 NAGALAND Education Sainik School at Punglwa, Kohima NESIDS-OTRI NLCPR Department of School Educ 2004-03-19 14.07 2006-03-19 12.308 0 12.308 12.5895 Completed
2717 NAGALAND Education Sarva Shiksha Abhiyan (2005-06) NESIDS-OTRI NLCPR Department of School Educ 2006-03-29 4.646 2006-12-29 4.646 0 4.646 4.646 Completed
2718 NAGALAND Education Sarva Shiksha Abhiyan (2006-07) NESIDS-OTRI NLCPR Department of School Educ 2006-06-29 4.6304 2006-12-29 4.6304 0 4.6304 4.6304 Completed
2719 NAGALAND Education Upgradation and Modernization of 3 ITIs in the State of Nagaland NESIDS-OTRI NLCPR Department of School Educ 2006-12-14 2.1933 2008-05-30 1.2831 0 1.2831 1.974 Completed
2720 NAGALAND Irrigation and Flood Control Integrated Nguiki Irrigation Project NESIDS-OTRI NLCPR Dept water resources 2007-06-22 2.3713 2008-07-31 2.0924 0 2.0924 2.0924 Completed
2721 NAGALAND Irrigation and Flood Control Protection from Dhansiri river at Dimapur NESIDS-OTRI NLCPR Dept water resources 2002-02-27 5.108 2003-03-31 4.59 0 4.59 5.1 Completed
2722 NAGALAND Irrigation and Flood Control Sowhi Minor Irrigation Project. NESIDS-OTRI NLCPR Dept water resources 2001-10-11 1.06 2002-12-31 0.954 0 0.954 1.06 Completed
2723 NAGALAND Irrigation and Flood Control Tsurang Irrigation Project NESIDS-OTRI NLCPR Dept. of Power 2007-12-19 16.9332 2010-03-31 13.5236 0 13.5236 13.5236 Ongoing
2724 NAGALAND Irrigation and Flood Control Utilization of ground water resources through Shallow Tube Well NESIDS-OTRI NLCPR Public Health Engineering 2008-04-30 0.6305 2008-10-31 0.5674 0 0.5674 0.5674 Completed
2725 NAGALAND Health State Referral Hospital , Dimapur. NESIDS-OTRI NLCPR Dept. of Health & Family 2001-09-10 3 2002-12-31 2.7 0 2.7 3 Completed
2726 NAGALAND Health Upgradation of District Hospitals, Nagaland NESIDS-OTRI NLCPR Dept. of Health & Family 2004-02-26 14.4 2005-12-31 11.835 0 11.835 12.3469 Completed
2727 NAGALAND Health Upgradation of Naga Hospital at Kohima . NESIDS-OTRI NLCPR Dept. of Power 1998-12-23 25 2001-03-31 16.2 0 16.2 14.28 Ongoing
2728 NAGALAND Health Vitalisation of State Referral Hospital, Dimapur NESIDS-OTRI NLCPR Dept. of Health & Family 2004-02-19 35.62 2005-03-31 29.969 0 29.969 31.693 Completed
2729 NAGALAND Miscellaneous Administrative Training Institute. NESIDS-OTRI NLCPR Administrative Training I 1999-01-01 1 2000-09-30 0.9 0 0.9 1 Completed
2730 NAGALAND Miscellaneous Construction of Bus and Truck Terminus at Peren New District HQ (Model Township) in Nagaland NESIDS-OTRI NLCPR Dept of Transport 2012-10-31 8.7386 2014-04-30 7.8647 0 7.8647 7.8647 Completed
2731 NAGALAND Miscellaneous Construction of Judicial quaters for Judicial Officers in Nagaland NESIDS-OTRI NLCPR Dept. of Power 2014-02-28 9.8515 2024-12-31 8.0947 0 8.0947 6.4757 Ongoing
2732 NAGALAND Miscellaneous Construction of Multipurpose Hall at Longleng in Nagaland NESIDS-OTRI NLCPR Dept. of Power 2009-12-09 11.7042 2011-06-30 10.3272 0 10.3272 9.0849 Completed
2733 NAGALAND Miscellaneous Construction of New High Court Complex at Kohima Phase-I (Construction of residence for Honble Chief Justice of High Court and Construction of residences for Justice of High Court (six blocks) NESIDS-OTRI NLCPR Dept. of Power 2017-12-19 12.8674 2025-03-30 0.1 0 0.1 0.1 Foreclosed
2734 NAGALAND Miscellaneous Construction of Rest House for ADC HQ at Aboi under Mon District NESIDS-OTRI NLCPR Dept. of Power 2011-09-19 1.544 2014-08-31 1.3594 0 1.3594 1.0898 Completed
2735 NAGALAND Miscellaneous Construction of Rest House for ADC HQ at Khuza under Phek District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-16 1.6246 2014-08-31 1.4335 0 1.4335 1.4335 Completed
2736 NAGALAND Miscellaneous Construction of Rest House for ADC HQ at Meluri under Phek District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.8751 2014-08-31 1.6545 0 1.6545 1.6545 Completed
2737 NAGALAND Miscellaneous Construction of Rest House for ADC HQ at Niuland under Dimapur District in Nagaland funded under NLCPR Scheme. NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.7027 2013-09-19 1.5024 0 1.5024 1.5024 Completed
2738 NAGALAND Miscellaneous Construction of Rest House for ADC HQ at Shamator under Tuensang District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.8489 2014-08-31 1.6314 0 1.6314 1.6314 Completed
2739 NAGALAND Miscellaneous Construction of Rest House for Deputy Commissioner HQ at New Peren under Peren District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 2.1677 2014-08-31 1.9127 0 1.9127 1.9127 Completed
2740 NAGALAND Miscellaneous Construction of Rest House for EAC HQ at Botsa under Kohima District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-16 1.3605 2014-08-31 1.2005 0 1.2005 1.2005 Completed
2741 NAGALAND Miscellaneous Construction of Rest House for EAC HQ at Ghathashi under Zunheboto District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.2737 2014-08-31 1.1238 0 1.1238 1.1238 Completed
2742 NAGALAND Miscellaneous Construction of Rest House for EAC HQ at Khonsa under Kiphire District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.8838 2014-08-31 1.6622 0 1.6622 1.6622 Completed
2743 NAGALAND Miscellaneous Construction of Rest House for EAC HQ at Sakshi under Longleng District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.5437 2014-08-31 1.3621 0 1.3621 1.3621 Completed
2744 NAGALAND Miscellaneous Construction of Rest House for EAC HQ at Satoi under Zunheboto District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.2726 2014-08-31 1.1229 0 1.1229 1.1229 Completed
2745 NAGALAND Miscellaneous Construction of Rest House for SDO HQ at Changtongya under Makokchung District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.7971 2014-08-31 1.5857 0 1.5857 1.5857 Completed
2746 NAGALAND Miscellaneous Construction of Rest House for SDO HQ at Sanis under Wokha District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.9312 2014-08-31 1.7041 0 1.7041 1.7041 Completed
2747 NAGALAND Miscellaneous Construction of Rest House for SDO Hq. at Changtongya under Mokokchung District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.7971 2014-08-31 1.5857 0 1.5857 1.5857 Completed
2748 NAGALAND Miscellaneous Construction of Rest House for Sub-divisional Officer (Civil) at Dhansiripar under Dimapur District NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.6006 2014-08-31 1.4123 0 1.4123 1.4123 Completed
2749 NAGALAND Miscellaneous Construction of Swimming Pool at Dimapur, Nagaland NESIDS-OTRI NLCPR Dept. of Youth Resource & 2013-09-18 2.5985 2015-06-30 2.267 0 2.267 2.267 Completed
2750 NAGALAND Miscellaneous Establishment of North East Expo Centre ar Dimapur NESIDS-OTRI NLCPR Dept of Agriculture 2007-10-12 21.2178 2010-09-30 19.096 0 19.096 19.096 Completed
2751 NAGALAND Miscellaneous Extension of Hotel Japfu in Nagaland NESIDS-OTRI NLCPR Dept. of Power 2013-07-05 9.8312 2025-12-24 3.5392 0 3.5392 3.5392 Ongoing
2752 NAGALAND Miscellaneous Setting up of State Archive at Kohima NESIDS-OTRI NLCPR Dept of Art and Culture 2006-06-29 4.3095 2008-05-30 3.7656 0 3.7656 3.7656 Completed
2753 NAGALAND Power 23MW HFO, Thermal Power Plant, Dimapur NESIDS-OTRI NLCPR Dept. of Power 2004-03-17 32 2005-07-31 28.8 0 28.8 32 Foreclosed
2754 NAGALAND Power Construction of 10 MVA 132/33 kV Sub-station at Doyang (NH-61) near NEEPCO project NESIDS-OTRI NLCPR Dept. of Power 2012-03-23 10 2014-03-31 5.76 0 5.76 5.76 Completed
2755 NAGALAND Power Construction of 132 kV S/C Wokha-Zunheboto-Makokchung Transmission line Phase I, Wokha Doyang NH-61 NESIDS-OTRI NLCPR Dept. of Power 2011-09-23 20.4809 2013-09-30 17.6346 0 17.6346 17.6346 Completed
2756 NAGALAND Power Construction of 220 K/V F/C Transmission Line from Dimapur to Zadima NESIDS-OTRI NLCPR Dept. of Power 2017-11-17 108.1589 2024-12-31 97.3363 0 97.3363 97.3363 Ongoing
2757 NAGALAND Power Construction of 66KV Transmission Line (charged at 33KV) from Ganeshnagar to Peren & construction of 5MVA, 33/11 KV S/S at Jalukie & Peren NESIDS-OTRI NLCPR Dept. of Power 2008-12-18 21.7844 2010-05-15 19.2216 0 19.2216 19.2216 Completed
2758 NAGALAND Power Construction of end equipments and 220 kv S/C transmission line from PGCIL sub-station Dimapur to Chiephobozou NESIDS-OTRI NLCPR Dept. of Power 2010-12-03 14.2339 2012-10-31 12.5593 0 12.5593 12.5593 Completed
2759 NAGALAND Power Construction of new 66 kV Tizit to Mon Transmission Line NESIDS-OTRI NLCPR Dept. of Power 2005-05-10 12.4286 2006-05-31 10.8096 0 10.8096 10.8096 Completed
2760 NAGALAND Power Electrification of 4 Tribal Villages NESIDS-OTRI NLCPR Dept. of Power 2000-10-31 0.7 2002-12-31 0.63 0 0.63 0.7 Completed
2761 NAGALAND Power Likimro - HEP NESIDS-OTRI NLCPR Dept. of Power 1999-04-01 37.01 2002-12-31 33.309 0 33.309 37.01 Completed
2762 NAGALAND Power Sub-transmission & Distribution schemes (34 No.) NESIDS-OTRI NLCPR Dept. of Power 2000-11-07 67.85 2005-12-30 59.112 0 59.112 65.68 Completed
2763 NAGALAND Power Sub-Transmission system at Mokokchung NESIDS-OTRI NLCPR Dept. of Power 2003-02-18 6.99 2004-03-31 6.291 0 6.291 6.99 Completed
2764 NAGALAND Power Upgradation of 132/66/33 KV Grid Sub-station at Nagarjan, Dimapur NESIDS-OTRI NLCPR Dept. of Power 2014-07-01 17.0543 2017-06-30 15.3033 0 15.3033 15.3033 Completed
2765 NAGALAND Roads and Bridges Aboi-Tohok, 14 KM NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-10-23 6.53 2006-03-31 5.877 0 5.877 6.53 Completed
2766 NAGALAND Roads and Bridges Chantongya - Longleng Road (23 KMs) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2000-03-01 4.23 2002-09-30 3.807 0 3.807 4.23 Completed
2767 NAGALAND Roads and Bridges Constrcution of road from Kohima to Leike road junction to Barak - 15 Km (Phase- III) in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2012-12-24 19.1148 2014-12-31 17.2033 0 17.2033 15.672 Ongoing
2768 NAGALAND Roads and Bridges Construction & Improvement of road from Zhekiye to Hokiye via Satoi (Zhekiye to Chokhuvi)-26 km in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-02 16.9361 2010-08-31 14.9436 0 14.9436 14.9436 Completed
2769 NAGALAND Roads and Bridges Construction / Improvement of road from Tuophema to Kasha (8.5 km) in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-26 5.8682 2010-08-31 5.1779 0 5.1779 5.1779 Completed
2770 NAGALAND Roads and Bridges Construction and Upgradation of road from Old Phek via Khuza to Satakha Road NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2006-02-22 29.1721 2008-02-29 25.4902 0 25.4902 25.4902 Completed
2771 NAGALAND Roads and Bridges Construction of 2 lane RCC Bridge over Dhansiri river NESIDS-OTRI NLCPR Dept. of Power 2007-06-28 6.4519 2009-07-31 5.8067 0 5.8067 5.8067 Ongoing
2772 NAGALAND Roads and Bridges Construction of Link Roads to Mineral Deposit Areas in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2008-05-16 26.5391 2010-05-31 23.4171 0 23.4171 23.4171 Completed
2773 NAGALAND Roads and Bridges Construction of RCC T Beam girder double-lane bridge over river Tezu on Lanye to Meluri, Phek Dist NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-06-27 9.0026 2014-05-31 7.9435 0 7.9435 7.9435 Completed
2774 NAGALAND Roads and Bridges Construction of road from Kephore to Kituskir (10 km) in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-02 7.4905 2010-08-31 6.2638 0 6.2638 6.2638 Completed
2775 NAGALAND Roads and Bridges Construction of road from Agunato-Samator Road in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-27 15.973 2011-03-31 14.098 0 14.098 14.098 Completed
2776 NAGALAND Roads and Bridges Construction of Road from Chen HQ to Wangti, 23.10 Km in Mon District, Kohima in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2013-07-08 24.5059 2016-06-30 22.0553 0 22.0553 22.0553 Completed
2777 NAGALAND Roads and Bridges Construction of road from Chozuba Border Road to Kijumetuma Junction via Khusami (26 km) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-03-15 34.355 2013-02-28 30.312 0 30.312 30.312 Completed
2778 NAGALAND Roads and Bridges Construction of road from Chuchuyimlang to Mongdikang 20 km in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-10-14 11.0638 2011-03-31 9.7622 0 9.7622 9.7574 Completed
2779 NAGALAND Roads and Bridges Construction of road from Diezephe to Razephe via Vidima - 15 km NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-05-19 13.7124 2013-05-31 12.0992 0 12.0992 12.0992 Completed
2780 NAGALAND Roads and Bridges Construction of road from Jendang-Saddle-Noklak-Pangsha Tuensang District - 62 Km (Phase - II for 31 Km) in Nagaland NESIDS-OTRI NLCPR Dept. of Power 2012-12-26 21.8672 2024-12-31 15.7097 0 15.7097 15.7097 Ongoing
2781 NAGALAND Roads and Bridges Construction of road from Kohima to Leikie road junction to Tepuiki to Barak - 10 km (MDR) NESIDS-OTRI NLCPR Dept. of Power 2011-02-28 9.6854 2013-01-31 8.5459 0 8.5459 8.5459 Completed
2782 NAGALAND Roads and Bridges Construction of road from Longtho to Governors Camp at Liphayan 20 km in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-09-30 10.9456 2011-03-31 9.6579 0 9.6579 9.6579 Completed
2783 NAGALAND Roads and Bridges Construction of road from NH-150 to Chokriba via Thipuzu (10 km) in Phek District NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-12-19 11.6791 2013-03-31 10.3049 0 10.3049 10.3049 Completed
2784 NAGALAND Roads and Bridges Construction of road from NH-150 to Thiphuzu (25 km) in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-02 11.9246 2010-08-31 10.7321 0 10.7321 10.7321 Completed
2785 NAGALAND Roads and Bridges Construction of road from Noklak to Thonoknyu via Sanglao in Nagaland NESIDS-OTRI NLCPR Dept. of Power 2009-03-27 22.4938 2024-12-31 15.7646 0 15.7646 15.7646 Foreclosed
2786 NAGALAND Roads and Bridges Construction of Road from Phek to Chozuba (44.36 Km) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2007-12-31 17.4713 2009-06-30 14.5 0 14.5 14.5 Completed
2787 NAGALAND Roads and Bridges Construction of road from Pughoboto to Satakha, Zunheboto road, Zunheboto District (50km) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-09-19 39.2404 2013-08-31 35.3162 0 35.3162 35.3162 Completed
2788 NAGALAND Roads and Bridges Construction of Road from Purana Bazar (NH-39 Bypass) to Kohima-Bokajan Road NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2004-09-20 21.1763 2006-03-31 18.5033 0 18.5033 19.2496 Completed
2789 NAGALAND Roads and Bridges Construction of road from Razeba to Chizami via Thetsumi NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2008-12-18 25.7267 2010-12-15 23.154 0 23.154 23.154 Completed
2790 NAGALAND Roads and Bridges Construction of road from Ruzhazo to Phek town via Khumvophu NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2008-12-18 8.6004 2010-09-15 7.6486 0 7.6486 7.6486 Completed
2791 NAGALAND Roads and Bridges construction of Road from Sainik School Punglwa to Jalukie( from ODR to Intermediate Lane)-28 Km in Peren District ) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2016-02-25 36.1196 2018-02-28 32.2503 0 32.2503 32.2503 Completed
2792 NAGALAND Roads and Bridges Construction of road from Tamlu Administrative Hq. to Shemnyuching in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-02 11.4295 2011-02-28 10.2865 0 10.2865 10.2865 Completed
2793 NAGALAND Roads and Bridges Construction of road from Tuophema to Pughoboto via Kasha (Kasha to Pughoboto) - 12.47km NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-09-19 14.9487 2013-08-31 13.176 0 13.176 13.176 Completed
2794 NAGALAND Roads and Bridges Construction of Road from Yangli to Surohoto (17Km) in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-09-04 8.9468 2011-02-28 7.8942 0 7.8942 7.8942 Completed
2795 NAGALAND Roads and Bridges Construction of road from Zero Point Sanis to Woruku village - 27km (ODR) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-09-19 22.9944 2013-09-30 20.275 0 20.275 20.275 Completed
2796 NAGALAND Roads and Bridges Construction of Road Kohima Laike Road junction to old Puilwa -15km in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-09-04 7.4893 2011-02-28 6.6083 0 6.6083 6.6083 Completed
2797 NAGALAND Roads and Bridges Construction of Road to Dimapur Dist. Headquarters at Chumukedima NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2000-03-01 2.65 2002-03-29 2.385 0 2.385 2.65 Completed
2798 NAGALAND Roads and Bridges Construction of Tizu Bridge & Chizuti Bridge at Nimi-Laluri Road to Mineral Deposit Areas NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2010-12-23 20.5393 2012-11-30 18.1229 0 18.1229 18.1229 Completed
2799 NAGALAND Roads and Bridges Constructon of T.Beam Girder Double Lane Bridge of IRC Class 'A' loading over river DZU-U on Rusoma to Kijumetuma road NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2008-12-18 5.4441 2010-06-15 4.8997 0 4.8997 4.8997 Completed
2800 NAGALAND Roads and Bridges Dimapur to Ganeshnagar Road NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2003-01-30 12.12 2004-03-31 10.4132 0 10.4132 11.1132 Completed
2801 NAGALAND Roads and Bridges Improvement & Upgradation of road from Border road to Changlanshu - 19 km NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-06-27 6.1078 2014-05-31 5.3892 0 5.3892 5.3892 Completed
2802 NAGALAND Roads and Bridges Improvement and upgradation of District Capital Roads NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2004-07-29 20 2006-07-29 17.4753 0 17.4753 18.1763 Completed
2803 NAGALAND Roads and Bridges Improvement and Upgradation of road from Longkhum via Mangmetong - Aliba NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2006-02-22 17.81 2008-02-29 15.5589 0 15.5589 15.5589 Completed
2804 NAGALAND Roads and Bridges Improvement and Upgradation of road from NH-61 (Alichen to Mangmetong - 11 Km) to Doyang Hydro Project Phase -I in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2010-02-05 7.0414 2011-08-15 6.2129 0 6.2129 6.2129 Completed
2805 NAGALAND Roads and Bridges Improvement of Dimapur Niuland Road NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2000-03-01 7.36 2003-03-31 6.624 0 6.624 7.36 Completed
2806 NAGALAND Roads and Bridges Improvement of road from Hezidesa Village to Intanki River Bridge (6.60 km) and upgradation of Road from Mounglumuk to Jalukie Zandi Village (6.30km) in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2007-09-26 7.27 2008-08-28 6.5434 0 6.5434 6.5434 Completed
2807 NAGALAND Roads and Bridges Improvement of road from Zhekiye to Satoi - 70 km (Ghukhuyi upto Satoi Administrative Hq., MDR-21 km) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2010-11-10 14.3884 2012-04-30 12.6957 0 12.6957 12.6957 Completed
2808 NAGALAND Roads and Bridges Improvement of Roads in Mon District (Under PMs Package) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2005-09-29 23.7478 2007-09-29 20.5814 0 20.5814 20.5814 Completed
2809 NAGALAND Roads and Bridges Improvement of Roads in Tuensang District (Under PM's Package) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2005-09-29 40.7211 2007-03-31 32.8222 0 32.8222 32.8182 Completed
2810 NAGALAND Roads and Bridges Improvement of Roads in Wokha District (Under PM's Package) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2005-09-29 4.3542 2007-09-29 3.8012 0 3.8012 3.8012 Completed
2811 NAGALAND Roads and Bridges Khipire-Amahator-Lukhani Road (Tuensang Seminar Road) NESIDS-OTRI NLCPR Dept. of Power 2003-01-30 19.524 2008-03-31 14.0446 0 14.0446 14.4946 Ongoing
2812 NAGALAND Roads and Bridges Kiphire - Pungro Road (Tuensang Seminar Road) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-04-01 29 2008-03-31 26.55 0 26.55 28.5601 Completed
2813 NAGALAND Roads and Bridges Lampong Singha to Phomehing via Changnyu EAC HQ. (Mon Seminar Road) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2003-01-30 8.78 2005-12-31 0.54 0 0.54 Completed
2814 NAGALAND Roads and Bridges Mokokchung-Dikhu-Chare road in Tuensang Dist. (Tuensang Seminar Road) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-02-28 8.7 2006-03-31 7.831 0 7.831 8.537 Completed
2815 NAGALAND Roads and Bridges Mon-Namotola Road (Mon Seminar Road) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-10-01 9.58 2004-03-31 8.622 0 8.622 9.501 Completed
2816 NAGALAND Roads and Bridges Project Upgradation of road from Aizuto Mission Centre to Shena old Saptiqa EAC HQ via Atoizu and Tulo river i/c one bridge (25m span) 45 km. retained for 23 kms. only in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2015-08-10 14 2018-04-30 15.84 0 15.84 12.6 Completed
2817 NAGALAND Roads and Bridges Railway Over bridge at Dimapur NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-01-01 3.5 2002-09-30 3.15 0 3.15 3.5 Completed
2818 NAGALAND Roads and Bridges Replacement of Hamilton Bridge on Diku-Chare Road NESIDS-OTRI NLCPR Dept. of Power 2003-03-21 1.6 2005-03-21 0.36 0 0.36 0.06 Ongoing
2819 NAGALAND Roads and Bridges Tang-Junction to Chenmoho Road (Mon Seminar Road) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-04-01 15.54 2005-03-31 14.2828 0 14.2828 15.1258 Completed
2820 NAGALAND Roads and Bridges Tohok-Chen HQ-Chenlaiso-Wangti,49 KM NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2004-01-12 11.1108 2006-03-31 9.7807 0 9.7807 9.7146 Completed
2821 NAGALAND Roads and Bridges Tohok-Chenkhao-Wangti,31KM NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-10-23 8.1889 2006-03-31 7.37 0 7.37 7.9094 Completed
2822 NAGALAND Roads and Bridges Upgradation and Improvement of roads from Tourist Villages from major/minor hubs in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-02 4.8964 2011-02-28 4.323 0 4.323 4.323 Completed
2823 NAGALAND Roads and Bridges Upgradation of Co-Co Doyang Road (NH-61) to Kitsaki via Atoizu SDO HQ-37 (MDR) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2010-12-23 16.6112 2012-11-30 14.6569 0 14.6569 14.6569 Completed
2824 NAGALAND Roads and Bridges Upgradation of Dimapur Khopanala Jalukie Peren Road NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2006-02-21 36.73 2008-02-29 33.0595 0 33.0595 33.0595 Completed
2825 NAGALAND Roads and Bridges Upgradation of Dimapur-Nuiland Road from ODR to MDR (28 Kms) in Nagaland NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2010-08-16 29.4108 2012-02-29 25.9507 0 25.9507 25.9507 Completed
2826 NAGALAND Roads and Bridges Upgradation of road from Alongchen to Mangkolemba to via impur Mopungchuket Mongchen (ODR to MDR) - 19 Km-Phase-II in Nagaland NESIDS-OTRI NLCPR Dept. of Power 2017-05-25 22.33 2019-05-31 20.097 0 20.097 16.097 Completed
2827 NAGALAND Roads and Bridges Upgradation of road from Alongchen to Mangkolemba to via impur, Mopungchuket, Omngchem (ODR to MDR) - 15 Km (Phase-I) (upto WBM & Bituminous works) in Nagalnd NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2013-10-23 16.95 2015-09-30 15.255 0 15.255 15.255 Completed
2828 NAGALAND Roads and Bridges Upgradation of Road from Rusoma to Kijumetuma (36.00 Km) NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2007-12-31 21.8457 2009-09-30 19.6605 0 19.6605 19.6605 Completed
2829 NAGALAND Sports Construction of Football Stadium at Tobu Hq in Mon District in Nagaland NESIDS-OTRI NLCPR Dept. of Power 2014-02-20 2.6656 2024-12-12 1.8969 0 1.8969 1.3596 Ongoing
2830 NAGALAND Sports Construction of Indoor and Outdoor Stadium at Peren Government College, Peren NESIDS-OTRI NLCPR Dept. of Power 2010-07-30 8.2314 2024-12-31 2.903 0 2.903 2.903 Ongoing
2831 NAGALAND Sports Construction of Sports Hall at Mokokchung NESIDS-OTRI NLCPR Dept. of Youth Resource & 2003-03-21 1.94 2005-10-31 1.746 0 1.746 1.771 Completed
2832 NAGALAND Sports Development of Ziekezou Sports Complex, Kohima NESIDS-OTRI NLCPR Dept. of Power 2017-11-21 12.5 2024-12-30 11.25 0 11.25 4.5 Ongoing
2833 NAGALAND Sports Mini Outdoor Stadium at Wangkhao College in Mon Town NESIDS-OTRI NLCPR Dept. of Youth Resource & 2006-05-22 0.8026 2008-04-30 0.7014 0 0.7014 0.7014 Completed
2834 NAGALAND Tourism and Culture Construction of Rani Gaidinliu Library Cum memorial Museum at Kohima NESIDS-OTRI NLCPR Dept. of Power 2011-09-19 9.8308 2012-06-30 5.8354 0 5.8354 5.8354 Foreclosed
2835 NAGALAND Water Supply Augmantation of water supply at Dimapur. NESIDS-OTRI NLCPR Dept of Public Health Eng 2000-07-19 13.33 2002-03-01 11.997 0 11.997 13.33 Completed
2836 NAGALAND Water Supply Augmenataion of Water Supply to Wokha Town NESIDS-OTRI NLCPR Public Health Engineering 2012-11-23 19.596 2014-10-31 16.8368 0 16.8368 16.8368 Completed
2837 NAGALAND Water Supply Augmentation of water supply at Chen EAC H.Q. Chenwatnyu village NESIDS-OTRI NLCPR Public Health Engineering 2007-10-12 2.7948 2007-10-12 2.466 0 2.466 2.466 Completed
2838 NAGALAND Water Supply Providing water supply by gravity system to Aboi HQ and Longching EAC HQ in Mon District NESIDS-OTRI NLCPR Public Health & Engg Depa 2017-12-04 9.6598 2019-12-31 8.6938 0 8.6938 3.4775 Completed
2839 NAGALAND Water Supply Providing Water Supply by gravity to Mon village and 4 neighbouring villages in Mon District NESIDS-OTRI NLCPR Dept. of Power 2015-10-29 15.4667 2017-10-31 13.8212 0 13.8212 13.8212 Completed
2840 NAGALAND Water Supply Providing Water Supply to 24 villages of Chiephobozou R.D.Block in Nagaland NESIDS-OTRI NLCPR Public Health Engineering 2009-09-30 26.2641 2011-09-30 23.1742 0 23.1742 23.1742 Completed
2841 NAGALAND Water Supply Providing Water Supply to New Peren District HQ of Nagaland NESIDS-OTRI NLCPR Public Health Engineering 2012-09-14 9.3094 2014-12-31 8.3564 0 8.3564 8.3564 Completed
2842 NAGALAND Water Supply Providing water supply to Samziuram village, Peren NESIDS-OTRI NLCPR Dept. of Power 2017-11-21 18.9316 2024-12-31 17.0384 0 17.0384 6.8154 Ongoing
