Projects Dashboard

All Schemes Projects

As on 31-07-2026
Sr.No State Sector Project Name Scheme Sub Scheme Executing Department Sanctioned Date Approved Cost
(₹ Cr.)
Scheduled Completion Date Financial Expenditure as on 31-03-2026
(₹ Cr.)
Financial Expenditure for current FY 01-04-2026 to 31-07-2026
(₹ Cr.)
Total Financial Expenditure
(₹ Cr.)
U.C. Received
(₹ Cr.)
Present Status
1 ARUNACHAL PRADESH Education
Construction of RCC framed structure at Govt. Higher Secondary School Building, Basar in Lepa Rada District in Arunachal Pradesh
NESIDS-OTRI NESIDS Public works Department 2020-05-28 7.8538 2021-03-31 3.1415 0 3.1415 Ongoing
2 ARUNACHAL PRADESH Education
Infrastructure Development for Govt. Higher Secondary School at Kanubari, Longding District in Arunachal Pradesh
NESIDS-OTRI NESIDS Dept. of Education 2019-03-05 7.88 2020-03-31 7.3284 0.018 7.3464 2.9292 Ongoing
3 ARUNACHAL PRADESH Education
Infrastructure of Sainik School at Niglok, Passighat, East Siang
NESIDS-OTRI NESIDS Dept. of Education 2019-03-09 20 2020-03-31 18 0 18 14.4 Ongoing
4 ARUNACHAL PRADESH Education
Project Infrastructure Development of Rangfrah Vidya Niketan Vidyalah at Changlang
NESIDS-OTRI NESIDS Dept. of Education 2019-03-09 8.4461 2020-03-31 8.1633 0 8.1633 8.1631 Completed
5 ARUNACHAL PRADESH Health
Procurement of equipment for District Hospitals & CHCs (Pakke Kessang, Likabali, Basar, Shi Yomi, Boleng, Raga, Doimukh, Palin, Koloriang, Daporijo, Anini, Roing, Anjaw and Longding) in Arunachal Pradesh
NESIDS-OTRI NESIDS Dept. of Power 2021-01-18 18.18 2021-03-31 0.1 0 0.1 Ongoing
6 ARUNACHAL PRADESH Health
Procurement of hospital equipments to prepare 10 District Hospitals (Tawang, Bomdila, Ziro, Aalo, Tezu, Namsai, Changlang, Khonsa, Seppa and Yingkiong) to fight COVID-19
NESIDS-OTRI NESIDS Dept. of Health & familly 2020-05-28 51.6861 2021-03-31 48.9792 0 48.9792 48.9792 Ongoing
7 ARUNACHAL PRADESH Sports
Construction of Multi Sports Facility Outdoor stadium at Namsai HQ under Namsai District
NESIDS-OTRI NESIDS Dept. of Power 2023-11-29 38 2028-01-31 18.98392 3 21.98392 14.4919 Ongoing
8 ARUNACHAL PRADESH Agriculture and Allied
Area Expansion Programme (AEP) on Areca nut intercropped with Banana, Assam Lemon intercropped with Banana, Pineapple and Large Cardamom gardens proposed for Tezu-Sunpura circle of Lohit District
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 5.17 2025-03-31 5.1682 0 5.1682 2.07 Ongoing
9 ARUNACHAL PRADESH Agriculture and Allied
Bamboo Plantation at Hikam and Muro Area of Tadin village, Aalo, West Siang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2024-02-08 2.19 2026-02-08 2.1914 0 2.1914 1.1826 Ongoing
10 ARUNACHAL PRADESH Agriculture and Allied
C/o Bamboo Plantation under NEC of North East Bamboo Development Council under Gepen Circle
Schemes of NEC Schemes of NEC 2022-03-31 3.69 2025-03-31 3.686 0 3.686 1.48 Completed
11 ARUNACHAL PRADESH Agriculture and Allied
Centre of Excellence for Development of Fish Farming at Geying, Jomo Village, PO/PS Rumgong under Siang District
Schemes of NEC Schemes of NEC 2018-03-22 2.3454 2021-03-22 0.1 0 0.1 0.1 Foreclosed
12 ARUNACHAL PRADESH Agriculture and Allied
Comercial & Traditional Vegetable crops under polyhouse to Augment tribal household under jang area, Tawang District
Schemes of NEC Schemes of NEC 2023-03-27 5 2026-03-31 5 0 5 2.7 Ongoing
13 ARUNACHAL PRADESH Agriculture and Allied
Construction of Government Upper Primary Girls Residential School, Pan under Mengio Block in Papumpare District
Schemes of NEC Schemes of NEC 2020-09-18 2.76 2023-08-18 2.7595 0 2.7595 2.76 Completed
14 ARUNACHAL PRADESH Agriculture and Allied
Cultivation of cash crops with intercropping of pineapple/ banana garden at Sika - Bramin Tode , Rani, Magnang, 12-Mile, Sille and Oyan under Sille, Oyan Circle of East Siang districts of Arunachal Pradesh
Schemes of NEC Schemes of NEC 2016-04-13 3.99 2018-04-13 3.591 0 3.591 3.59 Completed
15 ARUNACHAL PRADESH Agriculture and Allied
Cultivation of Large Cardamom at Dibbin under Nafra Circle in West Kameng District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2022-03-31 2.55 2025-03-31 2.549 0 2.549 1.02 Completed
16 ARUNACHAL PRADESH Agriculture and Allied
Cultivation of Large cardamom in various districts of Arunachal Pradesh
Schemes of NEC Schemes of NEC 2016-04-13 6.6287 2019-04-13 5.9658 0 5.9658 5.97 Completed
17 ARUNACHAL PRADESH Agriculture and Allied
Cultivation of Large Cardamom Plantation in Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2004-05-07 1.04 2007-05-07 0.94 0 0.94 0.94 Completed
18 ARUNACHAL PRADESH Agriculture and Allied
Cultivation of Orange at Hina Village of Chetam Circle, CD Block Giba Upper Subansiri District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2014-01-30 3.92 2017-01-30 3.53 0 3.53 3.53 Completed
19 ARUNACHAL PRADESH Agriculture and Allied
Development of Fisheries in 31st Aalo East Assembly Constituency of West Siang District, AP
Schemes of NEC Schemes of NEC 2024-01-03 6.38 2027-01-03 6.3208 0.0596 6.3804 6.3244 Ongoing
20 ARUNACHAL PRADESH Agriculture and Allied
Development of Sericulture in Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2016-02-05 6.9675 2019-02-05 5.0164 0 5.0164 5.02 Completed
21 ARUNACHAL PRADESH Agriculture and Allied
Development programme of identified backward block under 30 Central Sector Scheme, Siyum Block, Upper Subansiri District
Schemes of NEC Schemes of NEC Dept. of Power 2020-09-23 2.53 2023-09-23 2.5337 0 2.5337 2.53 Ongoing
22 ARUNACHAL PRADESH Agriculture and Allied
Establishment of 10 Ha Orange garden at Tarrijo under Dumporijo
Schemes of NEC Schemes of NEC 2005-09-27 0.0732 2008-09-27 0.07 0 0.07 0.07 Completed
23 ARUNACHAL PRADESH Agriculture and Allied
Establishment of arge cardamom garden at Nibi Leba village under Nyobia Circle of Kurung Kumey district, Arunachal Pradesh
Schemes of NEC Choose... 2022-03-31 3.11 2025-03-31 3.11 0 3.11 1.25 Completed
24 ARUNACHAL PRADESH Agriculture and Allied
Establishment of Bee Keeping Unit in Upper Siang District, A.P.
Schemes of NEC Schemes of NEC 2023-03-22 4.55 2026-03-12 4.549 0 4.549 2.73 Completed
25 ARUNACHAL PRADESH Agriculture and Allied
Establishment of large cardamom at Debing Rijo, Giba Circle, Upper Subansiri District, Daporijo, AP
Schemes of NEC Schemes of NEC Other 2023-02-17 12 2026-02-17 12 0 12 12 Completed
26 ARUNACHAL PRADESH Agriculture and Allied
Establishment of Large Cardamom Garden at Rissi village under Palin Circle of Kurung Kumey District
Schemes of NEC Schemes of NEC 2010-01-20 1.1169 2013-01-20 1 0 1 1 Completed
27 ARUNACHAL PRADESH Agriculture and Allied
Establishment of Large Cardamon garden at Nibi-Leba village under Nyobia Circle of Kurung Kumey district, Arunachal Pradesh
Schemes of NEC Dept. of Power 2018-01-30 3.11 2023-06-02 3.11 0 3.11 1.25 Completed
28 ARUNACHAL PRADESH Agriculture and Allied
Establishment of Orange and Cardamom garden at Chesing Rijo (Magria) village of Chetam circle, Upper Subansiri district, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2010-02-05 1.36 2013-02-05 1.22 0 1.22 1.22 Completed
29 ARUNACHAL PRADESH Agriculture and Allied
Establishment of orange and cardamom plantation at Keojoring and Rava village under Nacho circle, Upper Subansiri district, A.P.
Schemes of NEC Schemes of NEC Other 2023-03-17 1.9765 2026-03-17 1.98 0 1.98 0.79 Ongoing
30 ARUNACHAL PRADESH Agriculture and Allied
Establishment of Orange garden (10 Ha) at Mecha Marde Village under Dumporijo Circle of Upper Subansiri Dist., Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2006-06-08 0.0302 2009-06-08 0.03 0 0.03 0.03 Completed
31 ARUNACHAL PRADESH Agriculture and Allied
Establishment of Organic Kiwi and Large Cardamom Gardens at Hazalo, Gandhigram and Dawodi Village in Vijoynagar Circle of Changlang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2021-03-25 3 2023-03-25 3 0 3 3 Completed
32 ARUNACHAL PRADESH Agriculture and Allied
Establishment of Poultry, Goaterry, Piggery, Dairy, Fisheries as a single component for the Community at Mai village, Lower Subansiri district, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2016-04-27 1.5427 2019-04-27 1.1293 0 1.1293 1.13 Completed
33 ARUNACHAL PRADESH Agriculture and Allied
Fish-cum-Paddy Cultivation at Choba-I Area and taleha in Kra-Daadi District
Schemes of NEC Schemes of NEC 2018-01-30 0.1 2021-01-30 0.1 0 0.1 0.1 Foreclosed
34 ARUNACHAL PRADESH Agriculture and Allied
High Density Plantation of Apples
Schemes of NEC Schemes of NEC 2004-08-28 2.2925 2007-08-28 2.06 0 2.06 2.06 Completed
35 ARUNACHAL PRADESH Agriculture and Allied
Integrated Community Large Cardamom and Orange plantation in Jhum land at Restaring, Korapu, Tarak Langdi and Galang Putung Villages under Tarak Circle of Kurung Kumey District.
Schemes of NEC Schemes of NEC 2010-01-08 2.4636 2013-03-31 2.22 0 2.22 2.22 Completed
36 ARUNACHAL PRADESH Agriculture and Allied
Large cardamom cultivation at Pitam area of Sindak village under Siyum circle, Upper Subansiri district, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2017-04-12 4 2020-04-12 3.6 0 3.6 3.6 Completed
37 ARUNACHAL PRADESH Agriculture and Allied
Marketing of Ginger by NERAMAC, Guwahati in the State of Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2007-03-31 0.75 2009-03-31 0.75 0 0.75 0.75 Completed
38 ARUNACHAL PRADESH Agriculture and Allied
Promotion and Development of Cash Crop in Arunachal Pradesh
Schemes of NEC Schemes of NEC 2014-12-16 4.978 2017-12-16 4.4802 0 4.4802 4.48 Completed
39 ARUNACHAL PRADESH Agriculture and Allied
Promotion of arecanut as alternative crops and alternate income source against illegal cultivation of cannabis and opium in variuos areas of Lekang, Namsai and Chongkham Circles of Namsai Aspirational District, AP
Schemes of NEC Schemes of NEC 2023-03-15 5.2313 2026-05-15 5.23 0 5.23 3.14 Completed
40 ARUNACHAL PRADESH Agriculture and Allied
Promotion of Banana Plantation for income augmentation and commercialization in Dego Kamki under West Siang District, AP
Schemes of NEC Schemes of NEC 2023-02-17 3.31 2026-02-17 3.314 0 3.314 0.8557861 Ongoing
41 ARUNACHAL PRADESH Agriculture and Allied
Proposal of identified block for providing key identified service at Giba Block, Upper Subansiri District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.27 2025-03-31 4.268 0 4.268 Ongoing
42 ARUNACHAL PRADESH Agriculture and Allied
Proposal of identified block for providing key identified service at Hunli Desali Block, Lower Dibang Valley District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2022-03-30 4.75 2026-03-30 4.75 0 4.75 Ongoing
43 ARUNACHAL PRADESH Agriculture and Allied
Proposal of identified block for providing key identified service at Kullung village, Mengio Block, Papumpare, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2022-03-31 1.99 2025-03-31 1.99 0 1.99 1.99 Completed
44 ARUNACHAL PRADESH Agriculture and Allied
Proposal of identified block for providing key identified service at Lemiking Block, Upper Subansiri District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Choose... 2022-03-24 3.6372 2025-03-24 3.6412 0 3.6412 Ongoing
45 ARUNACHAL PRADESH Agriculture and Allied
Proposal of identified block for providing key identified service at Monigong Block, Shi Yomi District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2022-03-31 4.72 2025-03-31 4.72 0 4.72 4.72 Ongoing
46 ARUNACHAL PRADESH Agriculture and Allied
Proposal of identified block for providing key identified service at Riaku village, Siyum Block, Upper Subansiri, Arunachal Pradesh
Schemes of NEC Schemes of NEC Choose... 2022-03-31 1.67 2025-03-31 1.668 0 1.668 Ongoing
47 ARUNACHAL PRADESH Agriculture and Allied
Strengthening of central hatchery, Nirjuli, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2014-12-17 3.8241 2017-12-17 2.7534 0 2.7534 2.75 Completed
48 ARUNACHAL PRADESH Agriculture and Allied
Strengthening of KVK in Geku, Balek, Pampoli, Deomali, Jairampur
Schemes of NEC Schemes of NEC 2022-03-31 6.8 2025-03-31 6.8 0 6.8 0.68 Ongoing
49 ARUNACHAL PRADESH Agriculture and Allied
Strengthening of Veterinary Hospital in Naharlagun Arunahal Pradesh
Schemes of NEC Schemes of NEC 2004-06-28 0.3147 2007-06-28 0.28 0 0.28 0.28 Completed
50 ARUNACHAL PRADESH Education
Aspirational District Namsai, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2019-06-07 1 2022-06-07 1 0 1 1 Completed
51 ARUNACHAL PRADESH Education
Backward Communities of Ollo Community in Tirap District, Lazu Circle, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2022-03-29 4.91 2025-03-29 4.906 0 4.906 2.41 Completed
52 ARUNACHAL PRADESH Education
Construction of Double Storied School Building at Sagalee (Govt. Higher Secondary School), Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2015-09-17 10.48 2018-09-17 9.4334 0 9.4334 9.43 Completed
53 ARUNACHAL PRADESH Education
Construction of Girls Hostel (G1) at JN College, Pasighat in East Siang District of Arunachal Pradesh
Schemes of NEC Schemes of NEC 2022-03-24 4.2748725 2025-03-24 4.2711 0 4.2711 1.47 Ongoing
54 ARUNACHAL PRADESH Education
Construction of Girls Hostel at Govt. Secondary School, Baririjo, Upper Subansari District AP
Schemes of NEC Schemes of NEC 2017-09-27 3.3176 2020-09-27 3.3176 0 3.3176 3.32 Completed
55 ARUNACHAL PRADESH Education
Construction of Government Higher Secondary School, Dirang, Arunachal Pradesh
Schemes of NEC Schemes of NEC Other 2021-03-25 4.7528 2024-03-25 4.7527538 0 4.7527538 4.7527538 Completed
56 ARUNACHAL PRADESH Education
Construction of Mini outdoor stadium at Vijayanagar and Gandhigram in Changlang Distrcit, Arunachal Pradesh (Lisu Yobin Community)
Schemes of NEC Schemes of NEC Choose... 2022-03-15 4.9 2025-03-15 3.6933 0 3.6933 3.6933 Ongoing
57 ARUNACHAL PRADESH Education
Construction of New Administrative Block at Dera Natung Government College, Itanagar, Arunachal Pradesh
Schemes of NEC Schemes of NEC Public Work Department, G 2022-03-29 6.8682 2025-03-29 6.592913 0.2752876 6.8682006 6.5145 Ongoing
58 ARUNACHAL PRADESH Education
Construction of RCC boys and girls hostel with boundary wall at Govt. Higher Secondary School, Anini, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2016-04-25 3.73 2020-04-25 3.73 0 3.73 3.73 Completed
59 ARUNACHAL PRADESH Education
Infrastructure Development of Govt. Secondary school at Parsi Parlo under Parsi Parlo Circle in Kurung Kumey District, Arunachal Pradesh.
Schemes of NEC Schemes of NEC Dept. of Power 2015-05-18 4.27 2018-05-18 3.4073 0 3.4073 3.41 Completed
60 ARUNACHAL PRADESH Education
Infrastructure Development of B.K. Mission School, Midphu Doimukh Papum Pare District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2016-07-21 2.6314 2019-07-21 2.6314 0 2.6314 2.63 Completed
61 ARUNACHAL PRADESH Education
Infrastructure Development of Girls School at Katang under Tirap District , Arunachal Pradesh
Schemes of NEC Schemes of NEC 2017-05-02 3.88 2020-05-02 0.1 0 0.1 0.1 Foreclosed
62 ARUNACHAL PRADESH Education
Infrastructure Development of ITI at Yupia, Papum Pare District, Arunachal Pradesh.
Schemes of NEC Schemes of NEC Dept. of Power 2015-05-18 1.41 2018-05-18 1.3622 0 1.3622 1.36 Completed
63 ARUNACHAL PRADESH Education
Infrastructure Development of ME School, Longding Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2017-05-02 3.8511 2020-05-02 3.4709 0 3.4709 3.465 Completed
64 ARUNACHAL PRADESH Education
Infrastructure Development of Model School at Paying Circle Hq, Upper Subansari District, Arunachal Pradesh.
Schemes of NEC Schemes of NEC Dept. of Power 2016-03-17 3.88 2019-03-17 3.8844 0 3.8844 3.88 Completed
65 ARUNACHAL PRADESH Education
Infrastructure Development Works at Mishing Inhabitat Area at Gadum-I, Gadum-II and Mer, Village in the East Siang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2022-03-22 4.7624 2025-03-22 4.765 0 4.765 1.91 Completed
66 ARUNACHAL PRADESH Education
Multipurpose Community Hall at Dumporijo ADC HQ. Upper Subansari District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2017-10-06 3.59 2020-10-06 0.1 0 0.1 0.1 Foreclosed
67 ARUNACHAL PRADESH Education
Promotion and Literary Development of Mother Languages of Arunachal Pradesh
Schemes of NEC Schemes of NEC 2022-03-27 4.62 2025-03-27 3.3664 0 3.3664 2.1132 Ongoing
68 ARUNACHAL PRADESH Sports
Construction of Football stadium at Jairampur under Changlang District, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2012-04-25 4.94 2020-01-08 4.45 0 4.45 4.45 Completed
69 ARUNACHAL PRADESH Sports
Construction of Football Stadium at Lumla, Tawang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2017-03-22 3.03 2022-06-16 3.03 0 3.03 3.03 Completed
70 ARUNACHAL PRADESH Sports
Construction of Football Stadium at Sakiang, Papumpare District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2016-03-31 2.82 2019-03-31 2.538 0 2.538 2.54 Completed
71 ARUNACHAL PRADESH Sports
Construction of Indoor Stadium at Toru under Papum Pare District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2011-09-16 2.78 2013-09-16 2.502 0 2.502 2.5 Completed
72 ARUNACHAL PRADESH Sports
Construction of Indoor Stadium-cum-Auditorium at GHSS, Basar,Arunachal Pradesh
Schemes of NEC Schemes of NEC 2016-06-15 2.9882 2019-06-15 2.6894 0 2.6894 2.69 Completed
73 ARUNACHAL PRADESH Sports
Construction of Mini football Stadium at Chowkham, Namsai District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Other 2023-03-15 9.684714 2026-03-15 7.921 0 7.921 6 Ongoing
74 ARUNACHAL PRADESH Sports
Construction of Mini Outdoor Stadium at Rijo Ground, Daporijo under Upper Subansiri District
Schemes of NEC Schemes of NEC 2014-12-17 3.5808 2017-12-17 3.22 0 3.22 3.22 Completed
75 ARUNACHAL PRADESH Sports
Construction of Mini Sports Stadium at Yachuli and Yazali, Lower Subansiri District.
Schemes of NEC Schemes of NEC 2011-09-16 4.37 2014-10-16 4.365 0 4.365 4.37 Completed
76 ARUNACHAL PRADESH Sports
Construction of Multipurpose Community Hall at Dumporijo ADC HQ, Upper Subansiri District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Youth Resource & 2021-03-30 3.1747 2024-03-30 3.1746 0 3.1746 3.1747 Completed
77 ARUNACHAL PRADESH Sports
Construction of Multipurpose Indoor Stadium-cum-Badminton Hall at Langrh, Nyobia Circle under Kurung Kumey District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2018-01-23 2.59 2021-01-23 0.1 0 0.1 0.1 Completed
78 ARUNACHAL PRADESH Sports
Construction of Outdoor Stadium and Boundary Wall at Government Higher Secondary School, Kanubari, Longding District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2015-02-09 2.4303 2019-02-09 2.4303 0 2.4303 2.43 Completed
79 ARUNACHAL PRADESH Sports
Construction of Outdoor Stadium at Chayangtajo in East Kameng District, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2015-05-15 3.9234 2018-05-15 3.5311 0 3.5311 3.53 Completed
80 ARUNACHAL PRADESH Sports
Construction of Outdoor Stadium at Jang in Tawang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2017-06-28 5.33 2020-06-28 5.325 0 5.325 5.325 Completed
81 ARUNACHAL PRADESH Sports
Construction of Outdoor Stadium at Sagalee, Papum Pare District, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2014-12-17 3.5867 2017-12-17 3.5867 0 3.5867 3.59 Completed
82 ARUNACHAL PRADESH Sports
Construction of Outdoor Stadium at Tezu, Lohit District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2014-12-17 2.2115 2018-12-17 1.99 0 1.99 1.99 Completed
83 ARUNACHAL PRADESH Sports
Construction of playground, rostrum and gallery at Kendriya Vidyalaya, Tezu, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2017-08-04 6.22 2020-08-04 6.22 0 6.22 6.22 Completed
84 ARUNACHAL PRADESH Irrigation and Flood Control
A/E work on Pare river at Midpu area under Papum Pare District.
Schemes of NEC Schemes of NEC 2011-02-01 4.8319 2014-02-01 4.3487 0 4.3487 4.35 Completed
85 ARUNACHAL PRADESH Irrigation and Flood Control
Anti Erosion Work at Mahadevpur Circle, Arunachal Pradesh, Lohit dist.
Schemes of NEC Schemes of NEC 2013-03-25 4.8945 2016-03-25 4.4051 0 4.4051 4.41 Completed
86 ARUNACHAL PRADESH Irrigation and Flood Control
Anti Erosion work at Senki river from Industrial colony to market area Chandranagar, Itanagar, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2018-03-14 5 2021-03-14 0.1 0 0.1 0.1 Completed
87 ARUNACHAL PRADESH Irrigation and Flood Control
Anti erosion work on Senki river to protect Rajiv Gandhi Polytechnic Institute at Vivek Vihar, Papum Pare District, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2018-03-14 2.88 2021-03-14 0.1 0 0.1 0.1 Completed
88 ARUNACHAL PRADESH Irrigation and Flood Control
Anti Erosion works on right bank of Sibo Korong river to protect Pasighat Township Ph-I, East Siang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2018-03-14 12.94 2021-03-14 0.1 0 0.1 0.1 Completed
89 ARUNACHAL PRADESH Irrigation and Flood Control
Anti-Erosion Scheme on Tazang siya and Sikhe river (lower Subansiri Dist.)
Schemes of NEC Schemes of NEC 2009-08-05 4.8 2012-08-05 3.6347 0 3.6347 3.63 Completed
90 ARUNACHAL PRADESH Irrigation and Flood Control
Anti-Erosion work at Right Bank of Sissiri river Silluck area to protect Ngopok and its adjoining village areas, Agricultural land areas and Mebo-Dola road East Siang dist.
Schemes of NEC Schemes of NEC 2006-03-07 4.4912 2009-03-07 4.0421 0 4.0421 4.04 Completed
91 ARUNACHAL PRADESH Irrigation and Flood Control
Anti-erosion work on Siang River to protect Loki Partung agricul-tural land and nearby villages at Pashighat, East Siang district, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2014-02-28 4 2018-02-28 3.6 0 3.6 3.6 Completed
92 ARUNACHAL PRADESH Irrigation and Flood Control
Anti-Erosion work on Tara Tamak river to protect Gadum and its adjoining villages of Arunachal Pradesh & Assam & Agricultural land areas, East Siang dist.
Schemes of NEC Schemes of NEC 2006-02-27 4.2632 2009-02-27 3.8369 0 3.8369 3.84 Completed
93 ARUNACHAL PRADESH Irrigation and Flood Control
Anti-Erosion Work to protect Parang,Pullung, Tatpu,Yaya, Nguriang-bung &Totpo Village at Papum Pare District
Schemes of NEC Schemes of NEC 2011-12-26 4.4006 2014-12-26 1.7601 0 1.7601 1.76 Completed
94 ARUNACHAL PRADESH Irrigation and Flood Control
Augmentation of Water Supply at Jairampur Township from Ngaphy Nallah, Changlang District, Arunachal
Schemes of NEC Schemes of NEC 2018-03-14 7 2022-03-14 0.1 0 0.1 0.1 Completed
95 ARUNACHAL PRADESH Irrigation and Flood Control
C/o Anti erosion work to protect Brokentang village and the adjoining areas in Tawang dist.
Schemes of NEC Schemes of NEC 2010-09-22 4.8827 2013-09-22 4.39 0 4.39 4.39 Completed
96 ARUNACHAL PRADESH Irrigation and Flood Control
C/o Anti-Erosion & protection wall at Raks and Hiya village at Nyapin Circle of Kurung Kumey Dist.
Schemes of NEC Schemes of NEC 2010-01-28 2.38 2014-01-28 2.142 0 2.142 2.14 Completed
97 ARUNACHAL PRADESH Irrigation and Flood Control
C/o Anti-erosion work on Right and Left Bank of Kolma River at Nirjuli to protect Kolmajuli village in Arunachal Pradesh
Schemes of NEC Schemes of NEC 2012-11-26 4.95 2015-11-26 4.45 0 4.45 4.45 Completed
98 ARUNACHAL PRADESH Irrigation and Flood Control
C/o Flood and Erosion management scheme at Injan to protect Kharsang and adjoining area under Miao sub-division in Changlang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2017-09-21 4.35 2020-09-21 3.915 0 3.915 3.92 Completed
99 ARUNACHAL PRADESH Irrigation and Flood Control
C/o Flood protection work at Lebia River to protect agricultural field at Upper Karoi village under Sagalee Circle District Papumpare, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2017-06-23 2.97 2020-06-23 2.673 0 2.673 2.67 Completed
100 ARUNACHAL PRADESH Irrigation and Flood Control
C/o RCC Retaining Wall at Tapik Nallah to protect Tapik Collony, Karsingsa, Papum Pare District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2018-03-14 2.32 2021-03-14 0.1 0 0.1 0.1 Completed
101 ARUNACHAL PRADESH Irrigation and Flood Control
Construction of Flood Protection work at Karsingsa on Right Bank of Dikrong River and its adjoining Tributaries, Papumpare dist.
Schemes of NEC Schemes of NEC 2009-08-05 4.9696 2012-08-05 4.47 0 4.47 4.47 Completed
102 ARUNACHAL PRADESH Irrigation and Flood Control
Construction of land protection work at Siang river to protect Sigar, Motum, Borguli and Seram village, Arunachal Pradesh.
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-03 3.4653 2025-03-03 3.4653 0 3.4653 3.47 Completed
103 ARUNACHAL PRADESH Irrigation and Flood Control
Construction of Water Supply at CO Dadam, Tirap District.
Schemes of NEC Schemes of NEC 2017-04-25 7.9377 2020-04-25 7.1439 0 7.1439 7.14 Completed
104 ARUNACHAL PRADESH Irrigation and Flood Control
Control Structure on both side of Noa-Dehing River to protect Namsai, Piyong & Lekang Circle, Namsai District, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2017-06-23 10 2020-06-23 0.1 0 0.1 0.1 Completed
105 ARUNACHAL PRADESH Irrigation and Flood Control
Drinking Water Supply of Thinsa Village, Tirap District, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2018-03-14 2.9 2021-03-14 0.1 0 0.1 0.1 Completed
106 ARUNACHAL PRADESH Irrigation and Flood Control
Flood Control measures at Patsing, Bomjir under Dambuk Sub-Division, Lower Dibang Valley District, Arunachal
Schemes of NEC Schemes of NEC 2018-03-14 11 2021-03-14 0.1 0 0.1 0.1 Completed
107 ARUNACHAL PRADESH Irrigation and Flood Control
Flood Control Works at Namsai in Arunachal Pradesh,Lohit dist
Schemes of NEC Schemes of NEC 2014-02-28 4.944 2017-02-28 4.4496 0 4.4496 4.45 Completed
108 ARUNACHAL PRADESH Irrigation and Flood Control
Flood protection of Pasighat Hydel Station assets and adjoining agriculture and horticulture field in East Siang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2023-03-28 1.4867 2026-03-28 0.49 0 0.49 0.49 Completed
109 ARUNACHAL PRADESH Irrigation and Flood Control
Flood protection work at Dirang township, Dirang West Kameng dist.
Schemes of NEC Schemes of NEC 2010-02-03 4.97 2013-02-03 4.473 0 4.473 4.47 Completed
110 ARUNACHAL PRADESH Irrigation and Flood Control
Improvement and Augmentation of Water Supply at Swamy Camp Township Hayuliang Circle of Anjaw District.
Schemes of NEC Schemes of NEC 2012-01-12 4.6284 2015-01-12 4.1656 0 4.1656 4.17 Completed
111 ARUNACHAL PRADESH Irrigation and Flood Control
Improvement of minor irrigation channel &C/o FC work at Pyuchi Siigang at Supyu ziro Lower Subansiri Dist.
Schemes of NEC Schemes of NEC 2011-03-14 4.95 2014-03-14 4.455 0 4.455 4.46 Completed
112 ARUNACHAL PRADESH Irrigation and Flood Control
Land protection work at Govt.Primary School upper Holongi PapumPare District
Schemes of NEC Schemes of NEC 2010-02-03 3.89 2013-02-03 3.5 0 3.5 3.5 Completed
113 ARUNACHAL PRADESH Irrigation and Flood Control
Proposal of identified backward block for providing key identified services at Mengio CD Block, Papum Pare district, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2023-02-17 4.49 2026-02-17 0 Foreclosed
114 ARUNACHAL PRADESH Irrigation and Flood Control
Proposal of identified backward block for providing key identified services at Nacho CD Block, Upper Subansiri District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Urban Development Departm 2023-02-17 3.23 2026-02-17 3.23 0 3.23 3.23 Completed
115 ARUNACHAL PRADESH Irrigation and Flood Control
Proposal of identified backward block for providing key identified services at Siyum CD Block, Upper Subansiri District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2023-02-17 4.29 2025-12-31 4.29 0 4.29 1.71 Ongoing
116 ARUNACHAL PRADESH Irrigation and Flood Control
Proposal of identified backward block for providing key identified services at Taliha CD Block, Upper Subansiri district, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2023-02-17 4.95 2026-12-17 4.95 0 4.95 4.95 Ongoing
117 ARUNACHAL PRADESH Irrigation and Flood Control
Providing of Water Supply at JNV Roing, lower Dibang Valley District
Schemes of NEC Schemes of NEC 2017-05-15 3.4756 2020-05-15 2.3596 0 2.3596 2.36 Completed
118 ARUNACHAL PRADESH Irrigation and Flood Control
Providing WSS & Sewage / Drainage System to Jamiri Circle Hq & Adjoining Village.
Schemes of NEC Schemes of NEC 2017-04-17 4.41 2020-04-17 3.969 0 3.969 3.97 Completed
119 ARUNACHAL PRADESH Irrigation and Flood Control
Providing WSS at Ragle Hamlet Paktung, Govt. Middle School and Health Sub centre.
Schemes of NEC Schemes of NEC 2017-04-18 4 2020-04-18 3.6 0 3.6 3.6 Completed
120 ARUNACHAL PRADESH Irrigation and Flood Control
WSS at Lawnu Co Hq Kanubari, Longding Dist, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2016-07-26 1.9411 2018-07-26 1.75 0 1.75 1.75 Completed
121 ARUNACHAL PRADESH Industries
Bamboo Auditorium at NIT, Arunachal
Schemes of NEC Schemes of NEC 2018-03-21 0.746 2021-03-21 0.67 0 0.67 0.67 Completed
122 ARUNACHAL PRADESH Industries
Construction of Multipurpose Shopping Complex at Hapoli, Lower Subansiri District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2016-02-17 7.3269 2019-02-17 6.5942 0 6.5942 6.59 Completed
123 ARUNACHAL PRADESH Industries
Construction of State Emporium cum Artifacts House at Itanagar, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2014-02-05 3.6942 2017-02-06 3.3248 0 3.3248 3.32 Completed
124 ARUNACHAL PRADESH Industries
Establishment of Entreprenuership Development Institute at Jote under Papum Pare District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2012-11-26 2.2956 2016-11-26 1.6564 0 1.6564 1.66 Completed
125 ARUNACHAL PRADESH Industries
Establsihment of State of Art Crop Collection cum processing Unit at Simari Lower Dibang Valley (AP)
Schemes of NEC Schemes of NEC 2023-03-27 3.74 2025-03-27 3.74 0 3.74 1.98 Ongoing
126 ARUNACHAL PRADESH Industries
Integrated Development of Community Sericulture Garden at Solungyar Village, by Govt. of Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2012-03-19 4.8 2015-03-19 4.32 0 4.32 4.32 Completed
127 ARUNACHAL PRADESH Industries
Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2020-08-17 2.6 2023-08-17 2.6 0 2.6 2.6 Completed
128 ARUNACHAL PRADESH Industries
Setting up of a Manufacturing of CTC Black Tea Unit by M/s Mouling Tea Processing Unit, Ramsing Upper Siang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2006-05-15 1.9594 2009-05-15 1.4792 0 1.4792 1.48 Completed
129 ARUNACHAL PRADESH Information and Public Relatio
Construction of Cultural-cum- Development Centre at Miao, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2016-04-13 3.8154 2019-04-13 3.4339 0 3.4339 3.43 Completed
130 ARUNACHAL PRADESH Information and Public Relatio
Death & the Boatman a Sajolang Docu feature film
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 0.56 2025-03-31 0 Foreclosed
131 ARUNACHAL PRADESH Information and Public Relatio
Documentation and Digitalization of Cultural Heritage of all Tribes of Arunachal Pradesh
Schemes of NEC Schemes of NEC 2015-06-05 2.5006 2018-06-05 2.25 0 2.25 2.25 Completed
132 ARUNACHAL PRADESH Information and Public Relatio
Extension & Modernization of Gallaries of J.N. State Museum, Itanagar
Schemes of NEC Schemes of NEC 2012-04-25 4.95 2019-12-09 4.46 0 4.46 4.46 Completed
133 ARUNACHAL PRADESH Information and Public Relatio
Protection/Preservation & Infrastructure Development of Archaeological Museum & Monument, Malinithan, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2013-02-27 4.95 2015-02-27 4.455 0 4.455 4.46 Completed
134 ARUNACHAL PRADESH Information and Public Relatio
Protection/Preservation of Archaeological Park at Itafort (Southern Gate) Itanagar, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2010-12-06 3.7 2013-12-06 3.33 0 3.33 3.33 Completed
135 ARUNACHAL PRADESH Information and Public Relatio
Strengthening of Hindi Section in the library of 18 government colleges of Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Higher & Technic 2021-01-19 1.7999898 2024-01-19 1.8 0 1.8 1.7999898 Completed
136 ARUNACHAL PRADESH Health
Accident & Trauma Centre at Along, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2007-03-28 1.4711 2009-03-28 0.94 0 0.94 0.94 Completed
137 ARUNACHAL PRADESH Health
Capital support for procurement of 5 Mobile lab in Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2021-08-24 3.85 2024-08-24 3.85 0 3.85 3.85 Completed
138 ARUNACHAL PRADESH Health
Construction of 50 bedded hospital at Palin, Kurung Kumei District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2006-03-07 4.32 2009-03-07 3.89 0 3.89 3.89 Completed
139 ARUNACHAL PRADESH Health
Construction of 50 bedded Hospital at Pistana, Lower Subansiri District
Schemes of NEC Schemes of NEC Dept. of Power 2011-02-16 4.8374 2014-02-16 4.35 0 4.35 4.35 Completed
140 ARUNACHAL PRADESH Health
Construction of 60 capacities Nursing Hostel for newly created Nursing College at TRIHMS, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2021-03-26 12.1409542 2024-03-20 12.14 0 12.14 5.23 Ongoing
141 ARUNACHAL PRADESH Health
Construction of Hiya Primary Health Centre under ADC Hq Nyapin, AP
Schemes of NEC Schemes of NEC 2016-03-08 3.6525 2019-03-08 3.29 0 3.29 3.29 Completed
142 ARUNACHAL PRADESH Health
Construction of Infrastructure Development at PHC at Dadam, CO HQ in Tirap, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2016-07-20 3.48 2019-07-20 3.13 0 3.13 3.13 Ongoing
143 ARUNACHAL PRADESH Health
Construction of Maternity & Child Care Centre at Miao Changlang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2023-03-31 5.1 2026-03-31 4.9725 0 4.9725 3.825 Ongoing
144 ARUNACHAL PRADESH Health
Development of Health Information and Hospital Management System in Papumpare Distrit.
Schemes of NEC Schemes of NEC Dept. of Power 2012-12-19 4.9779 2015-12-19 3.6 0 3.6 3.6 Completed
145 ARUNACHAL PRADESH Health
Establishment of 30 bedded hospital at Pareng, Sagalee Admn. Circle, Papumpare District
Schemes of NEC Schemes of NEC Dept. of Power 2011-06-21 4.9066 2014-06-21 3.8 0 3.8 3.8 Completed
146 ARUNACHAL PRADESH Health
Establishment of Bio Medical Waste Management Plant in District Hospitals (6 nos.), Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2009-08-06 4.5 2011-08-06 4.05 0 4.05 4.05 Completed
147 ARUNACHAL PRADESH Health
Infrastructure development of 50 bedded Hospital (Phase-II) at Palin Kurung Kumey District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2010-02-01 4.92 2014-02-01 4 0 4 4 Foreclosed
148 ARUNACHAL PRADESH Health
Infrastructure Development of Sagalee CHC, Papumpare District, AP
Schemes of NEC Schemes of NEC 2016-03-08 4.37 2019-03-08 3.933 0 3.933 3.93 Completed
149 ARUNACHAL PRADESH Health
Infrastructure of CHC Infrastructure at Seijosa in East Kameng District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2017-04-18 9.3079 2020-04-18 1 0 1 1 Foreclosed
150 ARUNACHAL PRADESH Health
Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Arunachal Pradesh for activities related to combating COVID-19 pandemic
Schemes of NEC Schemes of NEC 2020-04-01 3.25 2021-12-06 3.25 0 3.25 3.25 Completed
151 ARUNACHAL PRADESH Health
Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Arunachal Pradesh for meeting critical gap of the fallout of COVID-19 related problems faced by the NE People migrants/students stranded outside the NER
Schemes of NEC Schemes of NEC 2020-04-17 0.3 2023-04-17 0.3 0 0.3 0.3 Completed
152 ARUNACHAL PRADESH Health
Support to R.K. Mission Hospital, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2005-07-21 1.9338 2008-07-21 1.74 0 1.74 1.74 Completed
153 ARUNACHAL PRADESH Health
Up-gradation of 40 bedded Hospital at Likabali in Lower Siang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2021-03-26 14.3782 2024-03-26 14.38 0 14.38 12.28 Ongoing
154 ARUNACHAL PRADESH Health
Up-gradation of Mengio (Shakiang) PHC to 50 bedded Hospital, Papumpare District. (Revised)
Schemes of NEC Schemes of NEC 2009-12-18 8.35 2012-12-18 7.515 0 7.515 7.52 Completed
155 ARUNACHAL PRADESH Health
Upgradation of PHC at Raga/Boa Simla, Lower Subansiri Dist., Arunachal Pradesh
Schemes of NEC Schemes of NEC 2007-03-01 2.9872 2009-03-01 2.67 0 2.67 2.67 Completed
156 ARUNACHAL PRADESH Power
Augmentation & Improvement of Power Distribution System in and around Yangte Administrative Hq, Kurung Kumey District, A. Pradesh.
Schemes of NEC Schemes of NEC 2011-12-21 2.1331 2013-12-21 1.919 0 1.919 1.92 Completed
157 ARUNACHAL PRADESH Power
Augmentation and Improvement of existing T&D System in & around Sangram Administrative HQ in Kurung Kumey District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2011-03-25 4.6769 2013-03-25 4.209 0 4.209 4.21 Completed
158 ARUNACHAL PRADESH Power
Augmentation and Improvement of LT distribution system in and around Hapoli township area (ZIRO), Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2009-03-06 4.6679 2012-03-06 4.2 0 4.2 4.2 Completed
159 ARUNACHAL PRADESH Power
Construction of 132KV D/C Transmission line from Hoz to Itanagar (20 Km) including 2x20 MVA, 132/33 KV Substation at Chimpu, Itanagar, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2008-07-21 49.5 2012-07-21 44.55 0 44.55 44.55 Completed
160 ARUNACHAL PRADESH Power
Construction of 33 KV Express Line from Khonsa to Changlang, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2009-01-29 4.9822 2012-01-29 4.98 0 4.98 4.98 Completed
161 ARUNACHAL PRADESH Power
Construction of 33 KV Express Line from Migo-Zara to Pistana, Lower Subsansiri District, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2009-10-23 3.32 2012-10-23 2.98 0 2.98 2.98 Completed
162 ARUNACHAL PRADESH Power
Construction of 33 KV Express Line from Nirjuli to Kimin via Hoz & Potin, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2010-01-22 4.9571 2013-01-22 4.46 0 4.46 4.46 Completed
163 ARUNACHAL PRADESH Power
Construction of 33 KV Express Line from Pistana Substation to Mengio, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2010-02-03 4.9716 2013-02-03 4.47 0 4.47 4.47 Completed
164 ARUNACHAL PRADESH Power
Construction of 33/11KV, 2X1 MVA, sub-station at Pistana, Lower Subansiri District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2010-09-08 3.81 2013-09-08 3.429 0 3.429 3.43 Completed
165 ARUNACHAL PRADESH Power
Construction of 33/11kV, 2x1 MVA, Substation at Pania including construction of 33 KV Express Line from Palin to Pania, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2012-03-02 4.1972 2014-03-02 3.77 0 3.77 3.77 Completed
166 ARUNACHAL PRADESH Power
Construction of 33KV Express line from Changlang Power Sub-Station to Khimiyang including providing of 2X1 MVA, 33/11 KV Power Sub-Station at Khimiyang.
Schemes of NEC Schemes of NEC 2010-12-23 4.9632 2013-12-23 4.46 0 4.46 4.46 Completed
167 ARUNACHAL PRADESH Power
Construction of 33kV Line from Pakke to Chayangtajo including 2x1 MVA, 33/11 kV Substation at Chayangtajo, East Kameng District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2012-11-08 4.8952 2014-11-08 4.405 0 4.405 4.41 Completed
168 ARUNACHAL PRADESH Power
Construction of Express 33kV line from Dirang to Jang in West Kameng and Tawang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2017-04-19 13.49 2020-04-19 9 0 9 9 Completed
169 ARUNACHAL PRADESH Power
Construction of System Improvement HT/LT Lines including Distribution S/s in and around Daporijo Township, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2009-12-09 4.72 2013-12-09 4.248 0 4.248 4.25 Completed
170 ARUNACHAL PRADESH Power
Electrification of Tourist Destination in Lower Dibang Valley District Eze Breeze Tower (Jawaharlal Nehru Van Udyan) and Sally lake ( 4 km point on Roing Hunli Road), Arunachal Pradesh
Schemes of NEC Schemes of NEC Power Department 2022-03-09 3.1087532 2025-03-09 3.11 0 3.11 3.11 Completed
171 ARUNACHAL PRADESH Power
Improvement & Renovation including relignment of existing 33 KV line from Pasighat to Mebo and Construction of Tower over river Siang & Siku.
Schemes of NEC Schemes of NEC 2007-11-29 2.4584 2009-11-29 2.21 0 2.21 2.21 Completed
172 ARUNACHAL PRADESH Power
Installation of Solar Fencing with provision of chainlink fencing and angle iron post around crop fields of farmers in Tawang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Other 2023-02-23 2.68 2026-02-23 2.68 0 2.68 2.68 Ongoing
173 ARUNACHAL PRADESH Power
System Improvement in & around Bomdila Township including S/s, W Kameng Dist
Schemes of NEC Schemes of NEC 2010-12-23 4.8558 2014-12-23 4.37 0 4.37 4.37 Completed
174 ARUNACHAL PRADESH Power
System Improvement in & around Rupa Township including S/s for stability & voltage regulation of Rupa, Kalaktang Areas, W. Kameng Dist
Schemes of NEC Schemes of NEC 2011-03-23 4.8663 2014-03-23 4.379 0 4.379 4.38 Completed
175 ARUNACHAL PRADESH Power
System Improvement of 11 KV/LT Lines with upgradation of different capacities of Distribution Transformers i/c Auto Re-closures on 11 KV feeders under Tawang Electrical Sub-Division, Tawang, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2022-03-09 7.92 2025-03-09 7.92 0 7.92 5.08 Completed
176 ARUNACHAL PRADESH Power
System improvement of power distribution network in Dambuk under Lower Dibang Valley District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2016-03-10 12.52 2019-03-10 8.9 0 8.9 8.9 Completed
177 ARUNACHAL PRADESH Power
System improvement under Raga Electrical Sub-Division in Lower Subansiri District of Arunachal Pradesh
Schemes of NEC Schemes of NEC 2009-01-23 4.8951 2013-01-23 4.4 0 4.4 4.4 Completed
178 ARUNACHAL PRADESH Power
Upgradation, Improvement and Renovation of Electrical installation in and around Kalaktang Township, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2015-06-09 13.74 2018-06-09 12.366 0 12.366 12.37 Completed
179 ARUNACHAL PRADESH Science and Technology
Decision Support System(DSS) for sustainable urban development of five selected towns of Arunachal Pradesh using Remote Sensing and GIS Arunachal Pradesh
Schemes of NEC Schemes of NEC 2014-02-22 3.443 2017-02-22 3.0987 0 3.0987 3.1 Completed
180 ARUNACHAL PRADESH Science and Technology
Development of Human Resource Management System (Arunachal Pradesh)
Schemes of NEC Schemes of NEC 2011-03-22 2.727 2013-03-22 2 0 2 2 Foreclosed
181 ARUNACHAL PRADESH Science and Technology
Developmental Planning and Application of Space Technology for Agro-Horticulture & Medicinal in Arunachal Pradesh
Schemes of NEC Schemes of NEC 2011-03-26 2.7245 2014-03-26 2.45 0 2.45 2.45 Foreclosed
182 ARUNACHAL PRADESH Science and Technology
Disaster Management System in Arunachal Pradesh
Schemes of NEC Schemes of NEC 2005-03-31 3.1135 2008-03-31 3.1135 0 3.1135 3.11 Completed
183 ARUNACHAL PRADESH Science and Technology
Establishment of NEC Cell in Planning Department, Govt of AP. Secretary (Planning), Planning Dept. Govt. of Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2015-11-20 0.6 2018-11-20 0.5297 0 0.5297 0.53 Completed
184 ARUNACHAL PRADESH Science and Technology
Installation of CCTV cameras & Infrastructure Development of various Entry check gate of tax and Excise Department in AP. Commissioner, Tax & Excise Dept. Govt. of AP
Schemes of NEC Schemes of NEC Dept. of Power 2015-06-12 1.9 2018-06-12 1.9 0 1.9 1.9 Completed
185 ARUNACHAL PRADESH Science and Technology
Installation of Intelligent Character Recognition (ICR) System at Board of Secondary Education, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2007-03-30 0.47 2009-03-30 0.47 0 0.47 0.47 Completed
186 ARUNACHAL PRADESH Science and Technology
IT infrastructure development in schools of Arunachal Pradesh.(Dept. of Information Technology, Govt. of Arunachal Pradesh)
Schemes of NEC Schemes of NEC Dept. of Power 2015-06-12 3.784 2018-06-12 3.44 0 3.44 3.44 Completed
187 ARUNACHAL PRADESH Science and Technology
IT School Education Programme for 4 Schools of Arunachal Pradesh by M/S G Informatics Ltd.
Schemes of NEC Schemes of NEC 2005-03-31 0.4133 2008-03-31 0.4133 0 0.4133 0.41 Completed
188 ARUNACHAL PRADESH Science and Technology
Mapping and Monitoring of Shifting Cultivation areas in A.P. for Sustainable Development using Remote Sensing & GIS Technique
Schemes of NEC Dept. of Power 2012-03-05 2.6648 2015-03-05 2.4 0 2.4 2.4 Completed
189 ARUNACHAL PRADESH Science and Technology
Mapping of Mineralized Zones & Development of Mines Lease (including Reconnaissance Permit License) Information System in Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2013-11-21 3.2188 2016-11-21 2.8969 0 2.8969 2.9 Completed
190 ARUNACHAL PRADESH Science and Technology
Online connectivity of schools & process information management systems for Dept. of School Education, Govt. of A.P.
Schemes of NEC Schemes of NEC 2010-03-17 2.84 2013-03-17 2.84 0 2.84 2.84 Completed
191 ARUNACHAL PRADESH Science and Technology
Remote Sensing and GIS based identification of Hazardous Industries and Development of Emergency Planning & Response System. (Dept. of Industries, Govt. of Arunachal Pradesh)
Schemes of NEC Schemes of NEC 2015-06-12 2.779 2018-06-12 2.5015 0 2.5015 2.5 Completed
192 ARUNACHAL PRADESH Science and Technology
Statewide Telemedicine Programme for Health care Delivery in Arunachal Pradesh
Schemes of NEC Schemes of NEC 2005-12-28 4.55 2008-12-28 4.52 0 4.52 4.52 Completed
193 ARUNACHAL PRADESH Science and Technology
Upliftment and Infrastructure Development Works at Mishing Inhabited Area at Oyan, East Siang District, Arunachal Pradesh. Rural Works Department Pasighat Division , Govt. of AP
Schemes of NEC Schemes of NEC RWD 2023-03-29 4.9134 2025-03-31 4.9134 0 4.9134 4.9134 Completed
194 ARUNACHAL PRADESH Science and Technology
World Biodiversity Heritage Site - A Programme on Awareness and Conservation of climate indicator wild flower-Rhododendrons of Eastern Himalaya, North East India
Schemes of NEC Schemes of NEC 2014-02-28 0.4172 2017-02-28 0.33 0 0.33 0.33 Foreclosed
195 ARUNACHAL PRADESH Transport and Communication
Bordumsa-Borkhet
Schemes of NEC Schemes of NEC 2017-04-10 11.3 2020-04-10 10.17 0 10.17 10.17 Completed
196 ARUNACHAL PRADESH Transport and Communication
Construction of Longding-Nokajan road
Schemes of NEC Schemes of NEC 2010-03-25 33.98 2014-03-26 30.57 0 30.57 30.57 Completed
197 ARUNACHAL PRADESH Transport and Communication
Construction of Tezu Airport in Lohit District
Schemes of NEC Schemes of NEC 2010-02-10 79 2013-02-10 77.484 0 77.484 77.48 Foreclosed
198 ARUNACHAL PRADESH Transport and Communication
Digboi-Pengiri-Bordumsa-Mahadevpur road
Schemes of NEC Schemes of NEC 2006-12-12 49.43 2009-12-12 44.49 0 44.49 44.49 Completed
199 ARUNACHAL PRADESH Transport and Communication
Harmoti-Doimukh road
Schemes of NEC Schemes of NEC 2007-03-02 4.9058 2010-03-02 4.42 0 4.42 4.42 Completed
200 ARUNACHAL PRADESH Transport and Communication
Laimekuri-Nari-Telem-Rimi road
Schemes of NEC Schemes of NEC 2004-08-18 78 2007-08-18 70.7 0 70.7 70.7 Completed
201 ARUNACHAL PRADESH Transport and Communication
Motum-Tinali-Moktumghat road
Schemes of NEC Schemes of NEC 2007-02-28 4.71 2010-02-28 4.24 0 4.24 4.24 Completed
202 ARUNACHAL PRADESH Transport and Communication
Pakke-Seijosa-Itakhola
Schemes of NEC Schemes of NEC Public Work Department, G 2015-06-02 152.75 2018-06-02 133.81 1.5 135.31 133.81 Ongoing
203 ARUNACHAL PRADESH Transport and Communication
Passighat-Koyu-Ego road
Schemes of NEC Schemes of NEC 2004-07-15 50.19 2007-07-15 46.2 0 46.2 46.2 Completed
204 ARUNACHAL PRADESH Transport and Communication
Rupa-Kalaktang-Sikaridanga
Schemes of NEC Schemes of NEC 2006-02-27 2.48 2008-03-31 2.23 0 2.23 2.23 Completed
205 ARUNACHAL PRADESH Transport and Communication
Rural road from Nacho BRTF to Koba Village
Schemes of NEC Schemes of NEC 2017-04-11 12.07 2020-04-11 10.86 0 10.86 10.86 Completed
206 ARUNACHAL PRADESH Transport and Communication
Seppa-Chyangtajo road
Schemes of NEC Schemes of NEC 2006-09-22 172.52 2009-09-22 153 0 153 153 Completed
207 ARUNACHAL PRADESH Transport and Communication
Tamen-Dollungmukh Road
Schemes of NEC Schemes of NEC 2010-12-16 139.62 2013-12-16 112 0 112 112 Foreclosed
208 ARUNACHAL PRADESH Tourism and Culture
Beautification of Sela Lake in Tawang District, Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2010-03-22 3.4566 2013-03-22 3.111 0 3.111 3.11 Completed
209 ARUNACHAL PRADESH Tourism and Culture
Capacity building for Rural Eco-Tourism Guides and Village Hospitality Service Providers
Schemes of NEC Schemes of NEC 2014-03-05 0.223 2017-03-05 0.2 0 0.2 0.2 Completed
210 ARUNACHAL PRADESH Tourism and Culture
Construction of Adventure Tourism Camping cum Recreation Site at Huto Village in Doimukh, Papum-Pare District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2015-11-12 3.666 2018-11-12 3.2994 0 3.2994 3.3 Completed
211 ARUNACHAL PRADESH Tourism and Culture
Construction of Mega Festival cum Multipurpose Ground with Parking Facilities and Approach Road at Tawang, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2016-03-21 11.54 2019-03-21 11.3146 0 11.3146 11.31 Completed
212 ARUNACHAL PRADESH Tourism and Culture
Construction of Permanent Stage-cum-Covered Gallery at Common Festival Ground, Naharlagun, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2013-06-11 1.7942 2016-06-11 1.6148 0 1.6148 1.61 Completed
213 ARUNACHAL PRADESH Tourism and Culture
Construction of Tourism Amusement Park (Including Picnic Spot & Cottages) at Dollungmukh, Lower Subansari District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2015-11-06 3.2082 2018-11-06 2.31 0 2.31 2.31 Completed
214 ARUNACHAL PRADESH Tourism and Culture
Construction of Tourism Complex at Acheso (Dambuen) under Dibang Valley District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2023-03-31 3.58 2026-03-31 3.0435 0 3.0435 Ongoing
215 ARUNACHAL PRADESH Tourism and Culture
Construction of Tourist Lodge and Rejuvenation of Maryland lake at 10th Mile, Oyan Circle, East Siang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Dept. of Power 2017-09-21 5.2 2020-09-21 4.68 0 4.68 4.68 Completed
216 ARUNACHAL PRADESH Tourism and Culture
Creation of Tourist Facilities Centre at Tippi, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2006-03-08 0.35 2009-03-08 0.18 0 0.18 0.18 Completed
217 ARUNACHAL PRADESH Tourism and Culture
Development & Beautification of Thanghaphey Lakes in Tawang District
Schemes of NEC Schemes of NEC 2011-02-23 4.8816 2020-03-03 4.39 0 4.39 4.39 Completed
218 ARUNACHAL PRADESH Tourism and Culture
Development of Adventure Tourism Centre and Camping Site at Baririjo, Upper Subansiri District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2015-11-12 4.45 2018-11-12 4.005 0 4.005 4.01 Completed
219 ARUNACHAL PRADESH Tourism and Culture
Development of Park, Angling and Picnic Spot at Basar, West Siang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2012-02-28 3.9978 2015-02-28 3.6 0 3.6 3.6 Completed
220 ARUNACHAL PRADESH Tourism and Culture
Development of River Front on Tenga market West Kameng District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.865 2025-03-31 0 Completed
221 ARUNACHAL PRADESH Tourism and Culture
Development of Wayside Amenities at Tago Putu, Yazali, Lower Subansiri District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2017-09-21 13.5 2021-09-30 12.15 0 12.15 12.15 Completed
222 ARUNACHAL PRADESH Tourism and Culture
North East India Inter-State Friendship Car Rally from 7th April, 2022 to 22nd April, 2022.
Schemes of NEC Schemes of NEC 2022-03-29 2.1 2025-03-29 2.1 0 2.1 2.1 Completed
223 ARUNACHAL PRADESH Tourism and Culture
Scheme for Establishing Community Managed Rural Based Eco-Tourism Training Centre, AP
Schemes of NEC Schemes of NEC 2005-03-27 0.25 2009-03-27 0.25 0 0.25 0.25 Completed
224 ARUNACHAL PRADESH Tourism and Culture
Tourist Infrastructure Development of Sikar Lake at Tirbin under West Siang District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2011-03-24 4.2913 2014-03-24 3.86 0 3.86 3.86 Completed
225 ARUNACHAL PRADESH Tourism and Culture
Upgradation of Forest Houses at important Tourist Destinations of Arunachal Pradesh.
Schemes of NEC Schemes of NEC 2011-09-03 2.9781 2014-09-03 2.68 0 2.68 2.68 Completed
226 ARUNACHAL PRADESH Transport and Communication
Construction of Rigid Pavements road in Tawang Township (SH: Nehru Gonpa to Tawang Monastry in Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2019-03-08 20 2020-03-31 19.9949 0 19.9949 19.995 Completed
227 ARUNACHAL PRADESH Transport and Communication
Construction of Road from Babrang (Murga) Bridge point to Rho village (15 km) Tawang District
NESIDS-ROADS NESIDS Public works Department 2019-03-05 26.5 2020-03-31 26.1518 0 26.1518 26.1504 Completed
228 ARUNACHAL PRADESH Transport and Communication
Construction of road from Bomikoto village to Nilling Circle Hq via Sima-Dha (25.00 km) in Upper Subansiri District
NESIDS-ROADS NESIDS Public works Department 2019-03-08 36.54 2020-03-31 35.66 0 35.66 35.6593 Completed
229 ARUNACHAL PRADESH Transport and Communication
Construction of Road from BRTF Road to Pidi in West Siang District
NESIDS-ROADS NESIDS Public works Department 2019-03-08 19.9 2020-03-31 19.55 0 19.55 7.4476 Completed
230 ARUNACHAL PRADESH Transport and Communication
Construction of road from Chongkham to Meme via Namliang village (13.50 kms) in Namsai Districtin Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2019-03-08 21.12 2023-06-08 20.6992 0 20.6992 19.17 Completed
231 ARUNACHAL PRADESH Transport and Communication
Construction of Road from Dari to Chambang CO HQ. in Kra Daadi District(38 km) in Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2020-03-24 33.69 2023-01-24 32.8254 0 32.8254 32.8356 Completed
232 ARUNACHAL PRADESH Transport and Communication
Construction of road from Likwa Gyadi to Gyawepurang (10.86 kms) in East Kameng District) in Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2019-03-08 21.22 2020-03-31 18.92 0 18.92 10.52 Ongoing
233 ARUNACHAL PRADESH Transport and Communication
Construction of road from Longkhow to Pumau in Longding District (SH: FC, culverts,RW, bridge)
NESIDS-ROADS NESIDS Public works Department 2019-03-09 19.98 2023-06-09 19.98 0 19.98 19.9779 Completed
234 ARUNACHAL PRADESH Transport and Communication
Construction of road from Lumdung NH-229 to connect 9.00 Km point of PMGSY Road to Nere Village at East Kameng district in Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2020-03-13 10 2022-03-13 9.84 0 9.84 4 Completed
235 ARUNACHAL PRADESH Transport and Communication
Construction of road from Rumgong to connect Kaying (64 kms) Molom to Bogne village 23 kms in Siang district
NESIDS-ROADS NESIDS Public works Department 2019-03-09 20 2022-03-09 12.52 0 12.52 Ongoing
236 ARUNACHAL PRADESH Transport and Communication
Construction of Road from Terung to Sumsipathar in Tirap Districtin Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2019-03-08 20 2020-03-31 18.18 0 18.18 15.76 Completed
237 ARUNACHAL PRADESH Transport and Communication
Improvement and extension of Likabali Township road (10 kms) in Lower Siang District in Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2019-03-08 10 2020-03-31 9.22 0 9.22 8.34 Completed
238 ARUNACHAL PRADESH Transport and Communication
Project Construction of road from Kodum CO Hqr to Bam Tri-junction 16.50 Km under West Siang District in Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2022-04-20 19.6 2024-04-30 19.61 0 19.61 7.84 Completed
239 ARUNACHAL PRADESH Transport and Communication
Project Construction of road from Marung Gika to Panior Bridge Point via Sarchgai, mate, Kusuk & Pan-21 km in Papum Pare District in Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2022-04-20 20 2024-04-30 14.9925 0 14.9925 Ongoing
240 ARUNACHAL PRADESH Transport and Communication
Project Construction of Town Double Lane Road at Pokriang SDO Hq Langrh and Phassang Circle Hq. and adjoining Villages, Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2022-04-20 19.683 2024-04-30 19.68 0 19.68 7.83 Completed
241 ARUNACHAL PRADESH Transport and Communication
Project Up-gradation of road from NH-13 to Ugyen Tsangpo Helipad at Tawang in Tawang district, Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2022-04-20 20.84 2024-04-30 20.84 0 20.84 8.34 Completed
242 ARUNACHAL PRADESH Transport and Communication
Construction of Road from Bana EAC HQ via Old Sopung, Chijang Kajing Village East Kameng District in Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2023-11-30 64.95 2026-05-29 56.38 3 59.38 Ongoing
243 ARUNACHAL PRADESH Transport and Communication
Construction of Road from PWD Road to Peki Modi
NESIDS-ROADS NESIDS Public works Department 2024-01-12 69.35 2026-01-12 17.33 0 17.33 Ongoing
244 ARUNACHAL PRADESH Transport and Communication
Construction of Road from thongleng PMGSY Road to Thangaphey Pilgrimage Centre in tawang District in Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2023-11-30 59.91 2026-04-30 33.24 0 33.24 Ongoing
245 ARUNACHAL PRADESH Transport and Communication
Improvement and re-alignment of Road from Nafra to Integrated Development of Tourism Centre at Makhu Village in Arunachal Pradesh
NESIDS-ROADS NESIDS Public works Department 2023-11-30 32.32 2025-11-29 10.34 0 10.34 Ongoing
246 ARUNACHAL PRADESH Transport and Communication
Margherita-Deomali Road
NESIDS-ROADS NERSDS Public works Department 2020-03-14 43.57 2022-11-30 42.96 0 42.96 Completed
247 ARUNACHAL PRADESH Transport and Communication
Mirem-Mikong-Jonai Road
NESIDS-ROADS NERSDS Public works Department 2020-02-28 36.22 2023-02-28 35.71 0 35.71 16.9 Completed
248 ARUNACHAL PRADESH Water Supply
Augmentation of Water Supply at Hapoli Township in Lower Subansiri District
NESIDS-OTRI NESIDS PHED/WS 2019-03-01 20 2020-03-31 19.9 0 19.9 19.9 Completed
249 ARUNACHAL PRADESH Water Supply
Augmentation of Water supply at Miao Township (3.57 MLD) in Arunachal Pradesh
NESIDS-OTRI NESIDS PHED/WS 2019-12-26 28.51 2021-12-26 26.1736 0 26.1736 20.224 Ongoing
250 ARUNACHAL PRADESH Water Supply
Augmentation of Water Supply System at Bomdila Township (4.86 MLD) from Naga GG to Mandala Top (Phase-I) in West Kameng District
NESIDS-OTRI NESIDS PHED/WS 2024-02-27 61.7747 2026-02-27 61.7738 0 61.7738 46.331 Ongoing
251 ARUNACHAL PRADESH Water Supply
Augmentation of water supply to Bhalukpong town in West kameng District
NESIDS-OTRI NESIDS PHED/WS 2019-03-08 19.82 2020-03-31 19.8136 0 19.8136 19.8136 Completed
252 ARUNACHAL PRADESH Water Supply
Augumentation of water supply to Aalo Township in West Siang District in Arunachal Pradesh
NESIDS-OTRI NESIDS PHED/WS 2019-03-08 20 2020-03-31 20 0 20 13.726 Ongoing
253 ARUNACHAL PRADESH Water Supply
Integrated infrastructure Development for Tourism at Tawang with provision of sewage and water treatment plant at Tawang District in Arunachal Pradesh
NESIDS-OTRI NESIDS Dept. of Power 2020-02-25 32.9759 2022-02-25 25.0412 7.7935931 32.8347931 23.4386 Completed
254 ARUNACHAL PRADESH Water Supply
Project Improvement of Water Supply System for Mechuka Township & Peripheral villages with Sewerage System and Riverfront development for boosting tourism in Mechuka Township Arunachal Pradesh
NESIDS-OTRI NESIDS Public Health & Engg Depa 2022-04-20 34.6408 2024-04-30 27.3046 0 27.3046 3.4609 Ongoing
255 ARUNACHAL PRADESH Water Supply
Project Integrated Drinking Water project through hybrid of lift and gravity distribution system with value addition of Tourism components at Deomali, Tirap District Arunachal Pradesh
NESIDS-OTRI NESIDS Public Health & Engg Depa 2022-04-20 13.48 2024-04-30 5.392 0 5.392 Ongoing
256 ARUNACHAL PRADESH Education
Construction of 150 Borders Hostel at Higher Secondary School Kolariang
NESIDS-OTRI NLCPR PWD 2005-12-23 0.95 2007-12-31 0.8301 0 0.8301 0.8301 Completed
257 ARUNACHAL PRADESH Education
Construction of 200 seated Girls Hostel at J.N. College, Pasighat
NESIDS-OTRI NLCPR PWD 2005-10-18 5.1511 2007-10-31 4.501 0 4.501 4.501 Completed
258 ARUNACHAL PRADESH Education
Construction of Academic Block of Arunachal Pali Vidyapith, Chokham, Phase-I
NESIDS-OTRI NLCPR PWD 2002-09-23 0.59 2004-09-30 0.531 0 0.531 0.59 Completed
259 ARUNACHAL PRADESH Education
Construction of Academic Block of Arunachal Pali Vidyapith, Chokham, Phase-II
NESIDS-OTRI NLCPR PWD 2004-09-29 0.81 2005-09-30 0.729 0 0.729 0.81 Completed
260 ARUNACHAL PRADESH Education
Development of Rangfrah Government College Lumbusung Changlang District
NESIDS-OTRI NLCPR UD 2013-04-29 14.8646 2014-04-29 12.5625 0 12.5625 12.5625 Completed
261 ARUNACHAL PRADESH Education
Development of Shantideva Vidyalaya, Bomdila Monastry
NESIDS-OTRI NLCPR Dept. of Power 2007-12-26 2.9745 2009-12-31 2.0997 0 2.0997 2.0997 Ongoing
262 ARUNACHAL PRADESH Education
Establishment of VKV at Changlang, Changlang District
NESIDS-OTRI NLCPR Dept. of Power 2011-09-23 5.0155 2013-09-30 4.3712938 0 4.3712938 1.7755 Ongoing
263 ARUNACHAL PRADESH Education
Establishment of VKV at Ramsing, Upper Siang District
NESIDS-OTRI NLCPR PWD 2011-03-08 3.4454 2013-02-28 3.04 0 3.04 3.04 Completed
264 ARUNACHAL PRADESH Education
Establishment of VKV Girls Residential School at chayangtajo, East Kameng District in A.P.
NESIDS-OTRI NLCPR PWD 2012-10-31 10.7444 2015-10-31 8.527 0 8.527 8.527 Completed
265 ARUNACHAL PRADESH Education
Establishment of VKV Residential School at Longding in Longding District
NESIDS-OTRI NLCPR Dept. of Education 2014-01-30 8.9719 2017-01-31 7.2428 0 7.2428 7.2428 Completed
266 ARUNACHAL PRADESH Education
Financial assistance for commpletion of 532 incomplete school buildings, teachers quartes & Hostels.
NESIDS-OTRI NLCPR PWD 2001-11-15 14.48 2003-03-31 4.986 0 4.986 5.54 Completed
267 ARUNACHAL PRADESH Education
Furniture for 1557 Primary & Middle school.
NESIDS-OTRI NLCPR Education 2001-08-23 1.63 2003-08-29 1.467 0 1.467 1.63 Completed
268 ARUNACHAL PRADESH Education
Hostel buildings for 110 primary & middle sc
NESIDS-OTRI NLCPR PWD 2000-07-28 22 2002-03-31 19.8 0 19.8 22 Completed
269 ARUNACHAL PRADESH Education
Infrastructural Development of VKV Nyapin
NESIDS-OTRI NLCPR PWD 2011-06-27 3.4355 2013-06-30 3.0313 0 3.0313 3.0313 Completed
270 ARUNACHAL PRADESH Education
Infrastructure development of Givt. higher secondary school Hawai in Anjaw district
NESIDS-OTRI NLCPR PWD 2012-12-21 10.84 2015-12-31 8.9948 0 8.9948 8.9948 Completed
271 ARUNACHAL PRADESH Education
Infrastructure Development of various Schools under Palin Circle, Kurung Kumey District
NESIDS-OTRI NLCPR PWD 2011-12-26 13.8212 2014-12-31 4.878 0 4.878 4.878 Foreclosed
272 ARUNACHAL PRADESH Education
Infrastructure Development of Vivekananda Kendra Vidyalaya (VKV) at Dado
NESIDS-OTRI NLCPR PWD 2011-02-07 7.1001 2013-12-31 5.1026 0 5.1026 5.1026 Ongoing
273 ARUNACHAL PRADESH Education
Infrastructure development of VKV Koloriang (Phase-II)
NESIDS-OTRI NLCPR PWD 2010-06-02 2.8148 2011-11-30 2.4836 0 2.4836 2.4836 Completed
274 ARUNACHAL PRADESH Education
Infrastucrctural devlopment of 275 community schools running pre- primary classes in villages
NESIDS-OTRI NLCPR PWD 2000-08-10 5.82 2002-03-31 4.95 0 4.95 5.5 Completed
275 ARUNACHAL PRADESH Education
North Eastern Regional Institute of science & Techonolgy
NESIDS-OTRI NLCPR NERIST 2000-03-31 40 2003-09-12 21.6 0 21.6 20 Completed
276 ARUNACHAL PRADESH Education
Opening of Ramakrishna Sarada Mission School for girls at Khaso (Dirang) in West Kameng District
NESIDS-OTRI NLCPR PWD 2007-12-26 5.8805 2009-12-31 5.1887 0 5.1887 5.1887 Completed
277 ARUNACHAL PRADESH Education
Rama Krishna Mission Residential School at Narottam Nagar, Tirap District.
NESIDS-OTRI NLCPR PWD 2001-09-10 12.2 2004-06-08 10.98 0 10.98 12.2 Completed
278 ARUNACHAL PRADESH Education
Rama Krishna Mission School at Along.
NESIDS-OTRI NLCPR PWD 2000-07-17 2.56 2004-07-31 1.9638 0 1.9638 2.182 Completed
279 ARUNACHAL PRADESH Education
Rama Krishna Sarada Mission Middle School Khaso in West Kameng District to Higher Secondary School (Phase-II)
NESIDS-OTRI NLCPR Dept. of Power 2014-06-13 2.661 2022-06-30 1.8204 0 1.8204 1.8201 Completed
280 ARUNACHAL PRADESH Education
Rama Krishna Sarda Mission Girls School, Khonsa, Narottam Nagar, Tirap District.
NESIDS-OTRI NLCPR PWD 2001-09-10 3 2004-06-08 2.7 0 2.7 3 Completed
281 ARUNACHAL PRADESH Education
Reconstruction of Govt. Higher Secondary School at Anini
NESIDS-OTRI NLCPR PWD 2005-12-23 3.0229 2008-12-23 2.6414 0 2.6414 2.6414 Completed
282 ARUNACHAL PRADESH Education
Sarva Shiksha Abhiyan 2005-06
NESIDS-OTRI NLCPR Education 2006-03-28 8.201 2006-12-31 8.201 0 8.201 8.201 Completed
283 ARUNACHAL PRADESH Education
Sarva Shiksha Abhiyan 2006-07
NESIDS-OTRI NLCPR Education 2006-09-26 14.2874 2008-03-31 14.2874 0 14.2874 14.2874 Ongoing
284 ARUNACHAL PRADESH Education
Vivekananda Kendra Vidyalaya at Kitpi in Tawang District
NESIDS-OTRI NLCPR PWD 2006-09-26 5.2084 2008-09-30 4.5511 0 4.5511 4.5511 Completed
285 ARUNACHAL PRADESH Education
Vivekananda Kendra Vidyalaya, Koliarang,
NESIDS-OTRI NLCPR PWD 2001-10-30 0.8 2004-10-31 0.72 0 0.72 0.8 Completed
286 ARUNACHAL PRADESH Irrigation and Flood Control
Anti erosion works on kley river under Lower subansiri District.
NESIDS-OTRI NLCPR WRD 2002-09-26 7.31 2004-03-31 6.543 0 6.543 6.9282 Completed
287 ARUNACHAL PRADESH Irrigation and Flood Control
Flood Control & Anti Erosion Works (6 Nos)
NESIDS-OTRI NLCPR WRD 2000-03-28 11.3 2002-03-31 10.17 0 10.17 11.3 Completed
288 ARUNACHAL PRADESH Irrigation and Flood Control
Flood Control & Anti Erosion Works (8 Nos)
NESIDS-OTRI NLCPR WRD 2000-07-06 46.33 2002-03-31 41.688 0 41.688 46.32 Completed
289 ARUNACHAL PRADESH Health
Construction of In-Patient Department for District Hospital at Tawang
NESIDS-OTRI NLCPR PWD 2013-03-26 14.3835 2016-03-31 12.564 0 12.564 12.1235 Completed
290 ARUNACHAL PRADESH Health
Construction of well-equipped 50 bedded hospital at Yingkiong in Upper Siang District
NESIDS-OTRI NLCPR PWD 2013-08-12 13.0762 2016-06-30 11.7686 0 11.7686 11.7686 Completed
291 ARUNACHAL PRADESH Health
Corpus Fund for R.K. Mission Hospital, Itanagar
NESIDS-OTRI NLCPR RK Mission 2008-05-01 22.2222 2008-08-31 20 0 20 20 Completed
292 ARUNACHAL PRADESH Health
Infrastructure strengthening of Secondary Health care facilities in Arunachal Pradesh (General Hospital Naharlagun)
NESIDS-OTRI NLCPR Heath 2007-03-26 4.7153 2008-03-31 4.1202 0 4.1202 4.1202 Completed
293 ARUNACHAL PRADESH Health
New OPD Block of R.K. Mission Hospital
NESIDS-OTRI NLCPR RK Mission 2005-08-03 3.8769 2007-08-31 3.3876 0 3.3876 3.3876 Completed
294 ARUNACHAL PRADESH Health
Rama Krishna Mission Hospital, Itanagar and Repair, renovation and extension of GNM School of Nursing
NESIDS-OTRI NLCPR RK Mission 2000-10-16 1.36 2005-07-31 1.224 0 1.224 1.36 Completed
295 ARUNACHAL PRADESH Health
Upgradation of medical equipments at R.K Mission Hospital, Itanagar
NESIDS-OTRI NLCPR RK Mission 2007-06-29 4.076 2008-06-30 3.6677 0 3.6677 3.6677 Completed
296 ARUNACHAL PRADESH Miscellaneous
Construction of an Auditorium at Rajiv Gandhi University, Rono Hills, Papum Pare Distirct
NESIDS-OTRI NLCPR Dept. of Power 2011-03-17 9.6343 2018-07-15 8.6709 0 8.6709 8.6709 Ongoing
297 ARUNACHAL PRADESH Miscellaneous
Construction of Arunachal Pradesh Civil Secretariat Building at Itanagar
NESIDS-OTRI NLCPR PWD 2009-08-31 91.8677 2012-08-31 82.0029 0 82.0029 82.0029 Completed
298 ARUNACHAL PRADESH Miscellaneous
Construction of Police Officers Mess and accomodation to the Upper Subordinates and Police Officers in the Capital Complex (Papum Pare District) in Arunachal Pradesh
NESIDS-OTRI NLCPR Police Housing 2010-06-14 8.791 2012-06-15 6.9641 0 6.9641 6.9641 Completed
299 ARUNACHAL PRADESH Miscellaneous
Construction of State Legislative Assembly Building at Arunachal
NESIDS-OTRI NLCPR PWD 2006-05-17 38.9219 2008-11-30 34.065 0 34.065 34.065 Completed
300 ARUNACHAL PRADESH Miscellaneous
Infrastructure Development including Guest House at Biological Park/Zoo, Itanagar, Papumpare Dist.
NESIDS-OTRI NLCPR Forest 2011-03-15 3.3081 2012-02-29 2.8003 0 2.8003 2.8003 Completed
301 ARUNACHAL PRADESH Miscellaneous
Ropeway from Tawang Monestary to Ani Gompa (Tawang District)
NESIDS-OTRI NLCPR PWD 2006-05-17 3.3089 2007-11-30 2.8919 0 2.8919 2.8919 Completed
302 ARUNACHAL PRADESH Miscellaneous
Tourism infrastructure development at Hotspring at Dong which includes Yatri Nivas at Walong, Hawai and Hayuliang
NESIDS-OTRI NLCPR PHED/WS 2007-10-25 4.0003 2010-10-31 3.5578 0 3.5578 3.5578 Completed
303 ARUNACHAL PRADESH Power
132 KV S/C Transmission line from Along to Pasighat
NESIDS-OTRI NLCPR POWER 2005-08-03 29.0196 2008-08-01 25.3569 0 25.3569 21.426 Completed
304 ARUNACHAL PRADESH Power
C/o 33 KV Express line from Tawang to Lumla with 33/11 KV, 2x1.6 MVA sub station at Lumla
NESIDS-OTRI NLCPR POWER 2007-03-26 6.2176 2009-03-31 5.5958 0 5.5958 5.5958 Completed
305 ARUNACHAL PRADESH Power
Construction of 11/KV Transmission lines from Hawai to Kibithu
NESIDS-OTRI NLCPR POWER 2004-12-21 2.34 2006-12-31 2.0707 0 2.0707 2.1517 Completed
306 ARUNACHAL PRADESH Power
Construction of 2x3.15 MVA, 33/11 kV S/S at Seppa i/c distribution transformer and assocaited 11 kV link, East Kameng District
NESIDS-OTRI NLCPR POWER 2010-10-11 8.3562 2013-10-31 5.9572 0 5.9572 5.9572 Ongoing
307 ARUNACHAL PRADESH Power
Construction of 33 kv Line from Mebo to Dambuk for Evacuation of Central Sector Power, Lower Dibang Valley district
NESIDS-OTRI NLCPR POWER 2010-04-06 6.5283 2012-03-31 5.5564 0 5.5564 5.5564 Completed
308 ARUNACHAL PRADESH Power
Construction of 33/11 kV 2X5 MVA Power sub-station at Deopani and providing Higher Voltage Distribution system in and around Roing Township under Lower Dibang Valley District
NESIDS-OTRI NLCPR POWER 2014-02-20 14.0378 2016-02-28 11.2912 0 11.2912 11.2912 Completed
309 ARUNACHAL PRADESH Power
Construction of 33kV S/C transmission line from Kimin to Dollungmukh & Construction of 2x5 MVA. 33/11 kV sub-sttion at Tanio villge in Lower Subansari district in Arunchal Pradesh under NLCPR Scheme
NESIDS-OTRI NLCPR POWER 2017-08-14 12 2019-08-31 9.8979 0 9.8979 9.7979 Ongoing
310 ARUNACHAL PRADESH Power
Electrification of Tribal villages.
NESIDS-OTRI NLCPR POWER 2001-09-26 8.96 2003-10-31 8.064 0 8.064 8.96 Completed
311 ARUNACHAL PRADESH Power
Implementation of High Voltage Distribution System in Mahadevpur Namsai and Piyong Circle in Arunachal Pradesh
NESIDS-OTRI NLCPR POWER 2013-12-27 10.6638 2015-12-31 8.4485 0 8.4485 8.4485 Completed
312 ARUNACHAL PRADESH Power
Kathalguri Deomali Transmission line
NESIDS-OTRI NLCPR POWER 2000-06-29 29.45 2005-07-31 26.505 0 26.505 29.45 Completed
313 ARUNACHAL PRADESH Power
Renovation, modernization and improvement of T & D system i/c Sub-station of Bhalukpong, Kalaktang & Dirang and their adjacent areas in West Kameng district in Arunachal Pradesh
NESIDS-OTRI NLCPR Power 2017-08-30 25 2019-08-31 21.6272 0 21.6272 21.6259 Completed
314 ARUNACHAL PRADESH Power
Sub- transmission and Distribution - 2x1 MVA Substation at Sangram
NESIDS-OTRI NLCPR POWER 2000-10-16 0.55 2003-10-31 0.45 0 0.45 0.5 Completed
315 ARUNACHAL PRADESH Power
Sub- transmission and Distribution - 2x3.15 MVA Substation at Nirjuli
NESIDS-OTRI NLCPR POWER 2000-10-16 1.43 2003-10-31 1.287 0 1.287 1.43 Completed
316 ARUNACHAL PRADESH Power
Sub- transmission and Distribution - 2x5 KVA Substation at Bomdila
NESIDS-OTRI NLCPR POWER 2000-10-16 1.72 2003-10-31 1.548 0 1.548 1.72 Completed
317 ARUNACHAL PRADESH Power
Sub- transmission and Distribution - 2x5 MVA Substation at Naharlagun
NESIDS-OTRI NLCPR POWER 2000-10-16 1.69 2003-10-31 1.521 0 1.521 1.69 Completed
318 ARUNACHAL PRADESH Power
Sub- transmission and Distribution - 2x5 MVA Substation at Old Ziro
NESIDS-OTRI NLCPR POWER 2000-10-16 2.64 2003-10-31 2.376 0 2.376 2.64 Completed
319 ARUNACHAL PRADESH Power
Sub- transmission and Distribution - 33 KV DC line from Geku-Along-Passighat.
NESIDS-OTRI NLCPR POWER 2000-10-16 16.53 2003-10-31 16.5762 0 16.5762 15.802 Completed
320 ARUNACHAL PRADESH Power
Sub- transmission and Distribution - 33 KV DC Line from Nirjuli to Itanagar
NESIDS-OTRI NLCPR POWER 2000-10-16 2.8703 2008-07-31 2.5686 0 2.5686 2.7986 Completed
321 ARUNACHAL PRADESH Power
Sub- transmission and Distribution - 33 KV Express line from Tago to Old Ziro
NESIDS-OTRI NLCPR POWER 2000-10-16 0.68 2003-10-31 0.27 0 0.27 0.3 Completed
322 ARUNACHAL PRADESH Power
Ziro-Doparijo-Along transmission Line
NESIDS-OTRI NLCPR POWER 1999-03-31 53.17 2002-03-31 47.853 0 47.853 52.814 Completed
323 ARUNACHAL PRADESH Roads and Bridges
C/o RCC bridge over river Dirang to connect Dirang HQ to Dirang township i/c approach road in Arunachal Pradesh under NLCPR
NESIDS-OTRI NLCPR PWD 2017-08-14 18.6926 2019-08-31 16.695 0 16.695 16.695 Completed
324 ARUNACHAL PRADESH Roads and Bridges
C/o road from BRO road (4 KM point) on Anini Dambuine road to Etabe (12 KM)
NESIDS-OTRI NLCPR PWD 2009-03-28 22.1396 2012-03-30 15.6215 0 15.6215 15.6214 Ongoing
325 ARUNACHAL PRADESH Roads and Bridges
C/o road from Dumporijo to Hali (45 Km)
NESIDS-OTRI NLCPR PWD 2008-03-27 31.7636 2012-03-30 28.0267 0 28.0267 28.0267 Completed
326 ARUNACHAL PRADESH Roads and Bridges
C/o road from Jop to Silsango in Lower Subansiri District (30 Km)
NESIDS-OTRI NLCPR PWD 2007-06-28 34.4952 2010-03-31 30.1101 0 30.1101 30.11 Completed
327 ARUNACHAL PRADESH Roads and Bridges
C/o road from Nafra to Nakhu and Nachiban in West Kameng District (11 Km)
NESIDS-OTRI NLCPR PWD 2007-03-26 7.5401 2009-03-31 6.7861 0 6.7861 6.7864 Completed
328 ARUNACHAL PRADESH Roads and Bridges
C/o road from Nakhu to Sanchipan under Nafra circle, west Kameng district under NLCPR
NESIDS-OTRI NLCPR Dept. of Power 2017-08-23 22.2179 2019-08-31 19.9871 0 19.9871 19.4121 Ongoing
329 ARUNACHAL PRADESH Roads and Bridges
C/o road from Nyorak to Rime Moku village in West Siang District (20 Km, Ph-I 9.20 km)
NESIDS-OTRI NLCPR PWD 2007-06-28 9.8975 2010-03-31 8.9078 0 8.9078 8.9078 Completed
330 ARUNACHAL PRADESH Roads and Bridges
C/o road from Parsi Parlo to Pipsorang Circle HQ in Kra Daadi district in Arunachal pradesh under NLCPR
NESIDS-OTRI NLCPR PWD 2017-08-21 16.8486 2019-08-31 14.4933 0 14.4933 5.8242 Ongoing
331 ARUNACHAL PRADESH Roads and Bridges
C/o road from Sille to Yagrung in East Siang district. (10KM)
NESIDS-OTRI NLCPR RWD 2007-11-16 5.0094 2010-11-30 4.4201 0 4.4201 4.4201 Completed
332 ARUNACHAL PRADESH Roads and Bridges
Constrcution of Road from Pugging to Palling
NESIDS-OTRI NLCPR PWD 2010-02-15 15.3019 2013-01-31 13.5017 0 13.5017 13.5017 Completed
333 ARUNACHAL PRADESH Roads and Bridges
Construction of 6 nos. bridges to provide connectivity to Admn. CO HQ, Palling with District HQ in Upper Siang District in Arunachal Pradesh
NESIDS-OTRI NLCPR Public works Department 2016-05-05 32.4916 2019-04-30 29.241 0 29.241 17.6964 Ongoing
334 ARUNACHAL PRADESH Roads and Bridges
Construction of Bailey /RCC bridge over river Buche and Bah of Litemore-Taramori road, West Siang District
NESIDS-OTRI NLCPR PWD 2010-10-11 3 2013-10-31 2.7 0 2.7 2.7 Completed
335 ARUNACHAL PRADESH Roads and Bridges
Construction of bridge over Siyom on Kaying to Paksing road (Span 122.00 mtr.)
NESIDS-OTRI NLCPR PWD 2006-12-06 7.6382 2009-12-31 6.6741 0 6.6741 6.6741 Completed
336 ARUNACHAL PRADESH Roads and Bridges
Construction of Gacham Morshing Road (24.50 Km)
NESIDS-OTRI NLCPR PWD 2008-09-15 19.6249 2011-08-31 17.3161 0 17.3161 17.3161 Completed
337 ARUNACHAL PRADESH Roads and Bridges
Construction of Internal/Sectoral Township road at Tani Happa (New Sagalee) (SH: Survey, Investigation, Jungle Clearance, Formation cutting, Pavement, CD Work, CC Drain & Protection Work
NESIDS-OTRI NLCPR PWD 2014-12-29 12.1441 2017-12-31 9.9363 0 9.9363 7.952 Completed
338 ARUNACHAL PRADESH Roads and Bridges
Construction of link road from Lhou Nallah to Mukto Circle HQ. via Mirba, Gomkelling and Serjong (15 Km) in Tawang District
NESIDS-OTRI NLCPR PWD 2005-12-27 18.0297 2008-12-31 15.7541 0 15.7541 15.7541 Completed
339 ARUNACHAL PRADESH Roads and Bridges
Construction of Motorable Bridge over Siyom River to connect left bank at Paya (span 120m) in West Siang District
NESIDS-OTRI NLCPR PWD 2011-09-19 9.6853 2014-08-31 8.5459 0 8.5459 8.5459 Ongoing
340 ARUNACHAL PRADESH Roads and Bridges
Construction of Motorable Steel Arch Bridge over river Yamne at Reglat under Mariyang Division span 90 Mtr.
NESIDS-OTRI NLCPR PWD 2010-02-05 6.3439 2012-12-31 2.2838 0 2.2838 2.2838 Foreclosed
341 ARUNACHAL PRADESH Roads and Bridges
Construction of Motorable Suspension Bridge over River Lohit to connect Manchal Administrative Circle (Span 156.55 m)
NESIDS-OTRI NLCPR PWD 2005-12-27 13.0979 2008-12-31 11.4448 0 11.4448 11.4448 Completed
342 ARUNACHAL PRADESH Roads and Bridges
Construction of Motorable Suspension Bridge over river Siang at the site of Gandhi Bridge
NESIDS-OTRI NLCPR PWD 2006-03-27 48.43 2009-04-30 42.372 0 42.372 42.372 Completed
343 ARUNACHAL PRADESH Roads and Bridges
Construction of Motorable Suspension Bridge over river Siang between BRTF road & Komsing village (Span 225 m) at Sangam point in East Siang District
NESIDS-OTRI NLCPR PWD 2007-09-26 18.3441 2010-03-31 16.5097 0 16.5097 16.5097 Completed
344 ARUNACHAL PRADESH Roads and Bridges
Construction of Namsang - Khela Road (45.30)
NESIDS-OTRI NLCPR PWD 2009-12-29 4.9474 2010-12-31 4.3654 0 4.3654 4.3654 Completed
345 ARUNACHAL PRADESH Roads and Bridges
Construction of Nyodu Sibe Siru Road (23km) in West Siang District
NESIDS-OTRI NLCPR PWD 2014-06-27 19.4998 2017-07-31 17.3741 0 17.3741 13.8993 Ongoing
346 ARUNACHAL PRADESH Roads and Bridges
Construction of porter Track from Nuranang to Mago
NESIDS-OTRI NLCPR PWD 2004-01-15 2.59 2006-01-31 2.295 0 2.295 2.5523 Completed
347 ARUNACHAL PRADESH Roads and Bridges
Construction of PSC Girder RCC Bridge over Poklek River and Tolon River at Pasighat - Ledum - Tene - Koyu Road in East Siang District
NESIDS-OTRI NLCPR PWD 2014-02-28 18.0353 2017-02-28 15.907 0 15.907 12.7256 Ongoing
348 ARUNACHAL PRADESH Roads and Bridges
Construction of RCC Bridge over river Kamphai under Wakro Circle (Span 80 mtr)
NESIDS-OTRI NLCPR PWD 2010-12-23 6.081 2013-11-30 5.3656 0 5.3656 5.3656 Completed
349 ARUNACHAL PRADESH Roads and Bridges
Construction of road from 10 km point of Likabali-Aalo BRTF road to connect Kane village via Magi (7.5 km)
NESIDS-OTRI NLCPR PWD 2011-02-28 18.2332 2014-01-31 12.8705 0 12.8705 12.2032 Ongoing
350 ARUNACHAL PRADESH Roads and Bridges
Construction of road from 168km point of Roing-Anini BRTF road to Echigo village (12km) in Dibang Valley District
NESIDS-OTRI NLCPR PWD 2013-09-17 18.6121 2016-08-31 15.7601 0 15.7601 14.0597 Foreclosed
351 ARUNACHAL PRADESH Roads and Bridges
Construction of road from 80 KM point on Kimin - Ziro BRTF road to Krishi Vigyan Kendra at Yachuli (5.50 KM) (Lower Subansiri)
NESIDS-OTRI NLCPR PWD 2010-01-11 7.6905 2013-01-31 5.5302 0 5.5302 5.5302 Foreclosed
352 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Bameng to Lada (40 Km)
NESIDS-OTRI NLCPR PWD 2005-12-27 8.9019 2007-12-31 7.7783 0 7.7783 7.7783 Completed
353 ARUNACHAL PRADESH Roads and Bridges
Construction of road from BRTF road (32km) to Heya Mara via Poda Mara Merring Mara under Taliha Circle (Phase-I) - 15km upto WBM level Upper Subansari District
NESIDS-OTRI NLCPR PWD 2013-03-25 15.4236 2016-08-31 10.2039 0 10.2039 10.2039 Ongoing
354 ARUNACHAL PRADESH Roads and Bridges
CONSTRUCTION OF ROAD FROM BRTF ROAD TO ESSI YASE VILLAGE UNDER TIRBIN IN WEST SIANG DISTRICT
NESIDS-OTRI NLCPR PWD 2017-06-27 17.0511 2019-06-27 15.2622 0 15.2622 6.1049 Ongoing
355 ARUNACHAL PRADESH Roads and Bridges
Construction of road from BTK to Nam-Tsering connecting Zemithang to Dudanghar Administration Circle (11km) Tawang District
NESIDS-OTRI NLCPR Dept. of Power 2013-09-17 13.1318 2016-08-31 11.5995 0 11.5995 11.5995 Ongoing
356 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Chambang to Phaa (30 km), Phase 1
NESIDS-OTRI NLCPR PWD 2010-12-23 11.7922 2013-11-30 4.2446 0 4.2446 4.2446 Foreclosed
357 ARUNACHAL PRADESH Roads and Bridges
Construction of Road from Changlang to Khimiyang (36.10 Km)
NESIDS-OTRI NLCPR PWD 2008-09-15 8.587 2011-08-31 7.5767 0 7.5767 7.5767 Completed
358 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Darak to Belo to Yomcha
NESIDS-OTRI NLCPR PWD 2010-11-25 9.8081 2013-10-31 7.3198 0 7.3198 7.3198 Completed
359 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Digi to Panimuri via Sinyumrijo
NESIDS-OTRI NLCPR PWD 2011-06-24 3.6924 2014-06-30 2.7951 0 2.7951 2.7951 Completed
360 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Dipulamgu bridge point to Pipu (14 Km)
NESIDS-OTRI NLCPR PWD 2005-12-27 4.172 2007-12-31 3.6454 0 3.6454 3.6473 Completed
361 ARUNACHAL PRADESH Roads and Bridges
CONSTRUCTION OF ROAD FROM GEKU TO MARIYANG IN UPPER SIANG DISTRICT
NESIDS-OTRI NLCPR PWD 2017-06-27 19 2019-06-27 14.0142 0 14.0142 6.7968 Ongoing
362 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Itanagar to Seijosa (86 km) Phase 1: Road from Kampa to Tapiaso (30 km)
NESIDS-OTRI NLCPR Dept. of Power 2010-11-25 43.1687 2013-10-31 30.4721 0 30.4721 30.4721 Foreclosed
363 ARUNACHAL PRADESH Roads and Bridges
Construction of road from J.N. College Pasighat to Balek, East Siang District
NESIDS-OTRI NLCPR PWD 2010-06-02 5.0026 2013-01-31 1.7249 0 1.7249 1.7249 Foreclosed
364 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Janam to Okhasun under Wakka Circle Hq. (19 km) phase 1
NESIDS-OTRI NLCPR PWD 2010-12-23 10.8587 2013-11-30 9.5812 0 9.5812 9.5812 Completed
365 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Jengging to Ramsing in Upper Siang District (35 Km)
NESIDS-OTRI NLCPR PWD 2006-09-25 5.3662 2009-09-30 4.8296 0 4.8296 4.8296 Completed
366 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Kanubari to Bogapani via Ranglua & Lawnu CO HQ (41km) (Phase-I) in Longding District
NESIDS-OTRI NLCPR PWD 2014-02-20 20.69 2017-02-28 18.5712 0 18.5712 18.5712 Completed
367 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Kapu Ozakho (13.5km length complete upto Blacktopping level including culverts bridges etc) in Tirap District
NESIDS-OTRI NLCPR Dept. of Power 2014-02-25 14.5691 12.1407 0 12.1407 12.1407 Completed
368 ARUNACHAL PRADESH Roads and Bridges
Construction of Road from Kaying-Gaseng Gate Road in West Siang District 70 km ( Part A of Phase-I)
NESIDS-OTRI NLCPR PWD 2012-12-26 17.6283 2015-12-26 15.4742 0 15.4742 15.4742 Completed
369 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Kheti to Dadam (21 KM)
NESIDS-OTRI NLCPR RWD 2009-03-30 10.8708 2011-03-31 9.5918 0 9.5918 9.5918 Completed
370 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Loffa to Pakoti village (8 km)
NESIDS-OTRI NLCPR Dept. of Power 2010-06-14 6.7633 2013-06-15 4.774 0 4.774 4.774 Ongoing
371 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Lumba to Rayung via Gallang, Joru and Rissi villages (20 km), Phase 1
NESIDS-OTRI NLCPR PWD 2010-12-03 21.6004 2013-10-31 15.5386 0 15.5386 15.5386 Foreclosed
372 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Magopam to Bichom via Namfri, Ditching, Sacheda, Ramu-Sutu and Uchini (Phase-II) in West Kameng District
NESIDS-OTRI NLCPR Dept. of Power 2011-12-28 20.5243 2014-12-31 14.7152 0 14.7152 14.7152 Ongoing
373 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Mahadevpur Town to Krishnapur Village Lekang Circle in Lohit District (4.5km)
NESIDS-OTRI NLCPR PWD 2011-06-27 5.993 2013-06-30 5.1283 0 5.1283 5.1283 Completed
374 ARUNACHAL PRADESH Roads and Bridges
Construction of Road from Murga Bridge point to Rho village Phase-I
NESIDS-OTRI NLCPR PWD 2012-12-11 17.955 2015-12-11 15.393 0 15.393 15.393 Completed
375 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Neelam to Pistana (Phase-I) (5km length complete upto blacktopping level including culverts bridges etc.) in Lower Subansari District
NESIDS-OTRI NLCPR PWD 2014-02-28 4.6978 2016-02-28 4.228 0 4.228 3.3824 Ongoing
376 ARUNACHAL PRADESH Roads and Bridges
Construction of Road from New Mohong to Mahadevpur Township via Nongkhon (12 Km)
NESIDS-OTRI NLCPR PWD 2008-09-15 3.554 2011-08-31 3.1359 0 3.1359 3.1359 Completed
377 ARUNACHAL PRADESH Roads and Bridges
Construction of Road from NH 52 -A- to Pappu Hill Settlement (2 Km)
NESIDS-OTRI NLCPR PWD 2007-06-28 3.9899 2008-06-30 3.3821 0 3.3821 3.3821 Completed
378 ARUNACHAL PRADESH Roads and Bridges
Construction of road from NH-153 Longbi village point to Tengman village via Khetwa and Jotin Juda (35.00 km)
NESIDS-OTRI NLCPR PWD 2011-02-28 21.336 2014-01-31 17.5636 0 17.5636 17.5636 Completed
379 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Pachi to Rigom via Fachang, Tabri Lochung and Bokar (33 km)
NESIDS-OTRI NLCPR Dept. of Power 2010-12-24 14.1682 2013-11-30 5.0999 0 5.0999 5.0999 Ongoing
380 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Pakke to Wai (18.00 Km)
NESIDS-OTRI NLCPR PWD 2006-02-17 13.3541 2009-02-27 11.6686 0 11.6686 11.6686 Completed
381 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Pakoti to Kamsha Village (6.50km)
NESIDS-OTRI NLCPR PWD 2014-06-27 9.5081 2016-07-31 7.7015 0 7.7015 7.7015 Completed
382 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Parsi-Parlo (Patuk ADC HQ) (Phase-I 5km length complete upto blacktopping level including culverts bridges etc.
NESIDS-OTRI NLCPR Dept. of Power 2014-06-27 5.0052 2017-07-31 4.41 0 4.41 4.41 Ongoing
383 ARUNACHAL PRADESH Roads and Bridges
Construction of Road from Pilla to Sakiang (15 KM) upto WB M level in Arunachal Pradesh
NESIDS-OTRI NLCPR PWD 2013-12-06 18.4 2016-11-30 14.5992 0 14.5992 14.5992 Completed
384 ARUNACHAL PRADESH Roads and Bridges
Construction of road from PMGSY Bongleng road to Khet Village in Tawang District in Arunachal Pradesh
NESIDS-OTRI NLCPR Public works Department 2015-09-28 14.2078 2017-09-30 12.2965 0 12.2965 12.2965 Completed
385 ARUNACHAL PRADESH Roads and Bridges
Construction of Road from PWD road from Kamhua Noknu Village (Pongchau Circle) to Nginu - BRTF Road point (Wakka Circle) in Tirap District
NESIDS-OTRI NLCPR PWD 2010-02-12 13.5318 2013-01-31 11.8808 0 11.8808 11.8808 Completed
386 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Rani to Oiramghat (Assam) via Sika Tode-Sika Bamin Village - Jampani and Anchalghat Camp road (25km) in East Siang District
NESIDS-OTRI NLCPR PWD 2011-09-19 33.2547 2014-08-31 24.7153 0 24.7153 24.7153 Completed
387 ARUNACHAL PRADESH Roads and Bridges
Construction of Road from Rayung to Rungte Rite via Deby Tudbath Patey Phalap and Gang (30km) Phase-I (0.00 to 10.00km)
NESIDS-OTRI NLCPR PWD 2013-12-27 12.4447 2016-12-31 8.2072 0 8.2072 6.8169 Foreclosed
388 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Sangram to Parsi-Parlo (15km) upto WBM level in Kurung Kumey District
NESIDS-OTRI NLCPR PWD 2013-09-17 19.1508 2016-08-31 16.8222 0 16.8222 16.8222 Completed
389 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Sangram to Phassang-Pallang via Nyapin (SDO HQ) Phase-I
NESIDS-OTRI NLCPR PWD 2008-12-24 8.8172 2009-12-31 7.7799 0 7.7799 7.7799 Completed
390 ARUNACHAL PRADESH Roads and Bridges
Construction of Road from Sumhak to Shalom via Upper Chintan (14km) upto WBM level
NESIDS-OTRI NLCPR Dept. of Power 2014-02-20 18.4 2017-02-28 16.5263 0 16.5263 16.2855 Ongoing
391 ARUNACHAL PRADESH Roads and Bridges
Construction of road from Yembung-Yemsing road to Tarak village (Phase-I) in East Siang District
NESIDS-OTRI NLCPR PWD 2013-09-17 28.183 2016-08-31 25.3467 0 25.3467 25.3467 Completed
392 ARUNACHAL PRADESH Roads and Bridges
Construction of Road from Yemsing to Mirem (15km) upto WBM level in East Siang District of Arunachal Pradesh
NESIDS-OTRI NLCPR PWD 2013-09-23 18.3112 2016-08-31 15.656 0 15.656 15.656 Completed
393 ARUNACHAL PRADESH Roads and Bridges
Construction of Satnaguri to Longding road via Kanubari, Banfera, Wanu and Zedua (Phase-I) (15.50 Km)
NESIDS-OTRI NLCPR PWD 2008-03-26 5.6575 2010-03-31 4.9919 0 4.9919 4.9919 Completed
394 ARUNACHAL PRADESH Roads and Bridges
Construction of Single lane bailey bridge (span 40 mtr) over Tasing river in between Borguli village and Seram in East Siang district
NESIDS-OTRI NLCPR PWD 2009-03-28 3.4037 2011-03-31 2.2956 0 2.2956 2.2956 Completed
395 ARUNACHAL PRADESH Roads and Bridges
Construction of Steel Bridge over river Wome at Pakke point
NESIDS-OTRI NLCPR PWD 2010-11-25 2.3748 2012-10-31 1.7004 0 1.7004 1.7004 Completed
396 ARUNACHAL PRADESH Roads and Bridges
Construction of Steel Suspension Bridge over Siang River and approach roads at Kodak near Tuting
NESIDS-OTRI NLCPR Dept. of Power 2005-12-27 38.94 2008-12-31 34.3572 0 34.3572 33.54 Ongoing
397 ARUNACHAL PRADESH Roads and Bridges
Construction of Steel Suspension Bridge over Subansiri river near Siyum (Span 174.00 Mtr)
NESIDS-OTRI NLCPR PWD 2006-02-17 13.08 2009-02-27 11.5813 0 11.5813 11.5813 Completed
398 ARUNACHAL PRADESH Roads and Bridges
Construction of Tamen-Tali Road From 49.00 km to 60 km (Phase-II) in Kurung Kumey District in A.P.
NESIDS-OTRI NLCPR Dept. of Power 2012-11-07 14.4124 2015-11-07 10.377 0 10.377 10.377 Ongoing
399 ARUNACHAL PRADESH Roads and Bridges
Construction of Tamen-Tali road via Yirkoum (60 KM) Phase-I 0-49 Km
NESIDS-OTRI NLCPR PWD 2008-12-24 8.9811 2011-12-30 7.9245 0 7.9245 7.9245 Completed
400 ARUNACHAL PRADESH Roads and Bridges
Construction of Wak Liromaba Road (78km) - Phase-II: 0-26Km in West siang District
NESIDS-OTRI NLCPR PWD 2012-12-20 22.8018 2015-12-20 20.1164 0 20.1164 20.1164 Completed
401 ARUNACHAL PRADESH Roads and Bridges
Construction of Wak Liromoba Road (78 Km) Phase I (15 Km)
NESIDS-OTRI NLCPR PWD 2008-09-15 6.6004 2011-08-31 5.8239 0 5.8239 5.8239 Completed
402 ARUNACHAL PRADESH Roads and Bridges
Constuction of Foot overbridge at various locations of State Capital at Itanagar Naharlagun and Nirjuli
NESIDS-OTRI NLCPR Dept. of Power 2013-12-27 9.0992 2015-12-31 6.103 0 6.103 6.103 Ongoing
403 ARUNACHAL PRADESH Education
Improvement & Extension of Dosing, Pareng, Sine, Yibuk, Liging road. (Phase-I)
NESIDS-OTRI NLCPR PWD 2009-03-30 18.2608 2012-03-30 12.3151 0 12.3151 12.3151 Foreclosed
404 ARUNACHAL PRADESH Roads and Bridges
Improvement and realignment of Porter Track from Jhang to Sulungthi (95 KMs)
NESIDS-OTRI NLCPR PWD 2002-10-28 2.55 2004-10-29 2.295 0 2.295 2.55 Completed
405 ARUNACHAL PRADESH Roads and Bridges
Improvement and Upgradation of Internal Road at Daporijo township in Upper Subansari District
NESIDS-OTRI NLCPR PWD 2011-12-19 5.3469 2014-12-31 4.7179 0 4.7179 4.7179 Completed
406 ARUNACHAL PRADESH Roads and Bridges
Improvement of Doimukh Toru Road 40 Km. (from NH-52A) Nirjuli to Sagalee
NESIDS-OTRI NLCPR PWD 2005-12-27 21.869 2008-12-31 19.1452 0 19.1452 19.1452 Completed
407 ARUNACHAL PRADESH Roads and Bridges
Improvement of Janagthung-Cherrong-Panchvati-Chhanda road, West Kameng District
NESIDS-OTRI NLCPR PWD 2011-02-28 25.1017 2014-01-31 22.1486 0 22.1486 22.1486 Completed
408 ARUNACHAL PRADESH Roads and Bridges
Improvement of Palizi Thrizino Road (17.00 Km)
NESIDS-OTRI NLCPR PWD 2006-02-17 7.439 2009-02-27 6.6951 0 6.6951 6.6951 Completed
409 ARUNACHAL PRADESH Roads and Bridges
Improvement of Porter Track from Tungri to Mago (70 Km)
NESIDS-OTRI NLCPR PWD 2005-12-27 3.1056 2007-12-31 2.7136 0 2.7136 2.7136 Completed
410 ARUNACHAL PRADESH Roads and Bridges
Improvement of Tawang Township road Network in Arunachal Pradesh
NESIDS-OTRI NLCPR PWD 2010-02-15 4.8964 2013-01-31 4.3204 0 4.3204 4.3204 Completed
411 ARUNACHAL PRADESH Roads and Bridges
Improvement/ Construction of Road from Sagalee to Sakiang (50 Km)
NESIDS-OTRI NLCPR PWD 2006-02-17 42.887 2009-02-27 37.5514 0 37.5514 37.5514 Completed
412 ARUNACHAL PRADESH Roads and Bridges
Improvement/ Upgradation of Menga-Giba Road (8 Km)
NESIDS-OTRI NLCPR PWD 2006-03-27 3.5667 2009-04-30 3.21 0 3.21 3.21 Completed
413 ARUNACHAL PRADESH Roads and Bridges
Infrastructure Development of ADC HQ at Kodokha (C/o 10km road upto blacktopping level i/c culverts bridges) in Upper Subansari Distric
NESIDS-OTRI NLCPR PWD 2013-09-17 9.4234 2016-08-31 3.3924 0 3.3924 3.3924 Foreclosed
414 ARUNACHAL PRADESH Roads and Bridges
Inter-District road connection for Chayangtajo of East Kameng District to Passang Co Circle of Kurung Kumey District, Pahse-I
NESIDS-OTRI NLCPR Dept. of Power 2012-12-12 21.4061 2015-12-12 15.4124 0 15.4124 15.4124 Ongoing
415 ARUNACHAL PRADESH Roads and Bridges
Maintenance of Foot track and Sustension Bridges
NESIDS-OTRI NLCPR 2000-03-22 1 2001-03-31 0.9 0 0.9 1 Completed
416 ARUNACHAL PRADESH Roads and Bridges
Restoration and upgradation of 32 KM internal road at Ziro Township
NESIDS-OTRI NLCPR PWD 2009-03-28 13.9997 2012-02-29 12.3526 0 12.3526 12.3526 Completed
417 ARUNACHAL PRADESH Roads and Bridges
Road from Magopam to Bichom via Namfri (50 KM) via Ditching, Sacheda, Ramu-Sotu and Lichini under Singchung sub-division.
NESIDS-OTRI NLCPR PWD 2009-07-31 15.6717 2012-07-31 13.8279 0 13.8279 13.8279 Completed
418 ARUNACHAL PRADESH Roads and Bridges
Strengthening & Improvement of Changlang to Khimyang Road Phase-II 0.00 to 14.50km in Changlang District
NESIDS-OTRI NLCPR PWD 2013-10-23 6.934 2016-09-30 6.0602 0 6.0602 6.0602 Completed
419 ARUNACHAL PRADESH Roads and Bridges
Upgradation of Namchik-Miao-MPen Road (37 km)
NESIDS-OTRI NLCPR PWD 2011-09-19 20.7984 2014-08-31 17.3262 0 17.3262 17.3262 Completed
420 ARUNACHAL PRADESH Roads and Bridges
Upgradation of road from Subansari bridge point to Segi CO(HQ)
NESIDS-OTRI NLCPR PWD 2011-06-24 19.8205 2014-06-30 17.4887 0 17.4887 17.4887 Completed
421 ARUNACHAL PRADESH Sports
Construction of High Altitude Sports Complex at Tawang
NESIDS-OTRI NLCPR Dept. of Power 2010-10-11 13.066 2013-03-31 11.5288 0 11.5288 11.5284 Ongoing
422 ARUNACHAL PRADESH Sports
Construction of Indoor Multi Sports Complex at Namsai in Lohit district
NESIDS-OTRI NLCPR PWD 2014-12-29 3.1298 2016-12-31 2.7637 0 2.7637 2.7637 Completed
423 ARUNACHAL PRADESH Sports
Construction of Sports Complex at Jengging in Upper Siang District
NESIDS-OTRI NLCPR PWD 2014-02-20 12.7329 2015-08-31 11.3994 0 11.3994 9.1243 Completed
424 ARUNACHAL PRADESH Water Supply
Augmentation of water supply at Khonsa township in Tirap District
NESIDS-OTRI NLCPR PHED/WS 2012-03-23 19.8341 2015-03-31 17.4906 0 17.4906 17.4906 Completed
425 ARUNACHAL PRADESH Water Supply
AUGMENTATION OF WATER SUPPLY AT PASIGHAT TOWNSHIP FROM SIRPO SOURCE PHASE-1 IN EAST SIANG DISTRICT
NESIDS-OTRI NLCPR Dept. of Power 2017-06-27 19.5658 2019-06-27 17.5512 0 17.5512 17.5114 Ongoing
426 ARUNACHAL PRADESH Water Supply
Augmentation of water supply under Boleng PHE Sub-Division East Siang District
NESIDS-OTRI NLCPR PHED/WS 2013-11-06 7.5139 2016-10-31 2.704 0 2.704 2.704 Ongoing
427 ARUNACHAL PRADESH Water Supply
Augmentation/Providing Water Supply connection to newly created C.O. HQ at Parang Valley, Papumpare Dist.