2843 NAGALAND Water Supply Water Supply scheme for Mon and Chui villages NESIDS-OTRI NLCPR Public Health Engineering 2003-11-08 3.92 2005-03-31 3.3622 0 3.3622 3.6622 Completed
2844 NAGALAND Health Upgradation of the Radiation Oncology Centre at CIHSR in Nagaland under PM-DevINE PM-DevINE Dept. of Power 2024-06-13 34.5 2027-06-30 2.3149 17.0949 19.4098 Ongoing
2845 NAGALAND Education Educational Infrastructure/ facility Development in Polytechnics in Nagaland PM-DevINE Dept. of Higher & Technic 2024-06-13 30 2026-06-30 20.7846 6.9282 27.7128 Ongoing
2846 NAGALAND Information and Public Relatio Construction of Tribal Artisan Resource Centre at Chumukedima , Nagaland Schemes of NEC Nagaland Handloom and Han 2024-09-29 2.91 2027-09-29 1.45278185 1.45278185 0.7263909 Ongoing
2847 NAGALAND Tourism and Culture Creation of Amenity Centre at Kigwema, Nagaland Schemes of NEC Nagaland Tourism Board 2024-10-29 1.47 2027-10-29 0.735 0.735 0.3675 Ongoing
2848 NAGALAND Transport and Communication C/O Road from Jalukie (NH-129A) to New DC Complex model township Peren NESIDS-ROADS Public works Department 2024-10-23 21.91 2026-10-22 5.32 5.32 Ongoing
2849 NAGALAND Transport and Communication Construction of Road from Old Peren to New Peren (DC Office)via Chalkot junction (L-16.50KM) NESIDS-ROADS Public works Department 2024-11-05 46.32 2026-11-04 11.76 11.76 Ongoing
2850 NAGALAND Agriculture and Allied Promotion of Naga King Chilly Schemes of NEC Department of Horticultur 2024-11-06 4.95 2027-11-06 3.7179 3.7179 1.2379 Ongoing
2851 NAGALAND Education Construction of Classroom and Construction of 40 bedded Boys Hostel with Furniture and other amenities at Government Polytechnic Seithekema-C, Chumoukedima, Nagaland Schemes of NEC Directorate of Technical 2024-11-11 4.16 2027-11-11 1 1.04 2.04 Ongoing
2852 NAGALAND Science and Technology Construction of cultural activity complex at Pfutseromi Village in respect of Chakhesang Tribe, Office of the Deputy Commissioner, District Administrative Office, Phek Schemes of NEC Office of the Deputy Comm 2024-12-13 4.61 2027-12-13 0 Ongoing
2853 NAGALAND Transport and Communication Upgradation of Road from Khonoma village to NH 29 via Dzudza river NESIDS-ROADS Public works Department 2025-02-17 26.46 2027-02-16 6.5581 6.5581 Ongoing
2854 NAGALAND Transport and Communication Upgradation of road from Thizama via Kohima Bypass road to proposed Chiethu Airport via Nehre model village NESIDS-ROADS Public works Department 2025-02-20 42.6 2027-02-19 6.19 6.19 Ongoing
2855 NAGALAND Transport and Communication Improvement of road from Phomching HQ Nagaland to Longding HQ Arunachal Pradesh via Wetting Longzang and Phuka village NESIDS-ROADS Public works Department 2025-02-21 58 2027-02-20 17.08 17.08 Ongoing
2856 NAGALAND Transport and Communication Improvement of road from Coco road Emlomi Old British Bungalow to Ghukiye Jn via Kilki road NESIDS-ROADS Public works Department 2025-02-21 29.79 2027-02-20 4.42 4.42 Ongoing
2857 NAGALAND Health Setting up of 50 Bedded Hospital at New District Headquarter Peren, Nagaland PM-DevINE Dept. of Health & familly 2025-04-29 44.6509 2028-04-28 8.2925 8.2925 Ongoing
2858 NAGALAND Health Setting up of Multispeciality Hospital at Chumokedima Nagaland PM-DevINE Dept. of Health & familly 2025-07-09 58.7209 2027-07-31 10.4749 10.4749 Ongoing
2859 NAGALAND Science and Technology Nagaland Innovation Hub for startup NESIDS-OTRI Department of IT and comm 2025-08-20 19.5663 2028-08-20 4.7678 4.7678 Ongoing
2860 NAGALAND Industries Post-Harvest Coffee processing facilities for Sustainable Economic Development in Nagaland. Schemes of NEC Department of Land Resour 2025-08-08 8.55 2026-08-08 2.1375 2.1375 Ongoing
2861 NAGALAND Power Development of 1.5 MW Dzuna small hydro project NESIDS-OTRI Power Dept 2025-09-22 22.8031 2027-09-22 0 Ongoing
2862 NAGALAND Sports Construction of Kohima Multi Disciplinary Sports Centre at IG Stadium Complex, Kohima District PM-DevINE Youth Affairs and Sports 2025-10-27 72.5913 2027-10-31 0 Ongoing
2863 NAGALAND Transport and Communication Up-gradation of road from Lampong Sheanghah to Nyasa village via Longphoh, Shangnyu, Mon district , Length- 18Km NESIDS-ROADS Public works Department 2025-10-31 23.09 2028-04-30 0 Ongoing
2864 NAGALAND Power Development of 4.2 MW Nrazai Small Hydro Project NESIDS-OTRI Power Department, Nagalan 2025-11-24 45.6681 2028-11-24 0 Ongoing
2865 NAGALAND Industries Setting up handicraft facility centre at Kohima. Schemes of NEC Nagaland Khadi & Village 2025-12-15 4.7584 2027-12-15 0 Ongoing
2866 NAGALAND Sports Construction of Football Playground at Botsa EAC Hq.Kohima District, Nagaland NESIDS-OTRI Department of Youth resou 2026-01-05 20.45 2028-01-05 0 Ongoing
2867 OTHER AGENCY Education Construction of Boys and Girls Hostel at Roing, Dibang Valley District, Arunachal Pradesh Schemes of NEC Schemes of NEC Other 2021-03-30 5.1756805 2024-03-30 5 0.2498776 5.2498776 4.93 Ongoing
2868 OTHER AGENCY Education Construction of Hostel Building at Donyi Polo Vidya Niketan, Pasighat for Arunachal Sikha Vikas Samiti, Arunachal Pradesh Schemes of NEC Schemes of NEC 2023-03-31 4.66 2026-03-31 2.37 1.8010312 4.1710312 1.17 Ongoing
2869 OTHER AGENCY Education Establishment of School & Hostel Infrastructure for Underpriviledged Tribal Students of Arunachal Pradesh at Hucheiliang Village under Tezu Circle, Lohit Schemes of NEC Schemes of NEC 2023-03-31 4.53 2026-03-31 4.03605 0 4.03605 Ongoing
2870 OTHER AGENCY Science and Technology Implementation of 11 Plan of Action (PoA) projects in the state of Arunachal Pradesh covering domain areas of Agriculture & Allied, Disaster Management, Forestry, Ecology & Environment, Human Resource Development, Medical & Health, Planning & Development, Transport & Communication and Water Resources Management (PoA020, PoA024, PoA026, PoA027, PoA028, PoA029, PoA030, PoA031, PoA032, PoA034, PoA036) Schemes of NEC Schemes of NEC 2022-03-28 3.1932 2025-03-28 2.63 0 2.63 1.27 Ongoing
2871 OTHER AGENCY Education Construction of Birgweshree Shikla Girls Hostel of Kalyan Ashram, Udalguri, Assam Schemes of NEC Schemes of NEC 2023-03-31 4.24 2026-03-31 3.61 0 3.61 Ongoing
2872 OTHER AGENCY Education Construction of School Building of Saraswati Vidya Mandir at Boro Haflong, Dima Hasao District, Assam Schemes of NEC Schemes of NEC 2023-03-31 3.62 2027-03-31 2.88 0 2.88 0.6773758 Ongoing
2873 OTHER AGENCY Education Construction of Vivekananda School at Haflong, Dima Hasao, Assam Schemes of NEC Schemes of NEC 2022-03-25 4.694 2026-03-25 3.96 0 3.96 0.53 Ongoing
2874 OTHER AGENCY Industries Establishment of an Eri Silk Spinning Mill at Integrated Textile Park, Baksa (Assam) Schemes of NEC Schemes of NEC 2022-03-31 14.92 2025-03-31 14.038 0 14.038 8.218 Ongoing
2875 OTHER AGENCY Industries Market Development by Way of Digitization, Authentication and Implementing Traceability in Handloom Sector of North Eastern States(NEHHDC) Schemes of NEC Schemes of NEC 2022-03-31 14.92 2025-03-31 14.92 0 14.92 1.58 Ongoing
2876 OTHER AGENCY Industries Setting up of North East (Ashtlaxmi) Haat & Experience Centre for Facilitating Market Linkage for the Handicrafts & Handloom Artisans and Weavers from the North Eastern Region Schemes of NEC Schemes of NEC 2022-03-30 7.667 2025-03-30 6.3868 0 6.3868 3.07 Ongoing
2877 OTHER AGENCY Health Infrastructure Development of Siva Sundari Nari Sikshasram & Ante-Natal Clinic, Park Road, Silchar, District-Cachar, Assam. Schemes of NEC Schemes of NEC 2022-03-31 4.27 2025-03-31 4.27 0 4.27 3.21 Ongoing
2878 OTHER AGENCY Science and Technology Digital Design Labs for Livelihood Generation (henceforth been named in place of earlier name - Animation Lab for livelihood Generation)Assam Electronics Development Co-operation Limited (AMTRON) Schemes of NEC Schemes of NEC 2022-03-28 4.99 2026-03-31 4.99 0 4.99 4.59 Ongoing
2879 OTHER AGENCY Science and Technology Habitat Restoration and Conservation of Gangetic Dolphin(Platinisa Roxburgh, 1801) in North-East India Schemes of NEC Schemes of NEC 2021-02-17 0.2489 2024-03-26 0.25 0 0.25 0.1 Ongoing
2880 OTHER AGENCY Science and Technology Implementation of 6 Plan of Action (PoA) projects finalized for the state of Assam as per NESAC Society meeting held on 23rd January, 2021 (PoA053, PoA060, PoA061, PoA062, PoA063) Schemes of NEC Schemes of NEC 2022-03-28 2.2095 2025-03-28 2.21 0 2.21 0.88 Ongoing
2881 OTHER AGENCY Science and Technology Space-based land-use Intelligent System for Guwahati (SLIS-G) (PoA050) Schemes of NEC Schemes of NEC 2022-03-28 4.5 2025-03-28 4.5 0 4.5 1.78 Ongoing
2882 OTHER AGENCY Transport and Communication Construction of hangar, associated apron and link taxiway works at Dibrugarh Airport Schemes of NEC Schemes of NEC 2016-02-09 20.85 2019-02-09 11 0 11 7.04 Completed
2883 OTHER AGENCY Agriculture and Allied Organic Tropical Fruit, Tamenglong Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 4.6238 2025-03-31 2.3083 2.3078 4.6161 1.6212 Ongoing
2884 OTHER AGENCY Agriculture and Allied Sustainable management of bioresources through Biotechnological interventions of Shiroi Hills and adjacent areas, Manipur Schemes of NEC Schemes of NEC 2018-01-02 11.5168 2021-01-02 4.6067 0 4.6067 2.46 Ongoing
2885 OTHER AGENCY Education Community Development Programme of Koireng Tribe in Manipur, (Establishment of Rrsources Centre for Study of Linguistic Art & Culture for Koireng Tribe) Schemes of NEC Schemes of NEC 2020-11-17 3.008236 2023-11-23 1.516 0.496 2.012 1.516 Ongoing
2886 OTHER AGENCY Education Construction of (G1) 100 bedded SC/ST Boys Hostel with Warden Quarter, common Room & Medical Examination Room & 25 KW on-grid roof top Solar Power Installation for students at NIELIT Centre, Manipur Schemes of NEC Schemes of NEC 2022-03-19 8.5863 2025-03-19 0 0 Foreclosed
2887 OTHER AGENCY Education Construction of 3 storied Residential school cum Hostel faciltity at Pau Shankar Kane Vidyalaya, Hougailong, Ward 4 at Tamenglong, Manipur Schemes of NEC Schemes of NEC 2022-03-31 4.1545 2025-03-31 2.53 0.8425 3.3725 2.53 Ongoing
2888 OTHER AGENCY Education Construction of Centre for Development of Personality and Skill Development alongwith Hostels at Kakching, Manipur Schemes of NEC Schemes of NEC 2021-03-26 7.04 2024-03-26 6.08 0 6.08 5.3 Ongoing
2889 OTHER AGENCY Education Construction of Hostel Building for Boys and Girls at Bal Vidya Mandir, Palace Compound, Imphal, Manipur Schemes of NEC Schemes of NEC 2023-03-31 4.82 2026-03-31 3.58 0 3.58 Ongoing
2890 OTHER AGENCY Education Construction of International Students hostel gents & ladies at Manipur University, Imphal Schemes of NEC Schemes of NEC 2016-05-31 13.9893 2019-05-31 13.9893 0 13.9893 13.02 Ongoing
2891 OTHER AGENCY Education Construction of Multi-facility centre at IGNTU-RCM, Kangpokpi District, Manipur Schemes of NEC Schemes of NEC Choose... 2023-03-31 7.87 2026-03-31 1.97 2.2934979 4.2634979 Ongoing
2892 OTHER AGENCY Education Construction of SC/ST Boys and Girls Hostel in respect of National Institute of Electronics and Information Technology (NIELIT), Imphal Schemes of NEC Schemes of NEC 2017-09-20 9.4 2020-09-20 9.4 0 9.4 9.4 Completed
2893 OTHER AGENCY Education Mao Multipurpose Centre, Senapati District, Manipur Schemes of NEC Schemes of NEC 2022-03-29 4.4233 2025-03-29 4.31 0.081837 4.391837 2.81 Ongoing
2894 OTHER AGENCY Industries Integrated bamboo and cane development project at Tamenglong Schemes of NEC Schemes of NEC Dept. of Power 2020-09-22 5.42 2023-09-22 4.94 0 4.94 2.47 Ongoing
2895 OTHER AGENCY Science and Technology Implementation of 2 State Plan of Action (PoA) projects finalized as per NESAC Society in the domain of Water Resource for Manipur during the meeting held on 23rd January, 2021. (PoA067, PoA068) Schemes of NEC Schemes of NEC 2022-03-31 0.8 2025-03-31 0.81 0 0.81 0.32 Ongoing
2896 OTHER AGENCY Tourism and Culture Tourism Circuit Development at Senapati, Manipur, NERCRMS. Schemes of NEC Schemes of NEC 2022-03-31 9.99 2026-03-19 4.9986 2.4965 7.4951 1.9986 Ongoing
2897 OTHER AGENCY Education Construction of Administrative Building of Dr.APJ Abdul Kalam Centre for Policy Research & Analysis at IIM, Shillong Schemes of NEC Schemes of NEC Choose... 2022-03-23 9.55 2025-03-23 9.51 0 9.51 Ongoing
2898 OTHER AGENCY Education Construction of Boys Hostel and School Building at Khongong, Wapung Village, East Jaintia Hills District, Meghalaya Schemes of NEC Schemes of NEC 2022-03-28 4 2025-03-28 3 0.629 3.629 1.6573839 Ongoing
2899 OTHER AGENCY Education Construction of School Building of Garudachal Vidyapeeth at Ampati, Meghalaya Schemes of NEC Schemes of NEC Choose... 2023-03-31 2.79 2026-03-31 2.55 0 2.55 Ongoing
2900 OTHER AGENCY Education Construction of School Building of Garudachal Vidyapeeth at Belbari, Meghalaya Schemes of NEC Schemes of NEC Choose... 2023-03-31 4.6 2026-03-31 4.24659 0.35341 4.6 Ongoing
2901 OTHER AGENCY Education Implementation of Functional Hindi Course at North East by IIM, Shillong Schemes of NEC Schemes of NEC Choose... 2022-03-27 3.43 2025-03-27 0.5 0 0.5 Ongoing
2902 OTHER AGENCY Information and Public Relatio Folklore, Wildlife and Nature in North East India: A study of their Inter-Relationship Schemes of NEC Schemes of NEC 2021-03-31 0.7314 2027-03-31 0.7326 0 0.7326 0.72884 Ongoing
2903 OTHER AGENCY Science and Technology Design and Development of Laboratory Instrument, Shillong (NEHU) Schemes of NEC Schemes of NEC 2018-03-14 0.156 2025-03-31 0.156 0 0.156 0.15431 Ongoing
2904 OTHER AGENCY Science and Technology Implementation of 2 Plan of Action (PoA) projects finalized for the states of Meghalaya as per NESAC Society meeting held on 23rd January, 2021. (PoA069, PoA076) Schemes of NEC Schemes of NEC 2022-03-28 0.5292 2025-03-28 0.53 0 0.53 0.21 Ongoing
2905 OTHER AGENCY Science and Technology Multipurpose convention Centre and Space Exhibition facility at NESAC Schemes of NEC Schemes of NEC Choose... 2022-03-30 5 2025-03-30 3.75 0 3.75 Ongoing
2906 OTHER AGENCY Education Construction and Upgradation of existing Girls Hostel at KamlaNagar, Lawngtlai, Mizoram Schemes of NEC Schemes of NEC 2022-03-26 1.61 2025-03-26 1.32 0 1.32 0.08 Ongoing
2907 OTHER AGENCY Education Construction of Cluster of Academic Blocks at Pachhunga University College, Aizawl Schemes of NEC Schemes of NEC Dept. of Power 2020-09-10 4.57 2023-09-23 4.5664 0 4.5664 3.66 Completed
2908 OTHER AGENCY Education Construction of Post-Graduate Academic Blocks at Pachhunga University (Central Campus) Aizawl, Mizoram Schemes of NEC Schemes of NEC 2022-03-10 10.7926 2025-03-10 9.26 1.5313 10.7913 1.08 Ongoing
2909 OTHER AGENCY Industries Horticulture Value Chain through food processing in Mizoram Schemes of NEC Schemes of NEC Dept. of Power 2022-03-27 4.44 2025-03-27 4.4362 0 4.4362 4.4362 Ongoing
2910 OTHER AGENCY Science and Technology Implementation of 3 State Plan of Action (PoA) projects finalized as per NESAC Society in the domain of Agriculture & Allied Forest, Ecology & Environment and capacity building for Mizoram during the meeting held on 23rd January, 2021. (PoA078, PoA079, PoA080) Schemes of NEC Choose... 2022-03-28 0.74 2025-03-28 0.6 0 0.6 0.3 Ongoing
2911 OTHER AGENCY Tourism and Culture Mainstreaming of Socio Cultural events into Value Chain Economic Activities Schemes of NEC Schemes of NEC Choose... 2022-03-31 1.0184 2025-03-31 0.95 0 0.95 0.37 Ongoing
2912 OTHER AGENCY Education Clean and Safe Drinking water facility at Nagland University, Medzhiphema Campus, Nagaland Schemes of NEC Schemes of NEC 2023-03-31 4.4342 2026-03-31 2.34 1.6728 4.0128 Completed
2913 OTHER AGENCY Education Construction of Boys and Girls Hostel at Dhansiripar, Dimapur district, Nagaland under Janajati Shiksha Samiti Schemes of NEC Schemes of NEC 2022-03-25 2.1800169 2025-03-25 1.85 0.3567863 2.2067863 0.7068975 Ongoing
2914 OTHER AGENCY Education Construction of International Students and Research Scholars Hostel at Nagaland University, Lumami, Nagaland Schemes of NEC Schemes of NEC 2021-03-11 4.76 2024-03-11 4.77 0 4.77 4.35 Completed
2915 OTHER AGENCY Industries Bamboo based Craft Concentration Centre at Sovima Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2021-02-26 4.4846 2025-02-26 4.4846 0 4.4846 4.49 Completed
2916 OTHER AGENCY Science and Technology Implementation of 10 Plan of Action (PoA) projects finalized as per NESAC Society meeting held on 23rd January, 2021 for the state of Nagaland (PoA081, PoA082, PoA083, PoA084, PoA085, PoA091, PoA092, PoA093, PoA094, PoA095) Schemes of NEC Schemes of NEC 2022-03-28 3.6573 2026-03-31 3.6 0.0556 3.6556 1.46 Ongoing
2917 OTHER AGENCY Agriculture and Allied Annapoorna Anufood India 2022 Schemes of NEC Schemes of NEC Dept. of Power 2023-03-31 0.32 2026-03-31 0.32 0 0.32 0.32 Ongoing
2918 OTHER AGENCY Agriculture and Allied Apiary Development in Assam, Manipur and Meghalaya, NEC/Regional Schemes of NEC Schemes of NEC Choose... 2021-02-08 4.9882 2024-02-08 4.9882 0 4.9882 2 Completed
2919 OTHER AGENCY Agriculture and Allied Bamboo nursery raising and farming in parts of NER under AATMANIRBHAR BHARAT ABHIYAN (Arunanchal Pradesh, Assam, Manipur and Meghalaya) Schemes of NEC Schemes of NEC Dept. of Power 2021-03-26 4.92 2024-03-26 4.92 0 4.92 4.92 Completed
2920 OTHER AGENCY Agriculture and Allied Bamboo resource creation through plantation (NECBDC) Schemes of NEC Schemes of NEC 2022-03-31 14.96 2025-03-31 14.964 0 14.964 13.36 Completed
2921 OTHER AGENCY Agriculture and Allied Calendar of events for the promotion and marketing of Agri-Horti produces/ processed food of the NER for the financial year 2011-12 under the North Eastern Regional Marketing Corporation Ltd. Schemes of NEC Schemes of NEC 2011-09-08 2.02 2013-09-08 2.02 0 2.02 2.02 Completed
2922 OTHER AGENCY Agriculture and Allied Capacity building of NERCMP communities on cultivation of low chilling varieties of apple and its post post harvest management. Schemes of NEC Schemes of NEC 2018-10-12 0.64 2021-10-12 0.6363 0 0.6363 0.64 Foreclosed
2923 OTHER AGENCY Agriculture and Allied Collaborative project for natural rubber plantation development with focus in North East India Schemes of NEC Schemes of NEC 2023-03-31 6.54 2027-03-31 0.1 1.54 1.64 Ongoing
2924 OTHER AGENCY Agriculture and Allied Construction of Academic Blocks at Hengbung, Senapati District, Manipur Schemes of NEC Schemes of NEC 2021-03-01 4.6058 2023-03-31 4.22 0.388955 4.608955 1.77 Ongoing
2925 OTHER AGENCY Agriculture and Allied Construction of Marketing Complex Building of NERAMAC at Six Miles at Guwahati, Assam Schemes of NEC Schemes of NEC Dept. of Power 2017-03-14 14.18 2020-03-13 14.18 0 14.18 12.89 Completed
2926 OTHER AGENCY Agriculture and Allied Construction of way side amenities as part of Prime Minister Swachh Bharat Abhiyan (Clean India Mission) on approved Tourist Circuit falling under NERCMP Project areas in Dima Hasao, Assam West Khasi Hills, South West Khasi Hills, North Garo Hills, West Garo Hills districts in Meghalaya, Churchandpur district in Manipur and Tirap district in Arunachal Pradesh Schemes of NEC Schemes of NEC 2018-02-28 12.2 2021-02-28 12.2 0 12.2 12.2 Completed
2927 OTHER AGENCY Agriculture and Allied Constructon of Kankhu Women Market Complex, Chandel District, Manipur Schemes of NEC Schemes of NEC 2018-03-22 7.49 2021-03-22 4.078 0 4.078 4.08 Completed
2928 OTHER AGENCY Agriculture and Allied Development of Multi-Disciplinary Training cum Resource Centre, Shillong Schemes of NEC Schemes of NEC 2023-03-28 14.99 2026-03-27 0.1 5.4065 5.5065 Ongoing
2929 OTHER AGENCY Agriculture and Allied Digital platform to market of North Eastern Regions Agriculture and Horticulture produces Schemes of NEC Schemes of NEC 2022-03-27 4.8999 2025-03-31 0 Foreclosed
2930 OTHER AGENCY Agriculture and Allied Establishment of animal feeds production units in NER Schemes of NEC Schemes of NEC 2022-03-11 7.92 2025-03-11 7.128 0.5 7.628 4.0281 Ongoing
2931 OTHER AGENCY Agriculture and Allied Establishment of Avocado in NER of India Schemes of NEC Schemes of NEC Dept. of Power 2023-03-14 4.623 2026-03-13 3.83 0.795 4.625 4.626 Ongoing
2932 OTHER AGENCY Agriculture and Allied Establishment of Banana Tissue Culture Facility in the North East India Schemes of NEC Schemes of NEC 2023-03-31 4.68 2026-03-31 0 2.3625 2.3625 1.1825 Ongoing
2933 OTHER AGENCY Agriculture and Allied Establishment of Elite Nursery, NERCMP Schemes of NEC Schemes of NEC 2016-02-29 1.06 2019-02-28 1.06 0 1.06 1.06 Completed
2934 OTHER AGENCY Agriculture and Allied Establishment of Food Processing units in Assam, Manipur and Meghalaya Schemes of NEC Schemes of NEC 2023-03-30 8.05 2026-03-31 6.43 1.29 7.72 Ongoing
2935 OTHER AGENCY Agriculture and Allied Establishment of High-Tech Horticultural Nursery with Tissue Culture facilities in the North East India Schemes of NEC Schemes of NEC NERCORMS 2023-03-31 4.5175 2026-03-31 1.87 2.6475 4.5175 1.675 Ongoing
2936 OTHER AGENCY Agriculture and Allied Establishment of Kiwi Orchard in the North Eastern Region of India Schemes of NEC Schemes of NEC 2022-03-11 14.44 2025-03-31 5.2287 7.1979 12.4266 4.356 Ongoing
2937 OTHER AGENCY Agriculture and Allied Establishment of Kiwi Orchard with elite planting materials in the North East India Schemes of NEC Schemes of NEC Dept. of Power 2023-03-07 8.1238 2025-03-31 6.1397 1.9841 8.1238 3.71 Ongoing
2938 OTHER AGENCY Agriculture and Allied Establishment of Marketing cum collection centre (a) Large Centre 4 nos. and (b) Small centre 2 nos. Schemes of NEC Schemes of NEC 2016-03-21 1.55 2019-03-21 1.55 0 1.55 1.55 Completed
2939 OTHER AGENCY Agriculture and Allied Establishment of Multi-Utility cum CFC building with Diesel Operated Spices & Cereal Grinding Machine, NERCMP Schemes of NEC Schemes of NEC 2016-03-17 3.4465 2019-03-17 3.45 0 3.45 3.45 Completed
2940 OTHER AGENCY Agriculture and Allied Establishment of Piggery Value Chain in Imphal East, Imphal West, Thoubal and Bishnupur districts of Manipur in North East India, Manipur Schemes of NEC Schemes of NEC NERCORMS 2020-12-07 4.7260813 2025-03-31 4.168 0.5580812 4.7260812 2.7118 Ongoing
2941 OTHER AGENCY Agriculture and Allied Establishment of piggery value chain in the North East India Schemes of NEC Schemes of NEC Dept. of Power 2022-03-27 9.73 2025-03-31 7.3021 0 7.3021 0.96 Ongoing
2942 OTHER AGENCY Agriculture and Allied Extension of NERCMP-III Schemes of NEC Schemes of NEC 2020-04-23 49.99 2023-04-23 49.99 0 49.99 49.99 Completed
2943 OTHER AGENCY Agriculture and Allied Fund Release to NERCMP-II Schemes of NEC Schemes of NEC 2010-09-08 200 2013-09-08 200 0 200 200 Completed
2944 OTHER AGENCY Agriculture and Allied Integrated Farming System Model Demonstrations for sustainable livelihood improvement of farmers of Manipur Schemes of NEC Schemes of NEC 2021-03-17 1.5 2024-03-17 0.38 0.75 1.13 0.1 Ongoing
2945 OTHER AGENCY Agriculture and Allied Integrated Horticulture Development Projects for the States of Manipur, Nagaland and Mizoram Schemes of NEC Schemes of NEC 2016-10-14 11.88 2019-10-14 11.88 0 11.88 11.88 Completed
2946 OTHER AGENCY Agriculture and Allied Integrated Horticulture including fisheries for NEH region of India, ICAR, NEH Region, Umiam, Meghalaya Schemes of NEC Schemes of NEC 2017-03-02 14.961 2020-03-02 10.78 0 10.78 10.78 Foreclosed
2947 OTHER AGENCY Agriculture and Allied Integrated project on income generation through animal husbandry and livestock Schemes of NEC Schemes of NEC 2010-03-25 2.1 2013-03-25 2.1 0 2.1 2.1 Completed
2948 OTHER AGENCY Agriculture and Allied Livelihood project on Agriculture, Horticulture & allied activities in both Project and Non-Project villages, NERCMP Schemes of NEC Schemes of NEC 2016-02-29 1.4854 2019-02-28 1.49 0 1.49 1.49 Completed
2949 OTHER AGENCY Agriculture and Allied Mithun Conservation and Breeding Centre in Arunachal Pradesh, Nagaland and Manipur , NEC/Regional Schemes of NEC Schemes of NEC 2020-11-05 4.99 2023-11-05 1.9962 0.987 2.9832 1.04 Ongoing
2950 OTHER AGENCY Agriculture and Allied Multi Agriculture Allied by NERCRMS in Manipur and Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2022-03-30 4.82 2025-03-31 2.4065 2.2876 4.6941 0.48 Ongoing
2951 OTHER AGENCY Agriculture and Allied Multi Agriculture Horticulture Activities by NERCRMS in Manipur and Meghalaya Schemes of NEC Schemes of NEC Dept. of Power 2022-03-30 4.6748 2025-03-31 3.6882 0.88848 4.57668 2.2318 Ongoing
2952 OTHER AGENCY Agriculture and Allied Multi Agriculture Project on Promotion of Fishery and Piggery in Manipur and Meghalaya Schemes of NEC Schemes of NEC NERCORMS 2023-03-25 4.90135 2026-03-25 2.4953 2.2905 4.7858 2.5 Ongoing
2953 OTHER AGENCY Agriculture and Allied Multi Agriculture Project on Promotion of Piggery in Manipur and Nagaland Schemes of NEC Schemes of NEC NERCORMS 2023-03-22 4.7633034 2026-12-31 3.6947 1.1095 4.8042 Ongoing
2954 OTHER AGENCY Agriculture and Allied Multipurpose herbal extraction unit at Mao, Senapati district, Manipur Schemes of NEC Schemes of NEC 2023-03-31 2.72 2026-03-18 2.0434 0 2.0434 Ongoing
2955 OTHER AGENCY Agriculture and Allied NERCMP-III Schemes of NEC Schemes of NEC 2014-04-28 540 2021-10-21 400 0 400 400 Completed
2956 OTHER AGENCY Agriculture and Allied Organic tea cultivation in Tamenglong District, Manipur Schemes of NEC Schemes of NEC 2020-08-21 4.64 2023-08-31 4.64 0 4.64 2.75 Completed
2957 OTHER AGENCY Agriculture and Allied Pilot Project for Development of Tea, Pineapple, Floriculture, Mushroom, Kiwi and Aloe vera in the NERCMP project districts. Schemes of NEC Schemes of NEC 2010-03-25 2.42 2013-03-25 2.42 0 2.42 2.42 Completed
2958 OTHER AGENCY Agriculture and Allied Pilot Project on Cane Nursery and Plantation in NER Schemes of NEC Schemes of NEC 2023-03-31 1.96 2026-03-31 0.98 0.98 1.96 1.27 Ongoing
2959 OTHER AGENCY Agriculture and Allied Pilot Project on Farmer Producer Companies (FPCs) for Agricultural Reforms in NER (Arunachal Pradesh & Assam State under SFAC) Schemes of NEC Schemes of NEC 2017-08-14 1.5 2020-08-28 1.185 0 1.185 1.19 Completed
2960 OTHER AGENCY Agriculture and Allied Plantation / Rejuvenation of Citrus, Parkia. Schemes of NEC Schemes of NEC 2010-03-19 2.0678 2013-03-19 1.45 0 1.45 1.45 Completed
2961 OTHER AGENCY Agriculture and Allied Printing and Binding of Compendium of Government of India schemes and programmes relevant Schemes of NEC Schemes of NEC 2021-03-04 0.01 2024-03-04 0.01 0 0.01 0.01 Completed
2962 OTHER AGENCY Agriculture and Allied Promotion of Agarwood plantation in the North Eastern Region of India Schemes of NEC Schemes of NEC Dept. of Power 2023-03-06 12.9931301 2025-03-31 9.76 3.2273301 12.9873301 0.9 Ongoing
2963 OTHER AGENCY Agriculture and Allied Promotion of Arecanut plantation integrated with turmeric in the North Eastern Region of India Schemes of NEC Schemes of NEC Dept. of Power 2023-03-15 4.99 2026-03-31 3.7425 1.1991 4.9416 2.5025 Ongoing
2964 OTHER AGENCY Agriculture and Allied Promotion of Avocado, Persimmon and Blueberry Orchards in the North Eastern Region of India Schemes of NEC Schemes of NEC Choose... 2023-03-27 4.9871 2026-03-27 3.992 0.5058115 4.4978115 3.4946 Ongoing
2965 OTHER AGENCY Agriculture and Allied Promotion of commercial bamboo plantation in North East India (NERCRMS) Schemes of NEC Schemes of NEC 2022-03-11 8.06 2026-03-31 6.05 1.81 7.86 0.89 Ongoing
2966 OTHER AGENCY Agriculture and Allied Promotion of fishery and piggery fattening in the North East India Schemes of NEC Schemes of NEC 2020-11-16 4.91 2023-11-16 4.91 0 4.91 4.91 Completed
2967 OTHER AGENCY Agriculture and Allied Promotion of Low Chilling Apple Plantation in North Eastern Region of India Schemes of NEC Schemes of NEC 2020-08-05 3.07 2024-08-05 3.07 0 3.07 3.07 Completed
2968 OTHER AGENCY Agriculture and Allied Promotion of Low Chilling Apple Plantation in North Eastern Region of India, NEC/Regional Schemes of NEC Schemes of NEC 2021-01-29 4.83 2024-01-30 4.8283 0 4.8283 1.91 Completed
2969 OTHER AGENCY Agriculture and Allied Promotion of Medicinal and Aromatic Plants (MAP) Based Livelihood Opportunities in the North Eastern Region to Augment Rural Income and Promote Resilient Livelihood Opportunities through the Establishment of an Entrepreneurial Ecosystem , NEC/Regional Schemes of NEC Schemes of NEC 2020-11-02 4.85 2023-11-02 1.94 2.3479 4.2879 3.3979 Ongoing
2970 OTHER AGENCY Agriculture and Allied Promotion of mixed cropping fishery and livestock for sustainable farming in Noney District, manipur Schemes of NEC Schemes of NEC 2020-09-17 0.5 2023-09-17 0.5 0 0.5 0.5 Completed
2971 OTHER AGENCY Agriculture and Allied Promotional bamboo farming and plantation in parts of NER under Atma Nirbhar Bharat Abiyan Schemes of NEC Schemes of NEC 2020-08-20 4.9 2023-08-20 4.9 0 4.9 4.9 Completed
2972 OTHER AGENCY Agriculture and Allied Revival of Cashew Processing Plant, Agartala Schemes of NEC Schemes of NEC Dept. of Power 2023-03-17 0.575 2026-03-17 0.58 0 0.58 0.58 Completed
2973 OTHER AGENCY Agriculture and Allied Rural Economic and Livelihood Project Schemes of NEC Schemes of NEC 2020-08-03 3 2024-08-03 3 0 3 3 Completed
2974 OTHER AGENCY Agriculture and Allied Setting up infrastructure for bamboo treatment plant at CBTC, Burnihat, Assam Schemes of NEC Schemes of NEC 2020-05-28 0.54 2023-05-28 0.21 0 0.21 0.21 Completed
2975 OTHER AGENCY Agriculture and Allied Setting up of animal feed production units in the North East India 2022-23 at Schemes of NEC Schemes of NEC Dept. of Power 2023-03-28 14.94 2025-03-28 5.91 5.2914 11.2014 5.91 Ongoing
2976 OTHER AGENCY Agriculture and Allied Setting up of modern pig breeding units in North East India Schemes of NEC Schemes of NEC 2022-03-24 14.44 2025-03-24 5.7644 8.4973 14.2617 12.39 Ongoing
2977 OTHER AGENCY Agriculture and Allied Setting up of Piggery Breeding Units, NERCMP Schemes of NEC Schemes of NEC 2016-03-17 6.3582 2019-03-17 6.36 0 6.36 6.36 Completed
2978 OTHER AGENCY Agriculture and Allied Setting up of Piggery Fattening units in NERCMP - III districts of North East India - NERCMP Schemes of NEC Schemes of NEC 2017-03-22 14.96 2020-03-20 14.96 0 14.96 14.96 Completed
2979 OTHER AGENCY Agriculture and Allied Setting up of Poultry Hatchery and Rearing units in NERCMP - III districts of North East India - NERCMP Schemes of NEC Schemes of NEC 2017-03-22 9.98 2020-03-22 9.98 0 9.98 9.98 Completed
2980 OTHER AGENCY Agriculture and Allied Setting up of scientific pig breeding units in the North East India, Phase-II Schemes of NEC Schemes of NEC 2023-03-15 14.12 2026-03-25 2.8943 6.6185 9.5128 7.061 Ongoing
2981 OTHER AGENCY Agriculture and Allied Setting up of scientific pig breeding units in the North East India, Phase-III Schemes of NEC Schemes of NEC Choose... 2023-03-28 11.6098 2026-03-28 2.9338 8.7889 11.7227 8.7975 Ongoing
2982 OTHER AGENCY Agriculture and Allied Tissue Culture Facility for Production of Disease-Free Planting Material of Citrus(CAU, Imphal, Manipur) Schemes of NEC Schemes of NEC NERCORMS 2021-03-26 2.2771 2024-03-26 1.144 1.3385 2.4825 0.8375 Ongoing
2983 OTHER AGENCY Agriculture and Allied Value Addition of Naga Chilly and other Spice Crops for market readiness as through vacuum drying technology in Assam and Nagaland Schemes of NEC Schemes of NEC 2023-02-24 4.56 2026-02-24 4.1048 0.456 4.5608 4.1 Ongoing
2984 OTHER AGENCY Evaluation and Monitoring An information Repository of Products, Producers and Entrepreneurs of North East India, NEDFi Schemes of NEC Schemes of NEC 2022-03-25 3.3145218 2025-03-25 2.2543619 1.0601662 3.3145281 Ongoing
2985 OTHER AGENCY Evaluation and Monitoring Constitution of IIE as Nodal Institute to Establish, Develop and Manage Entrepreneurship Development Centre and Incubation Centres in North East Regions Educational Institutions Schemes of NEC Schemes of NEC 2023-03-29 7.83 2026-03-29 3.8 2.07 5.87 Ongoing
2986 OTHER AGENCY Evaluation and Monitoring Specified Skilled Workers (SSW) for Northeast Candidates Schemes of NEC Schemes of NEC 2023-03-31 1.40395 2026-03-31 0.98 0.42 1.4 0.45 Ongoing
2987 OTHER AGENCY Education 2 training programmes for one year in basic welding and certificate course Schemes of NEC Choose... 2013-09-23 0.61 2024-01-25 0.31 0 0.31 0.31 Foreclosed
2988 OTHER AGENCY Education 5 training course in the field of Hospitality & Tourism 121 unemployed youth from NE region Schemes of NEC Schemes of NEC 2013-09-24 0.7281 2016-09-24 0.7281 0 0.7281 0.73 Completed
2989 OTHER AGENCY Education 5 training course in the field of machine tools Schemes of NEC Schemes of NEC 2013-09-24 2.1485 2016-09-24 0 0 Completed
2990 OTHER AGENCY Education Basic Conventional Machining Schemes of NEC Schemes of NEC 2016-03-04 0.63 2019-03-04 0.315 0 0.315 0.28 Foreclosed
2991 OTHER AGENCY Education Capacity Building in IT and Digital Services (Including Digital Payments and GST) for State Govt. Officilas in NER. Schemes of NEC Schemes of NEC Choose... 2017-11-28 7.78 2020-11-28 7.77 0 7.77 6.15 Ongoing
2992 OTHER AGENCY Education Capacity Building of Mid-Level Officers in theDepartment of Industries & Commerce, Govt. of Nagaland Schemes of NEC Schemes of NEC 2017-02-15 0.22 2020-02-15 0.1654 0 0.1654 0.17 Foreclosed
2993 OTHER AGENCY Education Capacity Building of Teacher, Researchers and Bio-Medical Practisioners of North Eastern Region on Advanced Techniques in Molecular Biology and Biotechnology Schemes of NEC Schemes of NEC 2017-03-29 0.21 2020-03-29 0.1581 0 0.1581 0.16 Foreclosed
2994 OTHER AGENCY Education Capacity Building program for Civil Servants of the North Eastern States on Developing Rural Industries and Entrepreneurship Schemes of NEC Choose... 2017-11-21 0.3876 2020-11-21 0 Completed
2995 OTHER AGENCY Education Construction of 150 seats Boys Hostel at Tripura University Campus, Suryamaninagar Schemes of NEC Schemes of NEC Choose... 2020-11-23 10.2622 2023-11-23 10.2622 0 10.2622 10.2574 Ongoing
2996 OTHER AGENCY Education Construction of a hostel for the North East Students at Jawaharlal Nehru University, New Delhi Schemes of NEC Schemes of NEC 2016-04-25 28.68 2019-04-25 28.68 0 28.68 28.26 Ongoing
2997 OTHER AGENCY Education Construction of College, Arunachal Pradesh and Manipur Schemes of NEC Schemes of NEC Choose... 2023-03-29 4.96 2026-03-29 2.02 0 2.02 1.06 Ongoing
2998 OTHER AGENCY Education Construction of Ladies hostel for the students of NE Region at Bangalore University Schemes of NEC Schemes of NEC Choose... 2014-11-28 13.85 2017-11-28 11.18 1.5255 12.7055 11.18 Ongoing
2999 OTHER AGENCY Education Construction of office complex/building of the Lyngdoh of Hima Sobing at Sohiong village, East Khasi hills District, Meghalaya and Construction of Cultural Centre in Emesiiphro circle/village, Senapati District, Manipur Schemes of NEC Schemes of NEC Dept. of Power 2023-03-30 4.06 2026-03-31 3.3295 0 3.3295 1.06 Ongoing
3000 OTHER AGENCY Education Construction of School Building, Hostel and Science Lab in Mizoram, Assam & Manipur Schemes of NEC Schemes of NEC 2023-03-30 5 2025-03-31 4.14 0.7776 4.9176 2.34 Ongoing
3001 OTHER AGENCY Education Destination Management Training Programme Schemes of NEC Schemes of NEC Dept. of Power 2017-07-17 0.1336 2020-07-17 0.1002 0 0.1002 Foreclosed
3002 OTHER AGENCY Education Develop Professional knowledge and skills and exposure to best practices in governance. Schemes of NEC Schemes of NEC Dept. of Power 2017-03-19 0.18 2020-03-19 0.1328 0 0.1328 0.13 Foreclosed
3003 OTHER AGENCY Education Digital Classrooms in 215 Schools in 4 North Eastern States of Assam, Manipur, Meghalaya & Tripura Schemes of NEC Schemes of NEC 2018-04-27 4.69 2020-04-27 4.69 0 4.69 4.69 Completed
3004 OTHER AGENCY Education Documentation and revitalization of Netnyi, Khongdei and Zyphe three endangered languages of NE India Schemes of NEC Schemes of NEC 2020-09-23 0.79 2023-09-23 0.4 0.3608925 0.7608925 0.4 Ongoing
3005 OTHER AGENCY Education Documentation of Disputes between States of NER Schemes of NEC Schemes of NEC 2020-12-16 0.18 2023-12-16 0.18 0 0.18 0.12 Completed
3006 OTHER AGENCY Education Documentation of endangered language, oral, narratives and culture for lesser known tribal communities of Arunachal Pradesh Schemes of NEC Schemes of NEC 2020-09-07 0.9 2023-09-07 0.8995 0 0.8995 0.45 Ongoing
3007 OTHER AGENCY Education Establishing the North Eastern Regional Research and Resource Centre at Miranda House, Delhi Schemes of NEC Schemes of NEC Choose... 2022-03-11 2.754 2025-03-11 2.4016 0 2.4016 1.2 Ongoing
3008 OTHER AGENCY Education Export Potential & Procedures and Export Potential of A.P, Meghalaya, Mizoram, Assam, Manipur, Tripura. Schemes of NEC Schemes of NEC 2019-12-06 0.315 2021-12-06 0.2363 0 0.2363 0.24 Foreclosed
3009 OTHER AGENCY Education Export Potential of Nagaland & Procedures and Export Ptential of Tripura & Procedures. Schemes of NEC Schemes of NEC 2018-03-22 0.105 2021-03-22 0.08 0 0.08 0.08 Foreclosed
3010 OTHER AGENCY Education Financial Assistance during the fellowship Training Schemes of NEC Dept. of Power 2018-01-03 0.09 2024-06-28 0.048 0 0.048 Foreclosed
3011 OTHER AGENCY Education Orthography development for languages of NER Schemes of NEC Schemes of NEC 2020-09-03 0.9 2023-09-29 0.8951 0 0.8951 0.65 Ongoing
3012 OTHER AGENCY Education Replication of Innovations & Best practices in Good Governance for Civil Servants Schemes of NEC Choose... 2017-12-05 0.1428 2020-12-05 0 Completed
3013 OTHER AGENCY Education Seven courses in various trades of Fashion Technology Schemes of NEC Schemes of NEC Choose... 2019-03-31 5.82 2021-03-31 2.908 0 2.908 2.91 Ongoing
3014 OTHER AGENCY Education Sikkims endangered language documentation project(SELDP) Schemes of NEC Schemes of NEC 2020-08-22 0.9 2023-08-22 0.6345 0 0.6345 0.61 Ongoing
3015 OTHER AGENCY Education Skills Expo-Mizoram, Meghalaya, Tripura Schemes of NEC Schemes of NEC 2012-11-16 0.42 2015-11-16 0.2765 0 0.2765 0.28 Completed
3016 OTHER AGENCY Education Sponsoring Candidates for training in commercial Pilot Training Course and Aircraft maintenance Engineering Schemes of NEC Choose... 2008-02-22 3.2375 2011-02-22 0 Completed
3017 OTHER AGENCY Education Strengthening Human Resource and Systems Capacity for Public Health. Schemes of NEC Other 2017-02-23 3.0792 2020-02-23 0 Completed
3018 OTHER AGENCY Education Three training cources for Innovative Financial Mechanism in the North Eastern States in the context of managing Urban Infrastructure, transport and tourism Schemes of NEC Choose... 2016-03-31 0.19 2024-06-28 0.072 0 0.072 Foreclosed
3019 OTHER AGENCY Education Training course in field of Tourism, Travel & Hospitality Schemes of NEC Schemes of NEC Dept. of Power 2013-03-25 0.32 2016-03-25 0.2408 0 0.2408 Foreclosed
3020 OTHER AGENCY Education Training Course in the fields of community based management & finance management Schemes of NEC Schemes of NEC Dept. of Power 2019-03-31 0.11 2022-03-31 0.1113 0 0.1113 Foreclosed
3021 OTHER AGENCY Education Training Courses for the artisans and weavers Schemes of NEC Schemes of NEC 2016-03-30 0.2697 2019-03-30 0.2023 0 0.2023 0 Foreclosed
3022 OTHER AGENCY Education Training for rural girs on Hair, Skin & Beauty Care Schemes of NEC Schemes of NEC 2015-12-18 0.6 2018-12-18 0.4635 0 0.4635 0.46 Foreclosed
3023 OTHER AGENCY Education Training on Geospatial application & services for Governance activities for the officials of all eight State Remote Sensing Application Centres of NE Region. Schemes of NEC Schemes of NEC 2017-09-13 0.02 2020-09-13 0.0154 0 0.0154 0.02 Foreclosed
3024 OTHER AGENCY Education Training programme in 3D-Animation & Special Fx Graphics and software diploma programme Schemes of NEC Schemes of NEC Dept. of Power 2015-12-18 1.07 2018-12-18 1.07 0 1.07 Foreclosed
3025 OTHER AGENCY Education Training programme in the field of Hospital & Tourism Management Schemes of NEC Schemes of NEC 2014-02-28 3.27 2017-02-28 1.9558 0 1.9558 Completed
3026 OTHER AGENCY Education Training programme in the field of Hospital & Tourism Management Schemes of NEC Schemes of NEC 2013-12-20 1.52 2016-12-20 0.9153 0 0.9153 Foreclosed
3027 OTHER AGENCY Education Training programme in the field of Hospitality & Tourism Management Schemes of NEC Schemes of NEC 2014-12-05 7.1271 2017-12-05 3.5636 0 3.5636 3.56 Foreclosed
3028 OTHER AGENCY Education Understanding the problems of minority ethnic communities in North East India for working out the possible solutions Schemes of NEC Schemes of NEC 2020-10-15 0.82 2023-10-15 0.328 0 0.328 0.19 Ongoing
3029 OTHER AGENCY Education Workshop-cum-training on preservation and conservation of Mesuems in Nagaland Schemes of NEC Schemes of NEC Dept. of Power 2018-10-31 0.765 2021-10-31 0.5737 0 0.5737 Foreclosed
3030 OTHER AGENCY Sports Construction of a Multipurpose Hall cum Badminton Hall & Futsal Playground at Saikot, Churachandpur, Manipur and Development of Playground at Pilangkata-Maikhuli, Ri-Bhoi District, Meghalaya Schemes of NEC Schemes of NEC 2023-03-31 4.58 2025-03-31 2.254 1.4756 3.7296 1.604 Ongoing
3031 OTHER AGENCY Sports Construction of Retaining Wall and Drainage at Sports Complex at IGNTU-RCM, Makhan, Manipur Schemes of NEC Schemes of NEC 2018-04-23 1.1 2021-04-23 1.1 0 1.1 1.0985 Completed
3032 OTHER AGENCY Industries Action Plan for the Development of Handicrafts & Handloom Sector in the NER, APJ Abdul Kalam, IIM Schemes of NEC Schemes of NEC Dept. of Power 2021-02-03 0.1 2024-01-31 0.1 0 0.1 0.1 Completed
3033 OTHER AGENCY Industries Augmentation of Existing Transformer and Up-gradation of Existing Electrification System at CBTC, Burnihat, Assam Schemes of NEC Schemes of NEC 2020-11-18 0.29 2023-11-18 0.2857 0 0.2857 0.29 Completed
3034 OTHER AGENCY Industries Capacity Buidling Programme on Cane and Bamboo Products Schemes of NEC Schemes of NEC 2023-03-21 2.862 2026-03-21 2.86 0 2.86 3.222 Ongoing
3035 OTHER AGENCY Industries Conducting various training programmes for the benefit of Bamboo related Industrial Workers as well as the Management Staff by Cane & Bamboo Technology Centre (CBTC) Schemes of NEC Schemes of NEC 2005-04-27 0.228 2008-04-27 0.036 0 0.036 0.04 Completed
3036 OTHER AGENCY Industries Developemnt of Powerloom Unit in Tribal Area of Manipur and Mizoram Schemes of NEC Schemes of NEC Choose... 2023-03-25 4 2026-03-25 1 0 1 Ongoing
3037 OTHER AGENCY Industries Documentation of Traditional Textilesa and Costumes of the Liangmai, Rongmei and Zemme Tribes of Manipur and Nagaland Schemes of NEC Schemes of NEC Choose... 2023-03-30 0.1543 2026-03-30 0.05 0 0.05 Ongoing
3038 OTHER AGENCY Industries Establishment of Integrated Agarbatti Cluster with Zero Wastages Concept in Arunachal Pradesh, Manipur, Meghalaya and Mizoram Schemes of NEC Schemes of NEC 2022-03-29 14.9376 2025-03-29 14.6438 0 14.6438 5.98 Ongoing
3039 OTHER AGENCY Industries Establishment of Integrated Agarbatti Cluster with Zero Waste Bamboo Approach in Arunachal Pradesh Manipur, Mizoram and Tripura Schemes of NEC Schemes of NEC 2023-03-03 14.0251 2025-03-25 13.5363 0 13.5363 3.51 Ongoing
3040 OTHER AGENCY Industries Establishment of Stabilized Earth Brick Making Enterprises in North Eastern States Schemes of NEC Schemes of NEC 2022-03-31 5.8718 2025-03-31 4.6964 0.9403222 5.6367222 5.640322 Ongoing
3041 OTHER AGENCY Industries Expansion of Plastics Waste Management Centre (PWMC) CIPET, Borgaon, Guwahati, Kamrup District, Assam Schemes of NEC Schemes of NEC 2016-09-28 7.47 2019-09-28 6.15 1.32 7.47 5.65 Ongoing
3042 OTHER AGENCY Industries Livelihood and Employment Generation for the youth in the North Eastern Region through placement in Japan Schemes of NEC Schemes of NEC 2023-03-17 3.326 2026-03-17 0 0.8315 0.8315 Ongoing
3043 OTHER AGENCY Industries Multi Initiative in Cane and Bamboo project at Churachandpur & Bishnupur, Manipur and Falkland Aizawl, Mizoram Schemes of NEC Schemes of NEC 2022-03-31 4.8929 2025-03-31 4.8972 0 4.8972 1.96 Ongoing
3044 OTHER AGENCY Industries North East Entrepreneurship Development Programme through Startup Route, IIM Innovation Park Schemes of NEC Schemes of NEC 2022-03-31 14.9055 2025-03-31 14.9 0 14.9 7.0674352 Ongoing
3045 OTHER AGENCY Industries North Easten Development Finance Corporation Ltd., for State of Art Resource Centre(SAREC), for career and Livelihood Opportunities for the Youth of the NER Schemes of NEC Schemes of NEC 2020-08-14 3.74 2023-08-14 3.7439 0 3.7439 3.74 Ongoing
3046 OTHER AGENCY Industries Production of Animal Feeds from bamboo Powder Schemes of NEC Schemes of NEC 2023-03-31 4.457 2026-03-31 4.46 0 4.46 4.457 Ongoing
3047 OTHER AGENCY Industries Promoting Sustainable livelihood in North East India: the cane and Bamboo Cluster Development Project Schemes of NEC Schemes of NEC 2016-03-16 9.2 2019-03-16 9.1995 0 9.1995 9.2 Completed
3048 OTHER AGENCY Industries Promotion of bamboo handicrafts, jewellery & utility products in Poma Village, Papum Pare District, Arunachal Pradesh(CBTC) Schemes of NEC Schemes of NEC 2020-08-17 0.5 2024-08-17 0.5 0 0.5 0.5 Completed
3049 OTHER AGENCY Industries Promotion of bamboo model agarbatti cluster at Karara, Baihata Chariali, Kamrup Schemes of NEC Schemes of NEC 2020-08-21 2.56 2022-08-28 2.56 0 2.56 2.56 Completed
3050 OTHER AGENCY Industries Promotion of Cane and Bamboo production through market intelligence and design intervention in Mizoram an Nagaland Schemes of NEC Schemes of NEC 2023-02-24 4.4387 2026-02-24 2.2177 1.1096 3.3273 2.22161 Ongoing
3051 OTHER AGENCY Industries Promotion of traditional bamboo shoot processing and preservation Schemes of NEC Schemes of NEC 2020-06-09 2.91 2023-06-09 2.91 0 2.91 2.91 Completed
3052 OTHER AGENCY Industries Research and development project on development of packaging storage and transportation of fruits and vegetables, CBTC Schemes of NEC Schemes of NEC 2020-08-24 0.93 2023-08-23 0.93 0 0.93 0.93 Completed
3053 OTHER AGENCY Industries Setting up Bamboo Vacuum Pressure Impregnation Treatment Plant (Phase-II) Schemes of NEC Schemes of NEC 2023-03-03 12.8123 2025-03-31 12.8131 0 12.8131 12.81 Ongoing
3054 OTHER AGENCY Industries Setting up of a Bamboo Technology park at Burnihat Cane and Bamboo Technology Crntre (CBTC), Guwahati Schemes of NEC Schemes of NEC 2009-03-30 8.4678 2012-03-30 2.1429 0 2.1429 2.14 Completed
3055 OTHER AGENCY Industries Setting up of an Artisans and Weavers Facilitation Centre at the Craft Promotion Centre, NEHHDC, Pub-Boragaon, Guwahati by Constructing Bamboo Huts Schemes of NEC Schemes of NEC 2018-01-04 1.03 2021-01-04 0.938 0 0.938 0.93 Completed
3056 OTHER AGENCY Industries Setting up of Bamboo Crushing units in NER for prouction of Bamboo powder Schemes of NEC Schemes of NEC 2021-03-31 4.86 2024-03-31 4.856 0 4.856 4.86 Ongoing
3057 OTHER AGENCY Industries Setting up of Bamboo Primary Centre in the selected potential Areas in the NER Schemes of NEC Schemes of NEC 2023-03-28 12.8 2026-03-28 11.26 0 11.26 11.26 Ongoing
3058 OTHER AGENCY Industries Setting up of Bamboo Vacuum Pressure Impregnation Treatment Plant in NE States Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.5432 2025-03-31 4.0873 0 4.0873 4.0889 Ongoing
3059 OTHER AGENCY Industries Setting up of Cane and Bamboo Technology Park at Itanagar, Arunachal Prasdesh Schemes of NEC Schemes of NEC 2017-03-15 10.8331 2020-03-15 8.4678 0 8.4678 8.47 Completed
3060 OTHER AGENCY Industries Setting up of Multi-Disciplinary Livelihood Incubation Centre for Food Processing, Readymade Garment making and Handicraft at Hunphun, Ukhrul, Manipur Schemes of NEC Schemes of NEC 2017-07-04 13.5 2020-07-04 13.5 0 13.5 13.5 Ongoing
3061 OTHER AGENCY Industries Setting up Processing Units for Cashew Nut at Tura, West Garo Hills, Ginger Dehydration Unit at Haflong, Assam and Cattle & Poultry Feed Production Unit at Ukhrul, Manipur Schemes of NEC Schemes of NEC 2012-06-18 0.58 2015-06-18 0.52 0 0.52 0.52 Completed
3062 OTHER AGENCY Industries Sourcing and procurement of handicraft and handloom products from artisans and weavers of the NER Schemes of NEC Schemes of NEC 2020-05-22 3 2023-05-25 2.9962 0 2.9962 3 Completed
3063 OTHER AGENCY Industries Training of Fruit Wine Making Schemes of NEC Schemes of NEC 2023-03-30 1.71 2026-03-30 1.709 0 1.709 1.709 Ongoing
3064 OTHER AGENCY Industries Transforming unorganized care giving service industry into formal service sector industry(IIE Guwahati) Schemes of NEC Schemes of NEC 2020-08-24 4.82 2023-08-23 4.82 0 4.82 3.85 Ongoing
3065 OTHER AGENCY Industries UNIDO-CBTC Phase-II Project by Cane & Bamboo Technology Centre, Narikal Basti, Zoo Narengi Road, Guwahati Schemes of NEC Schemes of NEC 2009-03-30 6 2013-03-29 1.1163 0 1.1163 1.11 Completed
3066 OTHER AGENCY Information and Public Relatio 15 craft bazaars, 15 exhibitions and 5 others Schemes of NEC Schemes of NEC 2019-03-05 0.6148 2022-03-05 0.6148 0 0.6148 0.61 Completed
3067 OTHER AGENCY Information and Public Relatio 2 Months Bill organised by Moving Pixel Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0891 2021-04-01 0 Completed
3068 OTHER AGENCY Information and Public Relatio 42 Crafts Bazaar NEHHDC Schemes of NEC Schemes of NEC 2019-03-20 3.1296 2022-03-20 3.1296 0 3.1296 3.13 Completed
3069 OTHER AGENCY Information and Public Relatio 4th Act East Business Show NEHHDC Schemes of NEC Schemes of NEC 2019-03-13 0.0454 2021-03-13 0.0454 0 0.0454 0.05 Completed
3070 OTHER AGENCY Information and Public Relatio 9th East Himalayan Expo Schemes of NEC Schemes of NEC 2019-12-17 0.0817 2022-12-17 0.0817 0 0.0817 0.08 Completed
3071 OTHER AGENCY Information and Public Relatio Ayush Goa Schemes of NEC Schemes of NEC 2018-12-15 0.0362 2021-12-15 0.0362 0 0.0362 0.04 Completed
3072 OTHER AGENCY Information and Public Relatio Ayush Mumbai Schemes of NEC Schemes of NEC 2018-12-15 0.046 2021-12-15 0.046 0 0.046 0.05 Completed
3073 OTHER AGENCY Information and Public Relatio Bill for film North East: Indias New Growth Engine Schemes of NEC Schemes of NEC 2019-05-28 0.0385 2022-05-28 0.0385 0 0.0385 0.04 Completed
3074 OTHER AGENCY Information and Public Relatio Buyer Seller Meet on Food Processing Agriculture & Horticulture organised by CII Kolkata Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1835 2021-04-01 0 Completed
3075 OTHER AGENCY Information and Public Relatio Comparative study Bamboo versus Conventional Houses construction systems for NER organised by CBRI, Roorkee Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1475 2021-04-01 0 Completed
3076 OTHER AGENCY Information and Public Relatio Construction of cultural centre in Lhisemia Khel Kohima Village, Nagaland and Chowainamei Khunou Village, Senapati District Manipur Schemes of NEC Schemes of NEC 2023-03-31 4.84 2025-03-31 3.59 1.2257568 4.8157568 Ongoing
3077 OTHER AGENCY Information and Public Relatio Cooperative Value Chain Ecosystem for Integrated Development in NER organised by NCDC Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0173 2021-04-01 0 Completed
3078 OTHER AGENCY Information and Public Relatio CSFI Film Bonanza for 21 days organised by Ministry of I&B (CFSI) Schemes of NEC Schemes of NEC Choose... 2018-04-01 7.02 2021-04-01 0 Completed