NESIDS-OTRI NLCPR PHED/WS 2011-03-15 4.9294 2013-02-28 4.3494 0 4.3494 4.3494 Completed
428 ARUNACHAL PRADESH Water Supply
Doparijo Water Supply Scheme
NESIDS-OTRI NLCPR PHED/WS 2003-03-21 3.97 2005-03-31 3.3001 0 3.3001 3.6668 Completed
429 ARUNACHAL PRADESH Water Supply
Improvement and augmentation of water supply at Yachuli (0.6 MLD), Lower Subansari District
NESIDS-OTRI NLCPR PHED/WS 2011-05-19 13.19 2014-05-31 11.6383 0 11.6383 11.6383 Completed
430 ARUNACHAL PRADESH Water Supply
Itanagar Water Supply project
NESIDS-OTRI NLCPR PHED/WS 1999-03-31 10.59 2004-03-31 9.531 0 9.531 10.59 Completed
431 ARUNACHAL PRADESH Water Supply
Naharlagun Water Supply Scheme
NESIDS-OTRI NLCPR PHED/WS 2003-02-18 11.73 2005-02-28 10.0544 0 10.0544 11.0404 Completed
432 ARUNACHAL PRADESH Water Supply
Potable drinking water supply scheme for the villages of Sille, Rani, Sikabamin, Sika Tode, Oyan at Sile
NESIDS-OTRI NLCPR PHED/WS 2006-12-06 17.4242 2009-12-31 15.2251 0 15.2251 15.2251 Completed
433 ARUNACHAL PRADESH Water Supply
Providing drinking water supply for Tezu township
NESIDS-OTRI NLCPR PHED/WS 2010-10-11 23.4279 2013-10-31 20.6717 0 20.6717 20.6716 Completed
434 ARUNACHAL PRADESH Water Supply
Providing drinking water supply to Jang township and its peripheral rural villages
NESIDS-OTRI NLCPR PHED/WS 2010-12-14 5.6514 2013-11-30 4.9866 0 4.9866 4.9866 Completed
435 ARUNACHAL PRADESH Water Supply
Providing potable drinking water supply to Mebo Sub-divisional Hq and adjoining villages, East Siang district in Arunachal Pradesh
NESIDS-OTRI NLCPR PHED/WS 2010-03-22 20.5339 2013-03-15 18.1181 0 18.1181 18.1181 Completed
436 ARUNACHAL PRADESH Water Supply
Providing water supply at Bameng administrative HQ (Phase-I) in East Kameng district in Arunachal pradesh under NLCPR
NESIDS-OTRI NLCPR Dept. of Power 2017-12-14 13.4994 2020-12-14 12.0523 0 12.0523 7.3323 Ongoing
437 ARUNACHAL PRADESH Water Supply
Providing Water Supply at Lumla Township in Tawang District
NESIDS-OTRI NLCPR PHED/WS 2006-05-23 4.8825 2009-05-31 4.2662 0 4.2662 4.2662 Completed
438 ARUNACHAL PRADESH Water Supply
Providing water supply at Yupia District Administrative Headquarter, Papum Pare District
NESIDS-OTRI NLCPR PHED/WS 2011-05-19 6.118 2014-05-31 5.3981 0 5.3981 5.3981 Completed
439 ARUNACHAL PRADESH Water Supply
Providing Water Supply to Yingkiong for 2.00 MLD (Phase-I)
NESIDS-OTRI NLCPR PHED/WS 2014-12-29 7.3913 2017-12-31 6.3268 0 6.3268 6.3268 Completed
440 ARUNACHAL PRADESH Water Supply
Providing water supply-cum-irrigation to Jangloom Area
NESIDS-OTRI NLCPR Dept. of Power 2010-09-23 4.9152 2013-09-30 4.1129 0 4.1129 4.1129 Ongoing
441 ARUNACHAL PRADESH Water Supply
Providing/ Augmenta-tion of Water Supply facilities to all the administrative HQs. and its villages under 14-Doimukh Assembly Constituency
NESIDS-OTRI NLCPR PHED/WS 2007-10-01 12.7722 2009-09-30 10 0 10 10 Completed
442 ARUNACHAL PRADESH Water Supply
Restoration of Water Supply Facilities at Tezu.
NESIDS-OTRI NLCPR PHED/WS 2000-07-17 2 2002-07-31 1.8 0 1.8 2 Completed
443 ARUNACHAL PRADESH Water Supply
Water Supply at Chayangtajo Township, East Kameng Dist.
NESIDS-OTRI NLCPR PHED/WS 2011-03-15 14.8525 2014-02-28 13.3672 0 13.3672 13.3672 Completed
444 ARUNACHAL PRADESH Water Supply
Water Supply at Tali in Arunachal Pradesh
NESIDS-OTRI NLCPR Dept. of Power 2014-12-29 5.5399 2017-12-31 4.9859 0 4.9859 1.9943 Ongoing
445 ARUNACHAL PRADESH Water Supply
Water supply project at Bomdila Township
NESIDS-OTRI NLCPR PHED/WS 2004-10-20 17.0923 2007-10-31 14.935 0 14.935 15.4346 Completed
446 ARUNACHAL PRADESH Water Supply
Water Supply Scheme for Sagalee Township (0.90 MLD) Papum Pare District in Arunachal Pradesh
NESIDS-OTRI NLCPR PHED/WS 2013-06-04 10.5604 2016-05-31 9.5044 0 9.5044 9.5044 Completed
447 ARUNACHAL PRADESH Water Supply
Water Supply schemes at Along
NESIDS-OTRI NLCPR PHED/WS 2000-07-17 3.37 2002-07-31 2.7186 0 2.7186 3.0207 Completed
448 ARUNACHAL PRADESH Water Supply
Water Supply schemes at Pasighat.
NESIDS-OTRI NLCPR PHED/WS 2001-08-16 5.05 2003-08-31 4.365 0 4.365 4.8499 Completed
449 ARUNACHAL PRADESH Water Supply
Water Supply schemes at Roing.
NESIDS-OTRI NLCPR PHED/WS 2001-08-16 4.05 2003-08-31 3.4462 0 3.4462 3.8291 Completed
450 ARUNACHAL PRADESH Health
Establishment of State Cancer Institute at Itanagar, Arunachal Pradesh
PM-DevINE Dept. of Health & familly 2024-06-13 217.19 2026-12-31 106.7238 0 106.7238 Ongoing
451 ARUNACHAL PRADESH Tourism and Culture
Development of Signature View Point at Ziro on Potin-Pangin Road, Arunachal Pradesh
Schemes of NEC Public Work Department, G 2024-06-21 3.32 2027-06-21 2.988 0 2.988 2.988 Ongoing
452 ARUNACHAL PRADESH Tourism and Culture
Development of Tissa View Point near Tissa Camp, Tirap District, Arunachal Pradesh
Schemes of NEC Public Work Department, G 2024-06-24 1.81 2027-06-24 1.8075 0 1.8075 1.2525 Ongoing
453 ARUNACHAL PRADESH Tourism and Culture
Development of Pasighat-Yingkiong Road View point on NH513, Arunachal pradesh
Schemes of NEC Public Work Department, G 2024-06-24 1.89 2027-06-24 1.89 0.4725 2.3625 1.4175 Ongoing
454 ARUNACHAL PRADESH Tourism and Culture
Construction of Tourism Complex at Sapparijo (Kicho) under Raga, Kamle District, Arunachal Pradesh
Schemes of NEC Water Resources Departmen 2024-08-29 4.97 2027-08-29 4.7239 0.242 4.9659 4.72195 Ongoing
455 ARUNACHAL PRADESH Science and Technology
Infrastructure Development of Projects for Deprived Community namely Meyors of Anjaw District, Arunachal Pradesh
Schemes of NEC Public Work Department, G 2024-08-27 4.78 2027-08-27 4.1729687 0.6043313 4.7773 4.1664687 Ongoing
456 ARUNACHAL PRADESH Water Supply
Augmentation of Water Supply System at tezu Township (Phase II) in Lohit District
NESIDS-OTRI Public Health & Engg Depa 2024-07-16 43.45 2026-07-16 21.5498 0 21.5498 10.7749 Ongoing
457 ARUNACHAL PRADESH Water Supply
Intergrated Smart Drinking Water Supply to Basar Township and Its Peripheral settlement (1.6 MLD) with Tourism Components in Leparada District
NESIDS-OTRI PHE & WS Department Govt. 2024-07-01 37.77 2026-01-31 21.6789 0 21.6789 9.423 Ongoing
458 ARUNACHAL PRADESH Water Supply
Augmentation of Water Supply System at Namsai Township (7.9 MLD)
NESIDS-OTRI PHE & WS Department Govt. 2024-07-01 67.02 2026-07-31 33.35198 0 33.35198 16.7559 Ongoing
459 ARUNACHAL PRADESH Health
Construction of Nursing Hostel at District Hospital, Yingkiong, Upper Siang Dist. Arunachal Pradesh
Schemes of NEC Chief Engineer, Central Z 2025-01-13 10.1824 2027-01-13 5.079808 2.539808 7.619616 5.0798 Ongoing
460 ARUNACHAL PRADESH Water Supply
Augmentation of Water supply system at Daporijo Township in Upper Subansiri District
NESIDS-OTRI PHE & WS Department Govt. 2024-12-11 49.4691 2026-12-10 12.1817 0 12.1817 Ongoing
461 ARUNACHAL PRADESH Transport and Communication
Construction of Road Riaga to Sango Village, Gangte Circle, Kra daadi District
NESIDS-ROADS Public works Department 2025-02-19 21.1 2027-02-18 5.38 5.17 10.55 Ongoing
462 ARUNACHAL PRADESH Transport and Communication
Construction of road from Amuli NH313 to Athuni via Leyaka Pass at Anini
NESIDS-ROADS Public works Department 2025-02-19 94.45 2027-02-19 13.75 8.82 22.57 Ongoing
463 ARUNACHAL PRADESH Education
Construction of Boys Hostel at DK College Tawang, Arunachal Pradesh
Schemes of NEC PWD Tawang Division Gover 2025-02-11 8.1923 2027-02-11 4.098 0 4.098 Ongoing
464 ARUNACHAL PRADESH Tourism and Culture
Construction of Integrated State of Art Convention Centre at Tawang, Arunachal Pradesh
PM-DevINE ARC Test House & Consulta 2025-06-10 146.83 2028-06-30 54.2325 0 54.2325 Ongoing
465 ARUNACHAL PRADESH Industries
Revival and promotion of Mon-Shugu, Handmade Paper of the Monpa Tribe of Arunachal Pradesh
Schemes of NEC Department of Textiles & 2025-07-21 4.8553 2028-07-21 1.213825 2.42765 3.641475 1.113832501 Ongoing
466 ARUNACHAL PRADESH Industries
Setting up of Organic Turmeric Processing Unit cum Packaging Centre in New Lasum Patte of Dissing Passo Circle under Pakke Kessang District, Arunachal Pradesh
Schemes of NEC District Horticulture Off 2025-07-28 2.4429 2027-07-28 0.610725 0.610725 1.22145 0.610725 Ongoing
467 ARUNACHAL PRADESH Industries
Setting up of Common Facility Centre CFC for Persimmon Processing and Development of Value Chain in Dirang, West Kameng District, Arunachal Pradesh
Schemes of NEC Horticulture Department, 2025-07-28 4.9566 2027-07-28 2.4783 1.23915 3.71745 2.4783 Ongoing
468 ARUNACHAL PRADESH Industries
Technology intervention for development of Brokpa community through conservation of pure Dzomo for high milk production and clear value-added milk products Dirang, West Kameng district Arunachal Pradesh.
Schemes of NEC Department of Veterinary 2025-09-29 4.9632 2028-09-29 1.2408 0 1.2408 Ongoing
469 ARUNACHAL PRADESH Industries
Construction of Supermarket cum Parking Place at Kharsang Changlang District, Arunachal Pradesh.
Schemes of NEC Urban Development Departm 2025-10-23 12.5238 2028-10-23 3.13095 5.0095 8.14045 3.13095 Ongoing
470 ARUNACHAL PRADESH Power
Off-grid Electrification of Border Villages and Left Out Villages under RDSS
PM-DevINE Dept. of Power 2026-01-14 69.5236 2027-01-31 0 Ongoing
471 ARUNACHAL PRADESH Education
Construction of Girls Hostel G+1 at Donyi Polo Govt College Kamki, West Siang District, Arunachal Pradesh.
Schemes of NEC Executive Engineer, Yomch 2026-01-14 4.8517796 2028-01-14 3 3 1 Ongoing
472 ARUNACHAL PRADESH Education
Construction of Hostel at Govt. Model College Boys Roing Lower Dibang Valley District, Arunachal Pradesh.
Schemes of NEC Executive Engineer, PWD, 2026-02-03 4.86423 2028-02-03 1.03 0 1.03 Ongoing
473 ARUNACHAL PRADESH Education
Infrastructure Development of 6 Secondary School
NESIDS-OTRI Education Department 2026-03-25 39.7036 2028-03-25 0 Ongoing
474 ARUNACHAL PRADESH Education
Infrastructure Development of 5 Secondary School
NESIDS-OTRI Education Department 2026-03-25 39.2081 2028-03-25 0 Ongoing
475 ARUNACHAL PRADESH Education
Infrastructure Development in 04 Secondary School
NESIDS-OTRI Education Department 2026-03-25 25.9406 2028-03-25 0 Ongoing
476 ARUNACHAL PRADESH Sports
Setting up of Permanent Site of State Sports Academy at Miao, TCL Region, Phase-I, CHangland
PM-DevINE Youth Affairs and Sports 2026-03-30 130 2029-03-30 0 Ongoing
477 ARUNACHAL PRADESH Sports
Construction of Integrated Sports Complex at Dirang, Arunachal Pradesh
PM-DevINE Youth Affairs and Sports 2026-03-30 88 2029-03-30 0 Ongoing
478 ARUNACHAL PRADESH Sports
Construction of Football Stadium at Itanagar Capital Region ICR in Papum Pare District
PM-DevINE Youth Affairs and Sports 2026-03-30 181.26 2029-03-30 0 Ongoing
479 ARUNACHAL PRADESH Agriculture and Allied
Kiwi As An USP In Arunachal Pradesh.
Schemes of NEC Department of Horticultur 2026-05-15 35.1166 2029-05-15 0 Ongoing
480 ASSAM Education
Construction and renovation of Govt. HS school,Dibrugarh in Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-03 1.7273 2023-06-03 1.7273 0 1.7273 Ongoing
481 ASSAM Education
Construction and renovation of Cooton Collegiate Govt. HS school,Panbazar, Guwahati in Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-03 2.9497 2023-06-03 0.1 0 0.1 Ongoing
482 ASSAM Education
Construction and renovation of Dhubri Govt.Boy HS School ,Dhubri in Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-03 1.7273 2023-06-03 1.6010849 0 1.6010849 Ongoing
483 ASSAM Education
Construction and renovation of Kamrup Academy H.S. School, Chenikuthi, Guwahati, Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 2.2277 2021-03-30 1.5541 0 1.5541 1.563 Ongoing
484 ASSAM Education
Construction and renovation of Karimganj Govt. HS school,Karimganj in Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-03 1.2337 2023-06-03 0.858304 0 0.858304 Ongoing
485 ASSAM Education
Construction and renovation of Kuralguri Govt.Boy HS School ,Golaghat in Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-04 1.2337 2023-06-04 0.1 0 0.1 Ongoing
486 ASSAM Education
Construction and renovation of Panbazar Higher Secondary School, Panbazar, Guwahati, Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 2.2277 2021-03-30 1.6364079 0 1.6364079 2.0015 Ongoing
487 ASSAM Education
Construction and renovation of Silchar Govt. HS school,Cachar in Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-04 1.2337 2023-06-04 0.1 0 0.1 Ongoing
488 ASSAM Education
Construction and renovation of Sonaram Higher Secondary School, Bharalumukh, Guwahati, Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 2.2277 2021-03-30 1.5701 0 1.5701 0.628 Ongoing
489 ASSAM Education
Construction and renovation of Tarini Charan Govt. H.S. & M.P. School, Guwahati, Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 2.2277 2021-03-30 1.5741999 0 1.5741999 0.6196 Ongoing
490 ASSAM Education
Construction and renovation of Tezpur Govt. HS school,Tezpur, Sonitpur in Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-03 1.2337 2023-06-03 0.1 0 0.1 Ongoing
491 ASSAM Education
Construction of Additional Classrooms at Borguri High School, Tinsukia, Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 0.6216 2021-03-30 0.5906 0 0.5906 0.5905 Ongoing
492 ASSAM Education
Construction of Additional Classrooms at Karanga Girls Higher Secondary School Jorhat, Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 0.6216 2021-03-30 0.6215954 0 0.6215954 0.6215 Ongoing
493 ASSAM Education
Construction of Additional Classrooms by Strengthening for Senairam Girls Higher Secondary School Tinsukia in Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 0.6216 2021-03-30 0.2198 0 0.2198 0.193 Ongoing
494 ASSAM Education
Construction of Girls Hostel at Jorhat Govt. Girls Higher Secondary and Multipurpose School located in Jorhat, Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 2.1223 2021-03-30 0.682 0 0.682 0.2693 Ongoing
495 ASSAM Education
Construction of Meeting Hall by Strengthening of Barkolai Higher Secondary School, Nagaon, Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2020-03-29 0.6107 2021-03-30 0.57 0 0.57 0.57 Ongoing
496 ASSAM Education
Constrution and Renovatioin of lakhimpur Govt.HS School, lakhimpur in Assam
NESIDS-OTRI NESIDS Elementary Education Dept 2021-06-04 1.2337 2023-06-04 1.225 0 1.225 Ongoing
497 ASSAM Education
Transformation of school (50 nos) of the state as center of Excellence
NESIDS-OTRI NESIDS PWD (Education and Health 2023-11-14 400 2025-11-14 286.8695 0 286.8695 9.37095 Ongoing
498 ASSAM Health
Improvement / Special Infrastructure development of JSB Civil Hospital in Chirang District, Assam
NESIDS-OTRI NESIDS Welfare of Bodoland Dept. 2019-02-12 22.9924 2020-03-31 22.8724813 0 22.8724813 22.8724 Completed
499 ASSAM Health
Procurement of Ventilators (Newborn to Paediatric) for COVID-19 disease in Paediatric age group
NESIDS-OTRI NESIDS Dept. of Health & familly 2021-09-30 28.7 2022-03-31 7.275 0 7.275 Ongoing
500 ASSAM Health
Upgradation of 24 numbers of existing district hospitals for setting up of ICUs for treatment of COVID-19 patients in Assam
NESIDS-OTRI NESIDS Dept. of Health & familly 2020-07-07 97.488 2021-01-07 38.9952 0 38.9952 38.6849 Ongoing
501 ASSAM Agriculture and Allied
Agri-business centre with modern facilities including modest accommodation at Assam Agricultural University, Khanapara Campus, Assam
Schemes of NEC Schemes of NEC 2017-12-29 14.5015 2020-12-29 14.5 0 14.5 14.5 Completed
502 ASSAM Agriculture and Allied
Augmentation of Rubber Plantation and Production for Economic Development of Educated Unemployed Indigenous Tribal Communities in BTAD area, Chirang District (BTC), Assam
Schemes of NEC Schemes of NEC 2017-02-28 0.968 2020-02-28 0.8712 0 0.8712 0.87 Completed
503 ASSAM Agriculture and Allied
Community training centre on mushroom farming for livelihood and entreneurial development in the 6th Scheduled areas of BTR (Assam) and adjoining areas
Schemes of NEC Schemes of NEC Other 2022-03-31 4.99 2025-03-31 4.986 0 4.986 4.99 Completed
504 ASSAM Agriculture and Allied
Construction of Market shed at Salbari Bazar at Mushalpur, Assam
Schemes of NEC Schemes of NEC 2014-03-04 1.8755 2017-03-04 1.688 0 1.688 1.59 Completed
505 ASSAM Agriculture and Allied
Cultivation of Boro Paddy in Non traditional Areas. (West Khasi Hills, West Garo Hills, Ri-Bhoi, East Garo Hills & Jaintia Hills districts)
Schemes of NEC Schemes of NEC 2007-01-08 1 2011-01-21 0.9 0 0.9 0.9 Completed
506 ASSAM Agriculture and Allied
Development of Daranggiri Banana Market at Daranggiri, Goalpara, Assam
Schemes of NEC Schemes of NEC 2020-09-30 14.79 2023-09-30 10.3577073 0 10.3577073 5.3955 Ongoing
507 ASSAM Agriculture and Allied
Development of Fruits and Vegetable wholesale Market at Pamohi (Garchuk) Kamrup, Phase-III, Assam
Schemes of NEC Schemes of NEC 2016-05-20 12.98 2019-05-20 11.9438 0 11.9438 11.94 Completed
508 ASSAM Agriculture and Allied
Development of the Socio-Economic status of Rural Tribal Women at Sidli Development Block of Kajal Gaon sub Division, Chirang District, Assam
Schemes of NEC Schemes of NEC 2014-03-04 4.6676 2017-03-04 4.2008 0 4.2008 4.2 Completed
509 ASSAM Agriculture and Allied
Establishment of 20000 (Twenty Thousand) Litres Capacity Milk Processing Effluent Treatment Plant along with all ancillary services and staff quarters at Patacharkuchi LAC
Schemes of NEC Schemes of NEC 2023-03-31 7.3471 2026-03-26 6.0200226 0.7391682 6.7591908 6.0007708 Ongoing
510 ASSAM Agriculture and Allied
Establishment of integrated plant for production of Agriculture Bio-inputs in Assam Agriculture University
Schemes of NEC Schemes of NEC Other 2022-03-31 14.94 2025-03-31 14.936 0 14.936 9.96 Ongoing
511 ASSAM Agriculture and Allied
Establishment of modern boar semen production centre and creation of extension facilities for capacity building of piggery stakeholders. (ICAR, NRC on Pig)
Schemes of NEC Schemes of NEC 2016-09-06 4.31 2020-09-07 2.72 0 2.72 2.72 Completed
512 ASSAM Agriculture and Allied
Establishment of Modern Hygienic fish market at Topatoli, Kamrup, Assam
Schemes of NEC Schemes of NEC 2021-02-05 4.3491 2024-02-05 0.1 0 0.1 0.1 Completed
513 ASSAM Agriculture and Allied
Improving livelihood benchmark of poor and ultra poor through Fishery Centric Growth and Employment Intervention in Nalbari district, Assam
Schemes of NEC Schemes of NEC 2017-03-15 12.31 2020-03-15 12.31 0 12.31 12.31 Completed
514 ASSAM Agriculture and Allied
Integrated Piggery Development Project, Setting up of Slaughtering firm Dhaligaon under BTC, Kokrajar, Area.
Schemes of NEC Schemes of NEC 2005-03-24 0.7944 2008-03-24 0.71 0 0.71 0.71 Completed
515 ASSAM Agriculture and Allied
Pig Farming through promotion of Farmer Producer Organization (FPO) Tamulpur Subdivision, Baska (BTAD) district, Assam.
Schemes of NEC Schemes of NEC 2016-03-17 5.65 2019-03-17 5.65 0 5.65 5.65 Completed
516 ASSAM Agriculture and Allied
Proposal of identified block for providing key identified service at Bokajan Block, Karbi Anglong District, Assam
Schemes of NEC Schemes of NEC 2022-03-30 3.408 2025-12-31 3.408 0 3.408 3.408 Ongoing
517 ASSAM Agriculture and Allied
Proposal of identified block for providing key identified service at Boro Narainpur village, Harangajao ITDP Block, Dima Hasao, Assam
Schemes of NEC Schemes of NEC 2022-03-31 1.94 2025-03-31 1.9285136 0.0114864 1.94 1.746 Ongoing
518 ASSAM Agriculture and Allied
Proposal of identified block for providing key identified service at Chinthong Block, West Karbi Anglong District, Assam
Schemes of NEC Schemes of NEC 2022-03-30 4.612 2025-03-31 4.612 0 4.612 4.611989 Ongoing
519 ASSAM Agriculture and Allied
Proposal of identified block for providing key identified service at Harangajao ITDP Block, Dima Hasao, Assam
Schemes of NEC Schemes of NEC Other 2022-03-31 5 2025-03-31 4.8237231 0.1762769 5 4.5 Ongoing
520 ASSAM Agriculture and Allied
Proposal of identified block for providing key identified service at Lumbajong Block, Karbi Anglong District, Assam
Schemes of NEC Schemes of NEC 2022-03-31 4.968 2025-03-31 4.9672 0 4.9672 3.7308 Ongoing
521 ASSAM Agriculture and Allied
Proposal of identified block for providing key identified service at Nilip Block, Karbi Anglong District, Assam
Schemes of NEC Schemes of NEC 2022-03-27 4.66 2025-12-26 4.664 0 4.664 3.4890708 Ongoing
522 ASSAM Agriculture and Allied
Proposal of identified block for providing key identified service at Rongmowe Block, Karbi Anglong District, Assam
Schemes of NEC Schemes of NEC 2022-03-27 4.945 2025-12-29 4.948 0 4.948 3.7067569 Ongoing
523 ASSAM Agriculture and Allied
Proposal of identified block for providing key identified service at Samelangso Block, Karbi Anglong District, Assam
Schemes of NEC Schemes of NEC 2022-03-31 4.58 2025-03-31 4.583 0 4.583 3.4294343 Ongoing
524 ASSAM Agriculture and Allied
Proposal of identified block for providing key identified service at Sarmen Hanse village, Lumbajong Block, Karbi Anglong, Assam
Schemes of NEC Schemes of NEC 2022-03-31 1.97 2025-12-31 1.9696 0 1.9696 1.4844 Ongoing
525 ASSAM Agriculture and Allied
Socheng Development Block, Jirikingding, West Karbi Anglong, Hamren(30 Central Sector Schemes of NEC)
Schemes of NEC Schemes of NEC Other 2021-02-26 3.04 2024-02-29 3.04 0 3.04 3.04 Ongoing
526 ASSAM Agriculture and Allied
The Construction of wayside amenities as a part of Prime Minister Swachh Bharat Abhiyan (Clean India Mission), on approved Tourist Circuit falling under NERCMP Project Area in Karbi Anglong district of Assam
Schemes of NEC Schemes of NEC 2018-03-26 3.81 2021-03-26 2.6442 0 2.6442 2.64 Completed
527 ASSAM Agriculture and Allied
Upgradation of Sericulture training institute at Titabor, Assam
Schemes of NEC Schemes of NEC 2014-12-18 12.8181 2017-12-18 11.5363 0 11.5363 11.54 Completed
528 ASSAM Education
Aspirational District Baksa, Assam
Schemes of NEC Schemes of NEC 2019-07-02 1 2022-07-02 1 0 1 1 Completed
529 ASSAM Education
Aspirational District Barpeta, Assam
Schemes of NEC Schemes of NEC 2019-07-02 1 2022-07-02 1 0 1 1 Completed
530 ASSAM Education
Aspirational District Darrang, Assam
Schemes of NEC Schemes of NEC 2019-06-07 1 2022-06-07 1 0 1 1 Completed
531 ASSAM Education
Aspirational District Dhubri, Assam
Schemes of NEC Schemes of NEC 2019-06-11 1 2022-06-11 1 0 1 1 Completed
532 ASSAM Education
Aspirational District Goalpara, Assam
Schemes of NEC Schemes of NEC 2019-07-02 1 2022-07-02 1 0 1 1 Completed
533 ASSAM Education
Aspirational District Hailakandi, Assam
Schemes of NEC Schemes of NEC Other 2019-06-11 0.9487427 2022-06-11 0.9487 0 0.9487 0.9487 Completed
534 ASSAM Education
Aspirational District Udalguri, Assam
Schemes of NEC Schemes of NEC 2019-06-07 1 2022-06-07 1 0 1 1 Completed
535 ASSAM Education
Backward communities of Khasi-Jaintia Communities in the Cachar District, Assam
Schemes of NEC Schemes of NEC 2022-03-15 4.8181 2025-03-31 0.9 1 1.9 0.3168717 Ongoing
536 ASSAM Education
Backward communities of Singpho Community in Tinsukia, Assam
Schemes of NEC Schemes of NEC 2022-03-24 4.62 2025-03-24 3.6594891 0 3.6594891 Ongoing
537 ASSAM Education
Backward Communities Rongmei (Naga) Community in the Cachar District, Silchar, Assam
Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.6887 2025-03-31 1.17 0 1.17 0.6453542 Ongoing
538 ASSAM Education
Community Development Programme of Gorkha Community in Udalguri District, Assam
Schemes of NEC Schemes of NEC Other 2020-12-15 2.3011052 2023-12-15 2.3011052 0 2.3011052 2.3011052 Completed
539 ASSAM Education
Community development programme of Rabha Community in Udalguri District
Schemes of NEC Schemes of NEC 2021-01-11 3.4293 2024-01-11 3.43 0 3.43 2.87 Completed
540 ASSAM Education
Construction of Boys and Girls Hostel for Cotton University, Assam
Schemes of NEC Schemes of NEC 2020-08-31 11.85 2023-08-31 11.0026 0 11.0026 11.0026 Ongoing
541 ASSAM Education
Construction of Boys Hostel at Bineswar Brahma Engineering College, Kokrajhar, Assam
Schemes of NEC Schemes of NEC 2023-03-29 4.93 2026-03-29 3.69225 0 3.69225 Ongoing
542 ASSAM Education
Construction of bulding for the department of Geology in Cotton College, Guwahati, Assam
Schemes of NEC Schemes of NEC 2018-03-30 5.22 2021-03-30 4.9242351 0 4.9242351 4.18 Ongoing
543 ASSAM Education
Construction of Chandranath Sarmah Higher Secondary School at Bihaguri Sonitpur District, Assam.
Schemes of NEC Schemes of NEC PWD 2015-05-03 2.8647 2018-05-03 2.8647 0 2.8647 2.86 Foreclosed
544 ASSAM Education
Construction of Composite Regional Centre(North East) for Disability Study and Action in Assam by Shishu Sarothi
Schemes of NEC Schemes of NEC 2018-02-06 4.9 2021-02-06 4.763 0.1073274 4.8703274 4.103 Ongoing
545 ASSAM Education
Construction of Multi-Storied college Building (G+2), Assam Type at Arya Vidyapith College, Guwahati, Assam
Schemes of NEC Schemes of NEC Choose... 2023-03-30 9.28 2026-03-30 5.4128475 1.62385 7.0366975 5.4128475 Ongoing
546 ASSAM Education
Construction of New Academic building in Assam Women?s University, Jorhat, Assam
Schemes of NEC Schemes of NEC Choose... 2023-03-31 9.9325 2026-03-31 2.5663524 4.4208791 6.9872315 1.3019186 Ongoing
547 ASSAM Education
Construction of New Class Rooms & Laboratory of the Department of Life Science, Dibrugarh University, Assam
Schemes of NEC Schemes of NEC Other 2020-09-16 4.2213 2023-09-16 3.6732 0.5481 4.2213 3.846 Ongoing
548 ASSAM Education
Construction of RCC two (G2) building for seminar hall, computer centre and facilities for car parking at Darrang College, Tezpur, Assam
Schemes of NEC Schemes of NEC Dept. of Power 2012-11-21 2.07 2015-11-11 2.0659 0 2.0659 1.64 Ongoing
549 ASSAM Education
Construction of Saviour Orphan Children Home at Gossaigaon, Kokrajhar, Assam.
Schemes of NEC Schemes of NEC Dept. of Power 2014-03-05 2.65 2017-03-05 2.11 0 2.11 2.11 Completed
550 ASSAM Education
Construction/ Remodelling of RCC building including Development of Library, Vocational Centre etc. of Madhav Dev Higher Secondary School at Tulsimukh, Nagaon
Schemes of NEC Schemes of NEC Dept. of Power 2016-06-27 2.87 2019-06-27 2.3 0 2.3 2.3 Completed
551 ASSAM Education
Infrastructure Development of Omeo Kumar Das Institute of Social Chage and Development, Guwahati
Schemes of NEC Schemes of NEC 2016-05-13 11.33 2019-05-13 11.33 0 11.33 11.33 Completed
552 ASSAM Education
Setting up of Brahmaputra Studies Centre at Gauhati University Campus, Jalukbari, Gauhati
Schemes of NEC Schemes of NEC Other 2018-07-31 27.9933 2024-01-31 27.9938 0 27.9938 23.95 Ongoing
553 ASSAM Education
Setting up of the Central Instrumentation Facility of new CBCS Course at Dibrugarh Hanumanbax Surajmall Kanoi College, Dibrugarh
Schemes of NEC Schemes of NEC 2020-10-20 4.9878 2023-10-20 4.99 0 4.99 4.99 Completed
554 ASSAM Sports
Construction of Mini Stadium at Bihaguri, Sonitpur District.
Schemes of NEC Schemes of NEC 2014-03-03 4.3181 2017-03-03 3.8859 0 3.8859 3.89 Completed
555 ASSAM Sports
Construction of Titlagarh (Sonari) Sports Complex, Titlagarh, Assam
Schemes of NEC Schemes of NEC Dept. of Power 2012-04-25 2.45 2015-04-25 2 0 2 2 Completed
556 ASSAM Irrigation and Flood Control
Amring HEP (Karbi Anglong) 20 MW APGCL), Karbi Anglong dist.
Schemes of NEC Schemes of NEC 2008-11-25 2.11 2012-11-25 0.9 0 0.9 0.9 Completed
557 ASSAM Irrigation and Flood Control
Anti Erosion measures to protect BB of river Darranga at different reaches, Baksa Dist. Assam
Schemes of NEC Schemes of NEC 2018-03-14 4.96 2021-03-14 4.3727 0 4.3727 4.37266 Ongoing
558 ASSAM Irrigation and Flood Control
Anti-Erosion measure to protect Village of Lantibari No.1 & 2 Porbotjhora and Pub-Amguri, Chirang District from erosion of River Karnataka on RB,Assam
Schemes of NEC Schemes of NEC 2018-03-14 11.9 2021-03-14 0.1 0 0.1 0.1 Completed
559 ASSAM Irrigation and Flood Control
Anti-Erosion measure to protect villages of Uma Nagar upstream and its Adjoining area from the erosion of river Gangia Kokrajhar , Assam
Schemes of NEC Schemes of NEC 2018-03-14 4.05 2021-03-14 4.05 0 4.05 2.05 Completed
560 ASSAM Irrigation and Flood Control
Anti-Erosion Measures at different reaches on both bank of river Pomra(Assam), Baska dist.
Schemes of NEC Schemes of NEC 2014-06-04 2.2794 2017-06-04 2.0515 0 2.0515 2.05 Completed
561 ASSAM Irrigation and Flood Control
Anti-Erosion Measures to protect Ranipur and its adjoining area from the erosion of river Pekua, Kokrajhar dist.
Schemes of NEC Schemes of NEC 2012-03-23 3.4339 2015-03-23 3.0905 0 3.0905 3.09 Completed
562 ASSAM Irrigation and Flood Control
Bank protection at Ouguri (RB), Amguri(RB) and Amlighat (LB) on the river Killing (Ph-I), Morigaon District, Assam
Schemes of NEC Schemes of NEC 2018-03-14 4.5 2021-03-14 0.1 0 0.1 0.1 Completed
563 ASSAM Irrigation and Flood Control
Bio-Diversity Conservation of Basistha Bahini Watershed, in South West part of greater Guwahati, Kamrup dist.
Schemes of NEC Schemes of NEC 2009-08-25 4.9676 2012-08-25 4.4708 0 4.4708 4.47 Completed
564 ASSAM Irrigation and Flood Control
Controlling of Jiadhal river in Dhemaji district in Assam, Phase-I
Schemes of NEC Schemes of NEC 2006-02-27 14.9357 2009-02-27 9.4561 0 9.4561 9.46 Completed
565 ASSAM Irrigation and Flood Control
Dhankhunda flow irrigation scheme, Kamrup dist.
Schemes of NEC Schemes of NEC 2010-09-22 4.85 2013-09-22 4.365 0 4.365 4.37 Completed
566 ASSAM Irrigation and Flood Control
Gilabwr - Flow Irrigation scheme (FIS), Chirang dist.
Schemes of NEC Schemes of NEC 2012-03-23 4.18 2015-03-23 3.762 0 3.762 3.76 Completed
567 ASSAM Irrigation and Flood Control
Modernization & extension of Langparpan MIS , Karbianglong dist.
Schemes of NEC Schemes of NEC 2010-09-22 2.13 2013-09-22 1.92 0 1.92 1.92 Completed
568 ASSAM Irrigation and Flood Control
Promotion of an Environmentally sound approach for sustainable water management optimizing usage Rain water Harvesting for Roof tops in institutions, Health centres & community centres in Assam in 4 dist.
Schemes of NEC Schemes of NEC Public Health & Engg Depa 2015-12-01 9.2 2018-12-01 8.282 0 8.282 8.28 Completed
569 ASSAM Irrigation and Flood Control
Proposal of identified backward block for providing key identified services at Diyung Valley Maibang Dima Hasao, Assam
Schemes of NEC Schemes of NEC 2023-03-02 3.6787 2026-03-02 3.58 0 3.58 3.58 Ongoing
570 ASSAM Irrigation and Flood Control
Proposal of identified backward block for providing key identified services at Socheng Block of West Karbi Anglong District, Assam
Schemes of NEC Schemes of NEC Other 2023-02-17 5.12 2026-02-17 3.84 0 3.84 3.84 Ongoing
571 ASSAM Irrigation and Flood Control
Proposal of identified block for providing key identified services at Diyungbra ITDP, Dima Hasao District, Assam
Schemes of NEC Schemes of NEC 2023-03-01 3.799 2026-03-01 3.799 0 3.799 3.799 Completed
572 ASSAM Irrigation and Flood Control
Protection of Raimona Village and its adjoining area from the erosion of River Janali, Assam
Schemes of NEC Schemes of NEC 2011-02-01 3.74 2014-02-01 3.37 0 3.37 3.37 Completed
573 ASSAM Irrigation and Flood Control
Providing of Water Supply to Jawahar Navodaya Vidyalaya, Jalukie, Peren District, Nagaland.
Schemes of NEC Schemes of NEC 2017-11-01 3.34 2020-11-01 0.1 0 0.1 0.1 Completed
574 ASSAM Irrigation and Flood Control
Ram Enghee Minor Irrigation project, Karbi-anglong dist.
Schemes of NEC Schemes of NEC 2017-03-25 4.947 2020-03-25 4.4523 0 4.4523 4.45 Completed
575 ASSAM Irrigation and Flood Control
Retention and Rejuvenation of Dighali pukhuri at Guwahati, Kamrup Metro, Assam
Schemes of NEC Schemes of NEC Choose... 2023-03-31 4.92 2026-03-31 2.46 0 2.46 2.46 Ongoing
576 ASSAM Industries
Bamboo Plantation on Commercial Basis in BTC Area (Bodoland Territorial Areas)
Schemes of NEC Schemes of NEC 2006-11-01 1.7105 2009-11-01 1.1 0 1.1 1.1 Completed
577 ASSAM Industries
Danai Lunai Yojna-A Livelihood Project For Weavers on Eri Silk Hand-Woven Products of Bodoland Territorial Council Area
Schemes of NEC Schemes of NEC 2018-02-14 0.2525 2021-02-14 0.23 0 0.23 0.23 Completed
578 ASSAM Industries
Development & Standardization of an Improved Process for cooking & Reeling of Muga Coccon by Central Silk Board, Jorhat, Assam
Schemes of NEC Schemes of NEC 2006-03-28 0.0795 2009-03-28 0.07 0 0.07 0.07 Completed
579 ASSAM Industries
Empowering marginalised women of sixth scheduled areas of Assam through life skill education
Schemes of NEC Schemes of NEC Choose... 2022-03-31 1.88 2025-03-31 1.882 0 1.882 1.1280759 Ongoing
580 ASSAM Industries
Hahim Cluster Development Project under Boko Block, Kamrup, District, Assam
Schemes of NEC Schemes of NEC 2021-02-26 4.9773 2024-02-26 3.8868299 1 4.8868299 3.66 Ongoing
581 ASSAM Industries
Integrated Programme for Development for Water Hyacinth and Crafts in NER by NEDFI, Guwahati
Schemes of NEC Schemes of NEC 2010-03-25 1.617 2013-03-25 1.617 0 1.617 1.62 Completed
582 ASSAM Industries
Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19, in the state of Assam
Schemes of NEC Schemes of NEC 2020-12-30 4.7932 2023-12-30 4.6733895 0 4.6733895 2.93 Ongoing
583 ASSAM Industries
North East Bamboo Mission, Cane & Bamboo Technology Centre (CBTC), Narikal Basti, Zoo Narengi Road, Guwahati - 781024
Schemes of NEC Schemes of NEC 2004-10-08 2.6994 2007-10-08 2.6994 0 2.6994 2.7 Completed
584 ASSAM Industries
Regional Handloom & Handicrafts Marketing Complex by M/s ARTFED, Gopinath Bordoloi Road, Ambari, Guwahati - 781001, Assam
Schemes of NEC Schemes of NEC 2005-07-28 7.8534 2008-07-28 7.85 0 7.85 7.85 Completed
585 ASSAM Industries
Setting up of a Black Tea Manufacturing Unit by M/s. Horujan Tea Company, P.o. Jeypore, District Dibrugarh, Assam
Schemes of NEC Schemes of NEC 2009-09-09 1.9073 2012-09-09 0.48 0 0.48 0.48 Completed
586 ASSAM Industries
Setting up of a chira manufacturing unit by M/s. Salasar Chira Industries, Golaghat Basti, P.O. Hojai, Assam
Schemes of NEC Schemes of NEC 2007-01-02 0.5367 2009-01-02 0.48 0 0.48 0.48 Completed
587 ASSAM Industries
Setting up of a Common Facility Centre for Gold and Assamese Traditional Jewellery, Assam
Schemes of NEC Schemes of NEC 2017-02-20 5.7619989 2020-02-20 5.3391 0 5.3391 5.1893512 Completed
588 ASSAM Industries
Setting up of a CTC Black Tea Manufacturing Unit by M/s Longtong Tea Company, 8th Mile, Parbitapur, P.O. Jagun, District Tinsukia, Assam
Schemes of NEC Schemes of NEC 2009-09-09 2.3098 2011-09-09 0.5 0 0.5 0.5 Completed
589 ASSAM Industries
Setting up of a CTC Black Tea Manufacturing Unit by M/s. Ever Assam Tea Pvt. Ltd., Village & P.O. Laipuli, District Tinsukia, Assam
Schemes of NEC Schemes of NEC 2009-09-09 2.9317 2012-09-09 0.5 0 0.5 0.5 Completed
590 ASSAM Industries
Setting up of a CTC Tea & Black Tea Manufacturing Unit by M/s. Regina Tea Company Pvt. Ltd., Changlang Road, P.O. Magherita, Rupai Siding, doom Dooma, Tinsukia District, Assam
Schemes of NEC Schemes of NEC 2009-09-09 2.3098 2012-09-09 0.5 0 0.5 0.5 Completed
591 ASSAM Industries
Setting up of a jute products industry for manufacturing fine jute yarn unit by M/s. Apex Yarn Pvt. Ltd., Lokhra Industrial Estate, West Boragaon, Guwahati
Schemes of NEC Schemes of NEC 2006-10-31 3.284 2009-10-31 0.2007 0 0.2007 0.2 Completed
592 ASSAM Industries
Setting up of a LAMC and coke breeze manufacturing unit by M/s. Sri Shyam Carbon Company, 12th Mile Village-Ambher Jorhat, District Kamrup, Assam
Schemes of NEC Schemes of NEC 2006-12-19 2.1295 2009-12-19 1.92 0 1.92 1.92 Completed
593 ASSAM Industries
Setting up of a LAMC breeze coke & hard coke manufacturing unit by M/s. K.D. Cokes, 11th Mile, Amerigog, Jorabat, G.S. Road, Kamrup District, Assam
Schemes of NEC Schemes of NEC 2007-01-16 5.8256 2010-01-16 5.24 0 5.24 5.24 Completed
594 ASSAM Industries
Setting up of a manufacturing of chira (rice flake) industry by M/s. Shree Om Chira Industries, Station Road, Lanka, Nagaon, Assam
Schemes of NEC Schemes of NEC 2007-01-02 0.8208 2010-01-02 0.74 0 0.74 0.74 Completed
595 ASSAM Industries
Setting up of a manufacturing of maida, atta, wheat, bran & other wheat products for processing and packaging unit by M/s. Nawka Food Industry, Furkating, District Golaghat, Assam
Schemes of NEC Schemes of NEC 2006-06-12 0.8326 2009-06-12 0.75 0 0.75 0.75 Completed
596 ASSAM Industries
Setting up of a manufacturing of Mustard Oil Processing and Pouch Packaging Unit by M/s. M.R. Agro Industries, Sakrahi, Narayanpur
Schemes of NEC Schemes of NEC 2006-06-23 1.3634 2009-06-23 1.23 0 1.23 1.23 Completed
597 ASSAM Industries
Setting up of a manufacturing of ready made garments unit by M/s. Mens clothing Company, shed No. A-6(A) & B-6(A), Mini Industrial Estate, Kalapahar, Guwahati.
Schemes of NEC Schemes of NEC 2006-06-12 0.3038 2009-06-12 0.27 0 0.27 0.27 Completed
598 ASSAM Industries
Setting up of a manufacturing of soapstone powder by M/s. Pashupati Mercantiles Pvt. Ltd., Kamarkuchi, P.O. Taopesia, Kamrup
Schemes of NEC Schemes of NEC 2007-01-02 0.4706 2010-01-02 0.1172 0 0.1172 0.12 Completed
599 ASSAM Industries
Setting up of a manufacturing of wheat products such as atta, maida, suji, etc. unit by M/s. Nav Manas Food Products, NH-37, Mohanbari, Hindugaon, Dibrugarh, Assam
Schemes of NEC Schemes of NEC 2007-01-05 0.8081 2010-01-05 0.73 0 0.73 0.73 Completed
600 ASSAM Industries
Setting up of a manufacturing unit for adhesive tapes, cello tapes, printed taped, box,etc by M/s Shree Balajee Enterprises, Jojadia Complex, Fancy Bazar, Guwahati
Schemes of NEC Schemes of NEC 2006-12-19 0.345 2009-12-19 0.31 0 0.31 0.31 Completed
601 ASSAM Industries
Setting up of a Medium Voltage Electrical Control and Distribution Panels as per IS:8623 unit by M/s. Assam Electricals, Village Laipuli, P.O. Panitola, District Tinsukia, Assam
Schemes of NEC Schemes of NEC 2009-09-09 0.3026 2012-09-09 0.27 0 0.27 0.27 Completed
602 ASSAM Industries
Setting up of a mild steel black wire & mild steel black annealed wire manufacturing by M/s. Koushal Steel, West Boragaon, P.O. Gotanagar, Kamrup, Assam
Schemes of NEC Schemes of NEC 2007-01-02 0.8921 2009-01-02 0.324 0 0.324 0.32 Completed
603 ASSAM Industries
Setting up of a mild steel ingots manufacturing unit by M/s. Cachar Ispat Pvt. Ltd., 12, M.S. Road, Fancy Bazar, Guwahati
Schemes of NEC Schemes of NEC 2009-10-26 1.7927 2013-10-26 0.4482 0 0.4482 0.45 Completed
604 ASSAM Industries
Setting up of a mustard oil processing and pouch packaging unit by M/s. Tirupati Food Products, Pancharatna Road, Goalpara, Assam
Schemes of NEC Schemes of NEC 2009-11-11 0.506 2012-11-11 0.46 0 0.46 0.46 Completed
605 ASSAM Industries
Setting up of a pharmaceutical liquid and ointment formulation manufacturing unit by M/s. Quality Pharma Products Pvt. Ltd., Industrial Area, Lahoal, Dibrugarh, Assam
Schemes of NEC Schemes of NEC 2006-12-29 2.1534 2008-12-29 0.5 0 0.5 0.5 Completed
606 ASSAM Industries
Setting up of a processed bottled drinking water manufacturing unit by M/s. Udayak Agro Products Pvt. Ltd., Udayan Vihar, Satgaon, Guwahati
Schemes of NEC Schemes of NEC 2007-01-16 1.4168 2009-01-16 0.3542 0 0.3542 0.35 Completed
607 ASSAM Industries
Setting up of a processed bottled drinking water, pet bottles & jars manufacturing unit by M/s. B.N. Industries Pvt. Ltd., Kamkhya Umananda Bhavan, A.T. Road, Guwahati
Schemes of NEC Schemes of NEC 2009-10-15 0.9231 2013-10-15 0.2308 0 0.2308 0.23 Completed
608 ASSAM Industries
Setting up of a Processing for mustard oil unit by M/s. A.R. Enterprises, Industrial Estate, Gopal Bazar, Nalbari, Assam
Schemes of NEC Schemes of NEC 2006-06-24 0.4402 2008-06-24 0.4 0 0.4 0.4 Completed
609 ASSAM Industries
Setting up of a processing of crushed stone chips unit by M/s. Yankee Crusher, Golaghat Basti, Hojai, Nagaon, Assam
Schemes of NEC Schemes of NEC 2006-06-13 0.066 2009-06-13 0.06 0 0.06 0.06 Completed
610 ASSAM Industries
Setting up of a PVC Pipes & PVC doors etc. manufacturing unit by M/s. Om Shree Products, 496, Lokhra Road, Saukuchi, Guwahati
Schemes of NEC Schemes of NEC 2006-12-19 0.7775 2009-12-19 0.7 0 0.7 0.7 Completed
611 ASSAM Industries
Setting up of a PVC pipes manufacturing unit by M/s. Kamakhya Poly Udyog, Amerigog Village, G.S. Road, Jorabat, Guwahati-781023
Schemes of NEC Schemes of NEC 2006-12-18 1.4078 2009-12-18 1.27 0 1.27 1.27 Completed
612 ASSAM Industries
Setting up of a ready made shirts manufacturing unit by M/s. ACN Products & Marketing, Industrial Estate, Kalapahar, Guwahati, Assam
Schemes of NEC Schemes of NEC 2007-01-18 0.1673 2009-01-18 0.15 0 0.15 0.15 Completed
613 ASSAM Industries
Setting up of a Roller flour mill to manufacture wheat products such as atta, suji, maida, etc by M/s. Ishwar Food Products Pvt. Ltd., Pathiapathar Gaon, Tinsukia, Assam
Schemes of NEC Schemes of NEC 2006-12-29 0.7271 2009-12-12 0.1818 0 0.1818 0.18 Completed
614 ASSAM Industries
Setting up of a roller flour mill to manufacturing wheat products such as atta, suji maida, bran, etc. unit by M/s. Ganesh Roller Flour Mill, Barbethi, Haribargaon, Nagaon, Assam
Schemes of NEC Schemes of NEC 2007-01-22 1.0553 2009-01-22 0.95 0 0.95 0.95 Completed
615 ASSAM Industries
Setting up of an industry for manufacturing HDPE/PP Circular Woven Fabric and Industrial Sacks by M/s. Gattani Polymers, GB Gattani Industrial Estate, Mariani road, Cinamara, Jorhat, Assam
Schemes of NEC Schemes of NEC 2006-06-12 1.3425 2009-06-12 1.21 0 1.21 1.21 Completed
616 ASSAM Industries
Setting up of Chira (beaten rice) industry by M/s. Bajaj Industries, Station Road, Nalbari, Assam
Schemes of NEC Schemes of NEC 2007-01-02 0.5402 2009-01-02 0.49 0 0.49 0.49 Completed
617 ASSAM Industries
Setting up of Ice-cream & wafer cones unit by M/s Excellent Dairy & Farming Pvt. Ltd., Opp. Kamrup Weigh Bridge, Guwahati, Assam
Schemes of NEC Schemes of NEC 2009-09-02 1.8801 2012-09-02 0.47 0 0.47 0.47 Completed
618 ASSAM Industries
Setting up of plastic disposable glass and cups manufacturing unit by M/s. Siddhi Vinayak Papers (India) Pvt. Ltd., Lulangaon, Betkuchi, Lokhra, Guwahati- 781034
Schemes of NEC Schemes of NEC 2007-01-02 1.6521 2010-01-02 0.423 0 0.423 0.42 Completed
619 ASSAM Industries
Setting up of the Handloom Trade Centre at Dibrugarh, Assam by the Directorate of Handloom and Textile, Government of Assam
Schemes of NEC Schemes of NEC 2013-03-26 9.917 2016-03-31 8.9253 0 8.9253 8.93 Completed
620 ASSAM Industries
Setting up of TMT Bars & Steel Structure Manufacturing Unit by M/s. Vision Ispat Pvt. Ltd., Saharia House, G.S. Modi Road, Jyotinagar, Dibrugarh, Assam
Schemes of NEC Schemes of NEC 2009-09-09 2.3098 2012-09-09 0.5 0 0.5 0.5 Completed
621 ASSAM Industries
Setting up of wheat products mills for manufacturing maida, atta, wheat bran processing & packaging unit by M/s. B.K. Roller Flour Mills, Haribargoan, Nagaon, Assam
Schemes of NEC Schemes of NEC 2006-06-12 1.192 2009-06-12 1.07 0 1.07 1.07 Completed
622 ASSAM Industries
Tea Blending, Packaging and Value Addition unit for small tea growers of North Eastat Lahoal Dibrugar
Schemes of NEC Schemes of NEC 2023-02-07 2.97 2026-02-07 2.9675 0 2.9675 2.75 Completed
623 ASSAM Industries
Upgradation/Replacement of Machineries of the Spinning Unit at Tulsibari, Assam
Schemes of NEC Schemes of NEC 2011-11-22 4.5734 2014-11-28 4.12 0 4.12 4.12 Completed
624 ASSAM Information and Public Relatio
49th Annual National Conference of Nutrition Society of India organised by Assam University
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.04 2021-10-01 0 Completed
625 ASSAM Information and Public Relatio
Audio Visual Hub of Jyoti, Chitraban Film Studio, Kamrup, Assam
Schemes of NEC Schemes of NEC 2018-03-29 10 2020-03-29 10 0 10 10 Completed
626 ASSAM Information and Public Relatio
Conclave on Brahmaputra River Basin organised by Guwahati University
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.25 2021-04-01 0 Completed
627 ASSAM Information and Public Relatio
Conclave on Brahmaputra River Basin organised by NEC and Guwahati University
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.25 2021-04-01 0 Completed
628 ASSAM Information and Public Relatio
Construction of Cultural Complex of Shankardev Shishu Niketan at Hajongbari, Kamrup
Schemes of NEC Schemes of NEC 2022-03-31 14.1747 2025-03-31 14.17757 0 14.17757 9.1564309 Ongoing
629 ASSAM Information and Public Relatio
Construction of Regional Multi-Utility and Town Hall and Cultural Centre, Tinsukia, Assam.
Schemes of NEC Schemes of NEC 2014-02-28 7.98 2018-02-28 7.18 0 7.18 7.18 Completed
630 ASSAM Information and Public Relatio
Construction of the Nepali/Gorkha Cultural cum Multi-purpose Centre at Guwahati
Schemes of NEC Schemes of NEC Choose... 2022-03-31 14.4416 2025-03-31 14.07596 0 14.07596 5.05456 Ongoing
631 ASSAM Information and Public Relatio
Demonstration of Crafts & Textiles of the North Eastern at NEHHDC?s Craft Promotion Centre (CPC), Guwahati organised by NEHHDC
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.168 2021-04-01 0 Completed
632 ASSAM Information and Public Relatio
Destination Himachalorganised by NERAMAC
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0355 2021-04-01 0 Completed
633 ASSAM Information and Public Relatio
Emerging North East from 25th to 27th October, 2017 of Assam organised by Govt. of Assam
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.099 2021-04-01 0 Completed
634 ASSAM Information and Public Relatio
Establishment of Deori Tribal Cultural Complex, Narayanpur, Lakhimpur District, Upper Assam.
Schemes of NEC Schemes of NEC Other 2012-04-25 4.97 2015-04-25 4.4686 0 4.4686 3.37 Ongoing
635 ASSAM Information and Public Relatio
Geographical indication (GI) Registration on Sikkimese Lepcha Hat of Sikkim organised by NEHHDC
Schemes of NEC Schemes of NEC Choose... 2019-06-27 0.075 2022-06-27 0 Completed
636 ASSAM Information and Public Relatio
Global Conference on Cyber Space (GCCS) organised by IIT Guwahati
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.04 2021-04-01 0 Completed
637 ASSAM Information and Public Relatio
Government Achievements & Schemes Expo organised by NERAMAC
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0202 2021-04-01 0 Completed
638 ASSAM Information and Public Relatio
International Conference on Scientific and Indigenous bio-cultural knowledge organised by Assam University Silchar
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.05 2021-04-01 0 Completed
639 ASSAM Information and Public Relatio
Purchasing Gifts during DNE 2017 organised by NEHHDC
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0225 2021-04-01 0 Completed
640 ASSAM Information and Public Relatio
Seminar cum Youths meet on Digitalization and Rural Development in NE India organised by Assam University Silchar
Schemes of NEC Schemes of NEC 2018-04-01 0.03 2021-04-01 0.0225 0 0.0225 0.02 Completed
641 ASSAM Information and Public Relatio
Strengthening of Hindi Section in the Library of Assam Science & Technology University, Jalukbhari, Guwahati, Assam
Schemes of NEC Schemes of NEC Other 2021-01-21 0.1 2024-01-31 0.1 0 0.1 0.1 Completed
642 ASSAM Information and Public Relatio
Strengthening of Hindi Section in the Library of Cotton University, Guwahati, Assam
Schemes of NEC Schemes of NEC 2021-01-21 0.1 2024-01-21 0.04 0 0.04 0.04 Ongoing
643 ASSAM Information and Public Relatio
Support of qualified visual Merchandisers in NEHHDC Emporia & Regional Sales Promotion Offices organised by NEHHDC
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1811 2021-04-01 0 Completed
644 ASSAM Information and Public Relatio
Tai Educational and Cultural Centre, Dibrugarh, Assam.
Schemes of NEC Schemes of NEC Other 2014-02-25 3.3349 2017-02-25 3.0014 0 3.0014 2.4 Ongoing
645 ASSAM Information and Public Relatio
Technique 2017, Guwahati organised by IIT, Guwahati
Schemes of NEC Schemes of NEC 2018-04-01 0.04 2021-04-01 0.03 0 0.03 0.03 Completed
646 ASSAM Information and Public Relatio
Thailand-India travel fair, Bangkok, Thailand organised by NEHHDC
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0829 2021-04-01 0 Completed
647 ASSAM Information and Public Relatio
Two workshops on utilisation of Bamboo as Building Material in NER at Guwahati organised by CBRI, Roorkee
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.09 2021-04-01 0 Completed
648 ASSAM Information and Public Relatio
Upgradation of Tourist Facilities at Kaziranga
Schemes of NEC Schemes of NEC 2022-03-31 14.3276 2025-03-31 14.32761 0 14.32761 7.860259 Ongoing
649 ASSAM Health
Assam Medical College, Dibrugarh, Assam
Schemes of NEC Schemes of NEC 2005-03-15 8.2297 2008-03-15 4.96 0 4.96 4.96 Completed
650 ASSAM Health
Construction of Vertical Extension of 1st Floor (Part), 2nd & 3rd Floors of MDS building at Regional Dental College, Guwahati, Assam
Schemes of NEC Schemes of NEC 2012-09-03 4.6182 2015-09-03 2.92 0 2.92 2.92 Completed
651 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- III)
Schemes of NEC Schemes of NEC 2007-07-06 7.61 2009-07-06 7.61 0 7.61 7.61 Completed
652 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- III)
Schemes of NEC Schemes of NEC 2009-09-18 8.04 2011-09-18 8.04 0 8.04 8.04 Completed
653 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- III)
Schemes of NEC Schemes of NEC 2008-08-06 5 2012-08-06 5 0 5 5 Completed
654 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- III)
Schemes of NEC Schemes of NEC 2010-06-12 16.5 2012-06-12 16.5 0 16.5 16.5 Completed
655 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- III)
Schemes of NEC Schemes of NEC 2004-12-16 1 2007-12-16 1 0 1 1 Completed
656 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- III)
Schemes of NEC Schemes of NEC 2005-06-30 3.5 2008-06-30 3.5 0 3.5 3.5 Completed
657 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- III)
Schemes of NEC Schemes of NEC 2013-05-09 11 2015-05-09 11 0 11 11 Completed
658 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- III)
Schemes of NEC Schemes of NEC 2006-05-11 9.4 2008-05-11 9.4 0 9.4 9.4 Completed
659 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV)
Schemes of NEC Schemes of NEC 2014-11-28 4.775 2017-11-28 4.775 0 4.775 4.78 Completed
660 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV)
Schemes of NEC Schemes of NEC 2015-08-21 4.775 2018-08-21 4.775 0 4.775 4.78 Completed
661 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV)
Schemes of NEC Schemes of NEC 2013-03-25 8.8653 2016-03-25 8.8653 0 8.8653 8.87 Completed
662 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV)
Schemes of NEC Schemes of NEC 2016-07-26 8.1231 2019-07-26 8.1231 0 8.1231 8.12 Completed
663 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV)
Schemes of NEC Schemes of NEC 2017-08-17 8 2020-08-17 8 0 8 8 Completed
664 ASSAM Health
Dr. B. Borooah Cancer Institute, Guwahati (RPP- IV)
Schemes of NEC Schemes of NEC 2014-05-03 0.5 2016-05-03 0.5 0 0.5 0.5 Completed
665 ASSAM Health
Establishment of a Hospital Ship on the river Brahmaputra by C-NES, Guwahati, Assam
Schemes of NEC Schemes of NEC 2009-11-30 4 2012-11-30 2.4 0 2.4 2.4 Completed
666 ASSAM Health
Establishment of Community Ophthalmology and School of Optometry and Ophthalmic Asstt. Technology at Sri Sankaradeva Nethralaya, Guwahati
Schemes of NEC Schemes of NEC 2009-02-26 4.7375 2012-02-26 4.49 0 4.49 4.49 Completed
667 ASSAM Health
Establishment of New Govt. Nursing College at Jorhat, Assam
Schemes of NEC Schemes of NEC 2024-01-04 12.75 2027-01-04 3.19 3.1864285 6.3764285 3.1869 Ongoing
668 ASSAM Health
Gauhati Medical College, Guwahati, Assam
Schemes of NEC Schemes of NEC 2005-09-09 12.3535 2008-09-09 11.11 0 11.11 11.11 Completed
669 ASSAM Health
Phase-I Extension of Sri Sankaradeva Nethralaya, Guwahati, Assam for procurment of equipment of Vitrectomy and OCT
Schemes of NEC Schemes of NEC 2011-03-23 1.778 2016-03-23 1.78 0 1.78 1.78 Completed
670 ASSAM Health
Regional College of Nursing, Guwahati, Assam
Schemes of NEC Schemes of NEC 2005-03-16 5.7314 2008-03-16 5.16 0 5.16 5.16 Completed
671 ASSAM Health
Regional Dental College, Guwahati, Assam
Schemes of NEC Schemes of NEC 2005-03-16 13.1094 2008-03-16 7.18 0 7.18 7.18 Completed
672 ASSAM Health
Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Assam for activities related to combating COVID-19 pandemic
Schemes of NEC Schemes of NEC 2020-04-01 4.99 2023-04-01 4.99 0 4.99 4.99 Completed
673 ASSAM Health
Silchar Medical College, Silchar, Assam
Schemes of NEC Schemes of NEC 2005-09-09 13.9709 2008-09-09 6.43 0 6.43 6.43 Completed
674 ASSAM Health
Support to Sankar Madhab Rural charity Hospital, Panikheti, Assam
Schemes of NEC Schemes of NEC 2006-02-14 4.98 2009-02-14 4.48 0 4.48 4.48 Completed
675 ASSAM Health
Up-gradation of Academic Facilities at Down Town College of Allied Health Sciences, Panikheri (near Guwahati)., Assam
Schemes of NEC Schemes of NEC 2010-03-23 4.6 2013-03-23 3 0 3 3 Completed
676 ASSAM Health
Up-gradation of Civil Hospital, Sonari, Sibasagar District , Assam
Schemes of NEC Schemes of NEC 2005-01-03 4.1731 2008-01-03 3.01 0 3.01 3.01 Completed
677 ASSAM Health
Upgradation of services of Makunda Christian Leprosy and General Hospital, Bazaricherra, Karimganj
Schemes of NEC Schemes of NEC 2020-09-11 4.6 2023-09-11 4.6 0 4.6 4.6 Completed
678 ASSAM Power
132 KV S/C Trans. Line from Mariani to Nazira along with132/33 KV, 2 x25 MVA S/s at Nazira
Schemes of NEC Schemes of NEC 2009-06-23 22.61 2012-06-23 20.34 0 20.34 20.34 Completed
679 ASSAM Power
Augmentation of transformer capacity of 132/33kV Biswanath Charali (Pavoi) Sub-Station from 2X16 MVA to 2X40 MVA, Assam
Schemes of NEC Schemes of NEC 2016-05-20 5.67 2019-05-20 5.1 0 5.1 5.1 Completed
680 ASSAM Power
Augmentation of transformer capacity of 220X132 kV BTPS Sub-Station from 1X160 MVA 1X80MVA to 2X160, Kokrajhar District, Assam
Schemes of NEC Schemes of NEC 2016-05-20 6.78 2018-05-20 6.102 0 6.102 6.1 Completed
681 ASSAM Power
Construction of 132/33KV, 1x16MVA 1X25MVA, Umrangshu S/s , North Cachar Hills District.
Schemes of NEC Schemes of NEC 2011-03-01 13.44 2013-03-01 12.09 0 12.09 12.09 Completed
682 ASSAM Power
Construction of 2X5Mva, 33/11Kv Substation at Garmur, Majuli in Jorhat, Assam
Schemes of NEC Schemes of NEC Choose... 2018-01-15 6.81 2021-01-15 0 Foreclosed
683 ASSAM Power
Construction of 33/11kV, 2X5 MVA Sub-Station alongwith associated 33kV, 11kV & LT Feeders at Bishnupur Panchali under Dhemaji Electrical Division, APDCL, Dhemaji, Assam
Schemes of NEC Schemes of NEC 2016-05-20 10.25 2019-05-20 9.225 0 9.225 9.23 Completed
684 ASSAM Science and Technology
A Study on Hydro carbon pollution in Lentic Eco systems in and around oilfield areas and effect of hydrocarbon contamination of flora and fauna, (IASST) Guwahati, Institute of Advanced Study in Science & Technology (IASST)
Schemes of NEC Schemes of NEC 2013-03-22 0.2454 2016-03-22 0.2454 0 0.2454 0.25 Completed
685 ASSAM Science and Technology
Afforestation of Denuded Hills in DimaHasao District of Assam.
Schemes of NEC Schemes of NEC Choose... 2022-03-28 2.0069 2025-03-28 2.0068882 0 2.0068882 Ongoing
686 ASSAM Science and Technology
Afforestation of Denuded Hills in KarbiAnglong District of Assam.
Schemes of NEC Schemes of NEC Choose... 2022-03-28 2.0422 2025-03-28 0 Foreclosed
687 ASSAM Science and Technology
Assessment of Risk due to Intake of artificial colours through foodstuffs available in the North Eastern States (including Sikkim) Assam
Schemes of NEC Schemes of NEC 2009-12-07 0.19 2012-12-07 0.19 0 0.19 0.19 Completed
688 ASSAM Science and Technology
Computer Training for Teachers of Assam State for 10 PC System in 6 Schools
Schemes of NEC Schemes of NEC 2005-03-31 0.0277 2008-03-31 0.0277 0 0.0277 0.03 Completed
689 ASSAM Science and Technology
IT College Education Programme at North Lakhimpur College for Library,books,etc
Schemes of NEC Schemes of NEC 2005-03-31 0.0051 2008-03-31 0.0051 0 0.0051 0.01 Completed
690 ASSAM Science and Technology
Online/Realtime Seismic Network for Disaster Mitigation in North East India
Schemes of NEC Schemes of NEC 2005-03-31 1.7 2008-03-31 1.7 0 1.7 1.7 Completed
691 ASSAM Science and Technology
Seismic Vulnerability Assessment of Major Cities in North Eastern India (NEIST), Jorhat
Schemes of NEC Schemes of NEC 2013-01-11 1.8425 2015-01-11 1.8425 0 1.8425 1.84 Completed
692 ASSAM Science and Technology
Setting up of model rain water harvesting system in NIRD-NERC Guwahati (NIRD)
Schemes of NEC Schemes of NEC 2013-01-11 0.0703 2016-01-11 0.0703 0 0.0703 0.07 Completed
693 ASSAM Science and Technology
Strengthening on Geo-Informatic Application for Rural Development (C-GARD) laboratory (NIRD), National Institute of Rural Development (NIRD&PR), Guwahati
Schemes of NEC Schemes of NEC 2011-02-28 1.8197 2014-02-28 1.8197 0 1.8197 1.82 Completed
694 ASSAM Transport and Communication
5 Nos. road in Silchar Town
Schemes of NEC Schemes of NEC 2004-11-18 4.99 2007-11-18 4.66 0 4.66 4.66 Completed
695 ASSAM Transport and Communication
Agia-Medhipara-Phulbari-Tura
Schemes of NEC Schemes of NEC 2005-12-16 19.9896 2008-12-16 17.99 0 17.99 17.99 Completed
696 ASSAM Transport and Communication
Amingaon-North Guwahati
Schemes of NEC Schemes of NEC 2004-08-16 4.85 2007-08-16 4.85 0 4.85 4.85 Completed
697 ASSAM Transport and Communication
Baramara-Rangagarh road
Schemes of NEC Schemes of NEC 2004-08-04 4.7318 2007-08-04 4.73 0 4.73 4.73 Completed
698 ASSAM Transport and Communication
Bhawanipur NH-31 to Manas National Park via Saudarvitha Ananda Bazar Road
Schemes of NEC Schemes of NEC 2013-02-19 57.77 2016-02-19 51.993 0 51.993 51.99 Completed
699 ASSAM Transport and Communication
Bridge over Gaglacherra road
Schemes of NEC Schemes of NEC 2006-08-24 13.91 2009-08-24 13.32 0 13.32 13.32 Completed
700 ASSAM Transport and Communication
Bridge over river Barak at Fulertal
Schemes of NEC Schemes of NEC 2005-03-01 19.27 2008-03-01 17.636 0 17.636 17.64 Completed
701 ASSAM Transport and Communication
Construction of Hangars and Apron at LGBI Airport, Guwahati
Schemes of NEC Schemes of NEC 2013-02-20 32.06 2016-02-20 18.35 0 18.35 18.35 Completed
702 ASSAM Transport and Communication
Construction of Majuli-Bangaon(Dakchin Pat Satra) Road
Schemes of NEC Schemes of NEC 2018-03-13 14.91 2021-03-13 0.1 0 0.1 0.1 Foreclosed
703 ASSAM Transport and Communication
Digboi-Pengiri-Bordumsa-Mohadevpur road
Schemes of NEC Schemes of NEC 2006-09-05 42.89 2009-09-05 38.6 0 38.6 38.6 Completed
704 ASSAM Transport and Communication
Extension of Apron at Jorhat Airport
Schemes of NEC Schemes of NEC 2013-02-20 9.51 2016-02-20 5.71 0 5.71 5.71 Completed
705 ASSAM Transport and Communication
Extention of Runway to 7500 feet and construction of Isolation bay and Taxi way at Dibrugarh Airport
Schemes of NEC Schemes of NEC 2013-02-20 56.34 2016-02-20 31.6959 0 31.6959 31.7 Foreclosed
706 ASSAM Transport and Communication
Hajo-Nalbari-Sarthebari
Schemes of NEC Schemes of NEC 2004-08-18 66.31 2007-08-18 59.68 0 59.68 59.68 Completed
707 ASSAM Transport and Communication
Improvement of Mairang-Ranigodown-Azra Road
Schemes of NEC Schemes of NEC 2010-12-22 24.94 2013-12-22 22.45 0 22.45 22.45 Completed
708 ASSAM Transport and Communication
Improvement of Silchar-Kalain road connecting NH-53 to NH-44
Schemes of NEC Schemes of NEC 2010-02-18 59.25 2013-02-18 53 0 53 53 Completed
709 ASSAM Transport and Communication
ISBT Jorhat
Schemes of NEC Schemes of NEC 2006-08-24 11.3779 2009-08-24 9.9 0 9.9 9.9 Completed
710 ASSAM Transport and Communication
ISTT Guwahati
Schemes of NEC Schemes of NEC 2005-05-09 9.6027 2008-05-09 8.64 0 8.64 8.64 Completed
711 ASSAM Transport and Communication
Jowai-Nartiang-Khanduli-Baithalangso
Schemes of NEC Schemes of NEC 2011-02-23 71 2011-02-23 63 0 63 63 Completed
712 ASSAM Transport and Communication
Laimekuri-Nari-Telem-Rimi road
Schemes of NEC Schemes of NEC 2004-08-18 2.2363 2008-08-18 2.01 0 2.01 2.01 Completed
713 ASSAM Transport and Communication
Lanka-Garampani road
Schemes of NEC Schemes of NEC 2004-07-15 47.5333 2008-07-15 42.78 0 42.78 42.78 Completed
714 ASSAM Transport and Communication
Na Ali Road
Schemes of NEC Schemes of NEC 2006-09-05 52.8 2009-09-05 47.52 0 47.52 47.52 Completed
715 ASSAM Transport and Communication
Pakke-Seijosa-Itakhola
Schemes of NEC Schemes of NEC 2015-06-02 13.76 2018-06-02 12.384 0 12.384 12.38 Completed
716 ASSAM Transport and Communication
Pandit-Hemchandra road
Schemes of NEC Schemes of NEC 2006-11-09 30.68 2009-11-09 27.61 0 27.61 27.61 Completed
717 ASSAM Transport and Communication
Rampur-Belsor road
Schemes of NEC Schemes of NEC 2005-03-01 16.41 2008-03-01 15.37 0 15.37 15.37 Completed
718 ASSAM Transport and Communication
Rehabilitation of Silchar-Kalain road
Schemes of NEC Schemes of NEC 2008-05-20 4.9284 2011-05-20 4.43 0 4.43 4.43 Completed
719 ASSAM Transport and Communication
Saphekati-Pethakuti road
Schemes of NEC Schemes of NEC 2007-09-21 19.9 2010-09-21 16.5 0 16.5 16.5 Completed
720 ASSAM Transport and Communication
Silchar-Dwarband-Gaglacherra Road
Schemes of NEC Schemes of NEC 2004-08-18 85.8159 2007-08-18 77.5343 0 77.5343 77.53 Completed
721 ASSAM Transport and Communication
Tuensang-Longleng-Ladaigarh road
Schemes of NEC Schemes of NEC 2006-12-15 14.14 2009-12-15 12.73 0 12.73 12.73 Completed
722 ASSAM Transport and Communication
Upgradation of Bhanga-Anipur-Kanaibazar
Schemes of NEC Schemes of NEC 2004-08-18 86.4988 2007-08-18 76.7 0 76.7 76.7 Completed
723 ASSAM Transport and Communication
Wokha-Merapani road
Schemes of NEC Schemes of NEC 2006-02-09 34.83 2009-02-27 31.35 0 31.35 31.35 Completed
724 ASSAM Tourism and Culture
Construction of Yatriniwas-cum-NEC Guest House at Paltan Bazar, Guwahati
Schemes of NEC Schemes of NEC 2005-07-25 11.2447 2008-07-25 10.12 0 10.12 10.12 Completed
725 ASSAM Tourism and Culture
Creation of Facilities for Tourists at Mahamaya Temple, Dhubri, Assam
Schemes of NEC Schemes of NEC Choose... 2023-03-31 11.76 2026-03-31 11.466 0 11.466 8.82 Ongoing
726 ASSAM Tourism and Culture
Establishment of a Yatri Niwas and a Guest House at Silghat, Nagaon, Assam
Schemes of NEC Schemes of NEC Choose... 2023-03-31 8.95 2026-03-31 5.9775 0 5.9775 Ongoing
727 ASSAM Tourism and Culture
Integrated Development of Agnigarh with development of adjacent Riverfront Park towards Ganeshghat at Tezpur, Assam
Schemes of NEC Schemes of NEC Choose... 2023-03-31 10.96 2026-03-31 10.96 0 10.96 2.74 Ongoing
728 ASSAM Tourism and Culture
Preparation of Project Profiles for Tourism Infrastructure in the Bodoland Territorial Council Areas, Assam
Schemes of NEC Schemes of NEC 2006-08-29 2 2009-08-29 1.8 0 1.8 0.9 Foreclosed
729 ASSAM Tourism and Culture
Tea Museum at Dibrugarh, Assam
Schemes of NEC Schemes of NEC 2014-03-05 3.1441 2017-03-05 2.8297 0 2.8297 2.83 Completed
730 ASSAM Tourism and Culture
The Buddhist Destination Centre at Sivasagar Buddha Vihar, Sivasagar District, Assam
Schemes of NEC Schemes of NEC 2016-07-27 3.4 2019-07-27 3.4 0 3.4 3.4 Completed
731 ASSAM Education
Transformation of 20 schools as Centre of Excellence in the Kamrup District
PM-DevINE Dept. of Education 2023-03-27 132.86 2025-11-30 102.0086 0 102.0086 31.965 Ongoing
732 ASSAM Tourism and Culture
Development of Maa Kamakhya Access corridor at Guwahati in the capital region
PM-DevINE Public works Department 2024-01-04 498.37 2026-03-15 100.3543 100.3543 Ongoing
733 ASSAM Roads and Bridges
Upgradation/widening of existing 2 lane road to 4 lane road connecting LGB International Airport From VIP junction to Dharapur Junction, including (i) 4 lane grade separated junction at Dharapur (ii) 2 lane excess road from SOS junction to existing terminal building and (iii) 2 lane temporary exit from existing terminal building
PM-DevINE Public works Department 2024-01-24 271.45 2026-02-26 271.45 0 271.45 167.1493 Ongoing
734 ASSAM Health
Construction of medical college (100 admissions) at Sivasagar District
PM-DevINE Dept. of Health & familly 2024-01-04 499.82 2026-03-14 173.722 73.722 247.444 Ongoing
735 ASSAM Power
Construction of 2x50 MVA, 132/33KV GIS (Gas Insulated Substation) at 220/132 KV Amingaon GIS, Assam
NESIDS-OTRI NESIDS Dept. of Power 2022-04-20 30.5397 2024-04-30 30.639675 0 30.639675 7.6349 Ongoing
736 ASSAM Transport and Communication
Construction of Double Lane Road from Lanka to Umrangso via Diyungmukh, Haflong Tinali and Panimur
NESIDS-ROADS NESIDS Public works Department 2019-05-01 227.17 2022-07-31 227.17 0 227.17 227.168 Completed
737 ASSAM Transport and Communication
Construction of RCC Bridge No. 3/1 on the road from NH-39 Silonijan State Dispensary to Dhansiri Par Ghat via Panika Basti (including approach), Assam.
NESIDS-ROADS NESIDS Public works Department 2022-04-20 20.59 2024-04-30 20.5964 0 20.5964 0.1 Completed
738 ASSAM Transport and Communication
Construction of RCC Bridge No. 3/1 over River Dikhow at Chiripuria Ghat along with road from Chiripuria via Ajanpeer Dorgarh road to NH 37 in assam
NESIDS-ROADS Public works Department 2019-08-14 17.99 2020-03-31 16.8991 0 16.8991 15.2 Completed
739 ASSAM Transport and Communication
Construction of RCC Bridge over river Aie at Aie Powali including approach & protection work in Chirang District
NESIDS-ROADS NESIDS Public works Department 2019-02-14 69.74 2020-03-31 69.7389 0 69.7389 64.3494 Completed
740 ASSAM Transport and Communication
Construction of three lane Road over Bridge at Jorhat in replacement of Railway LC gate No ST-58 on Na-Ali, Jorhat District in Assam during 2018-19
NESIDS-ROADS NESIDS Public works Department 2018-08-30 67.75 2020-03-31 67.75 0 67.75 67.7392 Completed
741 ASSAM Transport and Communication
Improvement & Upgradation of Jamuguri to Nagsankar connected Road (Ch.0.00 Km to 12.50 Km) in Sonitpur District, Assam under NESIDS for F.Y. 2021-22.
NESIDS-ROADS NESIDS Public works Department 2022-04-20 22.73 2024-04-30 22.72 0 22.72 21.18 Completed
742 ASSAM Transport and Communication
Improvement & Widening of Lokopriya Gopinath Bordoloi Road, SH-3 B from Ch.0.00 Km to Ch. 18.65 Km, Assam under NESIDS for the year 2021-22.
NESIDS-ROADS NESIDS Public works Department 2022-04-20 79.13 2024-04-30 79.1264 0 79.1264 71.65 Completed
743 ASSAM Transport and Communication
Widening & Improvement of Bhadoi Panch Ali to Joypur Khonsa Road via Tipom, Assam
NESIDS-ROADS NESIDS Public works Department 2022-04-20 57.99 2024-04-30 43.5007 0 43.5007 30.87 Ongoing
744 ASSAM Transport and Communication
Widening and Strengthening of Nalbari Palla road at Solmara to Bangaon Jagra road via Billeswar Devalaya in Assam
NESIDS-ROADS NESIDS Public works Department 2022-04-20 21.14 2024-04-30 17.0175 0 17.0175 15.71 Completed
745 ASSAM Transport and Communication
Development & improvement of Jagun Namchik Miao road (Assam portion) including Br.No. 9/1 over river Namchik in Tinsukia District
NESIDS-ROADS NERSDS Public works Department 2020-01-30 24.89 2023-01-31 25.5547 0 25.5547 20.01 Completed
746 ASSAM Transport and Communication
Improvement and Widening of Road from Chaygaon to ukium in Assam
NESIDS-ROADS NESIDS Public works Department 2023-10-16 102.69 2026-10-31 101.71 0 101.71 22 Completed
747 ASSAM Transport and Communication
Mawshynrut-Boko-Hahim Road
NESIDS-ROADS NERSDS Public works Department 2020-01-24 23.37 2021-08-31 23.37 0 23.37 23.03 Completed
748 ASSAM Transport and Communication
Upgradation on Interstate Road from Sonapur to Byrnihat in the State of Assam and Meghalaya(LO-17-95 km)
NESIDS-ROADS NESIDS Public works Department 2023-10-16 53.8 2026-04-30 53.16 0 53.16 22 Completed
749 ASSAM Water Supply
Digboi Town Water Supply Scheme in Assam
NESIDS-OTRI NESIDS Public Health & Engg Depa 2019-08-29 41.688 2020-03-31 14.1344 0 14.1344 Ongoing
750 ASSAM Water Supply
Infrstructure Development of Greater Kheroni Piped water Supply Scheme in Karbi Anglong , Assam
NESIDS-OTRI NESIDS Hill Areas Dept 2019-02-21 21.8772 2020-03-31 21.2786 0 21.2786 19.0414 Ongoing
751 ASSAM Water Supply
Water Supply Projects in Tinsukia Town (Phase-III) Tinsikia District in Assam
NESIDS-OTRI NESIDS Department of Housing and 2019-03-01 27.1952 2020-03-31 6.1371 14.1742 20.3113 0.1 Ongoing
752 ASSAM Transport and Communication
Mukroh-Umspar linking Jrikyndeng Road
NESIDS-ROADS NERSDS Public works Department 2019-07-30 58.01 2021-12-23 57.34 0 57.34 57.34 Completed
753 ASSAM Transport and Communication
Construction of RCC Bridge No. 17/1 over river Dhansikri on Udalguri Bhairabkunda road
NESIDS-ROADS NERSDS Public works Department 2022-03-15 41.75 2024-03-15 41.75 0 41.75 38.02 Completed
754 ASSAM Education
Assam University Silchar (including Diphu Campus) - CS
NESIDS-OTRI NLCPR Assam University 1999-04-01 13 2005-07-31 11.7 0 11.7 13 Completed
755 ASSAM Education
Bodo Language Research and Development centre for Gauhati University Kokrajhar(BTC Package-2)
Special Packages BTC 2011-01-28 2.96 2014-01-31 2.5337 0 2.5337 2.5337 Completed
756 ASSAM Education
Construction of 15 HSS Buildings (BAC Area)
NESIDS-OTRI NLCPR PWD building 2001-01-31 1.5 2003-03-31 1.35 0 1.35 1.5 Completed
757 ASSAM Education
construction of academic - cum - Administrative building of K.K Handique Government Sanskrit College
NESIDS-OTRI NLCPR PWD building 2007-06-21 2.3809 2009-06-30 1.6971 0 1.6971 1.6971 Ongoing
758 ASSAM Education
Construction of Govt college of Arts & Crafts in Kamrup District
NESIDS-OTRI NLCPR Cultural Affairs Dept 2011-06-27 5 2013-12-31 1.7861 0 1.7861 Ongoing
759 ASSAM Education
Construction of RCC Multistoried Auditorium Building attached to Haflong Government College at Haflong in Dima Hasao District
NESIDS-OTRI NLCPR Hill Areas Dept 2013-01-16 2.3021 2015-01-31 2.063 0 2.063 2.063 Ongoing
760 ASSAM Education
Development of infrastructure facilities of Kahrupetia college, i.e construction of class rooms , computer labratory with Ac, hostel for tennis, elctricity facilities, water supply and sanitary installation in darrang distt.
NESIDS-OTRI NLCPR DC darrang 2007-10-24 1.7568 2008-11-29 1.1227 0 1.1227 0.5533 Ongoing
761 ASSAM Education
Guwahati University Campus. Kokrajhar
NESIDS-OTRI NLCPR PWD building 2003-01-30 5 2004-03-31 4.365 0 4.365 4.61 Completed
762 ASSAM Education
I.I.T. Guwahati-CS
NESIDS-OTRI NLCPR IIT Guwahati 1999-04-01 34 2005-07-31 30.6 0 30.6 34 Completed
763 ASSAM Education
Infrastructure Development of Assam Institute of Management, Guwahati
NESIDS-OTRI NLCPR PWD building 2010-07-23 14.6111 2012-07-31 8.2916 0 8.2916 6.7689 Ongoing
764 ASSAM Education
Infrastructure Development of Assam SLET Commission
NESIDS-OTRI NLCPR Higher Education Dept 2010-11-15 3.3446 2012-11-30 1.1804 0 1.1804 1.1804 Ongoing
765 ASSAM Education
Infrastructure Development of Haflong Government College Halflong
NESIDS-OTRI NLCPR Hill Areas Dept 2014-12-29 10.0549 2017-01-31 9.0494 0 9.0494 7.2 Ongoing
766 ASSAM Education
Infrastructure Development of North Eastern Judicial Officers Training Institute, Guwahati (Assam)
NESIDS-OTRI NLCPR PWD building 2005-12-27 3.5428 2007-12-31 3.1199 0 3.1199 3.1199 Completed
767 ASSAM Education
Modernisation & Augmentation of Infrastructure Development of Assam Textile Institute at Guwahati
NESIDS-OTRI NLCPR PWD building 2006-09-12 7.4149 2009-09-30 2.3357 0 2.3357 2 Foreclosed
768 ASSAM Education
New Infrastrucutre for Cotton College.
NESIDS-OTRI NLCPR PWD building 2000-02-28 3 2001-06-30 2.7 0 2.7 3 Completed
769 ASSAM Education
Sarva Shiksha Abhiyan for Assam
NESIDS-OTRI NLCPR Elementary Education Dept 2006-03-28 27.7 2006-12-29 27.7 0 27.7 27.7 Completed
770 ASSAM Education
Sarva Shiksha Abhiyan for Assam (2006-07)
NESIDS-OTRI NLCPR Elementary Education Dept 2006-06-29 102.9341 2007-03-31 102.9294 0 102.9294 102.9267 Completed
771 ASSAM Education
Tezpur University-CS
NESIDS-OTRI NLCPR Tezpur University 1999-04-01 24.33 2005-07-31 21.997 0 21.997 24.33 Completed
772 ASSAM Irrigation and Flood Control
89 Nos. of minor irrigation schemes
NESIDS-OTRI NLCPR Irrigation Dept 1999-02-15 25.2 2005-07-31 22.68 0 22.68 25.2 Completed
773 ASSAM Irrigation and Flood Control
A/E measures to protect Naharkatia Town from the erosion of river Burhi-Dehing at Jagun Gaon area.
NESIDS-OTRI NLCPR Water Resource Dept 2012-12-28 7.311 2013-08-31 6.5799 0 6.5799 2.63 Completed
774 ASSAM Irrigation and Flood Control
Amreng Minor irrigation Scheme (Karbi Anglong)
NESIDS-OTRI NLCPR Hill Areas Dept 2001-09-18 12 2005-03-31 10.8 0 10.8 12 Completed
775 ASSAM Irrigation and Flood Control
Anti Erosion measures to protect Dehingpuria Area near Margherita Town from the erosion of River Buridehing.
NESIDS-OTRI NLCPR Water Resource Dept 2012-12-28 5.3999 2013-08-31 4.86 0 4.86 1.944 Completed
776 ASSAM Irrigation and Flood Control
Anti-Erosion/Flood control Schemes in 25 different locations of Brahmaputra and Barak Valley
NESIDS-OTRI NLCPR Water Resource Dept 1999-02-15 60.6661 2007-03-31 54.4301 0 54.4301 60.6661 Completed
777 ASSAM Irrigation and Flood Control
Belsiri Lift Irrigation Scheme
NESIDS-OTRI NLCPR Irrigation Dept 2007-09-28 2.1742 2008-06-30 0.6848 0 0.6848 0.6842 Ongoing
778 ASSAM Irrigation and Flood Control
Borjan Composite Irrigation Scheme in Assam (Karbi Anglong)
NESIDS-OTRI NLCPR Hill Areas Dept 2005-10-28 22.2864 2009-10-31 20.0578 0 20.0578 20.0578 Completed
779 ASSAM Irrigation and Flood Control
Burinagar Lift Irrigation scheme (Nalbari Division)
NESIDS-OTRI NLCPR Irrigation Dept 2011-06-27 2.1569 2013-07-31 0.7347 0 0.7347 0.7347 Ongoing
780 ASSAM Irrigation and Flood Control
Champamati Irrigation Project (BTC Package)
Special Packages BTC 2005-10-31 43.85 2007-12-31 43.85 0 43.85 43.85 Completed
781 ASSAM Irrigation and Flood Control
Construction of dakhindol Lift Irrigation Scheme at Sonitpur and Joisidhi, Assam
NESIDS-OTRI NLCPR Irrigation Dept 2007-09-28 2.1121 2008-06-30 1.8636 0 1.8636 1.5207 Completed
782 ASSAM Irrigation and Flood Control
D.T.W. Irrigation Scheme at 30 points under Borsola Development Block in Sonitpur District
NESIDS-OTRI NLCPR Dept. of Power 2014-12-29 18.0846 2017-01-31 16.081 0 16.081 16.081 Completed
783 ASSAM Irrigation and Flood Control
Deithor Minor Irrigation cum Community Development Project(Karbi Anglong)
NESIDS-OTRI NLCPR Hill Areas Dept 2010-03-22 2.222 2013-04-30 0.7842 0 0.7842 0.6 Ongoing
784 ASSAM Irrigation and Flood Control
Dikangshi Irrigation Project
NESIDS-OTRI NLCPR Hill Areas Dept 2014-02-18 10.2576 2016-02-29 9.1992 0 9.1992 9.1992 Completed
785 ASSAM Irrigation and Flood Control
Farkongcho Irrigation Scheme
NESIDS-OTRI NLCPR Hill Areas Dept 2013-09-23 10.2196 2015-09-30 9.1756 0 9.1756 9.1756 Completed
786 ASSAM Irrigation and Flood Control
Flood Control scheme (5 No.) - Protection of different reaches from the erosion of river Dhansiri at Assam, K.A. Distt. Phase-I
NESIDS-OTRI NLCPR Water Resource Dept 2002-02-27 2.1 2003-03-31 1.89 0 1.89 2.1 Completed
787 ASSAM Irrigation and Flood Control
Flood Control scheme (5 No.) - Protection of different reaches from the erosion of river Dhansiri at Assam, K.A. Distt. Phase-II
NESIDS-OTRI NLCPR Water Resource Dept 2002-02-27 1.65 2003-03-31 1.485 0 1.485 1.65 Completed
788 ASSAM Irrigation and Flood Control
Flood Control scheme (5 No.) - Protn. Of Harinagar Pt-III area cum dyke along R/B of river Surma (international boundary) from Harinagar to Nathanpur
NESIDS-OTRI NLCPR Water Resource Dept 2002-02-27 3.6498 2003-03-31 3.2848 0 3.2848 3.6498 Completed
789 ASSAM Irrigation and Flood Control
Flood Control scheme (5 No.) - Strengthening of Kahai spur (stone spur no. 2) to protect Dibrugarh town from the erosion of river Brahmaputra
NESIDS-OTRI NLCPR Water Resource Dept 2002-02-27 6.55 2003-03-31 5.6249 0 5.6249 6.2498 Completed
790 ASSAM Irrigation and Flood Control
Flood Control Scheme (5 No.) - Protn. of Guwahati town from erosion of river Brahmaputra from Kachari Bazaar to D.C. Court
NESIDS-OTRI NLCPR Water Resource Dept 2002-02-27 3.3321 2003-03-31 2.9989 0 2.9989 3.3321 Completed
791 ASSAM Irrigation and Flood Control
Flow Irrigation Scheme from River Kulsik at Palashgarh
NESIDS-OTRI NLCPR Irrigation Dept 2011-05-31 19.2788 2013-06-30 17.3366 0 17.3366 17.3366 Completed
792 ASSAM Irrigation and Flood Control
Installation of one Lakh Shallow tube wells
NESIDS-OTRI NLCPR Irrigation Dept 2000-01-25 68.95 2002-03-31 62.055 0 62.055 68.95 Completed
793 ASSAM Irrigation and Flood Control
Kaku Basti Irrigation Scheme
NESIDS-OTRI NLCPR Irrigation Dept 2012-06-28 8.7165 2013-10-31 7.7958 0 7.7958 7.7958 Completed
794 ASSAM Irrigation and Flood Control
Khowra flow Irrigation Scheme
NESIDS-OTRI NLCPR Hill Areas Dept 2012-06-28 3.5533 2013-10-31 3.1869 0 3.1869 3.1869 Completed
795 ASSAM Irrigation and Flood Control
Langkhailu Irrigation Scheme
NESIDS-OTRI NLCPR Hill Areas Dept 2013-09-26 10.3768 2015-09-30 9.3184 0 9.3184 9.3184 Completed
796 ASSAM Irrigation and Flood Control
LIS over river Buridihing in Sassoni Mouza in Dibrugarh Dist.
NESIDS-OTRI NLCPR Irrigation Dept 2007-12-26 2.3979 2009-12-31 2.1158 0 2.1158 2.1158 Completed
797 ASSAM Irrigation and Flood Control
LIS over river Buriduhing in Tengakhat Kheremia Mouza in Dibrugarh Distt.
NESIDS-OTRI NLCPR Irrigation Dept 2007-12-26 2.9163 2009-12-31 2.5732 0 2.5732 2.5732 Completed
798 ASSAM Irrigation and Flood Control
Newzoar Flow Irrigation scheme
NESIDS-OTRI NLCPR Hill Areas Dept 2015-06-26 3.1478 2017-12-30 2.7698 0 2.7698 2.2202 Ongoing
799 ASSAM Irrigation and Flood Control
Phangcho Basti Irrigation Scheme
NESIDS-OTRI NLCPR Hill Areas Dept 2012-10-17 9.5269 2014-04-30 8.4405 0 8.4405 8.4405 Completed
800 ASSAM Irrigation and Flood Control
Phumen Phangcho Minor Irrigation Scheme (Karbi anglong)
NESIDS-OTRI NLCPR Hill Areas Dept 2011-06-27 6.0941 2012-10-31 5.4693 0 5.4693 5.4693 Completed
801 ASSAM Irrigation and Flood Control
Raising & strengthening Brahmaputra Dyke from Dizmore to Sonarigaon from 14th to23.15th including closing of Amguri and Arney Nalla.
NESIDS-OTRI NLCPR Water Resource Dept 2004-01-07 11.51 2006-03-31 9.3238 0 9.3238 9.8238 Completed
802 ASSAM Irrigation and Flood Control
Rajendrapur Flow Irrigation Scheme
NESIDS-OTRI NLCPR Irrigation Dept 2013-02-25 21.4695 2016-02-29 19.3225 0 19.3225 19.3225 Completed
803 ASSAM Irrigation and Flood Control
Sukla Irrigation Project (BTC Package)
Special Packages BTC 2005-10-31 8.13 2007-12-31 8.1272 0 8.1272 8.1272 Completed
804 ASSAM Irrigation and Flood Control
Thengkhari Barhola Pathar Irrigation Scheme
NESIDS-OTRI NLCPR Irrigation Dept 2014-06-27 4.1032 2016-06-30 2.7052 0 2.7052 2.7052 Ongoing
805 ASSAM Irrigation and Flood Control
Washillinghadi ELIS, NC Hills minor irrigation schemes.
NESIDS-OTRI NLCPR Hill Areas Dept 2001-09-18 2.7 2005-03-31 2.43 0 2.43 2.7 Completed
806 ASSAM Health
Assam Medical College (HOPE)
NESIDS-OTRI NLCPR PWD building 2003-03-21 20 2005-12-31 18 0 18 18.401 Completed
807 ASSAM Health
College of Nursing at Kokrajhar
NESIDS-OTRI NLCPR PWD building 2013-05-17 14.2721 2015-05-30 12.8429 0 12.8429 12.83339 Completed
808 ASSAM Health
Construction of 100 bedded hospital at Kajalgaon in BTC area(BTC Package)
Special Packages BTC 2005-01-27 38.52 2008-01-31 37.7169 0 37.7169 38.5161 Completed
809 ASSAM Health
Construction of Medical College at Nalbari under NLCPR in Assam
NESIDS-OTRI NLCPR PWD building 2017-12-07 217.821 2019-12-07 190.3389 0 190.3389 190.3389 Completed
810 ASSAM Health
Construction of two storeyed building of SJN Government Homoeopathic Medical College and Hospital at Panjabari, Guwahati
NESIDS-OTRI NLCPR PWD building 2008-11-12 2.6571 2010-10-31 2.3444 0 2.3444 2.3444 Completed
811 ASSAM Health
Conversion of 100 bedded Civil Hospital to 200 Bedded Hospital with construction of Staff Quarters and improvement & renovation of existing buildings at Haflong(NC Hills)
NESIDS-OTRI NLCPR PWD building 2004-07-29 11.1981 2006-12-31 9.7064 0 9.7064 10.1264 Completed
812 ASSAM Health
Renovation/Re-construction of RNB Civil Hospital at Kokrajhar (BTC Package)
Special Packages BTC 2005-10-31 7.58 2007-10-31 7.5809 0 7.5809 7.5809 Completed
813 ASSAM Health
Sankaradeva Netralaya
NESIDS-OTRI NLCPR Sankaradeva Netralaya 2000-05-11 1 2003-02-25 0.9 0 0.9 1 Completed
814 ASSAM Health
Shankar Dev Netralaya (equipments)
NESIDS-OTRI NLCPR Sankaradeva Netralaya 2002-11-12 0.82 2003-05-31 0.738 0 0.738 0.82 Completed
815 ASSAM Health
Shankar Dev Netralaya (OT)
NESIDS-OTRI NLCPR Sankaradeva Netralaya 2003-03-26 1.53 2003-09-30 1.377 0 1.377 1.53 Completed
816 ASSAM Health
Upgradation of Guwahati Medical College.
NESIDS-OTRI NLCPR PWD building 2000-02-10 8 2003-03-31 7.2 0 7.2 8 Completed
817 ASSAM Health
Upgradation of hospital at Udalguri to 100 bedded Hospital.
NESIDS-OTRI NLCPR PWD buildings 2001-02-22 1.69 2003-03-31 1.521 0 1.521 1.69 Completed
818 ASSAM Miscellaneous
1250 Capacity Auditorium at Guwahati.
NESIDS-OTRI NLCPR PWD building 2001-03-15 20 2005-07-31 18.1182 0 18.1182 19.9182 Completed
819 ASSAM Miscellaneous
Bodoland Bhawan at Dwarka New Delhi(BTC Package-2)
Special Packages BTC 2011-01-10 9.1 2014-01-10 8.4416 0 8.4416 8.4416 Completed
820 ASSAM Miscellaneous
Bodoland Indigenous Tribal Art & Cultural Complex-cumFilm Studio at Kathalguri, Kokrajhar
NESIDS-OTRI NLCPR Cultural Affairs Dept 2007-12-24 4.9514 2009-12-31 3.2037 0 3.2037 3.2037 Ongoing
821 ASSAM Miscellaneous
C/o Community hall at Diyungbra (Digendu) under PWD(Building), Haflong division (DHATC)
Special Packages DHATC 2017-07-26 2.94 2024-10-10 2.902 0 2.902 1.4705 Ongoing
822 ASSAM Miscellaneous
C/o Community hall at Mahur under PWD ( Building), Haflong division (DHATC)
Special Packages DHATC 2017-07-26 2.94 2018-08-31 2.9319478 0 2.9319478 1.4705 Ongoing
823 ASSAM Miscellaneous
C/o Community Hall at Nobdiangting under PWD (Building), Haflong division (DHATC)
Special Packages DHATC 2017-07-26 2.94 2018-08-31 2.9018824 0 2.9018824 1.4705 Ongoing
824 ASSAM Miscellaneous
Cashew processing Plant at Mankachar in Dhubri District in Assam
NESIDS-OTRI NLCPR NERAMAC 2010-01-14 2.4834 2011-01-31 2.0344 0 2.0344 1.648 Ongoing
825 ASSAM Miscellaneous
Centre for Plasma Physics, Guwahati.
NESIDS-OTRI NLCPR Institute for Plasma Rese 2000-03-14 4.5 2003-03-31 4.05 0 4.05 4.5 Completed
826 ASSAM Miscellaneous
Comprehensive Development Plan for college of Fisheries for augmenting Human Resources in Assam
NESIDS-OTRI NLCPR Department of Fisheries 2010-06-28 8.7482 2012-06-30 3.0876 0 3.0876 3.0876 Ongoing
827 ASSAM Miscellaneous
Construction of Auditorium at Songpijang in Haflong, Dima Hasao District, NCHAC.
Special Packages DHATC 2016-02-29 2.38 2018-08-31 2.3037 0 2.3037 2.3037 Completed
828 ASSAM Miscellaneous
Construction of Bodofa Cultural Complex at Kokrajhar (BTC Package)
Special Packages BTC 2005-02-07 18.44 2007-03-31 17.94 0 17.94 18.44 Completed
829 ASSAM Miscellaneous
Construction of Bus Terminals at Barpeta town
NESIDS-OTRI NLCPR Department of Housing and 2010-10-11 1.8596 2012-03-31 1.4208 0 1.4208 1.2997 Ongoing
830 ASSAM Miscellaneous
construction of cold storage ar Barama (Baska))(BTC Package-2)
Special Packages BTC 2011-01-10 8.9 2014-01-10 8.5888 0 8.5888 8.5888 Completed
831 ASSAM Miscellaneous
Construction of Cold storage at Kokrajahar district(BTC Package)
Special Packages BTC 2005-12-27 4.14 2008-12-27 4.1365 0 4.1365 4.1365 Completed
832 ASSAM Miscellaneous
Construction of Cold Storage at Udalguri district(BTC Package)
Special Packages BTC 2005-12-27 4.14 2008-12-27 4.1365 0 4.1365 4.1365 Completed
833 ASSAM Miscellaneous
Construction of Community Hall at Dehangi Bazar under PWD ( Building), Haflong division (DHATC)
Special Packages DHATC 2017-07-26 2.94 2018-08-31 1.4705 0 1.4705 1.4705 Ongoing
834 ASSAM Miscellaneous
Construction of Cultural Centre/Complex at Dotma in Kokrajhar
NESIDS-OTRI NLCPR Cultural Affairs Dept 2007-12-26 2.2106 2009-12-31 0.9905 0 0.9905 0.9905 Ongoing
835 ASSAM Miscellaneous
Construction of Home for orphans and destitute children at Haflong along with staff quarters including one Vocational Training Centre for children
NESIDS-OTRI NLCPR PWD building 2013-06-11 2.9848 2014-11-30 2.6572 0 2.6572 2.128 Completed
836 ASSAM Miscellaneous
Construction of Infrastructure (Vertical Extension) of District Centre Building at Mushalpur in Baksa District
Special Packages BTC 2020-02-25 3.85 2022-02-25 3.6012 0 3.6012 3.6012 Completed
837 ASSAM Miscellaneous
Construction of Joisingh Doloi Audotorium Hall at Diphu (Karbi Anglong)
NESIDS-OTRI NLCPR Hill Areas Dept 2007-02-01 3.7938 2010-01-01 3.3622 0 3.3622 3.3622 Completed
838 ASSAM Miscellaneous
Construction of Karmachari Bhawan at Panjabari, Guwahati under NLCPR Scheme.
NESIDS-OTRI NLCPR PWD building 2017-05-11 8.8515 2019-05-11 2.724 0 2.724 2.724 Ongoing
839 ASSAM Miscellaneous
Construction of Multi-Storey Secretariat Complex
NESIDS-OTRI NLCPR PWD building 2003-02-18 69 2005-07-31 62.1045 0 62.1045 68.3295 Completed
840 ASSAM Miscellaneous
Construction of Multistoried Car Parking cum City Hall, Jorhat
NESIDS-OTRI NLCPR PWD building 2010-12-13 10.5133 2013-12-31 7.3448 0 7.3448 3.7106 Ongoing
841 ASSAM Miscellaneous
Construction of North East Gate Way Bus Terminus at Srinwgai Gossaigaon(BTC Package)
Special Packages BTC 2005-12-27 1.44 2008-12-27 1.4442 0 1.4442 1.4038 Completed
842 ASSAM Miscellaneous
Construction of Roadside drain cum footpath and provision of roadside streetlight illumination in Naharkatia town in Dibrugarh Rural Road Division
NESIDS-OTRI NLCPR Dept. of Power 2008-09-30 6.4473 2010-02-28 5.0206 0 5.0206 4.9453 Ongoing
843 ASSAM Miscellaneous
Construction of S.R. Thaosen Media Centre at Haflong, Dima Hasao District.
Special Packages DHATC 2016-03-28 8.16 2018-02-28 7.9973 0 7.9973 4 Ongoing
844 ASSAM Miscellaneous
Construction of Sankar Madhab Cultural Complex at Letekupukhuri at Bhogpur Chariali Lakhimpur iDistrict n Assam
NESIDS-OTRI NLCPR Cultural Affairs Dept 2007-10-25 4.0145 2009-10-31 1.2645 0 1.2645 1.2645 Ongoing
845 ASSAM Miscellaneous
Construction of super market complex at Moran revenue Town.
NESIDS-OTRI NLCPR PWD building 2013-12-20 6.838 2015-06-30 2.4603 0 2.4603 Foreclosed
846 ASSAM Miscellaneous
Construction of Vertical Extension of District Centre Building (Assam Type with Dyna roofing on second floor of the building).
Special Packages BTC 2020-02-25 3.85 2022-02-25 3.6014 0 3.6014 3.6014 Completed
847 ASSAM Miscellaneous
Development and Upgradation of Jyoti Chitraban Film and Television Institute
NESIDS-OTRI NLCPR PWD building 2007-12-20 13.4677 2009-12-31 12.0352 0 12.0352 6.9348 Ongoing
848 ASSAM Miscellaneous
Enhancement of existing facility in Verteniary hospital at titaguri (Kokrajhar) Samthaibari(Chirang) and Bornagaon in Udalguri Distict.)(BTC Package-2)
Special Packages BTC 2011-01-28 9.02 2014-01-31 8.5927 0 8.5927 8.5927 Completed
849 ASSAM Miscellaneous
Establishment of Bamboo Industrial Park (BIP) at Manderdisa, NC Hills, Assam sanctioned under DHATC Package
Special Packages DHATC 2020-03-13 49.43 2024-12-31 42.4476621 0 45.5248621 24.71 Ongoing
850 ASSAM Miscellaneous
Establishment of clean meat selling booths with slaughtering facilities for pork, mutton/chevon & chicken at different markets of Karbi Anglong
Special Packages KAATC 2021-02-22 4.5 2023-02-22 2.25 0 2.25 2.25 Ongoing
851 ASSAM Miscellaneous
Infrastructure Development of Road Transport system under Karbi Anglong Autonomous Council (Karbi Anglong) - Part-I
NESIDS-OTRI NLCPR Hill Areas Dept 2010-11-10 1.8328 2012-04-30 1.6495 0 1.6495 1.3196 Ongoing
852 ASSAM Miscellaneous
Integrated Skill Development Centre at Dima Hasao District of Assam.
Special Packages DHATC 2016-02-29 36.6 2020-02-28 34.9967972 0 34.9967972 30.3 Completed
853 ASSAM Miscellaneous
Kamakhya Temple Road Development
NESIDS-OTRI NLCPR PWD Roads 2003-02-18 4.89 2003-12-31 4.401 0 4.401 4.89 Completed
854 ASSAM Miscellaneous
Multi Level Parking in different parts of Guwahati
NESIDS-OTRI NLCPR Guwahati Development Depa 2008-08-14 20.24 2010-01-31 15.9077 0 15.9077 15.3281 Completed
855 ASSAM Miscellaneous
Preservation of cultural Heritage of Majuli Natun Kamalabari satra (Phase-I)
NESIDS-OTRI NLCPR Cultural Affairs Dept 2009-11-05 6.1897 2011-04-30 4.3692 0.72 5.0892 2.1846 Ongoing
856 ASSAM Miscellaneous
Project Enhancement of Rural Socio-Economy with sustainable livelihood through piggery farming in Dima Hasao in Assam
Special Packages DHATC 2022-05-19 4 2022-05-20 4 0 4 2 Ongoing
857 ASSAM Miscellaneous
Proposed Integrated textile Park at Kharujan Mushalpur(BTC Package-2)
Special Packages BTC 2011-01-28 41 2015-01-31 40.9664563 0 40.9664563 39.7755 Completed
858 ASSAM Miscellaneous
Proposed Town Hall at Dibrugarh.
NESIDS-OTRI NLCPR Department of Housing and 2013-12-09 14.0817 2015-11-30 5.0665 0 5.0665 5.0665 Ongoing
859 ASSAM Miscellaneous
Setting up of Integrated Agro- Processing Park at Lalpool (Udalguri))(BTC Package-2)
Special Packages BTC 2011-01-10 9.07 2014-01-10 8.4552 0 8.4552 8.4552 Completed
860 ASSAM Miscellaneous
Setting up of IT Park at Kokrajhar (BTC Package-2)
Special Packages BTC 2013-03-13 25.94 2016-03-31 24.5811 0 24.5811 24.5811 Completed
861 ASSAM Miscellaneous
Setting up of Model Dairy Fishery Horticulture Poultry Farm Training Centre at Kokilabari under Baksa Distt.(BTC Package -2)
Special Packages BTC 2012-03-20 11.46 2015-03-20 11.4226 0 11.4226 11.276 Completed
862 ASSAM Miscellaneous
Socio-Literary Cultural Complex of Bodo Sahitya Sabha at Bathooupuri, Gorchuk, Guwahati
NESIDS-OTRI NLCPR Cultural Affairs Dept 2010-12-13 8.4101 2013-12-31 5.9364 0 5.9364 5.9364 Ongoing
863 ASSAM Miscellaneous
Srimanta Sankardev Kalakshtra project
NESIDS-OTRI NLCPR PWD building 1998-12-31 4.85 1999-11-09 4.365 0 4.365 4.85 Completed
864 ASSAM Miscellaneous
Street Lighting in Jorhat City leading to Jorhat Airport
NESIDS-OTRI NLCPR Dept. of Power 2010-04-05 2.1347 2011-09-30 1.8835 0 1.8835 1.5405 Ongoing
865 ASSAM Power
220 KV/DC Kathalguri Tinsukia line (30 Kms.)
NESIDS-OTRI NLCPR Power Dept 1999-02-15 6.4 2004-09-30 5.76 0 5.76 6.4 Completed
866 ASSAM Power
2x50 MVA , 220/132 KV Balipara (Tezpur ) Sub-station and a 132 KV Gohpur-Depota Line
NESIDS-OTRI NLCPR Power Dept 2002-10-08 13.71 2005-12-31 12.4122 0 12.4122 13.3622 Completed
867 ASSAM Power
Augmentation of 1x63 and 1x59 MVA, 20/132 kv Transformer by 2x100 mva at sarusajai sub station
NESIDS-OTRI NLCPR Power Dept 2002-10-07 7.8 2005-10-30 7.1621 0 7.1621 7.8 Completed
868 ASSAM Power
Augmentation of 220/132 kv 2x50 mva s/s to 2x100 s/s at mariani
NESIDS-OTRI NLCPR Power Dept 2002-02-27 6.37 2004-10-30 5.8267 0 5.8267 6.2464 Completed
869 ASSAM Power
Augmentation of Transformer Capacity of 132/33 KV Panchgram Sub Station from 2x16 MVA to 2x25 MVA in Cachar District
NESIDS-OTRI NLCPR Power Dept 2008-03-05 4.4 2011-12-01 3.96 0 3.96 3.96 Completed
870 ASSAM Power
Construction of 132 KV BTPS - Kokrajhar S/C line and 132 KV Kokrajhar S/C line 132 Kv/33Kv S/S at Kokrajhar
NESIDS-OTRI NLCPR Power Dept 2010-11-29 43.5775 2013-11-30 36.5107 0 36.5107 36.5107 Ongoing
871 ASSAM Power
Construction of 220/132 Kv, 1x50 MVA, 132/33 Kv and 1x16 MVA Agia S/S
NESIDS-OTRI NLCPR Power Dept 2007-03-28 7.3868 2008-05-30 6.498 0 6.498 6.498 Completed
872 ASSAM Power
Construction of 220/132 KV, 2x50 MVA and 220/33 KV, 2x40 MVA Azara Sub - Station with 220 Kv LILO line from one circuit of 220 KV DC Agia - Sarusajia line along with construction of 132 KV SC line to Boko with terminal bay at 132/33 Boko Sub-station
NESIDS-OTRI NLCPR Power Dept 2007-09-26 36.2207 2010-03-31 29.2686 0 29.2686 29.2686 Completed
873 ASSAM Power
Construction of new 33/11 kV, 2x5 MVA S/S at Thirubari with 45 Km 11 kV lines and 55 Km 33 kV lines from Dhiligaon to Thirubari
NESIDS-OTRI NLCPR Power Dept 2012-11-23 8.9094 2013-11-26 3.2065 0 3.2065 3.2065 Foreclosed
874 ASSAM Power
Electrification of Tribal Villages
NESIDS-OTRI NLCPR Power Dept 2002-01-28 1.36 2004-03-31 1.35 0 1.35 1.36 Completed
875 ASSAM Power
Installation of 2x31.5 MVA 132/33 KV transformers at Sarusajai Sub Station
NESIDS-OTRI NLCPR Power Dept 2002-12-10 5.26 2004-11-30 4.7554 0 4.7554 5.2154 Completed
876 ASSAM Power
Installation of Street Lights from Lokpriya Gopinath Bordoloi International Airport upto Jalukbari near Guwahati University for National Games 2005
NESIDS-OTRI NLCPR PWD roads 2004-12-24 2.3916 2005-12-31 2.0854 0 2.0854 2.1524 Completed
877 ASSAM Power
Namrup Sub- station 2x50 MVA, 220/132 kV
NESIDS-OTRI NLCPR Power Dept 1999-01-19 0.1057 2007-03-31 0.1057 0 0.1057 0.1057 Ongoing
878 ASSAM Power
Powerline to Balipara Industrial Growth Centre, Sonitpur
NESIDS-OTRI NLCPR Power Dept 2004-09-30 8.7289 2005-04-30 5.9602 0 5.9602 6.2661 Ongoing
879 ASSAM Power
Renovation of BTPS-Agia-Sarusajai 220 kV D/C Transmission Line
NESIDS-OTRI NLCPR Power Dept 2003-01-30 28.38 2004-05-31 25.542 0 25.542 28.2051 Completed
880 ASSAM Power
Replacement of old 11 KV MCCB by VCB at Beheting, Hezalbank,doomdooma, Duliajan, North Lakhimpur, Meherpur, karimganj, Tangla, Amingaon, Narangi, Nagaon,Kaliabor, Kathiatoli, rupohi, Samaguri, bokajan, jorhat, Balipara, Tezpur,chapaguri & Diphu S/S
NESIDS-OTRI NLCPR Power Dept 2003-02-18 5.1 2007-07-31 5.1 0 5.1 5.1 Completed
881 ASSAM Power
ST&D - Augmentation of 33/11 kV Garbhanga S/S from 2x5 MVA to 2x10 MVA
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.96 2005-03-30 0.96 0 0.96 0.96 Completed
882 ASSAM Power
ST&D - Augmentation of Dibrugarh 33 kV S/S from (3x5 1x2.5) MVA to 2x10 MVA
NESIDS-OTRI NLCPR Power Dept 2005-06-30 0.76 2006-07-31 0.76 0 0.76 0.76 Completed
883 ASSAM Power
ST&D - Augmentation of Duliajan 33 kV S/S from 1x2.5 MVA to 1x5 MVA
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.9 2005-07-31 0.9 0 0.9 0.9 Completed
884 ASSAM Power
ST&D - Augmentation of Hailakandi 33 kV S/S from 2x2.5 MVA to 2x5 MVA
NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.2 2005-03-31 0.8 0 0.8 0.8 Completed
885 ASSAM Power
ST&D - Augmentation of Hojai 33 kV S/S from 1x2.5 MVA to 2x2.5 MVA
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.6 2005-03-31 0.35 0 0.35 0.35 Completed
886 ASSAM Power
ST&D - Augmentation of Karimganj 33 kV S/S from 1x5 1x3.16 MVA to 2x5 MVA
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.75 2005-07-31 0.75 0 0.75 0.75 Completed
887 ASSAM Power
ST&D - Augmentation of Tezpur 33 kV S/S from (1x2.55) MVA to 2x5 MVA
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.9 2005-07-31 0.5 0 0.5 0.5 Completed
888 ASSAM Power
ST&D - Augmentation of Titabor 33 kV S/S from 2x2.5 MVA to 2x5 MVA
NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.05 2004-03-31 1.05 0 1.05 1.05 Completed
889 ASSAM Power
ST&D - Construction of 12 km 33 kV Baitamari to Chapar line with construction of 2x2.5 MVA S/S at Chapar
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.72 2004-03-31 0.72 0 0.72 0.72 Completed
890 ASSAM Power
ST&D - Construction of 14.5 km 33 kV Pathsala-Nathkuchi line with augmentation of Pathsala S/S from 2x2.5 MVA to 2x5 MVA
NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.81 2005-07-31 1.81 0 1.81 1.81 Completed
891 ASSAM Power
ST&D - Construction of 16 km long 33 kV line from Jorhat to Kakajan alongwith installation of 2x2.5 MVA S/S at Kakajan
NESIDS-OTRI NLCPR Power Dept 2005-06-30 0.9 2006-07-31 0.9 0 0.9 0.9 Completed
892 ASSAM Power
ST&D - Construction of 18 km long 33 kV line from Garmur to Pulibor alongwith 2x2.5 MVA S/S at Publibor
NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.24 2005-07-31 1.24 0 1.24 1.24 Completed
893 ASSAM Power
ST&D - Construction of 18 km long 33 KV line from Latka tapping poing to Agamoni alongwith installation of 2.5 MVA S/S at Agamoni
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.77 2005-07-31 0.77 0 0.77 0.77 Completed
894 ASSAM Power
ST&D - Construction of 1x2.5 MVA, 33 kV S/S at Gogamukh
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.45 2005-07-31 0.3 0 0.3 0.3 Completed
895 ASSAM Power
ST&D - Construction of 22 km long 33 kV line from Bordubi to Tengakhat with construction of 1x2.5 MVA transformer
NESIDS-OTRI NLCPR Power Dept 2005-06-30 1.22 2007-06-30 1.22 0 1.22 1.22 Completed
896 ASSAM Power
ST&D - Construction of 23 km 33 kV line from Rangia to Tamulpur
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.47 2005-07-31 0.47 0 0.47 0.47 Completed
897 ASSAM Power
ST&D - Construction of 26 km 33 kV Agia - Mornoi line with construction of 2x2.5 MVA S/S at Mornoi
NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.63 2005-07-31 1.63 0 1.63 1.63 Completed
898 ASSAM Power
ST&D - Construction of 37 km 33 kV line from Patharkandi to Karimganj
NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.19 2005-07-31 1.19 0 1.19 1.19 Completed
899 ASSAM Power
ST&D - Construction of 38 km, 33 kV line from Balipara to Dhalukpung
NESIDS-OTRI NLCPR Power Dept 2005-06-30 1.33 2007-07-31 1.33 0 1.33 1.33 Foreclosed
900 ASSAM Power
ST&D - Construction of 45 km long 33 kV line from Rowta Grid S/S to Paneri and augmentation of Paneri S/S from 2x3.16 MVA to 2x5 MVA
NESIDS-OTRI NLCPR Power Dept 2003-02-18 3.62 2005-07-31 3.62 0 3.62 3.62 Completed
901 ASSAM Power
ST&D - Construction of 5 MVA 33 kV S/S at Biswanath Chariali
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.98 2005-07-31 0.734 0 0.734 0.734 Completed
902 ASSAM Power
ST&D - Construction of 5 MVA, 33 kV S/S at Missamari
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.85 2005-07-31 0.55 0 0.55 Completed
903 ASSAM Power
ST&D - Construction of11/0.4 KV distribution S/S 11 KV lines and LT lines-LT lines- 100 km
NESIDS-OTRI NLCPR Power Dept 2000-11-07 1 2002-12-31 1 0 1 1 Completed
904 ASSAM Power
ST&D - Installation of 11 KV Auto Reclosers in S/S (40 Nos.)