3079 OTHER AGENCY Information and Public Relatio Destination Himachal Pradesh- 2017 Schemes of NEC Schemes of NEC 2018-12-15 0.0292 2021-12-12 0.0292 0 0.0292 0.03 Completed
3080 OTHER AGENCY Information and Public Relatio Destination North East Chandigarh Schemes of NEC Schemes of NEC 2019-09-27 0.0643 2022-09-27 0.0643 0 0.0643 0.06 Completed
3081 OTHER AGENCY Information and Public Relatio Distribution of Gift Hampers Schemes of NEC Schemes of NEC 2019-06-27 0.0419 2022-06-27 0.0419 0 0.0419 0.04 Completed
3082 OTHER AGENCY Information and Public Relatio Emerging North East Schemes of NEC Schemes of NEC 2019-05-31 0.0271 2022-05-31 0.0271 0 0.0271 0.03 Completed
3083 OTHER AGENCY Information and Public Relatio Emerging North East 2017 Schemes of NEC Schemes of NEC 2019-03-13 0.0194 2021-03-13 0.0194 0 0.0194 0.02 Completed
3084 OTHER AGENCY Information and Public Relatio Exhibition cum sales of exclusive H&H Products organised by CCIC New Delhi Schemes of NEC Schemes of NEC 2018-04-01 0.6 2022-04-01 0.55 0 0.55 0.55 Completed
3085 OTHER AGENCY Information and Public Relatio Exhibition from 8-17 January, 2017 Schemes of NEC Schemes of NEC 2019-09-27 0.1172 2022-09-27 0.1172 0 0.1172 0.12 Completed
3086 OTHER AGENCY Information and Public Relatio Extension of Social Media Campaign ( October 2023- December 2024) Schemes of NEC Schemes of NEC 2023-12-19 2.17 2026-12-19 0.74 1.2502 1.9902 0.737 Ongoing
3087 OTHER AGENCY Information and Public Relatio Global Exhibition on Services 2017 Schemes of NEC Schemes of NEC 2018-12-15 0.0197 2021-12-15 0.0197 0 0.0197 0.02 Completed
3088 OTHER AGENCY Information and Public Relatio Govt. Achievement and Schemes Expo-2017, New Delhi Schemes of NEC Schemes of NEC 2018-10-16 0.0237 2021-10-16 0.0237 0 0.0237 0.02 Completed
3089 OTHER AGENCY Information and Public Relatio Handicrafts and Handlooms Exhibition Chandigarh Schemes of NEC Schemes of NEC 2019-08-07 0.1617 2021-08-07 0.1617 0 0.1617 0.16 Completed
3090 OTHER AGENCY Information and Public Relatio ICWA & AsCon Jointly organizig seminar on the age of multilateralism and connectiong India's NE opportunities and challenges organised by Asian Confluence Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.02 2021-04-01 0 Completed
3091 OTHER AGENCY Information and Public Relatio Invest Tripura organised by ASSOCHAM, New Delhi Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.05 2021-04-01 0 Completed
3092 OTHER AGENCY Information and Public Relatio National Conference on Many Patriarchies, Many Personalities Re-interrogation Gender in Narrative from NE India organised by Shivaji College, New Delhi Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.03 2021-04-01 0 Completed
3093 OTHER AGENCY Information and Public Relatio National Conference on North East India: The untapped tourism industry Schemes of NEC Schemes of NEC 2020-01-15 0.007 2023-01-15 0.007 0 0.007 0.01 Completed
3094 OTHER AGENCY Information and Public Relatio NEHHDC Fair Utsav Schemes of NEC Schemes of NEC 2019-06-27 0.154 2022-06-27 0.154 0 0.154 0.15 Completed
3095 OTHER AGENCY Information and Public Relatio North East Festival Football Cup 2017, New Delhi organised by Hmar Football Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.05 2021-04-01 0 Completed
3096 OTHER AGENCY Information and Public Relatio North East Inter College Festival connect 18 Schemes of NEC Schemes of NEC 2018-11-13 0.0298 2021-11-13 0.0298 0 0.0298 0.03 Completed
3097 OTHER AGENCY Information and Public Relatio North East Round Table Schemes of NEC Schemes of NEC 2020-01-20 0.25 2023-01-20 0.25 0 0.25 0.25 Completed
3098 OTHER AGENCY Information and Public Relatio Odisha Folk Fair at Puri Schemes of NEC Schemes of NEC 2018-10-03 0.0925 2022-10-03 0.0925 0 0.0925 0.09 Completed
3099 OTHER AGENCY Information and Public Relatio Organizing one Special Exhibition at Aizawl, Mizoram Schemes of NEC Schemes of NEC 2018-11-13 0.1937 2022-11-13 0.1937 0 0.1937 0.19 Completed
3100 OTHER AGENCY Information and Public Relatio Participation at International Fairs/Exhibitions during 2016-17 organised by BRAWFED Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1368 2021-04-01 0 Completed
3101 OTHER AGENCY Information and Public Relatio Participation in 7th Bhutan India Regional Friendship Trade Fair for 5 days organised by BRAWFED Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1825 2021-04-01 0 Completed
3102 OTHER AGENCY Information and Public Relatio Revisiting the Life and Work of Verrier Elwin in NE India Digital Preservation and Propagation of Elwins Work Schemes of NEC Schemes of NEC 2021-03-30 0.4612 2025-03-21 0.4645 0 0.4645 0.18 Ongoing
3103 OTHER AGENCY Information and Public Relatio Ronagli Start up Summit Schemes of NEC Schemes of NEC 2020-02-05 0.162 2023-02-05 0.162 0 0.162 0.16 Completed
3104 OTHER AGENCY Information and Public Relatio Second North East Festival organised by Jesus and Mary College Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.015 2021-04-01 0 Completed
3105 OTHER AGENCY Information and Public Relatio STINER Stories organised by PrasarBharati Schemes of NEC Schemes of NEC Choose... 2018-04-01 2.8532 2021-04-01 0 Completed
3106 OTHER AGENCY Information and Public Relatio Students Meet on Entrepreneurship Tezpur University Schemes of NEC Schemes of NEC 2019-07-08 0.0075 2021-07-08 0.0075 0 0.0075 0.01 Completed
3107 OTHER AGENCY Information and Public Relatio Swachhmeva Jayate organised by Prasar Bharati Schemes of NEC Schemes of NEC Choose... 2018-04-01 2.5464 2021-04-01 0 Completed
3108 OTHER AGENCY Information and Public Relatio Textile Exhibition cum Fabrics and Fashion Show Schemes of NEC Schemes of NEC 2019-06-27 0.1237 2020-01-30 0.1237 0 0.1237 0.12 Completed
3109 OTHER AGENCY Information and Public Relatio Textiles India 2017 Schemes of NEC Schemes of NEC 2018-12-15 0.0705 2022-12-15 0.0705 0 0.0705 0.07 Completed
3110 OTHER AGENCY Information and Public Relatio Vision Jammu & Kashmir 2018 Schemes of NEC Schemes of NEC 2019-05-31 0.0243 2022-05-31 0.0243 0 0.0243 0.02 Completed
3111 OTHER AGENCY Information and Public Relatio Vision Jammu and Kashmir Schemes of NEC Schemes of NEC 2019-03-13 0.0357 2022-03-13 0.0357 0 0.0357 0.04 Completed
3112 OTHER AGENCY Health Modernization of Technology of Sri Sankardeva Nethralaya for precision eye care and ophthalmic education by SSN, Guwahati Schemes of NEC Schemes of NEC 2020-04-24 1.3037 2023-04-24 1.3 0 1.3 1.3 Completed
3113 OTHER AGENCY Health Vertical Extension of Hospital Building & Strengthening of Lairam Christain Medical Centre & Hospital Lawngtlai, Mizoram Schemes of NEC Schemes of NEC 2023-03-30 4.9893 2027-03-31 4.99 0 4.99 Ongoing
3114 OTHER AGENCY Science and Technology 5G Applications in NER with Hub at AMTRON, Guwahati. Assam Electronics Development Corporation Ltd (AMTRON) Schemes of NEC Schemes of NEC 2023-03-27 14.96 2026-03-27 14.9 0 14.9 14.14 Ongoing
3115 OTHER AGENCY Science and Technology Assessment of utilization of irrigation potential created for Dhansiri Champawati, Thoubal and Dholaithabi irrigation projects of NE India, Meghalaya Schemes of NEC Schemes of NEC 2017-09-14 0.07 2020-09-14 0.07 0 0.07 0.07 Completed
3116 OTHER AGENCY Science and Technology Computer Infrastructure Requirement Schemes of NEC Schemes of NEC 2005-03-31 0.0809 2008-03-31 0.0809 0 0.0809 0.08 Completed
3117 OTHER AGENCY Science and Technology Computer Room Furniture & Electrification at 55 Schools in North East States by M/S CKCK Furniture Schemes of NEC Schemes of NEC 2005-03-31 0.3214 2008-03-31 0.3214 0 0.3214 0.32 Completed
3118 OTHER AGENCY Science and Technology Computer Room Furniture & Electrification at 85 Schools in North East States by M/S BMG Schemes of NEC Schemes of NEC 2005-03-31 0.4946 2008-03-31 0.4946 0 0.4946 0.49 Completed
3119 OTHER AGENCY Science and Technology Computer Training for Teachers of Assam State for 5 PC System in 16 Schools Schemes of NEC Schemes of NEC 2005-03-31 0.0683 2008-03-31 0.0683 0 0.0683 0.07 Completed
3120 OTHER AGENCY Science and Technology Computer Training for Teachers of North East States for 10 PC System in 36 Schools Schemes of NEC Schemes of NEC 2005-03-31 0.1663 2008-03-31 0.1663 0 0.1663 0.17 Completed
3121 OTHER AGENCY Science and Technology Computer Training for Teachers of North East States for 5 PC System in 82 Schools Schemes of NEC Schemes of NEC 2005-03-31 0.3501 2008-03-31 0.3501 0 0.3501 0.35 Completed
3122 OTHER AGENCY Science and Technology Development of Geo Tourism Dashboard Application for planning, management and monitoring tourism activity in NE Region . North Eastern Space Application Centre (NESAC) Schemes of NEC Schemes of NEC 2021-03-31 0.7081 2024-03-31 0.71 0 0.71 0.36 Ongoing
3123 OTHER AGENCY Science and Technology Development of North Eastern Transport Monitoring System (NETMOS): North Eastern Region Communicty Resource Management Society (NERCRMS) Schemes of NEC Schemes of NEC 2023-03-20 4.99 2025-03-25 3.72 0 3.72 3.72 Ongoing
3124 OTHER AGENCY Science and Technology Development of Tele-Medicine Network for the North Eastern Region including Sikkim Schemes of NEC Schemes of NEC 2005-03-10 1.6435 2008-03-10 1.48 0 1.48 1.48 Completed
3125 OTHER AGENCY Science and Technology Establishment of Animal Breeding and GLP Accredited Biological Screening Toxicology Centre for Herbal Medicines of NE Region Schemes of NEC Schemes of NEC 2020-08-20 17.5 2023-08-20 17.5 0 17.5 17.5 Ongoing
3126 OTHER AGENCY Science and Technology Establishment of Bamboo Tissue Culture Unit. North Easter Cane & Bamboo Development Council (NECBDC), Byrnihat Schemes of NEC Schemes of NEC Dept. of Power 2023-03-31 4.55 2026-03-31 1.138675 0.4423626 1.5810376 Ongoing
3127 OTHER AGENCY Science and Technology Extension of the Existing Tissue Culture Laboratory at RFRI, Jorhat for Mass Production of Bamboo Planting Stock Schemes of NEC Schemes of NEC 2020-11-23 1.7568 2023-11-23 1.7394596 0.0173113 1.7567709 0.7 Ongoing
3128 OTHER AGENCY Science and Technology Gati Shakti Based Planning & Site Selection Using Geospatial Technology for 8 States of NER. NESAC Schemes of NEC Schemes of NEC Choose... 2023-03-29 0.1995 2026-03-29 0.0225 0.177 0.1995 Ongoing
3129 OTHER AGENCY Science and Technology Geo-tagging and Monitoring of NEC funded project/schemes in NE Region using Geospatial Technology and Tolls: NESAC Schemes of NEC Schemes of NEC Dept. of Power 2019-10-25 0.9669 2022-10-25 0.9669 0 0.9669 0.93 Ongoing
3130 OTHER AGENCY Science and Technology Herbal drug development for antimicrobial/anticancer from North East based selected plants Jorhat, Assam CSIR -NEIST-, Jorhat Schemes of NEC Schemes of NEC 2018-03-07 0.57 2020-08-24 0.57 0 0.57 0.57 Foreclosed
3131 OTHER AGENCY Science and Technology Implementation of 7 regional Plan of Action (PoA) projects finalized as per NESAC Society in the domain of Agriculture & Allied, Disaster Management, Forest, Ecology & Environment and Water Resources Management during the meeting held on 23rd January, 2021. (PoA00l, PoA002, PoA003, PoA004, PoA00S, PoA006 and PoA009) Schemes of NEC Schemes of NEC 2022-03-28 14.99 2025-03-20 14.99 0 14.99 4.68 Ongoing
3132 OTHER AGENCY Science and Technology Implementation of College IT Programme in 2 Colleges by M/S SM Enterprise Schemes of NEC Schemes of NEC 2005-03-31 0.0899 2008-03-31 0.0899 0 0.0899 0.09 Completed
3133 OTHER AGENCY Science and Technology Implementation of College IT Programme in North East States by M/S BMG Schemes of NEC Schemes of NEC 2005-03-31 1.12 2008-03-31 1.12 0 1.12 1.12 Completed
3134 OTHER AGENCY Science and Technology Installation of V-Sat System, LED Screen at PMKVY Training Centre, Ukhrul, Manipur (NERCMP) Schemes of NEC Schemes of NEC 2017-07-08 0.0447 2020-07-08 0.0447 0 0.0447 0.04 Completed
3135 OTHER AGENCY Science and Technology Intervention and Implementation of Some Appropriate Technologies for North Eastern Region through STINER-Hub. CSIR-NEIST, Jorhat Schemes of NEC Schemes of NEC 2023-03-31 4.9972 2026-03-31 2.5 1.30344 3.80344 1.72916 Ongoing
3136 OTHER AGENCY Science and Technology IT College Education Programme in 2 Colleges by M/S BMG Informatics Schemes of NEC Schemes of NEC 2005-03-31 0.3492 2008-03-31 0.3492 0 0.3492 0.35 Completed
3137 OTHER AGENCY Science and Technology IT School Education Programme for 32 Schools by M/S BMG Informatics Schemes of NEC Schemes of NEC 2005-03-31 0.6976 2008-03-31 0.6976 0 0.6976 0.7 Completed
3138 OTHER AGENCY Science and Technology Procurement of prototypes of Bamboo Processors(7 units) from IPRITI for advocacy and promotion of appropriate technologies to enhance livelihood of the people of NER, NECBDC Schemes of NEC Schemes of NEC 2023-06-23 2.1 2026-06-23 2.1 0 2.1 1.58 Ongoing
3139 OTHER AGENCY Science and Technology Provision of Computers & Peripherals at 19 Schools in North East States by M/S BMG Schemes of NEC Schemes of NEC 2005-03-31 0.6601 2009-03-31 0.6601 0 0.6601 0.66 Completed
3140 OTHER AGENCY Science and Technology Skill Development for North East Youth in Animation Visual Effects Gaming & Comics (AVGC) National Film Development Corporation Ltd Schemes of NEC Schemes of NEC 2023-03-03 2.31 2026-03-03 2.31 0 2.31 2.31 Completed
3141 OTHER AGENCY Science and Technology STINER-Common facility centre (STINER-CFC STATE) at SASRD, NU, Medziphema Campus, Nagaland. North East Institute of Science & Technology (CSIR), Jorhat Assam Schemes of NEC Schemes of NEC Choose... 2019-03-23 10 2022-03-23 9 1 10 9 Ongoing
3142 OTHER AGENCY Science and Technology Study of Non-edible plant oils of North-East: Extraction, compositional characterization and analysis for industrial application, Nagaland Schemes of NEC Schemes of NEC 2020-02-15 0.13 2020-02-15 0.13 0 0.13 0.13 Completed
3143 OTHER AGENCY Science and Technology Tele-education project- Establishment of Smart Virtual Classrooms in Aspirational District in NER Schemes of NEC Schemes of NEC 2020-08-20 10.18 2023-03-31 8.2107 0.8175 9.0282 6.8049374 Ongoing
3144 OTHER AGENCY Transport and Communication Constuction of Mahadev Tolloi Pfutsero Road (0.00 to 78.00 Kms) Schemes of NEC Schemes of NEC 2004-08-18 93.67 2007-08-18 93.67 0 93.67 93.67 Completed
3145 OTHER AGENCY Transport and Communication Mankachar-Mahendraganj road in Assam Schemes of NEC Schemes of NEC 2010-02-16 12.12 2013-02-16 10.91 0 10.91 10.91 Completed
3146 OTHER AGENCY Transport and Communication NEC Convention-cum-Cultural Centre at Dwarka, New Delhi Schemes of NEC Schemes of NEC 2020-11-18 116.38 2023-11-18 19.46 19.75 39.21 0.51 Ongoing
3147 OTHER AGENCY Tourism and Culture Capacity Building for Tourism Stake Holders of Sikkim Schemes of NEC Schemes of NEC 2020-12-09 1.5037 2023-12-09 1.5 0 1.5 1.5 Completed
3148 OTHER AGENCY Tourism and Culture Development of Eco-Tourism Complex at Thoubal Lake near Muirei and Ramrei, Ukhrul District, Manipur Schemes of NEC Schemes of NEC 2018-02-19 4.33 2022-02-19 1.732 0 1.732 1.73 Completed
3149 OTHER AGENCY Tourism and Culture Development of Integrated Tea Tourism in Tamenglong District, Manipur Schemes of NEC Schemes of NEC 2023-03-31 4.3714 2026-03-31 1.65 0.5407 2.1907 1.65 Ongoing
3150 OTHER AGENCY Tourism and Culture Development of Khayang Village Communitry Eco-Tourism & Homestay in Ukhrul District, Manipur Schemes of NEC Schemes of NEC 2018-02-15 1.5011 2021-02-15 0.644 0 0.644 0.64 Completed
3151 OTHER AGENCY Tourism and Culture Development of Sustainable Eco-Tourism Complex in Longding District, Arunachal Pradesh Schemes of NEC Schemes of NEC 2018-02-15 2.5 2021-02-15 2 0 2 2 Completed
3152 OTHER AGENCY Tourism and Culture National Paragliding Training Programme, Mizoram Schemes of NEC Schemes of NEC 2023-03-18 3.3 2026-03-18 3.3 0 3.3 3.3 Ongoing
3153 OTHER AGENCY Tourism and Culture Project proposal for Promotion of Tourism for Domestic & International Tourists to North East India Schemes of NEC Schemes of NEC 2018-03-14 1.87 2021-03-14 1.87 0 1.87 1.87 Completed
3154 OTHER AGENCY Tourism and Culture Promotion of Tourism in North East using Digital Tools (NERCRMS) Schemes of NEC Schemes of NEC 2022-03-29 4.91 2025-03-21 3.44 0 3.44 1.96 Ongoing
3155 OTHER AGENCY Tourism and Culture Promotional theme based regional tourist ciruits in NER Schemes of NEC Schemes of NEC 2017-03-24 7.5 2020-03-24 6.75 0 6.75 6.75 Completed
3156 OTHER AGENCY Tourism and Culture Setting up of a Revolving Fund Project for Development of Tourism in NER Schemes of NEC Schemes of NEC 2005-01-28 1 2008-01-28 1 0 1 1 Completed
3157 OTHER AGENCY Tourism and Culture Startup in the field of Catering Services & Food Joints under Entrepreneurship Programme Schemes of NEC Schemes of NEC 2020-08-17 1.8 2023-08-17 1.8 0 1.8 1.8 Ongoing
3158 OTHER AGENCY Tourism and Culture Swachhta Action Plan Schemes of NEC Schemes of NEC 2018-06-03 5.99 2021-06-03 5.99 0 5.99 5.99 Completed
3159 OTHER AGENCY Science and Technology Implementation of 3 Plan of Action (PoA) projects finalized for the states of Sikkim as per NESAC Society meeting held on 23rd January, 2021 (PoA096, PoA098, PoA100) Schemes of NEC Schemes of NEC Dept. of Power 2022-03-28 1.64 2026-03-25 1.526 0.1116 1.6376 0.66 Ongoing
3160 OTHER AGENCY Education Construction of Boys and Girls Hostel at Teiliamura, Khowai District, Tripura Schemes of NEC Schemes of NEC 2021-03-30 5.62 2024-03-30 5.25 0 5.25 4.104238 Ongoing
3161 OTHER AGENCY Education Construction of Community Centre for Musical Cultural and Skill Development at Krishnanagar, Agartala, Tripura Schemes of NEC Schemes of NEC 2022-03-27 2.77 2025-03-27 0.1 0 0.1 Ongoing
3162 OTHER AGENCY Education Construction of Girls Hostel Infrastructure Development of Gandhigram, West Trpura. Schemes of NEC Schemes of NEC 2022-03-28 2.82 2025-03-31 0.9 0.4 1.3 0.0101949 Ongoing
3163 OTHER AGENCY Education Construction of Hostel Building for Girls at Dhamma Dipa School at Manu Bankul Sabroom, South Tripura Schemes of NEC Schemes of NEC Choose... 2023-03-31 3.44 2026-03-31 2.58 0.86 3.44 1.6208835 Ongoing
3164 OTHER AGENCY Education Construction of School Building at Vivekananda Tripureswari Vidya Mandir, Tripura Schemes of NEC Schemes of NEC 2022-03-27 3.0311 2025-03-31 0.65 0.3 0.95 0.1622975 Ongoing
3165 OTHER AGENCY Education Construction of School building cum Teachers Training Centre at Tripureshwari Shishu Mandir, Ramnagar, Agartala, West Tripura Schemes of NEC Schemes of NEC Choose... 2023-03-31 4.41 2026-03-31 1.35 0.9351 2.2851 1.27 Ongoing
3166 OTHER AGENCY Education Construction of Skill Development Training Centre at Fulkumari, Udaipur, Gomati, South Tripura Schemes of NEC Schemes of NEC Choose... 2023-03-31 3.62 2026-03-31 1.8106889 1.8106889 0.77 Ongoing
3167 OTHER AGENCY Science and Technology Implementation of 3 Plan of Action (PoA) projects finalized for the states of Tripura as per NESAC Society meeting held on 23rd January, 2021 (PoA101, PoA105, PoA110). Schemes of NEC Schemes of NEC 2022-03-28 2.0808 2025-03-28 0.88 1.196146 2.076146 0.83 Ongoing
3168 OTHER AGENCY Science and Technology Deepening of Scientific Research on 5G Use Cases for solving challenges of society. North Eastern Region Community Resource Management Society (NERCMS) Schemes of NEC Schemes of NEC 2024-02-13 11.31 2026-02-13 2.57 7.5332712 10.1032712 8.4601237 Ongoing
3169 OTHER AGENCY Industries R&D project on the production of bamboo pallet and bamboo prefab housing beams and panels Schemes of NEC Schemes of NEC 2024-03-24 0.37 2026-03-24 0.2 0 0.2 0.2 Ongoing
3170 OTHER AGENCY Education Construction of Barak Hostel at JNU Complex, New Delhi Schemes of NEC Schemes of NEC Dept. of Power 2024-03-16 2.47 2026-03-16 2.47 0 2.47 Ongoing
3171 OTHER AGENCY Agriculture and Allied Documenting NE Ethnic Cuisines Schemes of NEC Schemes of NEC 2024-03-12 0.23 2026-03-12 0.23 0 0.23 Ongoing
3172 OTHER AGENCY Industries Maintenance, Upgradation and updating of Advancing North East Portal for two (2) years Schemes of NEC North Eastern Development 2024-08-27 3.16 2027-08-27 0.79 0 0.79 Ongoing
3173 OTHER AGENCY Agriculture and Allied Interior & Allied works at office-cum-marketing complex at NERAMAC Ltd. At Six Mile Guwahati Schemes of NEC NERAMAC 2024-08-09 4.98 2027-08-09 4.61 0 4.61 Ongoing
3174 OTHER AGENCY Science and Technology Establisment of Scientific Smoked Meat Production Units in North East India Schemes of NEC NERCORMS 2024-08-30 4.85 2027-08-30 1.03 3.2579216 4.2879216 3.36 Ongoing
3175 OTHER AGENCY Sports Construction of 2 nos. Synthetics court, 2 nos. of synthetic volleyball, 1 no of basket ball court west site Gallery with VIP Rostrum at Senapati Public Ground, Senapati District, Manipur Schemes of NEC NERCORMS 2024-01-23 4.36 2027-01-23 1.0911 1.09 2.1811 1.9778 Ongoing
3176 OTHER AGENCY Tourism and Culture Promotion of Tourism in Manipur and Mizoram. Schemes of NEC NERCORMS 2024-01-24 4.53 2027-01-24 1.132375 1.132375 2.26475 1.132375 Ongoing
3177 OTHER AGENCY Agriculture and Allied Saffron Cultivation in North Eastern States Schemes of NEC North East Centre Techno 2024-09-10 3.7217 2027-09-10 0.930425 0.930425 Ongoing
3178 OTHER AGENCY Information and Public Relatio Media Management & Promotion of Ministry of DoNER, North Eastern Council, Govt. Of India's Developmental Activities Schemes of NEC NERCORMS 2024-09-23 2.2161 2026-09-23 1.564325 1.564325 0.554025 Ongoing
3179 OTHER AGENCY Education Provision for furniture and fixture for construction of SC/ST Boys and Girls Hostel at NIELIT, Imphal Schemes of NEC National Institute of Ele 2024-12-04 1.19 2027-12-04 0.597375 0.597375 Ongoing
3180 OTHER AGENCY Science and Technology Northeast Student Program for Awareness, Reach and Knowledge on Space NE-SPARKS Schemes of NEC NESAC 2025-03-05 3.8372 2028-03-05 1.7267 1.7267 0.562499 Ongoing
3181 OTHER AGENCY Transport and Communication Agartala Akhaura Rail Link NLCPR-C Schemes of NEC Other 2016-07-22 708.73 2025-06-30 708.73 0 708.73 708.73 Ongoing
3182 OTHER AGENCY Science and Technology Establishment of STINER-Common Facility Centre CFC at CSIR-NEIST, Jorhat for Science and Technology Intervention in North East India STINER for FY 2018-19 CSIR-NEIST, Jorhat NLCPR-C Schemes of NEC NA 2018-08-10 40 2025-09-30 37 3 40 37 Ongoing
3183 OTHER AGENCY Transport and Communication Construction of Meter Guage to Broad Guage from Panchgram Station to Inside Cachar Paper Mill HPCL NLCPR-C Schemes of NEC M/O Heavy Industry and Pu 2016-03-15 19.23 2025-08-15 0 Ongoing
3184 OTHER AGENCY Irrigation and Flood Control Protection of Majuli Island from flood and erosion of River Brahmaputra NLCPR-C Schemes of NEC Brahmaputra Board 2017-03-15 207 2025-06-30 207 0 207 206.7175 Completed
3185 OTHER AGENCY Agriculture and Allied Creation of infrastructure of establishment of i. One new college in Agriculture and Allied Science, Pasighat, Arunachal Pradesh and ii. Six multi-technology testing centres and vocational training NLCPR-C Schemes of NEC Central Agricultural Univ 2018-03-13 82.23 2025-07-31 82.23 0 82.23 82.23 Ongoing
3186 OTHER AGENCY Science and Technology Establishment of North Eastern Science & Technology Cluster NEST for promoting Research, Innovation and Skill Development by Indian Institute of Technology, Guwahati, Assam Schemes of NEC IIT Guwahati 2025-07-04 22.98 2028-07-04 5.71 5.71 Ongoing
3187 OTHER AGENCY Science and Technology Gap funding of Residential Cost for Skill Training in AVGC and IT-ITES Sectors. Schemes of NEC NERCORMS 2025-08-08 0.51178 2027-08-08 0 Ongoing
3188 OTHER AGENCY Information and Public Relatio Production and Dissemination of High Quality Video Content through Digital Platform. Schemes of NEC NERCORMS 2025-08-01 3.32 2027-02-01 2.0776 2.0776 0.6938 Ongoing
3189 OTHER AGENCY Agriculture and Allied ADITYA PRABHA GRAM: Fostering Agricultural Harmony in Border Communities of Eastern Himalayas. Schemes of NEC Central Agriculture Unive 2025-09-12 4.9751 2028-09-12 1.2438 1.2438 Ongoing
3190 OTHER AGENCY Industries PADMA DOREE- Fusion between Eri Silk of North East & Chanderi Silk of Madhya Pradesh. Schemes of NEC NEHHDC 2025-09-19 4.6861222 2026-09-19 3.7488978 3.7488978 Ongoing
3191 OTHER AGENCY Education Ashtalakshmi Darshan-Youth Exchange Programme. Schemes of NEC NEHHDC 2025-10-14 12.104956 2027-10-14 6.052478 6.052478 Ongoing
3192 OTHER AGENCY Industries Safeguarding of Heritage with Sustainable Livelihood by Geographical Indication GI registration of 166 nos. of Crop/Commodities of North Eastern Region. Schemes of NEC NERAMAC 2025-11-25 4.3575 2027-11-25 2.17875 2.17875 Ongoing
3193 OTHER AGENCY Industries Strengthening of traditional bamboo artisan clusters by enhancing market access, modernizing products, and linking them with digital and retail ecosystems. Schemes of NEC NECBDC 2025-11-27 11.52 2028-11-27 0 Ongoing
3194 OTHER AGENCY Evaluation and Monitoring Managing the NERACE Portal. Schemes of NEC NERAMAC 2026-01-12 1.9305 2028-01-12 0 Ongoing
3195 SIKKIM Health Construction of 70 bedded District Hospital at Mangan, North Sikkim, Sikkim NESIDS-OTRI NESIDS Dept. of Health & familly 2020-03-20 10 2021-03-21 10 0 10 4 Completed
3196 SIKKIM Health Procurement of equipment for strengthening of Bio-Medical Waste Management (BMV) system & High Flow Nasal Oxygen (HFNO) System in Sikkim NESIDS-OTRI NESIDS Dept. of Health & familly 2021-09-27 5.3343 2022-10-27 5.2809 0 5.2809 0.1 Ongoing
3197 SIKKIM Agriculture and Allied Cultivation of commercial Floriculture crops at Kayathang, Rumtek, Sikkim Schemes of NEC Schemes of NEC 2012-12-18 1.82 2015-12-18 1.82 0 1.82 1.82 Completed
3198 SIKKIM Agriculture and Allied Cultivation of High yielding Paddy converting Mono-Cropping into Double Cropping in Sikkim. Schemes of NEC Schemes of NEC 2009-12-17 0.49 2012-12-17 0.45 0 0.45 0.45 Completed
3199 SIKKIM Agriculture and Allied Development of Commercial Floriculture in Sikkim Schemes of NEC Schemes of NEC 2016-05-12 6.28 2019-05-12 5.796 0 5.796 5.8 Completed
3200 SIKKIM Agriculture and Allied Development of Identified Backward Blocks under 30 PC Central Sector Scheme of NEC in Chongrang Block in West District, Sikkim Schemes of NEC Schemes of NEC 2020-11-25 2.81 2023-11-25 2.81 0 2.81 2.81 Completed
3201 SIKKIM Agriculture and Allied Establishment of trout breeding farm at Yakthang, Jyajuk under Lachen block, North Sikkim Schemes of NEC Schemes of NEC 2015-09-17 3.2631 2018-09-17 2.94 0 2.94 2.94 Completed
3202 SIKKIM Agriculture and Allied Farm Mechanisation, Sikkim Schemes of NEC Schemes of NEC 2013-11-21 5.0405 2016-11-21 4.5365 0 4.5365 4.54 Completed
3203 SIKKIM Agriculture and Allied Integrated poultry farming & Hatchery unit, at Kumrek near Rongpo, East Sikkim. Schemes of NEC Schemes of NEC 2005-12-25 2.0082 2008-12-25 1.8 0 1.8 1.8 Completed
3204 SIKKIM Agriculture and Allied Proposal of identified block for providing key identified service at Baiguney Block, West Sikkim district, Sikkim Schemes of NEC Schemes of NEC 2022-03-31 4.66 2025-03-31 3.498 1.1654 4.6634 1.97 Ongoing
3205 SIKKIM Agriculture and Allied Proposal of identified block for providing key identified service at Chongrang Block, West Sikkim district, Sikkim Schemes of NEC Dept. of Agriculture & An 2022-03-31 4.93 2025-03-31 4.934 0 4.934 3.94 Completed
3206 SIKKIM Agriculture and Allied Proposal of identified block for providing key identified service at Karji village, Chongrang Block, West Sikkim district, Sikkim Schemes of NEC Dept. of Agriculture & An 2022-03-31 1.94 2025-03-31 1.946 0 1.946 1.55 Completed
3207 SIKKIM Agriculture and Allied Proposal of identified block for providing key identified service at Mabong village, Baiguney Block, West Sikkim district, Sikkim Schemes of NEC Schemes of NEC 2022-03-31 2.01 2025-03-31 2.014 0 2.014 0.8 Completed
3208 SIKKIM Agriculture and Allied Sikkim Mandarin Re-Plantation programme with new disease free budded and grafted trees. Schemes of NEC Schemes of NEC 2022-03-22 2.77 2025-03-22 2.768 0 2.768 1.11 Completed
3209 SIKKIM Education Aspirational District West Sikkim, Sikkim Schemes of NEC Schemes of NEC 2019-06-07 1 2022-06-07 1 0 1 1 Completed
3210 SIKKIM Education Backward Community of Limboo Community, Sikkim Schemes of NEC Schemes of NEC 2022-03-11 4.525 2025-03-31 3.3912 0 3.3912 1.23 Ongoing
3211 SIKKIM Education Centre for excellence at Chakung, West Sikkim Schemes of NEC Schemes of NEC 2021-03-26 14.8 2024-03-26 8.9 0 8.9 8.9 Ongoing
3212 SIKKIM Education Community Development Programme at Kateng Bokrong, GPU under Namthang Block South Sikkim Schemes of NEC Schemes of NEC 2020-11-19 2.6 2023-11-19 1.9326677 0.6659123 2.59858 1.04 Ongoing
3213 SIKKIM Education Construction of Destitute Home (Child Care Institute) at Begha Dentam, West Sikkim Schemes of NEC Schemes of NEC 2017-03-22 3.848 2020-03-22 2.78 0 2.78 2.78 Completed
3214 SIKKIM Education Construction of Old Age Home at Lower Kamrang, Kitchu Dumra, South Sikkim (Boomtar) Schemes of NEC Schemes of NEC 2016-03-22 5.87 2019-03-22 3.756 0 3.756 3.76 Completed
3215 SIKKIM Education Construction of Panchayat Ghar and other facitlities at Gelling Baiguney GPU, Sikkim Schemes of NEC Schemes of NEC 2023-03-31 0.98 2026-03-31 0.42 0 0.42 Ongoing
3216 SIKKIM Education Construction of ScienceBlock at Kamrang Govt. Degree College at Namchi, South Sikkim Schemes of NEC Dept. of Education 2017-06-30 9.58 2020-06-30 9.5831 0 9.5831 7.59 Completed
3217 SIKKIM Education Construction of Sikkim State University at Temi Tarku, South Sikkim Schemes of NEC Schemes of NEC 2022-03-10 9.62 2025-03-10 7.42 2.1996 9.6196 4.92 Ongoing
3218 SIKKIM Education Development of Archery complex at Lalthagchan and Indoor Gymnasium for Boxing, Taekwondo, Karate, Wushu at Gangtok, East Sikkim Schemes of NEC Schemes of NEC 2012-12-26 4.98 2015-12-26 4.48 0 4.48 4.48 Completed
3219 SIKKIM Education Infrastructure Development at Tharpu Senior Secondary School, West Sikkim Schemes of NEC Schemes of NEC 2017-06-27 4.0944 2019-06-27 3.69 0 3.69 3.69 Completed
3220 SIKKIM Irrigation and Flood Control Augmentation of Dentam Water Supply Scheme (Phase-I) Schemes of NEC Schemes of NEC 2010-01-28 4.5 2014-01-28 4.05 0 4.05 4.05 Completed
3221 SIKKIM Irrigation and Flood Control Augmentation of Water Supply for Namthang Bazar from Paha Khola and Khop source in South Sikkim Schemes of NEC Schemes of NEC Dept. of Power 2017-05-09 9.59 2020-05-09 8.5437 0 8.5437 8.54 Completed
3222 SIKKIM Irrigation and Flood Control Augmentation of Water Supply Scheme at Makha Bazaar in East Sikkim Schemes of NEC Schemes of NEC 2011-12-23 4.9152 2014-12-23 4.42 0 4.42 4.42 Completed
3223 SIKKIM Irrigation and Flood Control Consn. Of Water Supply at Majitar in South Sikkim Schemes of NEC Schemes of NEC 2013-11-22 5.0231 2016-11-22 4.5208 0 4.5208 4.52 Completed
3224 SIKKIM Irrigation and Flood Control Drainage works for community assets under integrated development of Lower Rangpo Bazaar area including IBM area, East Sikkim, Sikkim. Schemes of NEC Schemes of NEC 2022-03-02 8.19 2026-03-03 5.5 1.68 7.18 3.68 Ongoing
3225 SIKKIM Irrigation and Flood Control Jhora Training and Anti-Erosion Work outside the defined boundary of Namchi, South Sikkim Schemes of NEC Schemes of NEC 2012-02-28 3.6775 2015-02-28 3.31 0 3.31 3.31 Completed
3226 SIKKIM Irrigation and Flood Control Providing New Distribution Network System of Water Supply to Namchi Town in South Sikkim (Phase-II) Schemes of NEC Schemes of NEC 2008-11-12 4.435 2012-11-12 3.99 0 3.99 3.99 Completed
3227 SIKKIM Irrigation and Flood Control River training works along Sipchu Jhora and River Teesta at Sinotar Temi constituency Phase-I, South Sikkim dist. Schemes of NEC Schemes of NEC 2009-12-18 4.8126 2013-12-18 4.33 0 4.33 4.33 Completed
3228 SIKKIM Irrigation and Flood Control Up-gradation & Modernization of Feeder/Approach including the Development of Selep water treatment plant for Sikkim, East Sikkim dist. Schemes of NEC Schemes of NEC 2008-07-16 4.8002 2011-07-16 3.2506 0 3.2506 3.25 Completed
3229 SIKKIM Irrigation and Flood Control Water harvesting and irrigation in Sikkim Mandarin, East Sikkim dist. Schemes of NEC Schemes of NEC 2012-11-26 4.0491 2015-11-26 3.64 0 3.64 3.64 Completed
3230 SIKKIM Industries Establishment of an Industrial Cordyceps Based Food & Nutraceutical Processing Unit as a Revenue Generation Model in Sikkim Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.99 2025-03-31 1.9958 0 1.9958 Foreclosed
3231 SIKKIM Industries Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Sikkim Schemes of NEC Schemes of NEC 2020-08-22 1.74 2023-08-11 1.74 0 1.74 1.74 Completed
3232 SIKKIM Industries Modernization and Expansion of Temi Tea Estate, South Sikkim Schemes of NEC Schemes of NEC 2015-12-11 2.9 2018-12-12 2.61 0 2.61 2.61 Completed
3233 SIKKIM Industries Production and Training Centre for Soft Toys at Gangtok, Sikkim Schemes of NEC Schemes of NEC 2011-12-08 4.6954 2014-12-08 4.0044 0 4.0044 4 Completed
3234 SIKKIM Industries Setting up of a Hand Made Paper Unit at Melli, South Sikkim Schemes of NEC Schemes of NEC 2014-12-09 3.9896 2017-12-09 3.5906 0 3.5906 3.59 Completed
3235 SIKKIM Industries Setting up of a Heritage Handicrafts Museum at Namchi, South Sikkim Schemes of NEC Schemes of NEC 2014-02-13 4.92 2017-02-13 4.428 0 4.428 4.43 Completed
3236 SIKKIM Information and Public Relatio Construction of Multi Purpose Community Centre at Soreng, Sikkim Schemes of NEC Schemes of NEC 2023-03-31 14.15 2026-03-31 3.5 6.82 10.32 1.5 Ongoing
3237 SIKKIM Information and Public Relatio Emerging North East from 25th to 27th October, 2017 organised by Govt. of Sikkim Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.099 2021-04-01 0 Completed
3238 SIKKIM Information and Public Relatio National Conference on Floriculture for Rural and Urban Prosperity organised by ICAR - National Research Centre for Orchids - Sikkim Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.045 2021-04-01 0 Completed
3239 SIKKIM Health Accident & Trauma Center at Namchi, Sikkim Schemes of NEC Schemes of NEC 2006-10-15 1.35 2008-10-15 1.22 0 1.22 1.22 Completed
3240 SIKKIM Health Capital Support for procurement of 2(two) Mobile Laboratories in Sikkim Schemes of NEC Schemes of NEC 2021-10-26 1.8172 2024-10-26 1.82 0 1.82 1.82 Completed
3241 SIKKIM Health Construction of T.B. Hospitals each at Mangan, North District and Gyalshing, West District, Sikkim(Re-opened) Schemes of NEC Schemes of NEC 2012-11-26 4.2702 2015-11-26 3.8432 0 3.8432 3.84 Completed
3242 SIKKIM Health Construction of X-Ray Block, Kitchen and Garage cum Seminar Room in selected PHCs, Sikkim Schemes of NEC Schemes of NEC 2007-02-28 2.8479 2010-02-28 2.56 0 2.56 2.56 Completed
3243 SIKKIM Health Procurement of Dental Chairs, Equipments and Dental Lab. Facilities at STNM Hospital, Gangtok Hospitals and PHCs in Sikkim. Schemes of NEC Schemes of NEC 2013-10-09 2.9746 2016-10-09 2.68 0 2.68 2.68 Completed
3244 SIKKIM Health Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Sikkim for activities related to combating COVID-19 pandemic Schemes of NEC Schemes of NEC 2020-04-01 1.75 2023-04-01 1.75 0 1.75 1.75 Completed
3245 SIKKIM Health Strengthening & up-gradation of PHSCs/PHCs/CHCs in the State of Sikkim Schemes of NEC Schemes of NEC 2005-02-24 4.04 2008-02-24 3.64 0 3.64 3.64 Completed
3246 SIKKIM Health Strengthening of Radiology Departments at Mangan CHC, Singtam CHC and Namchi CHC, Sikkim Schemes of NEC Schemes of NEC 2012-11-26 9.5025 2014-11-26 8.55 0 8.55 8.55 Completed
3247 SIKKIM Health Upgradation of Hospitals & Health Centers by procurement of Basic equipment & Labour Room Equipment in PHCs, Sikkim Schemes of NEC Schemes of NEC 2006-03-14 4.9348 2008-03-14 4.44 0 4.44 4.44 Completed
3248 SIKKIM Power Construction of 11/11 KV switching sub-station including re-arrangement and drawing of 11 KV transmission line at Kongri alongwith modernization of Tashiding Bazar in West Sikkim, Sikkim Schemes of NEC Schemes of NEC 2015-06-09 10.48 2018-06-09 9.432 0 9.432 9.43 Completed
3249 SIKKIM Power Construction of 11kV 3-Phase Heavy Duty Transmission Line from Rabong to Borong via Deorali and construction of control room at Ralong and construction of 11kV 3-Phase Heavy Duty Transmission line from Rabong to Namlung via Zarrong in South Sikkim Schemes of NEC Schemes of NEC 2012-02-29 4.48 2015-02-28 4.03 0 4.03 4.03 Completed
3250 SIKKIM Power Construction of 66kV S/C Transmission Line from 132/66kV Switchyard at Ravangla to Central University with 66/11kV, 2x5MVA substation at Yangang, South Sikkim. Schemes of NEC Schemes of NEC 2012-09-04 16.51 2015-09-04 14.86 0 14.86 14.86 Completed
3251 SIKKIM Power Conversion of existing 11KV Transmission line & 440 V, LT Distribution Overhead Lines including service connections to underground cable systems in congested areas at Pelling, West Sikkim Schemes of NEC Schemes of NEC 2008-07-27 4.7644 2011-07-27 4.29 0 4.29 4.29 Completed
3252 SIKKIM Power Conversion of Overhead HT & LT Over head lines into underground cable system with up-gradation of the existing distribution system at Ambedkar Road, Munshi Colony, Bhojo Gharie & Sonam Gyatso Marg & Arithang Areas, Gangtok, Sikkim Schemes of NEC Schemes of NEC 2009-01-23 4.9696 2012-01-23 4.47 0 4.47 4.47 Completed
3253 SIKKIM Power Design, Supply, Erection, Testing, Commissioning of 66 KV Single Circuit transmission line from 3.3/66 KV Sub-Station of Rongli-I HEP at Sisney including extension of line bay at 66/11 KV Sub-Station at Sungdung, Chujachen, Rongli in East Sikkim. Schemes of NEC Schemes of NEC 2009-08-21 3.8322 2012-08-21 3.45 0 3.45 3.45 Completed
3254 SIKKIM Power Diversion of 66KV Transmission Line from Tadong Sub-Station to ICAR compound in D/C 66KV Tower for independent circuit for Phodong, North Sikkim. Schemes of NEC Schemes of NEC 2010-12-23 4.93 2013-12-23 4.437 0 4.437 4.44 Completed
3255 SIKKIM Power Electrification of Central Park Along With Conversion of Existing Overhead L.T Line into Underground Cable with System Improvement & Street Light and Around Namchi Bazar in South Sikkim Schemes of NEC Schemes of NEC 2010-12-30 4.9838 2012-12-30 4.49 0 4.49 4.49 Completed
3256 SIKKIM Power Integration of New Sub-Stations & Generation Stations under North District with existing Central Load Dispatch Centre (CLDC) with facility for Energy Auditing, Sikkim. Schemes of NEC Schemes of NEC 2009-10-27 4.9 2012-10-27 4.41 0 4.41 4.41 Completed
3257 SIKKIM Power Interconnection of 11 KV Development Area Sub-Station with 11/11 KV TNA Sub-Station as part of Ring Main Network, Gangtok Schemes of NEC Schemes of NEC 2007-02-28 1.02 2007-12-01 0.918 0 0.918 0.92 Completed
3258 SIKKIM Power Procurement, erection, testing and commissioning of 20 MVA, 132/66 KV power transformer for 132/66 KV Sub-Station at Kyongsa, Gyalshing, West Sikkim i/c electrification of the Chenrezig Shingkham Riwa Potala at Sangha Choeling, Pelling in West Sikkim Schemes of NEC Schemes of NEC 2013-12-20 12.85 2015-12-20 12.85 0 12.85 12.85 Completed
3259 SIKKIM Power Remodeling & Conversion of existing Overhead LT Line into Underground Cable System of all Electrical Network In and around Rabong, South Sikkim Schemes of NEC Schemes of NEC 2009-01-23 4.9549 2012-01-23 4.46 0 4.46 4.46 Completed
3260 SIKKIM Power Remodelling and augmentation of HT & LY Power Supply & Distriction System at Pakyong Bazaaar, East Sikkim Schemes of NEC Schemes of NEC 2007-11-23 2.28 2010-11-23 2.05 0 2.05 2.05 Completed
3261 SIKKIM Power Renovation, Improvement and Strengthening of 66 KV switch yard and Construction of 1x7.5 MVA, 66/11 KV Substation at Lower Lagyap Hydel Project, Ranipool, Sikkim. Schemes of NEC Schemes of NEC 2009-10-27 4.66 2012-01-27 4.19 0 4.19 4.19 Completed
3262 SIKKIM Power Strengthening, modernization and improvement of transmission and distribution system of Raj Bhawan, Mintokgang, High court, VIP area and surrounding areas in Gangtok, East Sikkim Schemes of NEC Schemes of NEC 2018-02-26 8.6658 2021-02-26 7.7992 0 7.7992 7.8 Completed
3263 SIKKIM Power System Improvement & modernization i/c Augmentation of Distribution system of Uttarey Bazaar, Dentam Bazaar in West Sikkim Schemes of NEC Schemes of NEC 2016-02-29 14.05 2019-02-28 12.645 0 12.645 12.65 Completed
3264 SIKKIM Power Upgradation & Remodelling of Existing Distribution System of MG Road and its surrounding areas, Gangtok, Sikkim Schemes of NEC Schemes of NEC 2007-12-05 4.51 2010-12-05 4.06 0 4.06 4.06 Completed
3265 SIKKIM Power Upgradation and Strengthening of HT & LT Lines and Substations at Helipad Area, Bakthang and adjoining places in East Sikkim Schemes of NEC Schemes of NEC 2011-12-26 4.6343 2014-12-26 4.17 0 4.17 4.17 Completed
3266 SIKKIM Power Upgradation of Distribution System including installation of new S/s at strategic locations and strenthening of the ring main, Gangtok. Sikkim. Schemes of NEC Schemes of NEC 2009-12-09 4.9153 2012-12-09 4.42 0 4.42 4.42 Completed
3267 SIKKIM Power Upgradation, Strengthening of HT/LT Distribution System including Installation of new substations at strategic locations of Deorali (Pani House Area) and Upper Syari, Gangtok, Sikkim Schemes of NEC Schemes of NEC 2011-03-22 4.95 2014-03-22 4.46 0 4.46 4.46 Completed
3268 SIKKIM Science and Technology Computerisation of Food & Civil Supplies and Consumers Affairs Department Schemes of NEC Schemes of NEC 2015-08-14 3.39 2018-08-14 3.3 0 3.3 3.3 Completed
3269 SIKKIM Science and Technology Computerisation of the Examination Data Processing System at the State Public Service Commission(Sikkim) Schemes of NEC Schemes of NEC 2011-03-29 0.4444 2014-03-29 0.4444 0 0.4444 0.44 Completed
3270 SIKKIM Science and Technology I.T. System for Water Supply Management (Sikkim) Schemes of NEC Schemes of NEC 2012-03-22 3.95 2015-03-22 3.555 0 3.555 3.56 Completed
3271 SIKKIM Science and Technology Installation of CCTV Cameras in the Police Stations of Sikkim. Home Dept. Govt. of Sikkim Schemes of NEC Schemes of NEC 2021-03-31 4.717 2024-03-31 4.717 0 4.717 6.6 Completed
3272 SIKKIM Science and Technology IT Education Programme at 12 schools in Sikkim for 2009-10 Schemes of NEC Schemes of NEC 2009-12-17 0.552 2012-12-17 0.552 0 0.552 0.55 Completed
3273 SIKKIM Science and Technology Planning Resource Center-Open Data Center DPER & NECAD, Sikkim. Development Planning Economic Reforms & North Eastern Council Affairs (DPER & NECAD), Govt. of Sikkim Schemes of NEC Schemes of NEC 2016-04-29 3.4721 2019-04-29 3.1249 0 3.1249 3.12 Completed
3274 SIKKIM Science and Technology Sikkim E-Education Infosys for Sikkim, Department of Education, Government of Sikkim, Gangtok Schemes of NEC Schemes of NEC 2009-01-29 4 2012-01-29 4 0 4 4 Completed
3275 SIKKIM Science and Technology Sustainable Socio-Economic Development of farmers of Gurung Community through Dairying in Gyalshing District, Sikkim Office of the District Collector, District Administration Centre, Gyalshing Govt. of Sikkim Schemes of NEC Schemes of NEC 2023-03-16 2.73 2026-03-31 2.73 0 2.73 2.73 Ongoing
3276 SIKKIM Science and Technology Sustainable Socio-Economic Development of farmers of Gurung Community through Dairying in Soreng District, Sikkim Office of the District Collector, District Administration Centre, Soreng Govt. of Sikkim Schemes of NEC Schemes of NEC 2023-03-31 2.27 2026-03-31 2.24 0 2.24 0.243 Ongoing
3277 SIKKIM Transport and Communication (a) Construction of 25M span steel bridge over Upper Benkhola at Ben Tarku Rabongla (GLVC) road(b) Construction of 50M span steel bridge on approach toad to Khedum Village Schemes of NEC Schemes of NEC 2005-03-30 2.82 2007-03-30 2.53 0 2.53 2.53 Completed
3278 SIKKIM Transport and Communication (a) Construction of steel bridge on Namchi-Vok road(b) Construction of steel bridge on Pabong-Yangyang road Schemes of NEC Schemes of NEC 2005-07-25 2.9484 2008-07-25 2.65 0 2.65 2.65 Completed
3279 SIKKIM Transport and Communication Construction /Improvement of Sumin khor road Schemes of NEC Schemes of NEC 2007-05-01 3.5866 2010-05-01 3.23 0 3.23 3.23 Completed
3280 SIKKIM Transport and Communication Construction of 26 Nos. of Rural foot bridges in Sikkim Schemes of NEC Schemes of NEC 2016-09-23 14.0495 2019-09-24 12.64 0 12.64 12.64 Completed
3281 SIKKIM Transport and Communication Construction of bridge over river Ring Yang on Sombaria-Soreng road Schemes of NEC Schemes of NEC 2004-07-06 3.3202 2007-07-06 3.11 0 3.11 3.11 Completed
3282 SIKKIM Transport and Communication Construction of Makha Bridge over river Teesta Khola at Tanak on Macha-Lingi-Yangyang-Rabongla road Schemes of NEC Schemes of NEC 2005-10-24 4.9525 2008-10-24 4.46 0 4.46 4.46 Completed
3283 SIKKIM Transport and Communication Construction of retaining structure on approach road to Raj Bhavan VIP road at Gangtok Schemes of NEC Schemes of NEC 2005-07-25 1.1058 2008-07-25 1 0 1 1 Completed
3284 SIKKIM Transport and Communication Construction of road from 10th mile Legship-Kawzing road to Tingmoo Village Schemes of NEC Schemes of NEC 2005-03-30 4.6829 2008-03-30 4.21 0 4.21 4.21 Completed
3285 SIKKIM Transport and Communication Construction of Steel Bridge over river Rongni-Chu on Sangkhola-Sumin road Schemes of NEC Schemes of NEC 2004-07-06 2.854 2007-07-06 2.67 0 2.67 2.67 Completed
3286 SIKKIM Transport and Communication Construction of Steel Bridge over river Takcham Chu Schemes of NEC Schemes of NEC 2004-07-06 4.7674 2007-07-06 4.26 0 4.26 4.26 Completed
3287 SIKKIM Transport and Communication Improvement of Assam Pakyong road Schemes of NEC Schemes of NEC 2006-03-20 7.5076 2009-03-20 6.77 0 6.77 6.77 Completed
3288 SIKKIM Transport and Communication Improvement of Bermik Legship road Schemes of NEC Schemes of NEC 2005-07-25 4.4946 2008-07-25 4.05 0 4.05 4.05 Completed
3289 SIKKIM Transport and Communication Improvement of Chakung-Khaniserbong Road in West Sikkim Schemes of NEC Schemes of NEC 2005-12-15 6.5241 2008-12-15 5.87 0 5.87 5.87 Completed
3290 SIKKIM Transport and Communication Improvement of Kimbubotey Sokpey road Schemes of NEC Schemes of NEC 2006-03-20 11.8089 2009-03-20 10.63 0 10.63 10.63 Completed
3291 SIKKIM Transport and Communication Improvement of Ralang Phamtam road Schemes of NEC Schemes of NEC 2006-03-20 11.83 2009-03-20 10.65 0 10.65 10.65 Completed
3292 SIKKIM Transport and Communication Improvement of Sangkhola-Zingla road Schemes of NEC Schemes of NEC 2010-02-19 25.26 2013-02-19 22.73 0 22.73 22.73 Completed
3293 SIKKIM Transport and Communication Improvement of Sombaria Hilley road Schemes of NEC Schemes of NEC 2006-03-20 8.4568 2009-03-20 7.61 0 7.61 7.61 Completed
3294 SIKKIM Transport and Communication Purchase of Machinery Schemes of NEC Schemes of NEC 2004-08-25 3.76 2007-08-25 3.76 0 3.76 3.76 Completed
3295 SIKKIM Transport and Communication Replacement of suspension bridge with 102M span steel bridge over Rabi Khola river at 9th KM on Melling-Phong road Schemes of NEC Schemes of NEC 2006-12-15 4.973 2009-12-15 4.48 0 4.48 4.48 Completed
3296 SIKKIM Transport and Communication Reshi-Legship to Bermick Schemes of NEC Schemes of NEC 2012-11-08 39.96 2014-11-08 35.96 0 35.96 35.96 Completed
3297 SIKKIM Transport and Communication Sangkhola-Sumin Road Schemes of NEC Schemes of NEC 2010-02-19 10.95 2013-02-19 9.86 0 9.86 9.86 Completed
3298 SIKKIM Transport and Communication Sankalang-Bey-Sakyang road Schemes of NEC Schemes of NEC 2004-07-05 4.0138 2008-07-05 3.71 0 3.71 3.71 Completed
3299 SIKKIM Transport and Communication Upgradation including extension of Marchak Tumlabong road Schemes of NEC Schemes of NEC 2006-03-20 10.23 2009-03-20 9.21 0 9.21 9.21 Completed
3300 SIKKIM Tourism and Culture Construction of high altitude trekking route from Thamken to Shizam under Lachung Dzumsa in North Sikkim Schemes of NEC Other 2023-03-27 4.7 2026-03-27 3.1 0.85 3.95 3 Ongoing
3301 SIKKIM Tourism and Culture Creation and Establishment of Banbas Project Barsy Rhododendron Sanctuary at Hee Bermiok Schemes of NEC Schemes of NEC 2009-12-23 2.8 2012-12-23 2.52 0 2.52 2.52 Completed
3302 SIKKIM Tourism and Culture Development of Eco-friendly Tourist Complex at Tangu near Chopta Valley, Lachen, North Sikkim (Name revised) Schemes of NEC Schemes of NEC 2017-09-21 9.1 2020-09-21 8.19 0 8.19 8.19 Completed
3303 SIKKIM Tourism and Culture Development of Eco-Tourism and Allied Activities at Chauridara Green Village in South Sikkim Schemes of NEC Schemes of NEC 2013-03-18 3.6341 2016-03-18 3.27 0 3.27 3.27 Completed
3304 SIKKIM Tourism and Culture Development of Eco-Tourism at Golitar, Fambonglho Wildlife Sanctuary, Sikkim . Schemes of NEC Schemes of NEC 2011-03-24 3.9463 2014-03-24 3.9463 0 3.9463 3.95 Completed
3305 SIKKIM Tourism and Culture Development of Tourism Infrastructure at Chebuk and Kalapathar in North Sikkim Schemes of NEC Schemes of NEC 2023-03-31 4.6762 2026-03-31 2.9 0.89 3.79 1.5 Ongoing
3306 SIKKIM Tourism and Culture Eco-Tourism Development in Barsey Rhododendron Sanctuary, West Sikkim Schemes of NEC Schemes of NEC 2006-12-08 0.36 2009-12-08 0.32 0 0.32 0.32 Completed
3307 SIKKIM Tourism and Culture Extension of Sikkim Guest House at Panjabari, Guwahati, Assam Schemes of NEC Schemes of NEC 2021-02-12 4.1145 2024-02-12 4.11 0 4.11 7.35 Completed
3308 SIKKIM Tourism and Culture Khey Bumsa Tekung Tek Rural Mart and Bamboo Recreation Park at Labi and Gaikhana Villages of Kabi Lungchok Constituency, North Sikkim Schemes of NEC Schemes of NEC 2021-02-19 3.61 2025-02-19 3.605 0 3.605 2.41 Ongoing
3309 SIKKIM Tourism and Culture Khey Bumsa ? Tekung Tek Rural Mart and Bamboo Recreation Park at Labi and Gaikhana Villages of Kabi Lungchok Constituency Phase II, North Sikkim Schemes of NEC Schemes of NEC Choose... 2023-02-09 1.3113 2026-02-09 0.8578 0.1311 0.9889 0.53 Ongoing
3310 SIKKIM Tourism and Culture Remodelling and upgradation of Burtuk Heliport (Gangtok) in East Sikkim Schemes of NEC Schemes of NEC 2022-03-31 10.83 2025-03-31 10.83 0 10.83 5.83 Completed
3311 SIKKIM Tourism and Culture Tourism Infrastructure as support facility for Passenger Ropeway Project at Upper Dhaper, Yangang in South Sikkim Schemes of NEC Schemes of NEC 2022-03-31 13.59 2025-03-31 13.59 0 13.59 5.44 Completed
3312 SIKKIM Tourism and Culture Upgradation and Beautification of Lachen Bazaar in North Sikkim Schemes of NEC Schemes of NEC 2017-01-11 3.889 2020-01-11 3.5001 0 3.5001 3.5 Completed
3313 SIKKIM Tourism and Culture Conversion of Singshore bridge as a Glass Skywalk Bridge PM-DevINE PM-DevINE Public works Department 2024-02-16 52 2026-03-11 13 13 26 20.79 Ongoing
3314 SIKKIM Tourism and Culture Gap funding for Eco-friendly Passenger Ropeway (Cable Car) from Dhapper to Bhaleydunga in South Sikkim - at the cost of Rs. 57.82 Crore (28 percent) of total cost of Rs. 209.57 Crore PM-DevINE PM-DevINE Dept of Planning 2023-01-30 57.82 2023-03-31 57.711 0 57.711 57.711 Completed
3315 SIKKIM Tourism and Culture Gap funding for Passenger Ropeway System from Pelling to Sanga-Choeling in West Sikkim - at the cost of Rs. 63.39 Crore (58 percent) of total cost of Rs.108.39 Crore PM-DevINE PM-DevINE Dept of Planning 2023-01-30 63.39 2023-12-31 63.39 0 63.39 63.3899 Completed
3316 SIKKIM Tourism and Culture Skywalk Project at Bhaleydhunga, Yangang in South Sikkim PM-DevINE PM-DevINE Dept of Planning 2024-02-16 220 2026-03-11 55 55 110 93.44 Ongoing