NESIDS-OTRI NLCPR Power Dept 2003-02-18 3.17 2005-07-31 3.17 0 3.17 3.17 Completed
905 ASSAM Power
ST&D - Reconductoring of KahiliPara-Ulubari 33 kV feeder from raccoon to wolf conductor
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.05 2005-07-31 0.05 0 0.05 Completed
906 ASSAM Power
ST&D -Construction of 28 km line from Rowta to Dhekiajuli on double pole suspension with wolf conductor
NESIDS-OTRI NLCPR Power Dept 2003-02-18 1.51 2005-07-31 1.51 0 1.51 1.5 Completed
907 ASSAM Power
ST&D -Construction of 30 km 33 kV line from Pailapool to Kabuganj
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.97 2005-07-31 0.97 0 0.97 0.97 Completed
908 ASSAM Power
ST&D -Construction of 33/11 kV, 1x2.5 MVA S/S with auto recloser at Manzai
NESIDS-OTRI NLCPR Power Dept 2003-02-18 0.28 2005-07-31 0.28 0 0.28 0.28 Completed
909 ASSAM Power
ST&D- Construction of 11/.4 KV distribution S/S 11 KV lines and LT lines - 11/0.4 KV substation (500 KVA - 10 Nos., 315 KVA - 10 Nos., 250 KVA - 100 Nos., 100 KVA - 100 Nos., & 63 KVA - 50 Nos.
NESIDS-OTRI NLCPR Power Dept 2000-11-07 6.88 2002-12-31 6.88 0 6.88 6.86 Completed
910 ASSAM Power
ST&D- Construction of 20 km 33 KV line From Garbhanga to Borjhar and interlink with the existing 33 KV Mirza-Rani line along with augmentation of 33/11 KV Mirza S/S to 2x5 MVA
NESIDS-OTRI NLCPR Power Dept 2003-02-18 2.14 2005-07-31 2.14 0 2.14 2.14 Completed
911 ASSAM Power
ST&D-Construction of 11/0.4 KV distribution S/S 11 KV lines and LT lines - 11 KV line - 100km
NESIDS-OTRI NLCPR Power Dept 2000-11-07 1 2002-12-31 1 0 1 1 Completed
912 ASSAM Power
Strengthening of 11 kV HT and LT Line with 12 Meter Steel Tubular Pole including Illumination of Kokrajhar Town(BTC Package)
Special Packages BTC 2008-11-28 5.2 2010-11-30 5.0979 0 5.0979 5.0979 Completed
913 ASSAM Power
Sub-transmission and Distribution lines (ST&D)-Construction of 33 KV, 30 Km D/C line from Chandrapur to Narengi
NESIDS-OTRI NLCPR Power Dept 2000-11-07 2 2002-12-31 2 0 2 2 Completed
914 ASSAM Power
Tinsukia Sub-Station 2x50 MVA , 220/132 kV
NESIDS-OTRI NLCPR Power Dept 1999-02-15 19.64 2002-09-30 17.19 0 17.19 19.1 Completed
915 ASSAM Roads and Bridges
Ambagaon - Barigaon Road
NESIDS-OTRI NLCPR Border road organisation 2003-02-18 7.63 2005-07-31 6.867 0 6.867 5.0655 Completed
916 ASSAM Roads and Bridges
Barangajuli-Khairabari road
NESIDS-OTRI NLCPR Border road organisation 2003-02-18 2.1 2005-07-31 0.5337 0 0.5337 0.0236 Completed
917 ASSAM Roads and Bridges
Barpeta Basbari Road, Barpeta
NESIDS-OTRI NLCPR Border road organisation 2001-10-31 0.9 2004-03-31 0.783 0 0.783 0.1058 Completed
918 ASSAM Roads and Bridges
Bhergaon-Chouni-Khagrabari-Dimakuchi Road (BTC Package)
Special Packages BTC 2005-10-31 1.32 2007-12-31 1.3161 0 1.3161 1.3161 Completed
919 ASSAM Roads and Bridges
Bijni-Panbari Road(BTC Package)
Special Packages BTC 2005-10-31 15.59 2007-12-31 15.5858 0 15.5858 15.5857 Completed
920 ASSAM Roads and Bridges
Causeway Over Kulsi, Darrang
NESIDS-OTRI NLCPR Border road organisation 2004-02-11 1 2005-07-31 0.9 0 0.9 Completed
921 ASSAM Roads and Bridges
Chamuapara - Purandia Road
NESIDS-OTRI NLCPR PWD Roads 2004-02-11 4.85 2007-03-31 2.6966 0 2.6966 2.6532 Completed
922 ASSAM Roads and Bridges
Chapaguri-Khagrabari Road(BTC Package)
Special Packages BTC 2005-10-31 6.3 2007-12-31 6.3 0 6.3 6.2469 Completed
923 ASSAM Roads and Bridges
Charuali - Nagarijuli Road
NESIDS-OTRI NLCPR PWD Roads 2003-02-18 5.38 2005-07-31 4.842 0 4.842 5.5813 Completed
924 ASSAM Roads and Bridges
Const of RCC Br. No. Over river Aie at Chillapara Kahibari villages on the road from Kokoijana 31-National High way to Nagaon.Manikpur 31 National Highway via Kirtanpara Numbarpara villages under Bongaigaon rural road Divn.
NESIDS-OTRI NLCPR Dept. of Power 2010-11-29 40.0126 2013-11-30 35.6486 0 35.6486 35.6486 Completed
925 ASSAM Roads and Bridges
Const of RCC Br. No.9/8 over Laska on Dauluguri Dotma road
NESIDS-OTRI NLCPR Dept. of Power 2013-07-02 1.7503 2015-07-31 1.5752 0 1.5752 1.5741 Ongoing
926 ASSAM Roads and Bridges
Const. of Rangia Dhamdhama Road including RCC Br. No 18/1.18/2,19/2,20/1 & 20/3.
NESIDS-OTRI NLCPR Dept. of Power 2012-08-22 10.5477 2014-07-31 9.4477 0 9.4477 9.4252 Ongoing
927 ASSAM Roads and Bridges
Const. Of RCC Br.No.29/1 (at Brg.) at Kuhimari Bordowa road (SH-15) with RCC Bridge.
NESIDS-OTRI NLCPR PWD Roads 2012-06-28 5.0137 2014-06-30 4.06 0 4.06 1.8044 Ongoing
928 ASSAM Roads and Bridges
Const. of RCC. Br. No. 2/1 over river Belsiri on Dhekipelua to Belsiri T.E., Connecting NH-52, under Sonitpur Rural Road Division
NESIDS-OTRI NLCPR PWD Roads 2013-02-25 5.525 2015-02-28 3.975 0 3.975 3.975 Completed
929 ASSAM Roads and Bridges
Const. of road from Udharbond to Banaskandi Under Silchar Rural Road Division
NESIDS-OTRI NLCPR Dept. of Power 2013-12-09 3.1219 2015-11-30 2.5162 0 2.5162 2.5161 Completed
930 ASSAM Roads and Bridges
Constn of road from 52.0 km point of NH 154 - Katlicherra Grant of District Hailakandi to Veterbond - Dullavcherra NEC road of Dist Karimganj
NESIDS-OTRI NLCPR PWD Roads 2014-06-27 16.1658 2015-12-31 14.5491 0 14.5491 14.5492 Completed
931 ASSAM Roads and Bridges
Constn. of Br.No. 28/1 on Dehangi Dayangmukh Road over thaijuwari Nala & Langlodisa Nala (PWD Roads Haflong Division)(NC Hills)
NESIDS-OTRI NLCPR Hill Areas Dept 2009-03-30 3.55 2010-09-30 1.1176 0 1.1176 1.1176 Ongoing
932 ASSAM Roads and Bridges
Constn. of RCC Br. No. 22/1 over river Diffoloo on Chowkihola Panjan Deithor Malasi Dirring Kohora (CPDMDK) Road with approaches and protection works(Karbi Anglong)
NESIDS-OTRI NLCPR PWD Roads 2009-03-30 3.0382 2011-04-30 0.9487 0 0.9487 0.9487 Ongoing
933 ASSAM Roads and Bridges
Construction / improvement of Batabari Kopati road
NESIDS-OTRI NLCPR PWD Roads 2007-10-26 2.1372 2009-10-31 1.8858 0 1.8858 1.8858 Completed
934 ASSAM Roads and Bridges
Construction and widening of road from Khowang Chariali to Chenimari
NESIDS-OTRI NLCPR Dept. of Power 2014-02-20 8.542 2016-02-29 7.5607 0 7.5607 6.1472 Ongoing
935 ASSAM Roads and Bridges
Construction of 4 lane Tripura road including electrical works from NH - 37 to GS Road
NESIDS-OTRI NLCPR PWD Roads 2008-03-28 11.365 2009-09-30 10.2285 0 10.2285 10.2285 Completed
936 ASSAM Roads and Bridges
Construction of 4 Nos. road including box culverts and pucca drainage in Lakhipur Town
NESIDS-OTRI NLCPR PWD Roads 2011-12-29 14.2477 2013-06-30 10.1876 0 10.1876 10.1876 Ongoing
937 ASSAM Roads and Bridges
Construction of Additional Two Lane Rail-Over-Bridge (ROB) on A.T. Road at Maligaon, Guwahati (Assam)
NESIDS-OTRI NLCPR PWD Roads 2005-12-27 13.5592 2007-11-30 12.0229 0 12.0229 12.0229 Completed
938 ASSAM Roads and Bridges
Construction of Alternative Road to Kamakhya Temple at Guwahati in Kamrup (Metro) District (Phase-1 restricted to Hill Cutting and retaining wall) under NLCPR in Assam.
NESIDS-OTRI NLCPR Public works Department 2017-05-11 13.8539 2019-05-11 12.4671 0 12.4671 12.4671 Completed
939 ASSAM Roads and Bridges
Construction of approach road leading to Industrial Growth Centre at Balipara in Sonitpur District (Assam)
NESIDS-OTRI NLCPR PWD Roads 2005-12-27 2.6865 2006-12-31 2.4179 0 2.4179 2.4179 Completed
940 ASSAM Roads and Bridges
Construction of Borobazar Ulubari Road via Bagargaon including RCC Bridge & Cross drainage in Chirang District (BTC Package - 2)
Special Packages BTC 2012-09-10 18.69 2015-09-10 18.2855 0 18.2855 18.2855 Completed
941 ASSAM Roads and Bridges
Construction of Br. no 2/1&4/1 on Raha Barapujia road over river Botamari and Hatibandha with approaches in Nagoan District
NESIDS-OTRI NLCPR PWD Roads 2011-02-22 3.69 2013-03-31 3.1752 0 3.1752 3.0951 Ongoing
942 ASSAM Roads and Bridges
Construction of Bridge No. 1/1 including approaches and protection work over Jatinga at Borkhola on Mahasadak to Borkhola road
NESIDS-OTRI NLCPR PWD Roads 2013-02-22 14.3223 2015-08-31 12.8813 0 12.8813 12.8164 Completed
943 ASSAM Roads and Bridges
Construction of Bridge No. 1/2 & Bridge No. 4/1 on old AT Road under Dibrugarh Rural Road Division in Dibrugarh Distt.
NESIDS-OTRI NLCPR PWD Roads 2010-11-10 2.9037 2013-11-30 2.5876 0 2.5876 2.5876 Completed
944 ASSAM Roads and Bridges
Construction of Deori Tiniali to Deramukam road from 2nd km to 7th km under Clause 9.4 Mos signed between Govt. of India, Govt. of Assam and UPDS for the year 2017-18 under KAATC package
Special Packages KAATC 2018-12-11 4.38 2020-12-11 4.3836 0 4.3836 2.1918 Completed
945 ASSAM Roads and Bridges
Construction of Dibrugarh Sapekhati road from km 12 to Km 18 along with 2 RCC bridges No. 18/1 and 19/1 with approches (Bridge over river Buridihing at Saraighat)
NESIDS-OTRI NLCPR Dept. of Power 2007-12-19 21.1645 2011-11-30 18.8596 0 18.8596 18.7981 Ongoing
946 ASSAM Roads and Bridges
Construction of Digheeripar Bardoulguri Barachuba road from Ch. 0.00Km to Ch. 4.120Km and from Ch. 4.560 Km to Ch. 10.100 Km (Length9.660Km) including Cross Drainage Works in Darrang District under NLCPR in Assam
NESIDS-OTRI NLCPR Dept. of Power 2017-12-08 11.4212 2019-12-08 10 0 10 9.1671 Ongoing
947 ASSAM Roads and Bridges
Construction of Flyover at the Intersection of Pramathesh Barua Road and N.F Railway Track at Bijni Town in Assam
NESIDS-OTRI NLCPR PWD Roads 2011-12-29 19.6335 2013-06-30 16.6683 0 16.6683 16.6683 Completed
948 ASSAM Roads and Bridges
Construction of Guidebund near RCC bridge No.8/2 over river Tonganee on the road from NH-52 to Kuwaripukhuri via Fakirpara
NESIDS-OTRI NLCPR PWD Roads 2013-02-25 2.0876 2013-10-31 0.751 0 0.751 Foreclosed
949 ASSAM Roads and Bridges
Construction of Kaliapani RCC bridge No.21/1 over River Dibru on Domdoma Dighaltarang Natun Gaon road with approach Road in Tinsukia
NESIDS-OTRI NLCPR PWD Roads 2012-08-22 13.2294 2015-07-31 11.509 0 11.509 11.5089 Completed
950 ASSAM Roads and Bridges
Construction of Kashikotra Bamungaon Bengtol Road(BTC Package)
Special Packages BTC 2005-12-27 11.69 2008-12-27 11.69 0 11.69 11.69 Completed
951 ASSAM Roads and Bridges
Construction of Khanda Road from Dawdhara to Doomni via Nawputa in Baska Distt.(BTC Package-2)
Special Packages BTC 2012-03-20 10.75 2015-03-20 10.75 0 10.75 10.739 Completed
952 ASSAM Roads and Bridges
Construction of Khetri Dharmapur to Hajo Nalbari Road at Morowa via Piplibari, Kakaya,Jagara, Goalpara,Baguhati & Kalakuchi
NESIDS-OTRI NLCPR PWD Roads 2013-12-09 10.3922 2015-11-30 9.0661 0 9.0661 9.0661 Completed
953 ASSAM Roads and Bridges
Construction of Maijan Thakurbari road to Malukbari road in Dibrugarh District
NESIDS-OTRI NLCPR PWD Roads 2012-05-21 8.11 2014-05-31 2.8623 0 2.8623 2.177 Completed
954 ASSAM Roads and Bridges
Construction of Mohmora Ali with RCC Bridge No. 9/2 in Sibsagar District
NESIDS-OTRI NLCPR PWD Roads 2010-11-12 7.7196 2013-02-28 2.718 0 2.718 1.5453 Ongoing
955 ASSAM Roads and Bridges
Construction of Moran Netai Road Dibrugarh
NESIDS-OTRI NLCPR PWD Roads 2010-11-10 3.0342 2012-11-30 2.1439 0 2.1439 2.1382 Foreclosed
956 ASSAM Roads and Bridges
Construction of railway over Br. at Dhing gate on Nagaon Bhurgaon via Dhing at Nagaon under NLCPR
NESIDS-OTRI NLCPR PWD Roads 2012-08-22 21.0546 2014-01-31 18.2624 0 18.2624 18.2624 Ongoing
957 ASSAM Roads and Bridges
Construction of RCC Br. (a) No. 1/1 and 2/1 on Deroi Rongoli road (b) No. 2/1 on Deopling Ramuagar road and No. 3/1 ghilaguri Road
NESIDS-OTRI NLCPR PWD Roads 2010-12-13 3.9118 2012-12-31 3.3169 0 3.3169 3.3169 Completed
958 ASSAM Roads and Bridges
Construction of RCC Br. No. 1/1 over regular Channel Gadadhar on Silerpar - Borshijhora Road in dhubri District
NESIDS-OTRI NLCPR PWD Roads 2008-03-28 4.5073 2010-03-31 4.0566 0 4.0566 4.0566 Completed
959 ASSAM Roads and Bridges
Construction of RCC Br. No. 1/1 over River Kalang on Ghahi - Borjhora Road under Nagaon Rural Road Division (Nagaon District)
NESIDS-OTRI NLCPR PWD Roads 2011-06-27 2.8112 2013-07-31 2.5057 0 2.5057 2.5057 Completed
960 ASSAM Roads and Bridges
Construction of RCC Br. No. 1/1 over River Pota on Hazuwa Nalbari Road in Baska District in Assam
NESIDS-OTRI NLCPR PWD Roads 2008-03-27 2.6401 2009-09-30 2.3526 0 2.3526 1.9006 Completed
961 ASSAM Roads and Bridges
Construction of RCC Br. No. 1/1 over Santijan on Srimanta Sankardev Govesona Kendra Road in Nagaon Road
NESIDS-OTRI NLCPR PWD Roads 2008-03-28 2.8055 2009-03-31 2.4999 0 2.4999 2.4999 Completed
962 ASSAM Roads and Bridges
Construction of RCC Br. No. 2/2 and 2/3 (Renamed as Br. Nos. 3/1 and 4/6) on Shyamaprasadpur to Dossgram Road via Swapnargul over stream Singrai in Cachar District
NESIDS-OTRI NLCPR PWD Roads 2010-11-29 2.57 2012-07-31 2.2901 0 2.2901 2.2901 Completed
963 ASSAM Roads and Bridges
Construction of RCC Br. No. 32/1 on AT road (old) including approaches with protection works in Goalpara
NESIDS-OTRI NLCPR Dept. of Power 2009-03-30 7.3912 2010-09-30 4.6102 0 4.6102 3.354 Ongoing
964 ASSAM Roads and Bridges
construction of RCC Br. No. 4/1 & 6/1 with approaches on J.B road in Jorhat distt.
NESIDS-OTRI NLCPR PWD Roads 2007-06-21 3.244 2009-06-30 2.8907 0 2.8907 2.8907 Completed
965 ASSAM Roads and Bridges
construction of RCC Br. No. 4/1 on Belguri - Satrasal Road in Dhrubri District
NESIDS-OTRI NLCPR PWD Roads 2008-03-27 2.7331 2010-03-31 2.4598 0 2.4598 2.4598 Completed
966 ASSAM Roads and Bridges
Construction of RCC Br. No. 5/1 on Jajari - Chabukdhara Road over River Sonai under Nagaon Rural Road Division
NESIDS-OTRI NLCPR PWD Roads 2010-02-03 2.3638 2012-02-29 2.1063 0 2.1063 2.0875 Completed
967 ASSAM Roads and Bridges
Construction of RCC Br. No. 6/1, 9/1 & 10/1 on Ambagaon Kathpara Solmari Singiari Road (NG-M-17) in Nagaon District
NESIDS-OTRI NLCPR PWD Roads 2010-02-03 2.3902 2012-02-29 2.1379 0 2.1379 2.1379 Completed
968 ASSAM Roads and Bridges
Construction of RCC Br. No. 7/1 on Dharamtul Dandua Road with approaches
NESIDS-OTRI NLCPR PWD Roads 2009-03-30 2.4842 2010-08-31 2.2136 0 2.2136 2.2136 Completed
969 ASSAM Roads and Bridges
Construction of RCC Br. No. 7/1 on Sissibargaon Amguri Road over Singimari steam in Dhemaji District
NESIDS-OTRI NLCPR Dept. of Power 2013-02-22 4.2932 2014-08-31 3.8491 0 3.8491 1.545 Completed
970 ASSAM Roads and Bridges
Construction of RCC Br. No. 8/1 on Bhalukmari in Mikirbheta Bhurbandha Road with approaches and protection work in Morigaon District
NESIDS-OTRI NLCPR PWD Roads 2010-02-03 2.5462 2012-02-29 2.2689 0 2.2689 2.2689 Completed
971 ASSAM Roads and Bridges
Construction of RCC Br. No. 8/1 over Saral Bhanga on Dotma Balajan Road
NESIDS-OTRI NLCPR Dept. of Power 2011-12-19 12.0231 2013-08-31 10.7144 0 10.7144 10.7138 Ongoing
972 ASSAM Roads and Bridges
Construction of RCC Br. No.6/1 over Numbor river from BBDC to Rongkimi Road under Clause 9.2 of MoS signed between Govt. of India, Govt. of Assam & UPDS for the year 2017-18. under KAATC package
Special Packages KAATC 2018-12-11 3.84 2020-12-12 3.8337 0 3.8337 1.917 Ongoing
973 ASSAM Roads and Bridges
Construction of RCC Br.No.1/1 over river Kaldia on Sarumanikpur Maharani road.
NESIDS-OTRI NLCPR PWD Roads 2013-02-22 4.6156 2015-02-28 4.154 0 4.154 4.154 Ongoing
974 ASSAM Roads and Bridges
Construction of RCC bridge at 7th Km of Kathal Road over river Ghagra including approaches and protection work in Cachar District.
NESIDS-OTRI NLCPR Dept. of Power 2008-03-28 2.5 2009-03-31 2.249 0 2.249 2.2354 Ongoing
975 ASSAM Roads and Bridges
Construction of RCC bridge No 15/2 over river Burisuti on Patdadaha Panbari Road
NESIDS-OTRI NLCPR PWD Roads 2014-02-20 7.1917 6.3917 0 6.3917 6.3917 Completed
976 ASSAM Roads and Bridges
Construction of RCC Bridge No. 1/1 and 4/1 with approaches on Nilbagan-Hojai Road in Nagaon District (Assam)
NESIDS-OTRI NLCPR PWD Roads 2006-06-02 1.9167 2007-11-30 1.7079 0 1.7079 1.7079 Completed
977 ASSAM Roads and Bridges
Construction of RCC Bridge No. 1/1 on Mohmoria to Kuruabahi via Bebejia Road over river Kalang under Nagaon Rural Road Division
NESIDS-OTRI NLCPR PWD Roads 2013-06-05 2.7408 2014-11-30 2.2073 0 2.2073 2.2072 Completed
978 ASSAM Roads and Bridges
Construction of RCC Bridge No. 1/1 over river Barak at Sadarghat, Silchar on Silchar - Kumbhigram Road
NESIDS-OTRI NLCPR PWD Roads 2013-11-07 59.0106 2016-04-30 52.6676 0 52.6676 52.6676 Completed
979 ASSAM Roads and Bridges
Construction of RCC Bridge No. 1/1 over River Doomdooma on old AT Road
NESIDS-OTRI NLCPR PWD Roads 2012-09-26 4.2187 2014-09-30 1.518 0 1.518 1.518 Ongoing
980 ASSAM Roads and Bridges
Construction of RCC Bridge No. 1/1 over Targhat channel on NH-31 (Targhat to Asharikandi Ghegeralga Road)
NESIDS-OTRI NLCPR PWD Roads 2012-08-22 3.249 2014-07-31 2.9241 0 2.9241 2.9241 Completed
981 ASSAM Roads and Bridges
Construction of RCC Bridge No. 1/1, 3/1 and 5/1 on Bahirjonai Berachapari Road in Dhemaji District (Assam) with approaches
NESIDS-OTRI NLCPR Dept. of Power 2006-02-21 5.5217 2007-08-31 4.8035 0 4.8035 3.7335 Completed
982 ASSAM Roads and Bridges
Construction of RCC Bridge No. 1/1, 3/1, 3/2 and 4/1 on Bhairabpur to Kulibazar Road in Dhemaji District (Assam) with approaches
NESIDS-OTRI NLCPR PWD Roads 2005-12-27 4.6644 2007-05-31 4.1563 0 4.1563 4.1563 Completed
983 ASSAM Roads and Bridges
Construction of RCC Bridge No. 1/1, 4/1 and 5/1 on Sripani Jengrai Road in Dhemaji District (Assam) with approaches
NESIDS-OTRI NLCPR PWD Roads 2006-02-21 3.0178 2007-08-31 2.1691 0 2.1691 2.1691 Completed
984 ASSAM Roads and Bridges
Construction of RCC Bridge No. 1/1, 4/1, 8/1 and 9/2 on Fakiragram Sapatgram Road in Dhubri District with approaches
NESIDS-OTRI NLCPR PWD Roads 2005-10-28 5.1451 2007-02-28 4.5848 0 4.5848 4.5848 Completed
985 ASSAM Roads and Bridges
Construction of RCC Bridge No. 1/2 and 3/1 on Sarupeta Bhuyapara in Barpeta District
NESIDS-OTRI NLCPR PWD Roads 2004-09-30 1.7736 2005-12-31 1.5553 0 1.5553 1.6176 Completed
986 ASSAM Roads and Bridges
Construction of RCC Bridge No. 1/3, 2/1 and 3/1 on Namti Ali in Sivasagar District
NESIDS-OTRI NLCPR PWD Roads 2004-09-21 0.8968 2005-12-31 0.7855 0 0.7855 0.8155 Completed
987 ASSAM Roads and Bridges
Construction of RCC bridge no. 10/1 & 18/1 on Bagals Road in Nalbari District with approaches
NESIDS-OTRI NLCPR PWD Roads 2008-09-30 3.0811 2010-01-31 2.7455 0 2.7455 2.7455 Completed
988 ASSAM Roads and Bridges
Construction of RCC Bridge No. 10/1 and approaches on Khowang Bhamun Road in Dibrugarh District of Assam
NESIDS-OTRI NLCPR PWD Roads 2005-12-27 1.0325 2007-05-31 0.9203 0 0.9203 0.9203 Completed
989 ASSAM Roads and Bridges
Construction of RCC Bridge No. 10/1 on Gogamukh Ghilamara Road in Dhemaji District (Assam) with approaches
NESIDS-OTRI NLCPR PWD Roads 2006-01-25 1.0841 2007-09-30 0.9501 0 0.9501 0.7445 Completed
990 ASSAM Roads and Bridges
Construction of RCC Bridge No. 11/1 on Teok Boloma Nakachari Road in Jorhat District (Assam) with approaches
NESIDS-OTRI NLCPR PWD Roads 2006-01-03 1.0917 2007-06-30 0.9746 0 0.9746 0.9746 Completed
991 ASSAM Roads and Bridges
Construction of RCC Bridge No. 12/1 on Goroimari -Dewaguri Laharighat Road with approaches in assam
NESIDS-OTRI NLCPR PWD Roads 2009-09-30 3.1734 2011-03-31 2.2562 0 2.2562 2.2562 Ongoing
992 ASSAM Roads and Bridges
Construction of RCC Bridge No. 156/2, 159/1, 163/2, 165/3, 172/2, 174/2, 177/1 and 182/2 on Dhodar Ali Road in Sivasagar District
NESIDS-OTRI NLCPR PWD Roads 2004-09-30 3.5251 2005-12-31 3.09 0 3.09 3.2125 Completed
993 ASSAM Roads and Bridges
Construction of RCC Bridge No. 16/1, 19/1 and 19/3 on Bagals Road in Nalbari District with approaches
NESIDS-OTRI NLCPR PWD Roads 2005-10-31 4.0473 2007-02-28 3.5525 0 3.5525 3.5525 Completed
994 ASSAM Roads and Bridges
Construction of RCC Bridge No. 17/4, 19/4, 20/2 and 26/1 on Mt. Sepon Sunpura Road in Sivasagar District (Assam) with approaches
NESIDS-OTRI NLCPR PWD Roads 2005-10-28 3.7786 2007-02-28 3.3672 0 3.3672 3.3672 Completed
995 ASSAM Roads and Bridges
Construction of RCC bridge no. 18/2 over stream Bahanigaon & bridge no. 19/1 over river Kachikata on Laluk-Narayanpur via Bihpuria Road in Lakhimpur District
NESIDS-OTRI NLCPR PWD Roads 2008-09-30 2.087 2010-07-31 1.6697 0 1.6697 1.4998 Completed
996 ASSAM Roads and Bridges
Construction of RCC Bridge No. 2/1 on Bamunbari to Jariguri Road in Dibrugarh District of Assam with approaches
NESIDS-OTRI NLCPR PWD Roads 2005-12-21 1.0805 2007-05-31 0.9421 0 0.9421 0.778 Completed
997 ASSAM Roads and Bridges
Construction of RCC Bridge No. 2/1 on Kokrajhar Monakocha Road over River Gaurang in Kokrajhar District with approaches
NESIDS-OTRI NLCPR PWD Roads 2005-10-28 9.9063 2007-02-28 8.8274 0 8.8274 8.8274 Completed
998 ASSAM Roads and Bridges
Construction of RCC Bridge No. 2/1 on Nandini Karaimari Road in Assam
NESIDS-OTRI NLCPR PWD Roads 2009-07-14 6.5813 2011-01-01 5.8356 0 5.8356 5.8356 Completed
999 ASSAM Roads and Bridges
Construction of RCC Bridge No. 2/2 - Haripur Sansarghat Road in Nalbari District
NESIDS-OTRI NLCPR PWD Roads 2004-02-20 2.2637 2005-06-30 1.7035 0 1.7035 1.8299 Completed
1000 ASSAM Roads and Bridges
Construction of RCC Bridge No. 2/3 on river Bhulla, 3/2 on river Lakhi and 7/2 on river Lakhimorasuti on Bengbari Ambagaon Road in Udalguri District, Assam
NESIDS-OTRI NLCPR PWD Roads 2006-06-27 6.3285 2007-12-31 5.6393 0 5.6393 5.6393 Completed
1001 ASSAM Roads and Bridges
Construction of RCC Bridge No. 2/3, 5/1, 9/1, 11/1, 15/3, 16/1, 18/1 and 19/4 on Itakhola Pavoi Road in Sonitpur District (Assam) with approaches
NESIDS-OTRI NLCPR PWD Roads 2005-10-28 8.7542 2007-02-28 7.6123 0 7.6123 7.6123 Completed
1002 ASSAM Roads and Bridges
Construction of RCC Bridge No. 2/4, 6/1 and 8/1 on river Kaldia including approaches on Dr. Jina Ram Das Road in Barpeta District (Assam)
NESIDS-OTRI NLCPR PWD Roads 2006-06-27 5.3585 2007-12-31 4.6543 0 4.6543 4.6543 Completed
1003 ASSAM Roads and Bridges
Construction of RCC Bridge No. 20/1 - Nalbari Palla Road in Nalbari District
NESIDS-OTRI NLCPR PWD Roads 2004-02-20 1.4436 2005-06-30 1.063 0 1.063 1.1374 Completed
1004 ASSAM Roads and Bridges
Construction of RCC Bridge No. 24/1 on Morigaon Moirabari Road in Morigaon District
NESIDS-OTRI NLCPR Dept. of Power 2011-01-25 3.1554 2012-07-31 2.7974 0 2.7974 2.7829 Completed
1005 ASSAM Roads and Bridges
Construction of RCC Bridge No. 24/2 and 32/2 on Mt. Golaghat Merapani Road in Golaghat District (Assam) with approaches and protection work
NESIDS-OTRI NLCPR PWD Roads 2006-01-03 1.8567 2007-06-30 1.6545 0 1.6545 1.6545 Completed
1006 ASSAM Roads and Bridges
Construction of RCC Bridge No. 3/1 on Majgaon Shantipur Road over River Sonai under Nagaon rural road Division
NESIDS-OTRI NLCPR PWD Roads 2010-06-17 3.3319 2012-06-30 2.7786 0 2.7786 2.3754 Completed
1007 ASSAM Roads and Bridges
Construction of RCC Bridge No. 3/1 over Puthimari river at Dolonghat (Dhulabari))(BTC Package-2)
Special Packages BTC 2010-12-14 8 2013-12-14 4 0 4 4 Ongoing
1008 ASSAM Roads and Bridges
Construction of RCC Bridge No. 3/1 over River Pagladia on U.C Baruah Road in Nalbari District including Approaches and Protection Work
NESIDS-OTRI NLCPR PWD Roads 2012-08-21 7.3015 2015-07-31 6.5313 0 6.5313 6.527 Completed
1009 ASSAM Roads and Bridges
Construction of RCC Bridge No. 3/2 over River Mansiri on Charduar Road with approaches in Sonitpur District
NESIDS-OTRI NLCPR PWD Roads 2005-10-28 1.6575 2007-02-28 1.477 0 1.477 1.477 Completed
1010 ASSAM Roads and Bridges
Construction of RCC Bridge No. 4/1 and 15/1 including approaches on Nagaon - Bhuragaon Road in Nagaon District
NESIDS-OTRI NLCPR PWD Roads 2006-05-16 4.344 2007-11-30 3.8708 0 3.8708 3.8708 Completed
1011 ASSAM Roads and Bridges
Construction of RCC Bridge No. 4/1 on Dimou-Raidongia Road over river Sonai under Nagaon Rural Road Division (Nagaon District)
NESIDS-OTRI NLCPR PWD Roads 2010-04-05 2.7098 2012-04-30 2.0473 0 2.0473 1.884 Completed
1012 ASSAM Roads and Bridges
Construction of RCC Bridge No. 4/1 on Garmari Gagalmari Road
NESIDS-OTRI NLCPR PWD Roads 2009-07-14 2.3344 2011-07-29 2.0802 0 2.0802 1.6192 Completed
1013 ASSAM Roads and Bridges
Construction of RCC Bridge No. 4/1, 6/1 and 14/1 on North Lakhimpur Kamalabari Road
NESIDS-OTRI NLCPR PWD Roads 2005-10-28 4.5527 2007-02-28 4.0569 0 4.0569 3.1641 Completed
1014 ASSAM Roads and Bridges
Construction of RCC bridge No. 4/1, 7/1, 8/1 and 11/1 over field canal / River Sakati on Abhyapuri Tilungia Road with approaches and protection works in Bongaigaon District
NESIDS-OTRI NLCPR PWD Roads 2008-11-07 3.3809 2010-10-31 3.0127 0 3.0127 2.362 Completed
1015 ASSAM Roads and Bridges
Construction of RCC Bridge No. 4/2, 9/2, 10/2 and 17/1 on Met Na-Ali Jorhat Titabor in Jorhat District
NESIDS-OTRI NLCPR PWD Roads 2004-09-30 1.426 2005-12-31 1.2539 0 1.2539 1.3033 Completed
1016 ASSAM Roads and Bridges
Construction of RCC Bridge No. 4/3 on NH-36 -O- Point to Horaghat Karkok Road at Kanki Eagti Gaon via Monsing Rongchehon Gaon
NESIDS-OTRI NLCPR PWD Roads 2013-07-02 2.2056 2015-01-30 1.98 0 1.98 1.584 Ongoing
1017 ASSAM Roads and Bridges
Construction of RCC Bridge No. 42/5 & 74/1 on DLHS Road in Karbi Anglong District
NESIDS-OTRI NLCPR PWD Roads 2004-03-19 1.4325 2005-03-31 1.0527 0 1.0527 1.1266 Completed
1018 ASSAM Roads and Bridges
Construction of RCC Bridge No. 5/1 on Burhagohain Tinthengia Road in Dibrugarh District of Assam
NESIDS-OTRI NLCPR PWD Roads 2005-12-21 0.9881 2007-05-31 0.8806 0 0.8806 0.8806 Completed
1019 ASSAM Roads and Bridges
Construction of RCC Bridge No. 5/1 on river Bharalkunda, 7/1 on Sister-par Beel, 8/1 on Dulani Beel, 9/9 on Distributary of river Champamati and 11/1 on Hill Canal including approaches on Jogighopa Chapar Road in Bongaigaon District in Assam.
NESIDS-OTRI NLCPR PWD Roads 2006-06-27 7.0941 2007-12-31 6.3216 0 6.3216 6.3216 Completed
1020 ASSAM Roads and Bridges
Construction of RCC Bridge No. 5/1 on Sonakhira Bubrighat Road in Karimganj District (Assam) with approaches and protection work
NESIDS-OTRI NLCPR PWD Roads 2006-01-03 0.9726 2007-06-30 0.8667 0 0.8667 0.8667 Completed
1021 ASSAM Roads and Bridges
Construction of RCC Bridge no. 5/1 over river Manas connecting Goalpara and Numberpara village on the road from Tulungia at NH-31(B) to Manikpur at NH-31 via Borghola -Kirtanpara and Chakla
NESIDS-OTRI NLCPR Dept. of Power 2013-07-02 18.7199 2016-07-30 16.1445 0 16.1445 16.1445 Completed
1022 ASSAM Roads and Bridges
Construction of RCC Bridge no. 5/3 on Bhorbhogia Mikirbheta Dhing Road with approaches in Morigaon District
NESIDS-OTRI NLCPR PWD Roads 2008-11-25 2.4117 2010-11-30 2.149 0 2.149 2.149 Completed
1023 ASSAM Roads and Bridges
Construction of RCC bridge No. 57/1 on Gaurisagar Moran Road and construction of RCC bridge no. 15/2 over River Disam on Naharkatia - Tinkhong Road under Dibrugarh Rural Road Division
NESIDS-OTRI NLCPR PWD Roads 2008-12-10 4.0612 2010-05-31 3.4723 0 3.4723 3.4723 Completed
1024 ASSAM Roads and Bridges
Construction of RCC Bridge No. 6/1 on Chariali Pavoi Road in Sonitpur District with approaches, protection work and sub-way
NESIDS-OTRI NLCPR PWD Roads 2005-10-25 0.8853 2007-02-28 0.789 0 0.789 0.789 Completed
1025 ASSAM Roads and Bridges
Construction of RCC Bridge No. 6/1, 7/1, 8/1, 8/2, 9/1, 11/1 and 11/2 on Sepon Suffry Road in Sivasagar District (Assam) with approaches
NESIDS-OTRI NLCPR PWD Roads 2005-12-27 4.1117 2007-05-31 3.6086 0 3.6086 3.6016 Ongoing
1026 ASSAM Roads and Bridges
Construction of RCC Bridge No. 6/2 7/3 8/1 8/2 10/1 and 11/1 over branches of river Kaloo on A.P.S. Road under Dhubri rural Road Division
NESIDS-OTRI NLCPR PWD Roads 2012-08-22 13.9149 2014-07-31 12.5234 0 12.5234 12.5109 Completed
1027 ASSAM Roads and Bridges
Construction of RCC Bridge No. 6/3 over Gongia river on Dotoma - Bhawraguri Road)(BTC Package-2)
Special Packages BTC 2010-12-14 8 2013-12-14 7.9887 0 7.9887 7.9887 Completed
1028 ASSAM Roads and Bridges
Construction of RCC Bridge No. 7/115/1 and 19/1 on Nagaon Barapujia Road(NH-38) Road division
NESIDS-OTRI NLCPR PWD Roads 2009-08-18 4.6583 2011-08-31 4.0367 0 4.0367 4.0367 Completed
1029 ASSAM Roads and Bridges
construction of RCC Bridge No. 8/1 over Gurufella river on Gossaigaon - Sapatgram Road)(BTC Package-2)
Special Packages BTC 2010-12-14 7.92 2013-12-14 7.919 0 7.919 7.919 Completed
1030 ASSAM Roads and Bridges
Construction of RCC Bridge No. 8/6 over river Dirring, (b) Bridge No. 18/1 over river Borjan, (c) Bridge No. 19/1 over River Borjan,(d) Bridge No. 23/3 over River Donjon, (e) Bridge No. 27/3 Over River Kokosang (2) Br. No. 2/1 ovr river Kohra (KarbiAnglon
NESIDS-OTRI NLCPR PWD Roads 2009-07-14 11.3837 2011-07-29 9.66 0 9.66 9.66 Ongoing
1031 ASSAM Roads and Bridges
Construction of RCC Bridge No. 9/1 on Mancotta Khamtighat road along with approaches and Protection work and strengthening of damaged road pavement from ch. 8308.00m to ch. 32600.00m via Saraighat Bridge up to Bamunbari Tiniali connecting Moran Naharkatia road (Sh-27) under PWD, Dibrugarh Rural Road Division in Dibrugarh District of Assam
NESIDS-OTRI NLCPR Public works Department 2017-05-11 13.87 2019-05-11 12.483 0 12.483 12.4528 Completed
1032 ASSAM Roads and Bridges
Construction of RCC Bridge No. 9/2 on Borbhogia Mikirbhata Road in Morigaon District with approaches
NESIDS-OTRI NLCPR PWD Roads 2005-10-28 2.3896 2007-02-28 2.1293 0 2.1293 2.1293 Completed
1033 ASSAM Roads and Bridges
Construction of RCC bridge No.1/1, 2/1 and 2/2 on Jonnai Silapathar Road in Dhimaji District
NESIDS-OTRI NLCPR PWD Roads 2004-07-29 1.9 2005-12-31 1.6667 0 1.6667 1.7337 Completed
1034 ASSAM Roads and Bridges
Construction of RCC bridge No.1/2 on Manja to Hidim Teron Road in Karbi Anglong District
NESIDS-OTRI NLCPR Dept. of Power 2004-07-28 1.7812 2005-12-31 1.5618 0 1.5618 1.6027 Ongoing
1035 ASSAM Roads and Bridges
Construction of RCC Bridge No.1/5(L18.00m) and 5/3 (L26.00m) over river Telehor and Dera respectively on Deori Tiniali to Deramokam Road (KAATC Package)
Special Packages KAATC 2015-03-26 4.1 2017-06-26 4 0 4 2.0496 Completed
1036 ASSAM Roads and Bridges
Construction of RCC bridge No.12/1 and 12/2 on Bangaon Jagara Road in Nalbari District
NESIDS-OTRI NLCPR PWD Roads 2004-07-29 1.7481 2005-12-31 1.533 0 1.533 1.599 Completed
1037 ASSAM Roads and Bridges
Construction of RCC bridge No.12/3 on Balkulia Rajapathar Road in Karbi Anglong District
NESIDS-OTRI NLCPR Hill Areas Dept 2004-07-28 1.7351 2005-12-31 1.5214 0 1.5214 1.5677 Completed
1038 ASSAM Roads and Bridges
Construction of RCC bridge No.13/1, 14/1, 15/1, 20/3 and 22/1 on Silchar Kumbhirgram Road in Cachar District
NESIDS-OTRI NLCPR PWD Roads 2004-07-29 5.6787 2005-12-31 4.9743 0 4.9743 5.1752 Completed
1039 ASSAM Roads and Bridges
Construction of RCC Bridge No.2/1 on the road from NH-52 to Kuwaripukhuri via Fakirpara and RCC Bridge No. 7/1 on Nimtoli Kachomari road including approach and protection work
NESIDS-OTRI NLCPR PWD Roads 2015-06-22 4.9566 2017-06-30 3.8935 0 3.8935 3.4891 Ongoing
1040 ASSAM Roads and Bridges
Construction of RCC Bridge No.2/2 and 4/2 including approaches on Gurnagar Tikrikilla Road in Goalpara District
NESIDS-OTRI NLCPR Dept. of Power 2006-05-16 3.5519 2007-11-30 3.0355 0 3.0355 3.03548 Ongoing
1041 ASSAM Roads and Bridges
Construction of RCC Bridge No.2/4 over Bornewria river at Men Teron under KAATC package
Special Packages KAATC 2019-07-31 3.45 2019-07-31 3.0935 0 3.0935 1.709 Ongoing
1042 ASSAM Roads and Bridges
Construction of RCC bridge No.24/1 on Barpathar-Bokajan Deithor-Chowkihola (BBDC) Road in Karbi Anglong District
NESIDS-OTRI NLCPR Hill Areas Dept 2004-07-28 0.5442 2005-12-31 0.468 0 0.468 0.4887 Completed
1043 ASSAM Roads and Bridges
Construction of RCC bridge No.26/3 on Samar Ali Das Road in Karbi Anglong District in Assam
NESIDS-OTRI NLCPR Hill Areas Dept 2004-07-28 1.6754 2005-12-31 1.4744 0 1.4744 1.0121 Completed
1044 ASSAM Roads and Bridges
Construction of RCC Bridge No.27/2, 28/1,29/1,30/2,32/2,35/1 and 45/1 including approaches on Dhubri-Kachugaon Road in Kokrajhar
NESIDS-OTRI NLCPR PWD Roads 2006-05-16 5.164 2007-11-30 4.6017 0 4.6017 4.5938 Completed
1045 ASSAM Roads and Bridges
Construction of RCC Bridge No.3/1 including approaches on Pukia Silapathar Road in Dhemaji District.
NESIDS-OTRI NLCPR PWD Roads 2006-05-16 1.3678 2007-11-30 1.2189 0 1.2189 1.2189 Completed
1046 ASSAM Roads and Bridges
Construction of RCC bridge No.3/1, 3/2,6/3,6/4, 6/6,10/5,12/1, 13/1, 21/2 and 23/2 on Border Roads (Gar Ali) in Jorhat District
NESIDS-OTRI NLCPR PWD Roads 2004-07-29 3.9756 2005-12-31 3.4884 0 3.4884 3.6284 Completed
1047 ASSAM Roads and Bridges
Construction of RCC bridge No.35/2 and 53/2 on Moran Naharkatia Road in Dibrugarh District
NESIDS-OTRI NLCPR PWD Roads 2004-07-29 1.1416 2005-12-31 1.0018 0 1.0018 0.8423 Completed
1048 ASSAM Roads and Bridges
Construction of RCC Bridge No.38/1, 43/1,43/3 and 44/2 including approaches and subway on Silchar - Hailakandi Road in Hailakandi District
NESIDS-OTRI NLCPR PWD Roads 2006-05-16 3.5313 2007-11-30 3.0595 0 3.0595 2.9866 Completed
1049 ASSAM Roads and Bridges
Construction of RCC Bridge No.4/3, 10/2 and 14/1 on Pengeri Philobari Road in Tinsukia District with approaches
NESIDS-OTRI NLCPR PWD Roads 2004-07-07 2.3366 2006-12-31 2.0493 0 2.0493 1.8426 Ongoing
1050 ASSAM Roads and Bridges
Construction of RCC bridge No.40/1 on Bagals Road in Kamrup District
NESIDS-OTRI NLCPR PWD Roads 2004-07-28 1.2888 2005-12-30 1.1292 0 1.1292 1.1732 Completed
1051 ASSAM Roads and Bridges
Construction of RCC bridge No.40/2 on CPDMDK Road in Karbi Anglong District
NESIDS-OTRI NLCPR Hill Areas Dept 2004-07-28 1.3182 2005-12-31 1.156 0 1.156 1.2027 Completed
1052 ASSAM Roads and Bridges
Construction of RCC Bridge No.6/1 on Udalguri Barbengera Road in Darrang District with approaches
NESIDS-OTRI NLCPR PWD Roads 2004-07-08 1.0403 2006-01-31 0.9116 0 0.9116 0.9616 Completed
1053 ASSAM Roads and Bridges
Construction of RCC Bridge No.6/1 over river Katakhal at Ratanpur Ferryghat on Hailakandi Ratanpur road(MDR)
NESIDS-OTRI NLCPR PWD Roads 2013-03-25 22.9405 2015-09-30 20.6454 0 20.6454 20.3813 Completed
1054 ASSAM Roads and Bridges
Construction of RCC bridge No.8/2, 20/1, 21/1, 23/3, 29/2, 32/1, 36/1 and 40/1 on Mangaldoi Bhutiachang Road in Darrang District
NESIDS-OTRI NLCPR PWD Roads 2004-07-29 6.847 2005-12-31 5.9188 0 5.9188 6.1589 Completed
1055 ASSAM Roads and Bridges
Construction of RCC Bridge over Deopani river at Bahakangtui upper Deopani, Karbi Anglong under clause 9.2 of MoS signed between Govt. of India, Govt. of Assam & UPDS for the year 2017-18 under KAATC package
Special Packages KAATC 2018-12-11 4.1 2020-12-12 4.0722 0 4.0722 2.0506 Ongoing
1056 ASSAM Roads and Bridges
Construction of RCC Bridge over River Aie
NESIDS-OTRI NLCPR PWD Roads 2010-11-10 78.8365 2013-11-30 70.2503 0 70.2503 70.2503 Completed
1057 ASSAM Roads and Bridges
Construction of RCC Bridges and Slab Culverts by Replacing Old Bridge and slab culverts on Kamarbondha Road upto 22nd Km
NESIDS-OTRI NLCPR PWD Roads 7.285 2013-12-31 6.0578 0 6.0578 5.1467 Completed
1058 ASSAM Roads and Bridges
construction of road and minor bridge from Motinagar to Buban hill Temple - Phase I
NESIDS-OTRI NLCPR PWD Roads 2007-10-24 3.2607 2009-10-31 2.9287 0 2.9287 2.8661 Ongoing
1059 ASSAM Roads and Bridges
Construction of road from Ambagaon to Kundarbil in Udalguri District (BTC Package -2)
Special Packages BTC 2014-09-12 12.75 2016-09-11 12.6961 0 12.6961 12.6946 Completed
1060 ASSAM Roads and Bridges
Construction of road from Banamali Tiniali to Rongagorh Tiniali with RCC Br. No. 2/2 over river Desang and Br. No. 8/2 on Mohmora Ali
NESIDS-OTRI NLCPR PWD Roads 2013-02-25 14.2231 2015-05-31 12.788 0 12.788 12.788 Ongoing
1061 ASSAM Roads and Bridges
Construction of Road from Beltola Chariali to Sarusajai (Bishnu Rabha Path), Guwahati (Assam)
NESIDS-OTRI NLCPR PWD Roads 2005-12-27 7.7731 2007-12-31 6.9266 0 6.9266 6.9266 Completed
1062 ASSAM Roads and Bridges
Construction of Road from Bhangarpar to Chandranathppur via babur bazar (Length 5.5 KM)
NESIDS-OTRI NLCPR PWD Roads 2007-12-20 2.4905 2008-12-31 2.1906 0 2.1906 2.1906 Completed
1063 ASSAM Roads and Bridges
Construction of road from Bijni Subhaijhar road at village Nayapara No.2 to Kathalguri via Sanyasiguri including construction of RCC bridge No.1/2 over river Chara in Chirang district.
NESIDS-OTRI NLCPR PWD Roads 2015-06-22 3.9584 2017-06-30 3.56 0 3.56 3.56 Completed
1064 ASSAM Roads and Bridges
Construction of Road from Birla (Taranglaso) to Ronkimi near NH-36 including RCC Bridge No. 24/1 (L25.00 km) in Assam under KAATC package
Special Packages KAATC 2018-06-06 44.15 2020-06-06 43.1599 0 43.1599 43.1599 Completed
1065 ASSAM Roads and Bridges
Construction of Road from Borobazar to Gumergaon via Chawdhuripara in Chirang District
NESIDS-OTRI NLCPR PWD Roads 2014-12-29 16.6839 14.9844 0 14.9844 14.9844 Completed
1066 ASSAM Roads and Bridges
Construction of Road from DillaiBazar to Mon Bahadur Tamang-Koilajan, Longvoku Model Village, Vokekaj to Manja at NH-36 (L30 km) under KAATC Packages
Special Packages KAATC 2018-08-01 32.4 2020-03-31 31.4945 0 31.4945 31.4945 Ongoing
1067 ASSAM Roads and Bridges
Construction of Road from Gopalpur (Kekerikuchi) to Niz-Kaurbaha(13.50kmlength) including construction of RCC Br.No5/1(15.00m) under PWD,Musalpur(R&B)Division.
NESIDS-OTRI NLCPR PWD Roads 2013-02-25 11.7083 2015-02-28 10.5372 0 10.5372 10.5372 Completed
1068 ASSAM Roads and Bridges
Construction of road from Hidipi to Lahorijan - goutom Basti road in Karbi anglong
NESIDS-OTRI NLCPR Hill Areas Dept 2010-11-10 4.8541 2012-04-30 4.2828 0 4.2828 4.2828 Ongoing
1069 ASSAM Roads and Bridges
Construction of road from Kanuri to Binnachora (Satgaharipara) via Nalia including protection works and 4 RCC bridges
NESIDS-OTRI NLCPR Dept. of Power 2013-12-09 38.5505 2015-11-30 34.6954 0 34.6954 34.6943931 Completed
1070 ASSAM Roads and Bridges
Construction of road from Kumarikata to Nayabasti (Kumarikata Jalah Road) in Baksa District (BTC Package-2)
Special Packages BTC 2014-09-26 12.79 2016-09-25 12.6641 0 12.6641 12.6641 Completed
1071 ASSAM Roads and Bridges
Construction of Road from NH-31 at Barama to Masalpur Baska(BTC Package)
Special Packages BTC 2005-02-07 14.43 2007-03-31 13.387 0 13.387 13.93 Completed
1072 ASSAM Roads and Bridges
CONSTRUCTION OF ROAD FROM NH-31 TO KASHIMPUR SUPLEKUCHI VIA PURBAHARATI
NESIDS-OTRI NLCPR Public works Department 2017-06-19 5.6257 2019-06-19 1.7515 0 1.7515 Foreclosed
1073 ASSAM Roads and Bridges
Construction of Road from NH-39 to BBDC Road via Langmili, L10.70 Km under KAATC package
Special Packages KAATC 2021-05-10 12.05 12.0476 0 12.0476 6.0238 Completed
1074 ASSAM Roads and Bridges
Construction of Road from Paoriputa to Natun Panbari with black topping and construction of RCC Bridge over river Pasnai in Udalguri Rural Road Division (Length - 2.30 Km) in Assam (BTC Area)
NESIDS-OTRI NLCPR PWD Roads 2013-05-17 7.6794 2014-11-30 5.5265 0 5.5265 3.746 Ongoing
1075 ASSAM Roads and Bridges
Construction of road from Ramhari to Bherbheri via Chamuakhat(Ch.8.00 Km to 11.50 KM) including cross drainage works (Darrang)
NESIDS-OTRI NLCPR PWD Roads 2013-02-25 3.4568 2014-08-31 2.4776 0 2.4776 2.4776 Completed
1076 ASSAM Roads and Bridges
Construction of road from rangamati to kalaigaon road janaram chowka to aaola chowka
NESIDS-OTRI NLCPR PWD Roads 2012-01-31 5.7535 2014-05-31 4.9247 0 4.9247 4.5233 Completed
1077 ASSAM Roads and Bridges
Construction of Road from Rongaichara to Bhola Bazar
NESIDS-OTRI NLCPR PWD Roads 2012-12-26 3.6559 2014-06-30 3.1945 0 3.1945 3.139 Completed
1078 ASSAM Roads and Bridges
Construction of road from Rongjuli IB to Kherkuta via Bechimari road with RCC Bridge 1/1, 1/3 and 5/3 under Goalpara Rural Road Division
NESIDS-OTRI NLCPR Dept. of Power 2013-09-19 7.3373 2015-11-30 6.6013 0 6.6013 6.6013 Completed
1079 ASSAM Roads and Bridges
Construction of Road from Subhaijhar to Uttar Ballamguri via Kumarshali at Bijni in Chirang District, Assam
NESIDS-OTRI NLCPR Public works Department 2017-03-09 14.3488 2019-03-09 12.9136 0 12.9136 12.9136 Completed
1080 ASSAM Roads and Bridges
Construction of road side drainage system including improvement of town roads in Nagaon Urban area.
NESIDS-OTRI NLCPR Department of Housing and 2012-09-25 19.245 2014-09-30 12.8961 0 12.8961 11.3839 Ongoing
1081 ASSAM Roads and Bridges
CONSTRUCTION OF ROAD WITH M & BT FROM CHEK ARTU TO BELENDING TO DERA-ARLOK, L 9.35KM, UNDER KAATC PACKAGE
Special Packages KAATC 2020-12-03 7.56 2022-02-02 5.7309 0 5.7309 3.7812 Ongoing
1082 ASSAM Roads and Bridges
Construction of Road with Mealling and Black Topping from NH-36 at Disobai to Batlok towards Thekarajan (Lenght12 km ) under KAATC in Assam
Special Packages KAATC 2019-07-31 15 2021-01-11 7.5 0 7.5 7.5 Ongoing
1083 ASSAM Roads and Bridges
Construction of road with Metalling and Black Topping from Era Gaon to Tikoklangso towards Langchitung (Length12.40 km) under KAATC package
Special Packages KAATC 2019-11-01 15.12 2021-11-01 7.5614 0 7.5614 7.5614 Ongoing
1084 ASSAM Roads and Bridges
Construction of Road with MTBT from UT Road at Dimakuchi Donbosco School to Badlapara via Kalikhola Road, Udalguri in Assam
NESIDS-OTRI NLCPR PWD Roads 2011-12-14 6.2091 2014-06-30 5.5791 0 5.5791 5.542 Completed
1085 ASSAM Roads and Bridges
Construction of road with RCC Bridges (2Nos.) from Pazipur Dhurkuchi to Borbori Narpara Road under Nalbari Rural Road Division
NESIDS-OTRI NLCPR PWD Roads 2013-10-04 5.8627 2015-12-31 5.2324 0 5.2324 5.2324 Completed
1086 ASSAM Roads and Bridges
Construction of Roads at Tinsukia Town
NESIDS-OTRI NLCPR Department of Housing and 2014-02-20 14.6065 2016-02-29 11.3542 0 11.3542 11.3542 Ongoing
1087 ASSAM Roads and Bridges
Construction of Tiphuk Jajolipukhuri Road with RCC Bridge No. 3/3 in Sibsagar District
NESIDS-OTRI NLCPR Dept. of Power 2010-11-10 5.5991 2012-11-30 4.9423 0 4.9423 4.9018 Ongoing
1088 ASSAM Roads and Bridges
Construction of Two Lane RoB in between Barpeta Railway Station and Surupeta Railway Station replacing L.C gate No. SK-37 at Barpeta District
NESIDS-OTRI NLCPR Public works Department 2017-10-24 35.4046 2019-10-24 30.7464 0 30.7464 12.2986 Ongoing
1089 ASSAM Roads and Bridges
Construction of Umpoo to Deori Tiniali Road via Longle Ethan upto Mulahin with cross drainage structure under clause 9.4 MoS signed between Govt. of India, Govt. of Assam and UPDS for the year 2017- 18 under KAATC package
Special Packages KAATC 2018-12-11 11.56 2016-11-26 9.0273 0 9.0273 5.779 Ongoing
1090 ASSAM Roads and Bridges
Construction of Zoo Japorigog Road (CH.0.00 to 1865.00 m from R.G. Baruah Road near State Zoo to Junction Point of Dispur Narengi Road including electrical works
NESIDS-OTRI NLCPR PWD Roads 2010-12-13 6.1986 2012-12-31 4.6966 0 4.6966 4.6066 Completed
1091 ASSAM Roads and Bridges
Constyruction of RCC bridge no. 13/1 13/2 and 30/2 on Mohbondha Road
NESIDS-OTRI NLCPR PWD Roads 2011-01-25 6.1433 2013-01-31 5.2396 0 5.2396 4.3714 Ongoing
1092 ASSAM Roads and Bridges
Conversion of SPT Bridge 20/1 over River Gangia into RCC Bridge on Gosaigaon Sapatgram Road in Kokrajhar District(BTC Package)
Special Packages BTC 2008-11-28 10.83 2010-11-30 10.7129 0 10.7129 10.7129 Completed
1093 ASSAM Roads and Bridges
Conversion of SPT Bridge No. 10/1, 12/3, 14/2 and 16/1 into RCC Bridge on metd. Kokrajhar Bahalpur road
NESIDS-OTRI NLCPR PWD Roads 2013-09-23 6.9894 2015-09-30 6.2282 0 6.2282 6.2282 Completed
1094 ASSAM Roads and Bridges
Conversion of washed out STP Bridge No. 2/1 over river Hell into RCC Bridge on Shialmari Moinaguri Road in Kokrajhar District
NESIDS-OTRI NLCPR PWD Roads 2012-12-28 19.6753 2014-12-31 17.7077 0 17.7077 17.7079 Completed
1095 ASSAM Roads and Bridges
Development of Roads for Dhemaji Town
NESIDS-OTRI NLCPR Dept. of Power 2013-12-09 11.9811 2015-11-30 10.2028 0 10.2028 10.2028 Completed
1096 ASSAM Roads and Bridges
Diguncherra-Airport Road
NESIDS-OTRI NLCPR PWD Roads 1998-04-01 0.25 2000-03-31 0.225 0 0.225 0.25 Completed
1097 ASSAM Roads and Bridges
Goreswar to Khoirabari Road (BTC Package)
Special Packages BTC 2005-10-31 6.57 2007-12-31 6.5728 0 6.5728 6.5727 Completed
1098 ASSAM Roads and Bridges
Gossaigaon to Kazigaon via Bhukka Tipkai Road(BTC Package)
Special Packages BTC 2005-10-31 11 2007-12-31 11 0 11 10.8166 Completed
1099 ASSAM Roads and Bridges
Hardutta-Birudatta road
NESIDS-OTRI NLCPR PWD Roads 2003-02-18 1.33 2005-07-31 1.1831 0 1.1831 1.3146 Completed
1100 ASSAM Roads and Bridges
Improvement & Strengthening of hard crust road from Laisong to Laiko Border Road (length 30km) under Mahur Road Division
NESIDS-OTRI NLCPR Hill Areas Dept 2012-12-28 8.3529 2014-06-30 7.5174 0 7.5174 7.5174 Ongoing
1101 ASSAM Roads and Bridges
Improvement / Upgradation by M&BT of Road from Kathalguri village to Wirwar via Parkup Pahar from Ch.2500.00m to 9000.00m (KAATC Package)
Special Packages KAATC 2015-03-26 3.5 2016-11-26 3.3335 0 3.3335 3.3335 Completed
1102 ASSAM Roads and Bridges
Improvement and Development of Goalpara Town Road Network in Goalpara District
NESIDS-OTRI NLCPR Department of Housing and 2013-05-17 17.2385 2014-11-30 15.2144 0 15.2144 12.4118 Ongoing
1103 ASSAM Roads and Bridges
Improvement and M & BT of Road from Donkamokam (Artukelang Charali) to Fangtrengfang upto PMGSY Road (Portion from ch. 3803.00 m to 5510.00 m & 6010.00 m to 8303.00 m, length 4.00 km) (KAATC Package)
Special Packages KAATC Public works Department 2017-02-21 3.29 2019-03-31 3.2858 0 3.2858 3.2858 Completed
1104 ASSAM Roads and Bridges
Improvement and M&BT of road near Satgaon Don Bosco School to Mugasong Tiniali road(length 4.00 Km) (KAATC Package)
Special Packages KAATC 2015-03-26 3.25 2017-03-31 3.1313 0 3.1313 3.1313 Completed
1105 ASSAM Roads and Bridges
Improvement and upgradation of Chencoories Elgin Road including construction of Major RCC bridge over river Ghagra
NESIDS-OTRI NLCPR Dept. of Power 2009-10-15 11.8091 2011-10-31 10.2253 0 10.2253 10.2132 Ongoing
1106 ASSAM Roads and Bridges
Improvement and upgradation of Kashikotra to Basugaon Road(BTC Package)
Special Packages BTC 2004-12-31 5.51 2007-12-31 5.2289 0 5.2289 5.3465 Completed
1107 ASSAM Roads and Bridges
Improvement and widening of Bishmuri Saralpara Sarbhanga Road (BTC Package -2)
Special Packages BTC 2012-03-20 26.79 2015-03-20 26.2595 0 26.2595 26.2595 Completed
1108 ASSAM Roads and Bridges
Improvement including Metalling & Black Topping at Chaitsema-Rongmandu Road from Monjuli to Longpai (ch. From 0.00m to 3900.00m) (KAATC Package)
Special Packages KAATC 2015-03-26 3.57 2017-03-26 3.5035 0 3.5035 3.4653746 Ongoing
1109 ASSAM Roads and Bridges
Improvement of Sujit Narzary road from Tihu Chowk to Barimakha via Belguri Pathar
NESIDS-OTRI NLCPR PWD Roads 2015-02-24 31.3582 2017-01-31 28.2224 0 28.2224 28.2187 Completed
1110 ASSAM Roads and Bridges
Improvement of Badlapara to Dharamjuli Road under Udalguri Rural Road division
NESIDS-OTRI NLCPR PWD Roads 2009-03-31 4.0335 2010-09-30 3.559 0 3.559 3.559 Completed
1111 ASSAM Roads and Bridges
Improvement of Banglagarh Jaberikuchi Road including cross drainage works in Darrang District
NESIDS-OTRI NLCPR PWD Roads 2013-07-02 20.4655 2015-07-31 18.4189 0 18.4189 16.2519 Ongoing
1112 ASSAM Roads and Bridges
Improvement of Barnagaon Pakribari road Udalguri (BTC Package)
Special Packages BTC 2005-02-07 1.5 2007-03-31 1.425 0 1.425 1.4638 Completed
1113 ASSAM Roads and Bridges
Improvement of Barpeta Bashibari Road leading to Manas Sanctuary from km. 1st to Km. 21st in Barpeta District in Assam
NESIDS-OTRI NLCPR PWD Roads 2006-12-31 12.3565 2008-06-30 10.9863 0 10.9863 10.8452 Completed
1114 ASSAM Roads and Bridges
Improvement of BBDC Road at 31 Km (Karbi Anglong)
NESIDS-OTRI NLCPR Hill Areas Dept 2009-06-16 40.1723 2011-06-30 35.0035 0 35.0035 22.6028 Ongoing
1115 ASSAM Roads and Bridges
Improvement of Bezera Balikuchi road
NESIDS-OTRI NLCPR PWD Roads 2011-02-22 3.7065 2013-03-31 3.2704 0 3.2704 2.6162 Completed
1116 ASSAM Roads and Bridges
Improvement of Bhangagarh - Bharalumukh VIP Road for National Games 2005
NESIDS-OTRI NLCPR PWD Roads 2005-03-17 9.828 2005-11-30 8.5859 0 8.5859 8.9299 Completed
1117 ASSAM Roads and Bridges
Improvement of Bhowraguri Kachugaon Road in Kokrajhar (BTC Package)
Special Packages BTC 2004-12-31 23.73 2007-12-31 22.539 0 22.539 23.7344 Completed
1118 ASSAM Roads and Bridges
Improvement of Charigaon Road under Jorhat Road Division
NESIDS-OTRI NLCPR PWD Roads 2010-03-22 5.5698 2012-04-30 4.9423 0 4.9423 4.9423 Completed
1119 ASSAM Roads and Bridges
Improvement of Chintagaon Botiamari Road in Udalguri District
NESIDS-OTRI NLCPR PWD Roads 2011-09-15 8.9826 2013-06-30 8.0444 0 8.0444 8.0444 Completed
1120 ASSAM Roads and Bridges
Improvement of Dalgaon Kopti Road (Orang - Dalgaon Road)
NESIDS-OTRI NLCPR PWD Roads 2007-10-26 2.3571 2009-10-31 1.697 0 1.697 1.697 Completed
1121 ASSAM Roads and Bridges
Improvement of Dhamdhama Tupalia Subankhata (DTS) Road (Metalling and black-topping of remaining stretches including improvement of existing metalled surface(BTC Package)
Special Packages BTC 2004-12-31 13.72 2007-03-31 13.4255 0 13.4255 13.72 Completed
1122 ASSAM Roads and Bridges
Improvement of Drainage system of Dibrugarh Town in Assam
NESIDS-OTRI NLCPR Department of Housing and 2014-02-28 23.8148 2017-02-28 19.9888 0 19.9888 17.0583 Ongoing
1123 ASSAM Roads and Bridges
Improvement of Jalah Rupahi Saudarbhitha Gobardhana road Baska(BTC Package)
Special Packages BTC 2005-02-07 10 2007-03-31 9.5 0 9.5 9.9599 Completed
1124 ASSAM Roads and Bridges
Improvement of Jalah to Kumarikata including 2 Nos. of Bridges over River Kaldia and Diring in Baska District(BTC Package)
Special Packages BTC 2010-10-08 21.21 2011-10-07 21.0012 0 21.0012 21.0012 Completed
1125 ASSAM Roads and Bridges
Improvement of JB Road
NESIDS-OTRI NLCPR PWD Roads 2011-05-26 2.9737 2013-06-30 2.639 0 2.639 2.639 Completed
1126 ASSAM Roads and Bridges
Improvement of Kadamtal Nikashi Road from Kuchighar to Bhaluk donga
NESIDS-OTRI NLCPR PWD Roads 2013-10-21 4.1575 2015-07-31 3.5851 0 3.5851 2.9933 Completed
1127 ASSAM Roads and Bridges
Improvement of Kalaigaon Kundarbil road Udalguri (BTC Package)
Special Packages BTC 2005-02-07 1.32 2007-03-31 1.2539 0 1.2539 1.2896 Completed
1128 ASSAM Roads and Bridges
Improvement of Kanimara Nannatary Road in Nalbari District
NESIDS-OTRI NLCPR Dept. of Power 2012-12-26 4.35 2014-06-30 3.9105 0 3.9105 3.7022 Completed
1129 ASSAM Roads and Bridges
Improvement of Kaurbaha-Nagrijuli Road by metalling and black-topping including conversion of SPT Bridges into RCC Minor Bridges (BTC Package)
Special Packages BTC 2004-12-31 14.5 2007-12-31 14.1695 0 14.1695 14.455 Completed
1130 ASSAM Roads and Bridges
Improvement of Kharupetia Udalguri Road from Ch.0.00km to 15.00km (EW GSB BM & SDBC Pavement length15.00km carriage way width5.50m) including RCC drains in the Bazar Portion under Darrang District.
NESIDS-OTRI NLCPR Dept. of Power 2015-03-25 27.1287 2017-02-28 24.3464 0 24.3464 23.3302 Completed
1131 ASSAM Roads and Bridges
Improvement of Kheroni Rongpongbong Road from 37.10th Km to 46.10 th Km(Widening, Lowering and strengthening of existing hard crust and Providing H.P. Culvert).
Special Packages KAATC 2016-02-29 3.2 2018-02-28 2.35 0 2.35 1.6 Ongoing
1132 ASSAM Roads and Bridges
Improvement of Khoirabari MPK road (Andherighat) to Harisinga via Bhergaon Tangla and Purandia 42.25 km length with conversion of 11 SPT bridges to RCC(BTC Package)
Special Packages BTC 2005-12-27 26.5 2008-12-27 26.5026 0 26.5026 26.5026 Completed
1133 ASSAM Roads and Bridges
Improvement of Kollanga Sildibi Road from 7th km to 10th km (L3.25 km) with Construction of RCC Bridge No. 8/2 over river Dera) (KAATC Package)
Special Packages KAATC Public works Department 2017-02-21 3.59 2019-03-31 3.5856 0 3.5856 3.5856 Completed
1134 ASSAM Roads and Bridges
Improvement of Lahorijan Gautom basti Road( Ph-II, L-5.50Km from Ch 9000.0m to Ch 145000.0 M)
NESIDS-OTRI NLCPR Hill Areas Dept 2013-07-02 5.1735 2015-03-31 3.7228 0 3.7228 3.6623 Ongoing
1135 ASSAM Roads and Bridges
Improvement of Mahilapara Dongapara Barangajuli PWD Road.
NESIDS-OTRI NLCPR PWD Roads 2010-12-14 8.3519 2012-12-31 7.4423 0 7.4423 7.4423 Completed
1136 ASSAM Roads and Bridges
Improvement of Morigaon - Pachatia-Damal-Dharamtul Road including construction of RCC bridge No. 5/1 over river Kolong
NESIDS-OTRI NLCPR PWD Roads 2013-12-09 7.3255 2015-11-30 2.6345 0 2.6345 2.6345 Foreclosed
1137 ASSAM Roads and Bridges
Improvement of Mridongpara Road under NLCPR in Sibsagar District
NESIDS-OTRI NLCPR PWD Roads 2013-06-05 6.7152 2014-11-30 6.0402 0 6.0402 4.6506 Ongoing
1138 ASSAM Roads and Bridges
Improvement of Municipal Roads in Narayanpur Town in Assam
NESIDS-OTRI NLCPR Department of Housing and 2010-01-20 4 2012-01-31 3.5294 0 3.5294 3.5294 Completed
1139 ASSAM Roads and Bridges
Improvement of Nagaon Morikolong Nanoi dakhinpath Road under Nagaon district
NESIDS-OTRI NLCPR PWD Roads 2007-11-26 1.9903 2008-11-30 1.7735 0 1.7735 1.7735 Completed
1140 ASSAM Roads and Bridges
Improvement of Nagaon-Barapujia Road under Nagaon Dist.
NESIDS-OTRI NLCPR PWD Roads 2007-11-22 2.98 2009-11-30 2.6554 0 2.6554 2.6554 Completed
1141 ASSAM Roads and Bridges
Improvement of Naginimora Jajoli Road from Ch. 8.346 Km to Ch. 13.650 Km including conversion of SPT bridge no. 14/1 to RCC Bridge
NESIDS-OTRI NLCPR PWD Roads 2012-08-21 4.8543 2014-01-31 4.3679 0 4.3679 4.3679 Completed
1142 ASSAM Roads and Bridges
Improvement of Namati to Sukani Road under PWD Dibrugarh Rural Road Division
NESIDS-OTRI NLCPR PWD Roads 2014-02-20 6.3158 2016-02-29 2.2725 0 2.2725 2.2725 Foreclosed
1143 ASSAM Roads and Bridges
Improvement of North Kajolgaon Bengtol Sonitpur road Chirang(BTC Package)
Special Packages BTC 2005-02-07 8.1 2007-03-31 7.6947 0 7.6947 8.1 Completed
1144 ASSAM Roads and Bridges
Improvement of North Kajolgaon Dangtol Road (BTC Package)
Special Packages BTC 2004-12-31 5.93 2007-03-31 5.6275 0 5.6275 5.925 Completed
1145 ASSAM Roads and Bridges
Improvement of PGHJ road from 19th to 74th km (Umrangso to Dilhnagi) under PWD (Roads), Haflong Division (DHATC)
Special Packages DHATC 2017-08-08 34.98 2018-09-30 34.605 0 34.605 34.6044 Completed
1146 ASSAM Roads and Bridges
Improvement of Rampur Model Road starting from NH - 37 in Kamrup District
NESIDS-OTRI NLCPR PWD Roads 2008-03-05 2.2458 2009-03-31 2.0013 0 2.0013 1.9999 Completed
1147 ASSAM Roads and Bridges
Improvement of Road between Hatigaon Bhetapara Road for National Games 2005
NESIDS-OTRI NLCPR PWD Roads 2005-03-17 4.5626 2005-11-30 3.9867 0 3.9867 4.1467 Completed
1148 ASSAM Roads and Bridges
Improvement of Road Bye Lanes of Chabua Town
NESIDS-OTRI NLCPR Department of Housing and 2013-09-23 9.0603 2015-09-30 6.1751 0 6.1751 6.1751 Foreclosed
1149 ASSAM Roads and Bridges
Improvement of Road from 1st Km of Demow Dehing Road to Dhaoma Pukhuri (Length - 10.125 Km) with R.C.C. Bridge (Length 18.75 m) in Demow Rural Road sub - Division
NESIDS-OTRI NLCPR PWD Roads 2012-05-28 7.6 2014-05-30 5.4165 0 5.4165 4.3524 Ongoing
1150 ASSAM Roads and Bridges
Improvement of Road from Amsoi Tiniali to Sinani Bridge via Borgaon, Morten (From 0.00 Km to 17th Km).
Special Packages KAATC 2016-02-29 7.1 2018-02-28 6.8094 0 6.8094 3.55 Completed
1151 ASSAM Roads and Bridges
Improvement of Road from Barama-Dhamdhama-Tamulpur under Non Lapsable Central pool of Resources.
NESIDS-OTRI NLCPR PWD Roads 2014-03-03 8.4655 2016-02-29 7.5152 0 7.5152 7.5152 Completed
1152 ASSAM Roads and Bridges
Improvement of road from Bashbari to Gossaigaon via Dingdinga Kokrajhar District (D.K. Road)(BTC Package-2)
Special Packages BTC 2012-03-20 25 2015-03-20 24.3911 0 24.3911 24.3911 Completed
1153 ASSAM Roads and Bridges
Improvement of road from Budura to Parbhuchuba Dimakuchi PWD Road at Batabari via Khasiachuba, Barangabari
NESIDS-OTRI NLCPR PWD Roads 2013-07-02 11.09 2015-01-31 9.9809 0 9.9809 9.9701 Completed
1154 ASSAM Roads and Bridges
Improvement of Road from Joysingh Doloi Auditorium Hall to Bijoy Teron Village approach road via Cotton Ginning Mill by widening of road formation including construction of RCC Bridge No.1/1 (KAATC PAckage)
Special Packages KAATC 2015-03-26 3.6 2016-11-26 3.5543 0 3.5543 1.8 Completed
1155 ASSAM Roads and Bridges
Improvement of road from Kahilipara to Don Bosco School at Guwahati in Assam
NESIDS-OTRI NLCPR PWD Roads 2007-12-31 2.5216 2009-12-31 2.2694 0 2.2694 2.2694 Completed
1156 ASSAM Roads and Bridges
Improvement of Road from Khairabari to Jamuguri in Udalguri
NESIDS-OTRI NLCPR PWD Roads 2013-10-28 13.2918 2016-10-31 4.783 5.6057 10.3887 4.783 Ongoing
1157 ASSAM Roads and Bridges
Improvement of Road Network at Sonari Town under Charaideo Rural Road Division
NESIDS-OTRI NLCPR Dept. of Power 2010-12-13 7.2374 2012-06-29 6.3621 0 6.3621 6.352 Ongoing
1158 ASSAM Roads and Bridges
Improvement of Road Network leading towards Dibru- Chaikhowa National Park under Dibrugarh Rural Road division
NESIDS-OTRI NLCPR PWD Roads 2010-03-22 7.4742 2013-04-30 6.5927 0 6.5927 6.6017 Ongoing
1159 ASSAM Roads and Bridges
Improvement of Roads and Natural Drainage System within Greater Tezpur Town
NESIDS-OTRI NLCPR PWD Roads 2007-03-28 25.5178 2009-05-29 3.4813 0 3.4813 3.4813 Foreclosed
1160 ASSAM Roads and Bridges
Improvement of Roads in Biswanath Chariali Town
NESIDS-OTRI NLCPR PWD Roads 2011-02-22 11.7443 2013-03-31 8.1283 0 8.1283 4.1435 Ongoing
1161 ASSAM Roads and Bridges
Improvement of roads in Jorhat Town
NESIDS-OTRI NLCPR PWD Roads 2007-12-20 2.5 2009-06-30 2.2395 0 2.2395 2.2395 Completed
1162 ASSAM Roads and Bridges
Improvement of Roads in Sivasagar Town
NESIDS-OTRI NLCPR PWD Roads 2007-12-20 2.4246 2009-12-31 2.1605 0 2.1605 2.1605 Completed
1163 ASSAM Roads and Bridges
Improvement of Roads of Tinsukia Master Plan Area,Tinsukia
NESIDS-OTRI NLCPR PWD Roads 2014-03-03 15.4574 2016-09-30 13.7545 0 13.7545 7.2408 Ongoing
1164 ASSAM Roads and Bridges
Improvement of Rongkhang Basti to Thekerajan Road (KAADC)
NESIDS-OTRI NLCPR Hill Areas Dept 2011-12-29 14.1814 2013-06-30 12.5914 0 12.5914 10.0694 Ongoing
1165 ASSAM Roads and Bridges
Improvement of Rowta Station Feeder Road in Udalguri District(BTC Package -2)
Special Packages BTC 2012-09-10 1.53 2014-09-10 1.5262 0 1.5262 1.5262 Completed
1166 ASSAM Roads and Bridges
Improvement of Singimari-Sualkuchi Road including cross drainage works & road side drains in Kamrup district
NESIDS-OTRI NLCPR PWD Roads 2013-03-25 18.2776 2015-03-31 16.4498 0 16.4498 16.4498 Completed
1167 ASSAM Roads and Bridges
Improvement of Sundari Bidyapur via Kakragaon Road(BTC Package)
Special Packages BTC 2004-12-31 9.21 2007-12-31 8.7483 0 8.7483 8.9454 Completed
1168 ASSAM Roads and Bridges
Improvement of Tangla Bhergaon Ramgaon Road from Ch.00 M to 9400 M including cross drainage works in Udalguri
NESIDS-OTRI NLCPR PWD Roads 2010-02-05 10.4334 2013-02-28 9.2059 0 9.2059 9.2059 Completed
1169 ASSAM Roads and Bridges
Improvement of Tangla Kachubil Road (BTC area)
NESIDS-OTRI NLCPR PWD Roads 2010-11-15 10.7986 2012-11-30 9.6212 0 9.6212 9.6212 Completed
1170 ASSAM Roads and Bridges
Improvement of Tihu Doomni Road leading to Indo-Bhutan foot hills from 7th to 25 km in Baska district(BTC Package)
Special Packages BTC 2005-12-27 9.95 2008-12-27 9.95 0 9.95 9.95 Completed
1171 ASSAM Roads and Bridges
Improvement of Udalguri Bhakatpara road via Bhairaguri Udalguri(BTC Package)
Special Packages BTC 2005-02-07 4.44 2007-03-31 4.2179 0 4.2179 4.3347 Completed
1172 ASSAM Roads and Bridges
Improvement of Udalguri Sapekhaity Bhakatpara Road in Udalguri Rural Road Division under NLCPR in Assam
NESIDS-OTRI NLCPR Public works Department 2017-05-11 31.0305 2019-05-11 27.9274 0 27.9274 27.9262 Completed
1173 ASSAM Roads and Bridges
Improvement with M&BT of Disagisim Sibnagar Road (L7.448 KM) (KAATC PAckage)
Special Packages KAATC 2015-03-26 3.01 2016-11-26 3.0096 0 3.0096 3.0096 Completed
1174 ASSAM Roads and Bridges
Improvement/Upgradation of Mangaldoi Bhutiachang Samrang road from CH-47722M to CH-48292 and fromCH-50000 to CH-62500M including cross drainage works
NESIDS-OTRI NLCPR PWD Roads 2013-06-11 29.9166 2014-06-30 26.9192 0 26.9192 26.9192 Completed
1175 ASSAM Roads and Bridges
Jagun-Kharsang Road(11 KM)
NESIDS-OTRI NLCPR PWD Roads 2003-12-24 3.0394 2005-03-31 2.4161 0 2.4161 2.5661 Completed
1176 ASSAM Roads and Bridges
Kachubari-Naokata-Patharighat Road, Nalbari & Darrang
NESIDS-OTRI NLCPR PWD Roads 2001-10-31 3.96 2004-03-31 3.5641 0 3.5641 3.96 Completed
1177 ASSAM Roads and Bridges
Kaithalkuchi-Barama Subankhata Road, North Kamrup
NESIDS-OTRI NLCPR PWD Roads 2001-12-06 0.61 2005-08-31 0.549 0 0.549 0.61 Completed
1178 ASSAM Roads and Bridges
Khowrang Mahanpur Road (BTC Package)
Special Packages BTC 2005-10-31 2.5 2007-12-31 2.5 0 2.5 2.4629 Completed
1179 ASSAM Roads and Bridges
Kumarikata- Jalah Road, Nalbari.
NESIDS-OTRI NLCPR PWD Roads 2001-10-31 15.08 2004-03-31 13.4676 0 13.4676 14.964 Completed
1180 ASSAM Roads and Bridges
Lailongpara-Kopati Road Via Boro Bazar(BTC Package)
Special Packages BTC 2005-10-31 1.31 2007-12-31 1.3104 0 1.3104 1.2723 Completed
1181 ASSAM Roads and Bridges
M & BT AND CONSTRUCTION FROM UMKHIRMI TO SOMATON MUKROH, UNDER KAATC PACKAGE
Special Packages KAATC 2020-12-08 7.34 2022-12-07 3.6722 0 3.6722 3.6722 Ongoing
1182 ASSAM Roads and Bridges
Mangaldai- Bhutiachang Road, Darrang.
NESIDS-OTRI NLCPR PWD Roads 2003-02-18 1.207 2003-10-31 1.0863 0 1.0863 1.207 Completed
1183 ASSAM Roads and Bridges
Met. And Blacktopping raod from Lalmati to Manglajhora in Kokrajhar District.(BTC Package -2)
Special Packages BTC 2012-03-20 6 2014-03-20 5.7869 0 5.7869 5.7869 Completed
1184 ASSAM Roads and Bridges
Metalling & Black topping of Assalu to Diduki Road including WBM (Length 18km) under Mahur Road Division
NESIDS-OTRI NLCPR Hill Areas Dept 2012-06-28 6.3957 2014-06-30 2.302 0 2.302 2.302 Ongoing
1185 ASSAM Roads and Bridges
Metalling & Black Topping of Road from Circuit House Tinsukia to NH-37 via Okanimuria Borguri Okanimuria Nakhrai and Lunpuria Kaibortogaon in Tinsukia Rural Road Subdivision/ Division
NESIDS-OTRI NLCPR Dept. of Power 2010-10-29 5.241 2012-02-29 4.6509 0 4.6509 4.493 Ongoing
1186 ASSAM Roads and Bridges
Metalling and backtopping of Gossaigaon to Saraibil Road including improvement of existing hard crust and conversion of STP bridge to Rcc bridges(BTC Package)
Special Packages BTC 2005-02-07 19.39 2007-03-31 18.3488 0 18.3488 19.39 Completed
1187 ASSAM Roads and Bridges
Metalling and Black Topping of Swapanpur to Ramchandi Road of Hailakandi District.
NESIDS-OTRI NLCPR PWD Roads 2008-03-27 3.7975 2009-03-31 2.7312 0 2.7312 2.7312 Ongoing
1188 ASSAM Roads and Bridges
Metalling and Black-topping of Narabari Dawkibari Road (Narabari to Florican Garden via Malgaon)(BTC Package)
Special Packages BTC 2004-12-31 15.95 2007-12-31 15.1525 0 15.1525 15.381 Completed
1189 ASSAM Roads and Bridges
Metalling and Blacktopping of Gunjung Maibang Road from 17th to 28.78 KM(NC Hills)
NESIDS-OTRI NLCPR Hill Areas Dept 2009-08-18 6.408 2011-01-31 1.9871 0 1.9871 1.9871 Foreclosed
1190 ASSAM Roads and Bridges
Metalling and Blacktopping of Road from Borhapjan samdang via Nahoroni road to Sukanguri L.P School in Tinsukia Rural Road Subdivision / Division
NESIDS-OTRI NLCPR PWD Roads 2010-09-15 3.2145 2012-03-31 2.8644 0 2.8644 2.9706 Completed
1191 ASSAM Roads and Bridges
Metalling and Blacktopping of Road from Dr. Fakaruddin Ali Ahmed Path To Doulgobindapur via Nalbari Hindu Smashan, Nalbari along with Pucca Drain and RCC Slab culverts
NESIDS-OTRI NLCPR PWD Roads 2010-02-05 2.2785 2012-02-29 2.0297 0 2.0297 1.6242 Completed
1192 ASSAM Roads and Bridges
Mt. & Bt. of Road from Jaipur NH-31 C to Amguri JD Road (Dumbruguri to Amguri) including construction of RCC Bridges & Culverts
NESIDS-OTRI NLCPR PWD Roads 2014-12-29 14.7147 2017-01-31 13.192 0 13.192 13.192 Completed
1193 ASSAM Roads and Bridges
Namati-Masalpur Road, Nalbari
NESIDS-OTRI NLCPR PWD Roads 2001-12-06 0.31 2006-07-31 0.279 0 0.279 0.31 Completed
1194 ASSAM Roads and Bridges
Project for Road Network of Jorhat Master Plan Area in Jorhat District
NESIDS-OTRI NLCPR PWD Roads 2006-09-12 4.61 2008-09-30 4.0284 0 4.0284 4.0284 Completed
1195 ASSAM Roads and Bridges
Rangiya Goreswar Road
NESIDS-OTRI NLCPR PWD Roads 2003-02-18 1.52 2004-03-31 1.3674 0 1.3674 1.5168 Completed
1196 ASSAM Roads and Bridges
RCC Bridge 4/1 on Hatigaon -Betapara
NESIDS-OTRI NLCPR PWD Roads 2004-01-07 1.5384 2005-06-30 1.2397 0 1.2397 1.3397 Completed
1197 ASSAM Roads and Bridges
Rcc Bridge on Additional Approach to Airport road(2nos)
NESIDS-OTRI NLCPR PWD Roads 2003-12-24 1.7339 2005-03-31 1.5219 0 1.5219 1.6368 Completed
1198 ASSAM Roads and Bridges
Rcc Bridge on Mandakata North Guwahati Road(2 nos)
NESIDS-OTRI NLCPR PWD Roads 2004-01-07 2.4019 2005-03-31 1.7636 0 1.7636 1.8917 Completed
1199 ASSAM Roads and Bridges
Recce of Road in BAC Area
NESIDS-OTRI NLCPR PWD Roads 2000-10-31 0.03 2005-07-31 0.027 0 0.027 0.028 Completed
1200 ASSAM Roads and Bridges
Road from Jarighat to Lakhichhera.
NESIDS-OTRI NLCPR PWD Roads 2000-03-28 0.92 2002-08-31 0.828 0 0.828 0.92 Completed
1201 ASSAM Roads and Bridges
Road from Hatichhera Dudpati Mudrennamukh.
NESIDS-OTRI NLCPR PWD Roads 2000-03-28 0.43 2001-12-31 0.387 0 0.387 0.43 Completed
1202 ASSAM Roads and Bridges
Road improvement projects in NC Hills (6 No.)
NESIDS-OTRI NLCPR PWD Roads 2000-03-10 4.98 2003-05-30 4.482 0 4.482 4.98 Completed
1203 ASSAM Roads and Bridges
Rowta- Udalguri Road, Darrang.
NESIDS-OTRI NLCPR PWD Roads 2001-10-31 8.32 2004-03-31 7.488 0 7.488 8.32 Completed
1204 ASSAM Roads and Bridges
Rupshir Ali (Construction of Bridge Nos. 3/25/2 &5/4)
NESIDS-OTRI NLCPR PWD roads 2009-07-14 2.1 2011-03-31 1.8839 0 1.8839 1.6507 Ongoing
1205 ASSAM Roads and Bridges
Sessa T.E to Timona road in Dibrugarh
NESIDS-OTRI NLCPR PWD Roads 2012-05-21 4.01 2014-05-31 3.5395 0 3.5395 3.5395 Completed
1206 ASSAM Roads and Bridges
Tamulpur-Goreswar Road, Nalbari.
NESIDS-OTRI NLCPR PWD Roads 2001-10-31 4.7341 2004-03-31 4.2607 0 4.2607 4.73 Completed
1207 ASSAM Roads and Bridges
tangla - Dimakuchi Road
NESIDS-OTRI NLCPR PWD Roads 2003-02-18 2.51 2005-07-31 2.259 0 2.259 2.51 Completed
1208 ASSAM Roads and Bridges
Tihu-Barama Road, Nalbari.
NESIDS-OTRI NLCPR PWD Roads 2001-12-06 0.64 2005-07-31 0.576 0 0.576 0.64 Completed
1209 ASSAM Roads and Bridges
Tulsijhyora-Kailamaila Road via Amguri(BTC Package)
Special Packages BTC 2005-10-31 9 2007-12-31 9 0 9 8.8774 Completed
1210 ASSAM Roads and Bridges
Udalguri - Kahibari road
NESIDS-OTRI NLCPR PWD Roads 2001-10-31 3.66 2005-03-31 3.294 0 3.294 3.66 Completed
1211 ASSAM Roads and Bridges
Udalguri- Bhairabkunda Road, Darrang.
NESIDS-OTRI NLCPR PWD Roads 2001-10-31 5.86 2004-03-31 5.274 0 5.274 5.86 Completed
1212 ASSAM Roads and Bridges
Udalguri-Tamulpur Road, Darrang.
NESIDS-OTRI NLCPR PWD Roads 2003-02-18 36.32 2008-03-31 32.184 0 32.184 33.4599 Completed
1213 ASSAM Roads and Bridges
Upgradation of Dalgaon Town to Sialmari via Dekerigaon
NESIDS-OTRI NLCPR PWD roads 2007-10-24 2.5173 2009-10-31 2.1192 0 2.1192 1.7982 Completed
1214 ASSAM Roads and Bridges
Upgradation of Nagaon - Bhuragaon Road via Dhing (SH-10) under Nagaon State Road Division (Nagaon District)
NESIDS-OTRI NLCPR PWD Roads 2010-03-22 11.5191 2011-04-30 10.2678 0 10.2678 10.2573 Completed
1215 ASSAM Roads and Bridges
upgradation of NT road through Ramphalbil Bazar to all weather road with conversion of SPT bridges into RCC bridge(International Border Areas)
NESIDS-OTRI NLCPR PWD Roads 2011-06-27 7.6418 2014-07-31 6.7144 0 6.7144 6.6731 Completed
1216 ASSAM Roads and Bridges
Upgradation of Road from NH-31 (C) via Serfanguri, Nepalpara, Athiabari, Ebargaon, Thaigiriguri and No. 2 Hazarikapara to Kapuragaon
NESIDS-OTRI NLCPR PWD Roads 2011-12-14 7.597 2013-12-31 6.5321 0 6.5321 6.5321 Completed
1217 ASSAM Roads and Bridges
Widening & Strengthening of Lahowal- Bordubi-Tinsukia Road (L.B.T.Road) in Tinsukia District.
NESIDS-OTRI NLCPR PWD Roads 2013-12-09 9.9821 2015-11-30 8.9838 0 8.9838 8.6564 Completed
1218 ASSAM Roads and Bridges
Widening and improvement of Barbora-Minirgon-Chapakhowa Road including conversion of SPT bridge No.7/1 in Tinsukia District
NESIDS-OTRI NLCPR Dept. of Power 2014-02-20 9.8869 2016-02-29 8.8975 0 8.8975 7.118 Ongoing
1219 ASSAM Roads and Bridges
Widening and Raising of Nazirakhat Sonapur Road (Length 6.00 km)
NESIDS-OTRI NLCPR PWD Roads 2007-12-20 2.6508 2008-12-31 2.3857 0 2.3857 2.3855 Completed
1220 ASSAM Roads and Bridges
Widening and Strengthening of Fakiragram-Serfanguri Road including conversion of STP bridge to Rcc bridges(BTC Package)
Special Packages BTC 2005-02-07 20.49 2007-03-31 19.4595 0 19.4595 20.4915 Completed
1221 ASSAM Sports
Apex Stadium at Kokrajhar, BAC
NESIDS-OTRI NLCPR PWD building 2001-01-31 9.3 2006-03-31 8.361 0 8.361 8.911 Completed
1222 ASSAM Sports
Construction of Chandi Barua Stadium at Barpeta
NESIDS-OTRI NLCPR PWD building 2009-02-10 2.9036 2010-07-31 1.5124 0 1.5124 1.5142 Ongoing
1223 ASSAM Sports
Construction of District Sports Complex at Jhagrapar in Dhubri District
NESIDS-OTRI NLCPR PWD building 2008-12-10 3.7777 2010-04-30 1.1666 0 1.1666 1.1666 Foreclosed
1224 ASSAM Sports
Construction of Indoor Stadium at Donkamokam Town (under Hamren Sub Division) of Karbi Anglong under NLCPR in Assam
NESIDS-OTRI NLCPR Hill Areas Dept 2017-05-11 6.1939 2019-05-11 5.5728 0 5.5728 2.2291 Ongoing
1225 ASSAM Sports
Construction of Indoor stadium at Silchar
NESIDS-OTRI NLCPR PWD building 2007-06-20 4.9433 2009-06-30 4.3617 0 4.3617 4.3617 Completed
1226 ASSAM Sports
Construction of Moran Sports Complex at Moran
NESIDS-OTRI NLCPR PWD building 2014-02-28 8.8816 2016-02-29 7.5925 0 7.5925 3.8444 Ongoing
1227 ASSAM Sports
Construction of Multi Disciplinary Sports Complex at Khanikar, Dibrugarh District under NLCPR in Assam
NESIDS-OTRI NLCPR PWD building 2017-12-07 139.8223 2019-12-07 117.7328 0 117.7328 93.8366 Ongoing
1228 ASSAM Sports
CONSTRUCTION OF N.L DAULAGUPU SPTS STADIUM WITH 3 STIED RCC DMITARY BUILDING AT HAFLONG IN DIMAHASAO
NESIDS-OTRI NLCPR Hill Areas Dept 2017-12-07 16.11 2019-12-07 12.7293 0 12.7293 5.0917 Ongoing
1229 ASSAM Sports
Construction of proposed stadium at Mushalpur in Baska District
NESIDS-OTRI NLCPR PWD building 2010-11-15 9 2013-11-30 7.9411 0 7.9411 7.9411 Completed
1230 ASSAM Sports
Construction of RCC Gallery of District Sports Association(Stadium Complex,Hailakandi)
NESIDS-OTRI NLCPR PWD building 2010-05-17 1.7713 2012-05-31 0.9564 0 0.9564 0.9533 Ongoing
1231 ASSAM Sports
Creation of Main Athletic Stadium Complex alongwith a multi-purpose Indoor Hall at Guwahati for National Games 2005
NESIDS-OTRI NLCPR PWD building 2004-03-22 75.1 2005-12-31 67.59 0 67.59 73.1 Completed
1232 ASSAM Sports
Development of Jorhat stadium at jorhat
NESIDS-OTRI NLCPR PWD building 2007-07-30 2.6893 2009-07-31 2.3503 0 2.3503 2.3503 Completed
1233 ASSAM Sports
Diphu Sports Complex at Diphu in Karbi Anglong District
NESIDS-OTRI NLCPR Hill Areas Dept 2004-07-29 5.0122 2005-03-31 4.511 0 4.511 1.75 Ongoing
1234 ASSAM Sports
Establishment of Sports Complex at Salbari under additional 250.00 crore BTC package
Special Packages BTC 2013-02-04 5 2018-03-31 4.835632 0 4.835632 3.6797 Ongoing
1235 ASSAM Sports
i)Const. of Hojai Stadium ii)Const. of swimming pool type - II with RCC Building iii) Indoor Hall type-II
NESIDS-OTRI NLCPR PWD building 2013-06-11 5.7131 2014-09-30 2.053 0 2.053 2.053 Ongoing
1236 ASSAM Sports
Mini Stadium at Chapaguri, Bongaigaon
NESIDS-OTRI NLCPR PWD building 2001-01-31 0.2 2005-07-31 0.1783 0 0.1783 0.1883 Completed
1237 ASSAM Sports
Up-gradation of Sports complex at Kajalgaon in chirang (chirang)(BTC Package-2)
Special Packages BTC 2011-01-10 5 2014-01-10 4.7416 0 4.7416 4.7416 Completed
1238 ASSAM Tourism and Culture
Construction of Center for Ethnic Community Cultural Practice (Dilaobra Sangibra Samathuraoni Nodrang) at Haflong.
Special Packages DHATC 2016-02-29 10 2019-02-28 9.708 0 9.708 9.708 Ongoing
1239 ASSAM Tourism and Culture
Construction of Model Village at Longkhor, Maibang, Dima Hasao
Special Packages DHATC 2023-11-29 6 2025-12-15 5.93225 0 5.93225 Ongoing
1240 ASSAM Tourism and Culture
Construction of Rajkumari Dishrudi Community Home Stay and Ecotourism at Panimur in Dima Hasao District
Special Packages DHATC 2016-02-29 17.49 2019-02-28 16.486 0 16.486 16.486 Completed
1241 ASSAM Tourism and Culture
Construction of Veer Sambhudhan Phonglo Memorial Park at Maibang
Special Packages DHATC 2023-11-29 15 2026-12-31 15.02538 0 15.02538 Ongoing
1242 ASSAM Tourism and Culture
Development of Tourism Infrastructure at Bagori Entry Point of Kaziranga National Park(Karbi Anglong)
NESIDS-OTRI NLCPR Tourism Dept 2010-02-08 3.2957 2012-07-31 2.908 0 2.908 2.908 Completed
1243 ASSAM Tourism and Culture
Mahapurush Shri Shri Madhav Deb Kalashetra at Dhekia Khowain Jorhat District
NESIDS-OTRI NLCPR Cultural Affairs Dept 2013-07-02 2.2511 2015-07-31 1.1119 0 1.1119 0.8087 Ongoing
1244 ASSAM Tourism and Culture
Project Development of Diphu Town Lake for Recreation under KAATC package
Special Packages KAATC 2021-12-31 15.6 2023-03-31 15.6469 0 15.6469 7.7995 Ongoing
1245 ASSAM Tourism and Culture
Srimanta Sankardev Bhavan & Research Centre at Rup Nagar, Guwahati
NESIDS-OTRI NLCPR PWD building 2014-02-20 9.9774 2016-02-29 8.6792 0 8.6792 8.0734 Ongoing
1246 ASSAM Water Supply
Augmentation of Greater Diphu Water Supply Scheme in Karbi Anglong District(Karbi Anglong)
NESIDS-OTRI NLCPR Hill Areas Dept 2008-08-19 27.6744 2011-07-31 8.5464 0 8.5464 8.5464 Ongoing
1247 ASSAM Water Supply
Augumentation of Donka-Mokam Piped Water Supply Scheme in Karbi Anglong
NESIDS-OTRI NLCPR Hill Areas Dept 2012-10-15 7.0664 2014-10-31 6.3283 0 6.3283 2.543 Ongoing
1248 ASSAM Water Supply
Bheragaon Piped Water Supply Scheme(BTC Package)
Special Packages BTC 2006-12-11 2.47 2007-12-31 2.4663 0 2.4663 2.4663 Completed
1249 ASSAM Water Supply
Bongaigaon Town Water Supply scheme (Bongaigaon District)
NESIDS-OTRI NLCPR Department of Housing and 2011-01-21 32.0224 2014-02-28 13.8285 0 13.8285 11.2946 Foreclosed
1250 ASSAM Water Supply
Dhubri Town Water Supply Scheme
NESIDS-OTRI NLCPR Department of Housing and 2006-09-12 10.2653 2008-09-30 9.2388 0 9.2388 8.8051 Ongoing
1251 ASSAM Water Supply
Drinking Water supply, Gossigaon
NESIDS-OTRI NLCPR Department of Housing and 2000-12-01 3.63 2005-07-31 2.3964 0 2.3964 2.5715 Ongoing
1252 ASSAM Water Supply
Golaghat Town Water Supply Scheme
NESIDS-OTRI NLCPR Dept. of Power 2007-05-28 5.0461 2009-05-31 4.4093 0 4.4093 4.4093 Completed
1253 ASSAM Water Supply
Greater Bokajan Water Supply Scheme (Karbi anglong)
NESIDS-OTRI NLCPR Hill Areas Dept 2008-12-17 10.0387 2010-12-31 9.0333 0 9.0333 3.1002 Ongoing
1254 ASSAM Water Supply
Greater dokmoka Tekelangjan Water supply scheme for fluoride, Arsenic / iron affected areas from river Dikrut(KA)
NESIDS-OTRI NLCPR Hill Areas Dept 2011-09-15 18.6589 2014-10-14 6.7074 0 6.7074 6.5908 Ongoing
1255 ASSAM Water Supply
Greater Mahur Town Water Supply Scheme in Assam (NC Hills)
NESIDS-OTRI NLCPR Hill Areas Dept 2006-12-31 5.1226 2007-12-31 1.6136 0 1.6136 1.6136 Ongoing
1256 ASSAM Water Supply
Greater Silchar Town Water Supply Scheme
NESIDS-OTRI NLCPR Hill Areas Dept 2003-01-30 12.3 2005-03-31 10.6482 0 10.6482 11.5882 Completed
1257 ASSAM Water Supply
Greater Sildharampur - Buragohain PWSS (under special economic package as per Mos) Karbi Anglong, Assam under KAATC package
Special Packages KAATC 2018-12-11 15.07 2020-12-11 14.7283 0 14.7283 14.7284 Completed
1258 ASSAM Water Supply
Greater Umswai Water Supply Scheme under KAATC package
Special Packages KAATC 2021-05-10 17.15 2023-05-10 12.9144 0 12.9144 8.5744 Ongoing
1259 ASSAM Water Supply
Haflong Water Supply Scheme (NC Hills)
NESIDS-OTRI NLCPR Hill Areas Dept 2004-02-20 1.4182 2005-07-31 0.648 0 0.648 0.7182 Ongoing
1260 ASSAM Water Supply
Kharupetia Water Supply Scheme
NESIDS-OTRI NLCPR Department of Housing and 2011-01-21 19.8115 2014-02-28 18.7038 0 18.7038 6.9923 Ongoing
1261 ASSAM Water Supply
kokrajhar water supply scheme (BTC Package)
Special Packages BTC 2005-02-07 23.12 2007-03-31 21.964 0 21.964 23.1122 Completed
1262 ASSAM Water Supply
Langklangvong Water Supply Scheme (Karbi Anglong)
NESIDS-OTRI NLCPR Hill Areas Dept 2009-12-02 5.9647 2012-12-31 2.1051 0 2.1051 Ongoing
1263 ASSAM Water Supply
Mangaldoi Water Supply Scheme
NESIDS-OTRI NLCPR Department of Housing and 2010-03-22 12.6105 2013-04-30 11.3394 0 11.3394 4.4506 Ongoing
1264 ASSAM Water Supply
Margherita Water Supply Scheme in Tinsukia District
NESIDS-OTRI NLCPR Department of Housing and 2010-03-22 9.3366 2012-04-30 3.2873 0 3.2873 3.2873 Ongoing
1265 ASSAM Water Supply
Sarupathar Piped water Supply scheme
NESIDS-OTRI NLCPR Department of Housing and 2011-01-25 10.2935 2013-02-28 9.264 0 9.264 7.4112 Ongoing
1266 ASSAM Water Supply
Sibsagar Town Water Supply Scheme
NESIDS-OTRI NLCPR Department of Housing and 2007-05-28 16.3935 2009-05-31 14.6068 0 14.6068 11.7943 Ongoing
1267 ASSAM Water Supply
Stabilisation of Dispur Water Supply Scheme
NESIDS-OTRI NLCPR Department of Housing and 2008-08-19 7.2952 2010-02-28 6.4369 0 6.4369 6.4369 Completed
1268 ASSAM Water Supply
Stabilisation of Silchar Water Supply Scheme
NESIDS-OTRI NLCPR Department of Housing and 2004-12-20 3.86 2007-03-29 3.3704 0 3.3704 3.5054 Completed
1269 ASSAM Water Supply
Storm water drainage system for Margherita town.
NESIDS-OTRI NLCPR Department of Housing and 2015-03-25 21.5848 2018-02-28 19.3919 0 19.3919 7.7705 Ongoing
1270 ASSAM Water Supply
Subankhata Water Supply Scheme (BTC Package)
Special Packages BTC 2005-10-31 3.28 2007-12-31 3.2763 0 3.2763 3.2763 Completed
1271 ASSAM Water Supply
Tamulpur Piped Water Supply Scheme
NESIDS-OTRI NLCPR Department of Housing and 2011-12-15 2.937 2013-12-31 2.6171 0 2.6171 2.0937 Completed
1272 ASSAM Water Supply
Tinsukia Town Water supply Scheme (Phase -II)
NESIDS-OTRI NLCPR Department of Housing and 2013-12-20 35.8125 2016-12-30 26.4652 2.9904 29.4556 12.7515 Ongoing
1273 ASSAM Water Supply
Tinsukia Town Water Supply Scheme (Phase-I)
NESIDS-OTRI NLCPR Department of Housing and 2013-12-20 35.8296 2016-12-30 31.6407 0 31.6407 25.7971 Ongoing
1274 ASSAM Water Supply
Udalguri Piped Water Supply Scheme(BTC Package)
Special Packages BTC 2006-12-11 5.34 2007-12-31 5.337 0 5.337 5.337 Completed
1275 ASSAM Water Supply
Uttarpar Piped Water Supply Scheme(BTC Package)
Special Packages BTC 2006-12-11 8.64 2007-12-31 8.6439 0 8.6439 8.5583 Completed
1276 ASSAM Roads and Bridges
Construction and improvement of Hamren town Interal Road (length 15.66 km)
Special Packages KAATC 2024-03-15 62.8 2027-03-15 62.0805 0 62.0805 31.04 Ongoing
1277 ASSAM Roads and Bridges
Widening & Improvement of existing 2 lane to 4 lane road from Mahatma Gandhi Park Road to Lumding road University campus(L-8.300 Km)
Special Packages KAATC 2024-03-15 105.16 2027-03-15 104.1462 0 104.1462 51.0366 Ongoing
1278 ASSAM Information and Public Relatio
Development of Sepoy Mutiny War Memorial Complex at Rontilla, Hailakandi
Schemes of NEC Schemes of NEC 2024-03-15 3.52 2026-03-15 0.7839073 0 0.7839073 Ongoing
1279 ASSAM Transport and Communication
Construction of Road from NH-515 at Lakhi Nepali to Junakarong via Rayang Army camp (L-14.08 Km.)
NESIDS-ROADS NESIDS Public works Department 2024-03-15 66.84 2026-09-30 19.72 0 19.72 Ongoing
1280 ASSAM Miscellaneous
Legacy Waste Treatment in 39 ULBS in Assam
NESIDS-OTRI NESIDS Department of Housing and 2024-03-14 71.9289 2026-03-13 32.7908 0 32.7908 Ongoing
1281 ASSAM Transport and Communication
Construction of Road from Bogamati to Umananda via Naobandha and Khaagrabari Village (L-25.10 Km.)
NESIDS-ROADS NESIDS Public works Department 2024-03-15 131.71 2027-03-31 118.86 5 123.86 Ongoing
1282 ASSAM Health
Skill Development Centre at Dr. B. Borooah Cancer Institute (BBCI), Guwahati, Assam
PM-DevINE Other 2024-06-13 35.12 2026-03-31 3.6422 0 3.6422 Ongoing
1283 ASSAM Infrastructure
Development of industrial estates for setting up of Small/Medium industries at Ramphalbil (Kokrajhar)
Special Packages Public works Department 2024-08-28 14.3998 2026-08-28 3.4788 0 3.4788 Ongoing
1284 ASSAM Science and Technology
Construction of College and Hostel Building at Haflong for Heraka Community identified as among deprived/neglected communities of Assam
Schemes of NEC Deputy Commissioner, Hafl 2024-08-27 4.6 2027-08-27 3.392747 0 3.392747 1.1432224 Ongoing
1285 ASSAM Transport and Communication
C/o New Road from Chowkikhola to Tarapung via Borpung in Assam (L : 50.52KM)
NESIDS-ROADS Public works Department 2024-07-30 201.4 2027-07-31 69.13 0 69.13 Ongoing
1286 ASSAM Transport and Communication
Improvement and Upgradation of road from Rajagaon to Dalimbari in West Karbi Anglong District in Assam (L-24.72KM)
NESIDS-ROADS Public works Department 2024-07-30 80.09 2027-01-31 51.22 4 55.22 Ongoing
1287 ASSAM Industries
Industrial Estate, Lakhibazar at Kokilabari , District Baksa
Special Packages Public works Department 2024-09-17 18.3971 2026-03-17 4.2775 0 4.2775 Ongoing
1288 ASSAM Tourism and Culture
Bodoland Movement Memorial Museum at Salbari, Baksa
Special Packages Public works Department 2024-10-08 29.9947 2027-10-08 0 Ongoing
1289 ASSAM Education
Infrastructure Development of 65 Secondary School for construction of new school building in Assam
NESIDS-OTRI Public works Department 2025-01-03 455 2026-01-03 58.71 49.83 108.54 Ongoing
1290 ASSAM Sports
Construction of Sports Academy at Udalguri district under BTC, SDP Govt. of Assam
Special Packages BTC IBA Deptt, BTC 2025-05-07 171.86 2028-05-07 16.01083 16.01083 Ongoing
1291 ASSAM Science and Technology
Handloom weaving production for weavers in Backward areas at Lakhimpur District Deori Tribe, Assam.