3317 SIKKIM Transport and Communication Construction of two lane balanced cantilever bridge over river Kanaka at Kayum Dzongu in North Sikkim NESIDS-ROADS NESIDS Public works Department 2018-09-12 97.89 2020-03-31 64.416 4 68.416 64.42 Ongoing
3318 SIKKIM Roads and Bridges Development of Eco-Tourism Zone at Zandidara under Barsey Rhodoendron Sanctuary in West Sikkim NESIDS-OTRI NESIDS 2022-04-20 20 2024-04-30 4.9975 5 9.9975 0.1 Ongoing
3319 SIKKIM Roads and Bridges Underground Parking Space at Namchi NESIDS-ROADS NESIDS Public works Department 2018-09-12 14.77 2020-03-31 14.77 0 14.77 14.77 Completed
3320 SIKKIM Transport and Communication Widening and Improvement of road from Namchi to Birdhang via Kitchdumra are connecting the West District to South District in Sikkim NESIDS-ROADS NESIDS Public works Department 2022-04-19 64.64 2024-04-30 64.42 0.225 64.645 41.92 Completed
3321 SIKKIM Transport and Communication Construction of 120M length Composite Steel Girder Bridge over Rangeet Khola along Zarong Biring Road: under Rabong Sub-Division 120 mtr NESIDS-ROADS NERSDS Public works Department 2021-03-24 19.82 2024-04-24 7.6 12.32 19.92 7.5 Completed
3322 SIKKIM Transport and Communication Construction of 50Mtr Steel Bridge along with 875M approach road over River Kalej Khola at Rangsang Dowan in West Sikkim NESIDS-ROADS NERSDS Public works Department 2020-01-17 8.03 2024-01-17 8.03 0 8.03 7 Completed
3323 SIKKIM Transport and Communication Construction of 55 M steel bridge over River Kateng Kali Khola, Namthang, South Sikkim (Length 55 M) NESIDS-ROADS NERSDS Public works Department 2019-08-09 9.54 2022-09-30 9.54 0 9.54 9.46 Completed
3324 SIKKIM Transport and Communication Upgradation, carpeting and construction of new road from Tharpu to Saili Golai for diversion of Boject slide in West Sikkim NESIDS-ROADS NERSDS Public works Department 2019-08-09 51.56 2022-08-09 51.15 0 51.15 50.14 Completed
3325 SIKKIM Water Supply Augmentation of Gyalshing water supply scheme in west sikkim under NESIDS NESIDS-OTRI NESIDS 2021-03-18 36.45 2023-03-18 36.45 0 36.45 34.5935 Ongoing
3326 SIKKIM Water Supply Augmentation of water supply at Soreng, West Sikkim NESIDS-OTRI NESIDS 2022-04-20 4.6 2024-04-30 4.6034 0 4.6034 1.74 Completed
3327 SIKKIM Education Assistance to affiliated colleges (4 No) NESIDS-OTRI NLCPR 2000-09-15 5 2005-03-31 4.5 0 4.5 5 Completed
3328 SIKKIM Education Centre for Computer and Communication Technology Polytechnic, Gangtok. NESIDS-OTRI NLCPR 2000-03-22 2.5 2004-03-31 2.25 0 2.25 2.5 Completed
3329 SIKKIM Education Construction of 198 School buildings NESIDS-OTRI NLCPR 2000-09-15 23.42 2003-03-31 21.078 0 21.078 23.42 Completed
3330 SIKKIM Education Construction of Model School in Sikkim NESIDS-OTRI NLCPR Dept. of Power 2013-06-20 10.0936 2015-06-30 9.0842 0 9.0842 9.0842 Completed
3331 SIKKIM Education Construction of Multi Purpose Hall cum Classroom for 5 Senior Secondary Schools at various places in Sikkim under NLCPR. NESIDS-OTRI NLCPR 2008-09-30 9.7115 2010-03-31 8.6066 0 8.6066 8.6066 Completed
3332 SIKKIM Education Construction of Multipurpose Halls cum Classroom in Six Senior Secondary Schools. NESIDS-OTRI NLCPR 2012-01-02 18 2013-05-31 13.0645 0 13.0645 13.0645 Completed
3333 SIKKIM Education Construction of School Buildings and Rain Water Harvesting for various Schools NESIDS-OTRI NLCPR 2006-12-08 11.474 2008-12-07 10.0434 0 10.0434 10.0433 Completed
3334 SIKKIM Education Multi-purpose Auditorium at Tashi Namgyal Academy, Gangtok, East Sikkim NESIDS-OTRI NLCPR Dept. of Power 2017-05-25 6.5 2019-11-30 5.524 0 5.524 5.524 Completed
3335 SIKKIM Education Sarva Shiksha Abhiyan NESIDS-OTRI NLCPR 2006-03-28 2.0005 2006-12-29 2.0005 0 2.0005 2.0005 Completed
3336 SIKKIM Irrigation and Flood Control Anti Erosion Works (15 No.) NESIDS-OTRI NLCPR 2000-01-14 5.32 2003-09-30 4.788 0 4.788 5.32 Completed
3337 SIKKIM Irrigation and Flood Control Anti Erosion Works (32 No.) NESIDS-OTRI NLCPR 2000-03-28 10.02 2001-12-30 9.02 0 9.02 10.02 Completed
3338 SIKKIM Irrigation and Flood Control Anti Erosion Works (38 No.) NESIDS-OTRI NLCPR 2001-09-12 15 2004-03-31 13.5 0 13.5 15 Completed
3339 SIKKIM Irrigation and Flood Control Anti Erosion Works (6 No.) NESIDS-OTRI NLCPR 2001-09-12 5.4866 2003-03-31 4.941 0 4.941 5.49 Completed
3340 SIKKIM Health Construction of Annexe Block for 1000 Bedded Super Speciality STNM Hospital at Sochyagang, East Sikkim NESIDS-OTRI NLCPR 2013-12-27 27.1267 2017-06-30 24.414 0 24.414 24.414 Completed
3341 SIKKIM Miscellaneous Beautification and upgradation of Ranipool Bazaar in Sikkim NESIDS-OTRI NLCPR 2013-12-20 7.635 2015-12-31 6.3592 0 6.3592 6.3592 Completed
3342 SIKKIM Miscellaneous Dacheling Cremation Ground NESIDS-OTRI NLCPR 2003-03-21 1.09 2005-12-31 0.9745 0 0.9745 1.0615 Completed
3343 SIKKIM Miscellaneous Development and Upgradation of Rangpo Bazar NESIDS-OTRI NLCPR 2012-06-28 6.4566 2013-06-30 5.3525 0 5.3525 5.3525 Completed
3344 SIKKIM Miscellaneous Development of Crematorium Complex at Jalipool in East Sikkim NESIDS-OTRI NLCPR 2016-12-16 6.5 2018-12-16 5.805 0 5.805 5.805 Completed
3345 SIKKIM Miscellaneous Development of village tourism at (a) chirbirey, (b) Zoom and (c) Majhigaon river Bank in Sikkim NESIDS-OTRI NLCPR Dept of Planning 2007-07-04 19.6831 2009-07-31 16.0092 0 16.0092 16.0092 Completed
3346 SIKKIM Miscellaneous Infrastructure Development and Beautification of Gyalshing Bazaar, Sikkim NESIDS-OTRI NLCPR 2013-09-17 6.258 2016-08-31 5.6323 0 5.6323 5.6323 Completed
3347 SIKKIM Miscellaneous Namchi to Samdruptse Ropeway, South Sikkim NESIDS-OTRI NLCPR 2007-10-12 16.0425 2009-08-31 14.4382 0 14.4382 14.4382 Completed
3348 SIKKIM Miscellaneous Regional facility for Solid Waste Treatment and Disposal Project at Shipsu to cater to South & West Sikkim (under SAP) NESIDS-OTRI NLCPR 2017-12-06 11.144 2019-12-31 10.0295 0 10.0295 10.0067 Ongoing
3349 SIKKIM Miscellaneous Ropeway from Deorali to tashiling NESIDS-OTRI NLCPR 2000-03-09 10.6 2004-06-30 9.54 0 9.54 10.6 Completed
3350 SIKKIM Miscellaneous Solid Waste Treatment Project for Mangan in Sikkim (under SAP) NESIDS-OTRI NLCPR 2017-12-05 10 2019-12-31 3.6 0 3.6 2.3991 Ongoing
3351 SIKKIM Power 132 kv S/c transmission line from rangit to Melli with 132/66 kv sub-station at Melli. NESIDS-OTRI NLCPR 2002-01-16 28.17 2004-08-31 25.353 0 25.353 28.17 Completed
3352 SIKKIM Power Augmentation of 66/11 KV, 2.5 MVA phodong Sub-Station to 5 MVA and replacement of all electrical equipments, North Sikkim under NLCPR NESIDS-OTRI NLCPR 2011-07-06 8.6095 2012-06-30 7.6084 0 7.6084 7.6084 Completed
3353 SIKKIM Power Centralized Load Dispatch Centre at Melli NESIDS-OTRI NLCPR 2002-09-23 9.7416 2005-03-31 9.0674 0 9.0674 9.2164 Completed
3354 SIKKIM Power Complete Electrification of Lord Buddha Statue including garden along with conversion of existing overhead L.T. distribution lines into underground cable system with modernization and refurbishment of existing electrical network at Rabong bazaar in South NESIDS-OTRI NLCPR 2010-03-09 4.0052 2011-09-30 3.534 0 3.534 3.534 Completed
3355 SIKKIM Power Construction of 11kV Heavy Duty Transmission Line from Mangan to Upper Dzongu and Lower Dzongu and Installation of 11/11 kV Control Room at Phidang, Lower Dzongu and Lingze, Upper Dzongu, North Sikkim NESIDS-OTRI NLCPR 2014-02-28 17.7141 2016-02-28 15.9427 0 15.9427 12.7541 Completed
3356 SIKKIM Power Construction of 132 KV Transmission line from LLHP to Nathula NESIDS-OTRI NLCPR 2006-06-29 31.0087 2008-05-30 26.9806 0 26.9806 26.9806 Completed
3357 SIKKIM Power Construction of 66 KV line from Lachung to Maltin including construction of 66/11 KV 5 MVA Switchyard at Lachung and additional bay at Maltin in Sikkim NESIDS-OTRI NLCPR 2011-03-22 10.791 2012-09-30 9.5253 0 9.5253 9.5253 Completed
3358 SIKKIM Power Construction of 66 kV S/C transmission line from Myong to Chungthang and transformer bay at Chungthang and feeder bay at Mayong NESIDS-OTRI NLCPR 2004-03-22 8.7676 2005-12-31 7.8579 0 7.8579 7.8579 Completed
3359 SIKKIM Power Construction of 66/11 KV 2x5 MVA Sub - station at Perbing Ranka East Sikkim including drawing of 11 KV HT Transmission lines for power evacuation and other allied electrical works in and around Gangtok in East Sikkim NESIDS-OTRI NLCPR Dept. of Power 2010-04-20 15.891 2011-09-30 14.0929 0 14.0929 14.0929 Completed
3360 SIKKIM Power Conversion of existing 440 V L.T. distribution overhead lines including service connections into underground cable system at Gyalshing Bazar and its surrounding areas in Sikkim NESIDS-OTRI NLCPR 2011-09-07 4.4532 2012-07-31 3.9293 0 3.9293 3.9293 Completed
3361 SIKKIM Power Cost. of 66/11 kv ,2 x 2.55 MVA Sub-Station with LILO arrangement at old Namchi Bazar including Up-gradation of existing 2X 2.5 MVA Sub-Station to 2X 7.5 MVA Sub-Station at Namchi , South Sikkim NESIDS-OTRI NLCPR 2010-12-23 13.4793 2012-06-30 11.726 0 11.726 11.726 Completed
3362 SIKKIM Power Design, Supply, erection, testing & commissioning of 11/66 KV switchyard at Rbochu HEP with 25 MVA, 11/66 KV transformer and construction of 66 KV transmission line from Rabochu to mAltin with additional bay in Maltin in Noth Sikkim NESIDS-OTRI NLCPR 2011-07-08 10.8763 2012-12-31 9.6106 0 9.6106 9.6106 Completed
3363 SIKKIM Power Drawing of 66 KV Transmission line including construction of 2x7.5 MVA, sub-station at Marchak, East Sikkim NESIDS-OTRI NLCPR 2010-04-20 10.0077 2011-09-30 8.8303 0 8.8303 8.8303 Completed
3364 SIKKIM Power Drawing of new 66 kv double circuit transmission line from LLHP to Tadong 66/11 KV Sub-Station, Sikkim NESIDS-OTRI NLCPR 2009-09-02 8.3443 2011-08-31 7.3626 0 7.3626 7.3626 Ongoing
3365 SIKKIM Power Establishment of 11/11 kV switching substation, upgradation of 11 kV transmission system under Pakyong Division in East Sikkim NESIDS-OTRI NLCPR 2013-04-29 26.331 2014-10-30 23.6979 0 23.6979 23.6979 Completed
3366 SIKKIM Power Extension of 132 Kv system in South and West Districts of Sikkim covering Gyalshing, Pelling and Rabongla NESIDS-OTRI NLCPR 2004-07-30 23.03 2006-03-31 20.7283 0 20.7283 21.5355 Completed
3367 SIKKIM Power Installation of 1x15 MVA transformer & extension bay at 66/11KV S/S Mamring South Sikkim NESIDS-OTRI NLCPR 2010-03-09 6.0584 2011-09-30 5.3636 0 5.3636 5.3636 Completed
3368 SIKKIM Power Major overhauling of 2x6 MW hydel generating station at lower lagyap hydel project. NESIDS-OTRI NLCPR 2000-01-07 19.51 2002-03-31 17.559 0 17.559 19.51 Completed
3369 SIKKIM Power Modenisation and Beautification of Distribution System with conversion of overhead transmission lines with underground cable system at Jorethang, South Sikkim NESIDS-OTRI NLCPR 2013-09-17 7.4116 2016-08-31 6.4704 0 6.4704 6.4704 Ongoing
3370 SIKKIM Power Modernization and Beautification of Ravangla and Sosing Bazaars alongwith addition of 66/11, 1X5 MVA sub-station at Ravangla under South Sikkim NESIDS-OTRI NLCPR 2017-09-06 18.4 2019-03-31 16.56 0 16.56 16.56 Completed
3371 SIKKIM Power Modernization of electrical network in and around Melli Bazaar, South Sikkim NESIDS-OTRI NLCPR 2011-11-04 8.8596 2013-10-31 7.8352 0 7.8352 7.8352 Completed
3372 SIKKIM Power Remodeling of Electrical Installation including System Improvement Works at Rhenock Bazar and adjoining areas in East Sikkim NESIDS-OTRI NLCPR 2014-06-27 15.95 2016-01-31 10.1944 0 10.1944 10.1944 Completed
3373 SIKKIM Power Remodeling of Power Distribution System at Rangpo Town, East Sikkim NESIDS-OTRI NLCPR 2014-02-20 14.7059 2017-02-28 10.4278 0 10.4278 10.4278 Completed
3374 SIKKIM Power Remodelling of transmission and distribution network of Gangtok Town NESIDS-OTRI NLCPR 2004-05-18 22.444 2006-02-28 20.1996 0 20.1996 21.0996 Completed
3375 SIKKIM Power Sub-Transmission and Distribution works at three locations (i) Power Supply to VIP Complex at Gangtok, (ii) Augmentation of Substation capacity at Tadong by 1x5 MVA, 66/11 KV transformer for referal hospital, (iii) construction of 66 KV D/C line from low NESIDS-OTRI NLCPR 2001-09-11 17.1156 2004-09-30 15.791 0 15.791 16.641 Completed
3376 SIKKIM Power Synchronization of Rimbi Stage I, Stage II and Kalez HEP to Common 11 kV grid and further to 66 kV State grid NESIDS-OTRI NLCPR 2006-03-23 9.6232 2006-09-29 8.6608 0 8.6608 8.6608 Completed
3377 SIKKIM Power Upgradation and Modernization of the power distribution network of Namchi and its surrounding areas with high voltage distribution system (HVDS), South Sikkim NESIDS-OTRI NLCPR 2017-08-28 18.5599 2019-08-31 16.7039 0 16.7039 16.7039 Completed
3378 SIKKIM Roads and Bridges Carpeting / Surface Improvement of Dentam - Uttarey Road (10 Km) in West Sikkim NESIDS-OTRI NLCPR 2004-07-30 3.99 2005-12-31 3.4717 0 3.4717 3.3399 Completed
3379 SIKKIM Roads and Bridges Carpeting / Surface Improvement of Soreng-Budang Road via Malbassey (10Km) in South Sikkim NESIDS-OTRI NLCPR 2004-07-30 3.39 2008-05-31 3.0522 0 3.0522 3.1712 Completed
3380 SIKKIM Roads and Bridges Carpeting / Surface Improvement, Protective works and Drainage on Namchi-Rabongla Road (26 Kms) in South Sikkim NESIDS-OTRI NLCPR 2004-07-30 12.07 2005-12-31 10.4588 0 10.4588 10.8808 Completed
3381 SIKKIM Roads and Bridges Construction / improvement of 18.3 km road Sribadam-Deythang-Mangalbarey in West Sikkim NESIDS-OTRI NLCPR 2009-03-02 16.8026 2011-02-28 14.0935 0 14.0935 14.0935 Completed
3382 SIKKIM Roads and Bridges Construction of 28 new roads (28 No.) NESIDS-OTRI NLCPR 2000-03-09 4.56 2003-12-31 4.104 0 4.104 4.56 Completed
3383 SIKKIM Roads and Bridges Construction of 40 M Span Steel Bridge over Lwang Khola along Namchi Phongla Road Km 8th, South Sikkim NESIDS-OTRI NLCPR 2010-11-09 3.2656 2011-10-31 2.8757 0 2.8757 2.3512 Completed
3384 SIKKIM Roads and Bridges Construction of 70 m Span Bridge over Dev Khola along GLVC road Km 8th, South Sikkim NESIDS-OTRI NLCPR 2010-11-09 5.0634 2011-10-31 3.6456 0 3.6456 3.6456 Completed
3385 SIKKIM Roads and Bridges Construction of 70 Mtrs Span Roruchu Steel Bridge along GRBA road in East Sikkim NESIDS-OTRI NLCPR 2017-09-06 10.7514 2020-09-30 9.6763 0 9.6763 9.6763 Ongoing
3386 SIKKIM Roads and Bridges Construction of Bridge over Rangit River at Kitchudumra, Namchi - Sikip in South Sikkim NESIDS-OTRI NLCPR 2016-12-14 13.7495 2020-12-31 12.0779 0 12.0779 12.0779 Completed
3387 SIKKIM Roads and Bridges Construction of Diversion of Ranipool-Pakyong Road in East Sikkim NESIDS-OTRI NLCPR 2004-09-29 2.37 2006-09-29 2.0499 0 2.0499 2.1327 Completed
3388 SIKKIM Roads and Bridges Construction of Goshkan Dara Bridge over Teesta at Singtam NESIDS-OTRI NLCPR 2006-02-15 15.5971 2008-02-15 12.6871 0 12.6871 12.7096 Completed
3389 SIKKIM Roads and Bridges Construction of Link Road from Middle Tumin to Dhanbari via Namrang in East Sikkim NESIDS-OTRI NLCPR 2013-12-06 5.028 2015-11-30 4.5252 0 4.5252 4.5252 Completed
3390 SIKKIM Roads and Bridges Construction of link road from Passingdong P.H.E. to Linghtem Gumpha (Monastery) and Lingthem School-8km, upper Dzongo, North Sikkim NESIDS-OTRI NLCPR 2009-03-26 7.6555 2011-02-28 6.89 0 6.89 6.89 Completed
3391 SIKKIM Roads and Bridges Construction of pre- stressed Bridge over River Rangit on Legship Tashiding road in West Sikkim NESIDS-OTRI NLCPR 2008-09-30 21.868 2010-09-30 19.6775 0 19.6775 19.6775 Completed
3392 SIKKIM Roads and Bridges Construction of road from Latuk Thek to Rolep 5 km including 1 No. of Bridge over Rangpo Khola at Km 1st, Ch:10 in Sikkim NESIDS-OTRI NLCPR 2017-07-28 8.5598 2019-07-31 7.7038 0 7.7038 7.3076 Ongoing
3393 SIKKIM Roads and Bridges Construction of Rural suspension Foot Bridges (35 No.) NESIDS-OTRI NLCPR 2002-02-28 8.9 2005-03-31 8.01 0 8.01 8.839 Completed
3394 SIKKIM Roads and Bridges Construction of Steel Bridge at Khundrukay Khola along Yangang-Makha Road, South Sikkim NESIDS-OTRI NLCPR 2010-11-09 2.4106 2011-10-31 2.0638 0 2.0638 2.0638 Completed
3395 SIKKIM Roads and Bridges Double laning of Sichey-Ranka Road (11 Km). East Sikkim NESIDS-OTRI NLCPR 2010-11-09 25.6333 2012-06-30 22.608 0 22.608 22.608 Completed
3396 SIKKIM Roads and Bridges Extension of road from Chakhung Khanesherbong SPWD road to Majuwa village via Chota Samdung-3kms length alongwith 2nos. of RCC bridges in West District NESIDS-OTRI NLCPR 2008-12-18 2.7079 2010-06-15 2.3893 0 2.3893 2.3893 Completed
3397 SIKKIM Roads and Bridges Improvement & widening of Tintek Dikchu Road - 12 km in East Sikkim NESIDS-OTRI NLCPR 2009-03-02 16.153 2010-08-31 11.718 0 11.718 11.718 Completed
3398 SIKKIM Roads and Bridges Namachi Assangthang Road under South Sikkim circle (5 km) NESIDS-OTRI NLCPR 2008-03-28 6 2010-02-28 5.4 0 5.4 5.4 Completed
3399 SIKKIM Roads and Bridges Pakyong- Machong - Rolep Road in East NESIDS-OTRI NLCPR 2008-11-04 33.3858 2010-10-31 29.0169 0 29.0169 29.0169 Completed
3400 SIKKIM Roads and Bridges Replacement of 2 nos. of existing suspension bridges on Pelling-Yuksom Road in Sikkim NESIDS-OTRI NLCPR 2004-07-30 3.28 2006-03-31 2.8738 0 2.8738 2.9888 Completed
3401 SIKKIM Roads and Bridges Slope stabilisation of Labing landslide (160 m) and Chongrang landslide (800 m) on Yuksom-Legship road in West Sikkim NESIDS-OTRI NLCPR 2004-07-30 1.28 2008-04-30 1.1073 0 1.1073 1.1523 Completed
3402 SIKKIM Roads and Bridges Strengthening of roads and bridges (8 No.) NESIDS-OTRI NLCPR 2002-02-05 13.69 2007-03-31 12.321 0 12.321 13.69 Completed
3403 SIKKIM Roads and Bridges Surface improvement/widening,carpeting and bridge replacement on Gyalshing-Soreng Road (up to Dentam): (a) Pelling - Dentam Road (20 km) and (b) Replacement of BB Lal Suspension Brdg over Kalez Khola NESIDS-OTRI NLCPR 2004-03-22 12.51 2005-12-31 10.8255 0 10.8255 10.9905 Completed
3404 SIKKIM Roads and Bridges Upgradation and Carpeting of Link Road from Kaluk Dentam Road, Km 4th (Bermiok) to Leghship Bermoik Road Km 10th (Shivalaya Mandir) in Sikkim NESIDS-OTRI NLCPR 2013-02-22 5.7128 2015-01-31 5.1415 0 5.1415 5.1415 Completed
3405 SIKKIM Roads and Bridges Upgradation of LLHP to Nandok road (4kms) in East Sikkim NESIDS-OTRI NLCPR 2009-03-02 3.6277 2010-08-31 3.2273 0 3.2273 3.2273 Completed
3406 SIKKIM Roads and Bridges Upgradation of Rabongla - Makha Road (26 Kms) in South Sikkim NESIDS-OTRI NLCPR 2004-07-30 9.94 2008-05-31 8.7912 0 8.7912 9.1392 Completed
3407 SIKKIM Roads and Bridges Upgradation of Ranka Burtuk-Gangtok Road (8 kms) in East Sikkim NESIDS-OTRI NLCPR 2004-05-07 4.2 2005-09-30 3.672 0 3.672 3.872 Completed
3408 SIKKIM Roads and Bridges Upgradation of Rongli to Rorathang Road in East Sikkim NESIDS-OTRI NLCPR 2013-02-22 17.7503 2015-01-31 14.7733 0 14.7733 14.7733 Completed
3409 SIKKIM Roads and Bridges Upgradation to Intermediate Standard of Gangtok- Rumtek Road in East Sikkim (24 Km upto Old Rumtek Monastery)-MDR NESIDS-OTRI NLCPR 2014-12-29 62.1192 2017-12-31 55.9073 0 55.9073 55.9073 Completed
3410 SIKKIM Roads and Bridges Upgradation, carpeting of Namchi Phong Mamring Road in Sikkim NESIDS-OTRI NLCPR 2013-02-22 47.715 2016-01-31 42.9435 0 42.9435 42.9435 Completed
3411 SIKKIM Roads and Bridges WBM Carpetting of 9 roads (9 No.) NESIDS-OTRI NLCPR 2000-03-09 5.2 2001-03-31 4.68 0 4.68 5.2 Completed
3412 SIKKIM Sports Paljor Stadium's Upgradation NESIDS-OTRI NLCPR 2001-03-16 15.36 2003-03-31 15.36 0 15.36 15.36 Completed
3413 SIKKIM Sports Upgradation of Football Stadium with other allied facilities at Mangan, North Sikkim (Phase-II) NESIDS-OTRI NLCPR 2016-12-06 9 2019-11-30 8.1 0 8.1 3.186 Ongoing
3414 SIKKIM Tourism and Culture Construction of Scholars residence at Namgyal Institute of Tibetology, Deorali, Gangtok NESIDS-OTRI NLCPR 2012-11-21 2.3241 2014-10-31 1.783 0 1.783 1.783 Completed
3415 SIKKIM Tourism and Culture Development of Tourist Infrastructure for Kailash Mansarovar Yatra in Sikkim NESIDS-OTRI NLCPR 2017-08-17 42.23 2019-08-31 38.007 0 38.007 34.164462 Ongoing
3416 SIKKIM Tourism and Culture Tourist Wayside Amenity, Toilets for all age and differently-abled along en-route Nathula in East Sikkim (at 7 locations) NESIDS-OTRI NLCPR 2016-05-30 2.48 2018-05-31 2.232 0 2.232 2.232 Completed
3417 SIKKIM Water Supply Augmentation of Gyalshing Water Supply Scheme NESIDS-OTRI NLCPR 2004-03-22 7.5228 2005-12-31 6.635 0 6.635 7.0845 Completed
3418 SIKKIM Water Supply Augmentation of Namchi Water Supply Scheme, South Sikkim NESIDS-OTRI NLCPR 2012-12-28 38.2199 2016-11-30 34.3979 0 34.3979 34.3979 Completed
3419 SIKKIM Water Supply Augmentation of Rongli Water Supply Scheme NESIDS-OTRI NLCPR 2003-03-21 1.6871 2004-09-30 1.512 0 1.512 1.68 Completed
3420 SIKKIM Water Supply Augmentation of rural water supply scheme at Central Pandem,Sikkim NESIDS-OTRI NLCPR Dept. of Power 2009-06-03 20.4975 2012-05-30 6.33 0 6.33 3.7004 Foreclosed
3421 SIKKIM Water Supply AuGmentation of Water Supply for greater Rangpo in East Sikkim NESIDS-OTRI NLCPR 2006-12-13 19.9434 2008-12-12 16.1787 0 16.1787 16.1787 Completed
3422 SIKKIM Water Supply Augmentation of Water Supply for Sang Naya Bazar in East Sikkim NESIDS-OTRI NLCPR 2007-09-28 2.0074 2008-09-30 1.7712 0 1.7712 1.7712 Completed
3423 SIKKIM Water Supply Augmentation Water Supply Scheme for Greater Gangtok Phase-II in Sikkim NESIDS-OTRI NLCPR 2004-07-30 24.3439 2006-03-31 21.7406 0 21.7406 22.6406 Completed
3424 SIKKIM Water Supply Augumentation of Water Supply of newly created Jorthang Nagar Panchyat in South Sikkim (Modified version of DPR of Providing Water Supply with Treatment Plant to New Reigonal Administrative Centre at Karfectar, South Sikkim) NESIDS-OTRI NLCPR 2011-03-07 9.5265 2013-02-28 8.4056 0 8.4056 8.4056 Completed
3425 SIKKIM Water Supply Construction of Rain Water Harvesting structure at Rabdentse in West Sikkim NESIDS-OTRI NLCPR 2007-07-04 4.621 2008-07-03 3.3271 0 3.3271 3.3271 Completed
3426 SIKKIM Water Supply Construction of water supply scheme in Pakyong , East Sikkim NESIDS-OTRI NLCPR 2010-12-23 9.8342 2014-01-31 8.6773 0 8.6773 8.6773 Completed
3427 SIKKIM Water Supply Extension of Gangtok Sewerage Project (Phase-I), Sikkim NESIDS-OTRI NLCPR 2003-03-21 2.9649 2005-03-31 2.6684 0 2.6684 2.9649 Completed
3428 SIKKIM Water Supply Extension of Gangtok Sewerage Project (Phase-II), Sikkim NESIDS-OTRI NLCPR 2003-03-21 7 2005-03-31 6.2958 0 6.2958 7 Completed
3429 SIKKIM Water Supply Multi-stage pumping for Drinking water from River Rangeet to Namchi NESIDS-OTRI NLCPR 2003-03-21 12.48 2005-03-31 11.2278 0 11.2278 11.7378 Completed
3430 SIKKIM Water Supply Providing water supply scheme to Central University located at Yangang from Burphong Khola Source in South Sikkim NESIDS-OTRI NLCPR Dept of Planning 2016-03-23 40.4665 2018-04-30 36.4199 0 36.4199 36.4199 Completed
3431 SIKKIM Water Supply Rhenock Water Supply Scheme in East Sikkim NESIDS-OTRI NLCPR 2008-03-07 16.2731 2010-02-28 14.3586 0 14.3586 14.3586 Completed
3432 SIKKIM Water Supply Rural Water Supply for Amba, Taza and parts of Linkey Tareythang GPU in East Sikkim NESIDS-OTRI NLCPR 2013-01-16 9.1685 2014-11-30 8.2516 0 8.2516 8.2516 Completed
3433 SIKKIM Water Supply Rural water supply schemes NESIDS-OTRI NLCPR 2001-08-31 13.5 1970-01-01 12.15 0 12.15 13.5 Completed
3434 SIKKIM Water Supply Water Distribution Network for Singtam Town in East Sikkim NESIDS-OTRI NLCPR 2011-07-18 21.0495 2013-07-31 18.5732 0 18.5732 18.5732 Completed
3435 SIKKIM Water Supply Water Supply Scheme for Meli Bazar South Sikkim NESIDS-OTRI NLCPR 2011-07-08 8.7243 2013-06-30 7.7097 0 7.7097 7.7097 Completed
3436 SIKKIM Water Supply Water Supply Scheme for newly developed township Pangthang/Bojoghari NESIDS-OTRI NLCPR 2004-05-07 5.86 2006-12-30 5.0211 0 5.0211 5.2961 Completed
3437 SIKKIM Water Supply Water Supply Scheme from Chakmakey and Ringyang under Soreng Sub-Division NESIDS-OTRI NLCPR 2006-05-22 8.7515 2007-11-30 7.669 0 7.669 7.669 Completed
3438 SIKKIM Science and Technology CCTV surveillance of main towns and tourist places in Sikkim Schemes of NEC Schemes of NEC 2024-02-07 14.85 2026-02-07 7.44936 7.44936 7.449316 Ongoing
3439 SIKKIM Agriculture and Allied Upgradation of District Veterinary hospital to polyclinic at Pakyong, Soreng, Mangan and Galshing District Schemes of NEC Animal Husbandry and Vete 2024-09-30 6.68 2027-09-30 3.3388 3.3388 1.6694 Ongoing
3440 SIKKIM Transport and Communication Widening and Upgradation of single lane road from Sangkhola to Zingla under Gangtok District (L-16.37) NESIDS-ROADS Public works Department 2024-08-19 62.19 2027-02-28 18.36 36.23 54.59 0.75 Ongoing
3441 SIKKIM Health Gap funding for Construction of Government Medical College at Sichey, East Sikkim for Annual intake of 100 Students PM-DevINE Dept. of Health & familly 2024-11-25 167.9 2026-12-31 83.95 83.95 167.9 Ongoing
3442 SIKKIM Science and Technology Afforestation of Denuded Hills in North and East District of Sikkim, Social Forestry Circle, Forest and Environment Dept. Govt. of Sikkim Schemes of NEC Social Forestry Circle, F 2024-12-27 3 2027-12-27 0.75 0.75 Ongoing
3443 SIKKIM Education Construction of Academic Block at Government Degree College, Burtuk, Sikkim Schemes of NEC Education Department, Gov 2025-02-11 9.7152 2028-02-11 2.42 2.42 Ongoing
3444 SIKKIM Health Medical equipment, fixtures and furnishing for the upcoming 500 bedded district Hospital at Namchi NESIDS-OTRI Health & family welfare D 2025-04-16 145.3 2026-10-30 108.985 108.985 Ongoing
3445 SIKKIM Industries Bamboo Industrial Park and Innovation Product Cultural Craft Centre Schemes of NEC Department of Culture, Go 2025-05-15 4.88 2028-05-15 1.2195 1.2195 Ongoing
3446 SIKKIM Transport and Communication Geometric Improvement of curves and carpeting of road from Rimbi Khola to Yuksam in Gyalshing district ,Length-15.816 km NESIDS-ROADS PWD 2026-01-08 24.52 2028-01-08 0 Ongoing
3447 TRIPURA Education Construction of nine (9) 100 seated Hostel attached to the vidyajyoti schools under mission 100 in different district of Tripura NESIDS-OTRI NESIDS Dept. of Education 2022-04-21 7.9 2024-04-30 0.1 5.825 5.925 0.1 Ongoing
3448 TRIPURA Education Implementation of Educational Infrastructure related to IT Projects in 240 Schools across Tripura under NESIDS(OTRI) NESIDS-OTRI NESIDS Secondary Education 2024-02-22 24.8687 2026-02-22 6.609 6.609 Ongoing
3449 TRIPURA Education Infrastructure Development of six Higher Secondary School in various locations in Tripura NESIDS-OTRI NESIDS Dept. of Education 2022-04-21 50.5002 2024-04-30 32.149875 0 32.149875 0.1 Ongoing
3450 TRIPURA Education Project Construction of 51 Anganwadi Centre Building in Tripura NESIDS-OTRI NESIDS Social Welfare & Social E 2020-03-30 4.34 2021-03-31 0.1 3.6858 3.7858 0.1 Ongoing
3451 TRIPURA Health Establishment of a Newborn Resource Development Centre and Upgradation of NICU & PICU at the Department of Paediatrics, AGMC, Tripura NESIDS-OTRI NESIDS Directorate of Health Ser 2022-04-21 7.2032 2022-10-20 0.1 0 0.1 0.1 Ongoing
3452 TRIPURA Health Medical Infrastructures Strengthening for COVID-19 component by arrangement of Medical Gas (Oxygen O2), pipeline with manifold System, Logistics (Test Kits) and X-ray machine with CR system in Tripura NESIDS-OTRI NESIDS Dept. of Health & familly 2021-08-27 19.32 2023-09-01 0.1 0 0.1 0.1 Ongoing
3453 TRIPURA Health Procurement of 26 (Twenty Six) nos. of Advance Life Support and Patient Transportation ambulances under Directorate of Health Servicesin Tripura NESIDS-OTRI NESIDS Directorate of Health Ser 2021-03-31 4.185 2022-03-31 4.1837 0 4.1837 0.1 Ongoing
3454 TRIPURA Health Procurement of Pulse Oximeter and Antigen Tests Kits etc for combating COVID 19 pandemic in Tripura NESIDS-OTRI NESIDS Public Health & Engg Depa 2021-03-26 3.9 2023-04-26 0.1 0 0.1 0.1 Ongoing
3455 TRIPURA Agriculture and Allied Augmentation of production potential of hybrid true potato seed at Horticulture Research Centre, Nagichera, Tripura. Schemes of NEC Schemes of NEC 2017-02-28 1.81 2020-02-28 1.63 0 1.63 1.63 Completed
3456 TRIPURA Agriculture and Allied Construction of Cold Storage at Satchand, Tripura (Location: South Tripura dist) Schemes of NEC Schemes of NEC 2006-02-08 1.1085 2009-02-08 0.99 0 0.99 0.99 Completed
3457 TRIPURA Agriculture and Allied Cultivation of Exotic Dragon Fruit (Hylocereus sp.). Schemes of NEC Schemes of NEC 2022-03-31 6.819 2025-03-31 6.8176 0 6.8176 6.8214 Completed
3458 TRIPURA Agriculture and Allied Demonstrative Project for Improvement of Crop and Soil in Tripura. Schemes of NEC Schemes of NEC 2006-03-10 1.3 2009-03-10 1.17 0 1.17 1.17 Completed
3459 TRIPURA Agriculture and Allied Development of Identified Backward Blocks under 30 PC Central Sector Scheme of NEC in Raishyabari R.D. Block, Gandachara, Dhalai District, Tripura Schemes of NEC Schemes of NEC 2020-11-23 2.68 2023-11-23 2.68 0 2.68 1.8081824 Ongoing
3460 TRIPURA Agriculture and Allied Development Programme of Backward Block Under 30 PC Central Sector Scheme of NEC in Dumburnagar R.D. Block, Gandachara, Dhalai District, Tripura Schemes of NEC Schemes of NEC 2020-11-19 3.22 2023-11-19 3.22 0 3.22 2.1768236 Ongoing
3461 TRIPURA Agriculture and Allied Distribution of crossbreed Pregnant Heifer to the farmers Schemes of NEC Schemes of NEC 2013-11-08 3.6 2016-11-08 2.592 0.648 3.24 3 Ongoing
3462 TRIPURA Agriculture and Allied Duck-cum Fish culture for Non-Tribal People of the State of Tripura Schemes of NEC Schemes of NEC 2013-02-27 2.55 2016-02-27 2.3 0 2.3 2.3 Completed
3463 TRIPURA Agriculture and Allied Establishment of Rural collection centre fruits and vegetables Schemes of NEC Schemes of NEC 2015-05-13 2.7642 2018-05-13 2.4878 0 2.4878 2.49 Completed
3464 TRIPURA Agriculture and Allied Establishment of Integrated Pack House at Dhalai District Schemes of NEC Schemes of NEC Other 2023-03-13 4.9009592 2026-03-13 4.0426 0.8555 4.8981 1.85 Ongoing
3465 TRIPURA Agriculture and Allied Establishment of Modern Abattoir for Pig cum Port Processing Plant in Tripura State Schemes of NEC Schemes of NEC 2021-01-27 4.84 2024-01-27 4.84 0 4.84 1.9023 Ongoing
3466 TRIPURA Agriculture and Allied Infrastructure Development for creating modern Agri. Produce Market in two (2) locations of Tripura during 2022-23 Schemes of NEC Schemes of NEC Choose... 2023-03-30 12.41 2026-03-30 9.1 3 12.1 3.1 Ongoing
3467 TRIPURA Agriculture and Allied Livelihood Enhancement through increase of fish productivity (a) Reclamation of pond/mini barrage for enhancement of fish productivity Schemes of NEC Schemes of NEC 2022-03-31 9.45 2025-03-31 8.98 0.4725 9.4525 9.4506 Ongoing
3468 TRIPURA Agriculture and Allied Livelihood generation and Value Addition Chain in Piggery Sector based on District Composite Livestock Farm, Nalicherra under Dhalai District, Tripura Schemes of NEC Schemes of NEC Dept. of Power 2018-02-26 1.32 2021-02-26 1.19 0 1.19 1.19 Completed
3469 TRIPURA Agriculture and Allied Modernization of State Poultry Farm with Automated Layer Unit at Gandhigram, West Tripura District, Tripura Schemes of NEC Schemes of NEC 2021-03-26 3.66 2024-03-26 1.775 1.89 3.665 1.9131998 Ongoing
3470 TRIPURA Agriculture and Allied Moderrnization and Strengthening of regional Exotic Pig Breeding Farm, Nalkata, Tripura. Schemes of NEC Schemes of NEC Dept. of Power 2015-03-20 1.8655 2018-03-20 1.679 0 1.679 1.68 Foreclosed
3471 TRIPURA Agriculture and Allied Project proposal Popularisation & Propagation of Freshwater Prawn Culture Practices in Tripura State. Schemes of NEC Schemes of NEC 2006-09-11 0.4799 2009-09-11 0.43 0 0.43 0.43 Completed
3472 TRIPURA Agriculture and Allied Promotion of Fresh water Prawn Culture. Schemes of NEC Schemes of NEC 2004-07-12 0.45 2007-07-12 0.4 0 0.4 0.4 Completed
3473 TRIPURA Agriculture and Allied Promotion of intensive fish culture technology with Pabda for sustainable production and livelihood security of rural farmers, Tripura Schemes of NEC Schemes of NEC 2013-11-08 5.12 2016-11-08 4.6 0 4.6 4.6 Completed
3474 TRIPURA Agriculture and Allied Proposal of identified block for providing key identified service at Dumburnagar Block, Dhalai district, Tripura Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.74 2025-03-31 4.47 0.2664468 4.7364468 0.8931966 Ongoing
3475 TRIPURA Agriculture and Allied Proposal of identified block for providing key identified service at Ganganagar Block, Dhalai district, Tripura Schemes of NEC Schemes of NEC 2022-03-31 4.77 2025-03-31 4.46 0 4.46 1.9 Ongoing
3476 TRIPURA Agriculture and Allied Proposal of identified block for providing key identified service at Karnamipara VC, Ganganagar Block, Dhalai, Tripura Schemes of NEC Schemes of NEC Choose... 2022-03-31 1.925 2025-03-31 1.81 0 1.81 0.77 Ongoing
3477 TRIPURA Agriculture and Allied Proposal of identified block for providing key identified service at Raishyabari Block, Dhalai district, Tripura Schemes of NEC Schemes of NEC 2022-03-31 4.5325 2025-03-31 4.48 0 4.48 1.3608796 Ongoing
3478 TRIPURA Agriculture and Allied Proposal of identified block for providing key identified service at Ultacherra village, Dumburnagar Block, Dhalai, Tripua Schemes of NEC Schemes of NEC Choose... 2022-03-31 1.8888 2025-03-31 1.77 0 1.77 0.3915564 Ongoing
3479 TRIPURA Agriculture and Allied Scheme for Goat Rearing Unit (Black Bengal Asian Hill) Schemes of NEC Schemes of NEC Choose... 2022-03-28 2.9986 2025-03-28 1.5 0.74 2.24 0.31 Ongoing
3480 TRIPURA Agriculture and Allied Sericulture Training institute in Tripura. Schemes of NEC Schemes of NEC 2012-11-23 4.3406 2015-11-23 3.9065 0 3.9065 3.91 Completed
3481 TRIPURA Agriculture and Allied Setting up of 1000 MT Capacity Multipurpose Cold Storage at Amarpur, Tripura(Location: Gomati dist) Schemes of NEC Schemes of NEC 2011-09-22 2.522 2014-09-22 2.26 0 2.26 2.26 Completed
3482 TRIPURA Agriculture and Allied Setting up of 6 (six) integrated Seed Processing Plant for distribution of Quality Seed materials to the Farmers Schemes of NEC Schemes of NEC 2022-03-31 11.26 2025-03-31 8.75 2 10.75 3.6 Ongoing
3483 TRIPURA Agriculture and Allied Setting up of 7 New Agri Development Research Centre with IT facilities in Karbook, Ompi, Killa, Kakraban, Satchand, jampuijala and Kadamtala, Tripura Schemes of NEC Schemes of NEC 2018-02-26 12.11 2021-02-26 10.9 0 10.9 10.8997441 Completed
3484 TRIPURA Agriculture and Allied Strength of Gram Sewak Training Centre, UGTC. Schemes of NEC Schemes of NEC 2006-02-02 0.8591 2009-02-02 0.86 0 0.86 0.86 Completed
3485 TRIPURA Agriculture and Allied Strengthening of Block Level Brooder Houses along with Establishement of one Hatchery unit for Augmentation ofmPoultry Production Schemes of NEC Schemes of NEC 2023-03-31 2.6884 2025-03-31 2.69 0 2.69 0.138 Ongoing
3486 TRIPURA Agriculture and Allied Strengthening of District Poultry Farm, Panisagar, North Tripura District. Schemes of NEC Schemes of NEC Choose... 2022-03-31 2.21 2025-03-31 2.21 0 2.21 Ongoing
3487 TRIPURA Agriculture and Allied Strengthening of Exotic Pig Breeding Farm, Birchandra Manu, Tripura Schemes of NEC Schemes of NEC Dept. of Power 2016-03-09 3.886 2019-03-09 3.5 0 3.5 3.5 Completed
3488 TRIPURA Agriculture and Allied Strengthening of Pig Breeding Farms at Howaibari, Teliamura, Khowai District and Jalefa, South Tripura district. Schemes of NEC Schemes of NEC Choose... 2022-03-31 6.16 2025-03-31 6.16 0 6.16 3.5928549 Ongoing
3489 TRIPURA Agriculture and Allied Strrengthening of upgraded Gram Sevak Training Centre at Lembucherra, West Tripura for Skill Development of the Farmers & Extension Agencies Schemes of NEC Schemes of NEC 2018-02-26 2.05 2021-02-26 1.85 0 1.85 1.85 Completed
3490 TRIPURA Education Aspirational District Dhalai, Tripura Schemes of NEC Schemes of NEC Dept. of Power 2019-06-11 1 2022-06-11 1 0 1 1 Completed
3491 TRIPURA Education Community Development Programme for Santhal Community in Tripura Schemes of NEC Schemes of NEC 2021-03-30 1.25 2024-03-30 1.2516 0 1.2516 1.2524 Ongoing
3492 TRIPURA Education Construction of 100 seated capacity of mens hostel at Regional College of Physical Education at Panisagar, North Tripura. Schemes of NEC Schemes of NEC Dept. of Power 2017-08-16 4.22 2020-08-16 4.01 0 4.01 3.72 Ongoing
3493 TRIPURA Education Construction of 50 Seated Girls' Hostel in Government Degree College, Gondatwisa, Dhalai District Tripura Schemes of NEC Schemes of NEC Choose... 2023-03-31 4.66 2026-03-31 4.506 4.506 1 Ongoing
3494 TRIPURA Education Construction of 50 seated ST Boys Hostel attached to Madhab chandra HS School, LT Valley Sub-Division and 50 seated ST Girls Hostel attached to BC Manu SSVM, Santirbazar, south Tripura including Superintendent Quarters, Boundary wall, etc Schemes of NEC Schemes of NEC 2022-03-17 4 2025-03-17 2.06 1.9492 4.0092 0.6564 Ongoing
3495 TRIPURA Education Construction of 50 seated ST Girls Hostel attched to Darchaw Christian College HS School under Kumarghat Sub Division, Tripura Schemes of NEC Schemes of NEC 2023-03-31 1.56 2026-03-31 0.1 0 0.1 Foreclosed
3496 TRIPURA Education Construction of 50 type III residential Quarters for Hostel superintendent in ST & SC Hostels, Tripura. (In the following Districts-Khowai, Sepoyjala, West Tripura, Unakoti, Dhalai, Gomati and South Tripura) Schemes of NEC Schemes of NEC 2013-03-26 6.88 2019-01-03 6.39 0 6.39 5.71 Ongoing
3497 TRIPURA Education Improvement of Infrastructure in TTAADC Polytechnic Institute, Khumulwng, West Tripura Schemes of NEC Schemes of NEC 2021-03-24 4.72 2024-03-24 3.388 0.54 3.928 3 Ongoing
3498 TRIPURA Education Improvement of Infrastructure in Womens Polytechnic, Hapania, West Tripura under Higher Education Department, Tripura Schemes of NEC Schemes of NEC 2021-03-31 1.074 2024-03-31 0.4296 0.6444 1.074 0.8062 Ongoing
3499 TRIPURA Education Infrastructure Development of Kamalpur English Medium HS School Kamalpur Dhalai District, Tripura. Schemes of NEC Schemes of NEC 2018-02-26 1.59 2020-02-26 1.59 0 1.59 1.59 Foreclosed
3500 TRIPURA Education Mobile Common Service Centre (CSC) Schemes of NEC Schemes of NEC 2022-02-24 3.26 2025-02-24 3.264 0 3.264 3.26 Completed
3501 TRIPURA Sports Construction of 200 bedded (G2), Yuba Awas (Youth Hostel) in Ambasa, Dhalai District Schemes of NEC Schemes of NEC 2017-01-16 9.33 2020-01-16 8.026 0 8.026 6.97 Ongoing
3502 TRIPURA Irrigation and Flood Control Establishment of Solar based submersible irrigation pump at Govt. orchards, Tripura Schemes of NEC Schemes of NEC 2023-03-06 1.653 2026-03-06 1.6565 0 1.6565 1.653 Ongoing
3503 TRIPURA Irrigation and Flood Control Water arrangement in rural areas of Khowai district ad Sepahijila sistricts of Tripura/sinking & development of deep tubewell (DTW)schemes including construction of pump house, installation of pump set laying distribution pipeline etc. Schemes of NEC Schemes of NEC Dept. of Power 2017-03-02 14.3481 2020-03-02 12.9133 0 12.9133 10 Completed
3504 TRIPURA Industries Enabling Bulk Production of Bamboo Round Sticks in Tripura through Technological and Infrastructural Upgradation Schemes of NEC Schemes of NEC Dept. of Power 2023-03-28 5.9768 2026-03-28 1.4982 4.18376 5.68196 5.39773 Ongoing
3505 TRIPURA Industries Enhancement of Capacity of the Tea Processing Factory at Brahmakunda Tea Estate, West Tripura Schemes of NEC Schemes of NEC 2011-06-09 4.9839 2013-06-09 4.49 0 4.49 4.49 Completed
3506 TRIPURA Industries Enhancement of Capacity of the Tea Processing Factory at Brahmakunda Tea Estate, West Tripura, Department of Industries & Commerce, Govt. of Tripura, Agartala Schemes of NEC Schemes of NEC 2011-06-09 4.9839 2014-06-09 0.171 0 0.171 0.17 Completed
3507 TRIPURA Industries Enhancement of Capacity of the Tea Processing Factory at Tebaria, West Tripura by the Department of Industries and Commerce, Govt. of Tripura, Agartala Schemes of NEC Schemes of NEC 2011-06-09 4.9839 2014-06-09 2.3983 0 2.3983 2.4 Completed
3508 TRIPURA Industries Integrated Development of Bamboo Handicrafts Cluster in Tripura by the Department of Industries & Commerce, Kunjaban, Govt. of Tripura, Agartala. Schemes of NEC Schemes of NEC 2012-03-23 4.4125 2015-03-23 0.0633 0 0.0633 0.06 Completed
3509 TRIPURA Industries Integrated Development of Incense Cluster in Tripura Schemes of NEC Schemes of NEC 2013-10-30 7.799 2015-10-30 0.4363 0 0.4363 0.44 Completed
3510 TRIPURA Industries Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Tripura Schemes of NEC Schemes of NEC 2020-10-27 3 2023-10-27 2.4 0 2.4 2.4 Completed
3511 TRIPURA Industries Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19 to the state of Tripura(Swabalamban)(Phase-II) Schemes of NEC Schemes of NEC 2021-01-21 1.5 2024-01-21 0.558 0 0.558 0.56 Completed
3512 TRIPURA Industries Livelihood Development Through a Pilot Bamboo Enterprise for Rehabilitation of Surrendered Militants by Tribal Welfare Department, Govt. of Tripura, Agartala. Schemes of NEC Schemes of NEC 2006-05-05 3.8854 2008-05-05 3.5 0 3.5 3.5 Completed
3513 TRIPURA Industries Machineries and Equipments for Brahmakunda Tea Processing Factory (BTPF) Schemes of NEC Schemes of NEC 2023-02-15 0.9844 2026-02-15 0.984424 0 0.984424 0.61 Ongoing
3514 TRIPURA Industries Modernization/ Upgradation of Brahmakunda Tea Processing Factory (BTPF), Simna, West Tripura Schemes of NEC Schemes of NEC 2022-03-31 2.2 2025-03-31 1.65 0.5506589 2.2006589 1.6519766 Ongoing
3515 TRIPURA Industries Revival of Bamboo Sticks cluster at Kumarghat, Tripura Schemes of NEC Schemes of NEC 2017-02-28 4.9929 2020-02-28 1.566 0 1.566 1.57 Completed
3516 TRIPURA Industries Rubber Wood Based Plywood Manufacturing Unit at Agartala, Tripura Schemes of NEC Schemes of NEC Choose... 2022-03-29 7.3394 2025-03-29 0.1 0 0.1 Foreclosed
3517 TRIPURA Industries Strategic Interventions for Revitalization and Value Chain Development of Agarbatti Sector in Tripura. Schemes of NEC Schemes of NEC 2022-03-04 10.77 2025-03-04 4.7368874 5.765551 10.5024384 10.25935 Ongoing
3518 TRIPURA Information and Public Relatio 3rd North East Connectivity Summit Govt. of Manipur Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1 2021-04-01 0 Completed
3519 TRIPURA Information and Public Relatio Emerging North East from 25th to 27th October, 2017organised by Govt. of Tripura Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.099 2021-04-01 0 Completed
3520 TRIPURA Information and Public Relatio Strengthening of Hindi Section in the library of 5 government colleges of Tripura Schemes of NEC Schemes of NEC 2021-01-27 0.5 2025-03-19 0.5 0 0.5 0.4999946 Ongoing
3521 TRIPURA Information and Public Relatio Strengthening of Hindi Section in the Library of Maharaja Bir Bikram University, Agartala, Tripura Schemes of NEC Schemes of NEC 2021-02-24 0.1 2024-02-24 0.04 0.06 0.1 0.04 Ongoing
3522 TRIPURA Health Accident & Trauma Centre at Agartala, Tripura Schemes of NEC Schemes of NEC 2006-11-05 1.6081 2009-11-05 1.45 0 1.45 1.45 Completed
3523 TRIPURA Health Accident & Trauma Centre at Kulai, Tripura Schemes of NEC Schemes of NEC 2006-11-05 1.6081 2008-11-05 1.24 0 1.24 1.24 Completed
3524 TRIPURA Health Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Tripura for activities related to combating COVID-19 pandemic Schemes of NEC Schemes of NEC 2020-04-01 3 2023-04-01 3 0 3 3 Completed
3525 TRIPURA Health Up-gradation of Cancer Hospital, Agartala, Tripura Schemes of NEC Schemes of NEC 2010-03-19 3.0015 2013-03-19 1.5 0 1.5 1.5 Completed
3526 TRIPURA Power 1X21 MW Baramura Unit-V Gas Based Power Project, Tripura. Schemes of NEC Schemes of NEC 2007-08-07 80 2009-08-07 72 0 72 72 Completed
3527 TRIPURA Power Augmentation of Sub-Station capacity by addition of 1x15 MVA, 132/11 kV transformer at Gamai Tilla, Teliamura, Tripura west. 66/33 KV Sub-station Schemes of NEC Schemes of NEC 2005-02-03 3.25 2008-02-03 2.93 0 2.93 2.93 Completed
3528 TRIPURA Power Augmentation of Sub-Station capacity by addition of 1x15 MVA, 66/11 kV Sub-station at Rabindra Nagar, Sonamura, Tripura West. Schemes of NEC Schemes of NEC 2005-02-04 1.094 2008-02-04 0.98 0 0.98 0.98 Completed
3529 TRIPURA Power Augmentation of Sub-Station capacity by addition of 1x3 MVA, 66/33 KV and 1x6.3 MVA, 66/11 KV transformer at Jirania, Tripura West. Schemes of NEC Schemes of NEC 2005-02-04 4.8267 2008-02-04 4.34 0 4.34 4.34 Completed
3530 TRIPURA Power Augmentation by addition of 132/11kV, 1x15 MVA, Transformer along with associated equipments at 132kV Udaipur Substation, South Tripura. Schemes of NEC Schemes of NEC 2011-12-26 3.6098 2013-12-26 3.25 0 3.25 3.25 Completed
3531 TRIPURA Power Augmentation by capacity addition of 1X20/25 MVA, 132/33kV transformer and 2X12.5MVA, 132/11kV transformer with associated equipment at Mission Tilla 132kV Sub-Station, Dharmanagar, North Tripura Schemes of NEC Schemes of NEC 2016-02-29 9.505 2019-02-28 8.5545 0 8.5545 8.55 Completed
3532 TRIPURA Power Augmentation by capacity addition of 1X20/25 MVA, 132/33kV transformer and 2X12.5MVA, 132/11kV transformer with associated equipments at Mission Tilla 132kV Sub-Station, Dharmanagar, North Tripura Schemes of NEC Schemes of NEC 2012-02-28 3.8242 2015-02-28 3.44 0 3.44 3.44 Completed
3533 TRIPURA Power Augmentation of Sub Station Capacity by addition of 1x20/25 MV,132/33kV Transformer along with associated Civil work at Ambassa, Dhalai District. Tripura. Schemes of NEC Schemes of NEC 2011-12-26 4.42 2014-12-26 3.98 0 3.98 3.98 Completed
3534 TRIPURA Power Construction of 132kV S/C Transmission Line from 132kV Ambassa substation to Gandacherra Substation (47 Ckm), Tripura Schemes of NEC Schemes of NEC Dept. of Power 2012-09-04 12.07 2015-09-04 10.86 0 10.86 10.86 Completed
3535 TRIPURA Power Construction of 2X10MVA 132/33 KV and 2X10 MVA, 33/11 KV Sub-Station including LILO at Bishramganj, Sepahijala District, Tripura Schemes of NEC Schemes of NEC 2014-11-28 13.9224 2017-11-28 12.53 0 12.53 12.53 Completed
3536 TRIPURA Power Renovation & Strengthening of 132 KV line from Agartala to Khowai (45 CKM) Schemes of NEC Schemes of NEC 2005-02-04 3.8778 2008-02-04 3.49 0 3.49 3.49 Completed
3537 TRIPURA Power Renovation & Strengthening of 132 KV line from Ambassa to Kumarghat (45 CKM) Schemes of NEC Schemes of NEC 2005-02-03 3.8778 2008-02-03 3.49 0 3.49 3.49 Completed
3538 TRIPURA Power Renovation & Strengthening of 132 KV line from Teliamura to Ambassa (30 CKM) Schemes of NEC Schemes of NEC 2005-02-03 2.5932 2008-03-03 2.33 0 2.33 2.33 Completed
3539 TRIPURA Science and Technology Afforestation of Denuded/Deprived areas in South Tripura and West Tripura District of Tripura State. Schemes of NEC Schemes of NEC 2022-03-31 4 2025-03-31 2 1.0601406 3.0601406 0.5 Ongoing
3540 TRIPURA Science and Technology Delineation of Run Off Potential Areas and Identification of Suitable sites for Rain Water Harvesting Structures at Dhalai District of Tripura and Jampui Hills of North Tripura, using Geo- Spatial Technology, Tripura Schemes of NEC Schemes of NEC 2022-03-22 1.6157 2025-03-22 1.6188 0 1.6188 1.45 Ongoing
3541 TRIPURA Science and Technology Establishment of Science Park at Vigyan Gram Schemes of NEC Schemes of NEC Dept. of Power 2021-02-12 10.29 2025-03-31 2.1 4.1 6.2 6.2 Ongoing
3542 TRIPURA Science and Technology Installation of Intelligent Character Recognition System (ICR) at 2 Institutions of Tripura Schemes of NEC Schemes of NEC 2008-03-25 0.8191 2011-03-25 0.8191 0 0.8191 0.82 Completed
3543 TRIPURA Science and Technology Installation of Intelligent Character Recognition System (ICR) at Tripura University Schemes of NEC Schemes of NEC 2008-03-31 0.4096 2010-03-31 0.4096 0 0.4096 0.41 Completed
3544 TRIPURA Science and Technology Supply of computers & peripherals at Mohanpur H.S. School, West Tripura Schemes of NEC Schemes of NEC 2010-01-19 0.0423 2013-01-19 0.0423 0 0.0423 0.04 Completed
3545 TRIPURA Science and Technology Training Centre on Computer Education and Main Streaming of the Tribal Youths in Tripura by Ashray Schemes of NEC Schemes of NEC 2006-03-06 0.0613 2008-03-06 0.0613 0 0.0613 0.06 Completed
3546 TRIPURA Transport and Communication Agartala-Mohanpur-Chebri raod Schemes of NEC Schemes of NEC 2005-12-16 99.1 2008-12-16 89.19 0 89.19 89.19 Completed
3547 TRIPURA Transport and Communication Balance work of Manu-Chamanu road Schemes of NEC Schemes of NEC 2005-07-29 14.88 2008-07-29 13.89 0 13.89 13.89 Completed
3548 TRIPURA Transport and Communication Bishalgarh-Boxanagar-Sonamura-Borpathari- Belonia Schemes of NEC Schemes of NEC 2010-07-29 233.41 2013-08-29 205.498 0 205.498 205.5 Completed
3549 TRIPURA Transport and Communication Dharmanagar-Tilthai-Damcherra road Schemes of NEC Schemes of NEC 2006-09-22 81.67 2009-09-22 73.5 0 73.5 73.5 Completed
3550 TRIPURA Transport and Communication ISBT Chandrapur Schemes of NEC Schemes of NEC 2005-05-09 9.69 2008-05-09 8.72 0 8.72 8.72 Completed
3551 TRIPURA Transport and Communication ISTT Jirania Schemes of NEC Schemes of NEC 2005-09-12 24.79 2008-09-12 21.5 0 21.5 21.21 Completed
3552 TRIPURA Transport and Communication Jayashree-Thumcharai road Schemes of NEC Schemes of NEC 2006-03-30 3.9442 2009-03-30 3.55 0 3.55 3.55 Completed
3553 TRIPURA Transport and Communication Kowaifung-Ailmara road Schemes of NEC Schemes of NEC 2005-03-21 3.1375 2008-03-31 3.12 0 3.12 3.12 Completed
3554 TRIPURA Transport and Communication Nidaya-Radhanagar road Schemes of NEC Schemes of NEC 2006-03-30 4.16 2009-03-30 3.74 0 3.74 3.74 Completed
3555 TRIPURA Tourism and Culture Infrastructure Development of State Institute of Hotel Management (SIHM) Catering Technology & Applied Nutrition at Anandanagar, Agartala Schemes of NEC Schemes of NEC 2021-03-15 3.7596 2024-03-15 3.5558 0 3.5558 2.5552 Ongoing
3556 TRIPURA Tourism and Culture Musical Garden in Agartala, Tripura Schemes of NEC Schemes of NEC 2023-03-31 1.5 2026-03-31 1.5 0 1.5 1.5 Completed
3557 TRIPURA Tourism and Culture Setting up of a Star Category Hotel at Agartala (Infrastructure Development of Tourism, Tripura) Schemes of NEC Schemes of NEC 2005-03-24 1 2008-03-24 1 0 1 1 Completed
3558 TRIPURA Health Establishment of 200 Bedded MCH (Maternal & Child Health) wing at AGMC & GBP Hospital in Tripura PM-DevINE PM-DevINE Dept. of Health & familly 2024-01-23 192.1 2027-04-14 48 0 48 Ongoing
3559 TRIPURA Health Establishment of Dental College at Agartala by Government of Tripura PM-DevINE PM-DevINE Dept. of Health & familly 2024-01-24 202 2027-04-14 50.5 0 50.5 Ongoing
3560 TRIPURA Power Establishment of Solar Micro Grid for supply of reliable power to Remote Habitations in Tripura by Department of Power PM-DevINE PM-DevINE Dept. of Power 2023-11-22 80.79 2025-12-31 35.18 35.19 70.37 Ongoing
3561 TRIPURA Health Setting up of Integrated Rehabilitation Centre for Drug Addicted in Tripura PM-DevINE PM-DevINE Dept. of Health & familly 2024-01-23 86.12 2027-01-31 21.53 0 43.06 Ongoing
3562 TRIPURA Power Upgradation of 132KV Surjamaninagar Sub-Station of TSECL into 400KV in Tripura NESIDS-OTRI NESIDS Dept. of Power 2019-10-07 120.88 2020-03-31 43.3036 0 43.3036 0.1 Foreclosed
3563 TRIPURA Transport and Communication Improvement of Road from Jatanbari to Mandirghat via Tirathmukh (L-13.775 km)in Tripura NESIDS-ROADS NESIDS Public works Department 2021-03-05 50.79 2023-03-05 42.99 0 42.99 29.18 Completed