Schemes of NEC Deori Autonomous Council, 2025-06-26 4.95 2028-06-26 3.7075 1.11 4.8175 3.7065472 Ongoing
1292 ASSAM Tourism and Culture
Construction of Hotel and Tourism Management Institute of Chirang, SDP, Govt. of Assam under BTC Package.
Special Packages BTC IBA Deptt, BTC 2025-05-13 44.7234 2027-05-13 10.7754 0 10.7754 Ongoing
1293 ASSAM Education
Smart Tech-Enhancing Learning Through Technology integration in Assam under NESIDS OTRI Scheme Phase III
NESIDS-OTRI Samagra Shiksha Assam 2025-07-02 36.32 2026-04-02 0 14.5237 14.5237 Ongoing
1294 ASSAM Education
Smart Tech-Enhancing Learning Through Technology integration in Assam under NESIDS OTRI Scheme Phase II
NESIDS-OTRI Samagra Shiksha Assam 2025-07-02 43.52 2026-04-02 0 17.4028 17.4028 Ongoing
1295 ASSAM Education
Smart Tech-Enhancing Learning Through Technology integration in Assam under NESIDS OTRI Scheme Phase I
NESIDS-OTRI Samagra Shiksha Assam 2025-07-03 44 2026-04-03 0 17.5948 17.5948 Ongoing
1296 ASSAM Agriculture and Allied
Food Processing Plant with cold storage facilities at Goladangi in Kokrajhar District Assam
Special Packages BTC Executive engineer PWD Ko 2025-07-17 41.3325 2027-01-14 9.097 0 9.097 Ongoing
1297 ASSAM Agriculture and Allied
Food Processing Plant with cold storage facilities at Lalpool, Udalguri District
Special Packages BTC Executive engineer PWD Ko 2025-07-18 39.6003 2027-01-18 8.6081 0 8.6081 Ongoing
1298 ASSAM Agriculture and Allied
Food Processing Plant with cold storage facilities at Nakuchi, Baksa District Assam
Special Packages BTC Executive engineer PWD Ko 2025-07-21 42.8546 2027-01-21 0 Ongoing
1299 ASSAM Transport and Communication
Improvement and Upgradation of Mangaldoi-Mazikuchi road from Km 11+000 to 26+000
NESIDS-ROADS Public works Department 2025-08-11 45.31 2027-08-11 10 0 10 Ongoing
1300 ASSAM Education
Construction of 100 Capacity 3 storied RCC Girls Hostel for Bineswar Brahma Engineering College Kokrajhar, Assam.
Schemes of NEC Bodoland Territorial Coun 2025-08-04 8.200688116 2028-08-04 2.05 2.05 Ongoing
1301 ASSAM Power
42MW solar project at Bong long Terang village Karbi Anglong
Special Packages KAATC M/s Blue bell group of co 2025-09-29 201.83 2027-03-29 49.685 99.37 149.055 Ongoing
1302 ASSAM Tourism and Culture
Hotel and Tourism Management Institute at Diphu, in Karbi Anglong
Special Packages KAATC Karbi Anglong Autonomous 2025-10-07 63.4559 2027-04-07 10 20.57345 30.57345 Ongoing
1303 ASSAM Roads and Bridges
Construction of Roads from 5th KM of DLHS road to Langkaijan- Ch. 0.00 Km to 14 Km
Special Packages KAATC PWD 2025-11-10 47.29 2027-11-09 6.605 16.86067 23.46567 Ongoing
1304 ASSAM Transport and Communication
Widening and strengthening of road NH-37 to Garchuk via Harmotigarh, Length-8.10 Km
NESIDS-ROADS PWD Roads 2026-01-22 31.78 2028-01-22 0 Ongoing
1305 ASSAM Education
Construction of Academic cum Multipurpose building at Hemo Prova Borbora Girls College, Golaghat, Assam
Schemes of NEC Department of Higher Educ 2026-02-03 7.82 2029-02-03 0 Ongoing
1306 ASSAM Transport and Communication
Construction of Road from Singri to No.1 Sitalmari Length-6.2 Km
NESIDS-ROADS PWD Roads 2026-02-06 19.98 2028-02-06 0 Ongoing
1307 ASSAM Tourism and Culture
Production and Marketing Centre for Handloom and Textile at Udhiyaguri, Baksa under BTC Package for SDPs
Special Packages BTC PWDB, BTC 2026-02-05 25.7629 2027-08-04 0 Ongoing
1308 ASSAM Science and Technology
Establishment of a State-Of-The-Art Central Science Laboratory as per NEP-2020 at Gargaon College, Sivasagar, Assam.
Schemes of NEC Gargaon College, Simalugu 2026-03-11 8.0062 2028-03-11 0 Ongoing
1309 ASSAM Information and Public Relatio
Construction of Bhupen Hazarika Museum Srimanta Sankardev Kalashetra, Guwahati.
Schemes of NEC Public Works Department B 2026-03-19 13.98 2028-03-19 0 Ongoing
1310 ASSAM Information and Public Relatio
Construction of Cultural Complex of Shankardev Shishu Niketan at Hajongbari, Kamrup Metro, Assam, Phase-II.
Schemes of NEC Public Works Department, 2026-03-28 4.8561845 2027-06-28 0 Ongoing
1311 ASSAM Sports
Construction of 100 bedded Sports Hostel in Amingaon, Assam.
Schemes of NEC P.W.D Building, Chandmari 2026-03-20 13.0899 2027-09-20 0 Ongoing
1312 ASSAM Transport and Communication
Construction of RCC Bridge No.1/1 on Lamabari via No.2 Rangapanio to Nagaon-Mazbat Road in the district of Udalguri Span 4x40m with Approach Road 790 m
NESIDS-ROADS PWD Roads 2026-03-31 22.6 2028-03-31 0 Ongoing
1313 ASSAM Industries
Branding Muga the Golden Silk as States USP of Assam.
Schemes of NEC Assam Silk Outreach Missi 2026-06-11 31.52 2029-06-11 0 Ongoing
1314 ASSAM Miscellaneous
The Proposed Institute of Livelihood Management at Tangla, Udalguri District, Assam
Special Packages BTC PWDB, BTC 2026-06-11 22.0881 2029-06-10 0 Ongoing
1315 ASSAM Tourism and Culture
Production and Marketing Centre for Handloom and Textile at Holtugaon, Kokrajhar
Special Packages BTC Arts and culture Departme 2026-06-22 24.3189 2029-06-21 0 Ongoing
1316 ASSAM Agriculture and Allied
Development of Bamboo Nursery cum Production Centre at Aie Powali, District Chirang and Small Nurseries & Processing Centre
Special Packages BTC PWD, Kokrajhar and Chiran 2026-06-11 27.3079 2029-06-10 0 Ongoing
1317 ASSAM Agriculture and Allied
Development of Bamboo Nursery cum Production Centre at Khayerghutu, District-Kokrajhar
Special Packages BTC PWD, Kokrajhar and Chiran 2026-06-11 9.8207 2029-06-10 0 Ongoing
1318 DELHI Education
Hostel for NER Student at JNU
NESIDS-OTRI NLCPR 1999-04-01 3.95 2000-03-31 0.9 0 0.9 Completed
1319 DELHI Education
Indira Gandhi National Open University
NESIDS-OTRI NLCPR 1999-04-01 8 2000-03-31 7.2 0 7.2 Completed
1320 DELHI Miscellaneous
Creation of Export Development Fund (EDF) for NER
NESIDS-OTRI NLCPR 2000-04-01 5 2001-03-31 4.5 0 4.5 Completed
1321 DELHI Miscellaneous
Software Devolpoment for AIR and Doordarshan
NESIDS-OTRI NLCPR 2000-04-01 4.46 2001-03-31 4.014 0 4.014 Completed
1322 MANIPUR Education
Construction of buildings for 52 Anganwadi centres with one toilet and rain water harvesting, Chandel District in Manipur
NESIDS-OTRI NESIDS Dept. of Education 2020-01-22 3.0949 2022-01-22 3.033 0 3.033 0.003 Ongoing
1323 MANIPUR Health
Construction of District Hospital Imphal West at Mayang, Imphal,Manipur
NESIDS-OTRI NESIDS Dept. of Health & familly 2021-02-10 53.4 2023-02-10 51.8599 0 51.8599 20.744 Ongoing
1324 MANIPUR Health
Establishment of Blood Bank at CHC Nungba, Noney District in Manipur
NESIDS-OTRI NESIDS Department of Health and 2022-04-20 2.35 2024-04-30 0.4498 0 0.4498 0.115 Ongoing
1325 MANIPUR Health
Establishment of Infectious Disease Centre at Porompat, Imphal East
NESIDS-OTRI NESIDS Dept. of Health & familly 2018-12-10 20.04 2020-03-31 14.251 1.4835 15.7345 5.7004 Ongoing
1326 MANIPUR Health
Establishment of Trauma Care Centre at CHC Nungba, Noney District in Manipur
NESIDS-OTRI NESIDS Department of Health and 2022-04-20 3.787 2024-04-30 0.9627 0 0.9627 0.001 Ongoing
1327 MANIPUR Health
Infrastructure Development of Maternity & Child Hospital, Imphal East in Manipur
NESIDS-OTRI NESIDS Department of Health and 2022-04-20 34.64 2024-04-30 23.99095 9.8346 33.82555 8.66145 Ongoing
1328 MANIPUR Health
Porvision of paid/private Ward in Jawaharlal Nehru Institute of Medical Science (JNIMS) Imphal East, Manipur
NESIDS-OTRI NESIDS Public Health & Engg Depa 2019-08-13 12.9325 2020-03-31 12.6911 0 12.6911 12.6911 Ongoing
1329 MANIPUR Health
Procurement of 17 ALS ambulances for 16 Districts and 1 Central Pool (Medical Directorate) in Manipur
NESIDS-OTRI NESIDS Dept. of Health & familly 2021-08-27 4.25 2023-09-01 3.5 0 3.5 3.4 Completed
1330 MANIPUR Health
Procurement of 2000 Nos. Oxygen Concentrators and Procurement of Oxygen Cylinder -D Type-2000 No. and 1000 No. D/B type in Manipur
NESIDS-OTRI NESIDS Dept. of Health & familly 2021-08-27 18.7392 2023-09-01 0.1 0 0.1 Foreclosed
1331 MANIPUR Health
Project Strengthening for Covid-19 testing (RT-PCR, RAT and TrueNat) in Manipur
NESIDS-OTRI NESIDS Department of Health and 2021-09-30 19.2508 2022-09-30 2.5132 0 2.5132 2.5132 Ongoing
1332 MANIPUR Health
Setting up/installation of Liquid Medical Oxygen Tank and Vaporizer 3 Nos. (one 10KL and two no. of 20 KL) at JNIMS, Imphal East in Manipur
NESIDS-OTRI NESIDS Dept. of Health & familly 2021-08-27 5.6863 2023-09-01 0.74186 0 0.74186 0.1 Ongoing
1333 MANIPUR Agriculture and Allied
Adoption of Milch buffalo (Murrah) in and around Loktak Lake of Manipur
Schemes of NEC Schemes of NEC 2013-11-20 5.1671 2016-11-20 4.6504 0 4.6504 4.65 Completed
1334 MANIPUR Agriculture and Allied
Alternative Farming System for Tribal Jhumias/Poppy Planters in CCP Pherzawl, Noney, TML, SPT and Kangpokpi Districts and Alternative Farming System for Tribal Jhumias/ Poppy Planters in UKL, KMJ, TPL and CDL Districts
Schemes of NEC Schemes of NEC 2022-03-31 12.19 2025-03-31 12.19 0 12.19 4.88 Completed
1335 MANIPUR Agriculture and Allied
Community based approach for commercialization and increasing export potential of some economic important horticultural crops in Ukhrul district of Manipur(ICAR)
Schemes of NEC Schemes of NEC 2017-03-15 1.0896 2020-03-31 0.37 0 0.37 0.37 Foreclosed
1336 MANIPUR Agriculture and Allied
Construction & establishment of Subji Mandi/ Marketing Complex at Wino Bazar, Ukhrul, Manipur
Schemes of NEC Schemes of NEC 2016-03-21 4.5 2019-03-21 3.5 0 3.5 3.5 Completed
1337 MANIPUR Agriculture and Allied
Construction of Agro Market Complex at Mayang Imphal Bazar, Imphal West, Manipur.
Schemes of NEC Schemes of NEC 2016-07-25 6.977 2019-07-25 3.51 0 3.51 3.51 Completed
1338 MANIPUR Agriculture and Allied
Construction of farmers hostel for ICAR, Lamphelpat, Imphal West district, Manipur(ICAR)
Schemes of NEC Schemes of NEC 2017-03-14 13.7617 2020-03-14 13.76 0 13.76 13.76 Completed
1339 MANIPUR Agriculture and Allied
Construction of five (5) Slaughter Houses in five different places, 2 in Ukhrul District, 1 each in IE, IW and CCP
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 9.9 2025-03-31 3.96 3.465 7.425 3.0910704 Ongoing
1340 MANIPUR Agriculture and Allied
Construction of Khashimla Women Market Complex near Naga Gate, Hungpung, Ukhrul district, Manipur
Schemes of NEC Schemes of NEC 2017-04-11 13.9688 2022-03-07 13.9688 0 13.9688 13.97 Completed
1341 MANIPUR Agriculture and Allied
Construction of Modern Agro Market Complex at Kyamgei Village, Imphal East District, Manipur
Schemes of NEC Schemes of NEC Dept. of Power 2023-03-22 7.6695428 2026-03-26 7.6670428 0 7.6670428 1.1505 Ongoing
1342 MANIPUR Agriculture and Allied
Construction of Multi- Level Parking- Inter State & District Agricultural and Economic Transportation Hub at Senapati Bazar, Senapati District, Manipur
Schemes of NEC Schemes of NEC Dept. of Power 2023-01-20 14.91 2026-01-30 14.91 0 14.91 14.91 Completed
1343 MANIPUR Agriculture and Allied
Construction of Public Toilet Complex at PMKVY Training Centre, Ukhrul, Manipur
Schemes of NEC Schemes of NEC 2017-09-25 0.1594 2020-09-25 0.16 0 0.16 0.16 Completed
1344 MANIPUR Agriculture and Allied
Construction of retaining wall and approach road at UDCRMS Resource Centre, Ukhrul, Manipur.
Schemes of NEC Schemes of NEC 2018-03-19 1.6 2021-03-19 0.74 0 0.74 0.74 Completed
1345 MANIPUR Agriculture and Allied
Construction of Sub-division level tribal market complex
Schemes of NEC Schemes of NEC 2016-07-13 13.22 2019-07-13 13.22 0 13.22 13.22 Completed
1346 MANIPUR Agriculture and Allied
Construction of way side amenities as part of Prime Minister Swachh Bharat Abhiyan (Clean India Mission) on approved Tourist Circuit falling under NERCMP Project Area in Ukhrul, Chandel and Senapati districts of Manipur.
Schemes of NEC Schemes of NEC Dept. of Power 2016-10-20 13 2019-10-20 13 0 13 13 Completed
1347 MANIPUR Agriculture and Allied
Construction of Women market at Khuman Lampak (Dingku Road) Opposite ISBT, Imphal East, Manipur
Schemes of NEC Schemes of NEC Dept of Planning 2014-03-04 9.846 2017-03-04 3.28 0 3.28 Ongoing
1348 MANIPUR Agriculture and Allied
Dairy Farming-A way of life for scheduled caste farmers of Manipur
Schemes of NEC Schemes of NEC Choose... 2022-03-31 14.2577 2025-03-31 4.34 6.3514 10.6914 3.2612 Ongoing
1349 MANIPUR Agriculture and Allied
Demonstration through animal based integrated indigenous farming systems for sustained livelihood in and around Khoupum areas of Tamenglong district of Manipur, KVK, Tamenglong under ICAR.(ICAR)
Schemes of NEC Schemes of NEC 2017-02-28 2.1371 2020-02-28 1.71 0 1.71 1.71 Foreclosed
1350 MANIPUR Agriculture and Allied
Development of demonstration plots on integrated farming system in Ukhrul district, Manipur
Schemes of NEC Schemes of NEC 2016-04-27 1.6 2019-04-27 1.44 0 1.44 1.44 Completed
1351 MANIPUR Agriculture and Allied
Development of Duncan Park at Somsai, Ukhrul, Manipur
Schemes of NEC Schemes of NEC 2016-05-11 8.06 2019-05-11 7.254 0 7.254 7.25 Completed
1352 MANIPUR Agriculture and Allied
Development of Floriculture in Manipur
Schemes of NEC Schemes of NEC 2013-02-27 1.9823 2016-02-27 1.78 0 1.78 1.78 Completed
1353 MANIPUR Agriculture and Allied
Development of identified backward block under 30 Central Sector Scheme in Churachandpur District
Schemes of NEC Schemes of NEC 2020-09-18 2.9 2023-09-18 2.9 0 2.9 2.9 Completed
1354 MANIPUR Agriculture and Allied
Development of Inland fisheries and aquaculture by constructing ponds in Manipur
Schemes of NEC Schemes of NEC Dept. of Power 2017-03-21 13.65 2020-03-21 13.6509 0 13.6509 13.65 Completed
1355 MANIPUR Agriculture and Allied
Development of Model Farm for fish based integrated system in Lamphelpat, Manipur(Implemented by Central Agricultural University, Imphal through Manipur Tribal Development Corporation Ltd., (A Govt. of Manipur undertaking).
Schemes of NEC Schemes of NEC Dept. of Power 2016-07-14 13.22 2019-07-14 13.22 0 13.22 13.22 Completed
1356 MANIPUR Agriculture and Allied
Development of Paddy-cum-Pisciculture Scheme in 5 (five) Hill Districts, Manipur
Schemes of NEC Schemes of NEC 2013-11-21 5.5973 2016-11-21 5.04 0 5.04 5.04 Completed
1357 MANIPUR Agriculture and Allied
Development programme of identified backward block under 30 Central Sector Scheme in Chandel District, Manipur
Schemes of NEC Schemes of NEC 2020-10-21 2.86 2024-10-21 2.86 0 2.86 2.86 Completed
1358 MANIPUR Agriculture and Allied
Establishment of Magfruit factory, Manipur
Schemes of NEC Schemes of NEC 2015-06-16 9.52 2018-06-29 8.57 0 8.57 8.57 Completed
1359 MANIPUR Agriculture and Allied
Establishment of Model Floriculture Centre at Leingangching, Kamjong District, Sendra Bishnupur District and Panam Garden, Andro Imphal East District, Manipur
Schemes of NEC Schemes of NEC 2018-02-26 8.58 2021-02-26 7.72 0 7.72 7.72 Completed
1360 MANIPUR Agriculture and Allied
Establishment of Poultry breeding farm at Ningthoukhong, Manipur
Schemes of NEC Schemes of NEC 2016-03-14 11.5588 2019-03-14 10.4029 0 10.4029 10.4 Completed
1361 MANIPUR Agriculture and Allied
Establishment of Resource Centre, Ukhrul, NERCMP
Schemes of NEC Schemes of NEC 2016-03-17 4.9073 2019-03-17 3.7481 0 3.7481 3.75 Completed
1362 MANIPUR Agriculture and Allied
Gap funding for watershed and springshed for watershed village in Manipur.
Schemes of NEC Schemes of NEC 2017-03-21 6.052 2020-03-21 4.84 0 4.84 4.84 Completed
1363 MANIPUR Agriculture and Allied
Integrated approach for enhancing ecosystem services of Nungkot Sarbei Machengpat at Andro, Imphal East, Manipur
Schemes of NEC Schemes of NEC 2018-02-26 13.29 2021-02-26 11.96 0 11.96 11.96 Completed
1364 MANIPUR Agriculture and Allied
Integrated traditional farming for improvement of rural economy and sustainable livelihood, Manipur.
Schemes of NEC Schemes of NEC 2016-10-17 0.8149 2019-10-30 0.81 0 0.81 0.81 Foreclosed
1365 MANIPUR Agriculture and Allied
Model Horticulture Centre at three locations: Ngarumphung, Tupul and Haipi, Manipur
Schemes of NEC Schemes of NEC 2016-03-16 12 2019-03-15 10.8 0 10.8 10.8 Completed
1366 MANIPUR Agriculture and Allied
Project on rejuvenation of orange and Tree Bean cultivation in TML and Noney Districts
Schemes of NEC Schemes of NEC 2022-03-31 3.83 2025-03-31 3.7947 0 3.7947 3.45 Ongoing
1367 MANIPUR Agriculture and Allied
Promotion of Animal Husbandry based micro-enterprises for self employment of the BPL tribal women and youth in the blocks of Kangpokpi and Senapati District of Manipur
Schemes of NEC Schemes of NEC 2017-07-13 8.55 2020-07-13 8.55 0 8.55 8.55 Completed
1368 MANIPUR Agriculture and Allied
Promotion of Integrated Horticulture Farming System in Shifting Cultivation Areas of Manipur
Schemes of NEC Schemes of NEC 2016-10-26 13.45 2019-10-26 10.44 0 10.44 10.44 Completed
1369 MANIPUR Agriculture and Allied
Promotion of small holder value chain system for organic horticulture crops cultivation in Manipur
Schemes of NEC Schemes of NEC 2020-09-30 4.9 2023-09-30 4.9 0 4.9 4.9 Completed
1370 MANIPUR Agriculture and Allied
Promotion of smallholders value chain system for Kiwi cultivation in Manipur
Schemes of NEC Schemes of NEC 2023-03-31 3.48 2026-03-31 3.4432 0 3.4432 3.4432 Ongoing
1371 MANIPUR Agriculture and Allied
Proposal of identified block for providing key identified service at Sangaikot, Churachandpur District, Manipur
Schemes of NEC Schemes of NEC 2022-03-31 4.97 2025-03-31 4.9705 0 4.9705 4.9725 Completed
1372 MANIPUR Agriculture and Allied
Proposal of identified block for providing key identified service at Singngat, Churachandpur District, Manipur
Schemes of NEC Schemes of NEC 2022-03-31 4.65 2025-03-31 4.6525 0 4.6525 3.49 Completed
1373 MANIPUR Agriculture and Allied
Proposal of identified block for providing key identified service at Vangai Range, Pherzawl District, Manipur
Schemes of NEC Schemes of NEC 2022-03-31 5 2025-03-31 3.75 1.125 4.875 3.4628752 Ongoing
1374 MANIPUR Agriculture and Allied
Revival of progeny Orchard-cum-Nurseries (maram, Gelzang, Thawai Mahadev and Jiribam) in Manipur
Schemes of NEC Schemes of NEC 2011-05-24 3.4442 2014-05-24 3.1 0 3.1 3.1 Completed
1375 MANIPUR Agriculture and Allied
Setting up of Common facility centre for processing of fruits & vegetable including spices at Shirui village, Ukhrul district, Manipur (ICAR)
Schemes of NEC Schemes of NEC 2017-03-15 1.28 2020-03-13 0.48 0 0.48 0.48 Foreclosed
1376 MANIPUR Agriculture and Allied
Watershed Management and Sustainable livelihood in 12 districts (TPL, KMJ, KPI, PZI, UKL, Jiribam, Kakching, IE, IW, TBL, BPR)
Schemes of NEC Schemes of NEC 2022-03-26 6.1536 2025-03-26 4.62 1.4080502 6.0280502 2.2290998 Ongoing
1377 MANIPUR Education
Aspirational District Chandel, Manipur
Schemes of NEC Schemes of NEC 2019-06-11 1 2022-06-11 1 0 1 1 Completed
1378 MANIPUR Education
Backward Communities of Nepali Community in Kangpokpi District, Manipur
Schemes of NEC Schemes of NEC Choose... 2022-03-21 3.5468 2025-03-21 2.0886164 0 2.0886164 0.8867 Ongoing
1379 MANIPUR Education
Backward Community of Zeme of Tousem Sub-Divison, Tamenglong District, Manipur
Schemes of NEC Schemes of NEC 2022-03-21 4.26 2025-03-21 3.8217178 0 3.8217178 3.8219178 Ongoing
1380 MANIPUR Education
Community Development Programme of Tarao Community Tribe, TD Block, Chandel District, Manipur
Schemes of NEC Schemes of NEC 2020-12-15 2.41 2023-12-15 2.408 0 2.408 2.41 Completed
1381 MANIPUR Education
Construction of Girls Hostel Chaoyaima H.S School at Manipur
Schemes of NEC Schemes of NEC 2016-07-19 2.3426 2020-07-17 2.3426 0 2.3426 2.34 Completed
1382 MANIPUR Education
Construction of Auditorium and Compound Wall of Sainik School, Imphal Manipur
Schemes of NEC Schemes of NEC Dept. of Power 2016-04-05 6.2 2019-04-05 6.2 0 6.2 6.2 Completed
1383 MANIPUR Education
Construction of Boys & Girls Hostel at Mayorumtang (GreenLand), Ukhrul district, Manipur.
Schemes of NEC Schemes of NEC 2014-11-28 4.751 2017-11-28 4.751 0 4.751 4.75 Completed
1384 MANIPUR Education
Construction of Boys & Girls Hostel at St. Anthonys School, Muirei, Ukhrul Dist. Manipur.
Schemes of NEC Schemes of NEC 2016-04-26 7.06 2019-04-26 7.06 0 7.06 7.06 Completed
1385 MANIPUR Education
Construction of Boys and Girls Hostel Poirukhongjil H.S School at Manipur
Schemes of NEC Schemes of NEC 2016-07-19 3.92 2019-07-19 3.9245 0 3.9245 3.92 Completed
1386 MANIPUR Education
Construction of Cultural Hall cum Multi-purpose building for Senapati District Village Chief Association at Senapati District Heafdquarter, Manipur
Schemes of NEC Schemes of NEC Choose... 2023-03-28 3.0196355 2026-03-28 3.0196355 0 3.0196355 2.92 Ongoing
1387 MANIPUR Education
Construction of Girls Hostel at Wangkhei Girls High School, Imphal East, Manipur
Schemes of NEC Schemes of NEC 2016-04-27 5.96 2019-04-27 5.96 0 5.96 5.96 Completed
1388 MANIPUR Education
Construction of Model Library building at Pettegrew College, Ukhrul District Manipur
Schemes of NEC Schemes of NEC 2017-05-08 2.27 2020-05-08 1.70595 0 1.70595 1.70595 Ongoing
1389 MANIPUR Education
Construction of Modern Library building at Modern College, Imphal, Manipur
Schemes of NEC Schemes of NEC 2017-05-08 2.2763 2020-05-08 2.2763 0 2.2763 2.28 Completed
1390 MANIPUR Education
Construction of Multipurpose cultural cum Indoor Hall for the Youth in the Hill area of Manipur at Purul, Senapati Dist, Manipur
Schemes of NEC Schemes of NEC 2016-04-26 5.98 2019-04-26 5.9764 0 5.9764 5.98 Completed
1391 MANIPUR Education
Construction of Multipurpose Cultural cum Indoor Hall for the youth in the hill area of Manipur, Longmai, Tamenglong District
Schemes of NEC Schemes of NEC Dept. of Power 2016-05-13 5.8537 2019-05-13 5.8537 0 5.8537 4.6 Completed
1392 MANIPUR Education
Construction of Scheduled Tribe Boys & Girls Hostel at Noney, Tamenglong District.
Schemes of NEC Schemes of NEC Dept. of Power 2016-03-22 8.54 2019-03-22 8.5384 0 8.5384 8.54 Completed
1393 MANIPUR Education
Construction of Science Lab (G2) Block of United College Chandel, Manipur
Schemes of NEC Schemes of NEC 2011-09-16 4.25 2014-09-16 4.248 0 4.248 4.25 Completed
1394 MANIPUR Education
Construction of ST Boys & Girls Hostel Auditorium etc. at Chandel District.
Schemes of NEC Schemes of NEC 2016-04-25 9.67 2019-04-25 9.667 0 9.667 9.67 Completed
1395 MANIPUR Education
Construction of Tangkhul Headman's Guest House cum administrative building at Ukhrul District, Manipur
Schemes of NEC Schemes of NEC Tribal Affairs & Hills, M 2023-03-28 2.836443 2026-03-28 2.76 0.076443 2.836443 2.76 Ongoing
1396 MANIPUR Education
Infrastructure Development of Moreh College, Moreh Chandel District Manipur
Schemes of NEC Schemes of NEC 2017-05-08 7.25 2019-05-08 7.2475 0 7.2475 7.25 Completed
1397 MANIPUR Education
Upgradation of Science Laboratories and Library Assistance in High and Higher Secondary Schools, Manipur
Schemes of NEC Schemes of NEC 2013-03-01 3.71 2016-03-01 2.96 0 2.96 2.08 Ongoing
1398 MANIPUR Sports
Construction of Mini Outdoor Stadium at Senapati Public Ground, Senapati District, Manipur
Schemes of NEC Schemes of NEC 2016-09-26 7.41 2023-06-02 7.4101 0 7.4101 7.41 Completed
1399 MANIPUR Sports
Construction of Mini Stadium at Luangrang (Nungnang) Noney District, Manipur
Schemes of NEC Schemes of NEC 2023-03-24 4.04 2026-03-24 3 0 3 2 Ongoing
1400 MANIPUR Sports
Construction of Multipurpose Indoor Stadium at Haotabi Lampak, Thoubal, Manipur
Schemes of NEC Schemes of NEC 2017-03-22 11.7384 2020-03-22 11.7384 0 11.7384 11.74 Completed
1401 MANIPUR Sports
Construction of Pakang Mini Stadium, Henglep Sports Complex, Churachandpur, Manipur
Schemes of NEC Schemes of NEC 2016-08-11 4.1255 2019-08-11 4.1255 0 4.1255 4.13 Completed
1402 MANIPUR Sports
Construction of Playground at Parbung, Churachandpur, Manipur
Schemes of NEC Schemes of NEC 2016-08-09 3.568 2019-08-09 3.568 0 3.568 3.57 Completed
1403 MANIPUR Sports
Construction of Sports Complex at Indira Gandhi National Tribal University- Regional Campus. (IGNTU)
Schemes of NEC Schemes of NEC 2014-03-05 9.43 2021-03-31 9.4332 0 9.4332 9.43 Completed
1404 MANIPUR Sports
Construction of Synthetic Football Turf at Senapati Public Ground, Senapati District, Manipur
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-30 5.62 2025-03-30 5.1758 0 5.1758 5.18 Completed
1405 MANIPUR Sports
Development of Infrastructure & Amenities of Lamka Public Ground, Churachandpur, Manipur
Schemes of NEC Schemes of NEC 2016-05-09 6.456 2019-05-09 6.456 0 6.456 6.46 Completed
1406 MANIPUR Sports
Skill Cum Rural Entrepreneurship Development Centre
Schemes of NEC Schemes of NEC 2018-01-18 3.9665 2021-03-18 3.9665 0 3.9665 3.9665 Ongoing
1407 MANIPUR Sports
Tensile Roofing and Stadium Chairs (Phase I) Cricket Stadium, Luwangsangbam, Imphal East
Schemes of NEC Schemes of NEC 2012-11-21 4.95 2019-10-30 4.45 0 4.45 4.45 Completed
1408 MANIPUR Irrigation and Flood Control
A/E & flood control scheme on Thoubal river ph.VI, Thoubal dist.
Schemes of NEC Schemes of NEC 2009-12-18 2.5 2012-12-18 1 0 1 1 Completed
1409 MANIPUR Irrigation and Flood Control
Anti-erosion & Flood control works of Thoubal River on LBB & RBB from Rd 10,713m to41,078m Thoubal Dist., Manipur.
Schemes of NEC Schemes of NEC 2016-04-21 3.98 2019-04-21 0.0633 0 0.0633 0.06 Completed
1410 MANIPUR Irrigation and Flood Control
Anti-Erosion & Flood Control Scheme along Terakhongsangbi stream in Bishnupur District, Manipur
Schemes of NEC Schemes of NEC 2018-10-10 4.3 2021-10-10 0.1 0 0.1 0.1 Completed
1411 MANIPUR Irrigation and Flood Control
Anti-erosion & Flood Control scheme on Imphal river on 9.60km U/S of Korengei bridge (RD0.00km) at Awang Sekmai, Imphal West District.
Schemes of NEC Schemes of NEC 2017-04-17 6.6 2020-04-17 5.94 0 5.94 5.94 Completed
1412 MANIPUR Irrigation and Flood Control
Anti-Erosion & Flood Control works along Chakpi River (LBB & RBB) at Serou, Thoubal District,
Schemes of NEC Schemes of NEC 2018-02-28 13.87 2021-02-28 0.1 0 0.1 0.1 Completed
1413 MANIPUR Irrigation and Flood Control
Anti-Erosion & Flood Control works on Chakpi River, Chandel District for Chakpikarong Bazaar to Hringphe Village & along United College stretch Manipur
Schemes of NEC Schemes of NEC 2018-10-10 4.64 2021-10-10 0.1 0 0.1 0.1 Completed
1414 MANIPUR Irrigation and Flood Control
Anti-Erosion Scheme on Langdangkong Stream, Ukhrul District, Manipur
Schemes of NEC Schemes of NEC 2014-03-05 4.95 2017-03-05 4.455 0 4.455 4.46 Completed
1415 MANIPUR Irrigation and Flood Control
Anti-Erosion Scheme on Sippi River Saitu Ganphazol Sub Division, Senapati District, Manipur
Schemes of NEC Schemes of NEC 2014-03-05 4.72 2018-03-05 4.248 0 4.248 4.25 Completed
1416 MANIPUR Irrigation and Flood Control
Augmentation of Top Dusara Water Supply Scheme, Imphal East District.
Schemes of NEC Schemes of NEC 2017-04-25 5 2020-04-25 1.2983 0 1.2983 1.3 Completed
1417 MANIPUR Irrigation and Flood Control
Composite Water Supply at Ramrei and its surrounding areas, Ukhrul District
Schemes of NEC Schemes of NEC 2017-04-24 14.95 2020-04-24 0.171 0 0.171 0.17 Completed
1418 MANIPUR Irrigation and Flood Control
Composite Water Supply Project at Kozhiirii and Likhurii Valleys, Phase-I Senapati District, Manipur
Schemes of NEC Schemes of NEC 2018-03-14 2.8 2020-05-20 0.1 0 0.1 0.1 Completed
1419 MANIPUR Irrigation and Flood Control
Composite Water Supply Scheme at Oklong in Senapati District, Manipur
Schemes of NEC Schemes of NEC 2015-03-23 5.7598 2018-03-23 5.1838 0 5.1838 5.18 Completed
1420 MANIPUR Irrigation and Flood Control
Composite Water Supply Scheme for Mualnuam & Songtal Churachandpur District in Manipur
Schemes of NEC Schemes of NEC 2012-11-26 4.2982 2015-11-26 3.8684 0 3.8684 3.87 Completed
1421 MANIPUR Irrigation and Flood Control
Composite Water Supply Scheme for Tumukhong Moirangpurel and its surrounding areas, Imphal East District
Schemes of NEC Schemes of NEC PUBLIC HEALTH ENGINEERING 2017-04-19 5.9263 2020-04-19 5.3338 0 5.3338 5.3338 Completed
1422 MANIPUR Irrigation and Flood Control
Constn. Of cross regulator across Chowki-darkhong stream and improvement /re-sectioning of parent channels (Kom-lakhong Thoubal dist.)
Schemes of NEC Schemes of NEC 2010-09-10 4.59 2013-09-10 3.5382 0 3.5382 3.54 Completed
1423 MANIPUR Irrigation and Flood Control
Construction of A/E scheme on Khuga river at Zoummunnuam Churachanpur district
Schemes of NEC Schemes of NEC 2016-03-17 7.3272 2019-03-17 6.5945 0 6.5945 6.59 Completed
1424 MANIPUR Irrigation and Flood Control
Construction of Buffer Water Reservoir at Shirui Village, Ukhrul District, Manipur
Schemes of NEC Schemes of NEC 2015-06-10 5 2018-06-10 4.5 0 4.5 4.5 Completed
1425 MANIPUR Irrigation and Flood Control
Construction of concrete Dam across Heirok Litan Makhong, Thoubal District, Manipur
Schemes of NEC Schemes of NEC 2013-10-08 4.6509 2015-10-08 4.1858 0 4.1858 4.19 Completed
1426 MANIPUR Irrigation and Flood Control
Construction of Concrete weir across Sekmai River at Sekmai Old Bridge, Imphal West District, Manipur
Schemes of NEC Schemes of NEC 2011-03-17 4.42 2015-03-17 3.978 0 3.978 3.98 Completed
1427 MANIPUR Irrigation and Flood Control
Construction of Gated Weir across Yaralkhong at Gurupat, Imphal East District in Manipur
Schemes of NEC Schemes of NEC 2016-09-30 2.55 2019-09-30 2.3 0 2.3 2.3 Completed
1428 MANIPUR Irrigation and Flood Control
Construction of Mini Barage across Langathel river nearby Lamlong Khunou, Thoubal District.
Schemes of NEC Schemes of NEC Dept. of Power 2017-04-18 3.85 2021-04-30 3.47 0 3.47 3.47 Completed
1429 MANIPUR Irrigation and Flood Control
Construction of Pick up weir a/c Loklai River at Pengjang, Churachanpur in Manipur
Schemes of NEC Schemes of NEC 2016-04-21 6.354 2019-04-21 5.7186 0 5.7186 5.72 Completed
1430 MANIPUR Irrigation and Flood Control
Construction of pick up weir and pucca canal a/c Thoubal river at Hungpung Chihui, Kaziphung village, Ukhrul District
Schemes of NEC Schemes of NEC 2016-03-18 3.8 2019-03-18 1.899 0 1.899 1.9 Completed
1431 MANIPUR Irrigation and Flood Control
Construction of pick up weir Irrigation Canal across Sengwal river at Khuningman Loukol, Tengnoupal Block, Tengnoupal District, Manipur
Schemes of NEC Schemes of NEC 2021-03-26 4.91 2024-03-26 4.91 0 4.91 4.91 Completed
1432 MANIPUR Irrigation and Flood Control
Development of Naga Nallah Drainage System in Manipur, Imphal East
Schemes of NEC Schemes of NEC 2011-12-23 4.1772 2015-12-23 3.7595 0 3.7595 3.76 Completed
1433 MANIPUR Irrigation and Flood Control
Implementation of Rain Water Harvesting Scheme at JNV Ramv (Lmbui), Ukhrul District, Manipur
Schemes of NEC Schemes of NEC 2014-11-28 2.82 2018-11-28 2.538 0 2.538 2.54 Completed
1434 MANIPUR Irrigation and Flood Control
Improvement and Upgradation of water supply scheme for Churachandpur Town, Zone-III, Manipur
Schemes of NEC Schemes of NEC 2013-11-07 5.2317 2016-11-07 4.7085 0 4.7085 4.71 Completed
1435 MANIPUR Irrigation and Flood Control
Installation of Water ATM in Manipur (Imphal East, Imphal West, Bishnupur, Thoubal, Senapati, Kakching, Chandel, Kangpokpi) Manipur.
Schemes of NEC Schemes of NEC Public Health Engineering 2022-03-31 4.2152 2026-03-31 4.2152 0 4.2152 4.2152 Completed
1436 MANIPUR Irrigation and Flood Control
Proposal of identified backward block for providing key identified services at Henglep Block, Churachandpur District, Manipur
Schemes of NEC Schemes of NEC PWD, Manipur 2023-02-17 4.79 2026-02-17 4.79 0 4.79 4.7883 Completed
1437 MANIPUR Irrigation and Flood Control
Waishel Drainage Scheme, Imphal West, Manipur
Schemes of NEC Schemes of NEC 2012-11-26 4.875 2015-11-26 4.3875 0 4.3875 4.39 Completed
1438 MANIPUR Irrigation and Flood Control
Water Supply Scheme at Laisoipat, Yenapat and Awangsoi Bishnupur dist, Manipur
Schemes of NEC Schemes of NEC 2015-06-09 14.916 2018-06-09 5.1838 0 5.1838 5.18 Completed
1439 MANIPUR Industries
Construction of Common Facility Centre in Hill Districts of Manipur for Processing of Agriculture and Horticulture Products
Schemes of NEC Schemes of NEC 2015-06-16 7.06 2017-06-16 6.35 0 6.35 6.35 Completed
1440 MANIPUR Industries
Development of Work Sheds/Factory Sheds at Takyelpat Industrial Estate in Imphal West District, Manipur
Schemes of NEC Schemes of NEC 2014-02-07 7.4 2017-02-07 1.7919 0 1.7919 1.79 Completed
1441 MANIPUR Industries
Development of Work Sheds/Factory Sheds at Industrial Estate, Bishnupur, Manipur
Schemes of NEC Schemes of NEC 2015-06-09 12.03 2018-06-09 10.83 0 10.83 10.83 Completed
1442 MANIPUR Industries
Development of Work Sheds/Factory Sheds at Industrial Estate, Thoubal, Manipur
Schemes of NEC Schemes of NEC 2015-06-09 12.03 2018-06-09 10.83 0 10.83 10.83 Completed
1443 MANIPUR Industries
Establishment of New Industrial Estate (Construction of Worksheds) at T.M. Kasom, Ukhrul, Manipur
Schemes of NEC Schemes of NEC Dept. of Power 2017-03-21 12.315 2020-03-21 12.315 0 12.315 12.31 Ongoing
1444 MANIPUR Industries
Implementation of Handloom for Employment Generation in Tamenglong District, Manipur
Schemes of NEC Schemes of NEC 2017-06-02 6.7286 2020-06-02 3.1103 0 3.1103 3.11 Completed
1445 MANIPUR Industries
Income Generation of Rural Poor Women Through Handloom Development Programme, Manipur by M/s. Sega Road Maning Takhel Leikai, Khadi and Village Association, Imphal, Manipur
Schemes of NEC Schemes of NEC 2006-03-30 0.11 2009-03-31 0.11 0 0.11 0.11 Completed
1446 MANIPUR Industries
Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Manipur
Schemes of NEC Schemes of NEC 2020-09-01 0.1543772 2023-09-01 0.154377 0 0.154377 0.1588 Ongoing
1447 MANIPUR Industries
Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19 to the state of Manipur Phase-II
Schemes of NEC Schemes of NEC Other 2021-02-25 0.2398886 2024-02-25 0.2398886 0 0.2398886 0.2374886 Ongoing
1448 MANIPUR Industries
Manufacturing of Bags of all types, Raincoats, etc by M/s. Romi Bag Industries, Thangmeibad, Thau, Leirak, Imphal, Manipur
Schemes of NEC Schemes of NEC 2006-03-30 0.15 2009-03-30 0.14 0 0.14 0.14 Completed
1449 MANIPUR Industries
Renovation of Panthoibi (Govt. of Manipur) Emporium in Emporia Complex in New Delhi by the Govt. of Manipur
Schemes of NEC Schemes of NEC 2011-02-23 2.9134 2014-02-23 0.522 0 0.522 0.52 Completed
1450 MANIPUR Industries
Setting up of a Common Facility centre for Manufacturing of Furniture and Wood Craft by M/s. Volunteers for Rural Health & Action, Lamding, Wanging, Manipur
Schemes of NEC Schemes of NEC 2006-02-02 0.1697 2009-02-02 0.15 0 0.15 0.15 Completed
1451 MANIPUR Industries
Setting up Processing Units for Cashew Nut at Tura , West Garo Hills, Ginger Dehydration Unit at Haflong, Assam and Cattle & poultry Feed Production Unit at Ukhrul, Manipur
Schemes of NEC Schemes of NEC 2012-06-18 0.58 2015-06-18 0.52 0 0.52 0.52 Completed
1452 MANIPUR Industries
Special Type of Pottery and Stone Chip Allied Products Production at Nungbi, Ukhrul District, Manipur
Schemes of NEC Schemes of NEC Dept. of Power 2014-03-05 3.4175 2017-03-05 2.5936 0 2.5936 2.59 Completed
1453 MANIPUR Information and Public Relatio
Construction of Boys Hotsel with Toilets at Jawaharlal Nehru Manipur Dance Academy, Imphal, Manipur
Schemes of NEC Schemes of NEC 2017-08-04 4.86 2020-08-04 4.855 0 4.855 4.8550984 Completed
1454 MANIPUR Information and Public Relatio
Construction of Hill(Tribal) Chief Guest House at Palace Compound, Imphal East
Schemes of NEC Schemes of NEC 2021-03-22 6.5000564 2024-03-22 6.5028964 0 6.5028964 4.98714 Ongoing
1455 MANIPUR Information and Public Relatio
Construction of Museum-cum-Library, Tribal Research Institute at Manipur
Schemes of NEC Schemes of NEC 2016-11-21 6.4 2019-11-21 4.5 0 4.5 4.5 Ongoing
1456 MANIPUR Information and Public Relatio
Heritage Protection in Hill and Plain districts of Manipur
Schemes of NEC Schemes of NEC 2015-05-06 3.4894 2018-05-06 2.5062 0 2.5062 2.51 Ongoing
1457 MANIPUR Information and Public Relatio
Infrastructure Development for Preservation of Panam Ningthou Immortal Fire and Different Historical Monuments in and around Andro, Imphal East, Manipur
Schemes of NEC Schemes of NEC 2016-07-22 1.93 2019-07-22 1.737 0 1.737 1.737 Ongoing
1458 MANIPUR Information and Public Relatio
Infrastructure Development of Heritage Complex Rajbari, Manipur
Schemes of NEC Schemes of NEC Choose... 2023-03-31 14.76 2026-03-31 7.9 1.72 9.62 7.9 Ongoing
1459 MANIPUR Information and Public Relatio
North East-ASEAN Business Summit organised by Govt. of Manipur
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.4 2021-04-01 0 Completed
1460 MANIPUR Information and Public Relatio
Renovation of Auditorium & Classrooms of Jawaharlal Nehru Manipur Dance Academy, Imphal, Manipur
Schemes of NEC Schemes of NEC 2013-02-27 4.0229 2016-02-27 3.1126 0 3.1126 3.11 Ongoing
1461 MANIPUR Information and Public Relatio
Strengthening of Hindi Section in the library of 10 government colleges of Manipur
Schemes of NEC Schemes of NEC Dept. of Higher & Technic 2021-02-05 0.9991796 2024-02-05 0.3991795 0.6 0.9991795 0.3991795 Ongoing
1462 MANIPUR Health
Construction of Nursing School with Hostel at Phungre, Ukhrul as an Extension of Leishiphung Christian Hospital, Ukhrul, Manipur
Schemes of NEC Schemes of NEC 2017-04-11 11.02 2020-04-11 9.92 0 9.92 9.92 Ongoing
1463 MANIPUR Health
Establishment of Blood Bank by Shija Health Care & Research Institute, Langol, Imphal
Schemes of NEC Schemes of NEC 2010-03-23 3.4389 2013-03-23 3.09 0 3.09 3.09 Completed
1464 MANIPUR Health
Establishment of Shija Regional Oxygen Plant and Generation Unit, Langol, Imphal, Manipur
Schemes of NEC Schemes of NEC 2012-02-27 3.7092 2015-02-27 3.3383 0 3.3383 3.34 Completed
1465 MANIPUR Health
Infrastructure support to Nursing School, Lamphelpat, Imphal, Manipur.
Schemes of NEC Schemes of NEC 2005-12-08 4.8762 2008-12-08 4.39 0 4.39 4.39 Completed
1466 MANIPUR Health
Procurement of 16 (sixteen) portable X-Ray Machine with DR System in Manipur
Schemes of NEC Schemes of NEC Dept. of Health & familly 2022-03-30 1.702624 2025-03-30 1.702624 0 1.702624 1.702624 Completed
1467 MANIPUR Health
Procurement of Advanced Medical Devices and Equipment at Sky Hospital and Research Centre, Imphal, Manipur
Schemes of NEC Schemes of NEC 2013-12-20 5.1367 2016-12-20 4.62 0 4.62 4.62 Completed
1468 MANIPUR Health
Procurement of Ambulances for 102 Maternity services ? 33 Ambulances
Schemes of NEC Schemes of NEC Choose... 2022-03-30 3.2 2025-03-30 2.741278 2.741278 Ongoing
1469 MANIPUR Health
Proposal for setting up of Emergency and Trauma Care unit at Jivan Hospital, Kakching, Thoubal Dist., Manipur
Schemes of NEC Schemes of NEC 2013-12-20 4.6713 2015-12-20 3.97 0 3.97 3.97 Completed
1470 MANIPUR Health
Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Manipur for activities related to combating COVID-19 pandemic
Schemes of NEC Schemes of NEC 2020-04-01 3 2022-04-01 3 0 3 3 Completed
1471 MANIPUR Health
Strengthening of Dental Care in District Hospitals and CHCs in Manipur
Schemes of NEC Schemes of NEC 2012-12-11 4.8566 2015-12-11 4.11 0 4.11 4.11 Completed
1472 MANIPUR Health
Support for Procurement of Advanced Medical Devices and Equipment at Christian Hospital, Imphal, Manipur
Schemes of NEC Schemes of NEC 2011-03-16 2.7746 2013-03-16 2.15 0 2.15 2.15 Completed
1473 MANIPUR Health
Support to District Hospital, Churachandpur, Manipur
Schemes of NEC Schemes of NEC 2005-12-08 4.3535 2008-12-08 3.91 0 3.91 3.91 Completed
1474 MANIPUR Health
Support to J.N. Hospital, Imphal (Private Paying Ward), Manipur
Schemes of NEC Schemes of NEC 2004-07-16 4.9606 2007-07-16 4.46 0 4.46 4.46 Completed
1475 MANIPUR Health
Up-gradation of Regional Childrens Heart Surgical Unit at Sky Hospital & Research Centre Pvt. Ltd., Imphal West, Manipur
Schemes of NEC Schemes of NEC 2017-04-11 8 2020-04-11 7.2 0 7.2 7.2 Completed
1476 MANIPUR Health
Upgradation of Govt. GNM School to College of Nursing, Lamphelpat, Imphal, Manipur
Schemes of NEC Schemes of NEC 2010-03-22 4.5256 2013-03-22 3.86 0 3.86 3.86 Completed
1477 MANIPUR Power
25kWp (each) Standalone SPV Power Plant(s) at the office (s) of Deputy Commissioners of Manipur (9x25KW)
Schemes of NEC Schemes of NEC 2012-03-13 2.4138 2015-03-13 2.17 0 2.17 2.17 Completed
1478 MANIPUR Power
25kWp SPV Power Plant at tribal Market Compex, New Lambulance, Imphal, Manipur
Schemes of NEC Schemes of NEC 2012-03-13 0.2675 2015-03-13 0.24 0 0.24 0.24 Completed
1479 MANIPUR Power
Electrification of 10 Tribal Villages (left out) of Tousem Sub-Division in Tamenglong, Manipur
Schemes of NEC Schemes of NEC 2011-12-21 4.0331 2013-12-21 2.9 0 2.9 2.9 Completed
1480 MANIPUR Power
Electrification of 12 Tribal villages (left out) of Nungba Sub-Division in Tamenglong District, Manipur
Schemes of NEC Schemes of NEC 2012-03-13 4.3234 2014-03-13 3.11 0 3.11 3.11 Completed
1481 MANIPUR Power
Installation of 132/33 KV Substation at Kongba
Schemes of NEC Schemes of NEC 2005-03-21 14.3635 2008-03-21 14.09 0 14.09 14.09 Completed
1482 MANIPUR Power
Installation of 1X10kW each capacity. Wind-Solar Hybrid systems for (i) Lamdan Village, Churrachanpur (ii) Hongbei Village, Ukhrul (iii) Lamdangmei Village, Tamenglong (iv) Dolangkhunou Village, Senapati, Manipur
Schemes of NEC Schemes of NEC 2008-03-25 0.9416 2011-03-25 0.85 0 0.85 0.85 Completed
1483 MANIPUR Power
Installation of 2X 20 MVA, 132 kV Sub-Station along with associated 132kV LILO lines & related works at Thoubal, Manipur
Schemes of NEC Schemes of NEC 2015-05-02 35.6158 2019-03-31 32.06 0 32.06 32.06 Completed
1484 MANIPUR Power
Installation of 2X5 MVA 33/11 KV Sub-Station along with the associated line & related works at Power House site of LDS HE project, Manipur.
Schemes of NEC Schemes of NEC 2013-01-10 7.79 2017-01-10 7.01 0 7.01 7.01 Foreclosed
1485 MANIPUR Power
Installation of 2X5 MVA, 33 KV Sub-Station along with the associated 33kV LILO line & related works at Mayangkhang, Senapati District, Manipur
Schemes of NEC Schemes of NEC 2015-12-21 7.6868 2017-12-21 6.82 0 6.82 6.82 Completed
1486 MANIPUR Power
Installation of 2X5 MVA, 33 KV Sub-Station along with the associated 33kV line & related works at Mao, Senapati District, Manipur
Schemes of NEC Schemes of NEC 2015-12-21 7.822 2017-12-21 7.04 0 7.04 7.04 Completed
1487 MANIPUR Power
Installation of 2x5 MVA, 33kV substation associated with 132kV substation at Chandel, Manipur
Schemes of NEC Schemes of NEC 2012-03-13 3.1048 2015-03-13 2.8 0 2.8 2.8 Completed
1488 MANIPUR Power
Installation of 6680 Sq M of solar thermal (Solar Water Heaters) collector area at various institutions, hospitals and individual households, Manipur
Schemes of NEC Schemes of NEC 2012-03-13 2.3547 2015-03-13 2.12 0 2.12 2.12 Completed
1489 MANIPUR Power
Renovation & Modernisation of 132/33KV Substation at Yurembam in Manipur
Schemes of NEC Schemes of NEC 2006-03-23 9.636 2009-03-23 8.67 0 8.67 8.67 Completed
1490 MANIPUR Power
Seven Nos. of Schemes in the capacity of 10kW (5W 5SPV) in Manipur
Schemes of NEC Schemes of NEC 2009-10-28 2.4108 2012-10-28 2.169 0 2.169 2.17 Completed
1491 MANIPUR Power
Stringing of 132kV s/c line (Second Circuit on D/C Towers from Kakching to Churachandpur, Manipur
Schemes of NEC Schemes of NEC 2014-11-28 10.18 2017-11-28 9.16 0 9.16 9.16 Completed
1492 MANIPUR Science and Technology
(a) Construction of Multi Utility Building for Thangal Tribe at Senapati District, Headquarter (b) Construction of 25 bedded Residential Hostel for Girls at Makeng Chejinba Village, Senapati District, Manipur (c ) Construction of Common Community Pond at Angkailongdi Village, Senapati District, Manipur. : District Rural Development Agency (DRDA), Senapati District Govt. of Manipur
Schemes of NEC Schemes of NEC 2023-03-31 4.66 2026-03-31 4.6577408 0 4.6577408 2.8569278 Ongoing
1493 MANIPUR Science and Technology
Afforestation of Denuded Hills in Churachandpur and Tamenglong District of Manipur
Schemes of NEC Schemes of NEC 2020-11-25 4 2023-11-25 4 0 4 4 Ongoing
1494 MANIPUR Science and Technology
Disaster Management system of Manipur (MARSAC) Manipur Remote Sensing Application Centre Govt. of Manipur
Schemes of NEC Schemes of NEC 2012-12-10 2.23 2015-12-10 2.007 0 2.007 2.01 Completed
1495 MANIPUR Science and Technology
Implementation of Chief Minister Dasboard-Real Time Monitoring of all Government Programme, Specially Beneficiary Oriented Programme
Schemes of NEC Schemes of NEC 2021-02-12 13.5 2024-02-12 13.5 0 13.5 12.3221609 Completed
1496 MANIPUR Science and Technology
IT College Education Programme in Liberal College, Manipur by M/S BMG Informatics
Schemes of NEC Schemes of NEC 2005-03-31 0.1746 2008-03-31 0.1746 0 0.1746 0.17 Completed
1497 MANIPUR Science and Technology
IT Education Programme for 7 Schools in Manipur for 2009-10
Schemes of NEC Schemes of NEC 2010-01-14 0.3263 2013-01-14 0.3263 0 0.3263 0.33 Completed
1498 MANIPUR Science and Technology
Setting up of 50 seats Digital Planetarium at Manipur Science Centre
Schemes of NEC Schemes of NEC 2012-03-15 2.45 2015-03-15 1.63 0 1.63 1.63 Completed
1499 MANIPUR Science and Technology
Setting up of Science Centre and Planetarium at Ukhrul, Manipur, Dept of Science & Technology, Govt. of Manipur
Schemes of NEC Schemes of NEC 2017-07-20 8.02 2020-07-20 8.02 0 8.02 5.92 Ongoing
1500 MANIPUR Science and Technology
Setting up of Science Centre and Planetarium at Churachandpur, Manipur, Dept of Science & Technology, Govt. of Manipur
Schemes of NEC Schemes of NEC 2017-07-20 7.85 2020-07-20 7.85 0 7.85 7.85 Ongoing
1501 MANIPUR Science and Technology
State wide Telemedicine Programme for Healthcare delivery in Manipur- State Health Society, Manipur
Schemes of NEC Schemes of NEC 2006-03-14 2.9957 2009-03-14 2.85 0 2.85 2.85 Completed
1502 MANIPUR Transport and Communication
Bishnupur - Nungba Road
Schemes of NEC Schemes of NEC 2012-12-27 142.85 2015-12-27 128.57 0 128.57 128.57 Completed
1503 MANIPUR Transport and Communication
Churachandpur-Singhat road
Schemes of NEC Schemes of NEC 2009-10-28 27.32 2013-10-28 24.59 0 24.59 24.59 Completed
1504 MANIPUR Transport and Communication
Const. of Inter State Truck Terminus at Imphal, Sekmai
Schemes of NEC Schemes of NEC 2016-09-23 12.29 2019-09-23 11.0583 0 11.0583 11.06 Completed
1505 MANIPUR Transport and Communication
Const. of Yaripok Bazar to Chagangpat.
Schemes of NEC Schemes of NEC 2017-08-16 6.41 2020-08-16 6 0 6 6 Completed
1506 MANIPUR Transport and Communication
Construction of Boundary Wall surrounding the newly acquired land at Imphal Airport
Schemes of NEC Schemes of NEC 2013-02-20 14.81 2017-02-20 8.89 0 8.89 8.89 Completed
1507 MANIPUR Transport and Communication
Construction of hangar, associated apron and link taxiway works at Imphal Airport
Schemes of NEC Schemes of NEC 2016-01-12 35.9 2019-01-12 17.5 0 17.5 17.5 Foreclosed
1508 MANIPUR Transport and Communication
Improvement of road from Mualdak to Kolhen Diversion road via Munlui
Schemes of NEC Schemes of NEC 2016-09-23 11.96 2019-09-23 10.76 0 10.76 10.76 Completed
1509 MANIPUR Transport and Communication
Improvement of road Koirengei to Sangakpham via Achangbigei, Kontha Khabam and Ahallup village, 7.33 Km, Manipur
Schemes of NEC Schemes of NEC 2020-08-21 7.35 2023-08-21 6.61 0 6.61 6.61 Completed
1510 MANIPUR Transport and Communication
Improvemnet of NH-150/NH-202 (New) to Chadong (near Maphou Dam) via Muirei, Ngaramphung & Lamlai Khunou, Manipur
Schemes of NEC Schemes of NEC 2016-05-23 10 2019-05-23 9 0 9 9 Completed
1511 MANIPUR Transport and Communication
ISBT at Dewlaland, Imphal
Schemes of NEC Schemes of NEC 2009-03-05 26.4 2013-03-05 23.76 0 23.76 23.76 Completed
1512 MANIPUR Transport and Communication
Kangpokpi-Tamei Road
Schemes of NEC Schemes of NEC 2014-04-07 89.95 2017-04-07 80.96 0 80.96 80.96 Completed
1513 MANIPUR Transport and Communication
Re-carpeting of Mahadev-Tolloi-Pfutsero Road
Schemes of NEC Schemes of NEC 2017-01-05 12.83 2020-01-05 12.83 0 12.83 12.83 Completed
1514 MANIPUR Transport and Communication
Tamenglong-Khongsang road
Schemes of NEC Schemes of NEC 2005-03-31 12.992 2008-03-31 12.9 0 12.9 12.9 Completed
1515 MANIPUR Transport and Communication
Tamenglong-Tamei Road
Schemes of NEC Schemes of NEC 2010-03-25 69.69 2013-03-25 62.72 0 62.72 62.72 Completed
1516 MANIPUR Tourism and Culture
Construction of Circuit House Churachandpur, Churachandpur Town, Manipur.
Schemes of NEC Schemes of NEC 2011-10-20 4.6667 2015-10-20 4.2 0 4.2 4.2 Completed
1517 MANIPUR Tourism and Culture
Construction of Tourism Park at Koide Zho of Senapati District, Manipur
Schemes of NEC Schemes of NEC 2018-03-12 3.5 2021-03-12 3.15 0 3.15 3.15 Ongoing
1518 MANIPUR Tourism and Culture
Construction/Renovation of Tourism Infrastructure Development around Mahabali Temple, Imphal East, Manipur
Schemes of NEC Schemes of NEC 2014-03-03 4.4088 2017-03-03 3.1715 0 3.1715 3.17 Ongoing
1519 MANIPUR Tourism and Culture
Development of Eco-Tourism Park at Kakching Khunou Lamkhai, Manipur
Schemes of NEC Schemes of NEC 2023-03-27 2.9458 2025-03-31 1.47 0 1.47 Ongoing
1520 MANIPUR Tourism and Culture
Development of Heritage Tourism at Yangkhullen village, Senapati District, Manipur
Schemes of NEC Schemes of NEC 2018-05-02 3.6 2021-05-02 2.6562 0 2.6562 2.66 Completed
1521 MANIPUR Tourism and Culture
Establishment of Eco-Tourism Park at Andro, Imphal East District, Manipur
Schemes of NEC Schemes of NEC 2018-03-14 5.36 2021-03-14 5.36 0 5.36 5.36 Completed
1522 MANIPUR Tourism and Culture
Establishment of Eco-Tourism Park at Shovako, Ukhrul District, Manipur
Schemes of NEC Schemes of NEC 2018-03-14 5.33 2021-03-14 5.334 0 5.334 5.326 Ongoing
1523 MANIPUR Tourism and Culture
Infrastructure Development of Tourist Destination at Shanthei Natural Park, Andro, Imphal East District, Manipur
Schemes of NEC Schemes of NEC 2014-02-27 4.78 2018-05-27 4.302 0 4.302 4.3 Completed
1524 MANIPUR Tourism and Culture
Renovation of Yatri-Niwas, at Moreh, Manipur
Schemes of NEC Schemes of NEC 2011-03-28 4.0782 2014-03-28 3.57 0 3.57 3.57 Completed
1525 MANIPUR Education
Development of Infrastructure for Manipur Technical University (MTU), Imphal West District
PM-DevINE Dept. of Education 2024-01-23 54.16 2026-01-25 33.2949 0 33.2949 Ongoing
1526 MANIPUR Infrastructure
Development of Infrastructure of the Processing Zone of Manipur IT SEZ at Mantripukhri, Imphal
PM-DevINE Other 2024-02-08 120 2026-08-06 58.392 29.196 87.588 Ongoing
1527 MANIPUR Health
Construction and Equipping of 60 Bedded State Mental Hospital in Lamphelpat, Imphal West, Manipur
PM-DevINE Dept. of Health & familly 2024-02-10 70.47 2026-10-06 30.9639 15.48 46.4439 Ongoing
1528 MANIPUR Transport and Communication
Development of Road Connectivity from Khabam Lamkhai to Hannaching Heingang via Marjing Polo Complex, Heingang Ching, Imphal East for promoting Tourism
NESIDS-ROADS NESIDS Public works Department 2018-12-10 25.4802 2020-03-31 25.4802 0 25.4802 25.4802 Ongoing
1529 MANIPUR Sports
Infrastructure Development in and around the Polo Ground at Ibudhou Marjing, Heingang, Imphal East
NESIDS-OTRI NESIDS Tourism Department 2022-04-20 26.03 2024-04-30 5.9211 5.8189 11.74 Ongoing
1530 MANIPUR Transport and Communication
Upgradation of Moirang Sendra Road upto Sendra Hillock and Road from Moirang Sendra Road to Omba Hillock and Keina Bazar on Moirang Khunou to Thanga Keibul Road-8.50 km for promoting Tourism Bishnupur in Manipur
NESIDS-ROADS NESIDS Public works Department 2019-07-29 14.74 2020-03-31 14.74 0 14.74 6.9365 Completed
1531 MANIPUR Transport and Communication
Construction of PSC Bridge(50M Span) OVER LEIMAKHONG River in front of ISTT including Approach Road to proposed PSC Bridge(Length 2.4 km) and proposed Bridge to PHC khurkhul(length 1.23 km)
NESIDS-ROADS NESIDS Public works Department 2023-10-16 31.13 2025-10-16 18.3015 2.243 20.5445 Ongoing
1532 MANIPUR Transport and Communication
Improvement/Upgradation of Road connecting Tadubi to Chowainamei Kunao and maopung Dung, Senapati District(LO-10.046 km) in Manipur
NESIDS-ROADS NESIDS Public works Department 2023-10-16 43.79 2026-10-16 40.6562 2.63 43.2862 Completed
1533 MANIPUR Transport and Communication
Rehabilitation and upgradation of Kamjong to Kongkan Thana via Pilong
NESIDS-ROADS NERSDS Public works Department 2019-08-05 118.2 2022-09-30 116.78 0 116.78 116.78 Completed
1534 MANIPUR Transport and Communication
Upgradation/Improvement of Henglep-Thingkhew Tipaimukh road
NESIDS-ROADS NERSDS Public works Department 2022-03-16 89.62 2024-03-31 47.6509 7 54.6509 13.33 Ongoing
1535 MANIPUR Water Supply
Augmentation of Moreh Water Supply Scheme for promoting Tourism Tengnoupal District in Manipur
NESIDS-OTRI NESIDS Public Health & Engg Depa 2019-08-13 21.3105 2020-03-31 21.3105 0 21.3105 21.3105 Completed
1536 MANIPUR Water Supply
Augmentation of Senapati District Head Quarter Water Supply Scheme for promoting tourism
NESIDS-OTRI NESIDS Public Health & Engg Depa 2018-09-14 29.94 2020-03-31 29.94 0 29.94 29.94 Completed
1537 MANIPUR Water Supply
Construction of six overhead Tank & ground sump & necessary pipelines in the Thongju and its adjoining areas in Imphal East District for promoting Tourism
NESIDS-OTRI NESIDS Public Health & Engg Depa 2018-09-14 41.9164 2020-03-31 41.9164 0 41.9164 41.9164 Ongoing
1538 MANIPUR Water Supply
Water supply distribution network for Churachandpur for promoting tourism in Manipur
NESIDS-OTRI NESIDS Public Health & Engg Depa 2018-09-14 19.8026 2020-03-31 19.8026 0 19.8026 19.8026 Completed
1539 MANIPUR Agriculture and Allied
Construction of Bamboo shoot processing Centre at Noney under Integrated Horti/Agri Project
NESIDS-OTRI HADP Horticulture Department 2019-08-07 1.22 2021-09-02 1.09519 0 1.09519 0.8446 Ongoing
1540 MANIPUR Agriculture and Allied
Construction of Chilly/Spices processing Centre at Khoupum under Integrated Horti/Agri Project
NESIDS-OTRI HADP Horticulture Department 2019-08-07 2.01 2021-10-30 1.9968 0 1.9968 1.4597 Ongoing
1541 MANIPUR Agriculture and Allied
Construction of feed plant at Lukhambi under Integrated Horti/Agri Project
NESIDS-OTRI HADP Veterinary Department 2019-08-07 1.15 2021-10-30 0.3507 0.0777 0.4284 0.3507 Ongoing
1542 MANIPUR Agriculture and Allied
Construction of incubation centre under Integrated Horti/Agri Project
NESIDS-OTRI HADP Horticulture Department 2019-08-07 1.03 2021-10-30 0.8925 0 0.8925 0.6743 Ongoing
1543 MANIPUR Agriculture and Allied
Construction of Market shed with storage at Lukhambi
NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 2.19 2021-10-30 1.592 0 1.592 0.684 Ongoing
1544 MANIPUR Agriculture and Allied
Construction of Pack House at 20 places under Integrated Horti/Agri Project
NESIDS-OTRI HADP Horticulture Department 2019-08-07 1.6 2021-09-02 1.4154 0 1.4154 1.4154 Ongoing
1545 MANIPUR Agriculture and Allied
Construction of Pack House at 24 Locations
NESIDS-OTRI HADP Horticulture Department 2019-08-07 1.92 2021-09-15 1.6984 0 1.6984 1.6984 Ongoing
1546 MANIPUR Agriculture and Allied
Construction of Suspension bridge over Barak River, Tuiphai Village
NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 0.33 2020-12-15 0.2565 0 0.2565 0.2565 Completed
1547 MANIPUR Agriculture and Allied
Construction of Suspension bridge over Chengthuitok River, Sempat Naga Village
NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 0.27 2020-12-05 0.2025 0 0.2025 0.2025 Completed
1548 MANIPUR Agriculture and Allied
Construction of Suspension bridge over Ijei River, Numgang Village
NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 0.8 2020-11-25 0.6268 0 0.6268 0.6268 Completed
1549 MANIPUR Agriculture and Allied
Construction of Suspension bridge over Irang River, Tamlok Village
NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 0.52 2020-12-28 0.3824 0 0.3824 0.3824 Completed
1550 MANIPUR Agriculture and Allied
Construction of Women Marketing Complex at Tamenglong HQ
NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-19 5.97 2021-10-30 5.677 0 5.677 2.2708 Ongoing
1551 MANIPUR Agriculture and Allied
Convention Centre / Training Hall at Tamenglong
NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 6.87 2021-10-30 2.8311 0 2.8311 2.264 Ongoing
1552 MANIPUR Agriculture and Allied
Development & Promotion of Eco-Tourism Centres at Zeilad Lake & Tharon Cave, Tamenglong
NESIDS-OTRI HADP Forest Department 2019-08-07 3.52 2022-01-04 3.4 0 3.4 3.4 Completed
1553 MANIPUR Agriculture and Allied
Engaging local vibrant NGO for community mobilization and instituitional building under integrated Horti/Agri project
NESIDS-OTRI HADP DC Noney 2019-08-07 0.35 2021-09-06 0.35 0 0.35 0.35 Ongoing
1554 MANIPUR Agriculture and Allied
Establishment of bamboo processing Centre at Tamenglong Headquarter
NESIDS-OTRI HADP Forest Department 2019-08-07 3.84 2021-09-02 3.7982 0 3.7982 3.7982 Ongoing
1555 MANIPUR Agriculture and Allied
Establishment of cold storage Chain at Temenglong
NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 2 2021-10-30 1.8894 0 1.8894 1.8894 Completed
1556 MANIPUR Agriculture and Allied
Fruits and vegetables processing Plant at Azuram
NESIDS-OTRI HADP Horticulture Department 2019-08-07 2 2021-10-03 1.4633 0 1.4633 1.4633 Ongoing
1557 MANIPUR Agriculture and Allied
Fruits and vegetables processing Plant at Tamenglong
NESIDS-OTRI HADP Horticulture Department 2019-08-07 2 2021-10-03 1.78474 0 1.78474 1.4633 Ongoing
1558 MANIPUR Agriculture and Allied
Spice Processing Unit at Tamei
NESIDS-OTRI HADP Horticulture Department 2019-08-07 2 2021-10-30 1.79292 0 1.79292 1.4597 Ongoing
1559 MANIPUR Agriculture and Allied
Sustainable Agro-Livestock Technology (SALT) 4-Model village.
NESIDS-OTRI HADP Veterinary Department 2019-08-07 2.41 2022-08-30 2.41 0 2.41 2.41 Completed
1560 MANIPUR Agriculture and Allied
Tea processing centre under integrated Horti/Agri project
NESIDS-OTRI HADP TCI MANIDCO 2019-08-07 1.33 2021-09-03 1.1842 0 1.1842 0.4736 Ongoing
1561 MANIPUR Agriculture and Allied
Tea processing Unit at Tamenglong Headquarter
NESIDS-OTRI HADP TCI MTDC 2019-08-07 3.09 2021-09-02 2.382 0 2.382 2.382 Ongoing
1562 MANIPUR Agriculture and Allied
Upgradation of connecting Roads under Noney District Headquarter (L-5.4km) (SH: P/L DSB, WBM &PC)
NESIDS-OTRI HADP PWD 2019-08-07 3.34 2020-12-28 2.3846 0 2.3846 2.3846 Ongoing
1563 MANIPUR Education
Basic Minimum services - Construction of 40 primary schools under ADC
NESIDS-OTRI NLCPR Education Department 1999-12-30 1.18 2002-12-26 1.062 0 1.062 1.18 Completed
1564 MANIPUR Education
Basic Minimum services- Construction of 32 primary schools
NESIDS-OTRI NLCPR Education Department 1999-12-30 1.25 2002-12-26 1.125 0 1.125 1.25 Completed
1565 MANIPUR Education
Construction 2 (Two) class rooms for 205 schools without Building.
NESIDS-OTRI NLCPR Education Department 2000-03-31 1.6 2003-03-31 1.44 0 1.44 1.6 Completed
1566 MANIPUR Education
Construction of 5 Nos. of Model Primary School Building for Sadar Hills Autonomous District Council, Sadar Hills district in Manipur Phase-I (Construction of 300 Nos. of Model Primary School under the Autonomous District Council of Manipur)
NESIDS-OTRI NLCPR Education Department 2014-02-21 2.3645 2017-01-31 2.1281 0 2.1281 2.1281 Completed
1567 MANIPUR Education
Construction of 5 Nos. of Model Primary School Building for Tamenglong Autonomous District Council Tamenglong district in Manipur- Phase I (Construction of 300 Nos. of Model Primary School under the Autonomous District Council of Manipur)
NESIDS-OTRI NLCPR Education Department 2014-02-21 2.3645 2014-02-24 2.1146 0 2.1146 2.1146 Completed
1568 MANIPUR Education
Construction of 5 Nos. of Model Primary School buildings for Chandel ADC in Chandel district
NESIDS-OTRI NLCPR Education Department 2011-07-04 2.1603 2012-04-30 1.9062 0 1.9062 1.9062 Completed
1569 MANIPUR Education
Construction of 5 Nos. of Model Primary School buildings for Churanchandpur ADC, Churachandpur district
NESIDS-OTRI NLCPR Education Department 2011-07-04 2.1603 2012-04-30 1.9062 0 1.9062 1.9062 Completed
1570 MANIPUR Education
Construction of 5 Nos. of Model Primary School Buildings for Senapati ADC in Senapati district
NESIDS-OTRI NLCPR Education Department 2011-07-04 2.1603 2012-04-30 1.9062 0 1.9062 1.9062 Completed
1571 MANIPUR Education
Construction of 5 Nos. of Model Primary School buildings for Ukhrul ADC in Ukhrul district
NESIDS-OTRI NLCPR Education Department 2011-07-04 2.1603 2012-04-30 1.9062 0 1.9062 1.9062 Completed
1572 MANIPUR Education
Construction of 8 Classrooms in Rengkai Government High School, Churachandpur
NESIDS-OTRI NLCPR Education Department 2005-09-27 0.6 2006-12-31 0.5241 0 0.5241 0.5241 Completed
1573 MANIPUR Education
Construction of Government College of Technology
NESIDS-OTRI NLCPR Education Department 2004-07-09 10 2007-07-31 8.7372 0 8.7372 9 Completed
1574 MANIPUR Education
Construction of Nungba PHC Operation Theatre
NESIDS-OTRI HADP Department of Health and 2019-08-07 0.38 2020-02-07 0.221 0 0.221 0.221 Ongoing
1575 MANIPUR Education
Construction of Tribal Boys Hostel at Adimjati Shiksha Ashram Campus, Imphal (150 boys capacity) in Manipur
NESIDS-OTRI NLCPR Manipur Tribal Developmen 2017-07-28 8.3 2019-07-28 7.3234 0 7.3234 7.3234 Completed
1576 MANIPUR Education
Establishment of a model residential Govenment School (VI-XII) at Jiribam Imphal East Manipur
NESIDS-OTRI NLCPR Education Department 2010-12-15 14.0421 2012-12-15 12.3901 0 12.3901 12.3901 Completed
1577 MANIPUR Education
Extension of 2 (Two) Class rooms for 172 State Govt. Secondary Schools
NESIDS-OTRI NLCPR Education Department 2000-03-31 8.6 2004-12-31 7.74 0 7.74 8.6 Completed
1578 MANIPUR Education
Extension of 2 (Two) Class rooms for the State Govt. Secondary Schools including 21 newly upgraded Higher Secondary Schools.
NESIDS-OTRI NLCPR Education Department 2000-03-31 2.15 2004-12-31 1.935 0 1.935 2.15 Completed
1579 MANIPUR Education
Girls Hostel at 2 Schools
NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-19 3.64 2021-12-31 1.24308 0 1.24308 Ongoing
1580 MANIPUR Education
Infrastructure Development of 9 Govt. colleges in valley/ hills in Manipur
NESIDS-OTRI NLCPR Education Department 2010-12-23 9.7207 2012-12-31 8.0133 0 8.0133 8.0133 Completed
1581 MANIPUR Education
Infrastructure Development of Manipur University Phase II
NESIDS-OTRI NLCPR Education Department 2004-10-29 3.88 2006-10-31 3.0551 0 3.0551 3.1651 Completed
1582 MANIPUR Education
Sarva Shiksha Abhiyan
NESIDS-OTRI NLCPR Education Department 2006-03-27 2.6549 2007-03-31 2.6549 0 2.6549 2.6549 Completed
1583 MANIPUR Education
Sarva Shiksha Abhiyan (2006-07)
NESIDS-OTRI NLCPR Education Department 2006-06-29 3.7805 2007-06-29 3.7805 0 3.7805 3.7805 Completed
1584 MANIPUR Education
Teachers Quarters (Barrak type) at 2 Schools
NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 2.27 2021-12-31 1.14668 0 1.14668 0.1 Ongoing
1585 MANIPUR Education
University and 60 Affiliated Colleges from Manipur
NESIDS-OTRI NLCPR Education Department 2000-03-31 20 2004-03-31 16.902 0 16.902 17.7821 Completed
1586 MANIPUR Irrigation and Flood Control
Construction of Barrage across Itam river at Kharason, Impahl East
NESIDS-OTRI NLCPR Minor Irrigation 2008-11-04 3.6134 2010-10-31 3.1883 0 3.1883 3.1883 Completed
1587 MANIPUR Irrigation and Flood Control
Construction of Barrage over Itok river at Chandrakhong at ThoubalManpur
NESIDS-OTRI NLCPR Minor Irrigation 2010-12-15 4.9831 2012-12-31 4.3689 0 4.3689 4.3689 Completed
1588 MANIPUR Irrigation and Flood Control
Construction of Mini Barrage across Wangjing river at Wangjing Canteen Lampak in Thoubal Manipur
NESIDS-OTRI NLCPR Minor Irrigation 2010-12-15 4.9828 2012-12-31 4.3169 0 4.3169 4.3169 Completed
1589 MANIPUR Irrigation and Flood Control
Construction of Pick up weir across Namia river at Konkan Thana in Ukhrul Manipur
NESIDS-OTRI NLCPR Minor Irrigation 2010-12-15 3.0632 2012-12-31 2.6596 0 2.6596 2.6596 Completed
1590 MANIPUR Irrigation and Flood Control
Modernisation of Kakching Ithei Maru Main Canal
NESIDS-OTRI NLCPR Minor Irrigation 2008-03-28 3.4064 2010-03-31 3.0057 0 3.0057 3.0057 Completed
1591 MANIPUR Health
Basic Minimum services - Construction of primary health service centre
NESIDS-OTRI NLCPR Department of Health and 1999-12-30 5.92 2002-12-26 5.328 0 5.328 5.92 Completed
1592 MANIPUR Health
Construction and Equipping of 50 Bedded Hospital at Chandel District
NESIDS-OTRI NLCPR Department of Health and 2006-11-30 13.1577 2008-11-28 11.497 0 11.497 11.497 Completed
1593 MANIPUR Health
Construction and Equipping of 50 bedded Hospital at Jiribam Sub Division
NESIDS-OTRI NLCPR Department of Health and 2006-11-30 15.6426 2009-11-30 14.0783 0 14.0783 14.0783 Completed
1594 MANIPUR Health
Construction and Equipping of 50 bedded Hospital at Senapati District
NESIDS-OTRI NLCPR Department of Health and 2006-11-30 14.261 2008-11-28 12.4699 0 12.4699 12.4699 Completed
1595 MANIPUR Health
Construction and Equipping of 50 bedded Hospital at Tamenglong District
NESIDS-OTRI NLCPR Department of Health and 2006-11-30 14.3672 2008-11-28 12.5538 0 12.5538 12.5538 Completed
1596 MANIPUR Health
Construction and equipping of 50 bedded hospital at Ukhrul District
NESIDS-OTRI NLCPR Department of Health and 2006-11-30 13.9657 2008-11-30 12.176 0 12.176 12.176 Completed
1597 MANIPUR Health
Construction of 10 PHCs in valleys
NESIDS-OTRI NLCPR Department of Health and 2007-11-20 7.8571 2008-11-28 6.9325 0 6.9325 6.9125 Completed
1598 MANIPUR Health
Construction of 18 PHSCs in valley areas
NESIDS-OTRI NLCPR Department of Health and 2007-11-20 2.565 2008-11-28 2.2632 0 2.2632 2.2632 Completed
1599 MANIPUR Health
Construction of 32 PHCs in Hill areas in Manipur
NESIDS-OTRI NLCPR Department of Health and 2007-11-21 5.4539 2008-11-28 4.8124 0 4.8124 4.8124 Completed
1600 MANIPUR Health
Construction of CHC Napet Palli, Jiribum sub division in Imphal East, Manipur
NESIDS-OTRI NLCPR Department of Health and 2010-11-04 5.0492 2012-10-31 4.4552 0 4.4552 4.4552 Ongoing
1601 MANIPUR Health
Construction of Dharmasala Building at Regional Institute of Medical Sciences (RIMS)
NESIDS-OTRI NLCPR Regional Institute of Med 2006-09-11 2.8212 2008-09-30 1.8777 0 1.8777 1.8777 Ongoing
1602 MANIPUR Health
Construction of Thoubal District Hospital
NESIDS-OTRI NLCPR Department of Health and 2005-01-01 1.86 2006-01-31 0 Completed
1603 MANIPUR Health
Construction of Veterinary Hospitals in 9 Districts
NESIDS-OTRI NLCPR Veterinary Department 2007-12-31 7.4892 2009-12-31 6.6082 0 6.6082 6.6082 Completed
1604 MANIPUR Health
Purchase of Hospital Equipments for Tamenglong Dist. Hospital
NESIDS-OTRI HADP Department of Health and 2019-08-07 2.03 2021-09-02 1.9053 0 1.9053 1.9053 Completed
1605 MANIPUR Health
Strengthening of Health equipments in Govt Hospitals
NESIDS-OTRI NLCPR Department of Health and 2005-03-17 8.27 2006-09-30 7.4403 0 7.4403 7.5399 Completed
1606 MANIPUR Health
Telemedicine at District Hospital 3 PHC
NESIDS-OTRI HADP Department of Health and 2019-08-07 0.21 2021-01-06 0.1879 0 0.1879 0.08 Ongoing
1607 MANIPUR Health
Upgradation and Equipping of 480 Bed JN Hospital at Imphal
NESIDS-OTRI NLCPR Department of Health and 2007-12-31 17.5475 2009-12-31 11.8375 0 11.8375 8.7075 Foreclosed
1608 MANIPUR Miscellaneous
Basic Minimum services - Construction of 156 houses for tribals
NESIDS-OTRI NLCPR Education S 1999-12-30 0.25 2001-12-31 0.225 0 0.225 0.25 Completed
1609 MANIPUR Miscellaneous
Basic Minimum services - Construction of rural shelters
NESIDS-OTRI NLCPR Education 1999-12-30 0.4 2001-12-31 0.36 0 0.36 0.4 Completed
1610 MANIPUR Miscellaneous
Construction of Transit Hostel cum -Qtr for Govt. Employee /Doctor/Teacher at Haochong
NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 1.1 2021-08-31 0.9631 0 0.9631 0.9631 Completed
1611 MANIPUR Miscellaneous
Construction of Transit Hostel cum -Qtr for Govt. Employee /Doctor/Teacher at Nungba HQ.
NESIDS-OTRI HADP Public Health & Engg Depa 2019-08-07 1.12 2021-08-31 0.9776 0 0.9776 0.9776 Completed
1612 MANIPUR Miscellaneous
Construction of Transit Hostel cum -Qtr for Govt. Employees /Doctor/Teachers at Noney HQ.
NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 0.99 2021-01-29 0.9479 0 0.9479 0.9479 Completed
1613 MANIPUR Miscellaneous
Construction of Transit Hostel for Doctor and Nurses at PHC Noney
NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-19 1.09 2021-10-30 0.9726 0 0.9726 0.388 Ongoing
1614 MANIPUR Miscellaneous
Construction of Transit Quarter /hostel at Nungba Hr. Secondary School
NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 1.12 2021-08-31 0.9809 0 0.9809 0.9809 Completed
1615 MANIPUR Miscellaneous
Construction of Transit Quarter/Hostel at Khangsilung Hr. Secondary School, Khoupum
NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 1.11 2021-08-31 0.9742 0 0.9742 0.9742 Completed
1616 MANIPUR Miscellaneous
Construction of Tribal Markets in Manipur
NESIDS-OTRI NLCPR Tribal Affairs and Hills 2010-12-23 12.3042 2012-12-31 10.8566 0 10.8566 8.859 Ongoing
1617 MANIPUR Miscellaneous
Construction of Tribal Working Women Hostel (50 working women) Imphal in Manipur
NESIDS-OTRI NLCPR Tribal Affairs and Hills 2015-06-23 2.3775 2017-12-31 2.1396 0 2.1396 2.1396 Completed
1618 MANIPUR Miscellaneous
Improvement of Pemikhong Drainage System from Khurai Konsam Leikai to Porompat Thawanthaba Leikai.
NESIDS-OTRI NLCPR IFCD 2017-12-18 11.34 2019-12-18 8.2064 0 8.2064 8.2064 Completed
1619 MANIPUR Miscellaneous
Integrated project on Health, Education and Training Programme for peace & Goodwill in senapati Hqrs.
NESIDS-OTRI NLCPR Tribal Affairs and Hills 2012-06-26 4.0187 2013-12-31 3.6168 0 3.6168 3.6168 Completed
1620 MANIPUR Miscellaneous
Management of Solid Waste on Regional Basis (Cluster- B)
NESIDS-OTRI NLCPR MAHUD 2017-12-05 13.52 2019-06-05 10.3149 0 10.3149 10.315 Completed
1621 MANIPUR Miscellaneous
Restoration of (i) Manipur Legislative Assembly,(ii) CM Secretariate Building Complex and (iii) Speaker's Bungalow and Annexxe
NESIDS-OTRI NLCPR PWD 2002-03-31 1.6 2002-09-30 1.44 0 1.44 1.6 Completed
1622 MANIPUR Miscellaneous
Transit/working Hostel for District Level Officers at 3 Sub Stations HQ (TML, Tamei, Tousem)
NESIDS-OTRI HADP Manipur Police Housing Co 2019-08-07 6.6 2021-08-31 4.665 0 4.665 2.148 Ongoing
1623 MANIPUR Miscellaneous
Upgradation of Cricket Stadium at Lauwangsangbam (Construction of southern Gallery)
NESIDS-OTRI NLCPR Youth Affairs and Sports 2017-12-05 11.14 2019-06-05 9.4133 0 9.4133 9.4133 Completed
1624 MANIPUR Power
2nd Phase electrification of 29 tribal villages
NESIDS-OTRI NLCPR Power 2005-12-21 4.5988 2007-03-31 4.1389 0 4.1389 4.1389 Completed
1625 MANIPUR Power
Construction of 33 kv sub-station at Tousem
NESIDS-OTRI NLCPR Power 2003-03-17 2.54 2007-12-31 2.367 0 2.367 2.367 Completed
1626 MANIPUR Power
Construction of 33/11 kv sub-station at Noney
NESIDS-OTRI NLCPR Power 2003-03-17 3.82 2005-12-31 3.3887 0 3.3887 3.7443 Completed
1627 MANIPUR Power
Construction of 33/11 kv sub-station at Tamei
NESIDS-OTRI NLCPR Power 2003-02-28 2.91 2005-07-31 2.62 0 2.62 2.7076 Completed
1628 MANIPUR Power
Construction of 33/11 kv, 2x5 MVA sub-station at Maram (Senapati Dist.)
NESIDS-OTRI NLCPR Power 2003-03-17 2.81 2005-03-31 2.529 0 2.529 2.81 Completed
1629 MANIPUR Power
Construction of 33/11 kv, 2x5 MVA substation at Singhat
NESIDS-OTRI NLCPR Dept. of Power 2003-03-21 4.1 2007-12-31 3.6953 0 3.6953 3.7787 Completed
1630 MANIPUR Power
Construction of 400 KV Line on D/C Towers initially charged at 132 KV from Yurembam to Thoubal via Nambol in Manipur
NESIDS-OTRI NLCPR Dept. of Power 2015-12-22 123.15 2018-12-31 110.835 0 110.835 110.835 Completed
1631 MANIPUR Power
Construction of 400/132/33 KV SS at Thoubal in Manipur
NESIDS-OTRI NLCPR Dept. of Power 2015-03-30 128.24 2018-03-31 115.416 0 115.416 115.416 Completed
1632 MANIPUR Power
Electrification of tribal Villages
NESIDS-OTRI NLCPR Power 2002-01-28 11.29 2005-01-31 10.161 0 10.161 11.29 Completed
1633 MANIPUR Power
Installation of 132/33 KV substation at Rengpang (Tamelong District)
NESIDS-OTRI NLCPR Power 2003-02-28 6.44 2005-02-28 5.796 0 5.796 6.35 Completed
1634 MANIPUR Power
Installation of 2.12.5 MVA 132/33 KV Sub-station at Moreh along with the associated 132 lines
NESIDS-OTRI NLCPR Dept. of Power 2014-12-29 31.6164 2016-12-31 28.4547 0 28.4547 28.4547 Completed
1635 MANIPUR Power
Installation of 2x1 MVA 33 KV S/S along with associated 33 KV line at Henglep in Churachandpur
NESIDS-OTRI NLCPR Power 2009-03-30 4.1073 2011-03-01 3.6463 0 3.6463 3.6463 Completed
1636 MANIPUR Power
Installation of 2x1 MVA 33 KV Sub-station with 33 KV line at Chakpikarong in Chandel
NESIDS-OTRI NLCPR Power 2009-03-30 5.549 2011-03-01 4.9286 0 4.9286 4.9286 Completed
1637 MANIPUR Power
Installation of 2x12.5 MVA 132 KV Sub Station along with the associated 132 KV line & related works at Chandel in Manipur
NESIDS-OTRI NLCPR Power 2008-04-30 13.2598 2010-03-30 11.7482 0 11.7482 11.7482 Completed
1638 MANIPUR Power
Installation of 2x12.5 MVA 132/33KV S/S at Thanlon with associated 132 line in Manipur
NESIDS-OTRI NLCPR Power 2014-02-20 59.9782 2017-01-31 53.9804 0 53.9804 53.9804 Completed
1639 MANIPUR Power
Installation of 2x2.5 MVA 33/11 KV Sub Station at Willong along with 33 KV S/C line from Maram Sub Station to Wilong Sub Station in Manipur
NESIDS-OTRI NLCPR Power 2008-04-30 5.4489 2010-03-30 4.904 0 4.904 4.904 Completed
1640 MANIPUR Power
Installation of 2x2.5MVA 33/11 KV sub-station along with the associated 33KV line and related works at Gelnel in Senapati district in Manipur.
NESIDS-OTRI NLCPR Power 2014-02-28 3.8013 2017-01-31 3.4212 0 3.4212 3.4212 Completed
1641 MANIPUR Power
Installation of 2x3.15 MVA 33 KV Sub-station along with the associated 33 KV line & related works at Sagolmang in Impahl West
NESIDS-OTRI NLCPR Power 2009-03-30 3.3986 2011-03-01 3.0214 0 3.0214 3.0214 Completed
1642 MANIPUR Power
Installation of 2x5 MVA 33 KV Sub- station at Moreh Town
NESIDS-OTRI NLCPR Power 2000-01-18 4.6 2002-01-31 4.131 0 4.131 4.59 Completed
1643 MANIPUR Power
Installation of 2x5 MVA 33 KV Sub-station along with the associated 33 KV line & related works at Sekmaijin in Imphal West
NESIDS-OTRI NLCPR Power 2009-03-30 3.7751 2011-03-01 3.3529 0 3.3529 3.3529 Completed
1644 MANIPUR Power
Installation of 2x5 MVA 33 KV Sub-station with associated 33 KV line & related works at Ukhrul Khunjao in Ukhrul
NESIDS-OTRI NLCPR Power 2009-03-30 4.2059 2011-03-01 3.7369 0 3.7369 3.7369 Completed
1645 MANIPUR Power
Installation of 2x5 MVA 33/11 KV Sub-station along with the associated 33 KV line & releated work at Gumnom in Ukhrul district in Manipur
NESIDS-OTRI NLCPR Dept. of Power 2015-03-04 4.8399 2017-02-28 4.3559 0 4.3559 4.3559 Completed
1646 MANIPUR Power
Installation of 2x5 MVA 33/11 KV sub-station along with the associated 33 KV line and related works at Khongjom in Thoubal district in Manipur
NESIDS-OTRI NLCPR Power 2014-02-26 4.7949 2017-01-31 4.3154 0 4.3154 4.3154 Completed
1647 MANIPUR Power
Installation of 2x5 MVA 33/11 KV sub-station along with the associated 33 KV line related works at Nungbi Khullen in Ukhrul District in Manipur
NESIDS-OTRI NLCPR Power 2014-02-28 5.3888 2017-01-31 4.8499 0 4.8499 4.8499 Completed
1648 MANIPUR Power
Installation of 2x5 MVA 33/11KV sub-station along with the associated 33KV LILO line and related works at Sekmai in Imphal west district in Manipur
NESIDS-OTRI NLCPR Power 2014-02-28 4.6464 2017-01-31 4.1818 0 4.1818 4.1818 Completed
1649 MANIPUR Power
Installation of 2x5MVA 33/11 KV sub-station along with the associated 33KV line and related works at Sugnu in Thoubal district in Manipur
NESIDS-OTRI NLCPR Power 2014-02-28 5.3888 2017-01-31 4.8499 0 4.8499 4.8499 Completed
1650 MANIPUR Power
Installation of Sub Station at Lakhamai
NESIDS-OTRI NLCPR Power 2005-03-15 2.87 2007-03-15 2.5811 0 2.5811 2.6811 Completed
1651 MANIPUR Power
Installation of Sub Station at Namare
NESIDS-OTRI NLCPR Power 2005-03-15 3.75 2007-03-15 3.3709 0 3.3709 3.5019 Completed
1652 MANIPUR Power
Installation of Sub Station at Thanlon
NESIDS-OTRI NLCPR Power 2005-03-15 5.44 2007-03-15 4.8977 0 4.8977 5.0877 Completed
1653 MANIPUR Power
Installation of Sub Station at Thinkew
NESIDS-OTRI NLCPR Power 2005-03-15 3.15 2007-03-15 2.831 0 2.831 2.941 Completed
1654 MANIPUR Power
Laimakhong Heavy Fuel Bassed Power project.
NESIDS-OTRI NLCPR Power 1999-02-15 117.61 2000-11-30 105.849 0 105.849 117.605 Completed
1655 MANIPUR Power
Loktak Downstream H.E. Project (2x33 MW)
NESIDS-OTRI NLCPR Power 2008-11-24 109.5867 2010-11-30 34.5 0 34.5 Foreclosed
1656 MANIPUR Power
Renovation & Modernisation of 2 (two) nos. 132/33 KV Sub stations at Yaingangpokpi Ningthoukhong in Manipur- Phase I
NESIDS-OTRI NLCPR Power 2011-12-22 34.2555 2013-12-31 30.83 0 30.83 30.83 Completed
1657 MANIPUR Power
renovation and Modernaisation of 132 KV SSlocated at Kakching, Karong an dChurachandpur phase -II, thoubal , Senapati, Churachandpu in Manipur
NESIDS-OTRI NLCPR Power 2013-07-19 46.2027 2015-07-31 41.5824 0 41.5824 41.5824 Completed
1658 MANIPUR Power
ST&D - 2x1MVA Sub Station at Saikul
NESIDS-OTRI NLCPR Power 2000-11-17 1.49 2002-11-30 1.341 0 1.341 1.49 Completed
1659 MANIPUR Power
ST&D - 2x1MVA Sub Station at Shivapurikhan
NESIDS-OTRI NLCPR Power 2002-10-21 1.32 2004-10-31 1.188 0 1.188 1.32 Completed
1660 MANIPUR Power
ST&D - 33 KV DC line from Leimakhong to Iroisemba.
NESIDS-OTRI NLCPR Power 2002-02-13 4.31 2005-02-28 3.619 0 3.619 3.879 Completed
1661 MANIPUR Power
ST&D - 33 KV DC line from yaingangpokpi to Kongba
NESIDS-OTRI NLCPR Power 2002-10-21 0.6 2004-10-31 0 Completed
1662 MANIPUR Power
ST&D - 33 KV DC line from Yurembam to Mongsangei
NESIDS-OTRI NLCPR Power 2000-11-17 1.72 2005-07-30 1.548 0 1.548 1.72 Completed
1663 MANIPUR Power
ST&D- 33 KV DC line from Mongsangei to Khumanlampak via kongba
NESIDS-OTRI NLCPR Power 2002-10-21 4.52 2005-10-31 4.068 0 4.068 4.128 Completed
1664 MANIPUR Power
Trial Run of Laimakhong Heavy Fuel Based Power project.
NESIDS-OTRI NLCPR Power 2001-09-18 4.32 2002-09-30 3.888 0 3.888 4.32 Completed
1665 MANIPUR Roads and Bridges
Construction of Bally Suspension Bridge (360 ft. span) over Barak River on Tamenglong - Tousem - Haflong Road
NESIDS-OTRI NLCPR PWD 2005-12-26 3.3878 2007-03-31 2.9659 0 2.9659 2.9659 Completed
1666 MANIPUR Roads and Bridges
Construction of Bridge at Babu Bazar
NESIDS-OTRI NLCPR PWD 2006-11-30 2.9266 2008-11-28 2.5572 0 2.5572 2.5572 Completed
1667 MANIPUR Roads and Bridges
Construction of Bridge at Irong Ichin
NESIDS-OTRI NLCPR PWD 2006-11-30 3.3421 2008-11-28 2.9203 0 2.9203 2.9203 Completed
1668 MANIPUR Roads and Bridges
Construction of bridge over Challow river between Chingai (Kuingai) and Tusom in Manipur
NESIDS-OTRI NLCPR PWD 2011-06-28 3.0238 2013-06-30 2.6675 0 2.6675 2.6675 Completed
1669 MANIPUR Roads and Bridges
Construction of Bridge over Imphal River at Kiyamgei Mang Mapa
NESIDS-OTRI NLCPR PWD 2006-11-30 4.7122 2008-11-28 4.1174 0 4.1174 4.1174 Completed
1670 MANIPUR Roads and Bridges
Construction of Bridge over Iril river at Tinseed Road, Imphal East in Manipur
NESIDS-OTRI NLCPR PWD 2013-12-27 6.408 2016-12-31 5.7672 0 5.7672 5.7672 Completed
1671 MANIPUR Roads and Bridges
Construction of bridge over Jaduiki river on Tamei Kuilong Road
NESIDS-OTRI NLCPR PWD 2009-09-30 2.2648 2011-09-30 1.9983 0 1.9983 1.9983 Completed
1672 MANIPUR Roads and Bridges
Construction of bridge over Layii river on Kharasom Lazo to Layii Road
NESIDS-OTRI NLCPR PWD 2009-09-30 3.5321 2011-09-30 3.1165 0 3.1165 3.1165 Completed
1673 MANIPUR Roads and Bridges
Construction of Bridge over thoubal River at Haokha
NESIDS-OTRI NLCPR PWD 2006-11-30 2.756 2008-11-28 2.4082 0 2.4082 2.4089 Completed
1674 MANIPUR Roads and Bridges
Construction of Bridge over Thoubal River at Leishangthem
NESIDS-OTRI NLCPR PWD 2006-11-30 3.407 2008-11-28 2.977 0 2.977 2.977 Completed
1675 MANIPUR Roads and Bridges
Construction of Brodge over Heirok river at Heirok Chingdongpok
NESIDS-OTRI NLCPR PWD 2007-05-25 2.2045 2009-05-29 1.9263 0 1.9263 1.9263 Completed
1676 MANIPUR Roads and Bridges
Construction of Keishmathong Bridge
NESIDS-OTRI NLCPR PWD 2006-02-17 3.47 2008-02-29 3.029 0 3.029 3.029 Completed
1677 MANIPUR Roads and Bridges
Construction of Kumbi Bridge over Khuga River at km 10.75 of Moirang-Kumbi Road
NESIDS-OTRI NLCPR PWD 2007-01-04 4.32 2008-11-30 3.774 0 3.774 3.774 Completed
1678 MANIPUR Roads and Bridges
Construction of Lamlong Bridge
NESIDS-OTRI NLCPR PWD 2006-02-17 4.54 2008-02-29 3.9701 0 3.9701 3.9701 Completed
1679 MANIPUR Roads and Bridges
Construction of RCC bridge (60 m) over Thoubal River at Thoubal Mathak Leikai Keirambi in Manipur
NESIDS-OTRI NLCPR PWD 2010-04-13 5.0573 2012-03-31 4.4623 0 4.4623 4.4623 Completed
1680 MANIPUR Roads and Bridges
Construction of RCC Bridge over Imphal river at Moirangkhom (Old Thumbuthong) in Imphal West Manipur
NESIDS-OTRI NLCPR PWD 2011-06-28 7.132 2013-06-30 6.293 0 6.293 6.293 Completed
1681 MANIPUR Roads and Bridges
Construction of RCC bridge over Imphal river at Mongkhang Lambi
NESIDS-OTRI NLCPR PWD 2010-06-24 5.7904 2012-06-15 5.1092 0 5.1092 5.1092 Completed
1682 MANIPUR Roads and Bridges
Construction of RCC bridge over Iril river at Chingaren Mapa in Imphal East Manipur
NESIDS-OTRI NLCPR PWD 2011-06-28 6.3712 2013-06-30 5.6215 0 5.6215 5.6217 Completed
1683 MANIPUR Roads and Bridges
Construction of RCC bridge over Iril River at Keiro Litan Makhong in Manipur
NESIDS-OTRI NLCPR PWD 2010-04-13 6.2519 2012-03-31 5.5164 0 5.5164 5.5164 Completed
1684 MANIPUR Roads and Bridges
Construction of Road from Aibulon to Bungpilon in Churachandpur
NESIDS-OTRI NLCPR PWD 2011-03-15 11.1886 2013-03-31 9.8723 0 9.8723 9.8723 Completed
1685 MANIPUR Roads and Bridges
Construction of Singjamei bridge
NESIDS-OTRI NLCPR PWD 2004-10-29 3.69 2006-10-31 3.2247 0 3.2247 3.3547 Completed
1686 MANIPUR Roads and Bridges
Foot-path suspension bridge(11)
NESIDS-OTRI HADP DRDA Tamenglong 2019-08-07 3.74 2020-03-30 3.0507 0 3.0507 3.0507 Completed
1687 MANIPUR Roads and Bridges
Improvement of Koirengei- Sekmai Road i/c bridge approach from Sangakpham to Salanthong
NESIDS-OTRI NLCPR PWD 2017-12-18 16.5411 2019-12-18 14.7395 0 14.7395 14.7395 Completed
1688 MANIPUR Roads and Bridges
Improvement of Jiri - Tipaimukh Road (8-48 Km)
NESIDS-OTRI NLCPR PWD 2007-12-31 18.5633 2009-12-30 16.3795 0 16.3795 16.3795 Completed
1689 MANIPUR Roads and Bridges
Improvement of Lamsong-Khonghampat Road
NESIDS-OTRI NLCPR PWD 2008-03-07 2.6834 2009-03-30 2.3678 0 2.3678 2.3678 Completed
1690 MANIPUR Roads and Bridges
Improvement of Sawombung-Sagolmang Road from 0-12 Km
NESIDS-OTRI NLCPR PWD 2009-06-03 2.2276 2011-05-31 1.9655 0 1.9655 1.9655 Completed
1691 MANIPUR Roads and Bridges
Improvement of Tamenglong District Hospital Approach Road (L- 0.6km) i/c parking
NESIDS-OTRI HADP DC Tamenglong 2019-08-01 0.4497 2020-06-02 0.4095 0 0.4095 0.4095 Completed
1692 MANIPUR Roads and Bridges
Senapati-Phaibung Road (128.90 Kms.)
NESIDS-OTRI NLCPR PWD 2000-03-31 167.73 2005-03-31 147.958 0 147.958 150.4794 Ongoing
1693 MANIPUR Roads and Bridges
Widening and Improvement of road from Khongman Mangjil to Khongman Okram Chuthek at Imphal East in Manipur
NESIDS-OTRI NLCPR PWD 2013-02-26 11.1839 2015-02-28 9.7902 0 9.7902 9.7902 Completed
1694 MANIPUR Sports
Construction of District Sports Complex at Bishnupur in Manipur
NESIDS-OTRI NLCPR Youth Affairs and Sports 2010-12-15 9.4035 2013-12-15 6.6378 0 6.6378 3.385 Ongoing
1695 MANIPUR Sports
Construction of District Sports Complex at Churachandpur in Manipur
NESIDS-OTRI NLCPR Youth Affairs and Sports 2010-11-09 8.6201 2013-10-31 7.606 0 7.606 7.606 Completed
1696 MANIPUR Sports
Construction of District Sports Complex at Tamenglong in Manipur
NESIDS-OTRI NLCPR Youth Affairs and Sports 2010-11-09 7.4867 2013-10-31 5.315 0 5.315 5.315 Ongoing
1697 MANIPUR Sports
Construction of District Sports Complex at Ukhrul
NESIDS-OTRI NLCPR Youth Affairs and Sports 2009-09-01 9.1987 2012-08-31 7.0773 0 7.0773 5.6618 Ongoing
1698 MANIPUR Sports
Establishment of National Sports Academy at Khuman Lampak Sports complex,Imphal.
NESIDS-OTRI NLCPR Youth Affairs and Sports 2006-11-30 18.4317 2010-03-31 16.0908 0 16.0908 16.0908 Completed
1699 MANIPUR Sports
Infrastucrctural devlopment for national games
NESIDS-OTRI NLCPR Youth Affairs and Sports 1999-02-15 10 2004-05-25 9 0 9 10 Completed
1700 MANIPUR Tourism and Culture
Development of Cave Tourism project at the prominent tourist sites at Khangkui Cave, Ukhrul District.
NESIDS-OTRI NLCPR Tourism Department 2017-12-18 7.5 2019-12-18 6.5534 0 6.5534 6.5534 Completed
1701 MANIPUR Tourism and Culture
Development of Eco-Tourism projects at Cheirao Ching, Thangmeiband.
NESIDS-OTRI NLCPR Tourism Department 2017-12-18 13.3 2019-12-18 11.6282 0 11.6282 11.6282 Ongoing
1702 MANIPUR Water Supply
Augmentation of Konthoujam Water Supply Scheme (Imphal West District)
NESIDS-OTRI NLCPR PHED 2007-12-31 8.8576 2009-06-30 7.8156 0 7.8156 7.8156 Completed
1703 MANIPUR Water Supply
Augmentation of Leimaching Water Supply Scheme, Imphal East
NESIDS-OTRI NLCPR PHED 2011-12-22 11.0168 2014-12-31 9.7207 0 9.7207 9.7207 Completed
1704 MANIPUR Water Supply
Augmentation of Leimaram Irengham area Water Supply Scheme at Bishnupur
NESIDS-OTRI NLCPR PHED 2010-02-05 2.5969 2012-02-15 2.2738 0 2.2738 2.2738 Completed
1705 MANIPUR Water Supply
Augmentation of Water Supply at Chakpikarong
NESIDS-OTRI NLCPR PHED 2005-03-15 1.15 2007-03-31 1.0022 0 1.0022 1.0582 Completed
1706 MANIPUR Water Supply
Augmentation of Water Supply at Khoupum
NESIDS-OTRI NLCPR PHED 2005-03-15 1.49 2007-03-31 1.2977 0 1.2977 1.3717 Completed
1707 MANIPUR Water Supply
Augmentation of water supply at Langthabal Puramkhong in Imphal West
NESIDS-OTRI NLCPR PHED 2009-09-07 7.6417 2011-09-06 6.7427 0 6.7427 6.7427 Completed
1708 MANIPUR Water Supply
Augmentation of Water Supply at Litan and surrounding five villages in Ukhrul District in Manipur.
NESIDS-OTRI NLCPR Dept. of Power 2017-08-16 5.15 2019-08-16 4.7076 0 4.7076 4.7076 Completed
1709 MANIPUR Water Supply
Augmentation of Water Supply at Tamei
NESIDS-OTRI NLCPR PHED 2005-03-15 1 2007-03-31 0.8698 0 0.8698 0.9188 Completed
1710 MANIPUR Water Supply
Augmentation of Water Supply for Chandel HQ and surrounding areas
NESIDS-OTRI NLCPR PHED 2003-02-28 5.64 2006-02-28 5.076 0 5.076 5.558 Completed
1711 MANIPUR Water Supply
Augmentation of Water Supply for Churachandpur town from Khuga dam (Khuga river source) - Zone-III
NESIDS-OTRI NLCPR PHED 2003-02-28 8.15 2006-03-31 7.3369 0 7.3369 7.837 Completed
1712 MANIPUR Water Supply
Augmentation of Water Supply for Churachandpur town from Koite and Loklao river sources-Zone-I
NESIDS-OTRI NLCPR PHED 2003-02-28 14.17 2006-03-31 12.753 0 12.753 13.97 Completed
1713 MANIPUR Water Supply
Augmentation of Water Supply for Ukhrul District Headquarter
NESIDS-OTRI NLCPR PHED 2003-02-28 5.29 2006-06-30 4.761 0 4.761 5.026 Completed
1714 MANIPUR Water Supply
Augmentation of water supply scheme at Changpikot in Churachandpur
NESIDS-OTRI NLCPR PHED 2009-09-30 1.0453 2011-09-30 0.9223 0 0.9223 0.9223 Completed
1715 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Chingai, block Headquarter (0.17 MLD) at Ukhrul in Manipur
NESIDS-OTRI NLCPR PHED 2012-12-27 4.4263 2014-12-30 3.9837 0 3.9837 3.9837 Completed
1716 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Dampi in Churanchandpur
NESIDS-OTRI NLCPR PHED 2011-03-17 5.5398 2014-03-31 4.8881 0 4.8881 4.8881 Completed
1717 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Hengbung Senapati
NESIDS-OTRI NLCPR PHED 2011-02-21 4.2276 2013-02-28 3.7302 0 3.7302 3.7302 Completed
1718 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Kamjong Sub-Divisional head quarter in Ukhrul (0.22 MLD)
NESIDS-OTRI NLCPR PHED 2011-12-19 5.2482 2013-10-31 4.6308 0 4.6308 4.6308 Completed
1719 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Kangpokpi
NESIDS-OTRI NLCPR PHED 2004-10-28 2.12 2006-10-31 1.8489 0 1.8489 1.9359 Completed
1720 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Keibul Lamjao (0.418 MLED) in Bishnupur, Manpur
NESIDS-OTRI NLCPR PHED 2010-12-15 2.5557 2012-12-31 2.255 0 2.255 2.3067 Completed
1721 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Komlathabi in Chandel
NESIDS-OTRI NLCPR PHED 2009-07-16 3.7858 2011-07-31 3.2992 0 3.2992 3.2992 Completed
1722 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Mao
NESIDS-OTRI NLCPR PHED 2004-10-28 5.65 2006-10-31 4.9176 0 4.9176 5.1496 Completed
1723 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Maram
NESIDS-OTRI NLCPR PHED 2004-10-28 3.06 2006-09-30 2.6638 0 2.6638 2.7898 Completed
1724 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Noney
NESIDS-OTRI NLCPR PHED 2004-10-28 1.42 2006-06-30 1.2348 0 1.2348 1.2928 Completed
1725 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Nunghar in Ukhrul
NESIDS-OTRI NLCPR PHED 2011-12-19 5.4406 2013-10-31 4.7794 0 4.7794 4.7794 Completed
1726 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Phungyar Sub Divisional HDQR. at Ukhrul
NESIDS-OTRI NLCPR PHED 2013-02-27 3.8187 2016-02-29 3.4118 0 3.4118 3.4118 Completed
1727 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Purul Sub Division HQ
NESIDS-OTRI NLCPR PHED 2007-12-31 4.2886 2009-06-30 3.7841 0 3.7841 3.7841 Completed
1728 MANIPUR Water Supply
Augmentation of water supply scheme at Riha Loute and surrounding villages in Manipur
NESIDS-OTRI NLCPR PHED 2008-09-30 3.492 2010-09-30 3.0812 0 3.0812 3.0812 Completed
1729 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Saikot Block HQr. in Churachandpur
NESIDS-OTRI NLCPR PHED 2009-07-16 2.9733 2011-07-31 2.6235 0 2.6235 2.6235 Completed
1730 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Saikul
NESIDS-OTRI NLCPR PHED 2004-10-28 1.68 2006-09-30 1.492 0 1.492 1.56 Completed
1731 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Sajik Tampak in Chandel
NESIDS-OTRI NLCPR PHED 2010-04-13 2.6372 2012-02-15 2.327 0 2.327 2.327 Completed
1732 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Sanakeithel and surrounding four villages in Ukhrul District in Manipur.