3564 TRIPURA Transport and Communication Improvement of Tourist spot connectivity from Amarpur (Fatiksagar) leading to Chabimura and having access to eco- Tourism centre NESIDS-ROADS NESIDS Public works Department 2019-06-07 22.12 2020-03-31 22.1315 0 22.1315 22.1308 Completed
3565 TRIPURA Transport and Communication Imrpvement of road from Gandacherra-Raishyabari road at Ch. 18.30 KM to Narikel Kunja (Length-8.00 KM) for easy access for the Tourists from Dhalai, Norh and Unakioti Diricts to Narikel Kunja Island surrounded by Dumbur Lake Water in Tripura NESIDS-ROADS NESIDS Public works Department 2019-06-07 21.8213 2020-03-31 21.8116 0 21.8116 21.8213 Completed
3566 TRIPURA Transport and Communication Improvement of KA Road from Erarpar to Ambassa Road(LO-28.90 km) in the State of Tripura NESIDS-ROADS NESIDS Public works Department 2023-10-16 94.39 2026-10-31 63.0008 19.609 82.6098 4.0522 Completed
3567 TRIPURA Transport and Communication Improvement of Road from Udaipur-Kakraban Main Road(Hospital Chomuhani) to Tualmura via Camper Tilla-Ramkrishna Para Road(Length-9.35 km in Tripura) NESIDS-ROADS NESIDS Public works Department 2023-10-16 33.51 2026-10-31 21.79 6.785 28.575 Ongoing
3568 TRIPURA Transport and Communication Upgradation/Improvement of Hmunpuii NH-44) to Damcherra(Tripura Mizoram border) via Monchung in Tripura NESIDS-ROADS NERSDS Public works Department 2022-03-15 84.79 2024-03-15 62.4 15 83.5822 20.2 Ongoing
3569 TRIPURA Education Bhavans Science College, Tripura NESIDS-OTRI NLCPR Higher Education 2005-06-30 5.98 2008-06-30 5.2551 0 5.2551 5.2551 Completed
3570 TRIPURA Education Construction of 175 primary school building with provision of furniture . NESIDS-OTRI NLCPR Elementary Education 2001-02-20 14.44 2005-02-28 12.9898 0 12.9898 14.421 Completed
3571 TRIPURA Education Construction of Birchandra State Central Library at Agartala, West Tripura (Phase-I) NESIDS-OTRI NLCPR Higher Education 2014-02-20 9.7452 2017-02-28 6.0082 2.17 8.1782 3.5083 Ongoing
3572 TRIPURA Education Construction of Building for College of Agriculture NESIDS-OTRI NLCPR Agriculture Department 2009-09-10 56.0476 2011-09-30 49.5234 0 49.5234 49.5234 Completed
3573 TRIPURA Education Construction of Law College in tripura NESIDS-OTRI NLCPR Higher Education 2011-03-17 4.1934 2014-02-28 3.46 0 3.46 3.46 Completed
3574 TRIPURA Education Construction of one (G3) storeyed office building for the accommodation of Directorate of Higher Education, Directorate of School Education, Directorate of Youth Affairs & Sports in the premises vacated by the SDM Sadar, West Tripura, Phase-I NESIDS-OTRI NLCPR Dept. of Power 2014-02-20 17.71 2017-02-28 7.8575 0 7.8575 7.8575 Ongoing
3575 TRIPURA Education Construction of Tripura Institute of Technology (Phase-II), West Tripura NESIDS-OTRI NLCPR Dept. of Education 2017-05-12 74.39 2019-05-31 59.7058 0 59.7058 58.4 Ongoing
3576 TRIPURA Education Construction of Veterinary College NESIDS-OTRI NLCPR Animal Resource Developme 2012-01-02 16.3087 2012-01-02 14.39 0 14.39 14.39 Completed
3577 TRIPURA Education Costruction of Tripura Institute of Techonology(Phase-1) NESIDS-OTRI NLCPR Higher Education 2010-12-02 7.9386 2013-10-31 7.1447 0 7.1447 7.1447 Completed
3578 TRIPURA Education Development of 100 seated Boys Hostel and Quarters for Faculty ans Staff at Government Degree College Dharmanagar, NESIDS-OTRI NLCPR Higher Education 2010-04-20 3.8545 2013-04-20 3.401 0 3.401 3.401 Completed
3579 TRIPURA Education Development of Tripura University NESIDS-OTRI NLCPR Higher Education 2000-01-07 20.52 2003-01-31 18.468 0 18.468 20.52 Completed
3580 TRIPURA Education Establishment of a New College of Teachers Education in North Tripura NESIDS-OTRI NLCPR Higher Education 2009-03-30 21.1022 2011-03-31 18.6196 0 18.6196 18.6196 Completed
3581 TRIPURA Education Improvement of State B.Ed. College in Tripura NESIDS-OTRI NLCPR Higher Education 2009-03-30 8.2559 2012-01-31 6.3783 0 6.3783 6.3783 Completed
3582 TRIPURA Education Infrastructure development of R.K. Mission, Vivekanagar and Agartala in Tripura NESIDS-OTRI NLCPR Dept. of Power 2013-02-27 4.429 2015-02-27 3.5184 0 3.5184 3.5184 Ongoing
3583 TRIPURA Education Infrastructure Development of Tripura Engineering College. NESIDS-OTRI NLCPR Higher Education 2006-12-11 12.2433 2009-11-30 10.825 0 10.825 10.825 Completed
3584 TRIPURA Education Renovation and Upgradation of Kailashahar Government Girl H.S. School and Boarding House NESIDS-OTRI NLCPR Secondary Education 2010-04-19 4.7208 2012-04-30 4.1654 0 4.1654 4.1654 Completed
3585 TRIPURA Education Sarva Shiksha Abhiyan NESIDS-OTRI NLCPR Higher Education 2006-03-28 14.1404 2007-03-31 14.1404 0 14.1404 14.1404 Completed
3586 TRIPURA Education Sarva Shiksha Abhiyan (2006-07) NESIDS-OTRI NLCPR Higher Education 2006-06-29 10.66 2007-06-29 10.66 0 10.66 10.66 Completed
3587 TRIPURA Education Upgarding of infrastucture of R.K. Mission NESIDS-OTRI NLCPR Secondary Education 2001-07-09 2.75 2003-08-31 2.475 0 2.475 2.75 Completed
3588 TRIPURA Education Upgradation of facilities in 15 Government Degree Colleges in Tripura NESIDS-OTRI NLCPR Higher Education 2009-07-31 47.5459 2011-07-31 38.2358 0 38.2358 44.3782 Completed
3589 TRIPURA Education Upgradation of Infrastructure of 100 Nos. of Higher secondary Schools NESIDS-OTRI NLCPR Secondary Education 2006-12-15 45.41 2009-12-31 40.869 0 40.869 43.7831 Completed
3590 TRIPURA Education Upgradation of Infrastructure of 150 High Schools NESIDS-OTRI NLCPR Secondary Education 2006-12-11 28.11 2009-11-30 25.299 0 25.299 27.9201 Completed
3591 TRIPURA Education Upgradation of Regional College of Physical Education,Panisagar NESIDS-OTRI NLCPR Education (Youth Affair & 2011-03-11 13.8364 2013-02-28 12.2086 0 12.2086 12.2086 Completed
3592 TRIPURA Education Upgrading of Infrastructure of 25 Upper Primary Schools NESIDS-OTRI NLCPR Elementary Education 2001-02-20 3.69 2004-02-29 3.006 0 3.006 3.34 Completed
3593 TRIPURA Irrigation and Flood Control Minor Irrigation Schemes NESIDS-OTRI NLCPR Public Works Department ( 2001-02-05 4.78 2003-02-28 4.302 0 4.302 4.78 Completed
3594 TRIPURA Health Development of Gobind Ballabh Pant Hospital NESIDS-OTRI NLCPR Directorate of Health Ser 2005-10-18 12.8828 2020-03-31 11.5945 0 11.5945 9.8605 Completed
3595 TRIPURA Health Dhalai District Hospital NESIDS-OTRI NLCPR Directorate of Health Ser 2005-12-22 3.4723 2008-12-31 2.5938 0 2.5938 2.5938 Completed
3596 TRIPURA Health Dhalai District Hospital :Phase-II (Hospital Quarters), Tripura NESIDS-OTRI NLCPR Dept. of Health & familly 2017-05-18 11.3185 2019-05-31 9.0412 0 9.0412 3.0519 Ongoing
3597 TRIPURA Health Government Medical College and Hospital at Agartala NESIDS-OTRI NLCPR Higher Education 2005-10-10 104.5136 2009-11-30 94.0622 0 94.0622 94.0622 Completed
3598 TRIPURA Health Improvement of Teliamura Sub-Divisional Hospital in Tripura NESIDS-OTRI NLCPR Directorate of Health Ser 2008-11-19 7.3223 2010-05-31 6.4687 0 6.4687 6.4687 Completed
3599 TRIPURA Health North District Hospital in Tripura NESIDS-OTRI NLCPR Directorate of Health Ser 2005-06-30 9.4 2008-06-29 8.46 0 8.46 8.434 Completed
3600 TRIPURA Health North District Hospital: Phase-II (Hospital Quarters), Tripura NESIDS-OTRI NLCPR Dept. of Health & familly 2017-05-12 11.1005 2019-05-31 8.14 0 8.14 8.14 Ongoing
3601 TRIPURA Health South District Hospital (Phase-II) Hospital Quarters in Tripura NESIDS-OTRI NLCPR Dept. of Power 2013-10-08 9.6758 2016-09-30 8.1116 0 8.1116 8.1116 Completed
3602 TRIPURA Health South District Hospital in Tripura NESIDS-OTRI NLCPR Directorate of Health Ser 2005-06-30 9.4 2008-06-29 8.46 0 8.46 8.4489 Completed
3603 TRIPURA Health State Level Para Medical Institute at Agartala in Tripura NESIDS-OTRI NLCPR Higher Education 2005-03-17 14.07 2008-03-31 12.3555 0 12.3555 12.67 Completed
3604 TRIPURA Health Super Speciality Block, G.B.Pant Hospital, Agartala NESIDS-OTRI NLCPR Directorate of Health Ser 2002-02-22 8.88 2005-08-31 7.2 0 7.2 5.7501 Completed
3605 TRIPURA Miscellaneous Construction and establishment of Science City in Tripura NESIDS-OTRI NLCPR Science, Technology & Env 2015-03-25 27.454 2017-08-31 22.6763 0 22.6763 22.6763 Ongoing
3606 TRIPURA Miscellaneous Construction of 5 food Storage Godwon in Tripura NESIDS-OTRI NLCPR Food, Civil Supplies & C 2013-03-25 3.1472 2014-01-31 2.4587 0 2.4587 2.4587 Ongoing
3607 TRIPURA Miscellaneous Construction of Bus Terminal at Nagerjala, Agartala, Tripura NESIDS-OTRI NLCPR Urbar Development 2014-02-25 16.889 2017-02-28 11.5993 0 11.5993 8.89 Ongoing
3608 TRIPURA Miscellaneous Construction of District Administration Complex, Khowai District, Tripura NESIDS-OTRI NLCPR Revenue Department 2017-12-07 20.6 2019-12-07 14.7512 0 14.7512 5.4318 Ongoing
3609 TRIPURA Miscellaneous Construction of District Administration Complex, Sepahijala District, Tripura NESIDS-OTRI NLCPR Revenue Department 2017-12-07 21.6 2019-12-07 5.4794 0 5.4794 5.4794 Ongoing
3610 TRIPURA Miscellaneous Construction of Motor Stand at Dharmanagar NESIDS-OTRI NLCPR Transport Department 2010-12-15 10.3391 2013-06-30 8.9971 0 8.9971 8.9971 Completed
3611 TRIPURA Miscellaneous Construction of Motor Stand at Khumulwng, TTAADC in Tripura NESIDS-OTRI NLCPR Transport Department 2010-04-19 1.9415 2012-09-30 1.6383 0 1.6383 1.6383 Completed
3612 TRIPURA Miscellaneous Nazrul Kala Kshetra (Phase II) NESIDS-OTRI NLCPR Higher Education 2010-05-05 8.2018 2012-04-30 7.3816 0 7.3816 7.3816 Completed
3613 TRIPURA Miscellaneous New Capital Complex Project at Agartala NESIDS-OTRI NLCPR Information and Cultural 2000-01-24 50 2003-01-31 45 0 45 48.172 Completed
3614 TRIPURA Miscellaneous Rabindra Convention Centre (Satabarshiki Bhavan) NESIDS-OTRI NLCPR Information and Cultural 2011-12-13 21.9421 2011-12-13 19.3661 0 19.3661 19.3661 Completed
3615 TRIPURA Miscellaneous Tribal Development Project NESIDS-OTRI NLCPR Tribal Welfare Department 2001-03-08 28.8 2005-03-31 25.92 0 25.92 28.0379 Completed
3616 TRIPURA Power 132 KV D/C line from suryamaninagar to Rokhia (30 Km and site development and Fdr. Bay at Rokhia) NESIDS-OTRI NLCPR TSECL 2012-01-02 12.61 2012-01-02 11.0213 0 11.0213 11.0213 Ongoing
3617 TRIPURA Power 1x21 MW Gas Thermal project(Extension )at Rokhia(Phase-2) NESIDS-OTRI NLCPR TSECL 2000-01-07 85.17 2004-05-27 76.653 0 76.653 85.17 Completed
3618 TRIPURA Power 1x21 MW Gas Thermal projectat Rokhia(Unit VIII) NESIDS-OTRI NLCPR TSECL 2004-05-21 80.94 2008-12-31 72.8488 0 72.8488 78.0638 Completed
3619 TRIPURA Power Augmentation of P.K. Bari S/Station with 32 KV Bay for termination of 400 KV line NESIDS-OTRI NLCPR TSECL 2012-07-12 4.0059 2015-07-12 3.5985 0 3.5985 3.5985 Completed
3620 TRIPURA Power Electrification of Tribal Village (No.10) NESIDS-OTRI NLCPR TSECL 2001-09-26 1.44 2004-09-30 0.648 0 0.648 0.72 Completed
3621 TRIPURA Power Renovation & restrengthening of 132kv single circuit line from Agartala to Dharmanagar NESIDS-OTRI NLCPR TSECL 2001-12-18 10 2004-12-31 9 0 9 10 Completed
3622 TRIPURA Power Sub-Transmission and Distribution works (5 Nos.) NESIDS-OTRI NLCPR TSECL 2000-10-16 45.55 2003-10-31 35.559 0 35.559 25.7142 Completed
3623 TRIPURA Power Tranasmission Project (Phase-I):400 KV S/Stn at Surajamaninagar(to be charged at 132KV) & Infrastructure development,West Tripura Districtunder NLCPR. NESIDS-OTRI NLCPR TSECL 2010-12-23 79.9579 2015-01-31 45.4534 0 45.4534 45.4534 Completed
3624 TRIPURA Power Transmission Project (Phase-1) 132KV D/C line from Surajamaninagar to 79 TillaGrid S/Stn.(11.14Km)inciuding Fdr Bay & site develpomentWest Tripura NESIDS-OTRI NLCPR TSECL 2010-12-23 9.5081 2013-01-31 8.3422 0 8.3422 8.3422 Completed
3625 TRIPURA Power Transmission Project (Phase-1):132 KV D/C line from Surajamaninagar to Bhujungnagar (20 Km) & associated Fdr. Bay at Budhjungnagar, West Tripura NESIDS-OTRI NLCPR TSECL 2010-12-23 7.3853 2013-01-31 6.0287 0 6.0287 6.0287 Completed
3626 TRIPURA Power Transmission Scheme including Bodhjangnagar Industrial Estate NESIDS-OTRI NLCPR TSECL 2007-09-26 9.374 2009-03-31 8.3559 0 8.3559 8.3559 Completed
3627 TRIPURA Power Transmission Schemes (13 Nos.) NESIDS-OTRI NLCPR TSECL 1999-03-31 40 2004-03-31 36 0 36 40 Completed
3628 TRIPURA Roads and Bridges Construction of Flyover on Drop Gate-Nagerjala-Battala-Fire Service and Melarmath Areas ( Length 2500 M) at Agartala NESIDS-OTRI NLCPR Public works Department 2015-11-06 94.71 2018-03-31 85.239 0 85.239 85.239 Completed
3629 TRIPURA Roads and Bridges Construction of RCC Bridge at Ch 9.00 Km near Tulamura Market over Tulamuracherra on Gargi Tulamura road (ODR) NESIDS-OTRI NLCPR PWD (R & B) 2009-12-14 3.2833 2011-12-31 2.8971 0 2.8971 2.8971 Completed
3630 TRIPURA Roads and Bridges Construction of RCC Bridge near causeway at Krishnapur over Balucherra at Ch.6.05 km on Maharani- Tulashikhar road NESIDS-OTRI NLCPR PWD (R & B) 2010-03-09 1.7814 2012-09-30 1.5718 0 1.5718 1.5718 Completed
3631 TRIPURA Roads and Bridges Construction of RCC Bridge over Baradupatacherra at Ch.2.80 Km. on Kanchanpur - Jalabassa road (ODR) NESIDS-OTRI NLCPR PWD (R & B) 2010-04-19 3.8762 2013-03-31 3.27 0 3.27 3.27 Completed
3632 TRIPURA Roads and Bridges Construction of RCC bridge over Burima river near Golaghati Market on Bishalgarh Golaghati Takarjala road NESIDS-OTRI NLCPR PWD (R & B) 2010-02-05 3.5319 2013-01-31 3.1164 0 3.1164 3.1164 Completed
3633 TRIPURA Roads and Bridges Construction of RCC Bridge over Champakcherra at Ch.18.40 Km. on Mohanpur - Simna road (ODR) NESIDS-OTRI NLCPR PWD (R & B) 2010-04-19 2.8382 2012-03-31 2.5044 0 2.5044 2.5044 Completed
3634 TRIPURA Roads and Bridges Construction of RCC Bridge over Dhuraicherra at Ch. 0.90 Km on Kamalpur Bilascherra road (ODR) NESIDS-OTRI NLCPR PWD (R & B) 2010-02-16 2.973 2012-01-31 2.6232 0 2.6232 2.6232 Completed
3635 TRIPURA Roads and Bridges Construction of RCC Bridge over Ghoramaracherra on NH-44 at Jirania Tripura Engineering College Chalkbasta NESIDS-OTRI NLCPR PWD (R & B) 2010-04-19 3.1082 2012-03-31 2.7426 0 2.7426 2.7426 Completed
3636 TRIPURA Roads and Bridges Construction of RCC Bridge over Kakricherra on Thalibari Microsa NESIDS-OTRI NLCPR PWD (R & B) 2009-09-29 2.0977 2011-08-31 1.851 0 1.851 1.851 Completed
3637 TRIPURA Roads and Bridges Construction of RCC Bridge over Kalapaniacherra at Ch.0.50 Km on Satchand Block office old Manubankul road NESIDS-OTRI NLCPR PWD (R & B) 2010-03-09 2.656 2012-03-31 2.3435 0 2.3435 2.3435 Completed
3638 TRIPURA Roads and Bridges Construction of RCC bridge over Laxmicherra river at Ch.12.01 Km on Khowai Udna road NESIDS-OTRI NLCPR PWD (R & B) 2010-03-29 2.1569 2012-03-31 1.9031 0 1.9031 1.9031 Completed
3639 TRIPURA Roads and Bridges Construction of RCC Bridge over local stream at Ch. 14.60 Km on Mohanpur - Simna road NESIDS-OTRI NLCPR PWD (R & B) 2010-04-19 1.7735 2012-03-31 1.5648 0 1.5648 1.5648 Completed
3640 TRIPURA Roads and Bridges Construction of RCC Bridge over local stream at ch. 4.40 Km on Jogendranagar to Jampaijala Road NESIDS-OTRI NLCPR PWD (R & B) 2009-09-29 1.8408 2011-08-31 1.6242 0 1.6242 1.6242 Completed
3641 TRIPURA Roads and Bridges Construction of RCC Bridge over local stream at ch. 7.50 Km on Jogendranagar to Jampaijala Road NESIDS-OTRI NLCPR PWD (R & B) 2009-09-29 2.5584 2011-08-31 2.2574 0 2.2574 2.2574 Completed
3642 TRIPURA Roads and Bridges Construction of RCC Bridge over Local stream at Ch.4.50 Km on Dhanpur to Kakraban NESIDS-OTRI NLCPR PWD (R & B) 2009-08-17 1.7794 2011-08-31 1.57 0 1.57 1.57 Completed
3643 TRIPURA Roads and Bridges Construction of RCC Bridge over Local stream at Ch.7.00 Km on Dhanpur to Kakraban NESIDS-OTRI NLCPR PWD (R & B) 2009-08-17 2.2589 2011-08-31 1.9932 0 1.9932 1.9932 Completed
3644 TRIPURA Roads and Bridges Construction of RCC Bridge over Lohar at Ch. 0.45 Km on Kamlaghat Gamchakobra Banikya Chowmuhani road NESIDS-OTRI NLCPR PWD (R & B) 2010-03-09 2.6638 2012-03-31 2.3504 0 2.3504 2.3504 Completed
3645 TRIPURA Roads and Bridges Construction of RCC bridge over Lohar on Berimura Taltala Road NESIDS-OTRI NLCPR PWD (R & B) 2010-03-09 2.2933 2012-03-31 2.0235 0 2.0235 2.0235 Completed
3646 TRIPURA Roads and Bridges Construction of RCC Bridge over river Dhanai at ch. 6.60 Km on Champaknagar - Mandai road (ODR) NESIDS-OTRI NLCPR PWD (R & B) 2010-02-16 3.2134 2013-02-28 2.4264 0 2.4264 2.4264 Completed
3647 TRIPURA Roads and Bridges Construction of RCC Bridge over river Howrha at Ch. 0.10 Km. Champaknagar to Udaipur road (ODR) NESIDS-OTRI NLCPR Public works Department 2010-02-04 3.0167 2012-01-31 2.6618 0 2.6618 2.6618 Completed
3648 TRIPURA Roads and Bridges Construction of RCC Bridge over river Surmacherra at Ch.30.10 Km. on Mohanpur Simna Raod NESIDS-OTRI NLCPR PWD (R & B) 2009-08-17 1.6701 2012-06-30 1.4737 0 1.4737 1.4737 Completed
3649 TRIPURA Roads and Bridges Construction of RCC Bridge over river Surmacherra at Ch.34.53 on Mohanpur Simna Raod NESIDS-OTRI NLCPR PWD (R & B) 2009-08-17 2.2374 2012-06-30 1.9174 0 1.9174 1.9174 Completed
3650 TRIPURA Roads and Bridges Construction of RCC Bridge over Ujan Machmaracherra at Ch.9.00 Km. on Kanchanpur - Jalabassa road (ODR) NESIDS-OTRI NLCPR PWD (R & B) 2010-04-19 3.0701 2012-03-31 2.7089 0 2.7089 2.7089 Completed
3651 TRIPURA Roads and Bridges Construction of RCC over local stream at Ch. 12.00 Km on Mohanpur - Simna Road (ODR) NESIDS-OTRI NLCPR PWD (R & B) 2010-02-16 2.3278 2012-02-29 2.054 0 2.054 2.054 Completed
3652 TRIPURA Roads and Bridges Improvement and Upgradation of the Road connecting Sub- Division Headquarter with Nh-44/Percharthal (NH-44) to Kanchanpur Road (26.50 Km) phase-I portion from Percharthal to Machamara (8.50 km) in Tripura NESIDS-OTRI NLCPR PWD (R & B) 2014-03-27 24.8856 2017-03-31 17.9176 0 20.8276 17.9176 Ongoing
3653 TRIPURA Roads and Bridges Improvement of Mailak-Gamukabari via Burbaria (7.50Km) in Tripura NESIDS-OTRI NLCPR PWD (R & B) 2010-12-23 10.6805 2013-01-31 9.424 0 9.424 9.424 Completed
3654 TRIPURA Roads and Bridges Improvement of Melagarh-- Sonamura Road (Length: 8.454 Km) Sipahijala District in Tripura NESIDS-OTRI NLCPR Public works Department 2016-09-28 30.5 2018-09-30 23.6845 0 23.6845 23.3977 Ongoing
3655 TRIPURA Roads and Bridges Improvement of Pecharthal (NH-44) Kanchanpur Road (Lenth: 26:50) Phase-II from Machmara - Kanchanpur (Length: 18 Km in Unakoti District in Tripura ) NESIDS-OTRI NLCPR Dept. of Power 2017-06-21 56.746 2019-06-30 35.4282 0 35.4282 35.338 Ongoing
3656 TRIPURA Roads and Bridges Jogendranagar to Takarjal road (26.50Km) NESIDS-OTRI NLCPR PWD (R & B) 2012-09-25 36.796 2015-09-25 33.1164 0 33.1164 33.1164 Completed
3657 TRIPURA Roads and Bridges Replacement of 2 existing semi permanent timber (SPT) bridges in Tripura on Kamalpur-Maracherra-Ambassa Road by RCC bridges NESIDS-OTRI NLCPR PWD (R & B) 2006-03-20 4.2777 2008-03-31 3.7378 0 3.7378 3.7378 Completed
3658 TRIPURA Roads and Bridges Replacement of 49 Timber Bridges by Belley type Steel bridge in tribal areas. NESIDS-OTRI NLCPR PWD (R & B) 2001-01-09 28.49 2004-05-27 25.641 0 25.641 28.49 Completed
3659 TRIPURA Roads and Bridges Road connecting railway station to NH/State highway (4 Nos) NESIDS-OTRI NLCPR PWD (R & B) 2012-09-25 16.2028 2015-09-25 14.3738 0 14.3738 14.3738 Completed
3660 TRIPURA Roads and Bridges Upgradation of Halahali-Ambassa-Dangabari-Bel NESIDS-OTRI NLCPR PWD (R & B) 2001-09-12 189.093 2006-03-31 155.2361 0 155.2361 161.8547 Ongoing
3661 TRIPURA Roads and Bridges Widening & strengthening of Banikya Chowmuhani Shalbagan road. (9.00 Km.) NESIDS-OTRI NLCPR PWD (R & B) 2006-03-20 4.77 2008-03-31 4.1897 0 4.1897 4.1897 Completed
3662 TRIPURA Sports Construction of Boys Hostel (Sports), Tripura NESIDS-OTRI NLCPR Education (Youth Affair & 2010-09-20 3.0188 2012-08-31 2.6636 0 2.6636 2.6636 Completed
3663 TRIPURA Sports Construction of District Sports Complex at Ambassa in Tripura NESIDS-OTRI NLCPR Education (Youth Affair & 2012-05-25 4.906 2014-05-31 4.021 0 4.021 4.021 Ongoing
3664 TRIPURA Sports Construction of District Sports Complex at Kailashahar, North Tripura District, Tripura NESIDS-OTRI NLCPR Education (Youth Affair & 2011-09-22 3.9521 2013-08-31 3.4871 0 3.4871 3.4871 Completed
3665 TRIPURA Sports Construction of District SPorts Complex at Udaipur NESIDS-OTRI NLCPR Education (Youth Affair & 2012-01-02 4.8014 2012-01-02 4.2366 0 4.2366 4.2366 Completed
3666 TRIPURA Sports Construction of Girls Hostel (Sports), Tripura NESIDS-OTRI NLCPR Education (Youth Affair & 2010-11-09 2.7899 2012-10-31 2.4617 0 2.4617 2.4617 Completed
3667 TRIPURA Sports Construction of Sports Complex at Khumlwng, Sadar NESIDS-OTRI NLCPR Dept. of Power 2010-12-02 4.7836 2012-11-30 3.4442 0 3.4442 3.4442 Ongoing
3668 TRIPURA Sports Upgradation of Tripura Sports School, Badharghat NESIDS-OTRI NLCPR Education (Youth Affair & 2010-03-11 2.7931 2012-03-31 2.4644 0 2.4644 2.4644 Completed
3669 TRIPURA Water Supply Drinking water supply scheme for Dharamnagar NESIDS-OTRI NLCPR PWD (DWS) 2003-02-27 5.49 2006-03-31 4.5779 0 4.5779 5.0518 Completed
3670 TRIPURA Water Supply Drinking water supply scheme for Teliamura NESIDS-OTRI NLCPR PWD (DWS) 2003-03-17 6.21 2006-03-31 5.1648 0 5.1648 5.717 Completed
3671 TRIPURA Water Supply Quality improvement of Rural Water Scheme in Tripura by way of constryction of package type (dual media pressure) iron removal plants (IRPs) attched to existing deep tube wells NESIDS-OTRI NLCPR PWD (DWS) 2011-12-27 12.8308 2011-12-27 11.0797 0 11.0797 11.0797 Completed
3672 TRIPURA Water Supply Water Supply Scheme at Bishalgarh (1.00 MGD) NESIDS-OTRI NLCPR Dept. of Power 2007-06-29 7.8116 2009-06-30 6.8926 0 6.8926 6.8926 Ongoing
3673 TRIPURA Water Supply Water Supply Scheme at Jatanbari - Nutanbazar NESIDS-OTRI NLCPR PWD (DWS) 2007-04-24 5.2105 2010-03-31 4.5528 0 4.5528 4.5528 Completed
3674 TRIPURA Water Supply Water Supply Scheme at Melaghar NESIDS-OTRI NLCPR PWD (DWS) 2007-06-08 8.8646 2009-06-30 7.7457 0 7.7457 7.7457 Completed
3675 TRIPURA Transport and Communication Construction of road from Debendra Choudhury Para (Belcherra) to Chankala Bazar under Padmabil R.D. Block, Tripura NESIDS-ROADS NESIDS Public works Department 2024-03-14 40.38 2026-03-31 19.96 16.98 36.94 Ongoing
3676 TRIPURA Tourism and Culture Tourism and Cultural Promotion Hub at Gandhighat Agartala West TRIPURA NESIDS-OTRI Urban Development 2024-02-28 32.5867 2026-02-28 6.55 1.0456 7.5956 Ongoing
3677 TRIPURA Agriculture and Allied Strengthening of Laboratories at College of Veterinary Science and A.H.R.K Nagar, Agartala, West Tripura Schemes of NEC Animal Resources Developm 2024-09-04 1.99 2027-09-04 1.6915 1.6915 0.4928 Ongoing
3678 TRIPURA Education Integrated Kokborok Development of Language and Literature through research oriented studies and appropriate documentation. Schemes of NEC Tripura Tribal area Auton 2024-10-22 3.35 2027-10-22 0.8375 0.8375 Ongoing
3679 TRIPURA Science and Technology Conservation of medicinal plants and promotion of indigenous of knowledge at Dhalai and North Tripura district of Tripura Schemes of NEC Medicinal plants Board of 2024-10-28 1.92 2027-10-28 0.48 0.48 0.96 Ongoing
3680 TRIPURA Agriculture and Allied Fisheries Based Development Project for Dumbur, Tripura Schemes of NEC Department of Fisheries, 2025-01-27 5.66 2026-01-27 1.415 1.415 Ongoing
3681 TRIPURA Power Re-conductoring of 132 KV Intra-State Transmission lines by High Tension Low HTLS conductor with allied accessories in Tripura NESIDS-OTRI Tripura Power Transmissio 2025-02-12 49.01 2026-02-11 12.25295 24.5059 36.75885 Ongoing
3682 TRIPURA Agriculture and Allied Establishment of Veterinary Clinical Complex VCC at C.V. Sc. and A.H., R.K. Nagar, Agartala, Tripura West Schemes of NEC Animal Resources Developm 2025-07-30 13 2027-07-30 0 Ongoing
3683 TRIPURA Health Construction of new building for Khowai district hospital at Khowai, Tripura NESIDS-OTRI Health and family welfare 2025-08-14 48.469 2027-06-14 0 0 Ongoing
3684 TRIPURA Tourism and Culture Development of Tourist Amenities in Sepahijala Zoological Park, Tripura NESIDS-OTRI Forest Deptt. Govt. of Tr 2025-08-29 57.284 2028-08-29 0 Ongoing
3685 TRIPURA Health Construction of Transit Accommodation for Tribal Students and Patients at Shillong by Tripura Tribal Areas Autonomous District Council TTAADC. Schemes of NEC Tripura Tribal area Auton 2025-10-22 4.3269 2027-10-22 0 Ongoing
3686 TRIPURA Transport and Communication Construction of road from Kowaifung Panjirai to Karbook under Julaibari RD Block , Length-9.1 km NESIDS-ROADS PWD Roads 2025-12-23 30.15 2027-12-22 0 Ongoing
3687 TRIPURA Transport and Communication Construction of all weather road from Jampui Hill PMGSY Point to Kangrai under Jampui Hill RD Block in Tripura , Length -8.625 Km NESIDS-ROADS PWD roads 2025-12-26 21.34 2027-12-25 0 Ongoing
3688 TRIPURA Transport and Communication Improvement and Strengthening of road from Burighat to Sermun-II , Length-15.862 Km NESIDS-ROADS PWD Roads 2026-01-02 43.65 2028-01-02 0 Ongoing
3689 TRIPURA Tourism and Culture Development of Amarsagar dighi at udaipur, Gomti District, Tripura NESIDS-OTRI Tripura Tourism developme 2026-01-15 39.4991 2028-06-15 0 Ongoing
3690 TRIPURA Science and Technology Establishment of Agar International Trade and Research Centre for Promoting Trade and Research in Agarwood Sector, Tripura. Schemes of NEC NTFP Centre of Excellence 2026-01-21 13.98075 2028-01-21 0 Ongoing
3691 TRIPURA Tourism and Culture Development of Tourism Infrastructure in Four Island in Dumbur Lake along with other facilities NESIDS-OTRI Tripura Tourism developme 2026-01-14 30.04 2028-06-14 0 Ongoing
TOTAL 48664.699163116 32743.6804152 2989.79002245 35807.96679765 29400.5422491