NESIDS-OTRI NLCPR Dept. of Power 2017-08-16 4.68 2019-08-16 4.2559 0 4.2559 4.2559 Completed
1733 MANIPUR Water Supply
Augmentation of water supply scheme at Sanghshak in Ukhrul
NESIDS-OTRI NLCPR PHED 2009-09-04 6.9069 2011-09-03 6.0943 0 6.0943 6.0943 Completed
1734 MANIPUR Water Supply
Augmentation of water supply scheme at Sangpikot in Churachandpur
NESIDS-OTRI NLCPR PHED 2009-09-30 1.2501 2011-09-30 1.103 0 1.103 1.103 Completed
1735 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Singhat in Churachandpur
NESIDS-OTRI NLCPR PHED 2009-07-20 2.0464 2011-07-31 1.8057 0 1.8057 1.8057 Completed
1736 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Tadubi
NESIDS-OTRI NLCPR PHED 2004-10-28 4.3 2006-09-30 3.6954 0 3.6954 3.8704 Completed
1737 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Thanga (1.014 MLD) in Bishnupur, Manipur
NESIDS-OTRI NLCPR PHED 2010-12-15 5.3126 2012-12-31 4.6875 0 4.6875 4.6875 Completed
1738 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Thanlong in Churachandpur
NESIDS-OTRI NLCPR PHED 2009-07-16 2.1326 2011-07-31 1.8817 0 1.8817 1.8817 Completed
1739 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Tolloi in Ukhrul
NESIDS-OTRI NLCPR PHED 2011-12-19 3.2293 2013-10-31 2.8104 0 2.8104 2.8104 Completed
1740 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Tungjoy
NESIDS-OTRI NLCPR PHED 2007-12-31 2.1575 2009-06-30 1.9037 0 1.9037 1.9037 Completed
1741 MANIPUR Water Supply
Augmentation of Water Supply Scheme at Unopat and Surrounding village
NESIDS-OTRI NLCPR PHED 2008-03-31 2.9705 2010-03-31 2.6209 0 2.6209 2.6209 Completed
1742 MANIPUR Water Supply
Augmentation of water supply to Imphal City Phase-1 (29.5 MLD)
NESIDS-OTRI NLCPR PHED 1999-12-30 43.29 2004-12-31 38.957 0 38.957 42.532 Completed
1743 MANIPUR Water Supply
Basic Minimum services - Rural water supply
NESIDS-OTRI NLCPR PHED 1999-12-30 7 2002-12-26 6.3 0 6.3 7 Completed
1744 MANIPUR Water Supply
Composite Water Supply at Motbung in Senapati
NESIDS-OTRI NLCPR PHED 2009-07-20 2.5645 2011-07-31 2.2628 0 2.2628 2.2628 Completed
1745 MANIPUR Water Supply
Composite water supply for Senapati District Headquarter
NESIDS-OTRI NLCPR PHED 2003-02-28 4.68 2006-04-30 4.212 0 4.212 4.5138 Completed
1746 MANIPUR Water Supply
Composite water supply for Tamenglong District Headquarter
NESIDS-OTRI NLCPR PHED 2003-02-28 4.7 2005-12-31 4.23 0 4.23 4.463 Completed
1747 MANIPUR Water Supply
Rehabilitation of Khomidolk Water Supply System at Imphal East
NESIDS-OTRI NLCPR PHED 2010-02-05 4.5994 2012-02-15 4.0583 0 4.0583 4.0583 Completed
1748 MANIPUR Water Supply
Rehabilitation of Water Supply Scheme at Liyai Khullen in Senapati
NESIDS-OTRI NLCPR PHED 2009-07-16 3.4298 2011-07-31 3.0262 0 3.0262 3.0262 Completed
1749 MANIPUR Water Supply
Rural Water Supply Scheme at Nungba Sub-Division Headquarter
NESIDS-OTRI HADP Dept. of Power 2019-08-07 6.9 2021-09-17 5.3553 0 5.3553 5.3553 Ongoing
1750 MANIPUR Water Supply
Rural Water Supply Scheme for Haochong Sub-Division Headquarter & adjoining areas
NESIDS-OTRI HADP Dept. of Power 2019-08-07 4.78 2021-08-20 3.7297 0 3.7297 3.7297 Ongoing
1751 MANIPUR Water Supply
Upgradation of existing treatment plant at Bungmual from Lanva river source (Churachandpur District)-Zone-II
NESIDS-OTRI NLCPR PHED 2003-02-28 1.08 2006-03-31 0.918 0 0.918 1.0167 Completed
1752 MANIPUR Water Supply
Waithou Pat Water Supply Scheme
NESIDS-OTRI NLCPR PHED 2005-03-23 59.71 2008-03-31 52.4168 0 52.4168 52.8757 Completed
1753 MANIPUR Water Supply
Water Supply Scheme at Sapam in Thobal District, Manipur
NESIDS-OTRI NLCPR PHED 2010-10-13 2.5731 2012-10-15 2.2576 0 2.2576 2.2576 Completed
1754 MANIPUR Water Supply
Water Supply scheme at Tamah, Tamei Sub-Division, Tamenglong Dist.
NESIDS-OTRI HADP Dept. of Power 2019-08-07 9 2021-10-02 7.0924 0 7.0924 7.0924 Ongoing
1755 MANIPUR Water Supply
Water Supply Scheme by water conservation at Tamenglong HQ (Hangoipat at Carpentry area and Zelian lake) and Joulen
NESIDS-OTRI NLCPR PHED 2017-12-19 39.32 2019-12-19 35.063 0 35.063 35.063 Completed
1756 MANIPUR Water Supply
Water Supply Scheme in Government Polytechnic Campus, Takyel in Imphal West.
NESIDS-OTRI NLCPR PHED 2013-12-27 4.7904 2016-11-30 4.3113 0 4.3113 4.3113 Completed
1757 MANIPUR Education
Infrastructure Development for Dhanamanjuri University (DMU)
PM-DevINE Dept. of Higher & Technic 2024-06-13 70 2027-01-15 48 16 64 Ongoing
1758 MANIPUR Tourism and Culture
Establishment of an Artist's Village for promotion of world's most unique Pottery Art form Longpi Black Pottery of Manipur
PM-DevINE Other 2024-06-24 32.32 2027-01-15 8.0793 0 8.0793 Ongoing
1759 MANIPUR Education
Infrastructure Development for Manipur University of Culture at Wakha, Imphal East
PM-DevINE Dept. of Higher & Technic 2024-09-24 31.1864 2027-09-24 19.1721 6.3906 25.5627 Ongoing
1760 MANIPUR Agriculture and Allied
Women's Market at Tera Bazar, Manipur
Schemes of NEC Department of Municipal A 2024-09-04 2.94 2027-09-04 2.2098 0.66204 2.87184 1.8490367 Ongoing
1761 MANIPUR Transport and Communication
C/o of RCC Bridge at Kenseng Ashang Khullen(Kaka) over Maklang River Connecting international border
NESIDS-ROADS Public works Department 2024-09-06 11.96 2027-01-31 0.0981 0 0.0981 Ongoing
1762 MANIPUR Transport and Communication
Improvement of road from Bishnupur Chingdong to Khuman via Prengba Village, Loukiopat, Bishnupur, Awwangleikai, Maning Leikai, and Makha Leikai in Manipur
NESIDS-ROADS Public works Department 2024-09-09 11.01 2027-01-31 2.749 4 6.749 Ongoing
1763 MANIPUR Education
strengthening of 120 High School & Higher Secondary School in Manipur
NESIDS-OTRI Dept. of Education 2024-10-11 134.363 2026-10-31 18.075 18.075 36.15 Ongoing
1764 MANIPUR Health
Providing Superspeciality and assured speciality health care in remote and hill districts (infrastructure & equipment) in Manipur
PM-DevINE Dept. of Health & familly 2024-11-20 104.6611 2026-12-31 11.8448 0 11.8448 Ongoing
1765 MANIPUR Tourism and Culture
Development of Barak Heritage Festival and Tourism Infrastructure at Koide Biisho Village, Senapati, Manipur
Schemes of NEC Tourism Corporation of Ma 2024-11-01 4.41 2027-11-01 1.1025 0 1.1025 Ongoing
1766 MANIPUR Education
Provision for furniture and fixture for the Science Lab Block at United College, Chandel, Manipur
Schemes of NEC Tribal Affairs & Hills, M 2024-12-11 1.18 2027-12-11 1.1681 0 1.1681 0.5781 Ongoing
1767 MANIPUR Education
Provision for furniture and fixture for Construction of ST boys and Girls Hostel including the auditorium at St. Peter's Higher Secondary School, Chandel, Manipur
Schemes of NEC Tribal Affairs & Hills, M 2024-12-26 1.78 2024-12-26 0 0.7108982 0.7108982 Ongoing
1768 MANIPUR Power
Installation of grid connected SPV Power Plant of capacity 600kWP at 132/33 kv Elangkhangpokpi, Power sub-station, Kakching district in Manipur
NESIDS-OTRI Manipur Renewal Energy De 2025-01-20 33.394 2026-01-19 8.3485 8.3485 16.697 Ongoing
1769 MANIPUR Tourism and Culture
Development of Eco- Tourism site at Mantripukhri Khongnang Makhong, Imphal East District, Manipur
Schemes of NEC Tourism Corporationn of M 2025-03-25 2.7895 2028-03-25 0 Ongoing
1770 MANIPUR Agriculture and Allied
Integrated Farming for Upliftment of Huishu Village, Ukhrul District, Manipur
Schemes of NEC Department of Horticultur 2025-03-24 4 2028-03-24 2 1 3 1 Ongoing
1771 MANIPUR Education
Infrastructure Development of Oriental College, Takyel, Imphal West, Manipur
Schemes of NEC Director of University an 2025-03-11 6.225 2028-03-11 1.55 1.55 Ongoing
1772 MANIPUR Transport and Communication
Improvement of Road from Kamjong to Phungyar Junction via Bhungpakhunou
NESIDS-ROADS Public works Department 2025-05-19 27.73 2027-05-19 0 Ongoing
1773 MANIPUR Transport and Communication
Up-gradation of road from Mantripantha to Sapok, Charlong village
NESIDS-ROADS Public works Department 2025-05-22 39.99 2027-05-22 0 Ongoing
1774 MANIPUR Sports
Construction of multipurpose indoor stadium at Khuman lampak sports complex Imphal
NESIDS-OTRI PWD, Manipur 2025-07-03 36.2487 2026-05-31 0 0 0 Ongoing
1775 MANIPUR Transport and Communication
Up-gradation of road from NH-202 at Lamlai to Thoubal Dam in Manipur
NESIDS-ROADS Public works Department 2025-07-16 48.87 2027-07-16 1 7.3425 8.3425 Ongoing
1776 MANIPUR Education
Development of Allied infrastructure in Sainik School, Imphal
NESIDS-OTRI Sainik School Imphal 2025-10-06 21.81405 2028-10-06 0 Ongoing
1777 MANIPUR Infrastructure
Construction of Manipur International Convention Centre, Imphal, Phase-I
PM-DevINE Dept of Planning 2025-12-08 110.52 2027-12-08 0 Ongoing
1778 MANIPUR Sports
Construction of Football Stadium at Khoupum, Noney District, Manipur.
Schemes of NEC Youth Affairs & Sports De 2025-12-10 10.7735 2027-12-10 0 Ongoing
1779 MANIPUR Science and Technology
Plant for Collecting Plastic And Other Floating Debris from the Rivers in Manipur.
Schemes of NEC Directorate of Environmen 2026-02-16 9.9424 2028-02-16 0 Ongoing
1780 MANIPUR Water Supply
Augmentation of water supply scheme at kamjong district Head quarters
NESIDS-OTRI Kamjong P.H.E Division, P 2026-02-20 6.1314 2028-02-20 0 Ongoing
1781 MANIPUR Health
Establishment of College of Nursing at Jawaharlal Nehru Institute of Medical Science in Manipura
NESIDS-OTRI Health and family welfare 2026-03-16 49.5754 2028-03-16 0 Ongoing
1782 MANIPUR Tourism and Culture
Development of Eco-Tourism at Kaina Hillock, Imphal East District, Manipur.
Schemes of NEC Tourism Corporation of Ma 2026-03-30 4.7272 2028-03-30 0 Ongoing
1783 MANIPUR Transport and Communication
Improvement of road from Naharup Bridge at Khergao Road to Manipur Cultural University , Length-4.7 km
NESIDS-ROADS PWD roads 2026-06-18 9.94 2028-06-18 0 Ongoing
1784 MEGHALAYA Education
Construction of 23 Anganwadi Centre Building in Meghalaya
NESIDS-OTRI NESIDS Dept. of Power 2020-03-30 1.6 2024-12-31 1.1633 0 1.1633 1.1633 Ongoing
1785 MEGHALAYA Health
Procurement of Advance Life Support Ambulances (ALS) with equipment at an estimated cost of Rs. 3.65 crore in Meghalaya under NESIDS
NESIDS-OTRI NESIDS Dept. of Health & familly 2021-09-17 3.65 2021-09-17 0.7378 0 0.7378 Ongoing
1786 MEGHALAYA Health
Setting up of Corona Care Centre for Management of Covid-19 in Meghalaya
NESIDS-OTRI NESIDS Directorate of Health Ser 2020-06-03 10.0247 2021-03-31 8.2413 0 8.2413 5.8026 Ongoing
1787 MEGHALAYA Health
Strengthening of Diagnostic Services: State of the Art Diagnostic Centre at Pasteur Institute in Meghalaya
NESIDS-OTRI NESIDS Public Health & Engg Depa 2019-03-08 20 2024-12-31 19.71 0 19.71 9.855 Ongoing
1788 MEGHALAYA Agriculture and Allied
Construction of school/college buildings under 30 Central Sector Scheme of NEC in Mawshyrut C&RD Block, West Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2020-10-09 2.9 2023-10-09 2.9 0 2.9 2.9 Completed
1789 MEGHALAYA Agriculture and Allied
Construction of suspension footbridge connecting Bibrage to Rampragre across River Dareng(Span 100 Metres)
Schemes of NEC Schemes of NEC 2020-09-03 3 2023-09-03 3 0 3 3 Completed
1790 MEGHALAYA Agriculture and Allied
Construction of U Tirot Sing Market Complex, Mairang, West Khasi Hill district, Meghalaya
Schemes of NEC Schemes of NEC 2017-03-22 12.86 2020-03-22 12.86 0 12.86 12.86 Completed
1791 MEGHALAYA Agriculture and Allied
Creation of adequate infrastructure for scaling up spawn production in Meghalaya under Mushroom Mission
Schemes of NEC Schemes of NEC Other 2022-03-31 9.95 2025-03-31 9.95 0 9.95 9.95 Ongoing
1792 MEGHALAYA Agriculture and Allied
Development of a clustered livestock based integration network to ensure production of safe milk and meat in the state of Meghalaya (ICAR)
Schemes of NEC Schemes of NEC 2017-12-05 2.8525 2020-12-04 2.28 0 2.28 2.28 Foreclosed
1793 MEGHALAYA Agriculture and Allied
Establishment of poultry breeding farm-cum-hatchery with 3000 layers parent stock and 2000 broilers parent stock at Phulbari, West Garo Hills, District, Meghalaya.
Schemes of NEC Schemes of NEC 2015-06-16 5.6225 2018-06-16 4.0482 0 4.0482 4.05 Completed
1794 MEGHALAYA Agriculture and Allied
Honey Bee Mission
Schemes of NEC Schemes of NEC 2022-03-23 3 2025-03-23 4.8 0 4.8 3 Completed
1795 MEGHALAYA Agriculture and Allied
Honey Bee Mission(2023)
Schemes of NEC Schemes of NEC 2023-03-06 4.964 2026-03-31 4.9656 0 4.9656 4.96 Completed
1796 MEGHALAYA Agriculture and Allied
Horticulture Development Project in Nokrek Region of East Garo Hills District
Schemes of NEC Schemes of NEC 2010-03-23 4.3994 2013-03-23 3.96 0 3.96 3.96 Completed
1797 MEGHALAYA Agriculture and Allied
Ideal Fish and Fish Seed Production Farm and Multipurpose Development Project at Ishamati Village, Shella Bholaganj Block, Sohra Sub-Division, East Khasi Hills
Schemes of NEC Schemes of NEC 2010-03-23 1.1035 2014-03-23 1 0 1 1 Completed
1798 MEGHALAYA Agriculture and Allied
Poultry Entrepreneurship Programme under Meghalaya Livestock Mission
Schemes of NEC Schemes of NEC Choose... 2023-03-07 10 2026-03-07 0.1 0 0.1 Ongoing
1799 MEGHALAYA Agriculture and Allied
Promotion of Organic plantation of Khasi Mandarin Orange in Meghalaya
Schemes of NEC Schemes of NEC 2021-01-29 7.81 2024-03-29 7.81 0 7.81 7.81 Completed
1800 MEGHALAYA Agriculture and Allied
Proposal of identified block for providing key identified service at Bilkona village, Gasuapara Block, South Garo Hils, Meghalaya
Schemes of NEC Schemes of NEC 2022-03-31 1.99 2025-03-31 1.99 0 1.99 0.8 Completed
1801 MEGHALAYA Agriculture and Allied
Proposal of identified block for providing key identified service at Gasuapara, South Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC Other 2022-03-31 4.52 2025-03-31 4.522 0 4.522 1.81 Ongoing
1802 MEGHALAYA Agriculture and Allied
Proposal of identified block for providing key identified service at Langdongdai village, Mawshynrut Block, West Khasi Hills, Meghalaya
Schemes of NEC Schemes of NEC 2022-03-31 1.97 2025-03-31 1.9195 0 1.9195 0.6895 Ongoing
1803 MEGHALAYA Agriculture and Allied
Proposal of identified block for providing key identified service at Rongara, South Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2022-03-31 5 2025-03-31 5 0 5 5 Completed
1804 MEGHALAYA Agriculture and Allied
Rural Backyard Goatery under Meghalaya Livestock Mission
Schemes of NEC Schemes of NEC Veterinary Department 2023-03-21 5 2025-03-21 0 Foreclosed
1805 MEGHALAYA Agriculture and Allied
Rural Backyard Piggery under Meghalaya Livestock Mission
Schemes of NEC Schemes of NEC Choose... 2023-03-07 10 2026-03-07 0.1 0 0.1 Ongoing
1806 MEGHALAYA Agriculture and Allied
Setting up of 10 farmers' Markets @ Rs. 1.00 crore each
Schemes of NEC Schemes of NEC Meghalaya Basin Managemen 2022-03-30 9.9 2025-03-30 7.425 0 7.425 2.97 Ongoing
1807 MEGHALAYA Agriculture and Allied
Setting up of 20 farmers market @ Rs. 50.00 Lakh each (in all districts of the state)
Schemes of NEC Schemes of NEC 2021-02-18 10.9 2024-02-18 10.9 0 10.9 4.36 Ongoing
1808 MEGHALAYA Agriculture and Allied
Setting up of 20 farmers' Markets @ Rs. 50.00 lakh each
Schemes of NEC Schemes of NEC Meghalaya Basin Managemen 2022-03-31 9.94 2025-03-31 7.455 0 7.455 2.982 Ongoing
1809 MEGHALAYA Agriculture and Allied
Setting up of a Seed Testing Laboratory in Meghalaya
Schemes of NEC Schemes of NEC 2013-03-22 5.7542 2016-03-22 5.1788 0 5.1788 5.18 Completed
1810 MEGHALAYA Agriculture and Allied
Setting up of Bio-Curcumin Extraction Unit at Lashkein Block, West Jaintia Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2023-03-06 1.5 2026-03-18 1.5 0 1.5 0.6 Completed
1811 MEGHALAYA Agriculture and Allied
Strawberry Cultivation in Meghalaya.
Schemes of NEC Schemes of NEC 2004-08-20 3.08 2007-08-20 2.77 0 2.77 2.77 Completed
1812 MEGHALAYA Agriculture and Allied
Strengthening of Vocational Training Centre Under Kyrdemkulai
Schemes of NEC Schemes of NEC 2004-08-23 0.471 2007-08-23 0.42 0 0.42 0.42 Completed
1813 MEGHALAYA Agriculture and Allied
Strengthening of Vocational Training Centre, Rongkhom, Tura, Meghalaya.
Schemes of NEC Schemes of NEC 2006-02-28 0.1525 2009-02-28 0.14 0 0.14 0.14 Completed
1814 MEGHALAYA Agriculture and Allied
Tumeric Providing sustainable livelihood scientific method of organic production of turmeric (Curcuma longa along with crtification as organic produce C&RD Block, Ri-Bhoi district, Meghalaya
Schemes of NEC Schemes of NEC 2022-03-31 0.93 2025-03-31 0.9317834 0 0.9317834 0.928 Ongoing
1815 MEGHALAYA Agriculture and Allied
Upscaling the cultivation, post-harvest management processing of Lakadong Turmeric under Lakadong Mission
Schemes of NEC Schemes of NEC 2022-03-22 9.9654 2025-03-21 9.7462 0 9.7462 9.7538 Ongoing
1816 MEGHALAYA Education
Aspirational District Ri Bhoi District, Meghalaya
Schemes of NEC Schemes of NEC 2019-06-11 1 2022-06-11 1 0 1 1 Completed
1817 MEGHALAYA Education
Community Development Programme for Tiwa(lalung) Ri-Bhoi District, C&RD Block, Umsning
Schemes of NEC Schemes of NEC 2020-09-09 2.9478 2023-09-09 2.9519765 0 2.9519765 1.88 Ongoing
1818 MEGHALAYA Education
Construction of 2 storied Guest House (Phase I) at Shillong, Meghalaya
Schemes of NEC Schemes of NEC 2022-03-25 9.23 2025-03-25 1.3845 0 1.3845 1.3845 Ongoing
1819 MEGHALAYA Education
Construction of 54m Bailey Bridge over river Khynriem between Saibual and Moulasei, a Community Development Programme for BIATE Tribes East Jaintia Hills, C&RD Block, Saipung, Meghalaya
Schemes of NEC Schemes of NEC 2020-12-23 4.77 2023-12-23 1.91 0 1.91 0.01 Ongoing
1820 MEGHALAYA Education
Construction of Boarding School and Hostel Building for disabled students of Lynti Jam Welfare and Development Association at Mawtnum, Nongpoh, Ri Bhoi District
Schemes of NEC Schemes of NEC 2011-03-26 2.2714 2014-03-26 2.05 0 2.05 2.05 Completed
1821 MEGHALAYA Education
Construction of Boys & Girls Hostel of NEIMAs Orphanage-cum-Boarding School at Lad Mynrieng, Pynursla, East Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2018-04-10 1.9 2021-04-10 0.1 0 0.1 0.1 Completed
1822 MEGHALAYA Education
Construction of G4 building for Skill Development at Ramakrishna Mission Vivekananda Cultural Centre, Shillong
Schemes of NEC Schemes of NEC 2016-03-17 3.9312 2019-03-17 3.54 0 3.54 3.54 Completed
1823 MEGHALAYA Education
Construction of New Building in Capt.Williamson Sangma Memorial College, Baghmara, South Garo Hills
Schemes of NEC Schemes of NEC 2021-01-06 1.67 2024-01-06 1.6666 0 1.6666 1.0485 Completed
1824 MEGHALAYA Education
Construction of New Hostel Building for Girls in Nongtalang College, West Jaintia Hills
Schemes of NEC Schemes of NEC 2021-01-06 1.1029 2024-01-06 1.1029 0 1.1029 0.44 Completed
1825 MEGHALAYA Education
Construction of Nongkharai Christian Secondary School Building at Umsohpieng village, West Khasi Hills Distirct, Meghalaya
Schemes of NEC Schemes of NEC 2017-06-29 4.095 2020-06-29 4.095 0 4.095 4.1 Completed
1826 MEGHALAYA Education
Construction of RCC Bridge over river Lunar to connect Khaddum to Brichyrnot Village, East Jaintia Hills, Meghalaya for Hmar Community
Schemes of NEC Schemes of NEC 2022-03-27 4.91 2025-03-27 4.4 0 4.4 4.4 Ongoing
1827 MEGHALAYA Education
Construction of School Buildings at Mawthadraishan, West Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2022-03-15 4.7543 2025-03-31 4.7587 0 4.7587 2.4587 Ongoing
1828 MEGHALAYA Education
Focused Development of Deprived Areas Deprived Sections of the society by Promotion of Literacy by upgrading selected RKMission Schools in C&RD Block Mawsynram/Shella-Bholaganj in East Khasi Hills District & Ranikor C&RD Block in South West Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2020-12-29 4.3 2023-12-29 4.2988 0 4.2988 1.72 Completed
1829 MEGHALAYA Education
Focused Development of Deprived Areas Deprived Sections of the society by Promotion of Literacy by upgrading selected RKMission Schools in C&RD Block Mawsynram/Shella-Bholaganj in East Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2020-12-29 4.61 2023-12-29 4.6058 0 4.6058 1.84 Completed
1830 MEGHALAYA Education
Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Jalaphet and RKM School, Laitlyngkot)
Schemes of NEC Schemes of NEC 2022-03-25 4.45 2025-03-25 4.4465 0 4.4465 1.42 Ongoing
1831 MEGHALAYA Education
Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Laitlyndop and RKM School, Mylliem)
Schemes of NEC Schemes of NEC 2022-03-24 4.23 2025-03-24 4.23 0 4.23 1.35 Ongoing
1832 MEGHALAYA Education
Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Mawsmai)
Schemes of NEC Schemes of NEC 2022-03-25 2.2504 2025-03-25 2.2504 0 2.2504 0.72 Ongoing
1833 MEGHALAYA Education
Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Umploh and RKM School, Mawkynrew)
Schemes of NEC Schemes of NEC 2022-03-24 4.48 2025-03-24 4.4779 0 4.4779 1.43 Ongoing
1834 MEGHALAYA Education
Introduction of Interactive Digital Classroom for Development of Science and Mathematics in 24 Schools (3 classroom each) in the State of Meghalaya
Schemes of NEC Schemes of NEC 2014-03-05 4.5586 2017-03-05 4.11 0 4.11 4.11 Completed
1835 MEGHALAYA Education
Procurement of equipments, Furniture and Fixture etc. for the Skill Development Centre at Ramakrishna Mission, Shillong.
Schemes of NEC Schemes of NEC 2016-10-28 2.5 2019-10-28 2.25 0 2.25 2.25 Completed
1836 MEGHALAYA Education
Strengthening and Restructuring of College of Teacher of Education (PGT), Shillong.
Schemes of NEC Schemes of NEC 2014-03-05 2.8885 2019-03-05 2.8885 0 2.8885 2.89 Completed
1837 MEGHALAYA Sports
Construction of Multipurpose Indoor Stadium at Garobadha, South West Garo Hills District, Meghalaya.
Schemes of NEC Schemes of NEC Youth Affairs and Sports 2014-03-05 6.8187 2017-03-31 6.0697 0 6.0697 6.07 Foreclosed
1838 MEGHALAYA Sports
Construction of building for accomodation of Sports persons, officials, etc at JNS Complex, Polo Ground, Shillong
Schemes of NEC Schemes of NEC 2014-03-05 3.68 2019-09-02 3.31 0 3.31 3.31 Completed
1839 MEGHALAYA Sports
Construction of Football Ground at Saitsnad, Mawlangwir, SW Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2017-03-21 3.9611 2020-06-08 3.9611 0 3.9611 3.96 Completed
1840 MEGHALAYA Sports
Construction of Indoor Stadium at Madan Tukhon, Jongksha, Meghalaya.
Schemes of NEC Schemes of NEC 2017-04-20 13.4503 2023-12-29 12.2851 0.93 13.2151 13.2151 Ongoing
1841 MEGHALAYA Sports
Construction of Indoor Stadium Sports Hall at Tpep Pale, Jowai, Jaintia Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2014-03-05 2.0176 2017-03-05 1.82 0 1.82 1.82 Completed
1842 MEGHALAYA Sports
Construction of infrastructure for integrated training of the youth and sports cum convention Hall, Lower Chandmari, West Garo Hills District, Tura.
Schemes of NEC Schemes of NEC 2014-03-05 5.237 2018-03-05 4.7133 0 4.7133 4.71 Completed
1843 MEGHALAYA Sports
Construction of Mini Football Stadium at Dalu, West Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2018-03-07 2.9 2021-03-07 2.899 0 2.899 2.9 Completed
1844 MEGHALAYA Sports
Construction of Mini Outdoor Stadium at Gambegre, West Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2018-02-28 4.04 2021-02-28 3.03 0.8 3.83 3.2047091 Ongoing
1845 MEGHALAYA Sports
Construction of V.I.P Gallery, RCC Covered Public Sitting Gallery, Sitting Arrangements Including of Improvement of Playground at Chondon Nokat, South Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2018-02-28 2.15 2021-02-28 2.1545 0 2.1545 2.15 Completed
1846 MEGHALAYA Irrigation and Flood Control
Construction of embankment cum road including sluice gates and protection works on the left bank of river Galwang on the Mandagre to Salsella-Balachanda road at Haldibari (3.35 km), West Garo Hills District, Meghalaya.
Schemes of NEC Schemes of NEC 2017-06-23 10.4 2020-06-23 9.36 0 9.36 9.36 Completed
1847 MEGHALAYA Irrigation and Flood Control
Construction of Seinraij Jowai Community Hall cum Recreational Centre at Loompyrdi Iongpiah, West Jaintia Hills District, Jowai, Meghalaya
Schemes of NEC Schemes of NEC Dept. of Power 2023-03-31 4.17 2026-03-31 1.04 1.04 2.08 1.04 Ongoing
1848 MEGHALAYA Irrigation and Flood Control
Creating necessary Infrastructure for Storage of water to meet the Emergency needs of the State capital(Meghalaya), East Khasi Hills Dist.
Schemes of NEC Schemes of NEC 2014-02-28 15 2017-02-28 13.5 0 13.5 13.5 Completed
1849 MEGHALAYA Irrigation and Flood Control
Integrated programme for water impounding and creation of water body for recharging catchment areas, restoring depleting water table and improving river hydrology at Belbari village across Wanangjhora stream, South West Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2017-06-28 3.09 2020-06-28 0.1 0 0.1 0.1 Completed
1850 MEGHALAYA Irrigation and Flood Control
Integrated programme for water impounding and creation of water body for recharging catchment areas, restoring depleting water table and improving river hydrology at Chandagre village across Ringre stream, West Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2017-06-28 1.79 2020-06-28 0.1 0 0.1 0.1 Completed
1851 MEGHALAYA Irrigation and Flood Control
Integrated programme for water impounding and creation of water body for recharging catchment areas, restoring depleting water table and improving river hydrology at Chondon Nokat village across Chondon stream, South West Garo Hills District, Meghalaya.
Schemes of NEC Schemes of NEC 2017-06-29 2.09 2020-06-29 1.881 0 1.881 1.88 Completed
1852 MEGHALAYA Irrigation and Flood Control
Integrated programme for water impounding and creation of water body for recharging catchment areas, restoring depleting water table and improving river hydrology at Matkolgre village across Sona stream, South West Garo Hills District, Meghalaya.
Schemes of NEC Schemes of NEC 2017-06-28 5.36 2019-06-28 4.824 0 4.824 4.82 Completed
1853 MEGHALAYA Irrigation and Flood Control
Irrigation cum Management Works at Umtrew Umkta Village, Ri-Bhoi District, Meghalaya.
Schemes of NEC Schemes of NEC 2015-10-06 8.2344 2018-10-06 7.41 0 7.41 7.41 Completed
1854 MEGHALAYA Irrigation and Flood Control
Mawshbuit Combined Water Supply Project Phase-I, East Khasi Hills District.
Schemes of NEC Schemes of NEC 2017-04-17 6.6 2020-04-17 5.9371 0 5.9371 5.94 Completed
1855 MEGHALAYA Irrigation and Flood Control
Proposal of identified backward block for providing key identified services at Chokpot Block, South Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2023-02-17 4.74 2026-02-17 3.896 0 3.896 3.896 Ongoing
1856 MEGHALAYA Irrigation and Flood Control
Proposal of identified backward block for providing key identified services under 30 PC Component at Mawshynrut C&RD Block, Meghalaya
Schemes of NEC Schemes of NEC Other 2023-02-17 4.88 2026-02-17 4.885 0 4.885 4.88 Completed
1857 MEGHALAYA Irrigation and Flood Control
Survey & Investigation and preparation of DPR of Umngot HEP(3X70MW), Stage-I, east Khasi Hills & West Jaintia Hills District, Megahalaya
Schemes of NEC Schemes of NEC 2006-10-26 8.35 2008-10-24 7.411 0 7.411 7.41 Completed
1858 MEGHALAYA Irrigation and Flood Control
Survey & Investigation of Ganol St-II HEP (3x5 MW), Meghalaya
Schemes of NEC Schemes of NEC 2008-11-19 2.11 2011-11-19 1.9 0 1.9 1.9 Completed
1859 MEGHALAYA Industries
C/o of Khadi Plaza/ Market complex of Meghalaya Khadi & Village Industres Board at Barik Point
Schemes of NEC Schemes of NEC 2021-03-31 2.7377 2024-03-31 2.7377 0 2.7377 2.13 Completed
1860 MEGHALAYA Industries
Construction of a Rural Market Complex at Sohiong Village in the East Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2016-10-20 11.73 2019-10-20 10.557 0 10.557 10.56 Completed
1861 MEGHALAYA Industries
Construction of RCC G4 Commercial Building of Iewdak Laban Municipal Market, Shillong for sale of Agriculture, Horticulture, Handicraft, Piggery, Floriculture Products, etc
Schemes of NEC Schemes of NEC 2022-03-31 14.275 2025-03-31 14.275 0 14.275 10.350625 Ongoing
1862 MEGHALAYA Industries
Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Meghalaya
Schemes of NEC Schemes of NEC 2020-08-17 3 2023-08-17 3 0 3 3 Completed
1863 MEGHALAYA Industries
Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19, in the state of Meghalaya PHASE-II
Schemes of NEC Schemes of NEC 2020-11-24 3 2023-11-24 3 0 3 3 Completed
1864 MEGHALAYA Industries
Setting up of a lime manufacturing factory by M/s. Pillar Nongkhlaw Lime Factory, Laitsohpliah, Sohra Syiemship, East Khasi Hills, Meghalaya
Schemes of NEC Schemes of NEC 2006-09-28 0.3584 2008-09-28 0.32 0 0.32 0.32 Completed
1865 MEGHALAYA Industries
Setting up of a Manufacturing of Wax Candls Industry by M/s Resa Candles Industries, Riat Laban, Shillong,
Schemes of NEC Schemes of NEC 2006-09-28 0.1417 2009-09-28 0.13 0 0.13 0.13 Completed
1866 MEGHALAYA Industries
Setting up of a Modern Rice Mill by M/s. V.M. Modern Rice Mill, Umiam Industrial Area, Ri-Bhoi District
Schemes of NEC Schemes of NEC 2006-03-11 0.8865 2009-03-11 0.8 0 0.8 0.8 Completed
1867 MEGHALAYA Industries
Setting up of Livelihood Centre and Design, Innovation & Training Workshops on Water Hyacinth Craft Cluster in Meghalaya
Schemes of NEC Schemes of NEC 2023-03-17 3.69 2026-03-17 3.6953822 0 3.6953822 1.112844 Ongoing
1868 MEGHALAYA Industries
Setting up of Model Handloom Production Centre at Marngar, Ri-Bhoi District, Meghalaya
Schemes of NEC Schemes of NEC 2017-12-29 1.43 2020-12-29 1.43 0 1.43 1.43 Completed
1869 MEGHALAYA Industries
Setting up of Model Handloom Production Centre at Phulbari, West Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC Meghalaya Basin Managemen 2017-12-29 2.1 2020-12-29 2.1 0 2.1 2.1 Completed
1870 MEGHALAYA Industries
Setting up of Rural EntrepreneurshipCentre at Sohparu, West Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC Dept. of Power 2017-06-29 2.96 2020-06-29 2.96 0 2.96 2.96 Completed
1871 MEGHALAYA Industries
Setting up of Rural EntrepreneurshipCentre East Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC Dept. of Power 2017-06-29 3.01 2020-06-29 3.01 0 3.01 3 Completed
1872 MEGHALAYA Industries
Setting up of Rural EntrepreneurshipCentre North Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC Dept. of Power 2017-06-29 3.02 2020-06-29 3.02 0 3.02 3.02 Completed
1873 MEGHALAYA Industries
Setting up of Rural EntrepreneurshipCentre South Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC Dept. of Power 2017-06-29 3 2020-06-29 3 0 3 3 Completed
1874 MEGHALAYA Industries
Upgradation, Improvement and Widening of roads within Industrial Estate at Umiam, Ri Bhoi District, Meghalaya
Schemes of NEC Schemes of NEC 2017-03-23 13.5327 2020-03-23 12.18 0 12.18 12.18 Completed
1875 MEGHALAYA Information and Public Relatio
Construction of Cultural Infrastructure of Six(6) Sien Raij in East and West Jaintia Hills Districts, Meghalaya
Schemes of NEC Schemes of NEC Other 2023-03-31 1.9308034 2026-03-31 1.729 0 1.729 1.339075 Completed
1876 MEGHALAYA Information and Public Relatio
Development of Culture Complex of Seng Khasi Ri Raid Laban at Lum Shat Sngi, Kenches Trace, Shillong, Meghalaya
Schemes of NEC Schemes of NEC 2024-01-30 9.28 2027-01-30 7.56 0 7.56 6.06 Ongoing
1877 MEGHALAYA Information and Public Relatio
Don Bosco Community Information Centre, Mawlai, Shillong
Schemes of NEC Schemes of NEC 2012-05-01 3.3901 2015-05-01 3.051 0 3.051 3.05 Completed
1878 MEGHALAYA Information and Public Relatio
Don Bosco Community Information Centre, Mawlai, Shillong
Schemes of NEC Schemes of NEC 2012-05-01 3.39 2015-05-01 3.05 0 3.05 3.05 Completed
1879 MEGHALAYA Information and Public Relatio
North East Green Summit organised by North Eastern Hill University
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.075 2021-04-01 0 Completed
1880 MEGHALAYA Information and Public Relatio
Providing Show Case/ Galleries, Lighting, etc in the New building of Williamson Sangma State Museum, Shillong, Meghalaya
Schemes of NEC Schemes of NEC Dept of Art and Culture 2015-06-05 6.1755 2018-06-05 5.5579 0 5.5579 5.5579 Completed
1881 MEGHALAYA Information and Public Relatio
Providing Sound and Light to Multipurpose Hall at Shillong International Centre for Performing Arts & Culture(SICPAC), Mawkasiang, East Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2021-02-22 9.8044 2026-01-30 9.8018 0 9.8018 9.7 Completed
1882 MEGHALAYA Health
Accident & Trauma Center, Jowai, Meghalaya
Schemes of NEC Schemes of NEC 2007-03-27 0.8 2009-03-27 0.72 0 0.72 0.72 Completed
1883 MEGHALAYA Health
Accident & Trauma Center, Tura, Meghalaya
Schemes of NEC Schemes of NEC 2007-03-27 0.8 2009-03-27 0.72 0 0.72 0.72 Completed
1884 MEGHALAYA Health
Establishment of 6 bedded ICUs each at Civil Hospital, Tura and Ganesh Das Hospital, Shillong, Meghalaya
Schemes of NEC Schemes of NEC 2010-01-15 4.7703 2013-01-15 4.05 0 4.05 4.05 Completed
1885 MEGHALAYA Health
Improvement and Up-gradation of SAN-KER, Shillong, Meghalaya
Schemes of NEC Schemes of NEC 2016-07-20 3.25 2019-07-20 2.925 0 2.925 2.93 Completed
1886 MEGHALAYA Health
Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Meghalaya for activities related to combating COVID-19 pandemic
Schemes of NEC Schemes of NEC 2020-04-01 3 2020-04-01 3 0 3 3 Completed
1887 MEGHALAYA Health
Support for Procurment of an M.R.I. (1.5 T) machine at Civil Hospital, Shillong, Meghalaya
Schemes of NEC Schemes of NEC 2012-07-08 4.98 2015-07-08 4.48 0 4.48 4.48 Completed
1888 MEGHALAYA Health
Support of (1.5T) MRI Machine at Tura Civil Hospital, Meghalaya
Schemes of NEC Schemes of NEC Choose... 2023-03-31 6.69 2026-03-31 6.5253 0.1672 6.6925 5.02 Ongoing
1889 MEGHALAYA Health
Support of Bawri Nethralaya, Shillong, Meghalaya
Schemes of NEC Schemes of NEC 2005-07-28 0.75 2009-07-28 0.675 0 0.675 0.68 Completed
1890 MEGHALAYA Health
Up-gradation of Equipment Infrastructure and Development of District Hospitals, Meghalaya
Schemes of NEC Schemes of NEC 2012-11-16 9.4967 2015-11-16 8.547 0 8.547 8.55 Completed
1891 MEGHALAYA Health
Up-gradation of Laboratory and Diagnostic facilities and setting up of Orthopedic Operation Theatre at Civil Hospital, Tura, Meghalaya
Schemes of NEC Schemes of NEC 2012-01-03 4.9491 2015-01-03 3 0 3 3 Completed
1892 MEGHALAYA Health
Upgradation of Equipment infrastructure for establishment of Dialiasis Unit, Endoscopy Unit, Major OT upgradation & 10 bedded Casualty & Emergency Ward at Civil Hospital, Shillong, Meghalaya
Schemes of NEC Schemes of NEC 2011-03-31 4.984 2014-03-31 4.25 0 4.25 4.25 Completed
1893 MEGHALAYA Power
2nd Circuit 132 kV S/C Transmission Line between Stage III and Stage IV in Meghalaya
Schemes of NEC Schemes of NEC 2007-02-08 4.212 2009-02-08 3.79 0 3.79 3.79 Completed
1894 MEGHALAYA Power
Augmentation of 132/33kV Substation from 20 MVA 3x3.5mVA to 2x20 MVA2x5mVA at Ronkhong, West Garo District Hills
Schemes of NEC Schemes of NEC 2010-09-08 4.69 2013-09-08 4.22 0 4.22 4.22 Completed
1895 MEGHALAYA Power
Construction of 132 KV D/C on LILO on Mawlai-Cherra S/C Line at Mawngap Sub-Station, Meghalaya.
Schemes of NEC Schemes of NEC 2010-01-19 4.9674 2014-01-19 4.47 0 4.47 4.47 Completed
1896 MEGHALAYA Power
Construction of 132 KV LILO of Sumer NEHU Line at 132/33 KV, 2x20 MVA Substation at Umiam, Meghalaya.
Schemes of NEC Schemes of NEC 2009-01-23 4.94 2012-01-23 4.45 0 4.45 4.45 Completed
1897 MEGHALAYA Power
Construction of 132 KV S/c Transmission line on D/C tower from Agia (Assam) to Nangalbibra (Megh), (110 KM).
Schemes of NEC Schemes of NEC 2007-03-19 43.32 2010-03-19 38.988 0 38.988 38.99 Completed
1898 MEGHALAYA Power
Construction of 132/33 KV , 2X20 MVA S/s at Mendipathar (Ph-II), East Garo Hills, Meghalaya
Schemes of NEC Schemes of NEC 2012-01-04 4.85 2015-01-04 4.37 0 4.37 4.37 Completed
1899 MEGHALAYA Power
Construction of 132/33 KV , 2X20 MVA S/s at Umiam in Meghalaya.
Schemes of NEC Schemes of NEC 2008-08-07 4.7972 2012-08-07 4.32 0 4.32 4.32 Completed
1900 MEGHALAYA Power
Construction of 132/33 KV, 2 X 20 MVA Sub-Station at Mendipathar, Meghalaya.
Schemes of NEC Schemes of NEC 2009-10-21 4.71 2012-10-21 4.24 0 4.24 4.24 Completed
1901 MEGHALAYA Power
Construction of 33kV Line from Byrnihat to Nongpoh with a provision of D/C line, Ribhoi, Meghalaya
Schemes of NEC Schemes of NEC 2013-12-20 4.4455 2018-03-31 4 0 4 4 Completed
1902 MEGHALAYA Power
Construction of Lakhroh Mini Hydel Project (1x1500kW), W. Jaintia Hills, Meghalaya
Schemes of NEC Schemes of NEC 2008-03-25 5 2012-03-25 4.5 0 4.5 4.5 Completed
1903 MEGHALAYA Power
Construction of LILO on 132 KV Agia-Nangalbibra Line at Mendipathar, Meghalaya.
Schemes of NEC Schemes of NEC 2009-12-09 4.9965 2012-12-09 4.5 0 4.5 4.5 Completed
1904 MEGHALAYA Power
Construction of LILO on 132 KV Mawlai-Nangalbibra Line at Mawngap S/s
Schemes of NEC Schemes of NEC 2011-03-22 4.94 2014-03-22 4.45 0 4.45 4.45 Completed
1905 MEGHALAYA Power
Construction of new 33KV line on ST pole with Raccoon conductor from Khiehtyrshi to Wahiajer 33/11KV, 5.0 MVA substation with control room, Meghalaya
Schemes of NEC Schemes of NEC 2012-11-21 3.4037 2015-11-21 3.06 0 3.06 3.06 Completed
1906 MEGHALAYA Power
Improvement of Power supply in Dadenggre area by construction of new 33kV S/C line from Rongkhon to Dadenggre and strengthening of the 11kV and LT network under West Garo Hills (D) Division.
Schemes of NEC Schemes of NEC 2016-03-18 5.7 2019-03-18 1 0 1 1 Completed
1907 MEGHALAYA Power
Installation & Commissioning of Communication Network & remote terminal unit at 132KV Sub-Station for supervisory control and data acquisition of MeECL, Meghalaya
Schemes of NEC Schemes of NEC 2010-12-23 3.9543 2013-12-23 3.56 0 3.56 3.56 Completed
1908 MEGHALAYA Power
Installation of 220/132kV, 1x100 MVA Auto transformer at Agia (Assam) for Meghalya
Schemes of NEC Schemes of NEC 2011-03-08 11.43 2014-03-08 10.29 0 10.29 10.29 Completed
1909 MEGHALAYA Power
Installation of Capacitor Bank at 33 KV Umtru Switchyard & 132 KV EPIP-I at Byrnihat, Meghalaya.
Schemes of NEC Schemes of NEC 2008-03-25 3.1 2010-03-25 2.79 0 2.79 2.79 Completed
1910 MEGHALAYA Science and Technology
Computerisation of Educational Research & Training and District Institutes of Education & Training in Meghalaya
Schemes of NEC Schemes of NEC 2011-03-30 0.4807 2014-03-30 0.4807 0 0.4807 0.48 Completed
1911 MEGHALAYA Science and Technology
Establishment of NE RS & GIS Resource Network (NeSDR), North Eastern Space Application Centre (NESAC), Umiam, Shillong
Schemes of NEC Schemes of NEC 2017-02-15 4.0137 2020-02-15 4.0137 0 4.0137 4.01 Completed
1912 MEGHALAYA Science and Technology
Financial Assistance for Setting up of Community Information & Education Centres in NERCMP Project Districts
Schemes of NEC Schemes of NEC 2011-08-24 0.25 2014-08-24 0.25 0 0.25 0.25 Completed
1913 MEGHALAYA Science and Technology
Financial Assistance for Setting Up of Community Information and education Centre in NERCMP Project Districts
Schemes of NEC Schemes of NEC 2009-03-31 0.35 2012-03-31 0.35 0 0.35 0.35 Completed
1914 MEGHALAYA Science and Technology
Financial Assistance towards Procurement of Computers & Peripherals for NERCMP
Schemes of NEC Schemes of NEC 2009-02-28 0.2534 2012-02-28 0.2534 0 0.2534 0.25 Completed
1915 MEGHALAYA Science and Technology
Geophysical Studies in Southern Part of Shillong Plateau, Meghalaya using Micro-earthquake Technique
Schemes of NEC Schemes of NEC 2012-03-12 0.9 2015-03-12 0.9 0 0.9 0.9 Completed
1916 MEGHALAYA Science and Technology
Hi-tech seed production in Potato through Tissue Culture & Aeroponic System in NEH Region by Central Potato Research Station, Shillong .ICAR UNIT CPRI, SHIMLA
Schemes of NEC Schemes of NEC 2017-01-02 0.97 2020-01-02 0.97 0 0.97 0.97 Completed
1917 MEGHALAYA Science and Technology
IT based science & technology education programme at 100 schools in Meghalaya
Schemes of NEC Schemes of NEC 2010-03-25 1.48 2013-03-25 1.48 0 1.48 1.48 Completed
1918 MEGHALAYA Science and Technology
IT College Education Programme at Synod College for library, books, etc
Schemes of NEC Schemes of NEC 2005-03-31 0.0051 2008-03-31 0.0051 0 0.0051 0.01 Completed
1919 MEGHALAYA Science and Technology
IT Education Infrastructure at 100 Schools in 11 Districts of Meghalaya (Dept. of Information Technology, Govt. of Meghalaya)
Schemes of NEC Schemes of NEC 2013-12-19 4.9728 2016-12-19 4.4755 0 4.4755 4.48 Completed
1920 MEGHALAYA Science and Technology
IT Education Programme at 100 schools in Meghalaya, Meghalaya Information Technology Society, Shillong Meghalaya
Schemes of NEC Schemes of NEC 2012-02-28 4.4155 2015-02-28 4.4155 0 4.4155 4.42 Completed
1921 MEGHALAYA Science and Technology
IT Education Programme for 25 Schools in Meghalaya for 2009-10
Schemes of NEC Schemes of NEC 2009-08-07 1.1655 2011-08-07 1.1655 0 1.1655 1.17 Completed
1922 MEGHALAYA Science and Technology
IT School Education Programme for 14 Schools by M/S Nice Infotech, Shillong
Schemes of NEC Schemes of NEC 2005-03-31 0.3462 2008-03-31 0.3462 0 0.3462 0.35 Completed
1923 MEGHALAYA Science and Technology
Master Plan of Action for Utilization of Space Technology in North Eastern Region by NESAC, Umiam
Schemes of NEC Schemes of NEC 2011-03-30 0.95 2014-03-30 0.95 0 0.95 0.95 Completed
1924 MEGHALAYA Science and Technology
MBOSE eGovernance & Online Connectivity (Meghalaya)
Schemes of NEC Schemes of NEC 2010-03-15 2.303 2013-03-15 2.303 0 2.303 2.3 Completed
1925 MEGHALAYA Science and Technology
North Eastern District Natural Resources Plan (NEDRP) for North Eastern Region NER
Schemes of NEC Schemes of NEC 2013-03-25 1.4425 2016-03-25 1.4425 0 1.4425 1.44 Completed
1926 MEGHALAYA Science and Technology
Office of Automation of SMELC (Social Mobilization Experimentation & Learning Centre) Building at Tura, Weat Garo Hills
Schemes of NEC Schemes of NEC 2012-06-14 0.4 2015-06-14 0.4 0 0.4 0.4 Completed
1927 MEGHALAYA Science and Technology
Procurement of Multi-functional Color Photocopier for Social Mobilization Experimentation and Learning Centre (SMELC) under NERCMP, at Tura, Meghalaya
Schemes of NEC Schemes of NEC 2005-03-31 0.0475 2008-03-31 0.0475 0 0.0475 0.05 Completed
1928 MEGHALAYA Science and Technology
Recalling the Great Shillong Earthquake Quest for a reliable & effective mitigation and post disaster response strategies on 12th June, 2017
Schemes of NEC Schemes of NEC 2017-06-19 0.04 2020-06-19 0.04 0 0.04 0.04 Completed
1929 MEGHALAYA Science and Technology
Setting up of 50 Community Information & Education Centres in NERCMP Project Districts
Schemes of NEC Schemes of NEC 2010-01-18 0.5 2013-01-18 0.5 0 0.5 0.5 Completed
1930 MEGHALAYA Science and Technology
Setting up of digital planetarium at NEHU Campus, Tura (henceforth been named Setting up of digital planetarium in the Shillong Science Centre.)
Schemes of NEC Schemes of NEC 2012-11-30 2.4751 2015-11-30 2.2176 0 2.2176 1.35 Completed
1931 MEGHALAYA Science and Technology
To Support IT Education Programme in Meghalaya
Schemes of NEC Schemes of NEC 2011-03-26 2.212 2014-03-26 2.212 0 2.212 2.21 Completed
1932 MEGHALAYA Science and Technology
Use of Unmanned Aerial Vehicle (UAV) Remote Sensing (UAV-RS) for the States of NE Region (NER), Shillong
Schemes of NEC Schemes of NEC 2017-01-02 0.75 2020-01-02 0.75 0 0.75 0.75 Completed
1933 MEGHALAYA Transport and Communication
Agia-Medhipara-Phulbari-Tura
Schemes of NEC Schemes of NEC 2010-01-19 65.65 2013-01-20 59.09 0 59.09 59.09 Completed
1934 MEGHALAYA Transport and Communication
Barapani-Umroi-Mawlasnai
Schemes of NEC Schemes of NEC 2009-10-21 20.53 2012-10-21 19.38 0 19.38 19.38 Completed
1935 MEGHALAYA Transport and Communication
Cherra-Mawsmai-Shella raod
Schemes of NEC Schemes of NEC 2006-09-25 38.42 2009-09-25 35.43 0 35.43 35.43 Completed
1936 MEGHALAYA Transport and Communication
Improvement of Jowai-Khanduli-Baithalangsu road
Schemes of NEC Schemes of NEC 2011-02-23 67.36 2014-02-23 60.62 0 60.62 60.62 Completed
1937 MEGHALAYA Transport and Communication
Improvement of Mankachar-Mahendraganj road
Schemes of NEC Schemes of NEC 2006-03-17 28.67 2009-03-17 25.8 0 25.8 25.8 Completed
1938 MEGHALAYA Transport and Communication
ISBT Mawlai - Mawiong
Schemes of NEC Schemes of NEC 2013-01-28 48.31 2016-01-28 41.952 0 41.952 41.95 Completed
1939 MEGHALAYA Transport and Communication
Lad Moolamanoh-Mushut
Schemes of NEC Schemes of NEC 2005-10-15 3.6777 2008-10-15 3.31 0 3.31 3.31 Completed
1940 MEGHALAYA Transport and Communication
Metalling & Black toping of Rymbai-Jalalpur
Schemes of NEC Schemes of NEC 2005-07-14 4.94 2008-07-14 4.5 0 4.5 4.5 Completed
1941 MEGHALAYA Transport and Communication
Rymbai-Bataw-Borsora-Jalalpur road
Schemes of NEC Schemes of NEC 2005-12-26 40.3149 2008-12-27 36.28 0 36.28 36.28 Completed
1942 MEGHALAYA Transport and Communication
Safety and Security infrastructure at Barapani Airport
Schemes of NEC Schemes of NEC 2013-02-20 28.45 2016-02-20 17.07 0 17.07 17.07 Completed
1943 MEGHALAYA Transport and Communication
Silchar-Dwarband-Gaglacherra-Phaisen Road
Schemes of NEC Schemes of NEC 2004-08-18 9.68 2007-08-19 9.11 0 9.11 9.11 Completed
1944 MEGHALAYA Transport and Communication
Sutnga-Sumer
Schemes of NEC Schemes of NEC 2009-12-09 4.88 2012-12-12 4.5 0 4.5 4.5 Completed
1945 MEGHALAYA Transport and Communication
Upgradation Agia-Medhipra-Phulbari-Tura road (Balance work)
Schemes of NEC Schemes of NEC 2010-03-23 90.64 2013-03-23 81.58 0 81.58 81.58 Completed
1946 MEGHALAYA Tourism and Culture
Construction of Eco-Tourism Park at Langkawet, East Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2015-06-16 1.374 2018-06-16 1.24 0 1.24 1.24 Completed
1947 MEGHALAYA Tourism and Culture
Construction of guest house and wayside amenities at Swangngrei Hamegaon, West Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2017-03-22 4.045 2020-03-22 3.6405 0 3.6405 3.64 Completed
1948 MEGHALAYA Tourism and Culture
Construction of tea boutique and eco-tourist lodge in Umsning, Ri Bhoi District, Meghalaya for promotion of Tea Tourism
Schemes of NEC Schemes of NEC 2020-11-25 2.77 2024-03-31 2.77 0 2.77 1.86 Completed
1949 MEGHALAYA Tourism and Culture
Construction of Tourism Infrastructure at Laitlyngkot (Lamlyer) in East Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC Other 2023-03-31 4.65 2026-03-31 4.1825 0 4.1825 4.1825 Ongoing
1950 MEGHALAYA Tourism and Culture
Development of Ballonggre Songitcham in West Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2017-03-22 1.6851 2020-03-22 1.2144 0 1.2144 1.21 Completed
1951 MEGHALAYA Tourism and Culture
Development of Omed Ni Jamdap at Rajasimla, North Garo Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2017-03-22 0.9061 2020-03-22 0.8154 0 0.8154 0.82 Completed
1952 MEGHALAYA Tourism and Culture
Eco-Resort at Nongkhlaw, West Khasi Hills District, Meghalaya
Schemes of NEC Schemes of NEC 2017-03-22 1.2887 2020-03-22 0.9278 0 0.9278 0.93 Completed
1953 MEGHALAYA Tourism and Culture
Orchid Lake Resort Development, Umiam, Ri Bhoi District, Meghalaya
Schemes of NEC Schemes of NEC 2014-03-05 7.6061 2016-03-05 6.85 0 6.85 6.85 Completed
1954 MEGHALAYA Tourism and Culture
Rural Eco Tourism Circuit in Garo Hills (East Garo Hills, West Garo Hills and South West Garo Hills), Meghalaya
Schemes of NEC Schemes of NEC Dept. of Power 2017-03-22 14.39 2020-03-22 13.2639608 0 13.2639608 12.4329608 Completed
1955 MEGHALAYA Tourism and Culture
Village/Rural Tourism under Cooperative Sector for Wahkdait Pashum Ropeway Transport, Fruit and Vegetable Processing Unit & Livestock Cooperative society Ltd. in Pynursla C&RD Block East Khasi Hills District.
Schemes of NEC Schemes of NEC 2017-12-28 0.3791 2020-12-28 0.136 0 0.136 0.14 Completed
1956 MEGHALAYA Infrastructure
Construction of IT Park at Tura, West Garo Hills District, Meghalaya
PM-DevINE Other 2024-02-10 126.94 2027-05-27 95.205 0 95.205 55.8536 Ongoing
1957 MEGHALAYA Roads and Bridges
Construction of new four-lane road and conversion of existing two-lane road into four-lane with cycling tracks, utility ducts, footpaths, etc. at New Shillong Township by Directorate of Urban Affairs, Government of Meghalaya
PM-DevINE Public works Department 2024-02-01 146.79 2026-07-14 135.0925 0 135.0925 28.3677336 Ongoing
1958 MEGHALAYA Power
Augmentation of the 132/33 KV Mawlai substation from 3x20 MVA to 3x50 MVA, along with re-engineering of the 132 KV bus bar in Meghalaya
NESIDS-OTRI NESIDS Power Department 2019-03-08 49.8 2020-03-31 0.1 0 0.1 Ongoing
1959 MEGHALAYA Transport and Communication
Construction including MBT of Pynursla-Latangriwan road towards Mawlynnong
NESIDS-ROADS NESIDS Public works Department 2019-03-08 29.97 2020-03-31 29.8 0 29.8 20.92 Completed
1960 MEGHALAYA Transport and Communication
Construction of a road from Shillong city to Umroi Airport under Ri-Bhoi district (Length: 14.279 KM) at a cost of Rs. 50.00 crore
NESIDS-ROADS NESIDS Public works Department 2022-04-19 33 2024-04-20 32.983 0 32.983 8.74 Completed
1961 MEGHALAYA Transport and Communication
Improvement including widening of Agia Medhipara Phulbari Tura Road (Portion from 67/600 to 100/200 Km 32.60 Kms) at an estimated cost of Rs. 66.54 crores
NESIDS-ROADS NESIDS Public works Department 2022-04-19 52.87 2024-04-20 52.87 0 52.87 28.1 Completed
1962 MEGHALAYA Transport and Communication
Upgradation of Mawsmai-Shella Road from km8/00 (Laittyra village )upto km15/500 (Kynrem falls) in Meghalaya
NESIDS-ROADS NESIDS Public works Department 2019-03-08 15.48 2020-03-31 15.3835 0 15.3835 15.3835 Completed
1963 MEGHALAYA Transport and Communication
9th Mile (on East West corridor in Assam) to Umsen via Killing Pilangkata Road
NESIDS-ROADS NERSDS Public works Department 2019-08-06 84.01 2022-11-08 77.2256 0 77.2256 77.23 Completed
1964 MEGHALAYA Transport and Communication
Mawshynrut-Hahim-Boko Road
NESIDS-ROADS NERSDS Public works Department 2021-01-28 108.48 2023-01-28 107.075 0 107.075 76.37 Completed
1965 MEGHALAYA Transport and Communication
Upgradation/Improvement of Borkhat-Sonapur road
NESIDS-ROADS NERSDS Public works Department 2022-03-14 126.88 2024-04-14 91.44 0 91.44 28.8 Completed
1966 MEGHALAYA Water Supply
Bulk Water supply to Adjoining Rural Villages of Tura town
NESIDS-OTRI NESIDS PHE 2023-11-14 97.77 2025-11-14 90.8275 6.9393 97.7668 73.3275 Ongoing
1967 MEGHALAYA Water Supply
Greater Baghmara Water Supply Scheme
NESIDS-OTRI NESIDS Dept of Planning 2021-01-27 47.54 2023-01-27 47.54 0 47.54 47.54 Completed
1968 MEGHALAYA Water Supply
Greater Sohra(Cherrapunjee) water supply Scheme
NESIDS-OTRI NESIDS Public works Department 2019-02-22 24.8125 2020-03-31 24.8125 0 24.8125 24.8125 Ongoing
1969 MEGHALAYA Water Supply
Laying of new feeder mains under Tura Phase-I&II Water Supply Scheme
NESIDS-OTRI NESIDS Public works Department 2019-02-22 34.7394 2020-03-31 34.7394 0 34.7394 34.7394 Completed
1970 MEGHALAYA Education
Additional requirement of R.K. Mission, Cherrapunjee for construction of School Building, Library, Laboratory & Computer Classes
NESIDS-OTRI NLCPR Directorate of School Edu 2004-09-03 2 2006-09-30 1.7354 0 1.7354 1.8054 Completed
1971 MEGHALAYA Education
Campus Development Project of Building Infrastructure of Thomas Jones Synod College, Jowai
NESIDS-OTRI NLCPR Dept. of Power 2005-11-02 3.3658 2024-12-31 3.0292 0 3.0292 2.0602 Ongoing
1972 MEGHALAYA Education
College of Science & Commerce at Mahendraganj in Meghalaya
NESIDS-OTRI NLCPR Dept. of Power 2017-06-30 36.31 2025-07-31 30.2309822 0 30.2309822 12.204 Ongoing
1973 MEGHALAYA Education
College of Science and Commerce at Mawphlang in Meghalaya
NESIDS-OTRI NLCPR Directorate of Higher Tec 2017-06-30 36.55 2019-06-30 31.1685 0 31.1685 31.1675 Ongoing
1974 MEGHALAYA Education
Construction of Bormanik College Building at Laimer, Upper Shillong
NESIDS-OTRI NLCPR Directorate of Higher Tec 2009-09-29 2.5052 2012-09-30 2.2047 0 2.2047 2.2047 Ongoing
1975 MEGHALAYA Education
Construction of Laban Bengalee Girls HSS
NESIDS-OTRI NLCPR Directorate of School Edu 2013-10-04 2.15 2017-09-30 1.7415 0 1.7415 1.7415 Completed
1976 MEGHALAYA Education
Construction of Nongstoin College Building, Boys & Girls Hostel, Library at Nongpyngdeng, Nongstoin, West Khasi Hills
NESIDS-OTRI NLCPR Directorate of Higher Tec 2010-02-02 6.1962 2013-06-30 5.5766 0 5.5766 5.5766 Completed
1977 MEGHALAYA Education
Construction of RCC Building at Govt. Girls Higher Secondary School Shillong.
NESIDS-OTRI NLCPR Directorate of School Edu 2010-03-17 2.5014 2012-03-31 2.1806 0 2.1806 2.1806 Completed
1978 MEGHALAYA Education
Construction of RK Mission Ashram School Building, Teacher's Quarters and Student's Home at Cherrapunji.
NESIDS-OTRI NLCPR Directorate of School Edu 2001-03-08 1.56 2004-03-31 1.404 0 1.404 1.56 Completed
1979 MEGHALAYA Education
Construction of School Building for Sutnga Presbyterian Higher Secondary School
NESIDS-OTRI NLCPR Directorate of School Edu 2006-02-16 2.3356 2007-08-31 2.1021 0 2.1021 2.1021 Completed
1980 MEGHALAYA Education
Construction of School Building of O.M. Roy Memorial School at Kynton Massar, Mawlai, Shillong
NESIDS-OTRI NLCPR Directorate of School Edu 2006-07-03 2.2584 2008-01-01 1.9734 0 1.9734 1.9734 Completed
1981 MEGHALAYA Education
Construction of School Building, Mawthawpdah Presbyterian Secondary School, West Khasi Hills
NESIDS-OTRI NLCPR Directorate of School Edu 2010-07-07 3.271 2012-03-31 2.3552 0 2.3552 2.3552 Ongoing
1982 MEGHALAYA Education
Construction of School Building, Mendipathar Secondary School, East Garo Hills
NESIDS-OTRI NLCPR Directorate of School Edu 2008-09-19 1.214 2010-03-31 0.3824 0 0.3824 0.3824 Foreclosed
1983 MEGHALAYA Education
Construction of School Building, Pohskur Secondary School, Jaintia Hills
NESIDS-OTRI NLCPR Directorate of School Edu 2006-12-06 1.7536 2009-12-31 1.527 0 1.527 1.2626 Ongoing
1984 MEGHALAYA Education
Construction of School Building, Ri-Bhoi Presbyterian Higher Secondary School, Nongpoh, Ri-Bhoi District in Meghalaya
NESIDS-OTRI NLCPR Directorate of School Edu 2008-07-29 3.6508 2010-07-31 2.9306 0 2.9306 2.4642 Ongoing
1985 MEGHALAYA Education
Construction of Schools Building, Hostels, Basketball Court etc of Nongpathaw Secondary School, East Khasi Hills
NESIDS-OTRI NLCPR Directorate of School Edu 2010-07-07 2.707 2012-06-30 2.3885 0 2.3885 2.3885 Ongoing
1986 MEGHALAYA Education
Construction of Tikrikilla College Complex, West Garo Hills District
NESIDS-OTRI NLCPR Directorate of Higher Tec 2006-12-06 5.4283 2009-12-31 1.7099 0 1.7099 1.7099 Foreclosed
1987 MEGHALAYA Education
Construction/renovation of school building of DNS Wahlang Memorial Secondary School, East Khasi Hills,Shillong in Meghalaya
NESIDS-OTRI NLCPR Dept. of Power 2011-02-17 3.057 2013-02-28 2.4761 0 2.4761 2.4761 Completed
1988 MEGHALAYA Education
Infrastructural Requirements of Mawsynram Border Area College
NESIDS-OTRI NLCPR Directorate of Higher Tec 2005-11-02 2.863 2007-10-02 2.5767 0 2.5767 2.5767 Completed
1989 MEGHALAYA Education
North Eastern Hill Univesity, Shillong
NESIDS-OTRI NLCPR No information Available 2000-03-30 6 2004-03-31 5.4 0 5.4 6 Completed
1990 MEGHALAYA Education
Primary School Buildings
NESIDS-OTRI NLCPR Directorate of School Edu 2000-11-17 14.4 2003-12-31 12.96 0 12.96 14.4 Completed
1991 MEGHALAYA Education
Rymbai Presbyterian Higher Secondary School, Rymbai, Meghalaya
NESIDS-OTRI NLCPR Dept. of Power 2010-09-30 3.8144 2013-09-30 3.6656 0 3.6656 3.4012 Completed
1992 MEGHALAYA Education
SAC Expansion Programme - Developing the Employment Potential of NE Region in the New Economy & Promoting and Documenting Regional talent
NESIDS-OTRI NLCPR Directorate of Higher Tec 2006-12-08 4.2354 2010-12-31 2.3259 0 2.3259 2.3259 Ongoing
1993 MEGHALAYA Education
Sarva Shiksha Abhiyan (2005-06)
NESIDS-OTRI NLCPR Directorate of School Edu 2006-03-28 3.8516 2006-12-31 3.8516 0 3.8516 3.8516 Completed
1994 MEGHALAYA Education
Sarva Shiksha Abhiyan (2006-07)
NESIDS-OTRI NLCPR Directorate of School Edu 2006-09-26 8.588 2007-03-31 8.588 0 8.588 8.588 Completed
1995 MEGHALAYA Education
Upper Primary School Buildings
NESIDS-OTRI NLCPR Directorate of School Edu 2000-11-17 8 2003-12-31 7.2 0 7.2 8 Completed
1996 MEGHALAYA Miscellaneous
Construction and Development of the Iawmusiang Multi Purpose Market Complex, Jowai
NESIDS-OTRI NLCPR PWD(Buildings),Meghalaya 2006-07-03 20.0963 2008-01-01 6.3303 0 6.3303 6.3303 Foreclosed
1997 MEGHALAYA Miscellaneous
Construction of Airport at Baljek, Tura
NESIDS-OTRI NLCPR Transport Department 2000-11-13 3.21 2001-11-30 2.862 0 2.862 3.18 Completed
1998 MEGHALAYA Miscellaneous
Construction of New Nongstoin Market Complex at Nongstoin in Meghalaya
NESIDS-OTRI NLCPR Community & Rural Develop 2009-03-02 5.2926 2012-03-31 4.287 0 4.287 4.287 Completed
1999 MEGHALAYA Miscellaneous
Construction of Shopping Complex cum Auditorium near Lumshad, Lad Mawgap
NESIDS-OTRI NLCPR Community & Rural Develop 2009-02-20 2.31 2011-02-28 1.707 0.3753 2.0823 0.916 Ongoing
2000 MEGHALAYA Miscellaneous
Integrated Police Welfare Complex Baghmara in South Garo Hills in Meghalaya
NESIDS-OTRI NLCPR Home Police Department 2015-06-25 12.852 2018-06-30 11.5668 0 11.5668 4.6267 Ongoing
2001 MEGHALAYA Miscellaneous
Updating facilities of Ginger Processing Plant at Byrnihat for commercial production
NESIDS-OTRI NLCPR Industries Depatment 2007-07-11 0.5121 2008-07-31 0.5121 0 0.5121 0.5121 Completed
2002 MEGHALAYA Miscellaneous
Upgradation of Market at Mowphlong
NESIDS-OTRI NLCPR Community & Rural Develop 2003-03-21 1.9 2004-03-31 1.71 0 1.71 1.9 Completed
2003 MEGHALAYA Power
Construction of 132 kV D/C line from Sarusajai to Byrnihat
NESIDS-OTRI NLCPR Power Department 2004-03-10 9.7824 2005-06-30 8.8042 0 8.8042 9.7824 Completed
2004 MEGHALAYA Power
Construction of 132/33 kV S/S at Lumshnong with LILO from Khleirhiat to Badarpur
NESIDS-OTRI NLCPR Power Department 2004-09-28 4.63 2006-09-30 4.1677 0 4.1677 4.3297 Completed
2005 MEGHALAYA Power
Construction of 220 KV D/C Transmission Line from Misa (Assam) to Byrnihat (Meghalaya)
NESIDS-OTRI NLCPR Power Department 2007-09-28 63.37 2010-03-31 56.03 0 56.03 56.03 Completed
2006 MEGHALAYA Power
Construction of DC line from Rongkhon to Ampati along with 2x20 MVA, 132/33 KV Sub-Station at Ampati
NESIDS-OTRI NLCPR Power Department 2010-03-25 30.7933 2012-03-31 27.1705 0 27.1705 27.1705 Completed
2007 MEGHALAYA Power
Construction of new 132 kv S/C line connecting Khleihriat S/S (PGCIL) and Khliehriat (MeSEB) at Khleihriat
NESIDS-OTRI NLCPR Power Department 2004-12-28 2.52 2006-12-31 2.1986 0 2.1986 2.2924 Completed
2008 MEGHALAYA Power
Electrification of Tribal Villages
NESIDS-OTRI NLCPR Power Department 2000-10-06 1.5 2003-10-31 1.341 0 1.341 1.49 Completed
2009 MEGHALAYA Power
Lilo of one circuit of palatana-Bongaigaon at Killing with 400/220 KV 2315 MVA GIS Sub-Station in Meghalaya
NESIDS-OTRI NLCPR Power Department 2011-07-06 99.6665 2013-12-31 88.1609 0 88.1609 88.1609 Completed
2010 MEGHALAYA Power
Sanction of 30 Grant in the Project Construction of Ganol Hydro Electric Project (22.5 MW) at Tura, West Garo Hills
NESIDS-OTRI NLCPR Dept of Planning 2008-09-30 36.7238 2011-02-28 33.0436 0 33.0436 33.0436 Completed
2011 MEGHALAYA Power
Sanction of 30 Grant in the Project New Umtru Hydro Electric Project (2x20 MW) at Ri Bhoi District
NESIDS-OTRI NLCPR Power Department 2008-09-30 48.2884 2011-03-31 43.32 0 43.32 43.32 Completed
2012 MEGHALAYA Power
Sub Transmission & Distribution Scheme - Master plan for distribution of power in Meghalaya
NESIDS-OTRI NLCPR Power Department 2003-01-30 24 2005-06-30 20.8692 0 20.8692 22.8362 Completed
2013 MEGHALAYA Power
Sub Transmission & Distribution Scheme - Improvement of power supply in Shillong
NESIDS-OTRI NLCPR Power Department 2000-10-16 6.33 2003-03-31 5.697 0 5.697 6.33 Completed
2014 MEGHALAYA Power
Sub Transmission & Distribution Scheme - Improvement of power supply in Tura
NESIDS-OTRI NLCPR Power Department 2000-10-16 12.03 2003-03-31 10.827 0 10.827 12.03 Completed
2015 MEGHALAYA Power
Sub Transmission & Distribution Scheme - T&D scheme - commissioning of transformer at Khliehriat
NESIDS-OTRI NLCPR Power Department 2003-01-30 1.64 2003-12-24 1.476 0 1.476 1.64 Completed
2016 MEGHALAYA Power
Sub Transmission & Distribution Scheme - T&D scheme - commissioning of transformer at NEHU
NESIDS-OTRI NLCPR Power Department 2002-04-22 2 2004-04-30 1.8 0 1.8 2 Completed
2017 MEGHALAYA Roads and Bridges
Construction and Strengthening of Jakrem - Ranikor Road ( 6-15 Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-07-13 4.164 2010-03-31 3.3324 0 3.3324 3.3324 Completed
2018 MEGHALAYA Roads and Bridges
Construction including M & BT of a road from G. S. Road NH 40 to Nongthymmai Umsning (4.311 Km) Ri-Bhoi Distt. in Meghalaya
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2011-09-16 4.2615 2014-08-31 3.6414 0 3.6414 3.6414 Completed
2019 MEGHALAYA Roads and Bridges
Construction including M&BT of Intermediate lane on Rongjeng Mangsang Adokgre Road from 0.00 Km to 32.00 Km. including 90.00 m bridge over lldek river at 44th Km in Meghalaya
NESIDS-OTRI NLCPR Public works Department 2017-06-19 123.28 2019-06-30 104.5882 0 104.5882 98.6791 Ongoing
2020 MEGHALAYA Roads and Bridges
Construction including metalling and black topping of Lumshnong - Umlong Road (0-8 km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-09-26 6.0176 2010-03-31 5.31 0 5.31 5.31 Completed
2021 MEGHALAYA Roads and Bridges
Construction including Metalling and Blacktopping of a road from Khliehtrshi (near ATS) to meet Jowai Bypass (4.03 KM) in jaintia Hills District
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2013-02-27 5.3094 2015-12-31 4.6651 0 4.6651 4.6651 Completed
2022 MEGHALAYA Roads and Bridges
Construction including metalling and blacktopping of a Road from Mushut to Lumputhoi via Rngad (12 Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-12-26 4.8721 2009-12-31 4.2989 0 4.2989 4.2989 Completed
2023 MEGHALAYA Roads and Bridges
Construction including metalling and Blacktopping of Bandapara-Mallangkona of Shallang road (52 KM) phase- I 10.00 Km- West Garo Hills Distt. in Meghalaya
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2011-07-08 10.7209 2014-06-30 9.4338 0 9.4338 9.4338 Completed
2024 MEGHALAYA Roads and Bridges
Construction length of possengagre to Anangpara including Metalling and Blacktopping upto Anchenggre in Meghalaya
NESIDS-OTRI NLCPR Dept. of Power 2012-03-12 6.8894 2012-03-12 5.4937 0 5.4937 5.4937 Ongoing
2025 MEGHALAYA Roads and Bridges
construction of an approach road from Chokpot in South Garo Hills to Jetra (jetragre) (0-17 Km)
NESIDS-OTRI NLCPR Dept. of Power 2014-06-09 17.6476 15.8829 0 15.8829 15.8828 Completed
2026 MEGHALAYA Roads and Bridges
Construction of including Metalling and Blacktopping of a Road from Sohbar to Tharia (13Km) in Meghalaya
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2012-06-28 6.6585 2015-07-31 5.9927 0 5.9927 5.9927 Completed
2027 MEGHALAYA Roads and Bridges
Construction of major bridge over River Daru on Jholgaon-Katuli in Meghalaya
NESIDS-OTRI NLCPR Public works Department 2017-06-19 14.7 2019-06-30 12.8321 0 12.8321 12.8321 Completed
2028 MEGHALAYA Roads and Bridges
Construction of RCC Bridge over River Daru on Ampati-Purkashia Road (2nd km) to Ampati Village
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2005-12-23 5.068 2007-12-31 3.4261 0 3.4261 3.4261 Completed
2029 MEGHALAYA Roads and Bridges
Construction of RCC bridges No. 3/1 7/1 7/2 and 8/1 on Ampati - Mankchar Road
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2012-02-15 5.0004 2012-02-15 4.4121 0 4.4121 4.4121 Completed
2030 MEGHALAYA Roads and Bridges
Construction of remaining portion of Mawsahew- Nongsteng-Umblai-Mawphu Road (6th to 13th Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2008-09-30 9.5388 2010-10-31 6.8679 0 6.8679 3.2811 Foreclosed
2031 MEGHALAYA Roads and Bridges
Construction of road from Rongjeng-Mangsang-Adorgre road including metalling and blacktopping (33rd to 38th Km) with bridges (5.16 Km)
NESIDS-OTRI NLCPR Dept. of Power 2010-03-25 4.3924 2012-03-31 3.041 0 3.041 3.041 Ongoing
2032 MEGHALAYA Roads and Bridges
Construction of Road from Rongsang A.Bagre to Bandalkona connection Betasing-Mellim Road with bridges in the State of Meghalaya
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2017-05-25 13.7608 2019-05-25 12.3847 0 12.3847 12.3847 Completed
2033 MEGHALAYA Roads and Bridges
Improvement including Metalling & Blacktopping of road from Sonapur (NH-44) to Lad Borsora (10 Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2008-10-10 8.3299 2011-10-31 7.3499 0 7.3499 7.3499 Completed
2034 MEGHALAYA Roads and Bridges
Improvement including metalling and blacktopping of Mawkyrwat - Rangblang Road (12th to 19th Km) (8 Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-09-27 4.8 2010-03-31 4.32 0 4.32 4.32 Completed
2035 MEGHALAYA Roads and Bridges
Improvement including metalling and blacktopping of Mukhaialong Lumshyrmit Road (19 km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-11-16 9.11 2010-11-30 8.0383 0 8.0383 8.0383 Completed
2036 MEGHALAYA Roads and Bridges
Improvement, Metalling & Blacktopping of a road from NH-51 to Rongsigre (4.725 Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-12-31 3.2708 2009-12-31 2.8868 0 2.8868 2.8868 Completed
2037 MEGHALAYA Roads and Bridges
Improvement, widening including metalling and blacktopping of Dkhiah - Sutnga - Saipung - Mouslei - Halflong Road (16 Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-03-26 7.2208 2010-03-31 6.3094 0 6.3094 6.3094 Completed
2038 MEGHALAYA Roads and Bridges
Improvement, Widening, Strengthening including Metalling & Blacktopping of a road from 9th Mile of NH-37 (Guwahati - Shillong road) to Killing ? Pilangkata (6.00KM)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-09-28 3.1273 2009-03-31 2.7594 0 2.7594 2.7594 Completed
2039 MEGHALAYA Roads and Bridges
Improvement, widening, strengthening including Metalling and Blacktopping of a road 9th Mile NH-37 Guwahati-Shillong road to Killing Pillankata (7th to21.50km) in Meghalaya
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2010-12-23 10.9617 2014-01-31 9.2309 0 9.2309 9.2309 Completed
2040 MEGHALAYA Roads and Bridges
Improvement, Widening, Strengthening including Reconstruction of Bridges and Culverts of Rymbai - Iapmala - Suchen Road (1-17 Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2005-12-28 18.7749 2007-12-31 16.4053 0 16.4053 16.4053 Completed
2041 MEGHALAYA Roads and Bridges
Improvement/construction including Metalling and Blacktopping of a double lane road from Rymbai to Deichynrum (7Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2009-02-20 6.0256 2012-02-29 5.3167 0 5.3167 5.3167 Completed
2042 MEGHALAYA Roads and Bridges
Missing approaches of bridge over Kalipai river on Rymbai-Lampala-Suchen road in Jaintia Hills district
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2014-03-27 4.6761 2017-02-28 4.2084 0 4.2084 4.2084 Completed
2043 MEGHALAYA Roads and Bridges
Providing passing places in portion from 0 to 9-th Km. Of Smit- Mawkynrew- Mawlat Road etc.
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2001-07-11 4.93 2004-07-31 4.437 0 4.437 4.93 Completed
2044 MEGHALAYA Roads and Bridges
Re-Construction of SPT bridge No. 14/1 over Umngi River to Permanent RCC Bridge at 14th km of Laitmawsiang-Mawthawpdah road including approaches - West Khasi Hills Distt. in Meghalaya
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2010-12-23 7.0661 2014-01-31 5.9 0 5.9 5.9 Completed
2045 MEGHALAYA Roads and Bridges
Reconstruction of bridge over river Leiten (Bridge No-31/1) on Dkhiah-Sutnga-Saipung-Mawblei-Halflong Road
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-09-27 2.4315 2010-03-31 2.1454 0 2.1454 2.1454 Completed
2046 MEGHALAYA Roads and Bridges
Reconstruction of Bridges and Approaches on Damalgre - Mellim Boldamgiri road, Tura (Bridge No.5/3, 8/5, 9/1 and 10/2)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2009-09-30 11.4694 2011-09-30 10.1201 0 10.1201 10.1201 Completed
2047 MEGHALAYA Roads and Bridges
Reconstruction of Bridges and Approaches on Mawphlang - Balat Road
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2005-10-18 9.0053 2008-11-18 7.8686 0 7.8686 7.8686 Completed
2048 MEGHALAYA Roads and Bridges
Reconstruction of bridges on Kherapara to Dekubazar (Br.No.2/5, 5/3 & 10/2)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2010-02-02 8.5289 2013-01-31 7.0465 0 7.0465 7.0465 Foreclosed
2049 MEGHALAYA Roads and Bridges
Reconstruction of BUG bridge No. 9/3 and 9/4 with RCC pemanent bridge including approavhes on Rongrenggre-Simsanggre-Nengkhra Road - East Garo Hills Distt. in Meghalaya
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2012-05-21 3.7336 2016-04-30 3.1341 0 3.1341 3.1341 Completed
2050 MEGHALAYA Roads and Bridges
Rehabilitation of Lyngkhat - Dawki Road (9.75 km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2009-09-30 11.6085 2012-09-30 10.2429 0 10.2429 10.2429 Completed
2051 MEGHALAYA Roads and Bridges
Strengthening improvement including metalling & blacktopping of road from Bholaganj to Nongiri, including construction of a major bridge at Tharia over river Wahrew
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2012-01-02 29.3689 2012-01-02 25.9137 0 25.9137 25.7537 Completed
2052 MEGHALAYA Roads and Bridges
Strengthening including widening of existing pavement into Intermediate Lane of 4.75 m. width of Mawshynrut- Nongchau Rd.
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2001-07-11 7.3261 2004-03-31 6.5935 0 6.5935 7.3261 Completed
2053 MEGHALAYA Roads and Bridges
Strengthening of Baghmara-Maheshkhola Road (Strengthening of weak pavement from 35th Km. To 74th Km. In diff. Kms-15).
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2001-07-11 1.86 2004-03-31 1.674 0 1.674 1.86 Completed
2054 MEGHALAYA Roads and Bridges
Sutnga-Sumer Road (20 km)- Widening Metalling and Blacktopping in Jaintia Hills District
NESIDS-OTRI NLCPR Public works Department 2014-12-29 21.1972 2017-12-31 19.0775 0 19.0775 19.3275 Completed
2055 MEGHALAYA Roads and Bridges
Upgradation and Strengthening of Garobadha - Betasing Raod via Rangasakhona (from 6th Km of GR road upto 6th Km of BM road via Khasibil) in Tura District (7.833 Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-12-31 11.3756 2009-12-31 10.0372 0 10.0372 10.0372 Completed
2056 MEGHALAYA Roads and Bridges
Upgradation of Double Lane and Strengthening of Dkhiah - Sutnga - Saipung - Moulsei - Haflong Road (9th to 16th km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2005-10-18 4.4588 2008-11-18 3.896 0 3.896 3.896 Completed
2057 MEGHALAYA Roads and Bridges
Widening & Strengthening of Damara-Mendipathar-Songsak-Williamnagar Road (Conversion of SPT bridges to RCC bridges)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2012-01-02 5.9483 2012-01-02 4.8839 0 4.8839 4.8839 Completed
2058 MEGHALAYA Roads and Bridges
Widening and Strengthening of hard crust on Mawngap-Mairang Road (5th to 24th Km.)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2001-07-11 4.52 2004-03-31 4.068 0 4.068 4.52 Completed
2059 MEGHALAYA Roads and Bridges
Widening of road to double lane from Araimile to Dakopgre of Tura town (4 Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2007-09-27 3.1383 2010-03-31 2.7691 0 2.7691 2.7691 Completed
2060 MEGHALAYA Roads and Bridges
Widening of roads into double lane in Williamnagar town (8 Km)
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2008-03-28 15.1267 2011-03-31 13.3471 0 13.3471 13.3471 Completed
2061 MEGHALAYA Roads and Bridges
Widening to double lane standard including M&BT of Dkhiah-Sutanga-Saipung-Moulsei-Halflong Road (portion 1st to 8th and 18th Km), Jaintia Hills District, Meghalaya
NESIDS-OTRI NLCPR PWD(Roads),Meghalaya 2010-11-09 15.775 2013-10-31 13.2459 0 13.2459 13.2459 Completed
2062 MEGHALAYA Sports
Football Stadium at Ampati
NESIDS-OTRI NLCPR Dept of Planning 2016-03-15 38.2068 2019-03-31 34.3861 0 34.3861 27.5088 Ongoing
2063 MEGHALAYA Tourism and Culture
International centre for performing Arts & Culture,Shillong
NESIDS-OTRI NLCPR Dept. of Power 2014-03-27 151.3331 2017-02-28 136.1938 0 136.1938 136.1938 Completed
2064 MEGHALAYA Water Supply
Greater Raliang Water Supply Project
NESIDS-OTRI NLCPR Dept. of Power 2010-02-16 21.562 19.0253 0 19.0253 19.0253 Completed
2065 MEGHALAYA Water Supply
Greater Selsella Water Supply Scheme (Tura North Division)
NESIDS-OTRI NLCPR PHE 2012-12-26 12.04 2015-12-31 10.836 0 10.836 10.836 Completed
2066 MEGHALAYA Water Supply
Greater Shilong Water Supply Scheme, Shilong
NESIDS-OTRI NLCPR PHE 1999-01-01 35.79 2002-03-31 32.211 0 32.211 35.79 Completed
2067 MEGHALAYA Water Supply
Greater Sohrybgkham Water Supply Scheme (Hills Division)
NESIDS-OTRI NLCPR PHE 2010-03-04 6.7024 2013-02-28 5.8515 0 5.8515 5.8515 Completed
2068 MEGHALAYA Water Supply
Greater Umsning Water Supply Scheme (Umsning Division)
NESIDS-OTRI NLCPR PHE 2010-03-04 11.2828 2013-02-28 9.9554 0 9.9554 9.9554 Completed
2069 MEGHALAYA Water Supply
Ialong Combined Water Supply Scheme (Jowai Division) Meghalaya
NESIDS-OTRI NLCPR PHE 2010-08-26 4.5984 2012-07-31 4.0574 0 4.0574 4.0574 Completed
2070 MEGHALAYA Water Supply
Jowai Water Supply Project
NESIDS-OTRI NLCPR PHE 2003-03-21 15.41 2005-03-31 12.8456 0 12.8456 13.2756 Completed
2071 MEGHALAYA Water Supply
Mairang Water Supply Scheme
NESIDS-OTRI NLCPR PHE 2005-12-27 7.6927 2008-12-31 6.7218 0 6.7218 6.7219 Completed
2072 MEGHALAYA Water Supply
Mawsynram Water Supply Scheme (Hills Division)
NESIDS-OTRI NLCPR PHE 2010-03-09 3.8838 2013-03-31 3.4268 0 3.4268 3.4268 Completed
2073 MEGHALAYA Water Supply
Nongpoh Urban Water Supply Scheme
NESIDS-OTRI NLCPR PHE 2007-03-26 17.4672 2010-03-31 15.2626 0 15.2626 15.2616 Completed
2074 MEGHALAYA Water Supply
Tura Phase-III Water Supply Project
NESIDS-OTRI NLCPR PHE 2003-03-21 21.58 2006-03-31 18.531 0 18.531 19.7858 Completed
2075 MEGHALAYA Water Supply
Umroi Water Supply Scheme (Umsning Division), Meghalaya
NESIDS-OTRI NLCPR PHE 2010-08-26 9.2036 2013-07-31 8.1208 0 8.1208 8.1208 Completed
2076 MEGHALAYA Water Supply
Upper Shillong Water Supply Project
NESIDS-OTRI NLCPR Dept. of Power 2010-12-23 33.0236 2021-07-13 29.1412 0 29.1412 29.1412 Completed
2077 MEGHALAYA Agriculture and Allied
Integrated farming on Piggery-cum-fish Culture in villages under Umling, Jirang C&RD Blocks in Ri-Bhoi district, Meghalaya
Schemes of NEC Schemes of NEC 2024-03-13 2.03 2026-03-13 2.035875 0 2.035875 2.0359 Completed
2078 MEGHALAYA Education
Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Laitdiengsai and Nongkynrih)
Schemes of NEC Dept. of Power 2024-03-13 4.99 2027-03-31 3.5 0 3.5 1.996 Ongoing
2079 MEGHALAYA Education
Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Laitryngew and Wahlong)
Schemes of NEC Social Welfare Department 2024-03-13 4.97 2027-03-13 3.49 0 3.49 1.9898 Ongoing
2080 MEGHALAYA Education
Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Mawrah and Pomsohmen)
Schemes of NEC Social Welfare Department 2024-04-13 4.4 2027-04-13 3.26 0 3.26 1.758 Ongoing
2081 MEGHALAYA Education
Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Nongjngi)
Schemes of NEC Social Welfare Department 2024-04-13 4.87 2027-04-13 3.45 0 3.45 1.9498 Ongoing
2082 MEGHALAYA Education
Focused Development of Deprived Areas: Deprived Sections of Society by Promotion of Literacy by upgrading selected RKM Schools in Meghalaya (RKM School, Nongjri in Pynursla)
Schemes of NEC Social Welfare Department 2024-04-13 4.08 2027-04-13 3.058775 0 3.058775 1.6328 Ongoing
2083 MEGHALAYA Tourism and Culture
Development of Skywalk and Tourist Hub at Mawkdok, Sohra, Meghalaya under PM-DevINE
PM-DevINE Tourism Department, Govt. 2024-10-29 50.9031 2026-10-30 12.5626 0 12.5626 Ongoing
2084 MEGHALAYA Tourism and Culture
Gap funding for Passenger Ropeway Project at Shillong Peak, Shillong, Meghalaya
PM-DevINE Tourism Department, Govt. 2025-01-09 70.11 2027-01-30 17.5275 0 17.5275 Ongoing
2085 MEGHALAYA Education
Construction of RCC building for workshop laboratories, Examination Centre & Cell, Smart Class, Teachers Room, etc at Shillong Polytechnic
Schemes of NEC Executive Engineer PWD B, 2025-01-31 14.3133 2027-01-31 3.58 3.58 7.16 3.58 Ongoing
2086 MEGHALAYA Sports
Construction of Synthetic Athletic Track
NESIDS-OTRI State Sports Council Govt 2025-01-20 41.9 2027-01-05 0 10 10 Ongoing
2087 MEGHALAYA Transport and Communication
Upgradation of Meghalaya State Wide Area Network MSWAN
NESIDS-OTRI IT & Communication Depart 2025-01-28 34.99 2026-01-31 0 0 0 Ongoing
2088 MEGHALAYA Infrastructure
Establishment of a Regional Campus of Indian Institute of Corporate Affairs IICA at Shillong, Meghalaya
PM-DevINE Indian Institute of Corpo 2025-03-05 100.95 2028-03-31 0 Ongoing
2089 MEGHALAYA Transport and Communication
Construction of Major Bridge including immediate approaches over river Umngot on Jongksha-Kharang-Diengleng-Nongjrong-Moodymmai-Wahiajer road
NESIDS-ROADS Public works Department 2025-03-24 21.86 2027-03-23 2.3063 2.694 5.0003 Ongoing
2090 MEGHALAYA Industries
Construction of footpath, Laying of tiles, re-alignment of pipelines and provision of utility ducts inside the Iewduh market, Shillong
Schemes of NEC Shillong Municipal Board 2025-06-25 14.6984 2028-06-25 3.6746 3.6746 7.3492 3.6746 Ongoing
2091 MEGHALAYA Infrastructure
Gap funding for Unity Mall, New Shillong Township, Umasawli, Meghalaya
PM-DevINE Dept of Planning 2025-06-10 72.93 2027-06-30 36.46 0 36.46 Ongoing
2092 MEGHALAYA Power
Construction of 2 x 50 MVA, 132/33kV Substation at Mawkhan, East Khasi District, Meghalaya, alongwith the construction of 132kV D/C Saiseij-Mawkhan Kine and GIS Bay at Saiseij, Meghalaya
PM-DevINE Department of Power, Megh 2025-08-25 72.48 2028-08-31 0 Ongoing
2093 MEGHALAYA Tourism and Culture
Development of Sohra Tourism Circuit
PM-DevINE TOURISM DEPARTMENT 2025-10-31 233.75 2027-10-31 0 Ongoing
2094 MEGHALAYA Industries
Setting up of Integrated Entrepreneurship & Livelihood Centre for Tribal Youths, Women Entrepreneurs & Farmers in Meghalaya.
Schemes of NEC Meghalaya Basin Managemen 2025-12-22 10 2027-12-22 0 Ongoing
2095 MEGHALAYA Education
Construction of RK Mission School, Sohra, Meghalaya, under Focused Development of Deprived Areas; Deprived Sections of Society By Promotion Of Literacy By Upgrading Selected RK Mission Schools in Meghalaya.
Schemes of NEC Directorate Of Social Wel 2026-01-07 9.1547 2028-01-07 2.29 0 2.29 Ongoing
2096 MEGHALAYA Transport and Communication
Construction of road from Shkentalang NH206 to Lumshyrmit including major bridge on Myntdu river for connectivity to NH6 at Kongong Length-18.64 km
NESIDS-ROADS PWD Roads 2026-01-05 70.14 2028-01-05 0 Ongoing
2097 MEGHALAYA Water Supply
Greater Baghmara WSS pahse II
NESIDS-OTRI Public Health Engineering 2026-02-26 140.06 2028-02-26 0 Ongoing
2098 MEGHALAYA Power
Construction of 132 KC MLHEP 1 line to MUSTEM SC line for Redundant Trabsmission Corridor for Evacuation of Generation for MLHEP I in Meghalaya
NESIDS-OTRI Power Department 2026-03-24 49.9494 2028-03-24 0 Ongoing
2099 MEGHALAYA Power
Reconductoring and Strengtening of the 132 KV SC Tansmission Lines by HTLS Conductor and Restring of 132 KV SC Tranmission Lines with ACSR Panther conductor
NESIDS-OTRI Power Department 2026-03-25 44.35 2028-03-25 0 Ongoing
2100 MEGHALAYA Transport and Communication
Rehabilitation and Strengthening of a road from Chokpot to Kharukol via Warima, Kenegre, Paromgre, Nokatgre ,Length-46.080 km
NESIDS-ROADS PWD Roads 2026-03-25 136.64 2028-03-30 0 Ongoing
2101 MEGHALAYA Industries
Upgradation of 7 existing PRIME HUBS in Meghalaya.
Schemes of NEC Meghalaya Basin Managemen 2026-03-31 4.69 2028-03-31 0 Ongoing
2102 MEGHALAYA Agriculture and Allied
Integrated Lakadong Turmeric Value Chain Enhancement Project.
Schemes of NEC Department of Agriculture 2026-06-12 43.24 2031-06-12 0 Ongoing
2103 MEGHALAYA Transport and Communication
Construction of road from Umsen to Barapathar via Pilangku A, Jyrmang, Chibra and Mawiong , Length- 13.50 km
NESIDS-ROADS PWD Roads 2026-06-18 56.01 2028-06-18 0 Ongoing
2104 MIZORAM Health
Construction of 100 Bedded Kolasib District Hospital and Procurement of Hospital and procurement of Hospital Equipment, Kolasib, Mizoram
NESIDS-OTRI NESIDS PUBLIC WORK DEPARTMENT 2022-03-16 22 2025-03-21 19.0452 0 19.0452 12.8392 Ongoing
2105 MIZORAM Health
Construction of 50 Bedded District Hospital Complex and Procurement of Equipment at Hnahthial District
NESIDS-OTRI NESIDS PUBLIC WORK DEPARTMENT 2024-01-01 17.85 2028-01-01 3.4471 0 3.4471 Ongoing
2106 MIZORAM Health
Construction of 50 Bedded District Hospital Complex and Procurement of Equipment at Khawzawl, Mizoram
NESIDS-OTRI NESIDS PUBLIC WORK DEPARTMENT 2023-12-15 17.7505 2025-12-15 6.6075 3.3038 9.9113 3.3037 Ongoing
2107 MIZORAM Health
Construction of 50 Bedded District Hospital Complex and Procurement of Equipment at Saitual Mizoram
NESIDS-OTRI NESIDS PUBLIC WORK DEPARTMENT 2023-12-15 16.9605 2025-12-15 3.7853 3.7852 7.5705 Ongoing
2108 MIZORAM Health
Construction of State Resource Centre for HIV/AIDS at Aizawl, Mizoram
NESIDS-OTRI NESIDS PUBLIC WORK DEPARTMENT 2022-03-16 4 2024-03-21 3.6051 0 3.6051 2.7038 Ongoing
2109 MIZORAM Health
Construction of two Residential Hostels at Zoram Medical College,Falkawn,Mizoram
NESIDS-OTRI NESIDS Public Health & Engg Depa 2021-03-09 20 2023-03-09 20 0 20 17.7 Completed
2110 MIZORAM Health
Purchase of 2 (two) Truenat Quattro machines in Mizoram to combat pandemic Covid-19 (for Lawngtlai and Serchhip District)
NESIDS-OTRI NESIDS Dept. of Health & familly 2021-09-30 0.2912 2022-09-30 0.2912 0 0.2912 0.2912 Completed
2111 MIZORAM Health
Purchase of RT-PCR reagents & RNA extraction kits to last for approximately six months for Zoram Medical College, Falkawn, Mizoram in combating Covid-19.
NESIDS-OTRI NESIDS Dept. of Health & familly 2021-09-30 2.5317 2022-09-30 2.2266 0 2.2266 2.2235 Completed
2112 MIZORAM Health
Renovation/Upgradation of NICU/PICU and HDU at Zoram Medical College, Falkawn, Mizoram
NESIDS-OTRI NESIDS Dept. of Health & familly 2021-08-27 2.7731 2023-09-01 2.1994 0 2.1994 2.1994 Ongoing
2113 MIZORAM Health
Strengthening Health Infrastructure for Comprehensive response to possible Outbreak of COVID-19 in Mizoram under NESIDS
NESIDS-OTRI NESIDS DIRECTORIATE OF HEALTH &M 2020-05-28 16.1626 2024-03-21 12.7493 0 12.7493 11.8219 Ongoing
2114 MIZORAM Health
Up-gradation of Cardiology, Department at Civil Hospital, Aizwal in Mizoram
NESIDS-OTRI NESIDS DIRECTORIATE OF HEALTH &M 2022-04-20 10.45 2024-04-30 9.6684 0 9.6684 0.9942 Ongoing
2115 MIZORAM Agriculture and Allied
Bamboo development project in Mizoram
Schemes of NEC Schemes of NEC 2021-01-05 11.14 2023-01-05 11.14 0 11.14 11.14 Completed
2116 MIZORAM Agriculture and Allied
Community Bio-diversity conservation project, Mizoram.
Schemes of NEC Schemes of NEC 2005-02-22 0.7414 2008-02-22 0.68 0 0.68 0.68 Completed
2117 MIZORAM Agriculture and Allied
Cultivation of Aloe Vera in Chhanchhuhna Khawpui in Darlawan RD Block, Mizoram (Location: Saiha dist)
Schemes of NEC Schemes of NEC 2012-11-29 4.466 2015-11-29 4.41 0 4.41 4.41 Completed
2118 MIZORAM Agriculture and Allied
Cultivation of Mushroom at Chite, Mizoram.
Schemes of NEC Schemes of NEC 2006-10-18 0.2276 2009-10-18 0.2 0 0.2 0.2 Completed
2119 MIZORAM Agriculture and Allied
Development of Identified Backward Blocks under 30 PC Central Sector Scheme of NEC in Bunghmun W Block of Lunglei District, Mizoram , Mizoram
Schemes of NEC Schemes of NEC Dept. of Power 2020-11-08 2.6353245 2023-11-08 2.99 0 2.99 1.6435 Completed
2120 MIZORAM Agriculture and Allied
Development of Identified Backward Blocks under 30 PC Central Sector Scheme of NEC in Chawngte RD Block, Lawngtlai District, Mizoram
Schemes of NEC Schemes of NEC 2020-12-01 2.99 2023-12-01 2.99 0 2.99 2.99 Completed
2121 MIZORAM Agriculture and Allied
Development of Potato Seed Farm in Mizoram- Quality Seed Production of Potato through Tissue Culture & Apical Rooted Cuttings (ARC)
Schemes of NEC Schemes of NEC Agriculture Department 2022-03-31 1.8980872 2026-03-31 1.8980872 0 1.8980872 1.8980872 Completed
2122 MIZORAM Agriculture and Allied
Establishment of Integrated Horticulture Training Centre at Chite, Aizawl(Location: Aizawl dist)
Schemes of NEC Schemes of NEC 2011-05-25 2.66 2014-05-25 2.394 0 2.394 2.39 Completed
2123 MIZORAM Agriculture and Allied
Establishment of Piggery farm at TNT Area, Zuangtui, Aizawl, Mizoram.
Schemes of NEC Schemes of NEC 2006-06-13 0.2148 2009-06-13 0.19 0 0.19 0.19 Completed
2124 MIZORAM Agriculture and Allied
Establishment of Rootstock bank for Grapes at Mualkawi village, Champai district and Scion Bank and Rootstock Bank for Citrus at Maudarh, Lunglei district, Mizoram
Schemes of NEC Schemes of NEC 2016-03-18 6.4714 2019-03-18 3.1006 0 3.1006 3.1 Completed
2125 MIZORAM Agriculture and Allied
Establishment of State Veterinary Information & Resource Centre, Mizoram
Schemes of NEC Schemes of NEC 2023-02-02 8.3047373 2026-02-02 8.3047373 0 8.3047373 6.0229 Ongoing
2126 MIZORAM Agriculture and Allied
Improvement of Mandarin Orange Orchard at Leng Village, Serchhip District
Schemes of NEC Schemes of NEC 2017-04-18 1.1701 2020-04-18 1.05 0 1.05 1.05 Completed
2127 MIZORAM Agriculture and Allied
Integrated Piggery and Poultry Farming at Ailawng, Mizoram
Schemes of NEC Schemes of NEC 2023-03-15 2.9724 2026-03-13 2.92 0 2.92 0.1 Ongoing
2128 MIZORAM Agriculture and Allied
Integrated Piggery Farming at Lengpui
Schemes of NEC Schemes of NEC 2023-03-31 4.9686 2026-03-31 4.9721 0 4.9721 2.42 Ongoing
2129 MIZORAM Agriculture and Allied
Livestock Rearing for economically backward people of Sinlung Hills Council area,Mizoram
Schemes of NEC Schemes of NEC 2023-03-31 4.29 2026-03-31 3.41825 0 3.41825 2.5653 Ongoing
2130 MIZORAM Agriculture and Allied
Management system for controlling milking and animal monitoring solutions, Thuampui, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2017-03-20 2.24 2020-03-20 1.792 0 1.792 1.79 Completed
2131 MIZORAM Agriculture and Allied
Marketing of Ginger, Mizoram
Schemes of NEC Schemes of NEC 2007-03-08 0.875 2010-03-08 0.79 0 0.79 0.79 Completed
2132 MIZORAM Agriculture and Allied
Mithun Multiplication Centre at Lungkawlh Mizoram
Schemes of NEC Schemes of NEC Other 2022-03-31 5.3138 2025-03-31 5.316 0 5.316 5.3138 Completed
2133 MIZORAM Agriculture and Allied
Plantation of Black Pepper at Sairum, Sihphir, Mizoram
Schemes of NEC Schemes of NEC 2017-04-11 0.57 2020-04-11 0.57 0 0.57 0.57 Foreclosed
2134 MIZORAM Agriculture and Allied
Proposal of identified block for providing key identified service at Bungtlang South Block, Lawngtlai district, Mizoram
Schemes of NEC Schemes of NEC 2022-03-31 4.83 2025-03-31 4.832 0 4.832 4.828 Completed
2135 MIZORAM Agriculture and Allied
Proposal of identified block for providing key identified service at Bungtlang South village, Bungtlang South Block, Lawngtlai district, Mizoram
Schemes of NEC Schemes of NEC 2022-03-31 2 2025-03-31 2 0 2 1.9757 Completed
2136 MIZORAM Agriculture and Allied
Proposal of identified block for providing key identified service at Chawngte Block, Lawngtlai district, Mizoram
Schemes of NEC Schemes of NEC 2022-03-31 4.55 2025-03-31 4.55 0 4.55 4.55 Completed
2137 MIZORAM Agriculture and Allied
Proposal of identified block for providing key identified service at Marpara South village, West Bunghmun Block, Lunglei district, Mizoram
Schemes of NEC Schemes of NEC 2022-03-31 1.87 2025-03-31 1.868 0 1.868 1.868 Completed
2138 MIZORAM Agriculture and Allied
Proposal of identified block for providing key identified service at West Bunghmun Block, Lunglei district, Mizoram
Schemes of NEC Schemes of NEC 2022-03-31 4.92 2025-03-31 4.92 0 4.92 2.952 Completed
2139 MIZORAM Agriculture and Allied
Rubber based settlement project village & strategic development initiative in Lai Autonomous district Council, Mizoram
Schemes of NEC Schemes of NEC 2017-04-12 4.04 2020-04-12 3.217 0 3.217 3.22 Completed
2140 MIZORAM Agriculture and Allied
Setting-up of fish Seed Hatchery-cum-Fish Farming at Darlak, Mamit District, Mizoram.
Schemes of NEC Schemes of NEC 2006-10-31 0.1239 2009-10-31 0.11 0 0.11 0.11 Completed
2141 MIZORAM Agriculture and Allied
Training on cultivation of kiwi in Mizoram.
Schemes of NEC Schemes of NEC 2007-03-01 0.0128 2010-03-01 0.01 0 0.01 0.01 Completed
2142 MIZORAM Education
Aspirational District Mamit District, Mizoram
Schemes of NEC Schemes of NEC 2019-06-11 1 2022-06-11 1 0 1 1 Completed
2143 MIZORAM Education
Backward Community of Lai Community, Lawngtlai District, Mizoram
Schemes of NEC Schemes of NEC 2022-03-02 4.7970292 2025-03-02 4.798 0 4.798 3.63 Completed
2144 MIZORAM Education
Backward Community of Mara Community, Siaha District (Tipa Block), Mizoram
Schemes of NEC Schemes of NEC Other 2022-03-15 4.9168 2025-03-15 3.6908 0 3.6908 3.5594486 Ongoing
2145 MIZORAM Education
Community development progarme for Chakmas Autonomous District Council, Kamalanagar, Lawngtlai District, Mizoram for construction of school building
Schemes of NEC Schemes of NEC 2020-10-16 3.09 2023-10-16 3.0913 0 3.0913 2.46 Completed
2146 MIZORAM Education
Community development programme for Bru& Chakmas in Mamit District
Schemes of NEC Schemes of NEC Other 2020-09-18 3.8597 2023-09-18 3.8597 0 3.8597 3.8597 Completed
2147 MIZORAM Education
Community development programme for Bru& Chakmas in Mamit District, C&RD Blocks, West Phaileng
Schemes of NEC Schemes of NEC Dept. of Power 2020-09-18 1.5522 2023-09-18 1.5522 0 1.5522 1.22 Completed
2148 MIZORAM Education
Community development programme for Chakmas Autnomous District Council, Kamalanagar, Lawngtlai District, Mizoram for rice area expansion
Schemes of NEC Schemes of NEC 2020-10-16 2.96 2023-10-16 2.9568 0 2.9568 1.37 Completed
2149 MIZORAM Education
Community Hall at Chandmari West, Aizawl Mizoram
Schemes of NEC Schemes of NEC 2016-03-17 4.7528 2019-03-17 4.27 0 4.27 4.27 Completed
2150 MIZORAM Education
Construction of Comprehensive Spastic Children Care Complex at Bawngkawn, Aizawl Mizoram
Schemes of NEC Schemes of NEC 2016-07-21 7.7417 2019-07-21 3.97 0 3.97 3.97 Completed
2151 MIZORAM Education
Construction of Multi-Utility cum Community Centre at Tuikual North, Aizawl, Mizoram.
Schemes of NEC Schemes of NEC 2022-03-31 2.9991 2025-03-31 2.5726 0 2.5726 Ongoing
2152 MIZORAM Education
Construction of Observation Home / Special Home Complex at Pukpui Mizoram
Schemes of NEC Schemes of NEC 2017-03-21 4.2272 2019-03-21 3.8044 0 3.8044 3.8 Completed
2153 MIZORAM Education
Construction of Research Scholars Hostel for Boys & Girls at Mizoram University
Schemes of NEC Schemes of NEC 2016-08-26 11.8747 2019-08-26 11.8747 0 11.8747 11.87 Completed
2154 MIZORAM Education
Construction of Zomi Cultural Centre and Preservation of ZOMI Historical sites at Champhai, Mizoram
Schemes of NEC Schemes of NEC PWD, Government Of Mizora 2022-03-31 4.5843635 2025-03-31 4.2584 0.3259635 4.5843635 4.5843635 Completed
2155 MIZORAM Education
Establishment of Sinlung Hills Council Administrative Complex Mizoram
Schemes of NEC Schemes of NEC Choose... 2020-11-17 3.82 2023-11-17 3.8173628 0 3.8173628 1.36 Ongoing
2156 MIZORAM Sports
Construction of Community Complex at Edenthar, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2016-04-26 4.8152 2019-04-26 4.34 0 4.34 4.34 Completed
2157 MIZORAM Sports
Construction of Multipurpose Sports Complex at Aizawl West Joint YMA Field, Vaivakawn, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2016-06-02 9.6 2019-06-02 8.1675 0 8.1675 8.17 Completed
2158 MIZORAM Sports
Construction of Youth Recreation Centre-cum- Amalgamated office Complex for Sports & Youth Services Department at New Secretariat Complex, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2016-05-05 10.17 2021-03-31 8.32 0 8.32 8.32 Completed
2159 MIZORAM Sports
Establishment of Multipurpose Indoor Hall at Sihphir, Mizoram
Schemes of NEC Schemes of NEC 2016-09-26 12.7779 2020-09-17 12.7779 0 12.7779 12.78 Completed
2160 MIZORAM Sports
Laying of Artificial Turf at Hnahthial, Mizoram
Schemes of NEC Schemes of NEC 2017-08-04 6.829 2020-08-04 5.47 0 5.47 5.47 Completed
2161 MIZORAM Sports
Laying of Artificial Turf at Saitual, Mizoram
Schemes of NEC Schemes of NEC 2017-07-28 5.3881 2020-07-28 4.316 0 4.316 4.32 Completed
2162 MIZORAM Irrigation and Flood Control
Bualpui NG & Lunzarhtum combined WSS, Lawngtlai dist.
Schemes of NEC Schemes of NEC 2011-03-11 4.93 2013-03-11 0.2273 0 0.2273 0.23 Completed
2163 MIZORAM Irrigation and Flood Control
Constn. Of Check Dam/retaining wall and drainage network to prevent major landslide at the cemetery in Dawrpui Vengthar in Aizawl dist.
Schemes of NEC Schemes of NEC 2011-02-01 2.58 2014-02-01 2.32 0 2.32 2.32 Completed
2164 MIZORAM Irrigation and Flood Control
Darlawn Water Supply Scheme (Augmen-tation) in Mizoram, Aizawl dist.
Schemes of NEC Schemes of NEC 2012-11-26 4.852 2014-11-26 4.37 0 4.37 4.37 Completed
2165 MIZORAM Irrigation and Flood Control
East Lungdar Multi village Water Supply Scheme (Pumping), Serchhip District, Mizoram
Schemes of NEC Schemes of NEC 2018-02-09 11 2021-02-09 0.1 0 0.1 0.1 Completed
2166 MIZORAM Irrigation and Flood Control
FC & Irrigation potential of agricultura areas of Ngopa RD Block, Champhai dist.
Schemes of NEC Schemes of NEC 2009-10-07 4.3216 2012-10-07 4.05 0 4.05 4.05 Completed
2167 MIZORAM Irrigation and Flood Control
Implementation of Sangau WSS (pumping) Ph.I, Lawngtlai dist.
Schemes of NEC Schemes of NEC 2010-01-18 4.84 2013-01-18 3.9915 0 3.9915 3.99 Completed
2168 MIZORAM Irrigation and Flood Control
Phuaihbuang Pumping WSS in Mizoram, Aizawl dist.
Schemes of NEC Schemes of NEC 2010-09-22 3.915 2013-09-22 3.52 0 3.52 3.52 Completed
2169 MIZORAM Irrigation and Flood Control
Sangau Water Supply Scheme (Pumping) Phase-II in Mizoram,Lawngtlai dist.
Schemes of NEC Schemes of NEC 2012-11-29 4.716 2015-11-29 4.24 0 4.24 4.24 Completed
2170 MIZORAM Irrigation and Flood Control
Sewage Canal-cum-Check dam at Kanan-Dawrpui Vengtahr Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2017-08-02 6.62 2020-08-02 5.959 0 5.959 4.8 Completed
2171 MIZORAM Irrigation and Flood Control
Vairangte Water Supply Scheme, Kolasib dist.
Schemes of NEC Schemes of NEC 2013-10-08 7.8311 2016-10-08 0.522 0 0.522 0.52 Completed
2172 MIZORAM Industries
Construction of Approach Road and Internal Roads of Industrial Growth Centre at Luangmual, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2016-09-29 9.23 2019-09-29 8.31 0 8.31 8.31 Completed
2173 MIZORAM Industries
Construction of Handloom and Weaving Centre at Council Vaih, Saiha Town, Saiha District
Schemes of NEC Schemes of NEC 2020-12-14 4.3941 2023-12-14 4.4745 0 4.4745 3.95 Ongoing
2174 MIZORAM Industries
Construction of Lunglei Market and Trade Centre at Electric/ Chanmari Veng, Lunglei, Mizoram.
Schemes of NEC Schemes of NEC 2022-03-28 14.03 2025-03-28 14.0340159 0 14.0340159 14.0345793 Ongoing
2175 MIZORAM Industries
Construction of Market Building at West Phaileng, Mamit District, Mizoram
Schemes of NEC Schemes of NEC Choose... 2023-03-31 2.7825 2026-03-31 1.895625 0 1.895625 2.085625 Ongoing
2176 MIZORAM Industries
Construction of Mission Veng Bazar Complex at Mission Veng, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2014-03-03 5.9841 2018-03-03 5.39 0 5.39 5.39 Completed
2177 MIZORAM Industries
Construction of New Market Building at Dawrpui Veng, Aizawl
Schemes of NEC Schemes of NEC 2015-06-16 13 2018-06-16 8.712 0 8.712 8.71 Completed
2178 MIZORAM Industries
Creation of Passion Fruit Processing Unit at IIDC, Zote, Champhai, Mizoram
Schemes of NEC Schemes of NEC 2022-03-27 6.85 2025-03-27 6.35 0 6.35 0.1 Ongoing
2179 MIZORAM Industries
Enhancing the value of post-harvest Mizo Ginger to improve socio-economic conditions of marginal tribal farmers in Mizoram
Schemes of NEC Schemes of NEC 2020-10-19 2.67 2023-10-19 2.67 0 2.67 2.67 Completed
2180 MIZORAM Industries
Establishment of Handloom Production cum training Centre at Phuaibuang, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2020-12-24 3.5 2023-12-24 3.5 0 3.5 3.5 Completed
2181 MIZORAM Industries
Fostering Indurtsy Innovation, Infrastructure and Livelihood Opportunities (SDG No. 9) at Lungleng-I and Sialhawk, Mizoram and Strengthening of Food Testing Laboratory
Schemes of NEC Schemes of NEC Choose... 2023-03-29 4.84 2026-03-29 4.71981 0 4.71981 3.5314 Ongoing
2182 MIZORAM Industries
Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19, Phase-II Mizoram
Schemes of NEC Schemes of NEC 2020-12-09 2.7036 2023-12-09 2.7036 0 2.7036 2.7 Completed
2183 MIZORAM Industries
Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Mizoram under creation of capital assets
Schemes of NEC Schemes of NEC 2020-10-16 1.71 2023-10-16 0.1 0 0.1 0.1 Completed
2184 MIZORAM Industries
Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Mizoram under Grant-in Aid
Schemes of NEC Schemes of NEC 2020-10-16 1.29 2023-10-12 1.29 0 1.29 1.3 Completed
2185 MIZORAM Industries
Marketing of Handloom Handicrafts Products of Mizoram by the Mizoram Handloom & Handicrafts Developmet Corporation Ltd. (ZOHANDCO), Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2006-03-28 0.4095 2009-03-28 0.37 0 0.37 0.37 Completed
2186 MIZORAM Industries
Multi Purpose Post-Harvest Management Project in Mizoram for Post-COVID- Economic Revival
Schemes of NEC Schemes of NEC 2021-01-21 4.6136 2024-01-21 4.6136 0 4.6136 4.61 Ongoing
2187 MIZORAM Industries
Setting up of a Bamboo Technology Park at Sairang by Bamboo Development Agency, Govt. of Mizoram.
Schemes of NEC Schemes of NEC 2006-11-01 2.33 2008-11-01 2.1 0 2.1 2.1 Completed
2188 MIZORAM Industries
Setting up of a manufacturing of Round Bamboo Stick, Toothpicks, Splits etc., unit, Mizoram by M/s. MULIT-BAMTEC, Sesawng Village, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2006-06-08 0.8223 2009-06-08 0.74 0 0.74 0.74 Completed
2189 MIZORAM Industries
Setting up of a manufacturing of Round Bamboo Stick, Toothpicks, Splits etc., unit, Mizoram by M/s. Zo-BAMTEC, Sesawng Village, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2006-06-08 0.869 2008-03-31 0.78 0 0.78 0.78 Completed
2190 MIZORAM Industries
Setting up of a manufacturing of Water Storage Tanks unit, Mizoram by M/s. Zoram Plastic Industry, 28-29 Industrial Area, Zungtui, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2006-03-23 1.0453 2009-03-23 0.94 0 0.94 0.94 Completed
2191 MIZORAM Industries
Setting up of a Quality Bakery Products (Mechanized) Industry, Lunglei by M/s. Diki Bakery, Lunglei, Mizoram
Schemes of NEC Schemes of NEC 2006-07-28 0.1226 2009-07-28 0.11 0 0.11 0.11 Completed
2192 MIZORAM Industries
Upgradation of Mizoram Handloom & Handicrafts Development Corporation Ltd.
Schemes of NEC Schemes of NEC 2011-12-07 3.0704 2014-12-07 2.76 0 2.76 2.76 Completed
2193 MIZORAM Information and Public Relatio
Construction of Aizawl Institute of Arts & Music for the NER, Tuivamit Tlang, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2023-03-27 6.9 2026-03-27 6.2111463 0.6902455 6.9013918 6.2122126 Ongoing
2194 MIZORAM Information and Public Relatio
Construction of Auditorium at bethel veng, Mizoram
Schemes of NEC Schemes of NEC Choose... 2023-10-17 14.44 2026-10-17 6.4799 3.23995 9.71985 6.4799 Ongoing
2195 MIZORAM Information and Public Relatio
Construction of Cultural Centre-cum-Auditorium at Vaivakawn, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2013-01-31 6.1901 2015-01-31 5.57 0 5.57 5.57 Completed
2196 MIZORAM Information and Public Relatio
Construction of Lianchhiari Run (A multi-facility Centre)
Schemes of NEC Schemes of NEC 2017-04-11 10 2020-04-14 9 0 9 9 Completed
2197 MIZORAM Information and Public Relatio
Establishment of Lai Cultural Centre-cum-Auditorium at Lawngtlai, Mizoram
Schemes of NEC Schemes of NEC 2017-04-17 4.6662 2022-09-13 4.19 0 4.19 4.19 Completed
2198 MIZORAM Information and Public Relatio
Seminar in Nine Different Location in Mizoram organised by Govt.of Mizoram
Schemes of NEC Schemes of NEC 2018-04-01 0.27 2021-04-01 0.2 0 0.2 0.2 Completed
2199 MIZORAM Information and Public Relatio
Strengthening of Hindi Section in the library of government colleges of Mizoram
Schemes of NEC Schemes of NEC 2021-02-03 0.3 2025-03-27 0.3 0 0.3 0.3 Completed
2200 MIZORAM Health
Accident & Trauma Center, Kolasib, Mizoram
Schemes of NEC Schemes of NEC 2005-12-19 1.4105 2008-12-19 1.2695 0 1.2695 1.27 Completed
2201 MIZORAM Health
Accident & Trauma Center, Serchhip, Mizoram
Schemes of NEC Schemes of NEC 2005-12-19 1.4105 2008-12-19 1.27 0 1.27 1.27 Completed
2202 MIZORAM Health
Bio-Medical Waste Management Incinerators System for District Hospital, Lawngtlai, Champhai, Mamit & Serchhip in Mizoram
Schemes of NEC Schemes of NEC 2016-07-20 4.68 2019-07-20 4.212 0 4.212 4.21 Completed
2203 MIZORAM Health
Construction of 60 Bedded intern hospital at Zoram Medical Collge, Falkawn, Mizoram
Schemes of NEC Schemes of NEC 2022-03-17 6.79 2025-03-17 6.79 0 6.79 4.42 Ongoing
2204 MIZORAM Health
Construction of Central Medical Warehouse at Muallungthu, Mizoram
Schemes of NEC Schemes of NEC Choose... 2023-03-31 13 2026-03-31 6.5 3.25 9.75 6.5 Ongoing
2205 MIZORAM Health
Construction of Main Building of School of Nursing, Synod Hospital, Durtlang, Mizoram
Schemes of NEC Schemes of NEC 2017-08-08 8.33 2020-08-08 7.497 0 7.497 7.5 Completed
2206 MIZORAM Health
Construction of Mizoram Ayush Development Centre at New Capital Complex (MINECO), Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2022-02-23 2.6416 2025-02-23 2.64 0 2.64 1.74 Ongoing
2207 MIZORAM Health
Construction of Patient Lodging and Staff Quarters (Type-III & IV) at Mawdiangdiang near NEIGRIHMS, Shillong
Schemes of NEC Schemes of NEC PWD(Buildings),Meghalaya 2020-12-23 4.1967 2023-12-23 4.0943 0.104 4.1983 2.41 Ongoing
2208 MIZORAM Health
Establishment of 6 bedded ICU at Presbyterian Hospital, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2007-05-02 2.2952 2010-05-02 2.0657 0 2.0657 2.07 Completed
2209 MIZORAM Health
Establishment of Dialysis Unit at 50 Bedded Hospital, Lawngtlai
Schemes of NEC Schemes of NEC 2021-01-06 0.548 2024-01-06 0.5438052 0 0.5438052 0.25 Completed
2210 MIZORAM Health
Establishment of State Medical Library at Civil Hospital, Aizawl
Schemes of NEC Schemes of NEC 2014-02-12 3.6118 2017-02-12 3.25 0 3.25 3.25 Completed
2211 MIZORAM Health
Purchase of CT Scan Machine (16 Slices) for Civil Hospital, Lunglei, Mizoram
Schemes of NEC Schemes of NEC 2016-07-20 2.28 2019-07-26 2.05 0 2.05 2.05 Completed
2212 MIZORAM Health
Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Mizoram for activities related to combating COVID-19 pandemic
Schemes of NEC Schemes of NEC 2020-04-01 3 2023-04-01 3 0 3 3 Completed
2213 MIZORAM Health
Release of grants to the Government of Mizoram for procurement of PPE Suits and Test Kits related to combating COVID-19 pandemic
Schemes of NEC Schemes of NEC 2020-09-07 0.8 2023-09-07 0.8 0 0.8 0.8 Completed
2214 MIZORAM Health
Strengthening & Improvement of CSSD in District Hospitals (5 nos.), Mizoram
Schemes of NEC Schemes of NEC 2009-08-18 3 2012-08-18 2.7 0 2.7 2.7 Completed
2215 MIZORAM Health
Strengthening of Cardiology Department at Civil Hospital, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2012-11-26 4.99 2015-11-26 4.491 0 4.491 4.49 Completed
2216 MIZORAM Health
Strengthening of Dental Departments at Civil Hospital, Aizawl and District Hospitals in Mizoram
Schemes of NEC Schemes of NEC 2018-10-29 4.418 2019-09-17 3.98 0 3.98 3.98 Completed
2217 MIZORAM Health
Support for Development & Implementation of Hospital Management Information System (HMIS) at Civil Hospital, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2011-03-14 4.6651 2014-03-14 4.1986 0 4.1986 4.2 Completed
2218 MIZORAM Health
Support for Procurement of CT Scan (16 Slices) machine at Civil Hospital, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2012-01-03 2.8 2015-01-03 2.52 0 2.52 2.52 Completed
2219 MIZORAM Power
132 KV Central Sub-Station at Melriat
Schemes of NEC Schemes of NEC 2006-03-17 13.4144 2008-03-17 12.07 0 12.07 12.07 Completed
2220 MIZORAM Power
Construction 132kV khumtung -1 Bay at Melriat
Schemes of NEC Schemes of NEC 2010-09-20 3.96 2013-09-20 3.56 0 3.56 3.56 Completed
2221 MIZORAM Power
Construction 132kV khumtung -I1 Bay at Melriat
Schemes of NEC Schemes of NEC 2011-03-22 2.32 2013-03-22 2.09 0 2.09 2.09 Completed
2222 MIZORAM Power
Construction of 132 KV S/C line on D/C tower from Bairabi to W. Phaileng via Mamit with associated bays (74 Ckm) in Mizoram
Schemes of NEC Schemes of NEC 2017-06-19 54.95 2020-06-19 49.455 0 49.455 49.46 Completed
2223 MIZORAM Power
Construction of 132 KV S/C Transmission line from Melriat Substation (14.5 Ckm) to Luangmual and 132 KV Bay at Luangmual, Aizawl
Schemes of NEC Schemes of NEC 2009-01-29 4.9935 2012-01-29 4.49 0 4.49 4.49 Completed
2224 MIZORAM Power
Construction of 1X2.5 MVA, 33/11KV S/s at Buarpui & Saiphai with associated lines, Mizoram
Schemes of NEC Schemes of NEC 2014-02-26 13.7 2017-02-26 12.33 0 12.33 12.33 Completed
2225 MIZORAM Power
Construction of 33 KV Transmission line from Serchhip Substation to Sialsuk with 33 KV Substation at Sialsuk, Mizoram
Schemes of NEC Schemes of NEC 2009-01-23 4.97 2013-01-23 4.47 0 4.47 4.47 Completed
2226 MIZORAM Power
Construction of 33/11kV Sub-Station at Durtlang with 9kms 33kV line from 132kV Zuangtui Sub-Station, Mizoram
Schemes of NEC Schemes of NEC 2012-02-29 4.8079 2012-02-29 4.33 0 4.33 4.33 Completed
2227 MIZORAM Power
Construction of 33kV S/C on DC Tower from Aibawk substation to Sialsuk Substation with Associated Bays & 11kV Lines, Mizoram
Schemes of NEC Schemes of NEC 2016-02-26 14.78 2019-02-26 13.3 0 13.3 13.3 Completed
2228 MIZORAM Power
Construction of new 132kV substation for shifting 132kV Zuangtui substation with associated interlinking 132kV Lines, Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2012-07-31 20.77 2015-07-31 18.69 0 18.69 18.69 Completed
2229 MIZORAM Power
Construction of Tuiriza(100KW) and Tuiching (100KW) Micro Hydel Project 2X100 KW in Phullen and Hrianghmun, Mizoram
Schemes of NEC Schemes of NEC 2012-02-28 1.9557 2015-02-28 1.76 0 1.76 1.76 Completed
2230 MIZORAM Power
Improvement of 33kV Sub-Station at Ngopa with associated lines, Mizoram.
Schemes of NEC Schemes of NEC 2011-12-26 4.02 2014-12-26 3.62 0 3.62 3.62 Completed
2231 MIZORAM Power
Renovation & modernization of 132KV S/s at Bukpuii, Serchhip.
Schemes of NEC Schemes of NEC 2011-03-22 4.57 2014-03-22 4.11 0 4.11 4.11 Completed
2232 MIZORAM Power
Strengthening of 33/11kV Sub-Station at Zaizawhtlang and Thenhlum with associated, Mizoram
Schemes of NEC Schemes of NEC 2017-04-19 5.25 2020-04-19 3.8 0 3.8 3.8 Completed
2233 MIZORAM Power
Strengthening of 33/11kV substation at Vairengte (2.5 MVA) and Thingsulthliah (1.6MVA), Mizoram
Schemes of NEC Schemes of NEC 2015-09-06 5.72 2018-09-06 5.15 0 5.15 5.15 Completed
2234 MIZORAM Science and Technology
Afforestation of Denuded Hills in Champhai District of Mizoram
Schemes of NEC Schemes of NEC 2020-11-23 2 2023-11-23 1.95 0.05 2 1.95 Ongoing
2235 MIZORAM Science and Technology
Computerization of Cadastral Mapping, Lunglei District
Schemes of NEC Schemes of NEC 2005-03-31 2.0883 2009-03-31 2.0883 0 2.0883 2.09 Completed
2236 MIZORAM Science and Technology
Delineation of Urban Development Zones with special reference to Landslide Risk & Slope stability of AizawlCity, Mizoram
Schemes of NEC Schemes of NEC 2014-05-27 2.381 2017-05-27 2.14 0 2.14 2.14 Completed
2237 MIZORAM Science and Technology
Development of Comprehensive and Integrated GIS based System for maintenance and Management of Land Records in Mizoram
Schemes of NEC Schemes of NEC Other 2022-03-21 6.4 2025-03-30 3.97 0 3.97 3.97 Ongoing
2238 MIZORAM Science and Technology
Digital 3D Terrain Mapping and Modelling of Eight Districts of Mizoram using Geospatial Techniques, Mizoram
Schemes of NEC Schemes of NEC 2015-06-18 1.991 2018-06-18 1.79 0 1.79 1.79 Completed
2239 MIZORAM Science and Technology
Disaster Management System Project in Mizoram
Schemes of NEC Schemes of NEC 2009-01-30 1.85 2013-01-30 1.85 0 1.85 1.85 Completed
2240 MIZORAM Science and Technology
E-Governance of Mizoram Board of School Education & Online connectivity with selected schools in Mizoram
Schemes of NEC Schemes of NEC 2010-02-08 2.13 2013-02-08 2.13 0 2.13 2.13 Completed
2241 MIZORAM Science and Technology
Enhancement of State Revenue through application of information Technology in monitoring Mineral Exploitations & Resource Mapping, Mizoram
Schemes of NEC Schemes of NEC 2022-03-31 4.69 2025-03-31 4.06788 0 4.06788 2.54 Ongoing
2242 MIZORAM Science and Technology
Establishment of Digital Planetarium at Lunglei, Mizoram. (Mizoram Science, Technology & Innovation Council, Govt. of Mizoram)
Schemes of NEC Schemes of NEC 2017-04-19 3.14 2020-03-03 2.826 0 2.826 2.83 Completed
2243 MIZORAM Science and Technology
Establishment of Rural Information Kiosks in 300 villages in the state of Mizoram
Schemes of NEC Schemes of NEC 2012-03-01 4.8985 2015-03-01 4.41 0 4.41 4.41 Completed
2244 MIZORAM Science and Technology
Hazard Risk and Vulnerability Analysis for Eight District Headquarters of Mizoram using Remote Sensing and GIS. (Mizoram Remote Sensing Application Centre. Govt. of Mizoram)
Schemes of NEC Schemes of NEC 2016-03-11 2.19 2019-03-11 1.97 0 1.97 1.97 Completed
2245 MIZORAM Science and Technology
Infrastructure Development for Biotechnology Cell in Mizoram
Schemes of NEC Schemes of NEC Choose... 2022-03-30 3.23 2025-03-30 0.7512646 0.6454 1.3966646 0.7512646 Ongoing
2246 MIZORAM Science and Technology
IT Education and Science & Technology Awareness Programme at 100 schools in Mizoram
Schemes of NEC Schemes of NEC 2011-10-21 4.5701 2013-10-21 4.11 0 4.11 4.11 Completed
2247 MIZORAM Science and Technology
IT Education Programme for 150 Schools in Mizoram, Mizoram State e-Governance Society (MSeGS), Aizawl
Schemes of NEC Schemes of NEC Dept. of Power 2016-03-17 11.08 2019-03-17 11.08 0 11.08 11.08 Ongoing
2248 MIZORAM Science and Technology
IT Entrepreneurship Development Programme for Unemployed Youths
Schemes of NEC Schemes of NEC 2005-03-31 4.0939 2008-03-31 4.0939 0 4.0939 4.09 Completed
2249 MIZORAM Science and Technology
Large Scale Mapping of Wet Rice Cultivation (WRC) Potential area in Mizoram Using Geospatial Techniques.
Schemes of NEC Schemes of NEC 2022-03-21 2.1042 2025-03-31 2.11 0 2.11 2.1073 Completed
2250 MIZORAM Science and Technology
Mizoram Infrastructure Information & Monitoring System
Schemes of NEC Schemes of NEC 2012-12-10 2.01 2015-12-10 1.809 0 1.809 1.81 Completed
2251 MIZORAM Science and Technology
NER Online Job Portal. Mizoram Youth Commission, Govt. of Mizoram
Schemes of NEC Schemes of NEC Choose... 2023-03-31 3 2026-03-31 0.75 0 0.75 0.75 Ongoing
2252 MIZORAM Science and Technology
Project Proposal for Internet Connectivity to all Government Offices at District Level, Mizoram, Mizoram State e-Governance Society (MSeGS)
Schemes of NEC Schemes of NEC 2017-01-18 1.5035 2020-01-18 1.5035 0 1.5035 1.5 Completed
2253 MIZORAM Science and Technology
Rural Monitoring& Information Syatem (RMIS), Mizoram
Schemes of NEC Schemes of NEC Other 2022-03-31 2.48 2025-03-31 2.489 0 2.489 1.46904 Completed
2254 MIZORAM Transport and Communication
Bamboo Resource link road
Schemes of NEC Schemes of NEC 2006-03-08 1.09 2009-03-08 0.98 0 0.98 0.98 Completed
2255 MIZORAM Transport and Communication
Chalfilh(Vanzau) Tourist centre
Schemes of NEC Schemes of NEC 2006-09-08 4.02 2009-09-08 3.8 0 3.8 3.8 Completed
2256 MIZORAM Transport and Communication
Chalfilh(Vanzau) Tourist centre
Schemes of NEC Schemes of NEC 2004-12-17 3.45 2007-12-17 3.11 0 3.11 3.11 Completed
2257 MIZORAM Transport and Communication
Construction of approach road to PSC bridge over River Tlawang on Bairabi Zamuang road
Schemes of NEC Schemes of NEC 2016-09-27 4.4493 2019-09-27 4 0 4 4 Completed
2258 MIZORAM Transport and Communication
Khedacherra - Damcherra - Kwarthah- Tuilutkawn
Schemes of NEC Schemes of NEC 2013-01-09 183.27 2016-01-08 164.937 0 164.937 164.94 Completed
2259 MIZORAM Transport and Communication
Lengpui Airport
Schemes of NEC Schemes of NEC 2008-07-08 14.92 2011-08-08 13.42 0 13.42 13.42 Completed
2260 MIZORAM Transport and Communication
Mamit-Bhairabi Road
Schemes of NEC Schemes of NEC 2004-10-19 36.75 2007-10-20 33.57 0 33.57 33.57 Completed
2261 MIZORAM Transport and Communication
Saitual-Phullen
Schemes of NEC Schemes of NEC 2004-08-18 57.95 2007-08-18 52.65 0 52.65 52.65 Completed
2262 MIZORAM Transport and Communication
Saitual-Saichal-NE-Bualpui
Schemes of NEC Schemes of NEC 2004-09-27 40.97 2007-09-27 36.74 0 36.74 36.74 Foreclosed
2263 MIZORAM Transport and Communication
Serkhan-Baghabazar road
Schemes of NEC Schemes of NEC 2011-02-22 187.04 2014-02-22 168.341 0 168.341 168.34 Completed
2264 MIZORAM Transport and Communication
Thanlon Singhat (Ngopa Tuivai)
Schemes of NEC Schemes of NEC 2010-08-17 67.67 2013-08-17 60.9 0 60.9 60.9 Completed
2265 MIZORAM Transport and Communication
Tlabung-Kawpuichhuah road
Schemes of NEC Schemes of NEC 2006-12-16 14.94 2009-12-16 13.65 0 13.65 13.65 Completed
2266 MIZORAM Transport and Communication
Upgradation at Bhairabi-Zamuang
Schemes of NEC Schemes of NEC 2004-10-27 37.68 2007-10-27 35.01 0 35.01 35.01 Completed
2267 MIZORAM Transport and Communication
Upgradation of Kaitum-Artahkawn
Schemes of NEC Schemes of NEC 2004-09-16 32.3 2007-09-16 30.07 0 30.07 30.07 Completed
2268 MIZORAM Transport and Communication
Vaikhawtlang-Khuangphah road
Schemes of NEC Schemes of NEC 2005-03-29 4.8582 2008-03-29 4.23 0 4.23 4.23 Completed
2269 MIZORAM Tourism and Culture
Biate Tea Tourism Circuit and Nature Camp in Mizoram
Schemes of NEC Schemes of NEC Choose... 2023-03-28 3.6962 2026-03-29 2.091 0 2.091 Ongoing
2270 MIZORAM Tourism and Culture
Development of Mount Mawma Ecological Park Chakhei Mizoram
Schemes of NEC Schemes of NEC Choose... 2022-03-31 2.36 2025-03-31 2.36 0 2.36 2.3615 Completed
2271 MIZORAM Tourism and Culture
Discovering Mizoram-for promotion of tourism in the state of Mizoram
Schemes of NEC Schemes of NEC 2020-09-29 0.2 2023-09-29 0.2 0 0.2 0.2 Completed
2272 MIZORAM Tourism and Culture
Establishing Mizo Cultural Heritage Centre for Protecting the Historical and Natural Heritage of Mizoram at Kawlri, Serchhip District, Mizoram
Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.8647 2025-03-31 3.7482 1.2165 4.9647 2.4322 Ongoing
2273 MIZORAM Tourism and Culture
Integrated Tourist Circuit, Serchhip, Mizoram
Schemes of NEC Schemes of NEC 2020-05-28 4.38 2023-05-28 4.38 0 4.38 4.38 Completed
2274 MIZORAM Tourism and Culture
Samthang Zo Phulpui Nature Park, Mizoram
Schemes of NEC Schemes of NEC 2021-03-30 3.5921 2024-03-30 3.5921 0 3.5921 3.59 Completed
2275 MIZORAM Tourism and Culture
Tourism promotion and capacity building training in Mizoram
Schemes of NEC Schemes of NEC 2020-05-29 0.54 2023-05-29 0.5397 0 0.5397 0.54 Completed
2276 MIZORAM Roads and Bridges
Construction of Aizawl By-pass on Western Side
PM-DevINE Public works Department 2024-02-10 500 2027-11-30 112.95 0 112.95 Ongoing
2277 MIZORAM Roads and Bridges
Pilot project for the construction of Bamboo Link Roads at different locations in various districts in the State of Mizoram - (i) Tuirial Airfield to North Chaltlang (18 km) at a cost of Rs. 33.58 Crore and (ii) Lengpui to Saiphal Bamboo Plantation (41 km) at a cost of Rs. 66.42 crore
PM-DevINE Public works Department 2023-02-06 100 2025-12-11 83.3696 0 83.3696 9.5434 Ongoing
2278 MIZORAM Power
Construction of 2x10 MVA, 33/11 KV Sub-Station Chite with Associated Linking Lines in Mizoram
NESIDS-OTRI NESIDS POWER & ELECTRICITY DEPAR 2022-04-20 10.49 2024-04-30 10.2858 0 10.2858 10.2858 Completed
2279 MIZORAM Power
Construction of 2X6.3 MVA, 132/33 KV Sub-Station at Mamit with associated 33 KV tower line up to Zawlnuam via Zamuang, Mizoram
NESIDS-OTRI NESIDS POWER & ELECTRICITY DEPAR 2018-12-04 40.3384 2020-03-31 40.3384 0 40.3384 40.3384 Ongoing
2280 MIZORAM Transport and Communication
Component I of Development of Immediately Required Infrastructure for Tourism Development at Reiek and Reiek Tlang in Mizoram under NESIDS
NESIDS-ROADS NESIDS Public works Department 2019-12-17 5.6 2020-03-31 5.6 0 5.6 5.6 Completed
2281 MIZORAM Roads and Bridges
Development of Village based Eco-Tourism at Khamrang in Mizoram
NESIDS-OTRI NESIDS TOURISM DEPARTMENT 2022-04-20 7.8 2024-04-30 3.9 0 3.9 0.1 Ongoing
2282 MIZORAM Transport and Communication
Improvement & Up-gradation of difference at Lengpui Airport ,Mizoram
NESIDS-ROADS NESIDS Public works Department 2021-03-03 19.59 2023-03-03 19.583178 0 19.583178 13.17 Completed
2283 MIZORAM Transport and Communication
Improvement and Upgradation of Lawngtlai to Tuipui Ferry Road, Lawgtlai District in Mizoram
NESIDS-ROADS NESIDS Public works Department 2019-03-08 26.33 2020-03-31 26.3229 0 26.3229 25.1203 Completed
2284 MIZORAM Transport and Communication
Daido Vawngkawt Road
NESIDS-ROADS NESIDS Public works Department 2024-01-12 17.24 2026-01-12 17.03 0 17.03 Completed
2285 MIZORAM Transport and Communication
Upgradation of Zote-Farthlang-Bunali-Tuipui-Tawnzang Road
NESIDS-ROADS NERSDS Public works Department 2021-01-29 29.26 2024-04-29 23.2 0 23.2 14.72 Completed
2286 MIZORAM Transport and Communication
Upgradation and improvement of Hnahlan-Hmunlui-Tuimang-Singngei Road (Hnahlan to river Tiau Mizoram
NESIDS-ROADS NERSDS Public works Department 2021-01-29 44.17 2023-01-31 34.15 0 34.15 19.22 Completed
2287 MIZORAM Transport and Communication
Upgradation and improvement of Saiha-Lungbun-Tluangram-Haka Road (Lungbun to R.Kolodyne Mizoram)
NESIDS-ROADS NERSDS Public works Department 2021-01-29 50.21 2024-10-01 44.44 0 44.44 10.65 Completed
2288 MIZORAM Water Supply
Alternate Gravity Water Supply Scheme of Aizawl,Mizoram
NESIDS-OTRI NESIDS Public Health & Engg Depa 2018-12-04 114.1965 2020-03-31 112.4988 0 112.4988 107.1358 Ongoing
2289 MIZORAM Water Supply
Augmentation of Greater Mamit Water Supply Scheme Part-II
NESIDS-OTRI NESIDS PUBLIC HEALTH ENGINEERING 2022-04-20 37.8571 2024-04-30 35.8571 0 35.8571 28.06 Ongoing
2290 MIZORAM Water Supply
Augmentation of North Vanlaiphai Water Supply Scheme in Mizoram
NESIDS-OTRI NESIDS PUBLIC HEALTH ENGINEERING 2022-04-20 19.4017 2024-04-30 17.7606 0 17.7606 12.7606 Ongoing
2291 MIZORAM Agriculture and Allied
Bamboo processing industry.
NESIDS-OTRI NLCPR Dept. of Power 2000-12-20 4 2004-05-29 3.6 0 3.6 4 Completed
2292 MIZORAM Agriculture and Allied
Establishment of 8 Units of Fish seed farms in Mizoram.
NESIDS-OTRI NLCPR FISHERIES 2000-01-14 5.28 2005-05-18 4.752 0 4.752 5.28 Completed
2293 MIZORAM Agriculture and Allied
Integrated piggery development project
NESIDS-OTRI NLCPR AH&VETY 2000-01-14 6.57 2003-03-31 5.913 0 5.913 6.57 Completed
2294 MIZORAM Agriculture and Allied
Marketing facilities and marketing of Tung Seeds and Oil within Country & Abroad.
NESIDS-OTRI NLCPR AGRI 2000-01-24 0.5 2004-07-24 0.45 0 0.45 0.5 Completed
2295 MIZORAM Agriculture and Allied
Mobilisation and development of feed & foder project, modafer
NESIDS-OTRI NLCPR AH&VETY 2000-01-14 7.25 2005-01-31 3.924 0 3.924 4.36 Ongoing
2296 MIZORAM Education
Construction & Renovation of School Building.
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2000-07-27 21.43 2005-07-31 18.648 0 18.648 20.72 Completed
2297 MIZORAM Education
Construction of Boys and Girls Hostel at Saitual and Thingsulthliah in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-07-04 1.8999 2013-06-30 1.6926 0 1.6926 1.6807 Completed
2298 MIZORAM Education
Construction of Examination Hall for MPSC Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-23 2.8832 2012-12-31 2.5577 0 2.5577 1.9197 Completed
2299 MIZORAM Education
Construction of Government Aizawl College New Campus Building at Mualpui, Aizawl in Mizoram
NESIDS-OTRI NLCPR Dept. of Education 2017-12-18 12 2019-12-18 10.7999 0 10.7999 10.7999 Completed
2300 MIZORAM Education
Construction of Higher Secondary School Building at Kawlkulh and Kawlbem in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-12-26 1.9588 2014-12-31 1.7629 0 1.7629 1.7629 Completed
2301 MIZORAM Education
Construction of Hostels for Students of Higher Secondary Schools at Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-12-29 5.2048 2015-06-30 4.6843 0 4.6843 4.6843 Completed
2302 MIZORAM Education
Construction of Mara Student Hostel at Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2013-09-26 5.3836 2016-09-30 4.8452 0 4.8452 4.8452 Completed
2303 MIZORAM Education
Construction of Mizoram Law College at Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-02-27 2.8958 2010-08-31 2.5551 0 2.5551 2.5551 Completed
2304 MIZORAM Education
Construction of Multi Complex Building Auditorium at Pachhunga University College, Aizawl, Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-23 2.8526 2012-10-31 2.5673 0 2.5673 2.5673 Completed
2305 MIZORAM Education
Construction of Post-Matric Students Hostel at Aizawl in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-02-22 1.901 2013-02-28 1.6618 0 1.6618 1.6618 Completed
2306 MIZORAM Education
Construction of School Building within LADC (Phase-II), Lai Autonomous District Council
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2013-09-23 11.0985 2016-09-30 9.2584 0 9.2584 9.2584 Completed
2307 MIZORAM Education
Construction of School Buildings in Mara Autonomous District Council
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2007-12-19 2.1242 2008-12-31 1.9118 0 1.9118 1.9118 Completed
2308 MIZORAM Education
Construction of Schools within LADC
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2008-03-28 2.3686 2010-02-28 2.1106 0 2.1106 2.1106 Completed
2309 MIZORAM Education
Construction of Secondary School Buildings in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-09-14 9.6853 2007-12-31 8.3028 0 8.3028 8.3028 Completed
2310 MIZORAM Education
Construction of Student Hostel at Aizawl in respect of Chakma Autonomous District Council
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-10-25 5.65 2019-10-25 5.085 0 5.085 3.9332 Ongoing
2311 MIZORAM Education
Construction of Students Hostel for Lai Autonomous District Council at Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-10-17 5.9672 2014-10-31 5.3704 0 5.3704 5.3704 Completed
2312 MIZORAM Education
Construction of Teachers Training Complex at Lunglei in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-11-22 10.4 2019-11-22 9.36 0 9.36 9.36 Completed
2313 MIZORAM Education
Establishment of Sainik School at Chhingchhip, Serchhip District, Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-02-29 50.6423 2015-02-28 44.6842 0 44.6842 44.6842 Completed
2314 MIZORAM Education
Infrastricture Development of Lawngtlai College, Lawngtlai, Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-05-04 1.3609 2013-04-30 1.0729 0 1.0729 1.0729 Completed
2315 MIZORAM Education
Infrastructure development of 4 college in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-09-18 5.4632 2011-02-28 4.7251 0 4.7251 4.7251 Completed
2316 MIZORAM Education
Infrastructure Development of Govt. Champhai College at Champhai, Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-03-17 9.5129 2013-03-31 8.455 0 8.455 8.455 Completed
2317 MIZORAM Education
Infrastructure Development of Kamalanagar College in CADC
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-09-14 2.24 2015-09-30 2.016 0 2.016 2.016 Completed
2318 MIZORAM Education
Infrastructure Development of Mizoram University (additional)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-02-20 23.26 2007-06-30 20.934 0 20.934 21.3889 Completed
2319 MIZORAM Education
Infrastructure Development of various colleges (10 Nos.) in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-06-24 13.6764 2013-06-30 11.7362 0 11.7362 11.5931 Completed
2320 MIZORAM Education
Mizoram University
NESIDS-OTRI NLCPR MZU 2001-08-18 1.74 2004-08-31 1.566 0 1.566 1.74 Completed
2321 MIZORAM Education
Sarva Shiksha Abhiyan
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-03-28 5.1183 2007-03-31 5.1183 0 5.1183 5.1183 Completed
2322 MIZORAM Education
Sarva Shiksha Abhiyan (2006-07)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-06-29 6.8834 2007-06-29 6.8834 0 6.8834 6.8834 Completed
2323 MIZORAM Education
Secondary Schools Improvement Project
NESIDS-OTRI NLCPR HIGHER & TECHNICAL EDUCAT 2001-03-07 12.48 2004-05-28 11.232 0 11.232 12.48 Completed
2324 MIZORAM Health
200 Bedded Hospital at Lunglai.
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-02-22 7.62 2005-02-28 6.5056 0 6.5056 7.1776 Completed
2325 MIZORAM Health
Construction of 100 bedded Civil Hospital at Saiha
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2013-09-26 15.9252 2016-09-30 14.3327 0 14.3327 11.4661 Completed
2326 MIZORAM Health
Construction of 50 Bedded Hospital in Lawngtlai in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-12-29 11.9151 2016-12-31 10.6987 0 10.6987 10.6987 Completed
2327 MIZORAM Health
Construction of Medical Staff Quarters for CHC at Saitual and Thingsulthliah in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-05-03 1.3221 2012-10-31 0.4666 0 0.4666 0.4666 Completed
2328 MIZORAM Health
Construction of Out-Patient Department Block, Civil Hospital, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-03-21 3.71 2006-03-31 3.2704 0 3.2704 3.4454 Completed
2329 MIZORAM Health
Six bedded ICU at Civil Hospital, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-03-21 1.42 2004-06-25 1.278 0 1.278 1.42 Completed
2330 MIZORAM Health
State Referral Hospital, Aizawl.
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 1999-02-15 40.53 2004-02-29 36.4775 0 36.4775 40.0165 Completed
2331 MIZORAM Health
Veterinary Polyclinic at Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-03-02 4.823 2014-02-28 4.2442 0 4.2442 4.2442 Completed
2332 MIZORAM Miscellaneous
Allotment of BADP funds for Lai Autonomous District Council
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2001-06-11 1 2004-07-19 0.9 0 0.9 1 Completed
2333 MIZORAM Miscellaneous
BMS
NESIDS-OTRI NLCPR 1999-12-30 14.91 2004-07-19 13.419 0 13.419 14.91 Completed
2334 MIZORAM Miscellaneous
Construction of 10 Nos. of Helipads
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-09-12 2.582 2013-09-30 2.1438 0 2.1438 2.1438 Completed
2335 MIZORAM Miscellaneous
Construction of Community Halls at Various Places in Mizoram (Part-II)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-02-23 2.0649 2012-02-29 1.6949 0 1.6949 1.6949 Completed
2336 MIZORAM Miscellaneous
Construction of Community halls in various locations in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2008-03-07 4.7 2009-02-28 4.23 0 4.23 4.23 Completed
2337 MIZORAM Miscellaneous
Construction of Dam Reservoir and Development of Recreation Centre at Keilungliah, Champhai in Mizoram
NESIDS-OTRI NLCPR Public Health & Engg Depa 2017-12-05 19.88 2019-12-05 17.3133 0 17.3133 17.3133 Ongoing
2338 MIZORAM Miscellaneous
Construction of High Court Building at New Sectt. Complex in Aizaw (Mizoram)l
NESIDS-OTRI NLCPR Dept. of Power 2016-03-18 46.2412 2019-02-18 44.2659 0 44.2659 35.9427 Ongoing
2339 MIZORAM Miscellaneous
Construction of market building - Banglakawn Market, Kolasib
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.25 2005-07-31 0.225 0 0.225 0.25 Completed
2340 MIZORAM Miscellaneous
Construction of market building - Bara Bazar Market Complex, Aizawl Block-I
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 1.69 2004-07-31 1.521 0 1.521 1.69 Completed
2341 MIZORAM Miscellaneous
Construction of market building - Bara Bazar Market Complex, Aizawl Block-II
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 1.25 2006-12-31 1.125 0 1.125 1.25 Completed
2342 MIZORAM Miscellaneous
Construction of market building - Bara Bazar Market Complex, Aizawl Block-III (A)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.47 2006-12-31 0.423 0 0.423 0.47 Completed
2343 MIZORAM Miscellaneous
Construction of market building - Bara Bazar Market Complex, Aizawl Block-III (B)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.76 2006-12-31 0.684 0 0.684 0.76 Completed
2344 MIZORAM Miscellaneous
Construction of market building - Bazar Veng Market, Hnahthial
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.77 2005-07-31 0.693 0 0.693 0.77 Completed
2345 MIZORAM Miscellaneous
Construction of market building - Bethel Market, Champhai
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.34 2005-07-31 0.306 0 0.306 0.34 Completed
2346 MIZORAM Miscellaneous
Construction of market building - Bungkawn Market, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.45 2004-07-31 0.405 0 0.405 0.45 Completed
2347 MIZORAM Miscellaneous
Construction of market building - Car Parking at Bara Bazar Market Complex, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.03 2006-12-31 0.027 0 0.027 0.03 Completed
2348 MIZORAM Miscellaneous
Construction of market building - Chanmari Market, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.23 2004-07-31 0.207 0 0.207 0.23 Completed
2349 MIZORAM Miscellaneous
Construction of market building - Chanmari Market, Hnahthial
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.27 2005-07-31 0.243 0 0.243 0.27 Completed
2350 MIZORAM Miscellaneous
Construction of market building - Chanmari Market, Lunglei
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 1 2004-07-31 0.9 0 0.9 1 Completed
2351 MIZORAM Miscellaneous
Construction of market building - Dawrkawn Market, Serchhip
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.95 2005-07-31 0.855 0 0.855 0.95 Completed
2352 MIZORAM Miscellaneous
Construction of market building - Dismantling Old Building at Bara Bazar, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.13 2004-07-31 0.117 0 0.117 0.13 Completed
2353 MIZORAM Miscellaneous
Construction of market building - Mamit Market, Mamit
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.41 2005-07-31 0.369 0 0.369 0.41 Completed
2354 MIZORAM Miscellaneous
Construction of market building - Rahsi Veng Market, Champhai
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 1.18 2004-07-31 1.062 0 1.062 1.18 Completed
2355 MIZORAM Miscellaneous
Construction of market building - Ramhlun Market, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.54 2004-07-31 0.486 0 0.486 0.54 Completed
2356 MIZORAM Miscellaneous
Construction of market building - Serkawn Market, Lunglei
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.11 2004-07-31 0.099 0 0.099 0.11 Completed
2357 MIZORAM Miscellaneous
Construction of market building - Sihphir Market, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.5 2006-12-31 0.45 0 0.45 0.5 Completed
2358 MIZORAM Miscellaneous
Construction of market building - Storm Drain at Bara Bazar, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.19 2006-12-31 0.171 0 0.171 0.19 Completed
2359 MIZORAM Miscellaneous
Construction of market building - Strengthening of Administration
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.04 2005-07-31 0.036 0 0.036 0.04 Completed
2360 MIZORAM Miscellaneous
Construction of market building - Tanhril Ramrikawn Market, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 0.36 2005-07-31 0.324 0 0.324 0.36 Completed
2361 MIZORAM Miscellaneous
Construction of market building - Thakthing Market, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-19 0.17 2005-07-31 0.153 0 0.153 0.17 Completed
2362 MIZORAM Miscellaneous
Construction of market building - Thuampui Market, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.76 2006-12-31 0.684 0 0.684 0.76 Completed
2363 MIZORAM Miscellaneous
Construction of market building - Vaivakawn Market, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.62 2004-07-31 0.558 0 0.558 0.62 Completed
2364 MIZORAM Miscellaneous
Construction of market building - Venglai Market, Kolasib
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-12-31 0.74 2006-12-31 0.666 0 0.666 0.74 Completed
2365 MIZORAM Miscellaneous
Construction of market building - Zemabawk Market, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2002-07-19 0.47 2004-07-31 0.423 0 0.423 0.47 Completed
2366 MIZORAM Miscellaneous
Construction of Market Building at Vairengte in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2013-07-01 3.8765 2015-06-30 3.4207 0 3.4207 3.4207 Completed
2367 MIZORAM Miscellaneous
Construction of Mizoram State Account and Treasury Office Building at New Secretariat Complex, Aizawal.
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-05-05 11.1 2019-05-05 9.9899 0 9.9899 9.9899 Completed
2368 MIZORAM Miscellaneous
Construction of Multi Level Car Parking at New Secretariat Complex, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-05-05 39.89 2019-05-05 34.34 0 34.34 34.34 Completed
2369 MIZORAM Miscellaneous
Construction of Multi Shopping Complex at Saitual
NESIDS-OTRI NLCPR Public works Department 2015-11-16 3.1033 2017-12-31 2.793 0 2.793 2.793 Completed
2370 MIZORAM Miscellaneous
Construction of Multi-Level Parking, Community Centre and Office Complex at Aizawl North in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-12-15 12.9826 2013-10-31 9.9109 0 9.9109 9.9109 Completed
2371 MIZORAM Miscellaneous
Construction of Multipurpose Centre at Ramthar North, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-02-21 1.8494 2017-02-20 1.6645 0 1.6645 1.6645 Completed
2372 MIZORAM Miscellaneous
Construction of Police Headquarters Buildings at Khatla in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-12-29 15.5579 2017-06-30 14.0021 0 14.0021 14.0021 Completed
2373 MIZORAM Miscellaneous
Construction of RA Lorrain Market Centre at Saiha in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-04-08 3.8087 2012-03-31 3.3764 0 3.3764 3.3764 Completed
2374 MIZORAM Miscellaneous
Infrastructure Requirement of Mizoram Police ( Establishment of 3rd IR Battalion HQRTs at Thingkah), Lawngtlai
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-03-05 28.4228 2017-03-04 25.5805 0 25.5805 25.5805 Completed
2375 MIZORAM Miscellaneous
Intensive and Strengthening of Central Rural Sanitation Programme in Mara Autonomous District Council Area of Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-10-28 0.4686 2010-09-30 0.4218 0 0.4218 0.4312 Completed
2376 MIZORAM Miscellaneous
Modernization of Kamalanagar Town
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-10-23 19.8882 2014-10-31 14.3196 0 14.3196 14.3196 Foreclosed
2377 MIZORAM Miscellaneous
Solid Waste Management at Lunglei (under SAP)
NESIDS-OTRI NLCPR URBAN DEVELOPMENT & POVER 2017-12-18 6 2019-06-18 4.455 0.945 5.4 1.782 Ongoing
2378 MIZORAM Miscellaneous
State Capital Project, Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-07-23 5.18 2004-07-19 4.662 0 4.662 5.18 Completed
2379 MIZORAM Miscellaneous
Strengthening of Government Press, Aizawl, Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-03-14 8.4247 2012-03-31 7.3033 0 7.3033 7.3033 Completed
2380 MIZORAM Miscellaneous
Upgradation of Central Jail Aizawl for construction of Separate Women Jail in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-12-29 13.0695 2017-12-31 11.7625 0 11.7625 11.7625 Completed
2381 MIZORAM Miscellaneous
Upgradation of Lawngtlai Town in the Lai Autonomous District Council in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-05-03 11.8069 2014-04-30 10.4271 0 10.4271 10.4271 Completed
2382 MIZORAM Miscellaneous
Upgradation of Lengpui Airport in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-03-15 24.8162 2013-02-28 16.2046 0 16.2046 16.2046 Completed
2383 MIZORAM Power
Construction of 110 km 132 KV S/C Aizawl (Melriat S/S) - Lunglei line including one out-going bay at Melriat and one incoming bay at Lunglei
NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2012-09-11 41.7607 2015-09-30 37.5845 0 37.5845 37.5845 Completed
2384 MIZORAM Power
Construction of 132 kV S/C line on D/C towers from Kolasib to Aizawl (Melriat) with LILO of one circuit at Aizawl (Zuangtui) 132 kV Sub Station
NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2005-12-22 21.511 2008-12-31 17.0367 0 17.0367 17.0367 Completed
2385 MIZORAM Power
Construction of 132 kV single circuit Line from Khawzawl to Champai
NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2006-12-01 5.9 2009-11-30 5.306 0 5.306 5.306 Completed
2386 MIZORAM Power
Construction of 2 X 2.5 MVA, 33/11 KV S/s at P & E Complex with associated 33 KV line ai Saiha Town
NESIDS-OTRI NLCPR Dept. of Power 2017-05-05 7.66 2019-05-05 6.6749 0 6.6749 6.6749 Completed
2387 MIZORAM Power
Construction of 2 X 2.5 MVA, 33/11 KV S/s at P & E Complex with associated 33 KV lines in the heart of Lawngtlai Town
NESIDS-OTRI NLCPR Dept. of Power 2017-05-05 6.78 2019-05-05 6.0752 0 6.0752 6.0752 Completed
2388 MIZORAM Power
Construction of 33 kv D/C line tower from 3 MW Kautlabung SHP to Thenhlum 33 kv Sub-Station (17 kms) in Mizoram
NESIDS-OTRI NLCPR Dept. of Power 2017-12-12 7.82 2019-12-12 7.038 0 7.038 2.8152 Completed
2389 MIZORAM Power
Construction of 33 Kv D/C transmission line (Tower type) Lawngtalai to Saiha
NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2007-06-22 7.4369 2009-06-30 6.6932 0 6.6932 6.6932 Completed
2390 MIZORAM Power
Construction of 33KV D/C Serlui 'B' Kolasib switchyard at Serlui 'B' & incoming bay at 132 KV S/s at Kolasib (bawktlang)
NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2005-05-10 3.151 2007-03-31 2.7508 0 2.7508 1.99 Completed
2391 MIZORAM Power
Electrification of 3 Tribal villages.
NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2002-01-28 0.68 2004-03-31 0.612 0 0.612 0.68 Completed
2392 MIZORAM Power
HFO bassed 20 MW DG thermal plant at Bhairabi
NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2001-12-20 91.59 2003-06-30 82.422 0 82.422 91.58 Completed
2393 MIZORAM Power
Power Evacuation from Thermal Power Plant, Bairabi
NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2003-02-27 4.56 2004-09-30 4.104 0 4.104 4.56 Completed
2394 MIZORAM Power
Sub- transmision and Distribution Lines - Aizwal Town
NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2000-11-17 25.83 2004-05-27 23.247 0 23.247 25.83 Completed
2395 MIZORAM Power
Sub- transmision and Distribution Lines - Lunglei Town
NESIDS-OTRI NLCPR POWER & ELECTRICITY DEPAR 2002-10-21 8.3 2004-05-14 7.47 0 7.47 8.3 Completed
2396 MIZORAM Roads and Bridges
Bridge over River Chawngte(P to C)(LAI&Chakma ADC)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-01-07 2.5553 2006-01-31 2.196 0 2.196 2.4379 Completed
2397 MIZORAM Roads and Bridges
Bridge over River Chawngtelui on Diltlang to Chawngte Road(LAI ADC)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-01-07 2.0349 2006-01-31 1.746 0 1.746 1.94 Completed
2398 MIZORAM Roads and Bridges
Bridge over River Tuisih on Tuipang-Zwangling-Chheihhlu Road(Mara ADC)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-01-07 1.1406 2006-01-31 0.981 0 0.981 1.087 Completed
2399 MIZORAM Roads and Bridges
Bridge over River Vanva on Haulawng-Bualpui-Chhiphir Road
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2004-01-07 1.4567 2006-01-31 1.251 0 1.251 1.3872 Completed
2400 MIZORAM Roads and Bridges
Chawngte-Borapansury Road within Chakma Autonomous District Council
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-10-21 10.46 2006-10-31 8.9501 0 8.9501 9.7501 Completed
2401 MIZORAM Roads and Bridges
Construction of 3 Bailey Bridges in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-09-26 6.4942 2008-09-30 4.9821 0 4.9821 4.9821 Completed
2402 MIZORAM Roads and Bridges
Construction of Approach Road to Tuival from Mimbung and approach road to Godown at Kawlkulh, Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-06-24 3.6709 2012-12-31 2.9206 0 2.9206 2.9206 Completed
2403 MIZORAM Roads and Bridges
Construction of Bamboo Plantation Link road from tuiral airfield to Bukpui Phase - II (40 - 84)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-12-01 25.125 2008-12-31 7.9144 0 7.9144 7.9144 Completed
2404 MIZORAM Roads and Bridges
Construction of Bamboo Plantation Link Road to proposed Bamboo Plantation Areas from tuirial Airfield to Bukpui (0-40)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-12-01 22.3902 2008-12-31 7.0529 0 7.0529 7.0529 Completed
2405 MIZORAM Roads and Bridges
Construction of Bridge over Tuichang on Keituam - Artahkawn road in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2008-04-30 2.5949 2010-04-30 0.81 0 0.81 0.81 Completed
2406 MIZORAM Roads and Bridges
Construction of Hnahthial - Haulawng via Zotui Road Phase-I (14.393 Km. upto WBM & Bituminous works)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-12-29 15.1578 2017-12-31 13.2043 0 13.2043 13.2043 Completed
2407 MIZORAM Roads and Bridges
Construction of Jeepable Suspension Bridge over R. Chhimtuipui at Darzokai on Hnahthial to Sangau Road
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-03-02 2.1621 2013-02-28 1.9078 0 1.9078 1.9078 Completed
2408 MIZORAM Roads and Bridges
Construction of Khanpui to Tualbung road
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-07-04 1.9721 2012-06-30 1.2431 0 1.2431 1.2431 Completed
2409 MIZORAM Roads and Bridges
Construction of Lawngtlai By-Pass Road, Phase-I (13 km) in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2012-11-27 11.4385 2014-11-30 6.7176 0 6.7176 6.7176 Foreclosed
2410 MIZORAM Roads and Bridges
Construction of Link Road to Bamboo Plantation Areas from Saiphal to Hortoki (0-27.5km) in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-11-24 12.9967 2008-12-31 8.188 0 8.188 8.188 Completed
2411 MIZORAM Roads and Bridges
Construction of Link Roads to Bamboo Plantation - Plot No. A from W.Serzawl Saiphal/Saitlaw 18 kms
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-09-29 5.82 2006-09-30 5.238 0 5.238 5.5 Completed
2412 MIZORAM Roads and Bridges
Construction of Link Roads to Bamboo Plantation - Plot No. B from Dur Lui - Sairum and Dur Lui - Mualkhang
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-09-29 6.1662 2006-09-30 5.553 0 5.553 6.1662 Completed
2413 MIZORAM Roads and Bridges
Construction of Longpuighat - Kukurduleya Road
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-02-03 11.5245 2010-02-28 10.1687 0 10.1687 6.8938 Foreclosed
2414 MIZORAM Roads and Bridges
Construction of Road from Chuhvel to Sihthiang in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2011-02-23 2.2353 2013-02-28 1.9723 0 1.9723 1.9723 Completed
2415 MIZORAM Roads and Bridges
Construction of Road from Ramthar N to Ramhlum Sport Complex in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-23 2.0223 2012-12-31 1.7844 0 1.7844 1.7844 Completed
2416 MIZORAM Roads and Bridges
Construction of Sihpui to Thuampui Road in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-13 2.4823 2012-12-31 2.1903 0 2.1903 2.1903 Completed
2417 MIZORAM Roads and Bridges
Improvement and widening of Bawngkawn to Durtland Road
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-03-21 6.81 2004-05-29 6.129 0 6.129 6.81 Completed
2418 MIZORAM Roads and Bridges
Lungtian-Mamte Road via Vartek Kai within Lai ADC
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2003-10-21 26.65 2006-10-31 22.8305 0 22.8305 24.7745 Completed
2419 MIZORAM Roads and Bridges
Road formation and restoration works at Lawngtlai Slided loctaion
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-02-18 2.237 2011-02-28 1.9738 0 1.9738 1.9738 Completed
2420 MIZORAM Roads and Bridges
Upgradation of Parva-I to Simenasora Road
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2007-09-26 12.264 2008-02-29 10.8211 0 10.8211 10.367 Completed
2421 MIZORAM Sports
Construction of Additional Works for Indoor Stadium at Pitarte Tlang, Aizawl in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2013-02-21 2.4511 2014-08-31 2.1874 0 2.1874 2.1874 Completed
2422 MIZORAM Sports
Construction of Aizawl Cricket Stadium at Sihhmui, Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2009-12-21 11.2816 2011-03-31 9.9543 0 9.9543 9.9543 Completed
2423 MIZORAM Sports
Construction of Indoor Stadium at Aizawl
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2007-06-20 13.0522 2009-06-30 11.4048 0 11.4048 11.4048 Completed
2424 MIZORAM Sports
Construction of Indoor Stadium at Bungtlang in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-23 1.7375 2012-12-31 1.4947 0 1.4947 1.4947 Completed
2425 MIZORAM Sports
Construction of Indoor Stadium at Champhai
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2006-07-31 11.5999 2008-01-01 10.1358 0 10.1358 10.1358 Completed
2426 MIZORAM Sports
Construction of Indoor Stadium at Chanmari, Lunglei
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2014-02-21 4.9619 2017-02-20 4.1408 0 4.1408 4.1408 Completed
2427 MIZORAM Sports
Construction of Indoor Stadium at Keitum in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2010-12-23 1.7375 2012-12-31 1.4947 0 1.4947 1.4947 Completed
2428 MIZORAM Sports
Construction of Mini Sports Complex at Aibawk
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-05-05 4 2019-05-05 3.6 0 3.6 3.6 Completed
2429 MIZORAM Sports
Construction of Mini Sports Complex at E. Lungdar
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2015-09-17 4.3496 2017-09-17 3.9146 0 3.9146 4.0016 Completed
2430 MIZORAM Sports
Construction of Mini Sports Complex at Khawbung (Mizoram)
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2016-03-07 3.6989 2018-03-07 3.329 0 3.329 3.329 Completed
2431 MIZORAM Sports
Construction of Mini Sports Complex, Sakawrdai in Mizoram
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2017-10-25 3.5 2019-10-25 3.15 0 3.15 3.15 Completed
2432 MIZORAM Sports
Construction of Table Tennis TrainingCentre at Mission Vengthlang in Aizawl
NESIDS-OTRI NLCPR Public works Department 2015-10-13 3.6987 2017-12-31 3.3288 0 3.3288 3.3288 Completed
2433 MIZORAM Sports
Construction of Zauva Sailo Memorial Tennis Centre Lunglei
NESIDS-OTRI NLCPR PUBLIC WORK DEPARTMENT 2015-09-14 4.26 2017-09-14 3.834 0 3.834 3.834 Completed
2434 MIZORAM Sports
State Sports Academy, Zobawk
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2010-08-02 17.5124 2012-07-31 14.809 0 14.809 14.809 Completed
2435 MIZORAM Water Supply
Aibawk Water Supply scheme
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2013-09-26 9.7942 2016-09-30 8.8147 0 8.8147 8.8147 Completed
2436 MIZORAM Water Supply
Aizawl Water Supply Scheme (Phase-2)
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 1999-03-31 71.8 2004-03-31 59.62 0 59.62 64.12 Completed
2437 MIZORAM Water Supply
Bairabi Water Supply Scheme in Mizoram
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2011-07-04 4.9037 2013-06-30 4.3268 0 4.3268 4.3268 Completed
2438 MIZORAM Water Supply
Bilkhwthlir Water Supply Scheme, Kolasib District in Mizoram
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2011-05-03 7.8047 2013-04-30 6.9182 0 6.9182 6.9182 Completed
2439 MIZORAM Water Supply
Greater Champhai Water Supply Scheme.
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2000-03-23 13.71 2005-03-31 12.3402 0 12.3402 13.5302 Completed
2440 MIZORAM Water Supply
Greater Hnahthial Water Supply Scheme in Mizoram
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2010-11-29 8.256 2013-11-30 7.2576 0 7.2576 7.2576 Completed
2441 MIZORAM Water Supply
Greater Lawngtlai Water Supply Scheme in Mizoram
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2010-10-08 25.645 2013-10-15 22.628 0 22.628 22.628 Completed
2442 MIZORAM Water Supply
Greater Mamit Water Supply Scheme
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2003-10-13 5.7681 2006-10-31 4.8543 0 4.8543 5.2896 Completed
2443 MIZORAM Water Supply
Greater Saitual Water Supply Scheme in Mizoram
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2010-10-08 21.532 2013-10-15 18.9988 0 18.9988 18.9988 Completed
2444 MIZORAM Water Supply
Lower Sakawrdai Water Supply scheme
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2007-07-10 1.3372 2009-07-31 1.1799 0 1.1799 1.1799 Completed
2445 MIZORAM Water Supply
Sairang Water Supply Scheme in Mizoram
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2012-03-20 2.2114 2014-06-28 1.9512 0 1.9512 1.9512 Completed
2446 MIZORAM Water Supply
South Khawbung Water Supply Scheme in Mizoram
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2011-12-15 8.2738 2013-12-31 7.4322 0 7.4322 7.4322 Completed
2447 MIZORAM Water Supply
Tuipang Water Supply Scheme Mara Autonomous District Council in Mizoram
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2010-12-24 9.4113 2012-11-30 8.304 0 8.304 8.304 Completed
2448 MIZORAM Water Supply
W.Phaileng Water Supply Scheme (Pumping) in Mizoram
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2011-06-24 9.9519 2013-06-30 8.9567 0 8.9567 8.9567 Completed
2449 MIZORAM Water Supply
Water supply to Sainik School Chhingchhip,Mizoram
NESIDS-OTRI NLCPR PUBLIC HEALTH ENGINEERING 2017-05-23 7.87 2019-05-23 6.993 0 6.993 2.7972 Completed
2450 MIZORAM Industries
Setting up of Mechanized Brick Industry at Buchang, Kolasib Disrtict, Mizoram
Schemes of NEC Schemes of NEC Dept. of Power 2020-11-24 3.54 2023-11-23 3.51 0 3.51 Ongoing
2451 MIZORAM Information and Public Relatio
Our Heritage, Our Heritage at Vangchhia Tourist spot, Champhai, Mizoram
Schemes of NEC Art & Culture Department. 2024-08-30 2 2027-08-30 0.5 0.5 1 0.5 Ongoing
2452 MIZORAM Agriculture and Allied
Enhancement of the economic value of existing arecanut plantation in kolasib and Mamit District in Mizoram
Schemes of NEC Land resources, Soil and 2024-09-19 7.44 2027-09-19 3.719 1.8595 5.5785 3.719 Ongoing
2453 MIZORAM Sports
Upgradation of Sports Infrastructure of Ngopa Playground at Saitual District, Mizoram
Schemes of NEC Mizoram Public Works Depa 2024-11-05 3.9414529 2027-11-05 3.4776196 0 3.4776196 0.936095 Ongoing
2454 MIZORAM Health
Purchase of New CT Simulator at Mizoram State Cancer Institute, Mizoram
Schemes of NEC Directorate of Hospital & 2024-12-04 10.12 2027-12-04 8.08 0 8.08 8.08 Completed
2455 MIZORAM Agriculture and Allied
Fish Farmer Training Centre at Lengpui, Mizoram
Schemes of NEC Fisheries Department, Gov 2025-01-27 9.72 2028-01-27 4.86 2.43 7.29 2.43 Ongoing
2456 MIZORAM Transport and Communication
Construction of Thenzawl -Sialsuk via Sathlur and Lau river
NESIDS-ROADS Public works Department 2025-02-17 45.03 2027-02-17 8.18 0 8.18 Ongoing
2457 MIZORAM Transport and Communication
Construction of Khankawn to Rongura Hmun in Serchhip District
NESIDS-ROADS Public works Department 2025-03-24 31.98 2027-03-24 5.54 0 5.54 Ongoing
2458 MIZORAM Education
Implementation of Education Infrastructure related to IT projects in 220 Schools
NESIDS-OTRI Samagra Shiksha, Mizoram 2025-03-01 23.73 2025-09-30 0 5.9312 5.9312 Ongoing
2459 MIZORAM Power
Strengthening of Transmission & Transformation system for sustainable Power Supply in Mizoram
NESIDS-OTRI Electricity Department Mi 2025-06-03 47.87 2027-06-03 0 11.3691 11.3691 Ongoing
2460 MIZORAM Transport and Communication
Development of Heliport and Helipads in Thenzawl, Mizoram
NESIDS-OTRI PWD 2025-10-13 12 2027-10-13 0 Ongoing
2461 MIZORAM Health
Construction of 50 Bedded Psychiatry Block at Kulikawn Hospital, Aizawal, Mizoram
NESIDS-OTRI PWD Mizoram 2025-10-23 19.72 2028-10-31 0 Ongoing
2462 MIZORAM Health
Construction of 50 Bedded Hospital complex at Kulikawn Hospital, Aizawl Mizoram
NESIDS-OTRI PWD Mizoram 2025-10-24 34.75 2028-10-31 0 Ongoing
2463 MIZORAM Transport and Communication
Construction of Pukzing to Silsury Road ,Intermediate Lane, Length-21 Km
NESIDS-ROADS PWD Roads 2026-01-23 100.24 2028-01-23 7.44 11.717 19.157 Ongoing
2464 MIZORAM Transport and Communication
Construction of Tualpui to Champhai road , Length- 21 Km
NESIDS-ROADS PWD Roads 2026-01-23 57.01 2028-01-23 5.22 8.38 13.6 Ongoing
2465 MIZORAM Industries
Establishment Of Modern Jaggery Processing cum Training Center for Entrepreneurship Development at Phulpui, Aizawl District.
Schemes of NEC Agriculture & Farmers, We 2026-03-18 0.9674 2028-03-18 0 Ongoing
2466 MIZORAM Health
Construction of 100 Bedded District Hospital at Serchhip, Mizoram
NESIDS-OTRI Public Health Department 2026-03-20 50 2029-03-20 0 Ongoing
2467 MIZORAM Education
Development of School Building in Mizoram
NESIDS-OTRI Education Department Mizo 2026-03-20 40.45765 2029-03-20 0 Ongoing
2468 MIZORAM Power
Installation of 1.5MWp Grid connected Solar photovoltaic SPV power plant at Zoram medical collage and Hospital, Falkawn
NESIDS-OTRI Power 2026-03-23 13.0868 2027-03-23 0 Ongoing
2469 MIZORAM Health
New Construction of 40 bedded Hostel Building for Auxiliary Nursing & Mid-wifery School Zemabawk Mizoram
NESIDS-OTRI Health and Family Welfare 2026-03-23 10 2029-03-23 0 Ongoing
2470 MIZORAM Power
132 KV Lines Ring Synchronizing Project Phase I in Mizoram
NESIDS-OTRI Power Department 2026-03-24 13.8272589 2027-03-24 0 Ongoing
2471 MIZORAM Education
Reconstruction of Government School building Across Mizoram Phas II
NESIDS-OTRI Education Edpartment 2026-03-25 23.6147 2028-03-25 0 Ongoing
2472 MIZORAM Transport and Communication
Upgradation of Oil Palm Link Road at Kolasib, Mamit , Lunglei and Lawngtlai districts, Mizoram Length-32.70 km
NESIDS-ROADS PUBLIC WORK DEPARTMENT 2026-03-24 26.49 2028-03-26 6.5 6.5 Ongoing
2473 MIZORAM Tourism and Culture
Furnishing of Mizo Cultural Heritage Centre at Kawlri, Mizoram.
Schemes of NEC Office Of The Deputy Comm 2026-03-30 1.1145 2028-03-30 0 Ongoing
2474 MIZORAM Education
Construction of Science Building at Govt. Kolasib College, Mizoram.
Schemes of NEC PWD, Government Of Mizora 2026-03-31 7.6873 2028-03-31 0 Ongoing
2475 MIZORAM Science and Technology
Upliftment and Infrastructure Development Works for the Mara Tribal Community, Siaha District, Mizoram.
Schemes of NEC Mara Autonomous District 2026-03-31 3.3252 2027-03-31 0 Ongoing
2476 MIZORAM Industries
Sustainable Cultivation and Post-Harvest Management of Mizoram USP Crop-Mizo Ginger.
Schemes of NEC Department of Horticultur 2026-05-13 30.1324277 2028-05-13 0 Ongoing
2477 MIZORAM Sports
Sports Infrastructure Development within Mizoram- Construction of Centre of Excellence of Boxing at ITI, Veng, Aizawl
NESIDS-OTRI Mizoram State Sports coun 2026-05-19 38.3994251 2028-05-18 0 Ongoing
2478 MIZORAM Health
New Construction of Urban Primary Health Center, Chawlhhmun, Mizoram
NESIDS-OTRI Health and family welfare 2026-06-24 5.4306 2028-06-24 0 Ongoing
2479 MULTI STATE Agriculture and Allied
Livelihood Improvement project (Multi State) - Value chain on utilization of Banana Pseudo Stem for Value-Added Products
PM-DevINE Other 2023-02-14 67 2026-03-31 23.07895 0 23.07895 5.8833 Ongoing
2480 MULTI STATE Agriculture and Allied
Promoting Scientific Organic Agriculture in North-East India (Multi-State)
PM-DevINE PM-DevINE Other 2023-02-17 44.99 2026-03-31 23.7089 0 23.7089 4.355 Ongoing
2481 MULTI STATE Miscellaneous
Proposal ot Set up a Digital Design and 3D Printing Center of Excellence in the Electronic Mfg. Cluster (EMC) in collaboration with other Govt Agencies at Tech City, Guwahati
PM-DevINE PM-DevINE Other 2024-02-10 54.9 2025-01-31 53.842 0 53.842 41.1298 Completed
2482 MULTI STATE Health
Establishment of Dedicated Services for the Management of Paediatric and Adult Haematolymphoid Cancers in North East India, Guwahati
PM-DevINE PM-DevINE Other 2023-05-31 129 2026-03-31 82.2794 0 82.2794 15 Ongoing
2483 MULTI STATE Transport and Communication
Upgradation of Harmuti Doimukh road
NESIDS-ROADS NERSDS Public works Department 2017-01-09 58.25 2019-01-01 58.25 0 58.25 58.25 Completed
2484 MULTI STATE Transport and Communication
Upgradation of Tura Mankachar road
NESIDS-ROADS NERSDS Public works Department 2017-01-09 4.71 2018-01-06 4.71 0 4.71 Completed
2485 MULTI STATE Transport and Communication
Wokha Merapani Road
NESIDS-ROADS NERSDS Public works Department 2016-02-24 151.01 2023-08-31 151.01 0 151.01 151.01 Completed
2486 MULTI STATE Agriculture and Allied
Engineered Bamboo Products Promotion through Cluster Strenghtening and Export Facilitation in NER
PM-DevINE NECBDC 2025-12-08 70.9803 2028-12-08 0 Ongoing
2487 MULTI STATE Agriculture and Allied
Agarwood Cluster Development Project in Kadamtala, Tripura and Golaghat, Assam
PM-DevINE NERAMAC 2026-01-12 64.5517 2029-01-11 0 Ongoing
2488 NAGALAND Education
Construction of 92 no. of Separate Girls Toilet in Government Schools in Nagaland
NESIDS-OTRI NESIDS Department of School Educ 2020-03-29 1.4651 2021-03-30 1.4651 0 1.4651 1.4651 Completed
2489 NAGALAND Education
Implementation of Educational Infrastructure related to IT projects in 190 schools across Nagaland
NESIDS-OTRI NESIDS Dept. of Power 2022-05-10 18.9527 2025-06-30 18.951 0 18.951 Completed
2490 NAGALAND Education
In Service Teachers Training cum Examination Centre with Residential Facilitiesin Nagaland under NESIDS
NESIDS-OTRI NESIDS Dept. of Power 2021-03-31 15.5 2025-03-31 15.5 0 15.5 11.625 Ongoing
2491 NAGALAND Health
Strengthening health Infrastructure for Comprehensive response to possible Outbreak of COVID19 IN Nagaland
NESIDS-OTRI NESIDS Dept. of Health & familly 2020-07-02 17.9562 2024-09-30 15.5218884 0 15.5218884 7.1825 Ongoing
2492 NAGALAND Health
Strengthening of Health Infrastructure of various Health Facilities in Nagaland in Nagaland under NESIDS
NESIDS-OTRI NESIDS Dept. of Power 2021-03-24 21.0024 2025-12-31 8.1765368 0 8.1765368 4.139951 Ongoing
2493 NAGALAND Health
Strengthening of health systems for the management of COVID-19 pandemic with special reference to combat the impending 3rd wave of the pandemic in Nagaland
NESIDS-OTRI NESIDS Dept. of Health & familly 2022-04-20 19.9619 2024-09-24 14.4287 0 14.4287 4.7436148 Ongoing
2494 NAGALAND Agriculture and Allied
Agri Development in cluster basis at Peren, Mokokchung and Mon districts, Nagaland
Schemes of NEC Schemes of NEC 2016-02-05 6.6 2019-02-05 5.94 0 5.94 5.94 Completed
2495 NAGALAND Agriculture and Allied
Alder based large cardamom cultivation at Sotokur under Tuensang District, Nagaland
Schemes of NEC Schemes of NEC 2018-04-16 2 2021-04-16 2 0 2 2 Completed
2496 NAGALAND Agriculture and Allied
Bee Keeping and Honey Development in Nagaland.
Schemes of NEC Schemes of NEC 2010-03-23 4.5 2013-03-23 4.05 0 4.05 4.05 Completed
2497 NAGALAND Agriculture and Allied
Beekeeping and Honey Development in Nagaland Phase-II
Schemes of NEC Schemes of NEC 2014-12-18 4.95 2017-12-18 4.455 0 4.455 4.46 Completed
2498 NAGALAND Agriculture and Allied
Conservation & Propagation of Indigenous Fodder for sustainable livestock development in Nagaland
Schemes of NEC Schemes of NEC 2024-02-01 0.89 2026-02-01 0.665 0 0.665 0.2225 Ongoing
2499 NAGALAND Agriculture and Allied
Construction of Community based Fishery Project at Beiswapmpui, Peren district, Nagaland (Location: Peren dist)
Schemes of NEC Schemes of NEC 2012-12-03 4.9909 2014-12-03 4.49 0 4.49 4.49 Completed
2500 NAGALAND Agriculture and Allied
Construction of Govt. Higher Secondary School Building at Tizit, Mon District, Nagaland
Schemes of NEC Schemes of NEC 2020-09-29 2.8 2023-09-29 2.8 0 2.8 2.8 Completed
2501 NAGALAND Agriculture and Allied
Construction of Security Fencing Patrolling Road, Culvert, Protection Camps, Watch Towers and Barrack at Singphan Wildlife Sanctuary, Nagaland
Schemes of NEC Schemes of NEC 2018-03-22 5.14 2020-03-22 1.85 0 1.85 1.85 Completed
2502 NAGALAND Agriculture and Allied
Construction of Security Fencing, Patrolling Road, Culvert, Protection Camps, Watch Towers and barrack at Singpham Wildlife Sanctuary
Schemes of NEC Schemes of NEC 2018-03-22 1.85 2020-03-22 1.67 0 1.67 1.67 Completed
2503 NAGALAND Agriculture and Allied
Construction of table fish production farm at Duilongua village, New Jalukie, Peren district, Nagaland
Schemes of NEC Schemes of NEC 2017-02-28 6.125 2020-02-28 6.125 0 6.125 6.13 Completed
2504 NAGALAND Agriculture and Allied
Creation of Botanical garden and recreational park at Jalukie, Nagaland
Schemes of NEC Schemes of NEC 2017-04-12 2.87 2020-04-12 2.583 0 2.583 2.58 Completed
2505 NAGALAND Agriculture and Allied
Cultivation of Cashewnut at Peren district, Nagaland
Schemes of NEC Schemes of NEC 2017-12-28 5 2020-12-28 5 0 5 5 Completed
2506 NAGALAND Agriculture and Allied
Developing 100 Vegetable Villages for 10,000 households: Replication of Longkhum and Zhavame village modelCost per household
Schemes of NEC Schemes of NEC 2020-11-23 3.98 2024-11-23 3.98 0 3.98 3.98 Completed
2507 NAGALAND Agriculture and Allied
Developing 200 Value Addition Units for fruits and Vegetable across 11 districts Per unit cost: INR 2,00,000
Schemes of NEC Schemes of NEC 2021-11-23 4 2024-11-23 4 0 4 4 Completed
2508 NAGALAND Agriculture and Allied
Development 100 Pack Houses
Schemes of NEC Schemes of NEC 2021-02-26 3.97 2024-02-26 3.97 0 3.97 3.97 Completed
2509 NAGALAND Agriculture and Allied
Development of Chabou Fishery Project at Rio Colony, Dimapur (Location: Dimapur)
Schemes of NEC Schemes of NEC 2011-03-22 3.6344 2014-03-22 3.271 0 3.271 3.27 Completed
2510 NAGALAND Agriculture and Allied
Development of Community based Aquaculture in Yajang Village, Mokokchung District, Nagaland.
Schemes of NEC Schemes of NEC 2005-03-28 1.2376 2008-03-28 1.11 0 1.11 1.11 Completed
2511 NAGALAND Agriculture and Allied
Development of Eri culture for sustainable livelihood of Eri farmers in Dimapur Nagaland
Schemes of NEC Schemes of NEC 2018-03-22 2.78 2021-03-22 2.51 0 2.51 2.51 Completed
2512 NAGALAND Agriculture and Allied
Development of fish seed and table fish farm at Ghowoto village, Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2017-04-12 5.99 2020-07-29 4.3138 0 4.3138 4.31 Completed
2513 NAGALAND Agriculture and Allied
Development of Paddy cum Fish Culture, Nagaland.
Schemes of NEC Schemes of NEC 2015-02-25 4.6085 2018-02-25 4.2085 0 4.2085 4.21 Completed
2514 NAGALAND Agriculture and Allied
Development of Passion fruit cultivation in Nagaland Phase - I.
Schemes of NEC Schemes of NEC 2004-06-28 0.735 2007-06-28 0.66 0 0.66 0.66 Completed
2515 NAGALAND Agriculture and Allied
Development of Passion fruit cultivation in Nagaland Phase - II
Schemes of NEC Schemes of NEC 2005-03-31 0.735 2008-03-31 0.66 0 0.66 0.66 Completed
2516 NAGALAND Agriculture and Allied
Development of Pineapple Cultivation in Nagaland.
Schemes of NEC Schemes of NEC 2005-08-16 1 2008-08-16 0.9 0 0.9 0.9 Completed
2517 NAGALAND Agriculture and Allied
Development programme of identified backward block under 30 Central Sector Scheme of NEC in Pungro Town, Kiphire District, Nagaland
Schemes of NEC Schemes of NEC 2020-10-06 2.77 2023-10-06 2.77 0 2.77 2.77 Completed
2518 NAGALAND Agriculture and Allied
Establishment of Bio Village for Sustainable & inclusive growth of small farmers and community in Nagaland
Schemes of NEC Schemes of NEC 2013-03-28 2.5097 2016-03-28 2.26 0 2.26 2.26 Completed
2519 NAGALAND Agriculture and Allied
Establishment of Chick Rearing Farm & Satellite Farms at Siethekema-C, Dimapur.
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-21 3.26 2025-03-31 3.26 0 3.26 Completed
2520 NAGALAND Agriculture and Allied
Establishment of Cold Storage at Gosaigaon.
Schemes of NEC Schemes of NEC 2004-04-12 3.488 2007-04-12 3.14 0 3.14 3.14 Completed
2521 NAGALAND Agriculture and Allied
Establishment of Mini Honey Industrial Unit, Apitherapy Cell, Museum & Showroom at 6th Mile Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2017-06-15 2.4516 2020-06-15 2.2064 0 2.2064 2.21 Completed
2522 NAGALAND Agriculture and Allied
Establishment of Modern Dairy Cattle at SASRD, Medziphema Campus, Nagaland University
Schemes of NEC Schemes of NEC Dept. of Power 2017-02-28 13.4418 2020-02-28 13.4418 0 13.4418 13.44 Completed
2523 NAGALAND Agriculture and Allied
Expansion of Dragon Fruit farming at Shitovi village, Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2017-04-11 1.718 2020-04-11 1.24 0 1.24 1.24 Foreclosed
2524 NAGALAND Agriculture and Allied
Fish Seed and Table Fish Production Farm at Naga United Village, Dimapur, Nagaland.
Schemes of NEC Schemes of NEC 2005-08-18 0.3685 2008-08-18 0.33 0 0.33 0.33 Completed
2525 NAGALAND Agriculture and Allied
Fish Seed Production Farm, Dimapur, Nagaland.
Schemes of NEC Schemes of NEC 2005-08-10 0.9564 2007-10-25 0.86 0 0.86 0.86 Completed
2526 NAGALAND Agriculture and Allied
Fish Seed Table Fish Production Farm at Chumukedima, Dimapur, Nagaland.
Schemes of NEC Schemes of NEC 2006-09-18 1.7127 2009-08-18 1.54 0 1.54 1.54 Completed
2527 NAGALAND Agriculture and Allied
Fishery project at Lamhai Dunki village Peren district, Nagaland
Schemes of NEC Schemes of NEC 2016-03-17 3.34 2019-03-17 3.34 0 3.34 3.34 Completed
2528 NAGALAND Agriculture and Allied
Fishery Project at Molongyimsen, Mokokchung district, Nagaland
Schemes of NEC Schemes of NEC 2016-03-17 2.413 2019-03-17 2.17 0 2.17 2.17 Completed
2529 NAGALAND Agriculture and Allied
Food Processing Centre at Mokokchung, Nagaland
Schemes of NEC Schemes of NEC 2017-12-19 2.69 2020-12-19 2.13 0 2.13 2.13 Completed
2530 NAGALAND Agriculture and Allied
Hayali integrated agricultural and Allied development Nagaland (Location: Wokha dist)
Schemes of NEC Schemes of NEC 2012-09-19 4.375 2015-09-19 3.94 0 3.94 3.94 Completed
2531 NAGALAND Agriculture and Allied
Infrastructure Development of Green Park at State Horticulture Nursery(SHN), Dimapur
Schemes of NEC Schemes of NEC 2018-03-22 0.1 2021-03-22 0.1 0 0.1 0.1 Completed
2532 NAGALAND Agriculture and Allied
Integrated Eri & Muga Culture for sustainable livelihood of rural farmers
Schemes of NEC Schemes of NEC 2022-03-28 3 2025-03-28 3 0 3 1.2 Completed
2533 NAGALAND Agriculture and Allied
Integrated organic Pineapples farming in Nagaland
Schemes of NEC Schemes of NEC 2017-12-20 4.78 2020-12-20 4.78 0 4.78 4.78 Completed
2534 NAGALAND Agriculture and Allied
Integrated Processing Unit & Pack House for Pineapple at State Horticulture Nursery
Schemes of NEC Schemes of NEC 2023-03-28 2 2026-03-28 2 0 2 1.396 Ongoing
2535 NAGALAND Agriculture and Allied
Livelihood Enhancement through Horticulture Intervention under Small Farmers Agribusiness Consortium
Schemes of NEC Schemes of NEC Other 2023-03-28 4.34 2026-03-28 4.335 0 4.335 4.3392 Completed
2536 NAGALAND Agriculture and Allied
Marketing infrastructure in Nagaland
Schemes of NEC Schemes of NEC 2017-12-20 3.968 2020-12-20 3.968 0 3.968 3.97 Completed
2537 NAGALAND Agriculture and Allied
Marketing Support to Horticultural produces in Nagaland.
Schemes of NEC Schemes of NEC 2006-03-23 1.0756 2009-03-23 0.97 0 0.97 0.97 Completed
2538 NAGALAND Agriculture and Allied
Mushroom Cultivation (Oyster and Shitake) across 9 districts as revovling fund to SHGs:Rs. 30000 for Oyster per Group for 500 SHGs
Schemes of NEC Schemes of NEC Dept. of Power 2021-03-01 4.8 2024-03-01 4.8 0 4.8 4.8 Completed
2539 NAGALAND Agriculture and Allied
Piggery Infrastructures feed and fodder development in Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2016-04-19 4.6352 2019-04-19 4.17 0 4.17 4.17 Completed
2540 NAGALAND Agriculture and Allied
Post harvest management of horticulture crops (cold rooms, pack houses, marketing infrastructure) in Dimapur, Mokokchung, Peren, Tuensang, Phek and Wokha, Nagaland
Schemes of NEC Schemes of NEC 2017-12-28 7.179 2020-12-28 7.18 0 7.18 7.18 Completed
2541 NAGALAND Agriculture and Allied
Promotion & Development of Medicinal and Aromatic plants in Nagaland.
Schemes of NEC Schemes of NEC 2022-03-28 1.9181 2025-03-28 1.9195 0 1.9195 1.9186 Completed
2542 NAGALAND Agriculture and Allied
Promotion and Development of Medicinal and Aromatic Plants in Nagaland
Schemes of NEC Schemes of NEC 2012-03-25 2.24 2015-03-25 2.02 0 2.02 2.02 Completed
2543 NAGALAND Agriculture and Allied
Promotion of Organic Food Production during 2004-05 in Nagaland.
Schemes of NEC Schemes of NEC 2005-03-18 1.07 2008-03-18 0.96 0 0.96 0.96 Completed
2544 NAGALAND Agriculture and Allied
Proposal of identified block for providing key identified service at Bhandari Block, Wokha district, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 4.659 2025-03-31 4.6636 0 4.6636 1.86 Completed
2545 NAGALAND Agriculture and Allied
Proposal of identified block for providing key identified service at Lotsu village, Wokha Block, Mon district, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 1.967 2025-03-31 1.9668 0 1.9668 0.79 Completed
2546 NAGALAND Agriculture and Allied
Proposal of identified block for providing key identified service at Sanis Block, Wokha district, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 4.857 2026-03-31 4.8528 0 4.8528 1.94 Completed
2547 NAGALAND Agriculture and Allied
Proposal of identified block for providing key identified service at Tamlu Block, Longleng district, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 4.72 2025-03-25 4.718 0 4.718 4.722 Completed
2548 NAGALAND Agriculture and Allied
Proposal of identified block for providing key identified service at Tizit Block, Mon district, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 5 2025-03-31 5 0 5 5 Completed
2549 NAGALAND Agriculture and Allied
Proposal of identified block for providing key identified service at Tizit village, Tizit Block, Mon district, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 1.433 2025-03-31 1.4332 0 1.4332 1.43 Completed
2550 NAGALAND Agriculture and Allied
Reclamation & Renovation of old Ponds and Tanks in Nagaland (Location: Dimapur dist)
Schemes of NEC Schemes of NEC 2012-03-23 5 2015-03-23 4.5 0 4.5 4.5 Completed
2551 NAGALAND Agriculture and Allied
Rubber Plantation, Nagaland.
Schemes of NEC Schemes of NEC 2014-02-15 9.08 2017-02-15 8.18 0 8.18 8.18 Completed
2552 NAGALAND Agriculture and Allied
Sericulture project in the State of Nagaland
Schemes of NEC Schemes of NEC 2014-02-15 4.886 2017-02-15 4.4 0 4.4 4.4 Completed
2553 NAGALAND Agriculture and Allied
Setting up 2 units of piglet production farm, Dimapur district.
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 5.257 2025-03-31 5.2542 0 5.2542 1.8431 Ongoing
2554 NAGALAND Agriculture and Allied
Setting up of 1 Poultry Breeding Farm & 30 Satellite Farms at Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2017-07-13 3.0766 2020-07-13 3.0766 0 3.0766 3.08 Completed
2555 NAGALAND Agriculture and Allied
Setting up of 2 State Pig Breeding Farms at Medziphema and Jalukie, Nagaland
Schemes of NEC Schemes of NEC 2010-01-08 3.98 2013-01-08 3.58 0 3.58 3.58 Completed
2556 NAGALAND Agriculture and Allied
Setting up of cold storage unit at Dimapur, Nagaland (5000 MT).
Schemes of NEC Schemes of NEC 2006-01-12 0.6375 2009-01-12 0.57 0 0.57 0.57 Completed
2557 NAGALAND Agriculture and Allied
Setting up of Cold Storages implemented by Director Horticulture, Nagaland
Schemes of NEC Schemes of NEC 2023-03-15 9.05 2026-03-15 8.8288 0 8.8288 4.415 Ongoing
2558 NAGALAND Agriculture and Allied
Setting up of Dairy Farm at Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2017-07-13 2.51 2020-07-13 2.51 0 2.51 2.51 Completed
2559 NAGALAND Agriculture and Allied
Setting up of Demonstration units (Hazelnut, Kiwi, Peach, Nectarine, Apricot & Plum) & value chain development in Nagaland
Schemes of NEC Schemes of NEC 2023-03-28 8.18 2026-03-28 8.18 0 8.18 2.863 Ongoing
2560 NAGALAND Agriculture and Allied
Setting up of Model Dairy farm in Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2017-04-18 3.64 2020-04-18 3.28 0 3.28 3.28 Completed
2561 NAGALAND Agriculture and Allied
Strengthening the existing 6 Mushroom Seed Laboratory in six districts
Schemes of NEC Schemes of NEC 2020-11-23 0.3 2023-11-23 0.3 0 0.3 0.3 Completed
2562 NAGALAND Agriculture and Allied
Sustainable Bee keeping and Honey Development in Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 2 2025-03-31 2 0 2 0.8 Completed
2563 NAGALAND Agriculture and Allied
Table fish production
Schemes of NEC Schemes of NEC 2022-03-26 4.9417 2025-03-26 4.9442 0 4.9442 3.46 Ongoing
2564 NAGALAND Agriculture and Allied
Vermicomposting Projects in Nagaland.
Schemes of NEC Schemes of NEC 2005-11-01 4.12 2008-11-01 3.7 0 3.7 3.7 Completed
2565 NAGALAND Agriculture and Allied
Vertical (Multi Layered) farming of turmeric at Niuland Dimapur
Schemes of NEC Schemes of NEC 2023-03-30 1.03 2026-03-30 1.03 0 1.03 Completed
2566 NAGALAND Agriculture and Allied
Watershed management for sustainable agriculture production and improved livelihood, Nagaland.
Schemes of NEC Schemes of NEC 2016-05-02 4.1 2019-05-02 3.69 0 3.69 3.69 Completed
2567 NAGALAND Education
Aspirational District Kiphire, Nagaland
Schemes of NEC Schemes of NEC 2019-06-07 1 2022-06-07 1 0 1 1 Completed
2568 NAGALAND Education
Community Development Programme Construction of Multi Utility Community Hall at Mao Community Centre, Kuda Village, Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2020-12-01 4.3615 2023-12-01 4.3615 0 4.3615 4.36 Completed
2569 NAGALAND Education
Construction of Auditorium and Basic Amenities at Phek GHS, Nagaland
Schemes of NEC Schemes of NEC 2023-03-31 1.92 2026-03-31 1.92 0 1.92 0.7 Ongoing
2570 NAGALAND Education
Construction of Auditorium at GHS, Yongnyah, Longleng District, Nagaland
Schemes of NEC Schemes of NEC 2023-03-31 1.85 2026-03-31 1.8495 0 1.8495 0.75 Ongoing
2571 NAGALAND Education
Construction of College Hostel at Patkai Christian College Chumukedima, Seithekiema, Nagaland.
Schemes of NEC Schemes of NEC 2017-08-04 2.34 2020-08-04 1.42 0 1.42 1.42 Completed
2572 NAGALAND Education
Construction of Government High Secondary School and Hostel Building at Sangratsu village Mokokchung, Nagaland
Schemes of NEC Schemes of NEC 2017-07-07 2.54 2020-07-07 2.54 0 2.54 2.54 Completed
2573 NAGALAND Education
Construction of Govt. High School Auditorium/Multi-Utility Hall at Longsa, Nagaland.
Schemes of NEC Schemes of NEC Dept. of Power 2014-06-13 2.94 2017-06-13 2.94 0 2.94 2.94 Completed
2574 NAGALAND Education
Construction of Multipurpose Hall at Nagaland University, Medziphema, Nagaland
Schemes of NEC Schemes of NEC 2016-10-20 11.5021 2020-10-20 11.5021 0 11.5021 11.5 Completed
2575 NAGALAND Education
Construction of Rongmei Multi-Purpose Complex at Jalukie, Peren District, Nagaland
Schemes of NEC Schemes of NEC Office of the Deputy Comm 2022-03-31 4.2881246 2025-03-31 3.509925 0.7781996 4.2881246 1.7771 Ongoing
2576 NAGALAND Education
Construction of School, Science & Computer Building for the Childrens Christian School, Mission Road, Kohima.
Schemes of NEC Schemes of NEC 2016-04-22 3.4899 2019-04-22 3.4899 0 3.4899 3.49 Completed
2577 NAGALAND Education
Construction of Skill Development Centre Cum Garo Community, Dimapur, Nagaland
Schemes of NEC Schemes of NEC Other 2022-03-21 4.81 2025-03-31 4.1078 0.7022 4.81 4.1078 Ongoing
2578 NAGALAND Education
Construction of Working Women Hostel at Kohima Nagaland
Schemes of NEC Schemes of NEC Youth Affairs and Sports 2017-09-27 6.05 2020-09-27 6 0 6 4 Ongoing
2579 NAGALAND Education
Infrastructure Development at Kohima Orphanage Home
Schemes of NEC Schemes of NEC 2018-03-01 2.84 2020-03-01 0.1 0 0.1 0.1 Foreclosed
2580 NAGALAND Education
Infrastructure Development at Kohima Orphanage Home at Kohima, Nagaland
Schemes of NEC Schemes of NEC 2022-03-28 3.6045 2025-03-31 3.6012 0 3.6012 0.9012 Ongoing
2581 NAGALAND Education
Infrastructure Development at Mayangnokcha Govt. Higher Secondary School, Mokokchung, Nagaland.
Schemes of NEC Schemes of NEC 2014-06-13 6.7 2017-06-13 6.6986 0 6.6986 6.28 Completed
2582 NAGALAND Education
Infrastructure Development of Government High School at Noksen Town , Nagaland
Schemes of NEC Schemes of NEC 2018-04-10 4.36 2020-04-10 0.1 0 0.1 0.1 Foreclosed
2583 NAGALAND Education
Infrastructure Developmet for newly upgraded Govt. Hr. Sec. School in Meluri, Phek District and Medzhiphema, Dimapur District, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2016-07-21 4.01 2019-07-21 4.01 0 4.01 3.94 Ongoing
2584 NAGALAND Sports
Academy of Wrestling, Akara at Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2017-04-19 4.65 2020-04-19 4.185 0 4.185 4.19 Completed
2585 NAGALAND Sports
Augmentation of Water Supply through stream water sources in Japukong Range, Mokokchung Dist
Schemes of NEC Schemes of NEC 2013-12-18 4.85 2016-12-18 4.36 0 4.36 4.36 Completed
2586 NAGALAND Sports
Construction of Auditorium at Government Higher Secondary School, Mon Town
Schemes of NEC Schemes of NEC 2021-02-26 2.92 2024-02-26 2.92 0 2.92 2.92 Completed
2587 NAGALAND Sports
Construction of Auditorium at Govt. Higher Secondary School Mon Town, Nagaland
Schemes of NEC Schemes of NEC 2018-01-16 3.15 2021-01-16 2.83 0 2.83 2.83 Completed
2588 NAGALAND Sports
Construction of Dr.T.Ao Regional Football Academy at Seithekiema, Dimapur, Nagaland (Phase-II)
Schemes of NEC Schemes of NEC Dept. of Youth Resource & 2022-03-26 8.9562 2025-03-26 8.9562 0 8.9562 8.9562 Completed
2589 NAGALAND Sports
Construction of Football Ground at Chiephobozou, Nagaland
Schemes of NEC Schemes of NEC 2017-11-10 3.2 2019-11-10 3.2 0 3.2 3.2 Completed
2590 NAGALAND Sports
Construction of Indoor Stadium Shooting Range and Procurement of equipment and appliances for Nagaland State Rifle Association.
Schemes of NEC Schemes of NEC 2016-04-27 4.7896 2021-01-27 4.7896 0 4.7896 4.79 Completed
2591 NAGALAND Sports
Construction of Kumbani Stadium at Mangkolemba town, Mokokchung, Nagaland
Schemes of NEC Schemes of NEC 2017-06-27 3.9471 2023-08-21 3.5524 0 3.5524 3.55 Completed
2592 NAGALAND Sports
Construction of Mini Stadium Englan, Wokha, Nagaland
Schemes of NEC Schemes of NEC 2017-05-02 3.2 2020-05-02 2.306 0 2.306 2.31 Completed
2593 NAGALAND Sports
Construction of Multipurpose Hall at JNV School, Zuketsa, Phek District, Nagaland
Schemes of NEC Schemes of NEC 2017-09-12 5.91 2021-09-15 5.91 0 5.91 5.91 Completed
2594 NAGALAND Sports
Construction of Multipurpose Hall at JNV, Wakching, Mon District, Nagaland
Schemes of NEC Schemes of NEC 2017-11-13 8.05 2020-11-13 8.05 0 8.05 6.53 Completed
2595 NAGALAND Sports
Construction of Multipurpose Hall at MLA Hostel Kohima, Nagaland
Schemes of NEC Schemes of NEC 2016-05-09 6.4754 2021-12-21 5.8278 0 5.8278 5.83 Completed
2596 NAGALAND Sports
Construction of Multipurpose Sports Indoor Stadium at Pfutsero Town, Phek District
Schemes of NEC Schemes of NEC 2011-09-05 4.16 2013-09-05 3.744 0 3.744 3.74 Completed
2597 NAGALAND Sports
Construction of Multipurpose stadium at G. Rio, Kohima
Schemes of NEC Schemes of NEC 2014-03-05 2.6954 2017-03-05 2.4259 0 2.4259 2.43 Completed
2598 NAGALAND Sports
Construction of Outdoor Multi-utility Sports Complex at Impur junction under Kubolong sub-division Mokokchung, Nagaland
Schemes of NEC Schemes of NEC 2017-09-14 3.916 2021-12-21 1.566 0 1.566 1.57 Completed
2599 NAGALAND Sports
Construction of Outdoor Stadium at Mon District Headquarters, Nagaland.
Schemes of NEC Schemes of NEC 2014-12-17 5.02 2018-12-17 5.0187 0 5.0187 5.02 Completed
2600 NAGALAND Sports
Construction of Outdoor Stadium in Pughoboto Sub-Divisional Headquarter, Zunheboto District, Nagaland.
Schemes of NEC Schemes of NEC 2014-12-17 5.58 2018-12-20 5.5784 0 5.5784 5.58 Completed
2601 NAGALAND Sports
Construction of Urban Recreational & Resource Centre Kohima, Nagaland
Schemes of NEC Schemes of NEC 2016-03-17 10.3743 2019-03-17 10.37 0 10.37 8.15 Completed
2602 NAGALAND Sports
Development of Music and Youth Activity Centre at Yasogei, Kohima, Nagaland
Schemes of NEC Schemes of NEC 2017-03-06 9.1742 2020-03-06 9.1731 0 9.1731 4.11 Ongoing
2603 NAGALAND Irrigation and Flood Control
Anti erosion works on Tizu river at Zunheboto district, Nagaland.
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 2.97 2025-03-31 2.97 0 2.97 0.75 Completed
2604 NAGALAND Irrigation and Flood Control
Chathe Minor Irrigation Project at Sochunoma Village, Dimapur District, Govt. of Nagaland.
Schemes of NEC Schemes of NEC 2016-06-03 3.79 2019-06-03 2.052 0 2.052 2.05 Completed
2605 NAGALAND Irrigation and Flood Control
Conducting a detailed survey on water resource potential in Nagaland, including preparation of report on potentail of river, Inter-dist. Nagaland.
Schemes of NEC Schemes of NEC 2016-03-23 1.35 2018-03-23 1.215 0 1.215 1.22 Completed
2606 NAGALAND Irrigation and Flood Control
Integrated Nzu Valley Irrigation Project at Phenshunyu Village, Kohima District, Nagaland.
Schemes of NEC Schemes of NEC 2017-06-23 4.0129 2019-06-23 3.6116 0 3.6116 3.61 Completed
2607 NAGALAND Irrigation and Flood Control
Providing Water Supply to Akuk old Village by Pumping under Wokha District, Nagaland
Schemes of NEC Schemes of NEC 2014-02-28 2.8522 2018-02-28 2.2505 0 2.2505 2.25 Completed
2608 NAGALAND Irrigation and Flood Control
Providing Water Supply to Kejanglwa village in Peren dist Nagaland
Schemes of NEC Schemes of NEC 2018-03-14 4.47 2021-03-14 0 Completed
2609 NAGALAND Irrigation and Flood Control
Rain Water Harvesting Project at Pughoboto Ghatashe and Asukiqa area under Pughoboto Sub-division, Kohima District, Nagaland
Schemes of NEC Schemes of NEC 2016-03-23 2 2019-03-23 1.8 0 1.8 1.8 Completed
2610 NAGALAND Irrigation and Flood Control
Rain water reservoir for fire safety at regional border & skill training centre for fire safety officers, Nagaland
Schemes of NEC Schemes of NEC 2023-03-09 3.8179 2027-03-31 3.82 0 3.82 3.82 Completed
2611 NAGALAND Irrigation and Flood Control
Rutsa multipurpose irrigation project, Kohima dist, Nagaland
Schemes of NEC Schemes of NEC 2016-03-23 6.95 2019-03-23 6.2537 0 6.2537 6.25 Completed
2612 NAGALAND Irrigation and Flood Control
Sietsaru Multi-pupose Irrigation project at Phesama village, kohima dist., Nagaland
Schemes of NEC Schemes of NEC 2018-03-08 2.68 2021-03-08 1 0 1 1 Completed
2613 NAGALAND Irrigation and Flood Control
Soil Erosion protection of Kielierue Kam River at Jalukie in Nagaland
Schemes of NEC Schemes of NEC 2017-05-02 2.832 2020-05-02 2.55 0 2.55 2.55 Completed
2614 NAGALAND Irrigation and Flood Control
Storm Water Drainage at Shamator Town, Tuensang District, Nagaland.
Schemes of NEC Schemes of NEC 2017-06-27 3.506 2020-06-27 3.16 0 3.16 3.16 Completed
2615 NAGALAND Irrigation and Flood Control
Watershed Treatment for Flood Mitigation and Livelihood, Kohima dist.
Schemes of NEC Schemes of NEC 2012-03-17 4.5 2017-11-23 0.522 0 0.522 0.52 Completed
2616 NAGALAND Industries
1000 rubber rollers to immediately procured, Nagaland
Schemes of NEC Schemes of NEC 2020-10-27 3.5 2023-10-27 3.15 0 3.15 3.15 Completed
2617 NAGALAND Industries
1100 technicians per district to be trained in construction sector, Nagaland
Schemes of NEC Schemes of NEC 2020-09-29 1.2395 2023-09-29 1.24 0 1.24 1.2395 Ongoing
2618 NAGALAND Industries
600 coffee pulping machines to be provided for processing/value addition to cofee growers
Schemes of NEC Schemes of NEC 2020-10-27 3 2023-10-27 3 0 3 3 Completed
2619 NAGALAND Industries
Bamboo Incense and Tooth Pick Manufacturing Unit at Jalukie, Nagaland
Schemes of NEC Schemes of NEC Choose... 2023-03-30 4.55 2026-03-30 4.2775 0 4.2775 1.1375 Ongoing
2620 NAGALAND Industries
Construction of CFC for Emporium for Handloom & Handicrafts at Agri Expo, Nagaland
Schemes of NEC Schemes of NEC 2022-03-29 4.8464 2025-03-28 4.8463 0 4.8463 4.8478136 Ongoing
2621 NAGALAND Industries
Develop the Rea-nut based industry for production of Areca Plates as replacement for plastic, training & dying etc., Nagaland
Schemes of NEC Schemes of NEC 2020-10-06 0.35 2023-10-06 0.32 0 0.32 0.32 Completed
2622 NAGALAND Industries
Establishment of State of the Art Cane and Bamboo Technology Park at Nagaland Bamboo Resource Centre, Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2022-03-29 4.976 2025-03-29 4.97 0 4.97 1.77 Ongoing
2623 NAGALAND Industries
Ginger Processing Unit in all 11 Districts i.e., Kohima, Phek, Kiphire, Wokha, Tuensang, Zunheboto, Mokoching, Longleng, Mon, Peren, Dimapur (1000 kg capacity) through CBOs/ Entrepreneurs/ Cooperative
Schemes of NEC Schemes of NEC Department of Horticultur 2021-02-26 1.958 2024-02-26 1.958 0 1.958 0.74 Ongoing
2624 NAGALAND Industries
Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19 to the state of Nagaland(Phase-II)
Schemes of NEC Schemes of NEC 2021-01-21 2.94 2021-01-21 2.94 0 2.94 2.94 Completed
2625 NAGALAND Industries
Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Nagland
Schemes of NEC Schemes of NEC 2020-08-22 3 2023-08-22 3 0 3 3 Completed
2626 NAGALAND Industries
Multi Disciplinary Skill Development Nagaland,
Schemes of NEC Schemes of NEC Other 2022-03-21 3.2733297 2025-03-21 3.2733295 0 3.2733295 3.2733295 Ongoing
2627 NAGALAND Industries
Post harvest Support on rubber Sheet Processing for value Addition, Nagaland
Schemes of NEC Schemes of NEC 2023-03-03 2.5 2026-03-04 2.5 0 2.5 0.88 Ongoing
2628 NAGALAND Industries
Promotion of Handloom and Handicraft at Diezephe Village, Dimapur , Nagaland
Schemes of NEC Schemes of NEC 2022-03-28 2.9688 2025-03-28 2.9675 0 2.9675 2.9713 Ongoing
2629 NAGALAND Industries
Setting up of a Bamboo Shoot Processing Unit by M/s Nagaland Food Pvt. Ltd. C-26/3, Half Nagarjan, Dimapur City-797112
Schemes of NEC Schemes of NEC 2006-12-13 1.8247 2009-12-13 1.7601 0 1.7601 1.76 Completed
2630 NAGALAND Industries
Setting up of a Ramie Rhizome Fibre Unit by M/s Longnaktsu Multipurpose Co-Operative Society Ltd., Longsa, Govt. of Nagaland
Schemes of NEC Schemes of NEC 2006-03-07 1.1735 2008-03-07 1.06 0 1.06 1.06 Completed
2631 NAGALAND Industries
Skill training on machineries, processing and business management, Nagaland
Schemes of NEC Schemes of NEC Other 2020-09-29 1.98 2023-09-29 1.98 0 1.98 1.976 Completed
2632 NAGALAND Industries
Train 1100 youths/entrepreneurs in maintenance and repai of tools and machineries covering all 11 districts, Nagaland
Schemes of NEC Schemes of NEC 2020-09-29 1.98 2023-09-29 1.98 0 1.98 1.976 Completed
2633 NAGALAND Industries
Value Addition on Coffee/ procurement of roasting machines and training of entrepreneurs, Nagaland
Schemes of NEC Schemes of NEC Department of Land Resour 2023-03-17 4 2025-03-31 4 0 4 4 Ongoing
2634 NAGALAND Information and Public Relatio
4th North East Connectivity Summit, Kohima organised by Govt. of Nagaland
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.099 2021-04-01 0 Completed
2635 NAGALAND Information and Public Relatio
Abiogenesis Centre for Performing Arts & Culture at Dimapur, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2017-07-03 1.49 2020-07-03 1.341 0 1.341 1.34 Completed
2636 NAGALAND Information and Public Relatio
Construction of Amphi theatre for cultural tourism at Surumi village Zunheboto, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 2.9214 2025-03-31 2.9185 0 2.9185 1.17 Completed
2637 NAGALAND Information and Public Relatio
Construction of Cultural Complex at Aboi, Nagaland
Schemes of NEC Schemes of NEC 2018-03-14 2.5 2022-03-14 0.1 0 0.1 0.1 Foreclosed
2638 NAGALAND Information and Public Relatio
Construction of Konyak Heritage Complex at Mon District, Nagaland
Schemes of NEC Schemes of NEC 2023-03-30 22.79 2026-03-30 22.7888173 0 22.7888173 11.73 Ongoing
2639 NAGALAND Information and Public Relatio
Construction of Library-cum-Museum at Ungma, Mokokchung, Nagaland
Schemes of NEC Schemes of NEC Other 2017-04-11 3.9733191 2020-04-11 3.5498 0 3.5498 3.55 Completed
2640 NAGALAND Information and Public Relatio
Construction of Naga Indigenous Inn cum Learning Centre at Phesama village, Kohima, Nagaland
Schemes of NEC Schemes of NEC 2023-03-15 1.67 2026-03-15 1.77038 0 1.77038 Ongoing
2641 NAGALAND Information and Public Relatio
Nagaland College of Music & Fine Arts auditorium
Schemes of NEC Schemes of NEC Other 2023-03-31 2.63 2025-03-31 2.63 0 2.63 2.635 Completed
2642 NAGALAND Information and Public Relatio
Setting up of a Film Studio, Dimapur, Nagaland, Govt. of Nagaland
Schemes of NEC Schemes of NEC 2017-11-03 2.03 2021-03-31 2.032 0 2.032 0.81 Ongoing
2643 NAGALAND Information and Public Relatio
Setting up of Multi Media cum Convention Centre at Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2017-04-11 10.52 2020-04-11 7.09 0 7.09 7.09 Ongoing
2644 NAGALAND Information and Public Relatio
The stories of our ancestors(narrative retelling by the Nagas of NE India
Schemes of NEC Schemes of NEC Dept. of Power 2020-07-06 0.67 2023-07-06 0.0852 0 0.0852 0.09 Foreclosed
2645 NAGALAND Health
Accident and Trauma Centre at Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2005-03-23 1.4139 2008-03-23 1.27 0 1.27 1.27 Completed
2646 NAGALAND Health
Accident and Trauma Centre at Mokokchung, Nagaland
Schemes of NEC Schemes of NEC 2005-03-23 1.4436 2008-03-23 1.2993 0 1.2993 1.3 Completed
2647 NAGALAND Health
Establishment of 5 bedded ICU, HDU, Dialysis Unit & Major OT Up-gradation of Woodland Nursing Home, Mokokchung, Mokokchung Dist., Nagaland
Schemes of NEC Schemes of NEC 2011-03-16 2.53 2014-03-16 2.277 0 2.277 2.28 Completed
2648 NAGALAND Health
Establishment of 50 bedded Hospital at Mon, Mon District
Schemes of NEC Schemes of NEC 2009-12-18 4.6557 2013-12-18 1.7 0 1.7 1.7 Completed
2649 NAGALAND Health
Establishment of a 20 bedded CCU/ICU at Naga Hospital, Kohima, Nagaland
Schemes of NEC Schemes of NEC 2006-06-03 4.55 2009-06-03 4.095 0 4.095 4.1 Completed
2650 NAGALAND Health
Modernization of Bethel Medical Centre, Kohima, Nagaland
Schemes of NEC Schemes of NEC 2009-02-26 3.75 2012-02-26 3.375 0 3.375 3.38 Completed
2651 NAGALAND Health
Procurement of MRI Machine in the Faith Hospital at Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2016-02-22 5.408 2019-02-22 4.867 0 4.867 4.87 Completed
2652 NAGALAND Health
Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Nagaland for activities related to combating COVID-19 pandemic
Schemes of NEC Schemes of NEC 2020-04-01 3 2023-04-01 3 0 3 3 Completed
2653 NAGALAND Health
Setting up of North East Regional Multi-disciplinary Paramedical Institute, Dimapur, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2014-02-26 49.8131 2017-02-26 44.83 0 44.83 44.83 Completed
2654 NAGALAND Health
Support for construction of 2 Nos. of PHCs in difficult areas of Touphema (Kohima Dist.) & Ruzazho (Phek Dist.), Nagaland
Schemes of NEC Schemes of NEC 2007-01-03 1.3104 2009-01-03 1.1794 0 1.1794 1.18 Completed
2655 NAGALAND Health
Support for Procurement of Equipment & Machineries at Zion Hospital, Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2006-08-22 4.8239 2009-08-22 4.34 0 4.34 4.34 Completed
2656 NAGALAND Health
Up-gradation of Equipment Infrastructure at Aine Nursing Home and Diagnositic Center, Jalukie, Peren District, Nagaland
Schemes of NEC Schemes of NEC 2012-12-11 4.9088 2015-12-11 1.75 0 1.75 1.75 Completed
2657 NAGALAND Health
Up-Gradation of Equipment infrastructure at Oking Hospital & Research & Clinic, Kohima, Nagaland
Schemes of NEC Schemes of NEC 2011-06-21 4.3711 2014-06-21 3.93 0 3.93 3.93 Completed
2658 NAGALAND Health
Up-gradation of Infrastructure of Impur Christian Hospital, Impur, Mokokchung Dist., Nagaland
Schemes of NEC Schemes of NEC 2012-07-08 4.8458 2014-07-08 3.5 0 3.5 3.5 Completed
2659 NAGALAND Health
Up-gradation of Naga Hospital, Kohima for OPD, Casualty and Diagnostic Centre Complex, Nagaland
Schemes of NEC Schemes of NEC 2009-10-14 4.568 2012-10-14 3.11 0 3.11 3.11 Completed
2660 NAGALAND Health
Up-gradation of Zion Hospital, Dimapur for Casualty & Physio-Therapy Block and Paediatric Nursing Unit, Nagaland
Schemes of NEC Schemes of NEC 2009-10-16 4.5382 2012-10-16 4.08 0 4.08 4.08 Completed
2661 NAGALAND Power
Construction of 1 No. 33/11kV, 1X1.6MVA unmanned sub-station at Longmatra under Kiphire Division, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2017-04-19 5.9334 2020-04-19 5.34 0 5.34 4.5 Completed
2662 NAGALAND Power
Construction of 220/132/33kV Substation at Chiephobozou Block (Zhadima)(Part-II), Nagaland.
Schemes of NEC Schemes of NEC 2012-08-21 68.58 2015-08-21 61.72 0 61.72 61.72 Completed
2663 NAGALAND Power
Construction of 2X500kW Ponglefo SHEP, Nagaland
Schemes of NEC Schemes of NEC 2016-02-26 13.3251 2019-02-26 11.9926 0 11.9926 11.99 Completed
2664 NAGALAND Power
Construction of 33kV Transmission lines, 33/11kV Substation,11kV lines, 11/0.4kV Distribution substation and LT Lines in Kohima, Nagaland
Schemes of NEC Schemes of NEC 2013-12-20 14.97 2015-12-20 13.47 0 13.47 13.47 Completed
2665 NAGALAND Power
Construction of 66/33/11 KV, 5MVA Sub station at MON
Schemes of NEC Schemes of NEC 2005-02-01 7.7848 2009-02-01 7.01 0 7.01 7.01 Completed
2666 NAGALAND Power
Construction of SLDC Building at Nagarjan,Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2016-03-17 2.3 2018-03-17 2.07 0 2.07 2.07 Completed
2667 NAGALAND Power
Conversion of 33kV pole structure to Lattice tower of the Ringmain Feeder at Kohima, Nagaland
Schemes of NEC Schemes of NEC 2015-06-09 14.31 2018-06-09 3.29 0 3.29 3.29 Completed
2668 NAGALAND Power
Development of Hydroger, Nagaland
Schemes of NEC Schemes of NEC 2017-06-29 1.7263 2020-06-29 1.2 0 1.2 1.2 Completed
2669 NAGALAND Power
Off Grid solar power plants with an aggregate capacity of 855 KWP at Government Deptts. Office building in Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2017-04-19 6.6139 2020-04-19 5.9525 0 5.9525 4 Completed
2670 NAGALAND Power
Setting up of Noiroi Mini Hydro Electric Project Stage-I & Stage-II (4X75KW -2 units each) in Paren District, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2012-03-14 4.04 2015-03-14 3.63 0 3.63 3.63 Completed
2671 NAGALAND Power
Tsutsung Small/Mini HEP (4x250kW1000KW) Mokokchung, Nagaland
Schemes of NEC Schemes of NEC 2012-11-21 5.16 2015-11-21 4.64 0 4.64 4.64 Completed
2672 NAGALAND Power
Up-gradation of 66kV to 132kV S/C Kiphire- Tuensang- Mokokchung Transmission Line (Phase-I), Nagaland
Schemes of NEC Schemes of NEC 2012-01-04 4.9857 2015-01-04 4.49 0 4.49 4.49 Completed
2673 NAGALAND Power
Upgradation & Modernization of 132/33 KV Meluri S/s. Nagaland.
Schemes of NEC Schemes of NEC 2008-08-12 4.9551 2015-03-31 4.46 0 4.46 4.46 Completed
2674 NAGALAND Power
Upgradation of 66/33/11 kV Chumukedima Substation from 10MVA to 30 MVA, Nagaland.
Schemes of NEC Schemes of NEC 2012-01-04 4.9451 2016-01-04 4.45 0 4.45 4.45 Completed
2675 NAGALAND Power
Upgradation of 66KV TO 132KV S/C Kiphire-Tuensang -Mokokchung transmission line ( Phase- II)
Schemes of NEC Schemes of NEC 2019-09-27 5.83 2022-09-27 5.25 0 5.25 5.25 Completed
2676 NAGALAND Science and Technology
Afforestation of Denuded Hills in Peren District in Nagaland.
Schemes of NEC Schemes of NEC Forest Department 2022-03-27 3 2025-03-27 3 0 3 1.2 Ongoing
2677 NAGALAND Science and Technology
Afforestation of Denuded Hills in Phek District in Nagaland.
Schemes of NEC Schemes of NEC Forest Department 2022-03-27 3.0007 2025-03-31 3.0007 0 3.0007 1.2 Ongoing
2678 NAGALAND Science and Technology
Building of IT Infrastructure and Modernization of Motor Vehicle Department, Nagaland, Motor Vehicle Dept. Govt. of Nagaland
Schemes of NEC Schemes of NEC 2017-06-29 3 2020-06-29 2.7 0 2.7 2.7 Completed
2679 NAGALAND Science and Technology
Computerization Networking & Modernization of Nagaland Legislative Assembly. Nagaland Legislative Assembly Secretariat, Govt. of Nagaland
Schemes of NEC Schemes of NEC 2016-04-29 2.89 2019-04-29 2.601 0 2.601 2.6 Ongoing
2680 NAGALAND Science and Technology
Computerization of NSCB (Nagaland State Cooperative Bank) on CBS Platform with Financial inclusion Technology, Nagaland. Nagaland State Co-operative Bank Ltd.
Schemes of NEC Schemes of NEC 2016-03-11 1.967 2019-03-11 1.7703 0 1.7703 1.77 Completed
2681 NAGALAND Science and Technology
Computerization/Strengthening of NEC Cell under Planning Department, Govt. of Nagaland
Schemes of NEC Schemes of NEC 2010-03-25 0.4668 2013-03-25 0.4668 0 0.4668 0.47 Completed
2682 NAGALAND Science and Technology
Construction of Fire Station, Central Workshop-cum-Garage, Water Reservoir and Fire Fighting Equipments and Appliance.
Schemes of NEC Schemes of NEC 2013-11-15 4.27 2016-11-15 3.8467 0 3.8467 3.85 Foreclosed
2683 NAGALAND Science and Technology
Developing Information Technology Infrastracture in Schools for promoting Biodiversity Conservation, Nagaland(Nagaland State Biodiversity Board)
Schemes of NEC Schemes of NEC 2016-11-23 0.6422 2019-11-23 0.6422 0 0.6422 0.64 Completed
2684 NAGALAND Science and Technology
Development of IT Infrastructure Computerization and Networking for Planning & Co-ordination Department
Schemes of NEC Schemes of NEC 2013-11-21 2.34 2016-11-21 2.1092 0 2.1092 2.11 Completed
2685 NAGALAND Science and Technology
Development of School Information System in selected High/Higher Secondary Schools in Nagaland
Schemes of NEC Schemes of NEC 2005-03-31 2.12 2008-03-31 1.908 0 1.908 1.91 Completed
2686 NAGALAND Science and Technology
Establishment of State Soil Testing Laboratory Buildings & Equipments at Kohima, Nagaland, Soil and Water Conservation Dept, Govt. of Nagaland
Schemes of NEC Schemes of NEC 2017-06-29 3.717 2020-06-29 3.3453 0 3.3453 3.35 Completed
2687 NAGALAND Science and Technology
GIS Biodiversity & Vegetation Mapping Assessment of Endemic and Threatened Species of Nagaland
Schemes of NEC Schemes of NEC 2010-03-23 3.34 2013-03-23 3.11 0 3.11 3.11 Foreclosed
2688 NAGALAND Science and Technology
High Security Video Conferencing LAN Chief Ministers Secretariat, Nagaland. (Joint Secretary, Chief Ministers Secretariat, Govt. of Nagaland)
Schemes of NEC Schemes of NEC 2012-03-05 3.527 2015-03-05 3.1743 0 3.1743 3.17 Completed
2689 NAGALAND Science and Technology
IT Education Programme in Rural Govt. Middle Schools throughout Nagaland
Schemes of NEC Schemes of NEC 2010-03-25 0.6048 2013-03-25 0.6048 0 0.6048 0.6 Completed
2690 NAGALAND Science and Technology
IT Training for 360 Educated Unemployed Youths in Nagaland by Intensive Care Study Centre, Kohima
Schemes of NEC Schemes of NEC 2006-03-30 0.252 2009-03-30 0.252 0 0.252 0.25 Completed
2691 NAGALAND Science and Technology
Modern Equipments (IT Infrastructure) at all customary court in all 11 districts of Nagaland. Dept. of Justice & Law, Govt. of Nagaland
Schemes of NEC Schemes of NEC Other 2016-04-29 3.3 2019-04-29 2.97 0 2.97 2.97 Completed
2692 NAGALAND Science and Technology
Modernization of Department of Legal Metrology & Consumer Protection
Schemes of NEC Schemes of NEC 2013-11-15 1.74 2016-11-15 1.5628 0 1.5628 1.56 Completed
2693 NAGALAND Science and Technology
Nagaland State Spatial Data Infrastructure & Natural Hazard Zonation Mapping of Nagaland
Schemes of NEC Schemes of NEC 2009-02-05 3.72 2012-02-05 3.72 0 3.72 3.72 Completed
2694 NAGALAND Science and Technology
Online Connectivity of Secondary and Higher Secondary Schools with the Nagaland Board of School Education (NBSE)
Schemes of NEC Schemes of NEC 2009-01-29 2.13 2012-01-29 2.13 0 2.13 2.13 Completed
2695 NAGALAND Science and Technology
Preparation of Geo-spatial Plan for Governance & Sustainable Development for the State of Nagaland. Nagaland GIS & Remote Sensing Centre, Govt. of Nagaland
Schemes of NEC Schemes of NEC 2023-03-14 4.8 2026-03-14 4.7986 0 4.7986 2.89155 Completed
2696 NAGALAND Science and Technology
Preparatory Equipments under Management of Natural Calamities for the State of Nagaland
Schemes of NEC Schemes of NEC 2012-04-24 2.36 2015-04-24 2.122 0 2.122 2.12 Completed
2697 NAGALAND Science and Technology
Regional and State Requirement of Fire & Emergency Services Phase Wise at Nagaland. Department of Fire & Emergency Services Govt. of Nagaland
Schemes of NEC Schemes of NEC 2017-06-29 5.4752 2020-06-29 4.9277 0 4.9277 4.93 Completed
2698 NAGALAND Science and Technology
Secure, Scalable and Intelligent network e-frastructure solution for SIRD (State Institute of Rural Development) Kohima, Nagaland, Societies for Training & Research on Rural Development (STRD) State Institute of Rural Devp & Planning & Co-ordination Dept Govt. of Nagaland.
Schemes of NEC Schemes of NEC 2016-09-29 0.4848 2019-09-29 0.44 0 0.44 0.44 Completed
2699 NAGALAND Science and Technology
Strengthening of fire & Emergency services at Dimapur & Jalukie, Nagaland. Deputy Inspector General, Directorate of Fire & Emergency Services. Govt. of Nagaland
Schemes of NEC Schemes of NEC 2016-05-20 3.759 2019-05-20 3.3831 0 3.3831 3.38 Completed
2700 NAGALAND Science and Technology
Upgradation of Nagaland GIS and Remote Sensing Centres Infrastructure and Development of Training and Capacity Building Division
Schemes of NEC Schemes of NEC 2013-03-25 2.572 2016-03-25 2.572 0 2.572 2.57 Completed
2701 NAGALAND Transport and Communication
Cheiphobozou-Touphema Via Chiethu road
Schemes of NEC Schemes of NEC 2007-03-02 4.48 2010-03-02 3.8 0 3.8 3.8 Completed
2702 NAGALAND Transport and Communication
Construction of Longding-Nokajan road
Schemes of NEC Schemes of NEC 2010-03-25 54.18 2013-03-25 48.76 0 48.76 48.76 Completed
2703 NAGALAND Transport and Communication
ISBT Kohima
Schemes of NEC Schemes of NEC 2006-03-22 9.1227 2009-03-22 8.03 0 8.03 8.03 Completed
2704 NAGALAND Transport and Communication
ISBT Mokokchung
Schemes of NEC Schemes of NEC 2006-03-22 7.503 2009-03-22 6.75 0 6.75 6.75 Completed
2705 NAGALAND Transport and Communication
ISTT at Kohima
Schemes of NEC Schemes of NEC 2014-11-28 12.0093 2017-11-29 10.81 0 10.81 10.81 Completed
2706 NAGALAND Transport and Communication
Khaghoboto-Vishiyi-Luzhoto-Ghohito road
Schemes of NEC Schemes of NEC 2006-02-23 4.2193 2009-02-23 3.8 0 3.8 3.8 Completed
2707 NAGALAND Transport and Communication
Longleng-Ladaigarh Road
Schemes of NEC Schemes of NEC 2006-09-22 79.49 2009-10-22 71.54 0 71.54 71.54 Completed
2708 NAGALAND Transport and Communication
Medziphema-Jalukie-Athebong raod
Schemes of NEC Schemes of NEC 2006-01-04 44.66 2009-01-04 40.19 0 40.19 40.19 Completed
2709 NAGALAND Transport and Communication
Mokokchung (NH-155), NH-202 Junction to Aghunato via Longsa-Suruhoto road
Schemes of NEC Schemes of NEC 2012-11-23 158.31 2015-11-23 133 0 133 133 Completed
2710 NAGALAND Transport and Communication
Pukhungri-Avanku-Layshi road
Schemes of NEC Schemes of NEC Dept. of Power 2005-07-29 23.39 2008-07-29 20 0 20 20 Completed
2711 NAGALAND Transport and Communication
Viswema-Kedima-Zuketsa road
Schemes of NEC Schemes of NEC 2010-08-16 79.99 2013-08-16 71.99 0 71.99 71.99 Completed
2712 NAGALAND Transport and Communication
Wokha-Merapani road
Schemes of NEC Schemes of NEC 2006-09-22 44.45 2009-09-22 40.01 0 40.01 40.01 Completed
2713 NAGALAND Transport and Communication
Yimchenkimong-Woromong road
Schemes of NEC Schemes of NEC 2005-08-18 2.3192 2008-08-18 2.08 0 2.08 2.08 Completed
2714 NAGALAND Tourism and Culture
Capacity Building & Developing Infrastructure for Offroad Tourism in Tourism
Schemes of NEC Schemes of NEC Nagaland Tourism Board 2022-03-31 4.98 2026-03-19 4.9834 0 4.9834 4.9834 Completed
2715 NAGALAND Tourism and Culture
Construction of Approach Road and Security Fencing at IHM, Dimapur, Nagaland.
Schemes of NEC Schemes of NEC 2012-03-21 3.5224 2015-03-21 3.1702 0 3.1702 3.17 Completed
2716 NAGALAND Tourism and Culture
Construction of Eco-Tourism destination at Sendenyu Bio-diversity and wildlife conservation area, Kohima, Nagaland
Schemes of NEC Schemes of NEC 2016-10-18 2.84 2020-10-18 2.556 0 2.556 2.56 Completed
2717 NAGALAND Tourism and Culture
Construction of Guest House at Longleng District Head Quarter, Longleng, Nagaland
Schemes of NEC Schemes of NEC 2016-09-27 3.16 2019-09-27 2.8452 0 2.8452 2.28 Completed
2718 NAGALAND Tourism and Culture
Construction of Multilevel Parking at Rullinou, Kohima, Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2017-09-21 3.39 2020-09-21 1.22 0 1.22 1.22 Foreclosed
2719 NAGALAND Tourism and Culture
Construction of Tourist Lodge at Jalukie, Peren, Nagaland
Schemes of NEC Schemes of NEC 2017-12-28 2.95 2020-12-28 2.655 0 2.655 2.66 Completed
2720 NAGALAND Tourism and Culture
Construction of Tourist Resort at Dzukou, Viswema Range, Nagaland
Schemes of NEC Schemes of NEC 2014-03-03 2.8584 2018-03-03 2.5726 0 2.5726 2.57 Completed
2721 NAGALAND Tourism and Culture
Development of Kohima view point Aradura
Schemes of NEC Schemes of NEC 2022-03-03 4.5 2025-03-03 4.5 0 4.5 4.5 Ongoing
2722 NAGALAND Tourism and Culture
Development of Lavi Lake in Niuland at Dimapur, Nagaland
Schemes of NEC Schemes of NEC 2011-03-24 3.1331 2013-03-24 2.8198 0 2.8198 2.82 Completed
2723 NAGALAND Tourism and Culture
Development of Sungkotenem Lake at Mopungchuket in Mokukchung District, Nagaland
Schemes of NEC Schemes of NEC 2012-02-29 3.5102 2015-02-28 3.1592 0 3.1592 3.16 Completed
2724 NAGALAND Tourism and Culture
Development of trekking & base camp at Mt. Saramati, Thanamir Village, Kiphire District Nagaland
Schemes of NEC Schemes of NEC 2016-10-18 7.2 2019-10-18 6.48 0 6.48 6.48 Completed
2725 NAGALAND Tourism and Culture
Eco-Tourism Destination and Development of Trekking Route at Phusachodu Village, Phek District, Nagaland
Schemes of NEC Schemes of NEC 2017-03-22 3.1983 2021-03-22 2.8785 0 2.8785 2.88 Completed
2726 NAGALAND Tourism and Culture
Establishment of Enopen Tourist Resort at Khonoma, Kohima Nagaland
Schemes of NEC Schemes of NEC 2016-10-05 4.828 2019-10-05 4.3452 0 4.3452 4.35 Completed
2727 NAGALAND Tourism and Culture
Establishment of Services Block (Enopen Tourist Resort) at Khonoma, Kohima, Nagaland
Schemes of NEC Schemes of NEC 2021-03-31 1.88 2025-03-31 1.88 0 1.88 1.88 Completed
2728 NAGALAND Tourism and Culture
Infrastructure Development for Pilgrimage Destination at Molungyimsen, Mokukchung District, Nagaland.
Schemes of NEC Schemes of NEC 2012-06-07 4.6154 2015-06-07 4.1538 0 4.1538 4.15 Completed
2729 NAGALAND Tourism and Culture
Institute of Hotel Management and Catering at Dimapur, Nagaland Phase - II.
Schemes of NEC Schemes of NEC 2013-03-26 4.9822 2015-03-26 4.484 0 4.484 4.48 Completed
2730 NAGALAND Tourism and Culture
Integrated Tourism Project in Englan Range, Wokha, Nagaland
Schemes of NEC Schemes of NEC 2014-03-03 3.0071 2017-03-03 2.7063 0 2.7063 2.71 Completed
2731 NAGALAND Tourism and Culture
Seri - Tourism Model Farming Centre, in Mokokchung, Dimapur and Phek, Nagaland
Schemes of NEC Schemes of NEC 2023-02-28 4.8718 2025-02-27 4.87614 0 4.87614 4.87614 Completed
2732 NAGALAND Tourism and Culture
Tourist amenity Center at Dzu River
Schemes of NEC Schemes of NEC 2022-03-28 4.84 2026-03-19 4.836 0 4.836 4.836 Completed
2733 NAGALAND Tourism and Culture
Tourist Destination at Tsuza Erya Pangti Village, Wokha District, Nagaland
Schemes of NEC Schemes of NEC 2023-03-30 2.1642 2026-03-30 1.62315 0.54105 2.1642 1.6232 Ongoing
2734 NAGALAND Tourism and Culture
Upgradation of Nagaland House at Shillong
Schemes of NEC Schemes of NEC 2017-02-07 1.8134 2020-02-07 1.632 0 1.632 1.63 Completed
2735 NAGALAND Power
Construction of 220/132 kV (2x100 MVA) & 132/33 kV (2x50 MVA) Sub-station at Tsitrongse-Dimapur with Associated lines in Nagaland
PM-DevINE PM-DevINE Dept. of Power 2024-02-16 132.37 2026-09-30 99.275 0 99.275 Ongoing
2736 NAGALAND Agriculture and Allied
Livelihood projects relating to Special Development of Eastern Nagaland
PM-DevINE PM-DevINE Other 2023-03-23 180 2025-12-31 76.7672 0 76.7672 Ongoing
2737 NAGALAND Power
Scheme for Providing Stable Power Supply to Mon District in Nagaland
NESIDS-OTRI NESIDS Dept. of Power 2019-08-29 20.9607 2020-03-31 20.684 0 20.684 20.684 Completed
2738 NAGALAND Power
Up-gradation of Transformation capacity at 132 kv sub-station Nagarjan, Dimapur(132/66 kv, 100 MVA-1Nos. and 66/33, kv, 50 MVA -1 nos.)
NESIDS-OTRI NESIDS Dept. of Power 2023-12-22 24.46 2028-01-31 24.3341 0 24.3341 6.083525 Completed
2739 NAGALAND Transport and Communication
Construction and up gradation of Glory Peak Tourist Road under Phek District
NESIDS-ROADS NESIDS Public works Department 2022-10-05 32.5 2024-05-31 28.374 3 31.374 7.96 Completed
2740 NAGALAND Roads and Bridges
Construction of Widening of road from NH 29 (Sovima village Gate)- Sovima Cricket Ground upto Thahekhu village, Dimapur in Nagaland
NESIDS-ROADS NESIDS Public works Department 2019-08-29 21.9614 2020-03-31 21.9081 0 21.9081 21.9081 Completed
2741 NAGALAND Transport and Communication
Development of Tourism related infrastructure (Road with Heliport) at Tuophema tourist village
NESIDS-ROADS NESIDS Public works Department 2019-07-10 17.13 2020-03-31 17.0831 0 17.0831 17.0831 Completed
2742 NAGALAND Transport and Communication
Providing connectivity to places of tourist interest in the district Hq. of Tuensang District in Nagaland
NESIDS-ROADS NESIDS Public works Department 2019-08-30 25.38 2020-03-31 25.33 0 25.33 10.13 Completed
2743 NAGALAND Transport and Communication
Upgradation of Longnak-Mangkolemba road in Nagaland
NESIDS-ROADS NESIDS Public works Department 2022-04-20 28.53 2024-04-30 28.5373 0 28.5373 3.77 Completed
2744 NAGALAND Transport and Communication
Upgradation of road and bridge from NH-29 at 7th Mile Model Vilage to Siethekema C tourist destination onwards to Governors Camp from Ch.0.00 to 10.5 kms
NESIDS-ROADS NESIDS Public works Department 2019-10-07 32.89 2020-03-31 32.899 0 32.899 20.81 Completed
2745 NAGALAND Roads and Bridges
Upgradation of road from Kiphire to Tourist Destination at Zungki River, Kiphire District in Nagaland
NESIDS-ROADS NESIDS Public works Department 2019-08-30 20.4432 2020-03-31 20.3937 0 20.3937 20.3937 Completed
2746 NAGALAND Transport and Communication
Upgradation of road from Naga Lempong to Ahom Cave trekking point, Longleng in Nagaland
NESIDS-ROADS NESIDS Public works Department 2019-08-29 12.99 2020-03-31 12.967 0 12.967 9.62 Completed
2747 NAGALAND Transport and Communication
Upgradation of road from Wokha HQ to N. Longidang in Nagaland
NESIDS-ROADS NESIDS Public works Department 2019-08-29 22.89 2020-03-31 22.8435 0 22.8435 22.8435 Completed
2748 NAGALAND Transport and Communication
Dikhu Bridge to Amguri
NESIDS-ROADS NERSDS Public works Department 2019-07-31 59.77 2024-04-24 58.71 0 58.71 39.65 Completed
2749 NAGALAND Transport and Communication
Tenning to Lekie road
NESIDS-ROADS NERSDS Public works Department 2019-08-05 136.96 2021-08-05 61.7872 20.9628 82.75 36.57 Ongoing
2750 NAGALAND Transport and Communication
Upgradation of AT road from Tsuranga to Impur Junction
NESIDS-ROADS NERSDS Public works Department 2019-08-05 93.98 2021-08-05 92.77 0 92.77 72.86 Completed
2751 NAGALAND Transport and Communication
Upgradation of road from Chendang Saddle to Noklak (Length - 17.13 Km)
NESIDS-ROADS NERSDS Public works Department 2021-03-24 62.2 2024-04-24 61.415 0 61.415 52.11 Completed
2752 NAGALAND Transport and Communication
Upgradation of road from Chendang Saddle to Noklak (Phase-II)
NESIDS-ROADS NERSDS Public works Department 2022-03-27 45.59 2024-09-27 44.95 0 44.95 44.71 Completed
2753 NAGALAND Transport and Communication
Upgradation of road from Tuensang-to Longleng
NESIDS-ROADS NERSDS Public works Department 2019-08-05 217.13 2022-05-05 182.84 9.48 192.32 137 Ongoing
2754 NAGALAND Water Supply
Development of Tourism related infrastructure at Tuophema Tourist Village, Kohima District in Nagaland
NESIDS-OTRI NESIDS Dept. of Agriculture & An 2019-09-03 3.0823 2020-03-31 3.0823 0 3.0823 3.0824 Completed
2755 NAGALAND Industries
Community Trade Link Centre (CLTC) Project at Jalukie Peren District, Nagaland
Schemes of NEC Choose... 2024-01-11 4.75 2027-01-11 2.377375 1.0686375 3.4460125 2.37475 Ongoing
2756 NAGALAND Information and Public Relatio
Construction of Museum Cum Library & Guest House at Chungliyimti
Schemes of NEC Other 2024-01-08 3.12 2027-01-08 3.12573 0 3.12573 3.029757 Ongoing
2757 NAGALAND Education
Additional facilities (false ceiling) forr sainik School at Punglwa
NESIDS-OTRI NLCPR Department of School Educ 2007-09-27 0.5858 2009-02-27 0.5187 0 0.5187 0.5187 Completed
2758 NAGALAND Education
Additional Facilities to Sainik School at Punglwa, Nagaland
NESIDS-OTRI NLCPR Department of School Educ 2006-12-13 2.08 2008-05-30 0.9115 0 0.9115 0.9115 Completed
2759 NAGALAND Education
Computerisation & Computer Education in Schools.
NESIDS-OTRI NLCPR Department of School Educ 2000-03-31 1.62 2003-03-31 1.458 0 1.458 1.62 Completed
2760 NAGALAND Education
Construction of School Buildings
NESIDS-OTRI NLCPR Department of School Educ 2000-09-01 32.24 2001-03-30 29.016 0 29.016 32.24 Completed
2761 NAGALAND Education
Construction of Senayangpa School Building at Ungma Mokokchung in Nagaland
NESIDS-OTRI NLCPR Department of School Educ 2014-02-20 5.6924 2017-01-31 5.1232 0 5.1232 5.1232 Completed
2762 NAGALAND Education
Construction of Tribal Boys Hostel near Fazl Ali College, Mokokchung Town, Mokokchung District in Nagaland
NESIDS-OTRI NLCPR Department of School Educ 2014-02-20 4.4498 2017-01-31 3.8882 0 3.8882 3.8882 Completed
2763 NAGALAND Education
Improvement and upgradation of 11 Government High School Buildings
NESIDS-OTRI NLCPR Department of School Educ 2008-11-05 9.9894 2010-10-31 8.8141 0 8.8141 8.8141 Completed
2764 NAGALAND Education
Improvement of Science Education.
NESIDS-OTRI NLCPR Department of School Educ 2000-04-01 2.24 2003-03-31 2.016 0 2.016 2.24 Completed
2765 NAGALAND Education
Nagaland University
NESIDS-OTRI NLCPR Nagaland University 2001-09-02 4.03 2005-07-31 4.03 0 4.03 4.03 Completed
2766 NAGALAND Education
Sainik School at Punglwa, Kohima
NESIDS-OTRI NLCPR Department of School Educ 2004-03-19 14.07 2006-03-19 12.308 0 12.308 12.5895 Completed
2767 NAGALAND Education
Sarva Shiksha Abhiyan (2005-06)
NESIDS-OTRI NLCPR Department of School Educ 2006-03-29 4.646 2006-12-29 4.646 0 4.646 4.646 Completed
2768 NAGALAND Education
Sarva Shiksha Abhiyan (2006-07)
NESIDS-OTRI NLCPR Department of School Educ 2006-06-29 4.6304 2006-12-29 4.6304 0 4.6304 4.6304 Completed
2769 NAGALAND Education
Upgradation and Modernization of 3 ITIs in the State of Nagaland
NESIDS-OTRI NLCPR Department of School Educ 2006-12-14 2.1933 2008-05-30 1.2831 0 1.2831 1.974 Completed
2770 NAGALAND Irrigation and Flood Control
Integrated Nguiki Irrigation Project
NESIDS-OTRI NLCPR Dept water resources 2007-06-22 2.3713 2008-07-31 2.0924 0 2.0924 2.0924 Completed
2771 NAGALAND Irrigation and Flood Control
Protection from Dhansiri river at Dimapur
NESIDS-OTRI NLCPR Dept water resources 2002-02-27 5.108 2003-03-31 4.59 0 4.59 5.1 Completed
2772 NAGALAND Irrigation and Flood Control
Sowhi Minor Irrigation Project.
NESIDS-OTRI NLCPR Dept water resources 2001-10-11 1.06 2002-12-31 0.954 0 0.954 1.06 Completed
2773 NAGALAND Irrigation and Flood Control
Tsurang Irrigation Project
NESIDS-OTRI NLCPR Dept. of Power 2007-12-19 16.9332 2010-03-31 13.5236 0 13.5236 13.5236 Ongoing
2774 NAGALAND Irrigation and Flood Control
Utilization of ground water resources through Shallow Tube Well
NESIDS-OTRI NLCPR Public Health Engineering 2008-04-30 0.6305 2008-10-31 0.5674 0 0.5674 0.5674 Completed
2775 NAGALAND Health
State Referral Hospital , Dimapur.
NESIDS-OTRI NLCPR Dept. of Health & Family 2001-09-10 3 2002-12-31 2.7 0 2.7 3 Completed
2776 NAGALAND Health
Upgradation of District Hospitals, Nagaland
NESIDS-OTRI NLCPR Dept. of Health & Family 2004-02-26 14.4 2005-12-31 11.835 0 11.835 12.3469 Completed
2777 NAGALAND Health
Upgradation of Naga Hospital at Kohima .
NESIDS-OTRI NLCPR Dept. of Power 1998-12-23 25 2001-03-31 16.2 0 16.2 14.28 Ongoing
2778 NAGALAND Health
Vitalisation of State Referral Hospital, Dimapur
NESIDS-OTRI NLCPR Dept. of Health & Family 2004-02-19 35.62 2005-03-31 29.969 0 29.969 31.693 Completed
2779 NAGALAND Miscellaneous
Administrative Training Institute.
NESIDS-OTRI NLCPR Administrative Training I 1999-01-01 1 2000-09-30 0.9 0 0.9 1 Completed
2780 NAGALAND Miscellaneous
Construction of Bus and Truck Terminus at Peren New District HQ (Model Township) in Nagaland
NESIDS-OTRI NLCPR Dept of Transport 2012-10-31 8.7386 2014-04-30 7.8647 0 7.8647 7.8647 Completed
2781 NAGALAND Miscellaneous
Construction of Judicial quaters for Judicial Officers in Nagaland
NESIDS-OTRI NLCPR Dept. of Power 2014-02-28 9.8515 2024-12-31 8.0947 0 8.0947 6.4757 Ongoing
2782 NAGALAND Miscellaneous
Construction of Multipurpose Hall at Longleng in Nagaland
NESIDS-OTRI NLCPR Dept. of Power 2009-12-09 11.7042 2011-06-30 10.3272 0 10.3272 9.0849 Completed
2783 NAGALAND Miscellaneous
Construction of New High Court Complex at Kohima Phase-I (Construction of residence for Honble Chief Justice of High Court and Construction of residences for Justice of High Court (six blocks)
NESIDS-OTRI NLCPR Dept. of Power 2017-12-19 12.8674 2025-03-30 0.1 0 0.1 0.1 Foreclosed
2784 NAGALAND Miscellaneous
Construction of Rest House for ADC HQ at Aboi under Mon District
NESIDS-OTRI NLCPR Dept. of Power 2011-09-19 1.544 2014-08-31 1.3594 0 1.3594 1.3594 Completed
2785 NAGALAND Miscellaneous
Construction of Rest House for ADC HQ at Khuza under Phek District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-16 1.6246 2014-08-31 1.4335 0 1.4335 1.4335 Completed
2786 NAGALAND Miscellaneous
Construction of Rest House for ADC HQ at Meluri under Phek District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.8751 2014-08-31 1.6545 0 1.6545 1.6545 Completed
2787 NAGALAND Miscellaneous
Construction of Rest House for ADC HQ at Niuland under Dimapur District in Nagaland funded under NLCPR Scheme.
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.7027 2013-09-19 1.5024 0 1.5024 1.5024 Completed
2788 NAGALAND Miscellaneous
Construction of Rest House for ADC HQ at Shamator under Tuensang District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.8489 2014-08-31 1.6314 0 1.6314 1.6314 Completed
2789 NAGALAND Miscellaneous
Construction of Rest House for Deputy Commissioner HQ at New Peren under Peren District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 2.1677 2014-08-31 1.9127 0 1.9127 1.9127 Completed
2790 NAGALAND Miscellaneous
Construction of Rest House for EAC HQ at Botsa under Kohima District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-16 1.3605 2014-08-31 1.2005 0 1.2005 1.2005 Completed
2791 NAGALAND Miscellaneous
Construction of Rest House for EAC HQ at Ghathashi under Zunheboto District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.2737 2014-08-31 1.1238 0 1.1238 1.1238 Completed
2792 NAGALAND Miscellaneous
Construction of Rest House for EAC HQ at Khonsa under Kiphire District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.8838 2014-08-31 1.6622 0 1.6622 1.6622 Completed
2793 NAGALAND Miscellaneous
Construction of Rest House for EAC HQ at Sakshi under Longleng District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.5437 2014-08-31 1.3621 0 1.3621 1.3621 Completed
2794 NAGALAND Miscellaneous
Construction of Rest House for EAC HQ at Satoi under Zunheboto District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.2726 2014-08-31 1.1229 0 1.1229 1.1229 Completed
2795 NAGALAND Miscellaneous
Construction of Rest House for SDO HQ at Changtongya under Makokchung District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.7971 2014-08-31 1.5857 0 1.5857 1.5857 Completed
2796 NAGALAND Miscellaneous
Construction of Rest House for SDO HQ at Sanis under Wokha District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.9312 2014-08-31 1.7041 0 1.7041 1.7041 Completed
2797 NAGALAND Miscellaneous
Construction of Rest House for SDO Hq. at Changtongya under Mokokchung District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.7971 2014-08-31 1.5857 0 1.5857 1.5857 Completed
2798 NAGALAND Miscellaneous
Construction of Rest House for Sub-divisional Officer (Civil) at Dhansiripar under Dimapur District
NESIDS-OTRI NLCPR Dept of CAWD 2011-09-19 1.6006 2014-08-31 1.4123 0 1.4123 1.4123 Completed
2799 NAGALAND Miscellaneous
Construction of Swimming Pool at Dimapur, Nagaland
NESIDS-OTRI NLCPR Dept. of Youth Resource & 2013-09-18 2.5985 2015-06-30 2.267 0 2.267 2.267 Completed
2800 NAGALAND Miscellaneous
Establishment of North East Expo Centre ar Dimapur
NESIDS-OTRI NLCPR Dept of Agriculture 2007-10-12 21.2178 2010-09-30 19.096 0 19.096 19.096 Completed
2801 NAGALAND Miscellaneous
Extension of Hotel Japfu in Nagaland
NESIDS-OTRI NLCPR Dept. of Power 2013-07-05 9.8312 2025-12-24 3.5392 0 3.5392 3.5392 Ongoing
2802 NAGALAND Miscellaneous
Setting up of State Archive at Kohima
NESIDS-OTRI NLCPR Dept of Art and Culture 2006-06-29 4.3095 2008-05-30 3.7656 0 3.7656 3.7656 Completed
2803 NAGALAND Power
23MW HFO, Thermal Power Plant, Dimapur
NESIDS-OTRI NLCPR Dept. of Power 2004-03-17 32 2005-07-31 28.8 0 28.8 32 Foreclosed
2804 NAGALAND Power
Construction of 10 MVA 132/33 kV Sub-station at Doyang (NH-61) near NEEPCO project
NESIDS-OTRI NLCPR Dept. of Power 2012-03-23 10 2014-03-31 5.76 0 5.76 5.76 Completed
2805 NAGALAND Power
Construction of 132 kV S/C Wokha-Zunheboto-Makokchung Transmission line Phase I, Wokha Doyang NH-61
NESIDS-OTRI NLCPR Dept. of Power 2011-09-23 20.4809 2013-09-30 17.6346 0 17.6346 17.6346 Completed
2806 NAGALAND Power
Construction of 220 K/V F/C Transmission Line from Dimapur to Zadima
NESIDS-OTRI NLCPR Dept. of Power 2017-11-17 108.1589 2024-12-31 97.3363 0 97.3363 97.3363 Ongoing
2807 NAGALAND Power
Construction of 66KV Transmission Line (charged at 33KV) from Ganeshnagar to Peren & construction of 5MVA, 33/11 KV S/S at Jalukie & Peren
NESIDS-OTRI NLCPR Dept. of Power 2008-12-18 21.7844 2010-05-15 19.2216 0 19.2216 19.2216 Completed
2808 NAGALAND Power
Construction of end equipments and 220 kv S/C transmission line from PGCIL sub-station Dimapur to Chiephobozou
NESIDS-OTRI NLCPR Dept. of Power 2010-12-03 14.2339 2012-10-31 12.5593 0 12.5593 12.5593 Completed
2809 NAGALAND Power
Construction of new 66 kV Tizit to Mon Transmission Line
NESIDS-OTRI NLCPR Dept. of Power 2005-05-10 12.4286 2006-05-31 10.8096 0 10.8096 10.8096 Completed
2810 NAGALAND Power
Electrification of 4 Tribal Villages
NESIDS-OTRI NLCPR Dept. of Power 2000-10-31 0.7 2002-12-31 0.63 0 0.63 0.7 Completed
2811 NAGALAND Power
Likimro - HEP
NESIDS-OTRI NLCPR Dept. of Power 1999-04-01 37.01 2002-12-31 33.309 0 33.309 37.01 Completed
2812 NAGALAND Power
Sub-transmission & Distribution schemes (34 No.)
NESIDS-OTRI NLCPR Dept. of Power 2000-11-07 67.85 2005-12-30 59.112 0 59.112 65.68 Completed
2813 NAGALAND Power
Sub-Transmission system at Mokokchung
NESIDS-OTRI NLCPR Dept. of Power 2003-02-18 6.99 2004-03-31 6.291 0 6.291 6.99 Completed
2814 NAGALAND Power
Upgradation of 132/66/33 KV Grid Sub-station at Nagarjan, Dimapur
NESIDS-OTRI NLCPR Dept. of Power 2014-07-01 17.0543 2017-06-30 15.3033 0 15.3033 15.3033 Completed
2815 NAGALAND Roads and Bridges
Aboi-Tohok, 14 KM
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-10-23 6.53 2006-03-31 5.877 0 5.877 6.53 Completed
2816 NAGALAND Roads and Bridges
Chantongya - Longleng Road (23 KMs)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2000-03-01 4.23 2002-09-30 3.807 0 3.807 4.23 Completed
2817 NAGALAND Roads and Bridges
Constrcution of road from Kohima to Leike road junction to Barak - 15 Km (Phase- III) in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2012-12-24 19.1148 2014-12-31 17.2033 0 17.2033 15.672 Foreclosed
2818 NAGALAND Roads and Bridges
Construction & Improvement of road from Zhekiye to Hokiye via Satoi (Zhekiye to Chokhuvi)-26 km in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-02 16.9361 2010-08-31 14.9436 0 14.9436 14.9436 Completed
2819 NAGALAND Roads and Bridges
Construction / Improvement of road from Tuophema to Kasha (8.5 km) in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-26 5.8682 2010-08-31 5.1779 0 5.1779 5.1779 Completed
2820 NAGALAND Roads and Bridges
Construction and Upgradation of road from Old Phek via Khuza to Satakha Road
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2006-02-22 29.1721 2008-02-29 25.4902 0 25.4902 25.4902 Completed
2821 NAGALAND Roads and Bridges
Construction of 2 lane RCC Bridge over Dhansiri river
NESIDS-OTRI NLCPR Dept. of Power 2007-06-28 6.4519 2009-07-31 5.8067 0 5.8067 5.8067 Ongoing
2822 NAGALAND Roads and Bridges
Construction of Link Roads to Mineral Deposit Areas in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2008-05-16 26.5391 2010-05-31 23.4171 0 23.4171 23.4171 Completed
2823 NAGALAND Roads and Bridges
Construction of RCC T Beam girder double-lane bridge over river Tezu on Lanye to Meluri, Phek Dist
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-06-27 9.0026 2014-05-31 7.9435 0 7.9435 7.9435 Completed
2824 NAGALAND Roads and Bridges
Construction of road from Kephore to Kituskir (10 km) in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-02 7.4905 2010-08-31 6.2638 0 6.2638 6.2638 Completed
2825 NAGALAND Roads and Bridges
Construction of road from Agunato-Samator Road in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-27 15.973 2011-03-31 14.098 0 14.098 14.098 Completed
2826 NAGALAND Roads and Bridges
Construction of Road from Chen HQ to Wangti, 23.10 Km in Mon District, Kohima in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2013-07-08 24.5059 2016-06-30 22.0553 0 22.0553 22.0553 Completed
2827 NAGALAND Roads and Bridges
Construction of road from Chozuba Border Road to Kijumetuma Junction via Khusami (26 km)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-03-15 34.355 2013-02-28 30.312 0 30.312 30.312 Completed
2828 NAGALAND Roads and Bridges
Construction of road from Chuchuyimlang to Mongdikang 20 km in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-10-14 11.0638 2011-03-31 9.7622 0 9.7622 9.7574 Completed
2829 NAGALAND Roads and Bridges
Construction of road from Diezephe to Razephe via Vidima - 15 km
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-05-19 13.7124 2013-05-31 12.0992 0 12.0992 12.0992 Completed
2830 NAGALAND Roads and Bridges
Construction of road from Jendang-Saddle-Noklak-Pangsha Tuensang District - 62 Km (Phase - II for 31 Km) in Nagaland
NESIDS-OTRI NLCPR Dept. of Power 2012-12-26 21.8672 2024-12-31 15.7097 0 15.7097 15.7097 Foreclosed
2831 NAGALAND Roads and Bridges
Construction of road from Kohima to Leikie road junction to Tepuiki to Barak - 10 km (MDR)
NESIDS-OTRI NLCPR Dept. of Power 2011-02-28 9.6854 2013-01-31 8.5459 0 8.5459 8.5459 Completed
2832 NAGALAND Roads and Bridges
Construction of road from Longtho to Governors Camp at Liphayan 20 km in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-09-30 10.9456 2011-03-31 9.6579 0 9.6579 9.6579 Completed
2833 NAGALAND Roads and Bridges
Construction of road from NH-150 to Chokriba via Thipuzu (10 km) in Phek District
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-12-19 11.6791 2013-03-31 10.3049 0 10.3049 10.3049 Completed
2834 NAGALAND Roads and Bridges
Construction of road from NH-150 to Thiphuzu (25 km) in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-02 11.9246 2010-08-31 10.7321 0 10.7321 10.7321 Completed
2835 NAGALAND Roads and Bridges
Construction of road from Noklak to Thonoknyu via Sanglao in Nagaland
NESIDS-OTRI NLCPR Dept. of Power 2009-03-27 22.4938 2024-12-31 15.7646 0 15.7646 15.7646 Foreclosed
2836 NAGALAND Roads and Bridges
Construction of Road from Phek to Chozuba (44.36 Km)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2007-12-31 17.4713 2009-06-30 14.5 0 14.5 14.5 Completed
2837 NAGALAND Roads and Bridges
Construction of road from Pughoboto to Satakha, Zunheboto road, Zunheboto District (50km)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-09-19 39.2404 2013-08-31 35.3162 0 35.3162 35.3162 Completed
2838 NAGALAND Roads and Bridges
Construction of Road from Purana Bazar (NH-39 Bypass) to Kohima-Bokajan Road
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2004-09-20 21.1763 2006-03-31 18.5033 0 18.5033 19.2496 Completed
2839 NAGALAND Roads and Bridges
Construction of road from Razeba to Chizami via Thetsumi
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2008-12-18 25.7267 2010-12-15 23.154 0 23.154 23.154 Completed
2840 NAGALAND Roads and Bridges
Construction of road from Ruzhazo to Phek town via Khumvophu
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2008-12-18 8.6004 2010-09-15 7.6486 0 7.6486 7.6486 Completed
2841 NAGALAND Roads and Bridges
construction of Road from Sainik School Punglwa to Jalukie( from ODR to Intermediate Lane)-28 Km in Peren District )
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2016-02-25 36.1196 2018-02-28 32.2503 0 32.2503 32.2503 Completed
2842 NAGALAND Roads and Bridges
Construction of road from Tamlu Administrative Hq. to Shemnyuching in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-02 11.4295 2011-02-28 10.2865 0 10.2865 10.2865 Completed
2843 NAGALAND Roads and Bridges
Construction of road from Tuophema to Pughoboto via Kasha (Kasha to Pughoboto) - 12.47km
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-09-19 14.9487 2013-08-31 13.176 0 13.176 13.176 Completed
2844 NAGALAND Roads and Bridges
Construction of Road from Yangli to Surohoto (17Km) in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-09-04 8.9468 2011-02-28 7.8942 0 7.8942 7.8942 Completed
2845 NAGALAND Roads and Bridges
Construction of road from Zero Point Sanis to Woruku village - 27km (ODR)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-09-19 22.9944 2013-09-30 20.275 0 20.275 20.275 Completed
2846 NAGALAND Roads and Bridges
Construction of Road Kohima Laike Road junction to old Puilwa -15km in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-09-04 7.4893 2011-02-28 6.6083 0 6.6083 6.6083 Completed
2847 NAGALAND Roads and Bridges
Construction of Road to Dimapur Dist. Headquarters at Chumukedima
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2000-03-01 2.65 2002-03-29 2.385 0 2.385 2.65 Completed
2848 NAGALAND Roads and Bridges
Construction of Tizu Bridge & Chizuti Bridge at Nimi-Laluri Road to Mineral Deposit Areas
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2010-12-23 20.5393 2012-11-30 18.1229 0 18.1229 18.1229 Completed
2849 NAGALAND Roads and Bridges
Constructon of T.Beam Girder Double Lane Bridge of IRC Class 'A' loading over river DZU-U on Rusoma to Kijumetuma road
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2008-12-18 5.4441 2010-06-15 4.8997 0 4.8997 4.8997 Completed
2850 NAGALAND Roads and Bridges
Dimapur to Ganeshnagar Road
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2003-01-30 12.12 2004-03-31 10.4132 0 10.4132 11.1132 Completed
2851 NAGALAND Roads and Bridges
Improvement & Upgradation of road from Border road to Changlanshu - 19 km
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2011-06-27 6.1078 2014-05-31 5.3892 0 5.3892 5.3892 Completed
2852 NAGALAND Roads and Bridges
Improvement and upgradation of District Capital Roads
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2004-07-29 20 2006-07-29 17.4753 0 17.4753 18.1763 Completed
2853 NAGALAND Roads and Bridges
Improvement and Upgradation of road from Longkhum via Mangmetong - Aliba
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2006-02-22 17.81 2008-02-29 15.5589 0 15.5589 15.5589 Completed
2854 NAGALAND Roads and Bridges
Improvement and Upgradation of road from NH-61 (Alichen to Mangmetong - 11 Km) to Doyang Hydro Project Phase -I in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2010-02-05 7.0414 2011-08-15 6.2129 0 6.2129 6.2129 Completed
2855 NAGALAND Roads and Bridges
Improvement of Dimapur Niuland Road
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2000-03-01 7.36 2003-03-31 6.624 0 6.624 7.36 Completed
2856 NAGALAND Roads and Bridges
Improvement of road from Hezidesa Village to Intanki River Bridge (6.60 km) and upgradation of Road from Mounglumuk to Jalukie Zandi Village (6.30km) in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2007-09-26 7.27 2008-08-28 6.5434 0 6.5434 6.5434 Completed
2857 NAGALAND Roads and Bridges
Improvement of road from Zhekiye to Satoi - 70 km (Ghukhuyi upto Satoi Administrative Hq., MDR-21 km)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2010-11-10 14.3884 2012-04-30 12.6957 0 12.6957 12.6957 Completed
2858 NAGALAND Roads and Bridges
Improvement of Roads in Mon District (Under PMs Package)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2005-09-29 23.7478 2007-09-29 20.5814 0 20.5814 20.5814 Completed
2859 NAGALAND Roads and Bridges
Improvement of Roads in Tuensang District (Under PM's Package)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2005-09-29 40.7211 2007-03-31 32.8222 0 32.8222 32.8182 Completed
2860 NAGALAND Roads and Bridges
Improvement of Roads in Wokha District (Under PM's Package)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2005-09-29 4.3542 2007-09-29 3.8012 0 3.8012 3.8012 Completed
2861 NAGALAND Roads and Bridges
Khipire-Amahator-Lukhani Road (Tuensang Seminar Road)
NESIDS-OTRI NLCPR Dept. of Power 2003-01-30 19.524 2008-03-31 14.0446 0 14.0446 14.4946 Ongoing
2862 NAGALAND Roads and Bridges
Kiphire - Pungro Road (Tuensang Seminar Road)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-04-01 29 2008-03-31 26.55 0 26.55 28.5601 Completed
2863 NAGALAND Roads and Bridges
Lampong Singha to Phomehing via Changnyu EAC HQ. (Mon Seminar Road)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2003-01-30 8.78 2005-12-31 0.54 0 0.54 Completed
2864 NAGALAND Roads and Bridges
Mokokchung-Dikhu-Chare road in Tuensang Dist. (Tuensang Seminar Road)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-02-28 8.7 2006-03-31 7.831 0 7.831 8.537 Completed
2865 NAGALAND Roads and Bridges
Mon-Namotola Road (Mon Seminar Road)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-10-01 9.58 2004-03-31 8.622 0 8.622 9.501 Completed
2866 NAGALAND Roads and Bridges
Project Upgradation of road from Aizuto Mission Centre to Shena old Saptiqa EAC HQ via Atoizu and Tulo river i/c one bridge (25m span) 45 km. retained for 23 kms. only in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2015-08-10 14 2018-04-30 15.84 0 15.84 12.6 Completed
2867 NAGALAND Roads and Bridges
Railway Over bridge at Dimapur
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-01-01 3.5 2002-09-30 3.15 0 3.15 3.5 Completed
2868 NAGALAND Roads and Bridges
Replacement of Hamilton Bridge on Diku-Chare Road
NESIDS-OTRI NLCPR Dept. of Power 2003-03-21 1.6 2005-03-21 0.36 0 0.36 0.06 Completed
2869 NAGALAND Roads and Bridges
Tang-Junction to Chenmoho Road (Mon Seminar Road)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-04-01 15.54 2005-03-31 14.2828 0 14.2828 15.1258 Completed
2870 NAGALAND Roads and Bridges
Tohok-Chen HQ-Chenlaiso-Wangti,49 KM
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2004-01-12 11.1108 2006-03-31 9.7807 0 9.7807 9.7146 Completed
2871 NAGALAND Roads and Bridges
Tohok-Chenkhao-Wangti,31KM
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2001-10-23 8.1889 2006-03-31 7.37 0 7.37 7.9094 Completed
2872 NAGALAND Roads and Bridges
Upgradation and Improvement of roads from Tourist Villages from major/minor hubs in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2009-03-02 4.8964 2011-02-28 4.323 0 4.323 4.323 Completed
2873 NAGALAND Roads and Bridges
Upgradation of Co-Co Doyang Road (NH-61) to Kitsaki via Atoizu SDO HQ-37 (MDR)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2010-12-23 16.6112 2012-11-30 14.6569 0 14.6569 14.6569 Completed
2874 NAGALAND Roads and Bridges
Upgradation of Dimapur Khopanala Jalukie Peren Road
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2006-02-21 36.73 2008-02-29 33.0595 0 33.0595 33.0595 Completed
2875 NAGALAND Roads and Bridges
Upgradation of Dimapur-Nuiland Road from ODR to MDR (28 Kms) in Nagaland
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2010-08-16 29.4108 2012-02-29 25.9507 0 25.9507 25.9507 Completed
2876 NAGALAND Roads and Bridges
Upgradation of road from Alongchen to Mangkolemba to via impur Mopungchuket Mongchen (ODR to MDR) - 19 Km-Phase-II in Nagaland
NESIDS-OTRI NLCPR Dept. of Power 2017-05-25 22.33 2019-05-31 20.097 0 20.097 16.097 Completed
2877 NAGALAND Roads and Bridges
Upgradation of road from Alongchen to Mangkolemba to via impur, Mopungchuket, Omngchem (ODR to MDR) - 15 Km (Phase-I) (upto WBM & Bituminous works) in Nagalnd
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2013-10-23 16.95 2015-09-30 15.255 0 15.255 15.255 Completed
2878 NAGALAND Roads and Bridges
Upgradation of Road from Rusoma to Kijumetuma (36.00 Km)
NESIDS-OTRI NLCPR Dept. of PWD (R&B) 2007-12-31 21.8457 2009-09-30 19.6605 0 19.6605 19.6605 Completed
2879 NAGALAND Sports
Construction of Football Stadium at Tobu Hq in Mon District in Nagaland
NESIDS-OTRI NLCPR Dept. of Power 2014-02-20 2.6656 2024-12-12 1.8969 0 1.8969 1.3596 Ongoing
2880 NAGALAND Sports
Construction of Indoor and Outdoor Stadium at Peren Government College, Peren
NESIDS-OTRI NLCPR Dept. of Power 2010-07-30 8.2314 2024-12-31 2.903 0 2.903 2.903 Ongoing
2881 NAGALAND Sports
Construction of Sports Hall at Mokokchung
NESIDS-OTRI NLCPR Dept. of Youth Resource & 2003-03-21 1.94 2005-10-31 1.746 0 1.746 1.771 Completed
2882 NAGALAND Sports
Development of Ziekezou Sports Complex, Kohima
NESIDS-OTRI NLCPR Dept. of Power 2017-11-21 12.5 2024-12-30 11.25 0 11.25 4.5 Ongoing
2883 NAGALAND Sports
Mini Outdoor Stadium at Wangkhao College in Mon Town
NESIDS-OTRI NLCPR Dept. of Youth Resource & 2006-05-22 0.8026 2008-04-30 0.7014 0 0.7014 0.7014 Completed
2884 NAGALAND Tourism and Culture
Construction of Rani Gaidinliu Library Cum memorial Museum at Kohima
NESIDS-OTRI NLCPR Dept. of Power 2011-09-19 9.8308 2012-06-30 5.8354 0 5.8354 5.8354 Foreclosed
2885 NAGALAND Water Supply
Augmantation of water supply at Dimapur.
NESIDS-OTRI NLCPR Dept of Public Health Eng 2000-07-19 13.33 2002-03-01 11.997 0 11.997 13.33 Completed
2886 NAGALAND Water Supply
Augmenataion of Water Supply to Wokha Town
NESIDS-OTRI NLCPR Public Health Engineering 2012-11-23 19.596 2014-10-31 16.8368 0 16.8368 16.8368 Completed
2887 NAGALAND Water Supply
Augmentation of water supply at Chen EAC H.Q. Chenwatnyu village
NESIDS-OTRI NLCPR Public Health Engineering 2007-10-12 2.7948 2007-10-12 2.466 0 2.466 2.466 Completed
2888 NAGALAND Water Supply
Providing water supply by gravity system to Aboi HQ and Longching EAC HQ in Mon District
NESIDS-OTRI NLCPR Public Health & Engg Depa 2017-12-04 9.6598 2019-12-31 8.6938 0 8.6938 3.4775 Completed
2889 NAGALAND Water Supply
Providing Water Supply by gravity to Mon village and 4 neighbouring villages in Mon District
NESIDS-OTRI NLCPR Dept. of Power 2015-10-29 15.4667 2017-10-31 13.8212 0 13.8212 13.8212 Completed
2890 NAGALAND Water Supply
Providing Water Supply to 24 villages of Chiephobozou R.D.Block in Nagaland
NESIDS-OTRI NLCPR Public Health Engineering 2009-09-30 26.2641 2011-09-30 23.1742 0 23.1742 23.1742 Completed
2891 NAGALAND Water Supply
Providing Water Supply to New Peren District HQ of Nagaland
NESIDS-OTRI NLCPR Public Health Engineering 2012-09-14 9.3094 2014-12-31 8.3564 0 8.3564 8.3564 Completed
2892 NAGALAND Water Supply
Providing water supply to Samziuram village, Peren
NESIDS-OTRI NLCPR Dept. of Power 2017-11-21 18.9316 2024-12-31 17.0384 0 17.0384 6.8154 Ongoing
2893 NAGALAND Water Supply
Water Supply scheme for Mon and Chui villages
NESIDS-OTRI NLCPR Public Health Engineering 2003-11-08 3.92 2005-03-31 3.3622 0 3.3622 3.6622 Completed
2894 NAGALAND Health
Upgradation of the Radiation Oncology Centre at CIHSR in Nagaland under PM-DevINE
PM-DevINE Dept. of Power 2024-06-13 34.5 2027-06-30 25.6947 0 25.6947 Ongoing
2895 NAGALAND Education
Educational Infrastructure/ facility Development in Polytechnics in Nagaland
PM-DevINE Dept. of Higher & Technic 2024-06-13 30 2026-06-30 27.7128 0 27.7128 Ongoing
2896 NAGALAND Information and Public Relatio
Construction of Tribal Artisan Resource Centre at Chumukedima , Nagaland
Schemes of NEC Nagaland Handloom and Han 2024-09-29 2.91 2027-09-29 2.17917275 0.4358346 2.61500735 2.1791727 Ongoing
2897 NAGALAND Tourism and Culture
Creation of Amenity Centre at Kigwema, Nagaland
Schemes of NEC Nagaland Tourism Board 2024-10-29 1.47 2027-10-29 0.735 0.3675 1.1025 0.735 Ongoing
2898 NAGALAND Transport and Communication
C/O Road from Jalukie (NH-129A) to New DC Complex model township Peren
NESIDS-ROADS Public works Department 2024-10-23 21.91 2026-10-22 10.93 2.59 13.52 Ongoing
2899 NAGALAND Transport and Communication
Construction of Road from Old Peren to New Peren (DC Office)via Chalkot junction (L-16.50KM)
NESIDS-ROADS Public works Department 2024-11-05 46.32 2026-11-04 11.76 8.35 20.11 Ongoing
2900 NAGALAND Agriculture and Allied
Promotion of Naga King Chilly
Schemes of NEC Department of Horticultur 2024-11-06 4.95 2027-11-06 4.9558 0 4.9558 3.7138 Ongoing
2901 NAGALAND Education
Construction of Classroom and Construction of 40 bedded Boys Hostel with Furniture and other amenities at Government Polytechnic Seithekema-C, Chumoukedima, Nagaland
Schemes of NEC Directorate of Technical 2024-11-11 4.16 2027-11-11 3.08 0.97 4.05 3.08 Ongoing
2902 NAGALAND Science and Technology
Construction of cultural activity complex at Pfutseromi Village in respect of Chakhesang Tribe, Office of the Deputy Commissioner, District Administrative Office, Phek
Schemes of NEC Office of the Deputy Comm 2024-12-13 4.61 2027-12-13 1.4156 1.4156 Ongoing
2903 NAGALAND Transport and Communication
Upgradation of Road from Khonoma village to NH 29 via Dzudza river
NESIDS-ROADS Public works Department 2025-02-17 26.46 2027-02-16 6.5581 4.91 11.4681 Ongoing
2904 NAGALAND Transport and Communication
Upgradation of road from Thizama via Kohima Bypass road to proposed Chiethu Airport via Nehre model village
NESIDS-ROADS Public works Department 2025-02-20 42.6 2027-02-19 6.19 8.78 14.97 Ongoing
2905 NAGALAND Transport and Communication
Improvement of road from Phomching HQ Nagaland to Longding HQ Arunachal Pradesh via Wetting Longzang and Phuka village
NESIDS-ROADS Public works Department 2025-02-21 58 2027-06-04 17.08 9.82 26.9 Ongoing
2906 NAGALAND Transport and Communication
Improvement of road from Coco road Emlomi Old British Bungalow to Ghukiye Jn via Kilki road
NESIDS-ROADS Public works Department 2025-02-21 29.79 2027-06-23 12.5 4.09 16.59 Ongoing
2907 NAGALAND Health
Setting up of 50 Bedded Hospital at New District Headquarter Peren, Nagaland
PM-DevINE Dept. of Health & familly 2025-04-29 44.6509 2028-04-28 8.2925 0 8.2925 Ongoing
2908 NAGALAND Health
Setting up of Multispeciality Hospital at Chumokedima Nagaland
PM-DevINE Dept. of Health & familly 2025-07-09 58.7209 2027-07-31 10.4749 0 10.4749 Ongoing
2909 NAGALAND Science and Technology
Nagaland Innovation Hub for startup
NESIDS-OTRI Department of IT and comm 2025-08-20 19.5663 2028-08-20 4.7678 0 4.7678 Ongoing
2910 NAGALAND Industries
Post-Harvest Coffee processing facilities for Sustainable Economic Development in Nagaland.
Schemes of NEC Department of Land Resour 2025-08-08 8.55 2026-08-08 2.1375 2.1375 4.275 2.1375 Ongoing
2911 NAGALAND Power
Development of 1.5 MW Dzuna small hydro project
NESIDS-OTRI Power Dept 2025-09-22 22.8031 2027-09-22 4.2437 4.2437 Ongoing
2912 NAGALAND Sports
Construction of Kohima Multi Disciplinary Sports Centre at IG Stadium Complex, Kohima District
PM-DevINE Youth Affairs and Sports 2025-10-27 72.5913 2027-10-31 0 Ongoing
2913 NAGALAND Transport and Communication
Up-gradation of road from Lampong Sheanghah to Nyasa village via Longphoh, Shangnyu, Mon district , Length- 18Km
NESIDS-ROADS Public works Department 2025-10-31 23.09 2027-10-31 4.6 4.6 Ongoing
2914 NAGALAND Power
Development of 4.2 MW Nrazai Small Hydro Project
NESIDS-OTRI Power Department, Nagalan 2025-11-24 45.6681 2028-11-24 11.1966 11.1966 Ongoing
2915 NAGALAND Industries
Setting up handicraft facility centre at Kohima.
Schemes of NEC Nagaland Khadi & Village 2025-12-15 4.7584 2027-12-15 1.1896 1.1896 Ongoing
2916 NAGALAND Sports
Construction of Football Playground at Botsa EAC Hq.Kohima District, Nagaland
NESIDS-OTRI Department of Youth resou 2026-01-05 20.45 2028-01-05 4.82 4.82 Ongoing
2917 NAGALAND Science and Technology
Investigation And Assessment of Strategic & Critical Minerals of Nagaland For Their Economic Viability.
Schemes of NEC Directorate of Geology & 2026-02-26 4.99 2029-02-26 2.24 2.24 Ongoing
2918 NAGALAND Health
Construction of New Community Health Centre at Pughoboto, Zunheboto
NESIDS-OTRI Executive Engineer PWD Me 2026-03-12 5 2027-09-30 0 Ongoing
2919 NAGALAND Transport and Communication
Development of Passenger Amenity Centre at Bus Terminal Dimapur Nagaland
NESIDS-OTRI Transport Department 2026-03-23 6.5 2028-09-24 0 Ongoing
2920 NAGALAND Evaluation and Monitoring
Establishment of Helipads for Enhanced Helicopter Service Connectivity in Nagaland
NESIDS-OTRI Transport Department 2026-03-31 25 2028-03-31 0 Ongoing
2921 NAGALAND Industries
Cluster Based Coffee Value Chain Development In Nagaland.
Schemes of NEC Department of Land Resour 2026-03-31 44.0643123 2029-03-31 0 Ongoing
2922 NAGALAND Irrigation and Flood Control
Integrated Development Project For Backward Area Under Phomching A/C Constituency, Mon District, Nagaland.
Schemes of NEC Office Of The Deputy Comm 2026-03-31 6.26 2028-03-31 1.565 1.565 Ongoing
2923 NAGALAND Industries
Construction of Supercritical Extraction Unit at Jalukie, Peren, Nagaland.
Schemes of NEC Department Of Agriculture 2026-03-31 9 2028-03-31 0 Ongoing
2924 OTHER AGENCY Education
Construction of Boys and Girls Hostel at Roing, Dibang Valley District, Arunachal Pradesh
Schemes of NEC Schemes of NEC Other 2021-03-30 5.1756805 2024-03-30 5.2498776 0 5.2498776 4.93 Ongoing
2925 OTHER AGENCY Education
Construction of Hostel Building at Donyi Polo Vidya Niketan, Pasighat for Arunachal Sikha Vikas Samiti, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2023-03-31 4.66 2026-03-31 4.1710312 0 4.1710312 1.17 Ongoing
2926 OTHER AGENCY Education
Establishment of School & Hostel Infrastructure for Underpriviledged Tribal Students of Arunachal Pradesh at Hucheiliang Village under Tezu Circle, Lohit
Schemes of NEC Schemes of NEC Other 2023-03-31 4.1240478 2026-03-31 4.0872068 0.036841 4.1240478 3.9556142 Ongoing
2927 OTHER AGENCY Science and Technology
Implementation of 11 Plan of Action (PoA) projects in the state of Arunachal Pradesh covering domain areas of Agriculture & Allied, Disaster Management, Forestry, Ecology & Environment, Human Resource Development, Medical & Health, Planning & Development, Transport & Communication and Water Resources Management (PoA020, PoA024, PoA026, PoA027, PoA028, PoA029, PoA030, PoA031, PoA032, PoA034, PoA036)
Schemes of NEC Schemes of NEC North East Centre Techno 2022-03-28 3.1932 2025-03-28 3.1932 0 3.1932 3.1932 Completed
2928 OTHER AGENCY Education
Construction of Birgweshree Shikla Girls Hostel of Kalyan Ashram, Udalguri, Assam
Schemes of NEC Schemes of NEC 2023-03-31 4.24 2026-03-31 3.61 0 3.61 Ongoing
2929 OTHER AGENCY Education
Construction of School Building of Saraswati Vidya Mandir at Boro Haflong, Dima Hasao District, Assam
Schemes of NEC Schemes of NEC 2023-03-31 3.62 2027-03-31 2.88 0 2.88 0.6773758 Ongoing
2930 OTHER AGENCY Education
Construction of Vivekananda School at Haflong, Dima Hasao, Assam
Schemes of NEC Schemes of NEC Other 2022-03-25 4.5616127 2026-03-25 4.5036105 0.0580561 4.5616666 1.0575 Ongoing
2931 OTHER AGENCY Industries
Establishment of an Eri Silk Spinning Mill at Integrated Textile Park, Baksa (Assam)
Schemes of NEC Schemes of NEC 2022-03-31 14.92 2025-03-31 14.038 0 14.038 8.218 Ongoing
2932 OTHER AGENCY Industries
Market Development by Way of Digitization, Authentication and Implementing Traceability in Handloom Sector of North Eastern States(NEHHDC)
Schemes of NEC Schemes of NEC 2022-03-31 14.92 2025-03-31 14.92 0 14.92 14.92 Ongoing
2933 OTHER AGENCY Industries
Setting up of North East (Ashtlaxmi) Haat & Experience Centre for Facilitating Market Linkage for the Handicrafts & Handloom Artisans and Weavers from the North Eastern Region
Schemes of NEC Schemes of NEC NEHHDC 2022-03-30 9.07 2025-03-30 9.0668 0 9.0668 3.07 Ongoing
2934 OTHER AGENCY Health
Infrastructure Development of Siva Sundari Nari Sikshasram & Ante-Natal Clinic, Park Road, Silchar, District-Cachar, Assam.
Schemes of NEC Schemes of NEC 2022-03-31 4.27 2025-03-31 4.27 0 4.27 4.2734 Completed
2935 OTHER AGENCY Science and Technology
Digital Design Labs for Livelihood Generation (henceforth been named in place of earlier name - Animation Lab for livelihood Generation)Assam Electronics Development Co-operation Limited (AMTRON)
Schemes of NEC Schemes of NEC Other 2022-03-28 4.99 2026-03-31 4.99 0 4.99 4.99 Completed
2936 OTHER AGENCY Science and Technology
Habitat Restoration and Conservation of Gangetic Dolphin(Platinisa Roxburgh, 1801) in North-East India
Schemes of NEC Schemes of NEC Assam University 2021-02-17 0.2218462 2024-03-26 0.14 0.0818462 0.2218462 0.2218462 Completed
2937 OTHER AGENCY Science and Technology
Implementation of 6 Plan of Action (PoA) projects finalized for the state of Assam as per NESAC Society meeting held on 23rd January, 2021 (PoA053, PoA060, PoA061, PoA062, PoA063)
Schemes of NEC Schemes of NEC NESAC 2022-03-28 2.2095 2025-03-28 2.2095 0 2.2095 2.2095 Completed
2938 OTHER AGENCY Science and Technology
Space-based land-use Intelligent System for Guwahati (SLIS-G) (PoA050)
Schemes of NEC Schemes of NEC NESAC 2022-03-28 4.5 2025-03-28 4.5 0 4.5 4.4999999 Completed
2939 OTHER AGENCY Transport and Communication
Construction of hangar, associated apron and link taxiway works at Dibrugarh Airport
Schemes of NEC Schemes of NEC 2016-02-09 20.85 2019-02-09 11 0 11 7.04 Completed
2940 OTHER AGENCY Agriculture and Allied
Organic Tropical Fruit, Tamenglong
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-31 4.6238 2025-03-31 4.6238 0 4.6238 4.6238 Completed
2941 OTHER AGENCY Agriculture and Allied
Sustainable management of bioresources through Biotechnological interventions of Shiroi Hills and adjacent areas, Manipur
Schemes of NEC Schemes of NEC Other 2018-01-02 0.7436263 2021-01-02 0.7436263 0.7436263 0.7436263 Foreclosed
2942 OTHER AGENCY Education
Community Development Programme of Koireng Tribe in Manipur, (Establishment of Rrsources Centre for Study of Linguistic Art & Culture for Koireng Tribe)
Schemes of NEC Schemes of NEC 2020-11-17 3.008236 2023-11-23 2.8656 0.1421256 3.0077256 2.8596 Ongoing
2943 OTHER AGENCY Education
Construction of (G1) 100 bedded SC/ST Boys Hostel with Warden Quarter, common Room & Medical Examination Room & 25 KW on-grid roof top Solar Power Installation for students at NIELIT Centre, Manipur
Schemes of NEC Schemes of NEC 2022-03-19 8.5863 2025-03-19 0 0 Foreclosed
2944 OTHER AGENCY Education
Construction of 3 storied Residential school cum Hostel faciltity at Pau Shankar Kane Vidyalaya, Hougailong, Ward 4 at Tamenglong, Manipur
Schemes of NEC Schemes of NEC 2022-03-31 4.1545 2025-03-31 3.9134705 0 3.9134705 3.3725 Ongoing
2945 OTHER AGENCY Education
Construction of Centre for Development of Personality and Skill Development alongwith Hostels at Kakching, Manipur
Schemes of NEC Schemes of NEC Other 2021-03-26 6.0785771 2024-03-26 6.08 0 6.08 6.0786 Completed
2946 OTHER AGENCY Education
Construction of Hostel Building for Boys and Girls at Bal Vidya Mandir, Palace Compound, Imphal, Manipur
Schemes of NEC Schemes of NEC 2023-03-31 4.82 2026-03-31 3.583 0.4756425 4.0586425 3.583 Ongoing
2947 OTHER AGENCY Education
Construction of International Students hostel gents & ladies at Manipur University, Imphal
Schemes of NEC Schemes of NEC Manipur Tribal Developmen 2016-05-31 13.9893 2019-05-31 13.9893 0 13.9893 13.9893 Completed
2948 OTHER AGENCY Education
Construction of Multi-facility centre at IGNTU-RCM, Kangpokpi District, Manipur
Schemes of NEC Schemes of NEC Choose... 2023-03-31 7.87 2026-03-31 1.97 4.1750907 6.1450907 3.3732988 Ongoing
2949 OTHER AGENCY Education
Construction of SC/ST Boys and Girls Hostel in respect of National Institute of Electronics and Information Technology (NIELIT), Imphal
Schemes of NEC Schemes of NEC 2017-09-20 9.4 2020-09-20 9.4 0 9.4 9.4 Completed
2950 OTHER AGENCY Education
Mao Multipurpose Centre, Senapati District, Manipur
Schemes of NEC Schemes of NEC 2022-03-29 4.4233 2025-03-29 4.391837 0 4.391837 2.81 Ongoing
2951 OTHER AGENCY Industries
Integrated bamboo and cane development project at Tamenglong
Schemes of NEC Schemes of NEC Dept. of Power 2020-09-22 5.42 2023-09-22 4.94 0.4835 5.4235 2.47 Ongoing
2952 OTHER AGENCY Science and Technology
Implementation of 2 State Plan of Action (PoA) projects finalized as per NESAC Society in the domain of Water Resource for Manipur during the meeting held on 23rd January, 2021. (PoA067, PoA068)
Schemes of NEC Schemes of NEC NESAC 2022-03-31 0.8 2025-03-31 0.8 0 0.8 0.8 Completed
2953 OTHER AGENCY Tourism and Culture
Tourism Circuit Development at Senapati, Manipur, NERCRMS.
Schemes of NEC Schemes of NEC 2022-03-31 9.99 2026-03-19 9.9916 0 9.9916 4.4951 Ongoing
2954 OTHER AGENCY Education
Construction of Administrative Building of Dr.APJ Abdul Kalam Centre for Policy Research & Analysis at IIM, Shillong
Schemes of NEC Schemes of NEC Choose... 2022-03-23 9.55 2025-03-23 9.51 0 9.51 Ongoing
2955 OTHER AGENCY Education
Construction of Boys Hostel and School Building at Khongong, Wapung Village, East Jaintia Hills District, Meghalaya
Schemes of NEC Schemes of NEC Other 2022-03-28 3.8892141 2025-03-28 3.8865 0 3.8865 2.2653839 Ongoing
2956 OTHER AGENCY Education
Construction of School Building of Garudachal Vidyapeeth at Ampati, Meghalaya
Schemes of NEC Schemes of NEC Choose... 2023-03-31 2.79 2026-03-31 2.55 0 2.55 2.546425 Ongoing
2957 OTHER AGENCY Education
Construction of School Building of Garudachal Vidyapeeth at Belbari, Meghalaya
Schemes of NEC Schemes of NEC Choose... 2023-03-31 4.6 2026-03-31 3.36 1.1659294 4.5259294 4.1725194 Ongoing
2958 OTHER AGENCY Education
Implementation of Functional Hindi Course at North East by IIM, Shillong
Schemes of NEC Schemes of NEC Choose... 2022-03-27 3.43 2025-03-27 1.4036 0 1.4036 Ongoing
2959 OTHER AGENCY Information and Public Relatio
Folklore, Wildlife and Nature in North East India: A study of their Inter-Relationship
Schemes of NEC Schemes of NEC Other 2021-03-31 0.7314 2027-03-31 0.7326 0 0.7326 0.72884 Completed
2960 OTHER AGENCY Science and Technology
Design and Development of Laboratory Instrument, Shillong (NEHU)
Schemes of NEC Schemes of NEC 2018-03-14 0.156 2025-03-31 0.156 0 0.156 0.15431 Ongoing
2961 OTHER AGENCY Science and Technology
Implementation of 2 Plan of Action (PoA) projects finalized for the states of Meghalaya as per NESAC Society meeting held on 23rd January, 2021. (PoA069, PoA076)
Schemes of NEC Schemes of NEC NESAC 2022-03-28 0.5292 2025-03-28 0.53 0 0.53 0.5292 Completed
2962 OTHER AGENCY Science and Technology
Multipurpose convention Centre and Space Exhibition facility at NESAC
Schemes of NEC Schemes of NEC Choose... 2022-03-30 5 2025-03-30 4.875 0 4.875 Ongoing
2963 OTHER AGENCY Education
Construction and Upgradation of existing Girls Hostel at KamlaNagar, Lawngtlai, Mizoram
Schemes of NEC Schemes of NEC 2022-03-26 1.61 2025-03-26 1.32 0 1.32 0.08 Ongoing
2964 OTHER AGENCY Education
Construction of Cluster of Academic Blocks at Pachhunga University College, Aizawl
Schemes of NEC Schemes of NEC Dept. of Power 2020-09-10 4.57 2023-09-23 4.5664 0 4.5664 3.66 Completed
2965 OTHER AGENCY Education
Construction of Post-Graduate Academic Blocks at Pachhunga University (Central Campus) Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2022-03-10 10.7926 2025-03-10 10.7913 0 10.7913 1.08 Ongoing
2966 OTHER AGENCY Industries
Horticulture Value Chain through food processing in Mizoram
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-27 4.44 2025-03-27 4.4362 0 4.4362 4.4362 Ongoing
2967 OTHER AGENCY Science and Technology
Implementation of 3 State Plan of Action (PoA) projects finalized as per NESAC Society in the domain of Agriculture & Allied Forest, Ecology & Environment and capacity building for Mizoram during the meeting held on 23rd January, 2021. (PoA078, PoA079, PoA080)
Schemes of NEC Choose... 2022-03-28 0.74 2025-03-28 0.74 0 0.74 0.74 Completed
2968 OTHER AGENCY Tourism and Culture
Mainstreaming of Socio Cultural events into Value Chain Economic Activities
Schemes of NEC Schemes of NEC Choose... 2022-03-31 1.0184 2025-03-31 1.01484 0 1.01484 0.37 Ongoing
2969 OTHER AGENCY Education
Clean and Safe Drinking water facility at Nagland University, Medzhiphema Campus, Nagaland
Schemes of NEC Schemes of NEC Nagaland University 2023-03-31 4.4342 2026-03-31 4.431 0 4.431 2.7614 Ongoing
2970 OTHER AGENCY Education
Construction of Boys and Girls Hostel at Dhansiripar, Dimapur district, Nagaland under Janajati Shiksha Samiti
Schemes of NEC Schemes of NEC Other 2022-03-25 2.0868975 2025-03-25 2.0869 0 2.0869 2.0868975 Completed
2971 OTHER AGENCY Education
Construction of International Students and Research Scholars Hostel at Nagaland University, Lumami, Nagaland
Schemes of NEC Schemes of NEC 2021-03-11 4.76 2024-03-11 4.77 0 4.77 4.35 Completed
2972 OTHER AGENCY Industries
Bamboo based Craft Concentration Centre at Sovima Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2021-02-26 4.4846 2025-02-26 4.4846 0 4.4846 4.49 Completed
2973 OTHER AGENCY Science and Technology
Implementation of 10 Plan of Action (PoA) projects finalized as per NESAC Society meeting held on 23rd January, 2021 for the state of Nagaland (PoA081, PoA082, PoA083, PoA084, PoA085, PoA091, PoA092, PoA093, PoA094, PoA095)
Schemes of NEC Schemes of NEC NESAC 2022-03-28 3.6573 2026-03-31 3.6573 0 3.6573 3.6573 Completed
2974 OTHER AGENCY Agriculture and Allied
Annapoorna Anufood India 2022
Schemes of NEC Schemes of NEC NERAMAC 2023-03-31 0.32 2026-03-31 0.32 0 0.32 0.32 Completed
2975 OTHER AGENCY Agriculture and Allied
Apiary Development in Assam, Manipur and Meghalaya, NEC/Regional
Schemes of NEC Schemes of NEC Choose... 2021-02-08 4.9882 2024-02-08 4.9882 0 4.9882 2 Completed
2976 OTHER AGENCY Agriculture and Allied
Bamboo nursery raising and farming in parts of NER under AATMANIRBHAR BHARAT ABHIYAN (Arunanchal Pradesh, Assam, Manipur and Meghalaya)
Schemes of NEC Schemes of NEC Dept. of Power 2021-03-26 4.92 2024-03-26 4.92 0 4.92 4.92 Completed
2977 OTHER AGENCY Agriculture and Allied
Bamboo resource creation through plantation (NECBDC)
Schemes of NEC Schemes of NEC 2022-03-31 14.96 2025-03-31 14.964 0 14.964 13.36 Completed
2978 OTHER AGENCY Agriculture and Allied
Calendar of events for the promotion and marketing of Agri-Horti produces/ processed food of the NER for the financial year 2011-12 under the North Eastern Regional Marketing Corporation Ltd.
Schemes of NEC Schemes of NEC 2011-09-08 2.02 2013-09-08 2.02 0 2.02 2.02 Completed
2979 OTHER AGENCY Agriculture and Allied
Capacity building of NERCMP communities on cultivation of low chilling varieties of apple and its post post harvest management.
Schemes of NEC Schemes of NEC 2018-10-12 0.64 2021-10-12 0.6363 0 0.6363 0.64 Foreclosed
2980 OTHER AGENCY Agriculture and Allied
Collaborative project for natural rubber plantation development with focus in North East India
Schemes of NEC Schemes of NEC 2023-03-31 6.54 2027-03-31 1.64 0 1.64 0.1 Ongoing
2981 OTHER AGENCY Agriculture and Allied
Construction of Academic Blocks at Hengbung, Senapati District, Manipur
Schemes of NEC Schemes of NEC 2021-03-01 4.6058 2023-03-31 4.608955 0 4.608955 2.7455737 Ongoing
2982 OTHER AGENCY Agriculture and Allied
Construction of Marketing Complex Building of NERAMAC at Six Miles at Guwahati, Assam
Schemes of NEC Schemes of NEC Dept. of Power 2017-03-14 14.18 2020-03-13 14.18 0 14.18 12.89 Completed
2983 OTHER AGENCY Agriculture and Allied
Construction of way side amenities as part of Prime Minister Swachh Bharat Abhiyan (Clean India Mission) on approved Tourist Circuit falling under NERCMP Project areas in Dima Hasao, Assam West Khasi Hills, South West Khasi Hills, North Garo Hills, West Garo Hills districts in Meghalaya, Churchandpur district in Manipur and Tirap district in Arunachal Pradesh
Schemes of NEC Schemes of NEC 2018-02-28 12.2 2021-02-28 12.2 0 12.2 12.2 Completed
2984 OTHER AGENCY Agriculture and Allied
Constructon of Kankhu Women Market Complex, Chandel District, Manipur
Schemes of NEC Schemes of NEC 2018-03-22 7.49 2021-03-22 4.078 0 4.078 4.08 Completed
2985 OTHER AGENCY Agriculture and Allied
Development of Multi-Disciplinary Training cum Resource Centre, Shillong
Schemes of NEC Schemes of NEC 2023-03-28 14.99 2026-03-27 8.213 2.3 10.513 2.7 Ongoing
2986 OTHER AGENCY Agriculture and Allied
Digital platform to market of North Eastern Regions Agriculture and Horticulture produces
Schemes of NEC Schemes of NEC 2022-03-27 4.8999 2025-03-31 0 Foreclosed
2987 OTHER AGENCY Agriculture and Allied
Establishment of animal feeds production units in NER
Schemes of NEC Schemes of NEC 2022-03-11 7.92 2025-03-11 7.628 0 7.628 7.128 Ongoing
2988 OTHER AGENCY Agriculture and Allied
Establishment of Avocado in NER of India
Schemes of NEC Schemes of NEC NERCRMS 2023-03-14 4.623 2026-03-13 4.625 0 4.625 4.626 Completed
2989 OTHER AGENCY Agriculture and Allied
Establishment of Banana Tissue Culture Facility in the North East India
Schemes of NEC Schemes of NEC NERCORMS 2023-03-31 4.73 2026-03-31 3.3625 0 3.3625 2.365 Ongoing
2990 OTHER AGENCY Agriculture and Allied
Establishment of Elite Nursery, NERCMP
Schemes of NEC Schemes of NEC 2016-02-29 1.06 2019-02-28 1.06 0 1.06 1.06 Completed
2991 OTHER AGENCY Agriculture and Allied
Establishment of Food Processing units in Assam, Manipur and Meghalaya
Schemes of NEC Schemes of NEC NERCORMS 2023-03-30 8.0074843 2026-03-31 8.0040843 0 8.0040843 1.2894 Ongoing
2992 OTHER AGENCY Agriculture and Allied
Establishment of High-Tech Horticultural Nursery with Tissue Culture facilities in the North East India
Schemes of NEC Schemes of NEC NERCORMS 2023-03-31 4.5175 2026-03-31 4.5175 0 4.5175 1.675 Ongoing
2993 OTHER AGENCY Agriculture and Allied
Establishment of Kiwi Orchard in the North Eastern Region of India
Schemes of NEC Schemes of NEC NERCORMS 2022-03-11 14.1414 2025-03-31 13.999986 0.141414 14.1414 12.580026 Ongoing
2994 OTHER AGENCY Agriculture and Allied
Establishment of Kiwi Orchard with elite planting materials in the North East India
Schemes of NEC Schemes of NEC Dept. of Power 2023-03-07 8.1238 2025-03-31 8.1238 0 8.1238 8.1238 Completed
2995 OTHER AGENCY Agriculture and Allied
Establishment of Marketing cum collection centre (a) Large Centre 4 nos. and (b) Small centre 2 nos.
Schemes of NEC Schemes of NEC 2016-03-21 1.55 2019-03-21 1.55 0 1.55 1.55 Completed
2996 OTHER AGENCY Agriculture and Allied
Establishment of Multi-Utility cum CFC building with Diesel Operated Spices & Cereal Grinding Machine, NERCMP
Schemes of NEC Schemes of NEC 2016-03-17 3.4465 2019-03-17 3.45 0 3.45 3.45 Completed
2997 OTHER AGENCY Agriculture and Allied
Establishment of Piggery Value Chain in Imphal East, Imphal West, Thoubal and Bishnupur districts of Manipur in North East India, Manipur
Schemes of NEC Schemes of NEC NERCORMS 2020-12-07 4.7260813 2025-03-31 4.7260812 0 4.7260812 4.0780812 Completed
2998 OTHER AGENCY Agriculture and Allied
Establishment of piggery value chain in the North East India
Schemes of NEC Schemes of NEC Dept. of Power 2022-03-27 9.73 2025-03-31 8.8021 0 8.8021 7.2918 Ongoing
2999 OTHER AGENCY Agriculture and Allied
Extension of NERCMP-III
Schemes of NEC Schemes of NEC 2020-04-23 49.99 2023-04-23 49.99 0 49.99 49.99 Completed
3000 OTHER AGENCY Agriculture and Allied
Fund Release to NERCMP-II
Schemes of NEC Schemes of NEC 2010-09-08 200 2013-09-08 200 0 200 200 Completed
3001 OTHER AGENCY Agriculture and Allied
Integrated Farming System Model Demonstrations for sustainable livelihood improvement of farmers of Manipur
Schemes of NEC Schemes of NEC 2021-03-17 1.5 2024-03-17 1.4625 0 1.4625 1.125 Ongoing
3002 OTHER AGENCY Agriculture and Allied
Integrated Horticulture Development Projects for the States of Manipur, Nagaland and Mizoram
Schemes of NEC Schemes of NEC 2016-10-14 11.88 2019-10-14 11.88 0 11.88 11.88 Completed
3003 OTHER AGENCY Agriculture and Allied
Integrated Horticulture including fisheries for NEH region of India, ICAR, NEH Region, Umiam, Meghalaya
Schemes of NEC Schemes of NEC 2017-03-02 14.961 2020-03-02 10.78 0 10.78 10.78 Foreclosed
3004 OTHER AGENCY Agriculture and Allied
Integrated project on income generation through animal husbandry and livestock
Schemes of NEC Schemes of NEC 2010-03-25 2.1 2013-03-25 2.1 0 2.1 2.1 Completed
3005 OTHER AGENCY Agriculture and Allied
Livelihood project on Agriculture, Horticulture & allied activities in both Project and Non-Project villages, NERCMP
Schemes of NEC Schemes of NEC 2016-02-29 1.4854 2019-02-28 1.49 0 1.49 1.49 Completed
3006 OTHER AGENCY Agriculture and Allied
Mithun Conservation and Breeding Centre in Arunachal Pradesh, Nagaland and Manipur , NEC/Regional
Schemes of NEC Schemes of NEC 2020-11-05 4.99 2023-11-05 3.5832 0 3.5832 2.027 Ongoing
3007 OTHER AGENCY Agriculture and Allied
Multi Agriculture Allied by NERCRMS in Manipur and Nagaland
Schemes of NEC Schemes of NEC NERCORMS 2022-03-30 4.7201946 2026-02-25 4.7202 0 4.7202 4.7201946 Completed
3008 OTHER AGENCY Agriculture and Allied
Multi Agriculture Horticulture Activities by NERCRMS in Manipur and Meghalaya
Schemes of NEC Schemes of NEC NERCORMS 2022-03-30 4.7773 2025-03-31 4.7773 0 4.7773 4.77732 Completed
3009 OTHER AGENCY Agriculture and Allied
Multi Agriculture Project on Promotion of Fishery and Piggery in Manipur and Meghalaya
Schemes of NEC Schemes of NEC NERCORMS 2023-03-25 4.90135 2026-03-25 4.7858 0.115887 4.901687 4.790483 Ongoing
3010 OTHER AGENCY Agriculture and Allied
Multi Agriculture Project on Promotion of Piggery in Manipur and Nagaland
Schemes of NEC Schemes of NEC NERCORMS 2023-03-22 4.7633034 2026-12-31 4.7633 0 4.7633 4.7633 Completed
3011 OTHER AGENCY Agriculture and Allied
Multipurpose herbal extraction unit at Mao, Senapati district, Manipur
Schemes of NEC Schemes of NEC NERCORMS 2023-03-31 2.718755 2026-03-18 2.718755 0 2.718755 2.0434 Ongoing
3012 OTHER AGENCY Agriculture and Allied
NERCMP-III
Schemes of NEC Schemes of NEC 2014-04-28 540 2021-10-21 400 0 400 400 Completed
3013 OTHER AGENCY Agriculture and Allied
Organic tea cultivation in Tamenglong District, Manipur
Schemes of NEC Schemes of NEC 2020-08-21 4.64 2023-08-31 4.64 0 4.64 2.75 Completed
3014 OTHER AGENCY Agriculture and Allied
Pilot Project for Development of Tea, Pineapple, Floriculture, Mushroom, Kiwi and Aloe vera in the NERCMP project districts.
Schemes of NEC Schemes of NEC 2010-03-25 2.42 2013-03-25 2.42 0 2.42 2.42 Completed
3015 OTHER AGENCY Agriculture and Allied
Pilot Project on Cane Nursery and Plantation in NER
Schemes of NEC Schemes of NEC 2023-03-31 1.96 2026-03-31 1.96 0 1.96 1.27 Ongoing
3016 OTHER AGENCY Agriculture and Allied
Pilot Project on Farmer Producer Companies (FPCs) for Agricultural Reforms in NER (Arunachal Pradesh & Assam State under SFAC)
Schemes of NEC Schemes of NEC 2017-08-14 1.5 2020-08-28 1.185 0 1.185 1.19 Completed
3017 OTHER AGENCY Agriculture and Allied
Plantation / Rejuvenation of Citrus, Parkia.
Schemes of NEC Schemes of NEC 2010-03-19 2.0678 2013-03-19 1.45 0 1.45 1.45 Completed
3018 OTHER AGENCY Agriculture and Allied
Printing and Binding of Compendium of Government of India schemes and programmes relevant
Schemes of NEC Schemes of NEC 2021-03-04 0.01 2024-03-04 0.01 0 0.01 0.01 Completed
3019 OTHER AGENCY Agriculture and Allied
Promotion of Agarwood plantation in the North Eastern Region of India
Schemes of NEC Schemes of NEC Dept. of Power 2023-03-06 12.9931301 2025-03-31 12.9873301 0 12.9873301 0.9 Completed
3020 OTHER AGENCY Agriculture and Allied
Promotion of Arecanut plantation integrated with turmeric in the North Eastern Region of India
Schemes of NEC Schemes of NEC Dept. of Power 2023-03-15 4.99 2026-03-31 4.99 0 4.99 4.99 Completed
3021 OTHER AGENCY Agriculture and Allied
Promotion of Avocado, Persimmon and Blueberry Orchards in the North Eastern Region of India
Schemes of NEC Schemes of NEC Choose... 2023-03-27 4.9871 2026-03-27 4.4978115 0 4.4978115 3.5014115 Completed
3022 OTHER AGENCY Agriculture and Allied
Promotion of commercial bamboo plantation in North East India (NERCRMS)
Schemes of NEC Schemes of NEC NERCRMS 2022-03-11 8.065 2026-03-31 8.065 0 8.065 8.065 Completed
3023 OTHER AGENCY Agriculture and Allied
Promotion of fishery and piggery fattening in the North East India
Schemes of NEC Schemes of NEC 2020-11-16 4.91 2023-11-16 4.91 0 4.91 4.91 Completed
3024 OTHER AGENCY Agriculture and Allied
Promotion of Low Chilling Apple Plantation in North Eastern Region of India
Schemes of NEC Schemes of NEC 2020-08-05 3.07 2024-08-05 3.07 0 3.07 3.07 Completed
3025 OTHER AGENCY Agriculture and Allied
Promotion of Low Chilling Apple Plantation in North Eastern Region of India, NEC/Regional
Schemes of NEC Schemes of NEC 2021-01-29 4.83 2024-01-30 4.8283 0 4.8283 1.91 Completed
3026 OTHER AGENCY Agriculture and Allied
Promotion of Medicinal and Aromatic Plants (MAP) Based Livelihood Opportunities in the North Eastern Region to Augment Rural Income and Promote Resilient Livelihood Opportunities through the Establishment of an Entrepreneurial Ecosystem , NEC/Regional
Schemes of NEC Schemes of NEC NERCORMS 2020-11-02 4.9035 2023-11-02 4.8754008 0 4.8754008 4.0079 Ongoing
3027 OTHER AGENCY Agriculture and Allied
Promotion of mixed cropping fishery and livestock for sustainable farming in Noney District, manipur
Schemes of NEC Schemes of NEC 2020-09-17 0.5 2023-09-17 0.5 0 0.5 0.5 Completed
3028 OTHER AGENCY Agriculture and Allied
Promotional bamboo farming and plantation in parts of NER under Atma Nirbhar Bharat Abiyan
Schemes of NEC Schemes of NEC 2020-08-20 4.9 2023-08-20 4.9 0 4.9 4.9 Completed
3029 OTHER AGENCY Agriculture and Allied
Revival of Cashew Processing Plant, Agartala
Schemes of NEC Schemes of NEC Dept. of Power 2023-03-17 0.575 2026-03-17 0.58 0 0.58 0.58 Completed
3030 OTHER AGENCY Agriculture and Allied
Rural Economic and Livelihood Project
Schemes of NEC Schemes of NEC 2020-08-03 3 2024-08-03 3 0 3 3 Completed
3031 OTHER AGENCY Agriculture and Allied
Setting up infrastructure for bamboo treatment plant at CBTC, Burnihat, Assam
Schemes of NEC Schemes of NEC 2020-05-28 0.54 2023-05-28 0.21 0 0.21 0.21 Completed
3032 OTHER AGENCY Agriculture and Allied
Setting up of animal feed production units in the North East India 2022-23 at
Schemes of NEC Schemes of NEC Dept. of Power 2023-03-28 14.94 2025-03-28 12.305 1.1316 13.4366 11.705 Ongoing
3033 OTHER AGENCY Agriculture and Allied
Setting up of modern pig breeding units in North East India
Schemes of NEC Schemes of NEC 2022-03-24 14.44 2025-03-24 14.4722 0 14.4722 14.265 Ongoing
3034 OTHER AGENCY Agriculture and Allied
Setting up of Piggery Breeding Units, NERCMP
Schemes of NEC Schemes of NEC 2016-03-17 6.3582 2019-03-17 6.36 0 6.36 6.36 Completed
3035 OTHER AGENCY Agriculture and Allied
Setting up of Piggery Fattening units in NERCMP - III districts of North East India - NERCMP
Schemes of NEC Schemes of NEC 2017-03-22 14.96 2020-03-20 14.96 0 14.96 14.96 Completed
3036 OTHER AGENCY Agriculture and Allied
Setting up of Poultry Hatchery and Rearing units in NERCMP - III districts of North East India - NERCMP
Schemes of NEC Schemes of NEC 2017-03-22 9.98 2020-03-22 9.98 0 9.98 9.98 Completed
3037 OTHER AGENCY Agriculture and Allied
Setting up of scientific pig breeding units in the North East India, Phase-II
Schemes of NEC Schemes of NEC 2023-03-15 14.12 2026-03-25 9.5128 1 10.5128 9.5128 Ongoing
3038 OTHER AGENCY Agriculture and Allied
Setting up of scientific pig breeding units in the North East India, Phase-III
Schemes of NEC Schemes of NEC Choose... 2023-03-28 11.6098 2026-03-28 11.7227 0 11.7227 8.7975 Ongoing
3039 OTHER AGENCY Agriculture and Allied
Tissue Culture Facility for Production of Disease-Free Planting Material of Citrus(CAU, Imphal, Manipur)
Schemes of NEC Schemes of NEC NERCORMS 2021-03-26 2.2771 2024-03-26 2.4825 0 2.4825 1.7204 Ongoing
3040 OTHER AGENCY Agriculture and Allied
Value Addition of Naga Chilly and other Spice Crops for market readiness as through vacuum drying technology in Assam and Nagaland
Schemes of NEC Schemes of NEC 2023-02-24 4.56 2026-02-24 4.5608 0 4.5608 4.1 Ongoing
3041 OTHER AGENCY Evaluation and Monitoring
An information Repository of Products, Producers and Entrepreneurs of North East India, NEDFi
Schemes of NEC Schemes of NEC 2022-03-25 3.3145218 2025-03-25 3.3145281 0 3.3145281 Ongoing
3042 OTHER AGENCY Evaluation and Monitoring
Constitution of IIE as Nodal Institute to Establish, Develop and Manage Entrepreneurship Development Centre and Incubation Centres in North East Regions Educational Institutions
Schemes of NEC Schemes of NEC 2023-03-29 7.83 2026-03-29 7.83 0 7.83 0.46 Ongoing
3043 OTHER AGENCY Evaluation and Monitoring
Specified Skilled Workers (SSW) for Northeast Candidates
Schemes of NEC Schemes of NEC 2023-03-31 1.40395 2026-03-31 1.4 0 1.4 0.45 Ongoing
3044 OTHER AGENCY Education
2 training programmes for one year in basic welding and certificate course
Schemes of NEC Choose... 2013-09-23 0.61 2024-01-25 0.31 0 0.31 0.31 Foreclosed
3045 OTHER AGENCY Education
5 training course in the field of Hospitality & Tourism 121 unemployed youth from NE region
Schemes of NEC Schemes of NEC 2013-09-24 0.7281 2016-09-24 0.7281 0 0.7281 0.73 Completed
3046 OTHER AGENCY Education
5 training course in the field of machine tools
Schemes of NEC Schemes of NEC 2013-09-24 2.1485 2016-09-24 0 0 Completed
3047 OTHER AGENCY Education
Basic Conventional Machining
Schemes of NEC Schemes of NEC 2016-03-04 0.63 2019-03-04 0.315 0 0.315 0.28 Foreclosed
3048 OTHER AGENCY Education
Capacity Building in IT and Digital Services (Including Digital Payments and GST) for State Govt. Officilas in NER.
Schemes of NEC Schemes of NEC Choose... 2017-11-28 7.78 2020-11-28 7.77 0 7.77 6.15 Ongoing
3049 OTHER AGENCY Education
Capacity Building of Mid-Level Officers in theDepartment of Industries & Commerce, Govt. of Nagaland
Schemes of NEC Schemes of NEC 2017-02-15 0.22 2020-02-15 0.1654 0 0.1654 0.17 Foreclosed
3050 OTHER AGENCY Education
Capacity Building of Teacher, Researchers and Bio-Medical Practisioners of North Eastern Region on Advanced Techniques in Molecular Biology and Biotechnology
Schemes of NEC Schemes of NEC 2017-03-29 0.21 2020-03-29 0.1581 0 0.1581 0.16 Foreclosed
3051 OTHER AGENCY Education
Capacity Building program for Civil Servants of the North Eastern States on Developing Rural Industries and Entrepreneurship
Schemes of NEC Choose... 2017-11-21 0.3876 2020-11-21 0 Completed
3052 OTHER AGENCY Education
Construction of 150 seats Boys Hostel at Tripura University Campus, Suryamaninagar
Schemes of NEC Schemes of NEC Choose... 2020-11-23 10.2622 2023-11-23 10.2622 0 10.2622 10.2574 Ongoing
3053 OTHER AGENCY Education
Construction of a hostel for the North East Students at Jawaharlal Nehru University, New Delhi
Schemes of NEC Schemes of NEC 2016-04-25 28.68 2019-04-25 28.68 0 28.68 28.26 Ongoing
3054 OTHER AGENCY Education
Construction of College, Arunachal Pradesh and Manipur
Schemes of NEC Schemes of NEC Choose... 2023-03-29 4.96 2026-03-29 2.99 0 2.99 2.02 Ongoing
3055 OTHER AGENCY Education
Construction of Ladies hostel for the students of NE Region at Bangalore University
Schemes of NEC Schemes of NEC Choose... 2014-11-28 13.85 2017-11-28 12.7055 0 12.7055 12.7055 Ongoing
3056 OTHER AGENCY Education
Construction of office complex/building of the Lyngdoh of Hima Sobing at Sohiong village, East Khasi hills District, Meghalaya and Construction of Cultural Centre in Emesiiphro circle/village, Senapati District, Manipur
Schemes of NEC Schemes of NEC Dept. of Power 2023-03-30 4.06 2026-03-31 3.3295 0 3.3295 1.06 Ongoing
3057 OTHER AGENCY Education
Construction of School Building, Hostel and Science Lab in Mizoram, Assam & Manipur
Schemes of NEC Schemes of NEC 2023-03-30 5 2025-03-31 4.9741879 0 4.9741879 2.34 Ongoing
3058 OTHER AGENCY Education
Destination Management Training Programme
Schemes of NEC Schemes of NEC Dept. of Power 2017-07-17 0.1336 2020-07-17 0.1002 0 0.1002 Foreclosed
3059 OTHER AGENCY Education
Develop Professional knowledge and skills and exposure to best practices in governance.
Schemes of NEC Schemes of NEC Dept. of Power 2017-03-19 0.18 2020-03-19 0.1328 0 0.1328 0.13 Foreclosed
3060 OTHER AGENCY Education
Digital Classrooms in 215 Schools in 4 North Eastern States of Assam, Manipur, Meghalaya & Tripura
Schemes of NEC Schemes of NEC 2018-04-27 4.69 2020-04-27 4.69 0 4.69 4.69 Completed
3061 OTHER AGENCY Education
Documentation and revitalization of Netnyi, Khongdei and Zyphe three endangered languages of NE India
Schemes of NEC Schemes of NEC Tezpur University 2020-09-23 0.791 2023-09-23 0.4301075 0.3608925 0.791 0.4301075 Ongoing
3062 OTHER AGENCY Education
Documentation of Disputes between States of NER
Schemes of NEC Schemes of NEC 2020-12-16 0.18 2023-12-16 0.18 0 0.18 0.12 Completed
3063 OTHER AGENCY Education
Documentation of endangered language, oral, narratives and culture for lesser known tribal communities of Arunachal Pradesh
Schemes of NEC Schemes of NEC 2020-09-07 0.9 2023-09-07 0.8995 0 0.8995 0.45 Ongoing
3064 OTHER AGENCY Education
Establishing the North Eastern Regional Research and Resource Centre at Miranda House, Delhi
Schemes of NEC Schemes of NEC Choose... 2022-03-11 2.754 2025-03-11 2.4016 0 2.4016 1.2 Ongoing
3065 OTHER AGENCY Education
Export Potential & Procedures and Export Potential of A.P, Meghalaya, Mizoram, Assam, Manipur, Tripura.
Schemes of NEC Schemes of NEC 2019-12-06 0.315 2021-12-06 0.2363 0 0.2363 0.24 Foreclosed
3066 OTHER AGENCY Education
Export Potential of Nagaland & Procedures and Export Ptential of Tripura & Procedures.
Schemes of NEC Schemes of NEC 2018-03-22 0.105 2021-03-22 0.08 0 0.08 0.08 Foreclosed
3067 OTHER AGENCY Education
Financial Assistance during the fellowship Training
Schemes of NEC Dept. of Power 2018-01-03 0.09 2024-06-28 0.048 0 0.048 Foreclosed
3068 OTHER AGENCY Education
Orthography development for languages of NER
Schemes of NEC Schemes of NEC 2020-09-03 0.9 2023-09-29 0.8904684 0 0.8904684 0.8904684 Ongoing
3069 OTHER AGENCY Education
Replication of Innovations & Best practices in Good Governance for Civil Servants
Schemes of NEC Choose... 2017-12-05 0.1428 2020-12-05 0 Completed
3070 OTHER AGENCY Education
Seven courses in various trades of Fashion Technology
Schemes of NEC Schemes of NEC Other 2019-03-31 5.3948169 2021-03-31 5.3948169 0 5.3948169 5.3948169 Completed
3071 OTHER AGENCY Education
Sikkims endangered language documentation project(SELDP)
Schemes of NEC Schemes of NEC 2020-08-22 0.9 2023-08-22 0.45 0.1893 0.6393 0.61 Ongoing
3072 OTHER AGENCY Education
Skills Expo-Mizoram, Meghalaya, Tripura
Schemes of NEC Schemes of NEC 2012-11-16 0.42 2015-11-16 0.2765 0 0.2765 0.28 Completed
3073 OTHER AGENCY Education
Sponsoring Candidates for training in commercial Pilot Training Course and Aircraft maintenance Engineering
Schemes of NEC Choose... 2008-02-22 3.2375 2011-02-22 0 Completed
3074 OTHER AGENCY Education
Strengthening Human Resource and Systems Capacity for Public Health.
Schemes of NEC Other 2017-02-23 3.0792 2020-02-23 0 Completed
3075 OTHER AGENCY Education
Three training cources for Innovative Financial Mechanism in the North Eastern States in the context of managing Urban Infrastructure, transport and tourism
Schemes of NEC Choose... 2016-03-31 0.19 2024-06-28 0.072 0 0.072 Foreclosed
3076 OTHER AGENCY Education
Training course in field of Tourism, Travel & Hospitality
Schemes of NEC Schemes of NEC Dept. of Power 2013-03-25 0.32 2016-03-25 0.2408 0 0.2408 Foreclosed
3077 OTHER AGENCY Education
Training Course in the fields of community based management & finance management
Schemes of NEC Schemes of NEC Dept. of Power 2019-03-31 0.11 2022-03-31 0.1113 0 0.1113 Foreclosed
3078 OTHER AGENCY Education
Training Courses for the artisans and weavers
Schemes of NEC Schemes of NEC 2016-03-30 0.2697 2019-03-30 0.2023 0 0.2023 0 Foreclosed
3079 OTHER AGENCY Education
Training for rural girs on Hair, Skin & Beauty Care
Schemes of NEC Schemes of NEC 2015-12-18 0.6 2018-12-18 0.4635 0 0.4635 0.46 Foreclosed
3080 OTHER AGENCY Education
Training on Geospatial application & services for Governance activities for the officials of all eight State Remote Sensing Application Centres of NE Region.
Schemes of NEC Schemes of NEC 2017-09-13 0.02 2020-09-13 0.0154 0 0.0154 0.02 Foreclosed
3081 OTHER AGENCY Education
Training programme in 3D-Animation & Special Fx Graphics and software diploma programme
Schemes of NEC Schemes of NEC Dept. of Power 2015-12-18 1.07 2018-12-18 1.07 0 1.07 Foreclosed
3082 OTHER AGENCY Education
Training programme in the field of Hospital & Tourism Management
Schemes of NEC Schemes of NEC 2014-02-28 3.27 2017-02-28 1.9558 0 1.9558 Completed
3083 OTHER AGENCY Education
Training programme in the field of Hospital & Tourism Management
Schemes of NEC Schemes of NEC 2013-12-20 1.52 2016-12-20 0.9153 0 0.9153 Foreclosed
3084 OTHER AGENCY Education
Training programme in the field of Hospitality & Tourism Management
Schemes of NEC Schemes of NEC 2014-12-05 7.1271 2017-12-05 3.5636 0 3.5636 3.56 Foreclosed
3085 OTHER AGENCY Education
Understanding the problems of minority ethnic communities in North East India for working out the possible solutions
Schemes of NEC Schemes of NEC 2020-10-15 0.82 2023-10-15 0.328 0 0.328 0.19 Ongoing
3086 OTHER AGENCY Education
Workshop-cum-training on preservation and conservation of Mesuems in Nagaland
Schemes of NEC Schemes of NEC Dept. of Power 2018-10-31 0.765 2021-10-31 0.5737 0 0.5737 Foreclosed
3087 OTHER AGENCY Sports
Construction of a Multipurpose Hall cum Badminton Hall & Futsal Playground at Saikot, Churachandpur, Manipur and Development of Playground at Pilangkata-Maikhuli, Ri-Bhoi District, Meghalaya
Schemes of NEC Schemes of NEC NERCORMS 2023-03-31 4.9755264 2025-03-31 3.7296 0 3.7296 3.074 Ongoing
3088 OTHER AGENCY Sports
Construction of Retaining Wall and Drainage at Sports Complex at IGNTU-RCM, Makhan, Manipur
Schemes of NEC Schemes of NEC 2018-04-23 1.1 2021-04-23 1.1 0 1.1 1.0985 Completed
3089 OTHER AGENCY Industries
Action Plan for the Development of Handicrafts & Handloom Sector in the NER, APJ Abdul Kalam, IIM
Schemes of NEC Schemes of NEC Dept. of Power 2021-02-03 0.1 2024-01-31 0.1 0 0.1 0.1 Completed
3090 OTHER AGENCY Industries
Augmentation of Existing Transformer and Up-gradation of Existing Electrification System at CBTC, Burnihat, Assam
Schemes of NEC Schemes of NEC 2020-11-18 0.29 2023-11-18 0.2857 0 0.2857 0.29 Completed
3091 OTHER AGENCY Industries
Capacity Buidling Programme on Cane and Bamboo Products
Schemes of NEC Schemes of NEC 2023-03-21 2.862 2026-03-21 2.86 0 2.86 3.222 Ongoing
3092 OTHER AGENCY Industries
Conducting various training programmes for the benefit of Bamboo related Industrial Workers as well as the Management Staff by Cane & Bamboo Technology Centre (CBTC)
Schemes of NEC Schemes of NEC 2005-04-27 0.228 2008-04-27 0.036 0 0.036 0.04 Completed
3093 OTHER AGENCY Industries
Developemnt of Powerloom Unit in Tribal Area of Manipur and Mizoram
Schemes of NEC Schemes of NEC Choose... 2023-03-25 4 2026-03-25 2 0 2 0.7656811 Ongoing
3094 OTHER AGENCY Industries
Documentation of Traditional Textilesa and Costumes of the Liangmai, Rongmei and Zemme Tribes of Manipur and Nagaland
Schemes of NEC Schemes of NEC Choose... 2023-03-30 0.1543 2026-03-30 0.05 0 0.05 0.04861 Ongoing
3095 OTHER AGENCY Industries
Establishment of Integrated Agarbatti Cluster with Zero Wastages Concept in Arunachal Pradesh, Manipur, Meghalaya and Mizoram
Schemes of NEC Schemes of NEC 2022-03-29 14.9376 2025-03-29 14.6438 0 14.6438 5.98 Ongoing
3096 OTHER AGENCY Industries
Establishment of Integrated Agarbatti Cluster with Zero Waste Bamboo Approach in Arunachal Pradesh Manipur, Mizoram and Tripura
Schemes of NEC Schemes of NEC 2023-03-03 14.0251 2025-03-25 13.5363 0 13.5363 13.5342175 Ongoing
3097 OTHER AGENCY Industries
Establishment of Stabilized Earth Brick Making Enterprises in North Eastern States
Schemes of NEC Schemes of NEC 2022-03-31 5.8718 2025-03-31 5.8718027 0 5.8718027 5.640322 Ongoing
3098 OTHER AGENCY Industries
Expansion of Plastics Waste Management Centre (PWMC) CIPET, Borgaon, Guwahati, Kamrup District, Assam
Schemes of NEC Schemes of NEC 2016-09-28 7.47 2019-09-28 6.4274464 1.0425535 7.4699999 5.9370634 Ongoing
3099 OTHER AGENCY Industries
Livelihood and Employment Generation for the youth in the North Eastern Region through placement in Japan
Schemes of NEC Schemes of NEC 2023-03-17 3.326 2026-03-17 0.8315 0 0.8315 Ongoing
3100 OTHER AGENCY Industries
Multi Initiative in Cane and Bamboo project at Churachandpur & Bishnupur, Manipur and Falkland Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2022-03-31 4.8929 2025-03-31 4.8972 0 4.8972 1.96 Ongoing
3101 OTHER AGENCY Industries
North East Entrepreneurship Development Programme through Startup Route, IIM Innovation Park
Schemes of NEC Schemes of NEC 2022-03-31 14.9055 2025-03-31 14.9 0 14.9 7.0674352 Ongoing
3102 OTHER AGENCY Industries
North Easten Development Finance Corporation Ltd., for State of Art Resource Centre(SAREC), for career and Livelihood Opportunities for the Youth of the NER
Schemes of NEC Schemes of NEC NECBDC 2020-08-14 3.7439 2023-08-14 3.7439 0 3.7439 3.74 Completed
3103 OTHER AGENCY Industries
Production of Animal Feeds from bamboo Powder
Schemes of NEC Schemes of NEC 2023-03-31 4.457 2026-03-31 4.46 0 4.46 4.457 Ongoing
3104 OTHER AGENCY Industries
Promoting Sustainable livelihood in North East India: the cane and Bamboo Cluster Development Project
Schemes of NEC Schemes of NEC 2016-03-16 9.2 2019-03-16 9.1995 0 9.1995 9.2 Completed
3105 OTHER AGENCY Industries
Promotion of bamboo handicrafts, jewellery & utility products in Poma Village, Papum Pare District, Arunachal Pradesh(CBTC)
Schemes of NEC Schemes of NEC 2020-08-17 0.5 2024-08-17 0.5 0 0.5 0.5 Completed
3106 OTHER AGENCY Industries
Promotion of bamboo model agarbatti cluster at Karara, Baihata Chariali, Kamrup
Schemes of NEC Schemes of NEC 2020-08-21 2.56 2022-08-28 2.56 0 2.56 2.56 Completed
3107 OTHER AGENCY Industries
Promotion of Cane and Bamboo production through market intelligence and design intervention in Mizoram an Nagaland
Schemes of NEC Schemes of NEC 2023-02-24 4.4387 2026-02-24 4.326075 0 4.326075 3.33121 Ongoing
3108 OTHER AGENCY Industries
Promotion of traditional bamboo shoot processing and preservation
Schemes of NEC Schemes of NEC 2020-06-09 2.91 2023-06-09 2.91 0 2.91 2.91 Completed
3109 OTHER AGENCY Industries
Research and development project on development of packaging storage and transportation of fruits and vegetables, CBTC
Schemes of NEC Schemes of NEC 2020-08-24 0.93 2023-08-23 0.93 0 0.93 0.93 Completed
3110 OTHER AGENCY Industries
Setting up Bamboo Vacuum Pressure Impregnation Treatment Plant (Phase-II)
Schemes of NEC Schemes of NEC 2023-03-03 12.8123 2025-03-31 12.8131 0 12.8131 12.81 Ongoing
3111 OTHER AGENCY Industries
Setting up of a Bamboo Technology park at Burnihat Cane and Bamboo Technology Crntre (CBTC), Guwahati
Schemes of NEC Schemes of NEC 2009-03-30 8.4678 2012-03-30 2.1429 0 2.1429 2.14 Completed
3112 OTHER AGENCY Industries
Setting up of an Artisans and Weavers Facilitation Centre at the Craft Promotion Centre, NEHHDC, Pub-Boragaon, Guwahati by Constructing Bamboo Huts
Schemes of NEC Schemes of NEC 2018-01-04 1.03 2021-01-04 0.938 0 0.938 0.93 Completed
3113 OTHER AGENCY Industries
Setting up of Bamboo Crushing units in NER for prouction of Bamboo powder
Schemes of NEC Schemes of NEC 2021-03-31 4.86 2024-03-31 4.856 0 4.856 4.86 Ongoing
3114 OTHER AGENCY Industries
Setting up of Bamboo Primary Centre in the selected potential Areas in the NER
Schemes of NEC Schemes of NEC 2023-03-28 12.8 2026-03-28 12.796 0 12.796 11.26 Ongoing
3115 OTHER AGENCY Industries
Setting up of Bamboo Vacuum Pressure Impregnation Treatment Plant in NE States
Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.5432 2025-03-31 4.54162 0 4.54162 4.0889 Ongoing
3116 OTHER AGENCY Industries
Setting up of Cane and Bamboo Technology Park at Itanagar, Arunachal Prasdesh
Schemes of NEC Schemes of NEC 2017-03-15 10.8331 2020-03-15 8.4678 0 8.4678 8.47 Completed
3117 OTHER AGENCY Industries
Setting up of Multi-Disciplinary Livelihood Incubation Centre for Food Processing, Readymade Garment making and Handicraft at Hunphun, Ukhrul, Manipur
Schemes of NEC Schemes of NEC 2017-07-04 13.5 2020-07-04 13.5 0 13.5 13.5 Ongoing
3118 OTHER AGENCY Industries
Setting up Processing Units for Cashew Nut at Tura, West Garo Hills, Ginger Dehydration Unit at Haflong, Assam and Cattle & Poultry Feed Production Unit at Ukhrul, Manipur
Schemes of NEC Schemes of NEC 2012-06-18 0.58 2015-06-18 0.52 0 0.52 0.52 Completed
3119 OTHER AGENCY Industries
Sourcing and procurement of handicraft and handloom products from artisans and weavers of the NER
Schemes of NEC Schemes of NEC 2020-05-22 3 2023-05-25 2.9962 0 2.9962 3 Completed
3120 OTHER AGENCY Industries
Training of Fruit Wine Making
Schemes of NEC Schemes of NEC 2023-03-30 1.77 2026-03-30 1.709 0 1.709 1.709 Ongoing
3121 OTHER AGENCY Industries
Transforming unorganized care giving service industry into formal service sector industry(IIE Guwahati)
Schemes of NEC Schemes of NEC Other 2020-08-24 4.8229 2023-08-23 4.8229 0 4.8229 4.8229 Completed
3122 OTHER AGENCY Industries
UNIDO-CBTC Phase-II Project by Cane & Bamboo Technology Centre, Narikal Basti, Zoo Narengi Road, Guwahati
Schemes of NEC Schemes of NEC 2009-03-30 6 2013-03-29 1.1163 0 1.1163 1.11 Completed
3123 OTHER AGENCY Information and Public Relatio
15 craft bazaars, 15 exhibitions and 5 others
Schemes of NEC Schemes of NEC 2019-03-05 0.6148 2022-03-05 0.6148 0 0.6148 0.61 Completed
3124 OTHER AGENCY Information and Public Relatio
2 Months Bill organised by Moving Pixel
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0891 2021-04-01 0 Completed
3125 OTHER AGENCY Information and Public Relatio
42 Crafts Bazaar NEHHDC
Schemes of NEC Schemes of NEC 2019-03-20 3.1296 2022-03-20 3.1296 0 3.1296 3.13 Completed
3126 OTHER AGENCY Information and Public Relatio
4th Act East Business Show NEHHDC
Schemes of NEC Schemes of NEC 2019-03-13 0.0454 2021-03-13 0.0454 0 0.0454 0.05 Completed
3127 OTHER AGENCY Information and Public Relatio
9th East Himalayan Expo
Schemes of NEC Schemes of NEC 2019-12-17 0.0817 2022-12-17 0.0817 0 0.0817 0.08 Completed
3128 OTHER AGENCY Information and Public Relatio
Ayush Goa
Schemes of NEC Schemes of NEC 2018-12-15 0.0362 2021-12-15 0.0362 0 0.0362 0.04 Completed
3129 OTHER AGENCY Information and Public Relatio
Ayush Mumbai
Schemes of NEC Schemes of NEC 2018-12-15 0.046 2021-12-15 0.046 0 0.046 0.05 Completed
3130 OTHER AGENCY Information and Public Relatio
Bill for film North East: Indias New Growth Engine
Schemes of NEC Schemes of NEC 2019-05-28 0.0385 2022-05-28 0.0385 0 0.0385 0.04 Completed
3131 OTHER AGENCY Information and Public Relatio
Buyer Seller Meet on Food Processing Agriculture & Horticulture organised by CII Kolkata
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1835 2021-04-01 0 Completed
3132 OTHER AGENCY Information and Public Relatio
Comparative study Bamboo versus Conventional Houses construction systems for NER organised by CBRI, Roorkee
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1475 2021-04-01 0 Completed
3133 OTHER AGENCY Information and Public Relatio
Construction of cultural centre in Lhisemia Khel Kohima Village, Nagaland and Chowainamei Khunou Village, Senapati District Manipur
Schemes of NEC Schemes of NEC 2023-03-31 4.84 2025-03-31 4.8157568 0 4.8157568 Ongoing
3134 OTHER AGENCY Information and Public Relatio
Cooperative Value Chain Ecosystem for Integrated Development in NER organised by NCDC
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.0173 2021-04-01 0 Completed
3135 OTHER AGENCY Information and Public Relatio
CSFI Film Bonanza for 21 days organised by Ministry of I&B (CFSI)
Schemes of NEC Schemes of NEC Choose... 2018-04-01 7.02 2021-04-01 0 Completed
3136 OTHER AGENCY Information and Public Relatio
Destination Himachal Pradesh- 2017
Schemes of NEC Schemes of NEC 2018-12-15 0.0292 2021-12-12 0.0292 0 0.0292 0.03 Completed
3137 OTHER AGENCY Information and Public Relatio
Destination North East Chandigarh
Schemes of NEC Schemes of NEC 2019-09-27 0.0643 2022-09-27 0.0643 0 0.0643 0.06 Completed
3138 OTHER AGENCY Information and Public Relatio
Distribution of Gift Hampers
Schemes of NEC Schemes of NEC 2019-06-27 0.0419 2022-06-27 0.0419 0 0.0419 0.04 Completed
3139 OTHER AGENCY Information and Public Relatio
Emerging North East
Schemes of NEC Schemes of NEC 2019-05-31 0.0271 2022-05-31 0.0271 0 0.0271 0.03 Completed
3140 OTHER AGENCY Information and Public Relatio
Emerging North East 2017
Schemes of NEC Schemes of NEC 2019-03-13 0.0194 2021-03-13 0.0194 0 0.0194 0.02 Completed
3141 OTHER AGENCY Information and Public Relatio
Exhibition cum sales of exclusive H&H Products organised by CCIC New Delhi
Schemes of NEC Schemes of NEC 2018-04-01 0.6 2022-04-01 0.55 0 0.55 0.55 Completed
3142 OTHER AGENCY Information and Public Relatio
Exhibition from 8-17 January, 2017
Schemes of NEC Schemes of NEC 2019-09-27 0.1172 2022-09-27 0.1172 0 0.1172 0.12 Completed
3143 OTHER AGENCY Information and Public Relatio
Extension of Social Media Campaign ( October 2023- December 2024)
Schemes of NEC Schemes of NEC 2023-12-19 2.17 2026-12-19 1.9872 0 1.9872 1.9872 Ongoing
3144 OTHER AGENCY Information and Public Relatio
Global Exhibition on Services 2017
Schemes of NEC Schemes of NEC 2018-12-15 0.0197 2021-12-15 0.0197 0 0.0197 0.02 Completed
3145 OTHER AGENCY Information and Public Relatio
Govt. Achievement and Schemes Expo-2017, New Delhi
Schemes of NEC Schemes of NEC 2018-10-16 0.0237 2021-10-16 0.0237 0 0.0237 0.02 Completed
3146 OTHER AGENCY Information and Public Relatio
Handicrafts and Handlooms Exhibition Chandigarh
Schemes of NEC Schemes of NEC 2019-08-07 0.1617 2021-08-07 0.1617 0 0.1617 0.16 Completed
3147 OTHER AGENCY Information and Public Relatio
ICWA & AsCon Jointly organizig seminar on the age of multilateralism and connectiong India's NE opportunities and challenges organised by Asian Confluence
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.02 2021-04-01 0 Completed
3148 OTHER AGENCY Information and Public Relatio
Invest Tripura organised by ASSOCHAM, New Delhi
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.05 2021-04-01 0 Completed
3149 OTHER AGENCY Information and Public Relatio
National Conference on Many Patriarchies, Many Personalities Re-interrogation Gender in Narrative from NE India organised by Shivaji College, New Delhi
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.03 2021-04-01 0 Completed
3150 OTHER AGENCY Information and Public Relatio
National Conference on North East India: The untapped tourism industry
Schemes of NEC Schemes of NEC 2020-01-15 0.007 2023-01-15 0.007 0 0.007 0.01 Completed
3151 OTHER AGENCY Information and Public Relatio
NEHHDC Fair Utsav
Schemes of NEC Schemes of NEC 2019-06-27 0.154 2022-06-27 0.154 0 0.154 0.15 Completed
3152 OTHER AGENCY Information and Public Relatio
North East Festival Football Cup 2017, New Delhi organised by Hmar Football
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.05 2021-04-01 0 Completed
3153 OTHER AGENCY Information and Public Relatio
North East Inter College Festival connect 18
Schemes of NEC Schemes of NEC 2018-11-13 0.0298 2021-11-13 0.0298 0 0.0298 0.03 Completed
3154 OTHER AGENCY Information and Public Relatio
North East Round Table
Schemes of NEC Schemes of NEC 2020-01-20 0.25 2023-01-20 0.25 0 0.25 0.25 Completed
3155 OTHER AGENCY Information and Public Relatio
Odisha Folk Fair at Puri
Schemes of NEC Schemes of NEC 2018-10-03 0.0925 2022-10-03 0.0925 0 0.0925 0.09 Completed
3156 OTHER AGENCY Information and Public Relatio
Organizing one Special Exhibition at Aizawl, Mizoram
Schemes of NEC Schemes of NEC 2018-11-13 0.1937 2022-11-13 0.1937 0 0.1937 0.19 Completed
3157 OTHER AGENCY Information and Public Relatio
Participation at International Fairs/Exhibitions during 2016-17 organised by BRAWFED
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1368 2021-04-01 0 Completed
3158 OTHER AGENCY Information and Public Relatio
Participation in 7th Bhutan India Regional Friendship Trade Fair for 5 days organised by BRAWFED
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1825 2021-04-01 0 Completed
3159 OTHER AGENCY Information and Public Relatio
Revisiting the Life and Work of Verrier Elwin in NE India Digital Preservation and Propagation of Elwins Work
Schemes of NEC Schemes of NEC 2021-03-30 0.4612 2025-03-21 0.4645 0 0.4645 0.4567284 Completed
3160 OTHER AGENCY Information and Public Relatio
Ronagli Start up Summit
Schemes of NEC Schemes of NEC 2020-02-05 0.162 2023-02-05 0.162 0 0.162 0.16 Completed
3161 OTHER AGENCY Information and Public Relatio
Second North East Festival organised by Jesus and Mary College
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.015 2021-04-01 0 Completed
3162 OTHER AGENCY Information and Public Relatio
STINER Stories organised by PrasarBharati
Schemes of NEC Schemes of NEC Choose... 2018-04-01 2.8532 2021-04-01 0 Completed
3163 OTHER AGENCY Information and Public Relatio
Students Meet on Entrepreneurship Tezpur University
Schemes of NEC Schemes of NEC 2019-07-08 0.0075 2021-07-08 0.0075 0 0.0075 0.01 Completed
3164 OTHER AGENCY Information and Public Relatio
Swachhmeva Jayate organised by Prasar Bharati
Schemes of NEC Schemes of NEC Choose... 2018-04-01 2.5464 2021-04-01 0 Completed
3165 OTHER AGENCY Information and Public Relatio
Textile Exhibition cum Fabrics and Fashion Show
Schemes of NEC Schemes of NEC 2019-06-27 0.1237 2020-01-30 0.1237 0 0.1237 0.12 Completed
3166 OTHER AGENCY Information and Public Relatio
Textiles India 2017
Schemes of NEC Schemes of NEC 2018-12-15 0.0705 2022-12-15 0.0705 0 0.0705 0.07 Completed
3167 OTHER AGENCY Information and Public Relatio
Vision Jammu & Kashmir 2018
Schemes of NEC Schemes of NEC 2019-05-31 0.0243 2022-05-31 0.0243 0 0.0243 0.02 Completed
3168 OTHER AGENCY Information and Public Relatio
Vision Jammu and Kashmir
Schemes of NEC Schemes of NEC 2019-03-13 0.0357 2022-03-13 0.0357 0 0.0357 0.04 Completed
3169 OTHER AGENCY Health
Modernization of Technology of Sri Sankardeva Nethralaya for precision eye care and ophthalmic education by SSN, Guwahati
Schemes of NEC Schemes of NEC 2020-04-24 1.3037 2023-04-24 1.3 0 1.3 1.3 Completed
3170 OTHER AGENCY Health
Vertical Extension of Hospital Building & Strengthening of Lairam Christain Medical Centre & Hospital Lawngtlai, Mizoram
Schemes of NEC Schemes of NEC 2023-03-30 4.9893 2027-03-31 4.99 0 4.99 Ongoing
3171 OTHER AGENCY Science and Technology
5G Applications in NER with Hub at AMTRON, Guwahati. Assam Electronics Development Corporation Ltd (AMTRON)
Schemes of NEC Schemes of NEC Other 2023-03-27 14.90399 2026-03-27 14.9 0 14.9 14.14 Completed
3172 OTHER AGENCY Science and Technology
Assessment of utilization of irrigation potential created for Dhansiri Champawati, Thoubal and Dholaithabi irrigation projects of NE India, Meghalaya
Schemes of NEC Schemes of NEC 2017-09-14 0.07 2020-09-14 0.07 0 0.07 0.07 Completed
3173 OTHER AGENCY Science and Technology
Computer Infrastructure Requirement
Schemes of NEC Schemes of NEC 2005-03-31 0.0809 2008-03-31 0.0809 0 0.0809 0.08 Completed
3174 OTHER AGENCY Science and Technology
Computer Room Furniture & Electrification at 55 Schools in North East States by M/S CKCK Furniture
Schemes of NEC Schemes of NEC 2005-03-31 0.3214 2008-03-31 0.3214 0 0.3214 0.32 Completed
3175 OTHER AGENCY Science and Technology
Computer Room Furniture & Electrification at 85 Schools in North East States by M/S BMG
Schemes of NEC Schemes of NEC 2005-03-31 0.4946 2008-03-31 0.4946 0 0.4946 0.49 Completed
3176 OTHER AGENCY Science and Technology
Computer Training for Teachers of Assam State for 5 PC System in 16 Schools
Schemes of NEC Schemes of NEC 2005-03-31 0.0683 2008-03-31 0.0683 0 0.0683 0.07 Completed
3177 OTHER AGENCY Science and Technology
Computer Training for Teachers of North East States for 10 PC System in 36 Schools
Schemes of NEC Schemes of NEC 2005-03-31 0.1663 2008-03-31 0.1663 0 0.1663 0.17 Completed
3178 OTHER AGENCY Science and Technology
Computer Training for Teachers of North East States for 5 PC System in 82 Schools
Schemes of NEC Schemes of NEC 2005-03-31 0.3501 2008-03-31 0.3501 0 0.3501 0.35 Completed
3179 OTHER AGENCY Science and Technology
Development of Geo Tourism Dashboard Application for planning, management and monitoring tourism activity in NE Region . North Eastern Space Application Centre (NESAC)
Schemes of NEC Schemes of NEC 2021-03-31 0.7081 2024-03-31 0.71 0 0.71 0.7081 Ongoing
3180 OTHER AGENCY Science and Technology
Development of North Eastern Transport Monitoring System (NETMOS): North Eastern Region Communicty Resource Management Society (NERCRMS)
Schemes of NEC Schemes of NEC 2023-03-20 4.9834495 2025-03-25 4.2038095 0 4.2038095 3.72 Ongoing
3181 OTHER AGENCY Science and Technology
Development of Tele-Medicine Network for the North Eastern Region including Sikkim
Schemes of NEC Schemes of NEC 2005-03-10 1.6435 2008-03-10 1.48 0 1.48 1.48 Completed
3182 OTHER AGENCY Science and Technology
Establishment of Animal Breeding and GLP Accredited Biological Screening Toxicology Centre for Herbal Medicines of NE Region
Schemes of NEC Schemes of NEC Other 2020-08-20 17.5 2023-08-20 17.5 0 17.5 17.5 Completed
3183 OTHER AGENCY Science and Technology
Establishment of Bamboo Tissue Culture Unit. North Easter Cane & Bamboo Development Council (NECBDC), Byrnihat
Schemes of NEC Schemes of NEC Dept. of Power 2023-03-31 4.55 2026-03-31 1.138675 2.28 3.418675 1.138675 Ongoing
3184 OTHER AGENCY Science and Technology
Extension of the Existing Tissue Culture Laboratory at RFRI, Jorhat for Mass Production of Bamboo Planting Stock
Schemes of NEC Schemes of NEC 2020-11-23 1.7568 2023-11-23 1.7567709 0 1.7567709 1.2367596 Ongoing
3185 OTHER AGENCY Science and Technology
Gati Shakti Based Planning & Site Selection Using Geospatial Technology for 8 States of NER. NESAC
Schemes of NEC Schemes of NEC Choose... 2023-03-29 0.1995 2026-03-29 0.1995 0 0.1995 Ongoing
3186 OTHER AGENCY Science and Technology
Geo-tagging and Monitoring of NEC funded project/schemes in NE Region using Geospatial Technology and Tolls: NESAC
Schemes of NEC Schemes of NEC NESAC 2019-10-25 0.9669 2022-10-25 0.9669 0 0.9669 0.93 Ongoing
3187 OTHER AGENCY Science and Technology
Herbal drug development for antimicrobial/anticancer from North East based selected plants Jorhat, Assam CSIR -NEIST-, Jorhat
Schemes of NEC Schemes of NEC 2018-03-07 0.57 2020-08-24 0.57 0 0.57 0.57 Foreclosed
3188 OTHER AGENCY Science and Technology
Implementation of 7 regional Plan of Action (PoA) projects finalized as per NESAC Society in the domain of Agriculture & Allied, Disaster Management, Forest, Ecology & Environment and Water Resources Management during the meeting held on 23rd January, 2021. (PoA00l, PoA002, PoA003, PoA004, PoA00S, PoA006 and PoA009)
Schemes of NEC Schemes of NEC NESAC 2022-03-28 14.99 2025-03-20 14.99 0 14.99 14.9899747 Completed
3189 OTHER AGENCY Science and Technology
Implementation of College IT Programme in 2 Colleges by M/S SM Enterprise
Schemes of NEC Schemes of NEC 2005-03-31 0.0899 2008-03-31 0.0899 0 0.0899 0.09 Completed
3190 OTHER AGENCY Science and Technology
Implementation of College IT Programme in North East States by M/S BMG
Schemes of NEC Schemes of NEC 2005-03-31 1.12 2008-03-31 1.12 0 1.12 1.12 Completed
3191 OTHER AGENCY Science and Technology
Installation of V-Sat System, LED Screen at PMKVY Training Centre, Ukhrul, Manipur (NERCMP)
Schemes of NEC Schemes of NEC 2017-07-08 0.0447 2020-07-08 0.0447 0 0.0447 0.04 Completed
3192 OTHER AGENCY Science and Technology
Intervention and Implementation of Some Appropriate Technologies for North Eastern Region through STINER-Hub. CSIR-NEIST, Jorhat
Schemes of NEC Schemes of NEC 2023-03-31 4.9972 2026-03-31 3.7479 1.124 4.8719 3.7479 Ongoing
3193 OTHER AGENCY Science and Technology
IT College Education Programme in 2 Colleges by M/S BMG Informatics
Schemes of NEC Schemes of NEC 2005-03-31 0.3492 2008-03-31 0.3492 0 0.3492 0.35 Completed
3194 OTHER AGENCY Science and Technology
IT School Education Programme for 32 Schools by M/S BMG Informatics
Schemes of NEC Schemes of NEC 2005-03-31 0.6976 2008-03-31 0.6976 0 0.6976 0.7 Completed
3195 OTHER AGENCY Science and Technology
Procurement of prototypes of Bamboo Processors(7 units) from IPRITI for advocacy and promotion of appropriate technologies to enhance livelihood of the people of NER, NECBDC
Schemes of NEC Schemes of NEC 2023-06-23 2.1 2026-06-23 2.1 0 2.1 1.58 Ongoing
3196 OTHER AGENCY Science and Technology
Provision of Computers & Peripherals at 19 Schools in North East States by M/S BMG
Schemes of NEC Schemes of NEC 2005-03-31 0.6601 2009-03-31 0.6601 0 0.6601 0.66 Completed
3197 OTHER AGENCY Science and Technology
Skill Development for North East Youth in Animation Visual Effects Gaming & Comics (AVGC) National Film Development Corporation Ltd
Schemes of NEC Schemes of NEC 2023-03-03 2.31 2026-03-03 2.31 0 2.31 2.31 Completed
3198 OTHER AGENCY Science and Technology
STINER-Common facility centre (STINER-CFC STATE) at SASRD, NU, Medziphema Campus, Nagaland. North East Institute of Science & Technology (CSIR), Jorhat Assam
Schemes of NEC Schemes of NEC Other 2018-03-23 10 2022-03-23 9 1 10 9 Ongoing
3199 OTHER AGENCY Science and Technology
Study of Non-edible plant oils of North-East: Extraction, compositional characterization and analysis for industrial application, Nagaland
Schemes of NEC Schemes of NEC 2020-02-15 0.13 2020-02-15 0.13 0 0.13 0.13 Completed
3200 OTHER AGENCY Science and Technology
Tele-education project- Establishment of Smart Virtual Classrooms in Aspirational District in NER
Schemes of NEC Schemes of NEC 2020-08-20 10.18 2023-03-31 9.0282 0.305 9.3332 7.2174374 Ongoing
3201 OTHER AGENCY Transport and Communication
Constuction of Mahadev Tolloi Pfutsero Road (0.00 to 78.00 Kms)
Schemes of NEC Schemes of NEC 2004-08-18 93.67 2007-08-18 93.67 0 93.67 93.67 Completed
3202 OTHER AGENCY Transport and Communication
Mankachar-Mahendraganj road in Assam
Schemes of NEC Schemes of NEC 2010-02-16 12.12 2013-02-16 10.91 0 10.91 10.91 Completed
3203 OTHER AGENCY Transport and Communication
NEC Convention-cum-Cultural Centre at Dwarka, New Delhi
Schemes of NEC Schemes of NEC 2020-11-18 116.38 2023-11-18 71.0730574 9.1462307 80.2192881 70.6642574 Ongoing
3204 OTHER AGENCY Tourism and Culture
Capacity Building for Tourism Stake Holders of Sikkim
Schemes of NEC Schemes of NEC 2020-12-09 1.5037 2023-12-09 1.5 0 1.5 1.5 Completed
3205 OTHER AGENCY Tourism and Culture
Development of Eco-Tourism Complex at Thoubal Lake near Muirei and Ramrei, Ukhrul District, Manipur
Schemes of NEC Schemes of NEC 2018-02-19 4.33 2022-02-19 1.732 0 1.732 1.73 Completed
3206 OTHER AGENCY Tourism and Culture
Development of Integrated Tea Tourism in Tamenglong District, Manipur
Schemes of NEC Schemes of NEC 2023-03-31 4.3714 2026-03-31 3.29755 0 3.29755 2.1907 Ongoing
3207 OTHER AGENCY Tourism and Culture
Development of Khayang Village Communitry Eco-Tourism & Homestay in Ukhrul District, Manipur
Schemes of NEC Schemes of NEC 2018-02-15 1.5011 2021-02-15 0.644 0 0.644 0.64 Completed
3208 OTHER AGENCY Tourism and Culture
Development of Sustainable Eco-Tourism Complex in Longding District, Arunachal Pradesh
Schemes of NEC Schemes of NEC 2018-02-15 2.5 2021-02-15 2 0 2 2 Completed
3209 OTHER AGENCY Tourism and Culture
National Paragliding Training Programme, Mizoram
Schemes of NEC Schemes of NEC Other 2023-03-18 3.3 2026-03-18 3.3 0 3.3 3.3 Completed
3210 OTHER AGENCY Tourism and Culture
Project proposal for Promotion of Tourism for Domestic & International Tourists to North East India
Schemes of NEC Schemes of NEC 2018-03-14 1.87 2021-03-14 1.87 0 1.87 1.87 Completed
3211 OTHER AGENCY Tourism and Culture
Promotion of Tourism in North East using Digital Tools (NERCRMS)
Schemes of NEC Schemes of NEC 2022-03-29 4.91 2025-03-21 4.763 0 4.763 3.283 Ongoing
3212 OTHER AGENCY Tourism and Culture
Promotional theme based regional tourist ciruits in NER
Schemes of NEC Schemes of NEC 2017-03-24 7.5 2020-03-24 6.75 0 6.75 6.75 Completed
3213 OTHER AGENCY Tourism and Culture
Setting up of a Revolving Fund Project for Development of Tourism in NER
Schemes of NEC Schemes of NEC 2005-01-28 1 2008-01-28 1 0 1 1 Completed
3214 OTHER AGENCY Tourism and Culture
Startup in the field of Catering Services & Food Joints under Entrepreneurship Programme
Schemes of NEC Schemes of NEC 2020-08-17 1.8 2023-08-17 1.8 0 1.8 1.8 Completed
3215 OTHER AGENCY Tourism and Culture
Swachhta Action Plan
Schemes of NEC Schemes of NEC 2018-06-03 5.99 2021-06-03 5.99 0 5.99 5.99 Completed
3216 OTHER AGENCY Science and Technology
Implementation of 3 Plan of Action (PoA) projects finalized for the states of Sikkim as per NESAC Society meeting held on 23rd January, 2021 (PoA096, PoA098, PoA100)
Schemes of NEC Schemes of NEC NESAC 2022-03-28 1.64 2026-03-25 1.64 0 1.64 1.64 Completed
3217 OTHER AGENCY Education
Construction of Boys and Girls Hostel at Teiliamura, Khowai District, Tripura
Schemes of NEC Schemes of NEC 2021-03-30 5.62 2024-03-30 5.25 0 5.25 4.104238 Ongoing
3218 OTHER AGENCY Education
Construction of Community Centre for Musical Cultural and Skill Development at Krishnanagar, Agartala, Tripura
Schemes of NEC Schemes of NEC Other 2022-03-27 3.2258 2025-03-27 1.0733 0 1.0733 1.0733 Ongoing
3219 OTHER AGENCY Education
Construction of Girls Hostel Infrastructure Development of Gandhigram, West Trpura.
Schemes of NEC Schemes of NEC 2022-03-28 2.82 2025-03-31 1.3 0 1.3 0.0101949 Ongoing
3220 OTHER AGENCY Education
Construction of Hostel Building for Girls at Dhamma Dipa School at Manu Bankul Sabroom, South Tripura
Schemes of NEC Schemes of NEC Other 2023-03-31 3.4406 2026-03-31 2.9864037 0.1048798 3.0912835 2.1757835 Ongoing
3221 OTHER AGENCY Education
Construction of School Building at Vivekananda Tripureswari Vidya Mandir, Tripura
Schemes of NEC Schemes of NEC 2022-03-27 3.0311 2025-03-31 1.8053 0 1.8053 0.95 Ongoing
3222 OTHER AGENCY Education
Construction of School building cum Teachers Training Centre at Tripureshwari Shishu Mandir, Ramnagar, Agartala, West Tripura
Schemes of NEC Schemes of NEC Choose... 2023-03-31 4.41 2026-03-31 3.3886607 0 3.3886607 2.187 Ongoing
3223 OTHER AGENCY Education
Construction of Skill Development Training Centre at Fulkumari, Udaipur, Gomati, South Tripura
Schemes of NEC Schemes of NEC Choose... 2023-03-31 3.62 2026-03-31 1.8106889 0 1.8106889 0.77 Ongoing
3224 OTHER AGENCY Science and Technology
Implementation of 3 Plan of Action (PoA) projects finalized for the states of Tripura as per NESAC Society meeting held on 23rd January, 2021 (PoA101, PoA105, PoA110).
Schemes of NEC Schemes of NEC NESAC 2022-03-28 2.0808 2025-03-28 2.0808 0 2.0808 2.080796 Completed
3225 OTHER AGENCY Science and Technology
Deepening of Scientific Research on 5G Use Cases for solving challenges of society. North Eastern Region Community Resource Management Society (NERCMS)
Schemes of NEC Schemes of NEC 2024-02-13 11.31 2026-02-13 11.2804949 0 11.2804949 10.1030237 Ongoing
3226 OTHER AGENCY Industries
R&D project on the production of bamboo pallet and bamboo prefab housing beams and panels
Schemes of NEC Schemes of NEC 2024-03-24 0.37 2026-03-24 0.2 0 0.2 0.2 Ongoing
3227 OTHER AGENCY Education
Construction of Barak Hostel at JNU Complex, New Delhi
Schemes of NEC Schemes of NEC Dept. of Power 2024-03-16 2.47 2026-03-16 2.47 0 2.47 Ongoing
3228 OTHER AGENCY Agriculture and Allied
Documenting NE Ethnic Cuisines
Schemes of NEC Schemes of NEC 2024-03-12 0.23 2026-03-12 0.23 0 0.23 Ongoing
3229 OTHER AGENCY Industries
Maintenance, Upgradation and updating of Advancing North East Portal for two (2) years
Schemes of NEC North Eastern Development 2024-08-27 3.16 2027-08-27 0.79 0.79 1.58 0.79 Ongoing
3230 OTHER AGENCY Agriculture and Allied
Interior & Allied works at office-cum-marketing complex at NERAMAC Ltd. At Six Mile Guwahati
Schemes of NEC NERAMAC 2024-08-09 4.98 2027-08-09 4.61 0.3735 4.9835 4.6065 Ongoing
3231 OTHER AGENCY Science and Technology
Establisment of Scientific Smoked Meat Production Units in North East India
Schemes of NEC NERCORMS 2024-08-30 4.85 2027-08-30 4.2879216 0 4.2879216 3.36 Ongoing
3232 OTHER AGENCY Sports
Construction of 2 nos. Synthetics court, 2 nos. of synthetic volleyball, 1 no of basket ball court west site Gallery with VIP Rostrum at Senapati Public Ground, Senapati District, Manipur
Schemes of NEC NERCORMS 2024-01-23 4.36 2027-01-23 3.2733 0 3.2733 2.1822 Ongoing
3233 OTHER AGENCY Tourism and Culture
Promotion of Tourism in Manipur and Mizoram.
Schemes of NEC NERCORMS 2024-01-24 4.53 2027-01-24 3.397125 0 3.397125 3.397175 Ongoing
3234 OTHER AGENCY Agriculture and Allied
Saffron Cultivation in North Eastern States
Schemes of NEC North East Centre Techno 2024-09-10 3.7217 2027-09-10 1.86085 0 1.86085 0.930425 Ongoing
3235 OTHER AGENCY Information and Public Relatio
Media Management & Promotion of Ministry of DoNER, North Eastern Council, Govt. Of India's Developmental Activities
Schemes of NEC NERCORMS 2024-09-23 2.07301 2026-09-23 1.564325 0 1.564325 1.564325 Ongoing
3236 OTHER AGENCY Education
Provision for furniture and fixture for construction of SC/ST Boys and Girls Hostel at NIELIT, Imphal
Schemes of NEC National Institute of Ele 2024-12-04 1.19 2027-12-04 0.597375 0.5925475 1.1899225 0.597375 Ongoing
3237 OTHER AGENCY Science and Technology
Northeast Student Program for Awareness, Reach and Knowledge on Space NE-SPARKS
Schemes of NEC NESAC 2025-03-05 3.8372 2028-03-05 2.30232 0 2.30232 1.6722487 Ongoing
3238 OTHER AGENCY Transport and Communication
Agartala Akhaura Rail Link NLCPR-C
Schemes of NEC Other 2016-07-22 933.81 2025-06-30 708.73 225.08 933.81 708.73 Ongoing
3239 OTHER AGENCY Science and Technology
Establishment of STINER-Common Facility Centre CFC at CSIR-NEIST, Jorhat for Science and Technology Intervention in North East India STINER for FY 2018-19 CSIR-NEIST, Jorhat NLCPR-C
Schemes of NEC NA 2018-08-10 40 2025-09-30 40 0 40 37 Ongoing
3240 OTHER AGENCY Transport and Communication
Construction of Meter Guage to Broad Guage from Panchgram Station to Inside Cachar Paper Mill HPCL NLCPR-C
Schemes of NEC M/O Heavy Industry and Pu 2016-03-15 19.23 2025-08-15 0 Ongoing
3241 OTHER AGENCY Irrigation and Flood Control
Protection of Majuli Island from flood and erosion of River Brahmaputra NLCPR-C
Schemes of NEC Brahmaputra Board 2017-03-15 207 2025-06-30 207 0 207 206.7175 Ongoing
3242 OTHER AGENCY Agriculture and Allied
Creation of infrastructure of establishment of i. One new college in Agriculture and Allied Science, Pasighat, Arunachal Pradesh and ii. Six multi-technology testing centres and vocational training NLCPR-C
Schemes of NEC Central Agricultural Univ 2018-03-13 82.23 2025-07-31 82.23 0 82.23 82.23 Ongoing
3243 OTHER AGENCY Science and Technology
Establishment of North Eastern Science & Technology Cluster NEST for promoting Research, Innovation and Skill Development by Indian Institute of Technology, Guwahati, Assam
Schemes of NEC IIT Guwahati 2025-07-04 22.98 2028-07-04 5.71 5.71 Ongoing
3244 OTHER AGENCY Science and Technology
Gap funding of Residential Cost for Skill Training in AVGC and IT-ITES Sectors.
Schemes of NEC NERCORMS 2025-08-08 0.51178 2027-08-08 0 Ongoing
3245 OTHER AGENCY Information and Public Relatio
Production and Dissemination of High Quality Video Content through Digital Platform.
Schemes of NEC NERCORMS 2025-08-01 3.3054885 2027-02-01 2.0776 0.8935 2.9711 2.0814 Ongoing
3246 OTHER AGENCY Agriculture and Allied
ADITYA PRABHA GRAM: Fostering Agricultural Harmony in Border Communities of Eastern Himalayas.
Schemes of NEC Central Agriculture Unive 2025-09-12 4.9751 2028-09-12 1.2438 0 1.2438 Ongoing
3247 OTHER AGENCY Industries
PADMA DOREE- Fusion between Eri Silk of North East & Chanderi Silk of Madhya Pradesh.
Schemes of NEC NEHHDC 2025-09-19 4.6861222 2026-09-19 3.7488978 0 3.7488978 Ongoing
3248 OTHER AGENCY Education
Ashtalakshmi Darshan-Youth Exchange Programme.
Schemes of NEC NEHHDC 2025-10-14 12.104956 2027-10-14 6.052478 0 6.052478 Ongoing
3249 OTHER AGENCY Industries
Safeguarding of Heritage with Sustainable Livelihood by Geographical Indication GI registration of 166 nos. of Crop/Commodities of North Eastern Region.
Schemes of NEC NERAMAC 2025-11-25 4.3575 2027-11-25 2.17875 0 2.17875 Ongoing
3250 OTHER AGENCY Industries
Strengthening of traditional bamboo artisan clusters by enhancing market access, modernizing products, and linking them with digital and retail ecosystems.
Schemes of NEC NECBDC 2025-11-27 11.52 2028-11-27 4.1466 0 4.1466 Ongoing
3251 OTHER AGENCY Evaluation and Monitoring
Managing the NERACE Portal.
Schemes of NEC NERAMAC 2026-01-12 1.9305 2028-01-12 0.48 0 0.48 Ongoing
3252 OTHER AGENCY Science and Technology
Establishment of STEM Education Labs across remote schools in Meghalya, Tripura, Assam, Arunachal Pradesh and Mizoram.
Schemes of NEC North East Centre Techno 2026-03-31 4.9523489 2029-03-31 0 Ongoing
3253 OTHER AGENCY Industries
Establishment of National Network of Showrooms for North Eastern Region NER Entrepreneurs, Farmers and Artisans.
Schemes of NEC NEHHDC 2026-03-31 23.9286 2026-09-30 5.98215 5.98215 Ongoing
3254 OTHER AGENCY Information and Public Relatio
Social and Digital Media Promotion of Ministry of DoNER, North Eastern Council, Government of India's Developmental Activities.
Schemes of NEC NERCORMS 2026-04-30 3.9742 2028-04-30 0.99355 0.99355 Ongoing
3255 OTHER AGENCY Industries
Pilot Project on Sustainable Agro-Based Industries, Strengthening Value Chains in Assam & Manipur.
Schemes of NEC NERCRMS 2026-03-31 4.9142 2029-03-31 0 Ongoing
3256 OTHER AGENCY Industries
Construction of Hostel Building in NECBDC, Burnihat, Assam.
Schemes of NEC NECBDC 2026-03-31 4.6195 2028-03-31 0 Ongoing
3257 SIKKIM Health
Construction of 70 bedded District Hospital at Mangan, North Sikkim, Sikkim
NESIDS-OTRI NESIDS Dept. of Health & familly 2020-03-20 10 2021-03-21 10 0 10 4 Completed
3258 SIKKIM Health
Procurement of equipment for strengthening of Bio-Medical Waste Management (BMV) system & High Flow Nasal Oxygen (HFNO) System in Sikkim
NESIDS-OTRI NESIDS Dept. of Health & familly 2021-09-27 5.3343 2022-10-27 5.2809 0 5.2809 0.1 Ongoing
3259 SIKKIM Agriculture and Allied
Cultivation of commercial Floriculture crops at Kayathang, Rumtek, Sikkim
Schemes of NEC Schemes of NEC 2012-12-18 1.82 2015-12-18 1.82 0 1.82 1.82 Completed
3260 SIKKIM Agriculture and Allied
Cultivation of High yielding Paddy converting Mono-Cropping into Double Cropping in Sikkim.
Schemes of NEC Schemes of NEC 2009-12-17 0.49 2012-12-17 0.45 0 0.45 0.45 Completed
3261 SIKKIM Agriculture and Allied
Development of Commercial Floriculture in Sikkim
Schemes of NEC Schemes of NEC 2016-05-12 6.28 2019-05-12 5.796 0 5.796 5.8 Completed
3262 SIKKIM Agriculture and Allied
Development of Identified Backward Blocks under 30 PC Central Sector Scheme of NEC in Chongrang Block in West District, Sikkim
Schemes of NEC Schemes of NEC 2020-11-25 2.81 2023-11-25 2.81 0 2.81 2.81 Completed
3263 SIKKIM Agriculture and Allied
Establishment of trout breeding farm at Yakthang, Jyajuk under Lachen block, North Sikkim
Schemes of NEC Schemes of NEC 2015-09-17 3.2631 2018-09-17 2.94 0 2.94 2.94 Completed
3264 SIKKIM Agriculture and Allied
Farm Mechanisation, Sikkim
Schemes of NEC Schemes of NEC 2013-11-21 5.0405 2016-11-21 4.5365 0 4.5365 4.54 Completed
3265 SIKKIM Agriculture and Allied
Integrated poultry farming & Hatchery unit, at Kumrek near Rongpo, East Sikkim.
Schemes of NEC Schemes of NEC 2005-12-25 2.0082 2008-12-25 1.8 0 1.8 1.8 Completed
3266 SIKKIM Agriculture and Allied
Proposal of identified block for providing key identified service at Baiguney Block, West Sikkim district, Sikkim
Schemes of NEC Schemes of NEC Other 2022-03-31 4.156722 2025-03-31 3.4964 0.660322 4.156722 4.156722 Completed
3267 SIKKIM Agriculture and Allied
Proposal of identified block for providing key identified service at Chongrang Block, West Sikkim district, Sikkim
Schemes of NEC Dept. of Agriculture & An 2022-03-31 4.93 2025-03-31 4.934 0 4.934 4.93 Completed
3268 SIKKIM Agriculture and Allied
Proposal of identified block for providing key identified service at Karji village, Chongrang Block, West Sikkim district, Sikkim
Schemes of NEC Dept. of Agriculture & An 2022-03-31 1.94 2025-03-31 1.946 0 1.946 1.55 Completed
3269 SIKKIM Agriculture and Allied
Proposal of identified block for providing key identified service at Mabong village, Baiguney Block, West Sikkim district, Sikkim
Schemes of NEC Schemes of NEC 2022-03-31 2.01 2025-03-31 2.014 0 2.014 2.006 Completed
3270 SIKKIM Agriculture and Allied
Sikkim Mandarin Re-Plantation programme with new disease free budded and grafted trees.
Schemes of NEC Schemes of NEC 2022-03-22 2.77 2025-03-22 2.768 0 2.768 1.11 Completed
3271 SIKKIM Education
Aspirational District West Sikkim, Sikkim
Schemes of NEC Schemes of NEC 2019-06-07 1 2022-06-07 1 0 1 1 Completed
3272 SIKKIM Education
Backward Community of Limboo Community, Sikkim
Schemes of NEC Schemes of NEC 2022-03-11 4.525 2025-03-31 4.525 0 4.525 4.525 Ongoing
3273 SIKKIM Education
Centre for excellence at Chakung, West Sikkim
Schemes of NEC Schemes of NEC Education Department, Gov 2021-03-26 14.8043 2024-03-26 11.85 2.9543 14.8043 13.4971 Ongoing
3274 SIKKIM Education
Community Development Programme at Kateng Bokrong, GPU under Namthang Block South Sikkim
Schemes of NEC Schemes of NEC 2020-11-19 2.6 2023-11-19 2.59858 0 2.59858 1.04 Ongoing
3275 SIKKIM Education
Construction of Destitute Home (Child Care Institute) at Begha Dentam, West Sikkim
Schemes of NEC Schemes of NEC 2017-03-22 3.848 2020-03-22 2.78 0 2.78 2.78 Completed
3276 SIKKIM Education
Construction of Old Age Home at Lower Kamrang, Kitchu Dumra, South Sikkim (Boomtar)
Schemes of NEC Schemes of NEC 2016-03-22 5.87 2019-03-22 3.756 0 3.756 3.76 Completed
3277 SIKKIM Education
Construction of Panchayat Ghar and other facitlities at Gelling Baiguney GPU, Sikkim
Schemes of NEC Schemes of NEC 2023-03-31 0.98 2026-03-31 0.42 0 0.42 Ongoing
3278 SIKKIM Education
Construction of ScienceBlock at Kamrang Govt. Degree College at Namchi, South Sikkim
Schemes of NEC Dept. of Education 2017-06-30 9.58 2020-06-30 9.5831 0 9.5831 7.59 Completed
3279 SIKKIM Education
Construction of Sikkim State University at Temi Tarku, South Sikkim
Schemes of NEC Schemes of NEC 2022-03-10 9.62 2025-03-10 9.6196 0 9.6196 4.92 Ongoing
3280 SIKKIM Education
Development of Archery complex at Lalthagchan and Indoor Gymnasium for Boxing, Taekwondo, Karate, Wushu at Gangtok, East Sikkim
Schemes of NEC Schemes of NEC 2012-12-26 4.98 2015-12-26 4.48 0 4.48 4.48 Completed
3281 SIKKIM Education
Infrastructure Development at Tharpu Senior Secondary School, West Sikkim
Schemes of NEC Schemes of NEC 2017-06-27 4.0944 2019-06-27 3.69 0 3.69 3.69 Completed
3282 SIKKIM Irrigation and Flood Control
Augmentation of Dentam Water Supply Scheme (Phase-I)
Schemes of NEC Schemes of NEC 2010-01-28 4.5 2014-01-28 4.05 0 4.05 4.05 Completed
3283 SIKKIM Irrigation and Flood Control
Augmentation of Water Supply for Namthang Bazar from Paha Khola and Khop source in South Sikkim
Schemes of NEC Schemes of NEC Dept. of Power 2017-05-09 9.59 2020-05-09 8.5437 0 8.5437 8.54 Completed
3284 SIKKIM Irrigation and Flood Control
Augmentation of Water Supply Scheme at Makha Bazaar in East Sikkim
Schemes of NEC Schemes of NEC 2011-12-23 4.9152 2014-12-23 4.42 0 4.42 4.42 Completed
3285 SIKKIM Irrigation and Flood Control
Consn. Of Water Supply at Majitar in South Sikkim
Schemes of NEC Schemes of NEC 2013-11-22 5.0231 2016-11-22 4.5208 0 4.5208 4.52 Completed
3286 SIKKIM Irrigation and Flood Control
Drainage works for community assets under integrated development of Lower Rangpo Bazaar area including IBM area, East Sikkim, Sikkim.
Schemes of NEC Schemes of NEC Urban Development 2022-03-02 8.1897 2026-03-03 8.1897 0 8.1897 8.1666131 Ongoing
3287 SIKKIM Irrigation and Flood Control
Jhora Training and Anti-Erosion Work outside the defined boundary of Namchi, South Sikkim
Schemes of NEC Schemes of NEC 2012-02-28 3.6775 2015-02-28 3.31 0 3.31 3.31 Completed
3288 SIKKIM Irrigation and Flood Control
Providing New Distribution Network System of Water Supply to Namchi Town in South Sikkim (Phase-II)
Schemes of NEC Schemes of NEC 2008-11-12 4.435 2012-11-12 3.99 0 3.99 3.99 Completed
3289 SIKKIM Irrigation and Flood Control
River training works along Sipchu Jhora and River Teesta at Sinotar Temi constituency Phase-I, South Sikkim dist.
Schemes of NEC Schemes of NEC 2009-12-18 4.8126 2013-12-18 4.33 0 4.33 4.33 Completed
3290 SIKKIM Irrigation and Flood Control
Up-gradation & Modernization of Feeder/Approach including the Development of Selep water treatment plant for Sikkim, East Sikkim dist.
Schemes of NEC Schemes of NEC 2008-07-16 4.8002 2011-07-16 3.2506 0 3.2506 3.25 Completed
3291 SIKKIM Irrigation and Flood Control
Water harvesting and irrigation in Sikkim Mandarin, East Sikkim dist.
Schemes of NEC Schemes of NEC 2012-11-26 4.0491 2015-11-26 3.64 0 3.64 3.64 Completed
3292 SIKKIM Industries
Establishment of an Industrial Cordyceps Based Food & Nutraceutical Processing Unit as a Revenue Generation Model in Sikkim
Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.99 2025-03-31 1.9958 0 1.9958 Foreclosed
3293 SIKKIM Industries
Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Sikkim
Schemes of NEC Schemes of NEC 2020-08-22 1.74 2023-08-11 1.74 0 1.74 1.74 Completed
3294 SIKKIM Industries
Modernization and Expansion of Temi Tea Estate, South Sikkim
Schemes of NEC Schemes of NEC 2015-12-11 2.9 2018-12-12 2.61 0 2.61 2.61 Completed
3295 SIKKIM Industries
Production and Training Centre for Soft Toys at Gangtok, Sikkim
Schemes of NEC Schemes of NEC 2011-12-08 4.6954 2014-12-08 4.0044 0 4.0044 4 Completed
3296 SIKKIM Industries
Setting up of a Hand Made Paper Unit at Melli, South Sikkim
Schemes of NEC Schemes of NEC 2014-12-09 3.9896 2017-12-09 3.5906 0 3.5906 3.59 Completed
3297 SIKKIM Industries
Setting up of a Heritage Handicrafts Museum at Namchi, South Sikkim
Schemes of NEC Schemes of NEC 2014-02-13 4.92 2017-02-13 4.428 0 4.428 4.43 Completed
3298 SIKKIM Information and Public Relatio
Construction of Multi Purpose Community Centre at Soreng, Sikkim
Schemes of NEC Schemes of NEC 2023-03-31 14.15 2026-03-31 10.32 3.823275 14.143275 4.5 Ongoing
3299 SIKKIM Information and Public Relatio
Emerging North East from 25th to 27th October, 2017 organised by Govt. of Sikkim
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.099 2021-04-01 0 Completed
3300 SIKKIM Information and Public Relatio
National Conference on Floriculture for Rural and Urban Prosperity organised by ICAR - National Research Centre for Orchids - Sikkim
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.045 2021-04-01 0 Completed
3301 SIKKIM Health
Accident & Trauma Center at Namchi, Sikkim
Schemes of NEC Schemes of NEC 2006-10-15 1.35 2008-10-15 1.22 0 1.22 1.22 Completed
3302 SIKKIM Health
Capital Support for procurement of 2(two) Mobile Laboratories in Sikkim
Schemes of NEC Schemes of NEC 2021-10-26 1.8172 2024-10-26 1.82 0 1.82 1.82 Completed
3303 SIKKIM Health
Construction of T.B. Hospitals each at Mangan, North District and Gyalshing, West District, Sikkim(Re-opened)
Schemes of NEC Schemes of NEC 2012-11-26 4.2702 2015-11-26 3.8432 0 3.8432 3.84 Completed
3304 SIKKIM Health
Construction of X-Ray Block, Kitchen and Garage cum Seminar Room in selected PHCs, Sikkim
Schemes of NEC Schemes of NEC 2007-02-28 2.8479 2010-02-28 2.56 0 2.56 2.56 Completed
3305 SIKKIM Health
Procurement of Dental Chairs, Equipments and Dental Lab. Facilities at STNM Hospital, Gangtok Hospitals and PHCs in Sikkim.
Schemes of NEC Schemes of NEC 2013-10-09 2.9746 2016-10-09 2.68 0 2.68 2.68 Completed
3306 SIKKIM Health
Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Sikkim for activities related to combating COVID-19 pandemic
Schemes of NEC Schemes of NEC 2020-04-01 1.75 2023-04-01 1.75 0 1.75 1.75 Completed
3307 SIKKIM Health
Strengthening & up-gradation of PHSCs/PHCs/CHCs in the State of Sikkim
Schemes of NEC Schemes of NEC 2005-02-24 4.04 2008-02-24 3.64 0 3.64 3.64 Completed
3308 SIKKIM Health
Strengthening of Radiology Departments at Mangan CHC, Singtam CHC and Namchi CHC, Sikkim
Schemes of NEC Schemes of NEC 2012-11-26 9.5025 2014-11-26 8.55 0 8.55 8.55 Completed
3309 SIKKIM Health
Upgradation of Hospitals & Health Centers by procurement of Basic equipment & Labour Room Equipment in PHCs, Sikkim
Schemes of NEC Schemes of NEC 2006-03-14 4.9348 2008-03-14 4.44 0 4.44 4.44 Completed
3310 SIKKIM Power
Construction of 11/11 KV switching sub-station including re-arrangement and drawing of 11 KV transmission line at Kongri alongwith modernization of Tashiding Bazar in West Sikkim, Sikkim
Schemes of NEC Schemes of NEC 2015-06-09 10.48 2018-06-09 9.432 0 9.432 9.43 Completed
3311 SIKKIM Power
Construction of 11kV 3-Phase Heavy Duty Transmission Line from Rabong to Borong via Deorali and construction of control room at Ralong and construction of 11kV 3-Phase Heavy Duty Transmission line from Rabong to Namlung via Zarrong in South Sikkim
Schemes of NEC Schemes of NEC 2012-02-29 4.48 2015-02-28 4.03 0 4.03 4.03 Completed
3312 SIKKIM Power
Construction of 66kV S/C Transmission Line from 132/66kV Switchyard at Ravangla to Central University with 66/11kV, 2x5MVA substation at Yangang, South Sikkim.
Schemes of NEC Schemes of NEC 2012-09-04 16.51 2015-09-04 14.86 0 14.86 14.86 Completed
3313 SIKKIM Power
Conversion of existing 11KV Transmission line & 440 V, LT Distribution Overhead Lines including service connections to underground cable systems in congested areas at Pelling, West Sikkim
Schemes of NEC Schemes of NEC 2008-07-27 4.7644 2011-07-27 4.29 0 4.29 4.29 Completed
3314 SIKKIM Power
Conversion of Overhead HT & LT Over head lines into underground cable system with up-gradation of the existing distribution system at Ambedkar Road, Munshi Colony, Bhojo Gharie & Sonam Gyatso Marg & Arithang Areas, Gangtok, Sikkim
Schemes of NEC Schemes of NEC 2009-01-23 4.9696 2012-01-23 4.47 0 4.47 4.47 Completed
3315 SIKKIM Power
Design, Supply, Erection, Testing, Commissioning of 66 KV Single Circuit transmission line from 3.3/66 KV Sub-Station of Rongli-I HEP at Sisney including extension of line bay at 66/11 KV Sub-Station at Sungdung, Chujachen, Rongli in East Sikkim.
Schemes of NEC Schemes of NEC 2009-08-21 3.8322 2012-08-21 3.45 0 3.45 3.45 Completed
3316 SIKKIM Power
Diversion of 66KV Transmission Line from Tadong Sub-Station to ICAR compound in D/C 66KV Tower for independent circuit for Phodong, North Sikkim.
Schemes of NEC Schemes of NEC 2010-12-23 4.93 2013-12-23 4.437 0 4.437 4.44 Completed
3317 SIKKIM Power
Electrification of Central Park Along With Conversion of Existing Overhead L.T Line into Underground Cable with System Improvement & Street Light and Around Namchi Bazar in South Sikkim
Schemes of NEC Schemes of NEC 2010-12-30 4.9838 2012-12-30 4.49 0 4.49 4.49 Completed
3318 SIKKIM Power
Integration of New Sub-Stations & Generation Stations under North District with existing Central Load Dispatch Centre (CLDC) with facility for Energy Auditing, Sikkim.
Schemes of NEC Schemes of NEC 2009-10-27 4.9 2012-10-27 4.41 0 4.41 4.41 Completed
3319 SIKKIM Power
Interconnection of 11 KV Development Area Sub-Station with 11/11 KV TNA Sub-Station as part of Ring Main Network, Gangtok
Schemes of NEC Schemes of NEC 2007-02-28 1.02 2007-12-01 0.918 0 0.918 0.92 Completed
3320 SIKKIM Power
Procurement, erection, testing and commissioning of 20 MVA, 132/66 KV power transformer for 132/66 KV Sub-Station at Kyongsa, Gyalshing, West Sikkim i/c electrification of the Chenrezig Shingkham Riwa Potala at Sangha Choeling, Pelling in West Sikkim
Schemes of NEC Schemes of NEC 2013-12-20 12.85 2015-12-20 12.85 0 12.85 12.85 Completed
3321 SIKKIM Power
Remodeling & Conversion of existing Overhead LT Line into Underground Cable System of all Electrical Network In and around Rabong, South Sikkim
Schemes of NEC Schemes of NEC 2009-01-23 4.9549 2012-01-23 4.46 0 4.46 4.46 Completed
3322 SIKKIM Power
Remodelling and augmentation of HT & LY Power Supply & Distriction System at Pakyong Bazaaar, East Sikkim
Schemes of NEC Schemes of NEC 2007-11-23 2.28 2010-11-23 2.05 0 2.05 2.05 Completed
3323 SIKKIM Power
Renovation, Improvement and Strengthening of 66 KV switch yard and Construction of 1x7.5 MVA, 66/11 KV Substation at Lower Lagyap Hydel Project, Ranipool, Sikkim.
Schemes of NEC Schemes of NEC 2009-10-27 4.66 2012-01-27 4.19 0 4.19 4.19 Completed
3324 SIKKIM Power
Strengthening, modernization and improvement of transmission and distribution system of Raj Bhawan, Mintokgang, High court, VIP area and surrounding areas in Gangtok, East Sikkim
Schemes of NEC Schemes of NEC 2018-02-26 8.6658 2021-02-26 7.7992 0 7.7992 7.8 Completed
3325 SIKKIM Power
System Improvement & modernization i/c Augmentation of Distribution system of Uttarey Bazaar, Dentam Bazaar in West Sikkim
Schemes of NEC Schemes of NEC 2016-02-29 14.05 2019-02-28 12.645 0 12.645 12.65 Completed
3326 SIKKIM Power
Upgradation & Remodelling of Existing Distribution System of MG Road and its surrounding areas, Gangtok, Sikkim
Schemes of NEC Schemes of NEC 2007-12-05 4.51 2010-12-05 4.06 0 4.06 4.06 Completed
3327 SIKKIM Power
Upgradation and Strengthening of HT & LT Lines and Substations at Helipad Area, Bakthang and adjoining places in East Sikkim
Schemes of NEC Schemes of NEC 2011-12-26 4.6343 2014-12-26 4.17 0 4.17 4.17 Completed
3328 SIKKIM Power
Upgradation of Distribution System including installation of new S/s at strategic locations and strenthening of the ring main, Gangtok. Sikkim.
Schemes of NEC Schemes of NEC 2009-12-09 4.9153 2012-12-09 4.42 0 4.42 4.42 Completed
3329 SIKKIM Power
Upgradation, Strengthening of HT/LT Distribution System including Installation of new substations at strategic locations of Deorali (Pani House Area) and Upper Syari, Gangtok, Sikkim
Schemes of NEC Schemes of NEC 2011-03-22 4.95 2014-03-22 4.46 0 4.46 4.46 Completed
3330 SIKKIM Science and Technology
Computerisation of Food & Civil Supplies and Consumers Affairs Department
Schemes of NEC Schemes of NEC 2015-08-14 3.39 2018-08-14 3.3 0 3.3 3.3 Completed
3331 SIKKIM Science and Technology
Computerisation of the Examination Data Processing System at the State Public Service Commission(Sikkim)
Schemes of NEC Schemes of NEC 2011-03-29 0.4444 2014-03-29 0.4444 0 0.4444 0.44 Completed
3332 SIKKIM Science and Technology
I.T. System for Water Supply Management (Sikkim)
Schemes of NEC Schemes of NEC 2012-03-22 3.95 2015-03-22 3.555 0 3.555 3.56 Completed
3333 SIKKIM Science and Technology
Installation of CCTV Cameras in the Police Stations of Sikkim. Home Dept. Govt. of Sikkim
Schemes of NEC Schemes of NEC 2021-03-31 4.717 2024-03-31 4.717 0 4.717 6.6 Completed
3334 SIKKIM Science and Technology
IT Education Programme at 12 schools in Sikkim for 2009-10
Schemes of NEC Schemes of NEC 2009-12-17 0.552 2012-12-17 0.552 0 0.552 0.55 Completed
3335 SIKKIM Science and Technology
Planning Resource Center-Open Data Center DPER & NECAD, Sikkim. Development Planning Economic Reforms & North Eastern Council Affairs (DPER & NECAD), Govt. of Sikkim
Schemes of NEC Schemes of NEC 2016-04-29 3.4721 2019-04-29 3.1249 0 3.1249 3.12 Completed
3336 SIKKIM Science and Technology
Sikkim E-Education Infosys for Sikkim, Department of Education, Government of Sikkim, Gangtok
Schemes of NEC Schemes of NEC 2009-01-29 4 2012-01-29 4 0 4 4 Completed
3337 SIKKIM Science and Technology
Sustainable Socio-Economic Development of farmers of Gurung Community through Dairying in Gyalshing District, Sikkim Office of the District Collector, District Administration Centre, Gyalshing Govt. of Sikkim
Schemes of NEC Schemes of NEC Other 2023-03-16 2.73 2026-03-31 2.73 0 2.73 2.73 Ongoing
3338 SIKKIM Science and Technology
Sustainable Socio-Economic Development of farmers of Gurung Community through Dairying in Soreng District, Sikkim Office of the District Collector, District Administration Centre, Soreng Govt. of Sikkim
Schemes of NEC Schemes of NEC 2023-03-31 2.27 2026-03-31 2.24 0.027 2.267 2.243 Ongoing
3339 SIKKIM Transport and Communication
(a) Construction of 25M span steel bridge over Upper Benkhola at Ben Tarku Rabongla (GLVC) road(b) Construction of 50M span steel bridge on approach toad to Khedum Village
Schemes of NEC Schemes of NEC 2005-03-30 2.82 2007-03-30 2.53 0 2.53 2.53 Completed
3340 SIKKIM Transport and Communication
(a) Construction of steel bridge on Namchi-Vok road(b) Construction of steel bridge on Pabong-Yangyang road
Schemes of NEC Schemes of NEC 2005-07-25 2.9484 2008-07-25 2.65 0 2.65 2.65 Completed
3341 SIKKIM Transport and Communication
Construction /Improvement of Sumin khor road
Schemes of NEC Schemes of NEC 2007-05-01 3.5866 2010-05-01 3.23 0 3.23 3.23 Completed
3342 SIKKIM Transport and Communication
Construction of 26 Nos. of Rural foot bridges in Sikkim
Schemes of NEC Schemes of NEC 2016-09-23 14.0495 2019-09-24 12.64 0 12.64 12.64 Completed
3343 SIKKIM Transport and Communication
Construction of bridge over river Ring Yang on Sombaria-Soreng road
Schemes of NEC Schemes of NEC 2004-07-06 3.3202 2007-07-06 3.11 0 3.11 3.11 Completed
3344 SIKKIM Transport and Communication
Construction of Makha Bridge over river Teesta Khola at Tanak on Macha-Lingi-Yangyang-Rabongla road
Schemes of NEC Schemes of NEC 2005-10-24 4.9525 2008-10-24 4.46 0 4.46 4.46 Completed
3345 SIKKIM Transport and Communication
Construction of retaining structure on approach road to Raj Bhavan VIP road at Gangtok
Schemes of NEC Schemes of NEC 2005-07-25 1.1058 2008-07-25 1 0 1 1 Completed
3346 SIKKIM Transport and Communication
Construction of road from 10th mile Legship-Kawzing road to Tingmoo Village
Schemes of NEC Schemes of NEC 2005-03-30 4.6829 2008-03-30 4.21 0 4.21 4.21 Completed
3347 SIKKIM Transport and Communication
Construction of Steel Bridge over river Rongni-Chu on Sangkhola-Sumin road
Schemes of NEC Schemes of NEC 2004-07-06 2.854 2007-07-06 2.67 0 2.67 2.67 Completed
3348 SIKKIM Transport and Communication
Construction of Steel Bridge over river Takcham Chu
Schemes of NEC Schemes of NEC 2004-07-06 4.7674 2007-07-06 4.26 0 4.26 4.26 Completed
3349 SIKKIM Transport and Communication
Improvement of Assam Pakyong road
Schemes of NEC Schemes of NEC 2006-03-20 7.5076 2009-03-20 6.77 0 6.77 6.77 Completed
3350 SIKKIM Transport and Communication
Improvement of Bermik Legship road
Schemes of NEC Schemes of NEC 2005-07-25 4.4946 2008-07-25 4.05 0 4.05 4.05 Completed
3351 SIKKIM Transport and Communication
Improvement of Chakung-Khaniserbong Road in West Sikkim
Schemes of NEC Schemes of NEC 2005-12-15 6.5241 2008-12-15 5.87 0 5.87 5.87 Completed
3352 SIKKIM Transport and Communication
Improvement of Kimbubotey Sokpey road
Schemes of NEC Schemes of NEC 2006-03-20 11.8089 2009-03-20 10.63 0 10.63 10.63 Completed
3353 SIKKIM Transport and Communication
Improvement of Ralang Phamtam road
Schemes of NEC Schemes of NEC 2006-03-20 11.83 2009-03-20 10.65 0 10.65 10.65 Completed
3354 SIKKIM Transport and Communication
Improvement of Sangkhola-Zingla road
Schemes of NEC Schemes of NEC 2010-02-19 25.26 2013-02-19 22.73 0 22.73 22.73 Completed
3355 SIKKIM Transport and Communication
Improvement of Sombaria Hilley road
Schemes of NEC Schemes of NEC 2006-03-20 8.4568 2009-03-20 7.61 0 7.61 7.61 Completed
3356 SIKKIM Transport and Communication
Purchase of Machinery
Schemes of NEC Schemes of NEC 2004-08-25 3.76 2007-08-25 3.76 0 3.76 3.76 Completed
3357 SIKKIM Transport and Communication
Replacement of suspension bridge with 102M span steel bridge over Rabi Khola river at 9th KM on Melling-Phong road
Schemes of NEC Schemes of NEC 2006-12-15 4.973 2009-12-15 4.48 0 4.48 4.48 Completed
3358 SIKKIM Transport and Communication
Reshi-Legship to Bermick
Schemes of NEC Schemes of NEC 2012-11-08 39.96 2014-11-08 35.96 0 35.96 35.96 Completed
3359 SIKKIM Transport and Communication
Sangkhola-Sumin Road
Schemes of NEC Schemes of NEC 2010-02-19 10.95 2013-02-19 9.86 0 9.86 9.86 Completed
3360 SIKKIM Transport and Communication
Sankalang-Bey-Sakyang road
Schemes of NEC Schemes of NEC 2004-07-05 4.0138 2008-07-05 3.71 0 3.71 3.71 Completed
3361 SIKKIM Transport and Communication
Upgradation including extension of Marchak Tumlabong road
Schemes of NEC Schemes of NEC 2006-03-20 10.23 2009-03-20 9.21 0 9.21 9.21 Completed
3362 SIKKIM Tourism and Culture
Construction of high altitude trekking route from Thamken to Shizam under Lachung Dzumsa in North Sikkim
Schemes of NEC Other 2023-03-27 4.7 2026-03-27 4.7 0 4.7 3.85 Ongoing
3363 SIKKIM Tourism and Culture
Creation and Establishment of Banbas Project Barsy Rhododendron Sanctuary at Hee Bermiok
Schemes of NEC Schemes of NEC 2009-12-23 2.8 2012-12-23 2.52 0 2.52 2.52 Completed
3364 SIKKIM Tourism and Culture
Development of Eco-friendly Tourist Complex at Tangu near Chopta Valley, Lachen, North Sikkim (Name revised)
Schemes of NEC Schemes of NEC 2017-09-21 9.1 2020-09-21 8.19 0 8.19 8.19 Completed
3365 SIKKIM Tourism and Culture
Development of Eco-Tourism and Allied Activities at Chauridara Green Village in South Sikkim
Schemes of NEC Schemes of NEC 2013-03-18 3.6341 2016-03-18 3.27 0 3.27 3.27 Completed
3366 SIKKIM Tourism and Culture
Development of Eco-Tourism at Golitar, Fambonglho Wildlife Sanctuary, Sikkim .
Schemes of NEC Schemes of NEC 2011-03-24 3.9463 2014-03-24 3.9463 0 3.9463 3.95 Completed
3367 SIKKIM Tourism and Culture
Development of Tourism Infrastructure at Chebuk and Kalapathar in North Sikkim
Schemes of NEC Schemes of NEC 2023-03-31 4.6762 2026-03-31 4.5762 0 4.5762 2.39 Ongoing
3368 SIKKIM Tourism and Culture
Eco-Tourism Development in Barsey Rhododendron Sanctuary, West Sikkim
Schemes of NEC Schemes of NEC 2006-12-08 0.36 2009-12-08 0.32 0 0.32 0.32 Completed
3369 SIKKIM Tourism and Culture
Extension of Sikkim Guest House at Panjabari, Guwahati, Assam
Schemes of NEC Schemes of NEC 2021-02-12 4.1145 2024-02-12 4.11 0 4.11 7.35 Completed
3370 SIKKIM Tourism and Culture
Khey Bumsa Tekung Tek Rural Mart and Bamboo Recreation Park at Labi and Gaikhana Villages of Kabi Lungchok Constituency, North Sikkim
Schemes of NEC Schemes of NEC Social Forestry Circle, F 2021-02-19 3.6092 2025-02-19 3.6092 0 3.6092 3.6092 Completed
3371 SIKKIM Tourism and Culture
Khey Bumsa ? Tekung Tek Rural Mart and Bamboo Recreation Park at Labi and Gaikhana Villages of Kabi Lungchok Constituency Phase II, North Sikkim
Schemes of NEC Schemes of NEC Social Forestry Circle, F 2023-02-09 1.3113 2026-02-09 1.3113 0 1.3113 1.3113 Completed
3372 SIKKIM Tourism and Culture
Remodelling and upgradation of Burtuk Heliport (Gangtok) in East Sikkim
Schemes of NEC Schemes of NEC 2022-03-31 10.83 2025-03-31 10.83 0 10.83 5.83 Completed
3373 SIKKIM Tourism and Culture
Tourism Infrastructure as support facility for Passenger Ropeway Project at Upper Dhaper, Yangang in South Sikkim
Schemes of NEC Schemes of NEC 2022-03-31 13.59 2025-03-31 13.59 0 13.59 5.44 Completed
3374 SIKKIM Tourism and Culture
Upgradation and Beautification of Lachen Bazaar in North Sikkim
Schemes of NEC Schemes of NEC 2017-01-11 3.889 2020-01-11 3.5001 0 3.5001 3.5 Completed
3375 SIKKIM Tourism and Culture
Conversion of Singshore bridge as a Glass Skywalk Bridge
PM-DevINE PM-DevINE Public works Department 2024-02-16 52 2026-03-11 39 0 39 20.79 Ongoing
3376 SIKKIM Tourism and Culture
Gap funding for Eco-friendly Passenger Ropeway (Cable Car) from Dhapper to Bhaleydunga in South Sikkim - at the cost of Rs. 57.82 Crore (28 percent) of total cost of Rs. 209.57 Crore
PM-DevINE PM-DevINE Dept of Planning 2023-01-30 57.82 2023-03-31 57.711 0 57.711 57.711 Completed
3377 SIKKIM Tourism and Culture
Gap funding for Passenger Ropeway System from Pelling to Sanga-Choeling in West Sikkim - at the cost of Rs. 63.39 Crore (58 percent) of total cost of Rs.108.39 Crore
PM-DevINE PM-DevINE Dept of Planning 2023-01-30 63.39 2023-12-31 63.39 0 63.39 63.3899 Completed
3378 SIKKIM Tourism and Culture
Skywalk Project at Bhaleydhunga, Yangang in South Sikkim
PM-DevINE PM-DevINE Dept of Planning 2024-02-16 220 2026-03-11 110 0 110 93.44 Ongoing
3379 SIKKIM Transport and Communication
Construction of two lane balanced cantilever bridge over river Kanaka at Kayum Dzongu in North Sikkim
NESIDS-ROADS NESIDS Public works Department 2018-09-12 97.89 2020-03-31 83.416 0 83.416 64.42 Ongoing
3380 SIKKIM Roads and Bridges
Development of Eco-Tourism Zone at Zandidara under Barsey Rhodoendron Sanctuary in West Sikkim
NESIDS-OTRI NESIDS 2022-04-20 20 2024-04-30 14.4925 0 14.4925 4.9975 Ongoing
3381 SIKKIM Roads and Bridges
Underground Parking Space at Namchi
NESIDS-ROADS NESIDS Public works Department 2018-09-12 14.77 2020-03-31 14.77 0 14.77 14.77 Completed
3382 SIKKIM Transport and Communication
Widening and Improvement of road from Namchi to Birdhang via Kitchdumra are connecting the West District to South District in Sikkim
NESIDS-ROADS NESIDS Public works Department 2022-04-19 64.64 2024-04-30 64.645 0 64.645 41.92 Completed
3383 SIKKIM Transport and Communication
Construction of 120M length Composite Steel Girder Bridge over Rangeet Khola along Zarong Biring Road: under Rabong Sub-Division 120 mtr
NESIDS-ROADS NERSDS Public works Department 2021-03-24 19.82 2024-04-24 19.92 0 19.92 7.5 Completed
3384 SIKKIM Transport and Communication
Construction of 50Mtr Steel Bridge along with 875M approach road over River Kalej Khola at Rangsang Dowan in West Sikkim
NESIDS-ROADS NERSDS Public works Department 2020-01-17 8.03 2024-01-17 8.03 0 8.03 7 Completed
3385 SIKKIM Transport and Communication
Construction of 55 M steel bridge over River Kateng Kali Khola, Namthang, South Sikkim (Length 55 M)
NESIDS-ROADS NERSDS Public works Department 2019-08-09 9.54 2022-09-30 9.54 0 9.54 9.46 Completed
3386 SIKKIM Transport and Communication
Upgradation, carpeting and construction of new road from Tharpu to Saili Golai for diversion of Boject slide in West Sikkim
NESIDS-ROADS NERSDS Public works Department 2019-08-09 51.56 2022-08-09 51.15 0 51.15 50.14 Completed
3387 SIKKIM Water Supply
Augmentation of Gyalshing water supply scheme in west sikkim under NESIDS
NESIDS-OTRI NESIDS 2021-03-18 36.45 2023-03-18 36.45 0 36.45 34.5935 Ongoing
3388 SIKKIM Water Supply
Augmentation of water supply at Soreng, West Sikkim
NESIDS-OTRI NESIDS 2022-04-20 4.6 2024-04-30 4.6034 0 4.6034 2.7234 Completed
3389 SIKKIM Education
Assistance to affiliated colleges (4 No)
NESIDS-OTRI NLCPR 2000-09-15 5 2005-03-31 4.5 0 4.5 5 Completed
3390 SIKKIM Education
Centre for Computer and Communication Technology Polytechnic, Gangtok.
NESIDS-OTRI NLCPR 2000-03-22 2.5 2004-03-31 2.25 0 2.25 2.5 Completed
3391 SIKKIM Education
Construction of 198 School buildings
NESIDS-OTRI NLCPR 2000-09-15 23.42 2003-03-31 21.078 0 21.078 23.42 Completed
3392 SIKKIM Education
Construction of Model School in Sikkim
NESIDS-OTRI NLCPR Dept. of Power 2013-06-20 10.0936 2015-06-30 9.0842 0 9.0842 9.0842 Completed
3393 SIKKIM Education
Construction of Multi Purpose Hall cum Classroom for 5 Senior Secondary Schools at various places in Sikkim under NLCPR.
NESIDS-OTRI NLCPR 2008-09-30 9.7115 2010-03-31 8.6066 0 8.6066 8.6066 Completed
3394 SIKKIM Education
Construction of Multipurpose Halls cum Classroom in Six Senior Secondary Schools.
NESIDS-OTRI NLCPR 2012-01-02 18 2013-05-31 13.0645 0 13.0645 13.0645 Completed
3395 SIKKIM Education
Construction of School Buildings and Rain Water Harvesting for various Schools
NESIDS-OTRI NLCPR 2006-12-08 11.474 2008-12-07 10.0434 0 10.0434 10.0433 Completed
3396 SIKKIM Education
Multi-purpose Auditorium at Tashi Namgyal Academy, Gangtok, East Sikkim
NESIDS-OTRI NLCPR Dept. of Power 2017-05-25 6.5 2019-11-30 5.524 0 5.524 5.524 Completed
3397 SIKKIM Education
Sarva Shiksha Abhiyan
NESIDS-OTRI NLCPR 2006-03-28 2.0005 2006-12-29 2.0005 0 2.0005 2.0005 Completed
3398 SIKKIM Irrigation and Flood Control
Anti Erosion Works (15 No.)
NESIDS-OTRI NLCPR 2000-01-14 5.32 2003-09-30 4.788 0 4.788 5.32 Completed
3399 SIKKIM Irrigation and Flood Control
Anti Erosion Works (32 No.)
NESIDS-OTRI NLCPR 2000-03-28 10.02 2001-12-30 9.02 0 9.02 10.02 Completed
3400 SIKKIM Irrigation and Flood Control
Anti Erosion Works (38 No.)
NESIDS-OTRI NLCPR 2001-09-12 15 2004-03-31 13.5 0 13.5 15 Completed
3401 SIKKIM Irrigation and Flood Control
Anti Erosion Works (6 No.)
NESIDS-OTRI NLCPR 2001-09-12 5.4866 2003-03-31 4.941 0 4.941 5.49 Completed
3402 SIKKIM Health
Construction of Annexe Block for 1000 Bedded Super Speciality STNM Hospital at Sochyagang, East Sikkim
NESIDS-OTRI NLCPR 2013-12-27 27.1267 2017-06-30 24.414 0 24.414 24.414 Completed
3403 SIKKIM Miscellaneous
Beautification and upgradation of Ranipool Bazaar in Sikkim
NESIDS-OTRI NLCPR 2013-12-20 7.635 2015-12-31 6.3592 0 6.3592 6.3592 Completed
3404 SIKKIM Miscellaneous
Dacheling Cremation Ground
NESIDS-OTRI NLCPR 2003-03-21 1.09 2005-12-31 0.9745 0 0.9745 1.0615 Completed
3405 SIKKIM Miscellaneous
Development and Upgradation of Rangpo Bazar
NESIDS-OTRI NLCPR 2012-06-28 6.4566 2013-06-30 5.3525 0 5.3525 5.3525 Completed
3406 SIKKIM Miscellaneous
Development of Crematorium Complex at Jalipool in East Sikkim
NESIDS-OTRI NLCPR 2016-12-16 6.5 2018-12-16 5.805 0 5.805 5.805 Completed
3407 SIKKIM Miscellaneous
Development of village tourism at (a) chirbirey, (b) Zoom and (c) Majhigaon river Bank in Sikkim
NESIDS-OTRI NLCPR Dept of Planning 2007-07-04 19.6831 2009-07-31 16.0092 0 16.0092 16.0092 Completed
3408 SIKKIM Miscellaneous
Infrastructure Development and Beautification of Gyalshing Bazaar, Sikkim
NESIDS-OTRI NLCPR 2013-09-17 6.258 2016-08-31 5.6323 0 5.6323 5.6323 Completed
3409 SIKKIM Miscellaneous
Namchi to Samdruptse Ropeway, South Sikkim
NESIDS-OTRI NLCPR 2007-10-12 16.0425 2009-08-31 14.4382 0 14.4382 14.4382 Completed
3410 SIKKIM Miscellaneous
Regional facility for Solid Waste Treatment and Disposal Project at Shipsu to cater to South & West Sikkim (under SAP)
NESIDS-OTRI NLCPR 2017-12-06 11.144 2019-12-31 10.0295 0 10.0295 10.0067 Ongoing
3411 SIKKIM Miscellaneous
Ropeway from Deorali to tashiling
NESIDS-OTRI NLCPR 2000-03-09 10.6 2004-06-30 9.54 0 9.54 10.6 Completed
3412 SIKKIM Miscellaneous
Solid Waste Treatment Project for Mangan in Sikkim (under SAP)
NESIDS-OTRI NLCPR 2017-12-05 10 2019-12-31 3.6 0 3.6 2.3991 Ongoing
3413 SIKKIM Power
132 kv S/c transmission line from rangit to Melli with 132/66 kv sub-station at Melli.
NESIDS-OTRI NLCPR 2002-01-16 28.17 2004-08-31 25.353 0 25.353 28.17 Completed
3414 SIKKIM Power
Augmentation of 66/11 KV, 2.5 MVA phodong Sub-Station to 5 MVA and replacement of all electrical equipments, North Sikkim under NLCPR
NESIDS-OTRI NLCPR 2011-07-06 8.6095 2012-06-30 7.6084 0 7.6084 7.6084 Completed
3415 SIKKIM Power
Centralized Load Dispatch Centre at Melli
NESIDS-OTRI NLCPR 2002-09-23 9.7416 2005-03-31 9.0674 0 9.0674 9.2164 Completed
3416 SIKKIM Power
Complete Electrification of Lord Buddha Statue including garden along with conversion of existing overhead L.T. distribution lines into underground cable system with modernization and refurbishment of existing electrical network at Rabong bazaar in South
NESIDS-OTRI NLCPR 2010-03-09 4.0052 2011-09-30 3.534 0 3.534 3.534 Completed
3417 SIKKIM Power
Construction of 11kV Heavy Duty Transmission Line from Mangan to Upper Dzongu and Lower Dzongu and Installation of 11/11 kV Control Room at Phidang, Lower Dzongu and Lingze, Upper Dzongu, North Sikkim
NESIDS-OTRI NLCPR 2014-02-28 17.7141 2016-02-28 15.9427 0 15.9427 12.7541 Completed
3418 SIKKIM Power
Construction of 132 KV Transmission line from LLHP to Nathula
NESIDS-OTRI NLCPR 2006-06-29 31.0087 2008-05-30 26.9806 0 26.9806 26.9806 Completed
3419 SIKKIM Power
Construction of 66 KV line from Lachung to Maltin including construction of 66/11 KV 5 MVA Switchyard at Lachung and additional bay at Maltin in Sikkim
NESIDS-OTRI NLCPR 2011-03-22 10.791 2012-09-30 9.5253 0 9.5253 9.5253 Completed
3420 SIKKIM Power
Construction of 66 kV S/C transmission line from Myong to Chungthang and transformer bay at Chungthang and feeder bay at Mayong
NESIDS-OTRI NLCPR 2004-03-22 8.7676 2005-12-31 7.8579 0 7.8579 7.8579 Completed
3421 SIKKIM Power
Construction of 66/11 KV 2x5 MVA Sub - station at Perbing Ranka East Sikkim including drawing of 11 KV HT Transmission lines for power evacuation and other allied electrical works in and around Gangtok in East Sikkim
NESIDS-OTRI NLCPR Dept. of Power 2010-04-20 15.891 2011-09-30 14.0929 0 14.0929 14.0929 Completed
3422 SIKKIM Power
Conversion of existing 440 V L.T. distribution overhead lines including service connections into underground cable system at Gyalshing Bazar and its surrounding areas in Sikkim
NESIDS-OTRI NLCPR 2011-09-07 4.4532 2012-07-31 3.9293 0 3.9293 3.9293 Completed
3423 SIKKIM Power
Cost. of 66/11 kv ,2 x 2.55 MVA Sub-Station with LILO arrangement at old Namchi Bazar including Up-gradation of existing 2X 2.5 MVA Sub-Station to 2X 7.5 MVA Sub-Station at Namchi , South Sikkim
NESIDS-OTRI NLCPR 2010-12-23 13.4793 2012-06-30 11.726 0 11.726 11.726 Completed
3424 SIKKIM Power
Design, Supply, erection, testing & commissioning of 11/66 KV switchyard at Rbochu HEP with 25 MVA, 11/66 KV transformer and construction of 66 KV transmission line from Rabochu to mAltin with additional bay in Maltin in Noth Sikkim
NESIDS-OTRI NLCPR 2011-07-08 10.8763 2012-12-31 9.6106 0 9.6106 9.6106 Completed
3425 SIKKIM Power
Drawing of 66 KV Transmission line including construction of 2x7.5 MVA, sub-station at Marchak, East Sikkim
NESIDS-OTRI NLCPR 2010-04-20 10.0077 2011-09-30 8.8303 0 8.8303 8.8303 Completed
3426 SIKKIM Power
Drawing of new 66 kv double circuit transmission line from LLHP to Tadong 66/11 KV Sub-Station, Sikkim
NESIDS-OTRI NLCPR 2009-09-02 8.3443 2011-08-31 7.3626 0 7.3626 7.3626 Completed
3427 SIKKIM Power
Establishment of 11/11 kV switching substation, upgradation of 11 kV transmission system under Pakyong Division in East Sikkim
NESIDS-OTRI NLCPR 2013-04-29 26.331 2014-10-30 23.6979 0 23.6979 23.6979 Completed
3428 SIKKIM Power
Extension of 132 Kv system in South and West Districts of Sikkim covering Gyalshing, Pelling and Rabongla
NESIDS-OTRI NLCPR 2004-07-30 23.03 2006-03-31 20.7283 0 20.7283 21.5355 Completed
3429 SIKKIM Power
Installation of 1x15 MVA transformer & extension bay at 66/11KV S/S Mamring South Sikkim
NESIDS-OTRI NLCPR 2010-03-09 6.0584 2011-09-30 5.3636 0 5.3636 5.3636 Completed
3430 SIKKIM Power
Major overhauling of 2x6 MW hydel generating station at lower lagyap hydel project.
NESIDS-OTRI NLCPR 2000-01-07 19.51 2002-03-31 17.559 0 17.559 19.51 Completed
3431 SIKKIM Power
Modenisation and Beautification of Distribution System with conversion of overhead transmission lines with underground cable system at Jorethang, South Sikkim
NESIDS-OTRI NLCPR 2013-09-17 7.4116 2016-08-31 6.4704 0 6.4704 6.4704 Completed
3432 SIKKIM Power
Modernization and Beautification of Ravangla and Sosing Bazaars alongwith addition of 66/11, 1X5 MVA sub-station at Ravangla under South Sikkim
NESIDS-OTRI NLCPR 2017-09-06 18.4 2019-03-31 16.56 0 16.56 16.56 Completed
3433 SIKKIM Power
Modernization of electrical network in and around Melli Bazaar, South Sikkim
NESIDS-OTRI NLCPR 2011-11-04 8.8596 2013-10-31 7.8352 0 7.8352 7.8352 Completed
3434 SIKKIM Power
Remodeling of Electrical Installation including System Improvement Works at Rhenock Bazar and adjoining areas in East Sikkim
NESIDS-OTRI NLCPR 2014-06-27 15.95 2016-01-31 10.1944 0 10.1944 10.1944 Completed
3435 SIKKIM Power
Remodeling of Power Distribution System at Rangpo Town, East Sikkim
NESIDS-OTRI NLCPR 2014-02-20 14.7059 2017-02-28 10.4278 0 10.4278 10.4278 Completed
3436 SIKKIM Power
Remodelling of transmission and distribution network of Gangtok Town
NESIDS-OTRI NLCPR 2004-05-18 22.444 2006-02-28 20.1996 0 20.1996 21.0996 Completed
3437 SIKKIM Power
Sub-Transmission and Distribution works at three locations (i) Power Supply to VIP Complex at Gangtok, (ii) Augmentation of Substation capacity at Tadong by 1x5 MVA, 66/11 KV transformer for referal hospital, (iii) construction of 66 KV D/C line from low
NESIDS-OTRI NLCPR 2001-09-11 17.1156 2004-09-30 15.791 0 15.791 16.641 Completed
3438 SIKKIM Power
Synchronization of Rimbi Stage I, Stage II and Kalez HEP to Common 11 kV grid and further to 66 kV State grid
NESIDS-OTRI NLCPR 2006-03-23 9.6232 2006-09-29 8.6608 0 8.6608 8.6608 Completed
3439 SIKKIM Power
Upgradation and Modernization of the power distribution network of Namchi and its surrounding areas with high voltage distribution system (HVDS), South Sikkim
NESIDS-OTRI NLCPR 2017-08-28 18.5599 2019-08-31 16.7039 0 16.7039 16.7039 Completed
3440 SIKKIM Roads and Bridges
Carpeting / Surface Improvement of Dentam - Uttarey Road (10 Km) in West Sikkim
NESIDS-OTRI NLCPR 2004-07-30 3.99 2005-12-31 3.4717 0 3.4717 3.3399 Completed
3441 SIKKIM Roads and Bridges
Carpeting / Surface Improvement of Soreng-Budang Road via Malbassey (10Km) in South Sikkim
NESIDS-OTRI NLCPR 2004-07-30 3.39 2008-05-31 3.0522 0 3.0522 3.1712 Completed
3442 SIKKIM Roads and Bridges
Carpeting / Surface Improvement, Protective works and Drainage on Namchi-Rabongla Road (26 Kms) in South Sikkim
NESIDS-OTRI NLCPR 2004-07-30 12.07 2005-12-31 10.4588 0 10.4588 10.8808 Completed
3443 SIKKIM Roads and Bridges
Construction / improvement of 18.3 km road Sribadam-Deythang-Mangalbarey in West Sikkim
NESIDS-OTRI NLCPR 2009-03-02 16.8026 2011-02-28 14.0935 0 14.0935 14.0935 Completed
3444 SIKKIM Roads and Bridges
Construction of 28 new roads (28 No.)
NESIDS-OTRI NLCPR 2000-03-09 4.56 2003-12-31 4.104 0 4.104 4.56 Completed
3445 SIKKIM Roads and Bridges
Construction of 40 M Span Steel Bridge over Lwang Khola along Namchi Phongla Road Km 8th, South Sikkim
NESIDS-OTRI NLCPR 2010-11-09 3.2656 2011-10-31 2.8757 0 2.8757 2.3512 Completed
3446 SIKKIM Roads and Bridges
Construction of 70 m Span Bridge over Dev Khola along GLVC road Km 8th, South Sikkim
NESIDS-OTRI NLCPR 2010-11-09 5.0634 2011-10-31 3.6456 0 3.6456 3.6456 Completed
3447 SIKKIM Roads and Bridges
Construction of 70 Mtrs Span Roruchu Steel Bridge along GRBA road in East Sikkim
NESIDS-OTRI NLCPR 2017-09-06 10.7514 2020-09-30 9.6763 0 9.6763 9.6763 Ongoing
3448 SIKKIM Roads and Bridges
Construction of Bridge over Rangit River at Kitchudumra, Namchi - Sikip in South Sikkim
NESIDS-OTRI NLCPR 2016-12-14 13.7495 2020-12-31 12.0779 0 12.0779 12.0779 Completed
3449 SIKKIM Roads and Bridges
Construction of Diversion of Ranipool-Pakyong Road in East Sikkim
NESIDS-OTRI NLCPR 2004-09-29 2.37 2006-09-29 2.0499 0 2.0499 2.1327 Completed
3450 SIKKIM Roads and Bridges
Construction of Goshkan Dara Bridge over Teesta at Singtam
NESIDS-OTRI NLCPR 2006-02-15 15.5971 2008-02-15 12.6871 0 12.6871 12.7096 Completed
3451 SIKKIM Roads and Bridges
Construction of Link Road from Middle Tumin to Dhanbari via Namrang in East Sikkim
NESIDS-OTRI NLCPR 2013-12-06 5.028 2015-11-30 4.5252 0 4.5252 4.5252 Completed
3452 SIKKIM Roads and Bridges
Construction of link road from Passingdong P.H.E. to Linghtem Gumpha (Monastery) and Lingthem School-8km, upper Dzongo, North Sikkim
NESIDS-OTRI NLCPR 2009-03-26 7.6555 2011-02-28 6.89 0 6.89 6.89 Completed
3453 SIKKIM Roads and Bridges
Construction of pre- stressed Bridge over River Rangit on Legship Tashiding road in West Sikkim
NESIDS-OTRI NLCPR 2008-09-30 21.868 2010-09-30 19.6775 0 19.6775 19.6775 Completed
3454 SIKKIM Roads and Bridges
Construction of road from Latuk Thek to Rolep 5 km including 1 No. of Bridge over Rangpo Khola at Km 1st, Ch:10 in Sikkim
NESIDS-OTRI NLCPR 2017-07-28 8.5598 2019-07-31 7.7038 0 7.7038 7.3076 Ongoing
3455 SIKKIM Roads and Bridges
Construction of Rural suspension Foot Bridges (35 No.)
NESIDS-OTRI NLCPR 2002-02-28 8.9 2005-03-31 8.01 0 8.01 8.839 Completed
3456 SIKKIM Roads and Bridges
Construction of Steel Bridge at Khundrukay Khola along Yangang-Makha Road, South Sikkim
NESIDS-OTRI NLCPR 2010-11-09 2.4106 2011-10-31 2.0638 0 2.0638 2.0638 Completed
3457 SIKKIM Roads and Bridges
Double laning of Sichey-Ranka Road (11 Km). East Sikkim
NESIDS-OTRI NLCPR 2010-11-09 25.6333 2012-06-30 22.608 0 22.608 22.608 Completed
3458 SIKKIM Roads and Bridges
Extension of road from Chakhung Khanesherbong SPWD road to Majuwa village via Chota Samdung-3kms length alongwith 2nos. of RCC bridges in West District
NESIDS-OTRI NLCPR 2008-12-18 2.7079 2010-06-15 2.3893 0 2.3893 2.3893 Completed
3459 SIKKIM Roads and Bridges
Improvement & widening of Tintek Dikchu Road - 12 km in East Sikkim
NESIDS-OTRI NLCPR 2009-03-02 16.153 2010-08-31 11.718 0 11.718 11.718 Completed
3460 SIKKIM Roads and Bridges
Namachi Assangthang Road under South Sikkim circle (5 km)
NESIDS-OTRI NLCPR 2008-03-28 6 2010-02-28 5.4 0 5.4 5.4 Completed
3461 SIKKIM Roads and Bridges
Pakyong- Machong - Rolep Road in East
NESIDS-OTRI NLCPR 2008-11-04 33.3858 2010-10-31 29.0169 0 29.0169 29.0169 Completed
3462 SIKKIM Roads and Bridges
Replacement of 2 nos. of existing suspension bridges on Pelling-Yuksom Road in Sikkim
NESIDS-OTRI NLCPR 2004-07-30 3.28 2006-03-31 2.8738 0 2.8738 2.9888 Completed
3463 SIKKIM Roads and Bridges
Slope stabilisation of Labing landslide (160 m) and Chongrang landslide (800 m) on Yuksom-Legship road in West Sikkim
NESIDS-OTRI NLCPR 2004-07-30 1.28 2008-04-30 1.1073 0 1.1073 1.1523 Completed
3464 SIKKIM Roads and Bridges
Strengthening of roads and bridges (8 No.)
NESIDS-OTRI NLCPR 2002-02-05 13.69 2007-03-31 12.321 0 12.321 13.69 Completed
3465 SIKKIM Roads and Bridges
Surface improvement/widening,carpeting and bridge replacement on Gyalshing-Soreng Road (up to Dentam): (a) Pelling - Dentam Road (20 km) and (b) Replacement of BB Lal Suspension Brdg over Kalez Khola
NESIDS-OTRI NLCPR 2004-03-22 12.51 2005-12-31 10.8255 0 10.8255 10.9905 Completed
3466 SIKKIM Roads and Bridges
Upgradation and Carpeting of Link Road from Kaluk Dentam Road, Km 4th (Bermiok) to Leghship Bermoik Road Km 10th (Shivalaya Mandir) in Sikkim
NESIDS-OTRI NLCPR 2013-02-22 5.7128 2015-01-31 5.1415 0 5.1415 5.1415 Completed
3467 SIKKIM Roads and Bridges
Upgradation of LLHP to Nandok road (4kms) in East Sikkim
NESIDS-OTRI NLCPR 2009-03-02 3.6277 2010-08-31 3.2273 0 3.2273 3.2273 Completed
3468 SIKKIM Roads and Bridges
Upgradation of Rabongla - Makha Road (26 Kms) in South Sikkim
NESIDS-OTRI NLCPR 2004-07-30 9.94 2008-05-31 8.7912 0 8.7912 9.1392 Completed
3469 SIKKIM Roads and Bridges
Upgradation of Ranka Burtuk-Gangtok Road (8 kms) in East Sikkim
NESIDS-OTRI NLCPR 2004-05-07 4.2 2005-09-30 3.672 0 3.672 3.872 Completed
3470 SIKKIM Roads and Bridges
Upgradation of Rongli to Rorathang Road in East Sikkim
NESIDS-OTRI NLCPR 2013-02-22 17.7503 2015-01-31 14.7733 0 14.7733 14.7733 Completed
3471 SIKKIM Roads and Bridges
Upgradation to Intermediate Standard of Gangtok- Rumtek Road in East Sikkim (24 Km upto Old Rumtek Monastery)-MDR
NESIDS-OTRI NLCPR 2014-12-29 62.1192 2017-12-31 55.9073 0 55.9073 55.9073 Completed
3472 SIKKIM Roads and Bridges
Upgradation, carpeting of Namchi Phong Mamring Road in Sikkim
NESIDS-OTRI NLCPR 2013-02-22 47.715 2016-01-31 42.9435 0 42.9435 42.9435 Completed
3473 SIKKIM Roads and Bridges
WBM Carpetting of 9 roads (9 No.)
NESIDS-OTRI NLCPR 2000-03-09 5.2 2001-03-31 4.68 0 4.68 5.2 Completed
3474 SIKKIM Sports
Paljor Stadium's Upgradation
NESIDS-OTRI NLCPR 2001-03-16 15.36 2003-03-31 15.36 0 15.36 15.36 Completed
3475 SIKKIM Sports
Upgradation of Football Stadium with other allied facilities at Mangan, North Sikkim (Phase-II)
NESIDS-OTRI NLCPR 2016-12-06 9 2019-11-30 8.1 0 8.1 3.186 Ongoing
3476 SIKKIM Tourism and Culture
Construction of Scholars residence at Namgyal Institute of Tibetology, Deorali, Gangtok
NESIDS-OTRI NLCPR 2012-11-21 2.3241 2014-10-31 1.783 0 1.783 1.783 Completed
3477 SIKKIM Tourism and Culture
Development of Tourist Infrastructure for Kailash Mansarovar Yatra in Sikkim
NESIDS-OTRI NLCPR 2017-08-17 42.23 2019-08-31 38.007 0 38.007 34.164462 Ongoing
3478 SIKKIM Tourism and Culture
Tourist Wayside Amenity, Toilets for all age and differently-abled along en-route Nathula in East Sikkim (at 7 locations)
NESIDS-OTRI NLCPR 2016-05-30 2.48 2018-05-31 2.232 0 2.232 2.232 Completed
3479 SIKKIM Water Supply
Augmentation of Gyalshing Water Supply Scheme
NESIDS-OTRI NLCPR 2004-03-22 7.5228 2005-12-31 6.635 0 6.635 7.0845 Completed
3480 SIKKIM Water Supply
Augmentation of Namchi Water Supply Scheme, South Sikkim
NESIDS-OTRI NLCPR 2012-12-28 38.2199 2016-11-30 34.3979 0 34.3979 34.3979 Completed
3481 SIKKIM Water Supply
Augmentation of Rongli Water Supply Scheme
NESIDS-OTRI NLCPR 2003-03-21 1.6871 2004-09-30 1.512 0 1.512 1.68 Completed
3482 SIKKIM Water Supply
Augmentation of rural water supply scheme at Central Pandem,Sikkim
NESIDS-OTRI NLCPR Dept. of Power 2009-06-03 20.4975 2012-05-30 6.33 0 6.33 3.7004 Foreclosed
3483 SIKKIM Water Supply
AuGmentation of Water Supply for greater Rangpo in East Sikkim
NESIDS-OTRI NLCPR 2006-12-13 19.9434 2008-12-12 16.1787 0 16.1787 16.1787 Completed
3484 SIKKIM Water Supply
Augmentation of Water Supply for Sang Naya Bazar in East Sikkim
NESIDS-OTRI NLCPR 2007-09-28 2.0074 2008-09-30 1.7712 0 1.7712 1.7712 Completed
3485 SIKKIM Water Supply
Augmentation Water Supply Scheme for Greater Gangtok Phase-II in Sikkim
NESIDS-OTRI NLCPR 2004-07-30 24.3439 2006-03-31 21.7406 0 21.7406 22.6406 Completed
3486 SIKKIM Water Supply
Augumentation of Water Supply of newly created Jorthang Nagar Panchyat in South Sikkim (Modified version of DPR of Providing Water Supply with Treatment Plant to New Reigonal Administrative Centre at Karfectar, South Sikkim)
NESIDS-OTRI NLCPR 2011-03-07 9.5265 2013-02-28 8.4056 0 8.4056 8.4056 Completed
3487 SIKKIM Water Supply
Construction of Rain Water Harvesting structure at Rabdentse in West Sikkim
NESIDS-OTRI NLCPR 2007-07-04 4.621 2008-07-03 3.3271 0 3.3271 3.3271 Completed
3488 SIKKIM Water Supply
Construction of water supply scheme in Pakyong , East Sikkim
NESIDS-OTRI NLCPR 2010-12-23 9.8342 2014-01-31 8.6773 0 8.6773 8.6773 Completed
3489 SIKKIM Water Supply
Extension of Gangtok Sewerage Project (Phase-I), Sikkim
NESIDS-OTRI NLCPR 2003-03-21 2.9649 2005-03-31 2.6684 0 2.6684 2.9649 Completed
3490 SIKKIM Water Supply
Extension of Gangtok Sewerage Project (Phase-II), Sikkim
NESIDS-OTRI NLCPR 2003-03-21 7 2005-03-31 6.2958 0 6.2958 7 Completed
3491 SIKKIM Water Supply
Multi-stage pumping for Drinking water from River Rangeet to Namchi
NESIDS-OTRI NLCPR 2003-03-21 12.48 2005-03-31 11.2278 0 11.2278 11.7378 Completed
3492 SIKKIM Water Supply
Providing water supply scheme to Central University located at Yangang from Burphong Khola Source in South Sikkim
NESIDS-OTRI NLCPR Dept of Planning 2016-03-23 40.4665 2018-04-30 36.4199 0 36.4199 36.4199 Completed
3493 SIKKIM Water Supply
Rhenock Water Supply Scheme in East Sikkim
NESIDS-OTRI NLCPR 2008-03-07 16.2731 2010-02-28 14.3586 0 14.3586 14.3586 Completed
3494 SIKKIM Water Supply
Rural Water Supply for Amba, Taza and parts of Linkey Tareythang GPU in East Sikkim
NESIDS-OTRI NLCPR 2013-01-16 9.1685 2014-11-30 8.2516 0 8.2516 8.2516 Completed
3495 SIKKIM Water Supply
Rural water supply schemes
NESIDS-OTRI NLCPR 2001-08-31 13.5 1970-01-01 12.15 0 12.15 13.5 Completed
3496 SIKKIM Water Supply
Water Distribution Network for Singtam Town in East Sikkim
NESIDS-OTRI NLCPR 2011-07-18 21.0495 2013-07-31 18.5732 0 18.5732 18.5732 Completed
3497 SIKKIM Water Supply
Water Supply Scheme for Meli Bazar South Sikkim
NESIDS-OTRI NLCPR 2011-07-08 8.7243 2013-06-30 7.7097 0 7.7097 7.7097 Completed
3498 SIKKIM Water Supply
Water Supply Scheme for newly developed township Pangthang/Bojoghari
NESIDS-OTRI NLCPR 2004-05-07 5.86 2006-12-30 5.0211 0 5.0211 5.2961 Completed
3499 SIKKIM Water Supply
Water Supply Scheme from Chakmakey and Ringyang under Soreng Sub-Division
NESIDS-OTRI NLCPR 2006-05-22 8.7515 2007-11-30 7.669 0 7.669 7.669 Completed
3500 SIKKIM Science and Technology
CCTV surveillance of main towns and tourist places in Sikkim
Schemes of NEC Schemes of NEC 2024-02-07 14.85 2026-02-07 7.44936 3.7247 11.17406 11.174016 Ongoing
3501 SIKKIM Agriculture and Allied
Upgradation of District Veterinary hospital to polyclinic at Pakyong, Soreng, Mangan and Galshing District
Schemes of NEC Animal Husbandry and Vete 2024-09-30 6.68 2027-09-30 3.3388 1.6694 5.0082 3.3388 Ongoing
3502 SIKKIM Transport and Communication
Widening and Upgradation of single lane road from Sangkhola to Zingla under Gangtok District (L-16.37)
NESIDS-ROADS Public works Department 2024-08-19 62.19 2027-02-28 61.187 0 61.187 0.75 Completed
3503 SIKKIM Health
Gap funding for Construction of Government Medical College at Sichey, East Sikkim for Annual intake of 100 Students
PM-DevINE Dept. of Health & familly 2024-11-25 167.9 2026-12-31 167.9 0 167.9 Ongoing
3504 SIKKIM Science and Technology
Afforestation of Denuded Hills in North and East District of Sikkim, Social Forestry Circle, Forest and Environment Dept. Govt. of Sikkim
Schemes of NEC Social Forestry Circle, F 2024-12-27 3 2027-12-27 1.499838 1.499838 0.749838 Ongoing
3505 SIKKIM Education
Construction of Academic Block at Government Degree College, Burtuk, Sikkim
Schemes of NEC Education Department, Gov 2025-02-11 9.7152 2028-02-11 2.42 2.42 4.84 2.42 Ongoing
3506 SIKKIM Health
Medical equipment, fixtures and furnishing for the upcoming 500 bedded district Hospital at Namchi
NESIDS-OTRI Health & family welfare D 2025-04-16 145.3 2026-10-30 145.31 0 145.31 Ongoing
3507 SIKKIM Industries
Bamboo Industrial Park and Innovation Product Cultural Craft Centre
Schemes of NEC Department of Culture, Go 2025-05-15 4.88 2028-05-15 1.2195 1.2023 2.4218 1.2195 Ongoing
3508 SIKKIM Transport and Communication
Geometric Improvement of curves and carpeting of road from Rimbi Khola to Yuksam in Gyalshing district ,Length-15.816 km
NESIDS-ROADS PWD 2026-01-08 24.52 2028-01-08 3 0 3 Ongoing
3509 SIKKIM Education
Implementation of Education Infrastructure related to IT Project in 160 Schools acroo School
NESIDS-OTRI Education Department Sikk 2026-03-19 24.9250817 2027-03-31 0 Ongoing
3510 SIKKIM Transport and Communication
Construction of 35 mtr span bridge along with approach road of 300 m and protective works along the road from NH-10 Mayfair Fatak to IBP Road via Adampool and Bhanjhakri falls in Gangtok District, Sikkim
NESIDS-ROADS PWD 2026-03-25 10.9 2028-03-27 2.73 2.73 Ongoing
3511 SIKKIM Transport and Communication
Construction of 62mtr span bridge over Rongrong river at Km 23, Ch.15 along Assam-Pakyong District
NESIDS-ROADS PWD Roads 2026-03-25 17.17 2028-03-27 4.29 4.29 Ongoing
3512 SIKKIM Transport and Communication
Construction of 60 mtr span steel bridge over Rangpo Khola along Satam Samruk Yangnang sub-division under Namchi district to Gangla road, Gangla bridge , Approach road length- 200 m
NESIDS-ROADS PWD Roads 2026-03-25 17.56 2028-03-31 4.39 4.39 Ongoing
3513 SIKKIM Education
Construction of Multi-purpose Hall at Government Degree College, Rhenock.
Schemes of NEC The Education Department, 2026-03-31 6.7652 2027-10-31 0 Ongoing
3514 SIKKIM Agriculture and Allied
Empowering Organic Growth- A Proposal for ICS Strengthening, Market Outreach, and Trade Facilitation in Sikkim.
Schemes of NEC Department Of Agriculture 2026-05-14 55.546 2029-05-14 0 Ongoing
3515 SIKKIM Sports
Construction of Jas Lal Pradhan State Boxing Academy
NESIDS-OTRI Sports and youth affairs 2026-06-03 20.5 2028-06-03 0 Ongoing
3516 TRIPURA Education
Construction of nine (9) 100 seated Hostel attached to the vidyajyoti schools under mission 100 in different district of Tripura
NESIDS-OTRI NESIDS Dept. of Education 2022-04-21 7.9 2024-04-30 5.925 0 5.925 0.1 Ongoing
3517 TRIPURA Education
Implementation of Educational Infrastructure related to IT Projects in 240 Schools across Tripura under NESIDS(OTRI)
NESIDS-OTRI NESIDS Secondary Education 2024-02-22 26.44 2026-02-22 6.609 6.609 13.218 Ongoing
3518 TRIPURA Education
Infrastructure Development of six Higher Secondary School in various locations in Tripura
NESIDS-OTRI NESIDS Dept. of Education 2022-04-21 50.5002 2024-04-30 32.149875 0 32.149875 32.149875 Ongoing
3519 TRIPURA Education
Project Construction of 51 Anganwadi Centre Building in Tripura
NESIDS-OTRI NESIDS Social Welfare & Social E 2020-03-30 4.34 2021-03-31 3.7858 0 3.7858 0.1 Ongoing
3520 TRIPURA Health
Establishment of a Newborn Resource Development Centre and Upgradation of NICU & PICU at the Department of Paediatrics, AGMC, Tripura
NESIDS-OTRI NESIDS Directorate of Health Ser 2022-04-21 7.2032 2022-10-20 0.1 0 0.1 0.1 Ongoing
3521 TRIPURA Health
Medical Infrastructures Strengthening for COVID-19 component by arrangement of Medical Gas (Oxygen O2), pipeline with manifold System, Logistics (Test Kits) and X-ray machine with CR system in Tripura
NESIDS-OTRI NESIDS Dept. of Health & familly 2021-08-27 19.32 2023-09-01 0.1 0 0.1 0.1 Ongoing
3522 TRIPURA Health
Procurement of 26 (Twenty Six) nos. of Advance Life Support and Patient Transportation ambulances under Directorate of Health Servicesin Tripura
NESIDS-OTRI NESIDS Directorate of Health Ser 2021-03-31 4.185 2022-03-31 4.1837 0 4.1837 4.1837 Completed
3523 TRIPURA Health
Procurement of Pulse Oximeter and Antigen Tests Kits etc for combating COVID 19 pandemic in Tripura
NESIDS-OTRI NESIDS Public Health & Engg Depa 2021-03-26 3.9 2023-04-26 0.1 0 0.1 0.1 Ongoing
3524 TRIPURA Agriculture and Allied
Augmentation of production potential of hybrid true potato seed at Horticulture Research Centre, Nagichera, Tripura.
Schemes of NEC Schemes of NEC 2017-02-28 1.81 2020-02-28 1.63 0 1.63 1.63 Completed
3525 TRIPURA Agriculture and Allied
Construction of Cold Storage at Satchand, Tripura (Location: South Tripura dist)
Schemes of NEC Schemes of NEC 2006-02-08 1.1085 2009-02-08 0.99 0 0.99 0.99 Completed
3526 TRIPURA Agriculture and Allied
Cultivation of Exotic Dragon Fruit (Hylocereus sp.).
Schemes of NEC Schemes of NEC 2022-03-31 6.819 2025-03-31 6.8176 0 6.8176 6.8214 Completed
3527 TRIPURA Agriculture and Allied
Demonstrative Project for Improvement of Crop and Soil in Tripura.
Schemes of NEC Schemes of NEC 2006-03-10 1.3 2009-03-10 1.17 0 1.17 1.17 Completed
3528 TRIPURA Agriculture and Allied
Development of Identified Backward Blocks under 30 PC Central Sector Scheme of NEC in Raishyabari R.D. Block, Gandachara, Dhalai District, Tripura
Schemes of NEC Schemes of NEC Other 2020-11-23 2.68 2023-11-23 2.68 0 2.68 1.8081824 Ongoing
3529 TRIPURA Agriculture and Allied
Development Programme of Backward Block Under 30 PC Central Sector Scheme of NEC in Dumburnagar R.D. Block, Gandachara, Dhalai District, Tripura
Schemes of NEC Schemes of NEC 2020-11-19 3.22 2023-11-19 3.22 0 3.22 2.1768236 Ongoing
3530 TRIPURA Agriculture and Allied
Distribution of crossbreed Pregnant Heifer to the farmers
Schemes of NEC Schemes of NEC 2013-11-08 3.6 2016-11-08 3.24 0 3.24 3 Ongoing
3531 TRIPURA Agriculture and Allied
Duck-cum Fish culture for Non-Tribal People of the State of Tripura
Schemes of NEC Schemes of NEC 2013-02-27 2.55 2016-02-27 2.3 0 2.3 2.3 Completed
3532 TRIPURA Agriculture and Allied
Establishment of Rural collection centre fruits and vegetables
Schemes of NEC Schemes of NEC 2015-05-13 2.7642 2018-05-13 2.4878 0 2.4878 2.49 Completed
3533 TRIPURA Agriculture and Allied
Establishment of Integrated Pack House at Dhalai District
Schemes of NEC Schemes of NEC Directorate Of Horticultu 2023-03-13 4.9009592 2026-03-13 4.9009 0 4.9009 4.9009 Completed
3534 TRIPURA Agriculture and Allied
Establishment of Modern Abattoir for Pig cum Port Processing Plant in Tripura State
Schemes of NEC Schemes of NEC 2021-01-27 4.84 2024-01-27 4.84 0 4.84 1.9023 Ongoing
3535 TRIPURA Agriculture and Allied
Infrastructure Development for creating modern Agri. Produce Market in two (2) locations of Tripura during 2022-23
Schemes of NEC Schemes of NEC Choose... 2023-03-30 12.41 2026-03-30 12.1 0 12.1 3.1 Ongoing
3536 TRIPURA Agriculture and Allied
Livelihood Enhancement through increase of fish productivity (a) Reclamation of pond/mini barrage for enhancement of fish productivity
Schemes of NEC Schemes of NEC 2022-03-31 9.45 2025-03-31 9.4525 0 9.4525 9.4506 Completed
3537 TRIPURA Agriculture and Allied
Livelihood generation and Value Addition Chain in Piggery Sector based on District Composite Livestock Farm, Nalicherra under Dhalai District, Tripura
Schemes of NEC Schemes of NEC Dept. of Power 2018-02-26 1.32 2021-02-26 1.19 0 1.19 1.19 Completed
3538 TRIPURA Agriculture and Allied
Modernization of State Poultry Farm with Automated Layer Unit at Gandhigram, West Tripura District, Tripura
Schemes of NEC Schemes of NEC 2021-03-26 3.66 2024-03-26 3.665 0 3.665 1.9131998 Ongoing
3539 TRIPURA Agriculture and Allied
Moderrnization and Strengthening of regional Exotic Pig Breeding Farm, Nalkata, Tripura.
Schemes of NEC Schemes of NEC Dept. of Power 2015-03-20 1.8655 2018-03-20 1.679 0 1.679 1.68 Foreclosed
3540 TRIPURA Agriculture and Allied
Project proposal Popularisation & Propagation of Freshwater Prawn Culture Practices in Tripura State.
Schemes of NEC Schemes of NEC 2006-09-11 0.4799 2009-09-11 0.43 0 0.43 0.43 Completed
3541 TRIPURA Agriculture and Allied
Promotion of Fresh water Prawn Culture.
Schemes of NEC Schemes of NEC 2004-07-12 0.45 2007-07-12 0.4 0 0.4 0.4 Completed
3542 TRIPURA Agriculture and Allied
Promotion of intensive fish culture technology with Pabda for sustainable production and livelihood security of rural farmers, Tripura
Schemes of NEC Schemes of NEC 2013-11-08 5.12 2016-11-08 4.6 0 4.6 4.6 Completed
3543 TRIPURA Agriculture and Allied
Proposal of identified block for providing key identified service at Dumburnagar Block, Dhalai district, Tripura
Schemes of NEC Schemes of NEC Choose... 2022-03-31 4.74 2025-03-31 4.7364468 0 4.7364468 0.8931966 Ongoing
3544 TRIPURA Agriculture and Allied
Proposal of identified block for providing key identified service at Ganganagar Block, Dhalai district, Tripura
Schemes of NEC Schemes of NEC 2022-03-31 4.77 2025-03-31 4.46 0 4.46 4.1927 Ongoing
3545 TRIPURA Agriculture and Allied
Proposal of identified block for providing key identified service at Karnamipara VC, Ganganagar Block, Dhalai, Tripura
Schemes of NEC Schemes of NEC Choose... 2022-03-31 1.925 2025-03-31 1.81 0 1.81 0.77 Ongoing
3546 TRIPURA Agriculture and Allied
Proposal of identified block for providing key identified service at Raishyabari Block, Dhalai district, Tripura
Schemes of NEC Schemes of NEC 2022-03-31 4.5325 2025-03-31 4.48 0 4.48 1.3608796 Ongoing
3547 TRIPURA Agriculture and Allied
Proposal of identified block for providing key identified service at Ultacherra village, Dumburnagar Block, Dhalai, Tripua
Schemes of NEC Schemes of NEC Choose... 2022-03-31 1.8888 2025-03-31 1.77 0 1.77 0.3915564 Ongoing
3548 TRIPURA Agriculture and Allied
Scheme for Goat Rearing Unit (Black Bengal Asian Hill)
Schemes of NEC Schemes of NEC Choose... 2022-03-28 2.9986 2025-03-28 2.2343 0.76516 2.99946 2.2384 Ongoing
3549 TRIPURA Agriculture and Allied
Sericulture Training institute in Tripura.
Schemes of NEC Schemes of NEC 2012-11-23 4.3406 2015-11-23 3.9065 0 3.9065 3.91 Completed
3550 TRIPURA Agriculture and Allied
Setting up of 1000 MT Capacity Multipurpose Cold Storage at Amarpur, Tripura(Location: Gomati dist)
Schemes of NEC Schemes of NEC 2011-09-22 2.522 2014-09-22 2.26 0 2.26 2.26 Completed
3551 TRIPURA Agriculture and Allied
Setting up of 6 (six) integrated Seed Processing Plant for distribution of Quality Seed materials to the Farmers
Schemes of NEC Schemes of NEC 2022-03-31 11.26 2025-03-31 10.75 0.4199 11.1699 10.75 Ongoing
3552 TRIPURA Agriculture and Allied
Setting up of 7 New Agri Development Research Centre with IT facilities in Karbook, Ompi, Killa, Kakraban, Satchand, jampuijala and Kadamtala, Tripura
Schemes of NEC Schemes of NEC Other 2018-02-26 12.11 2021-02-26 10.9 0 10.9 10.8997441 Completed
3553 TRIPURA Agriculture and Allied
Strength of Gram Sewak Training Centre, UGTC.
Schemes of NEC Schemes of NEC 2006-02-02 0.8591 2009-02-02 0.86 0 0.86 0.86 Completed
3554 TRIPURA Agriculture and Allied
Strengthening of Block Level Brooder Houses along with Establishement of one Hatchery unit for Augmentation ofmPoultry Production
Schemes of NEC Schemes of NEC 2023-03-31 2.6884 2025-03-31 1.178 1.5103874 2.6883874 0.138 Ongoing
3555 TRIPURA Agriculture and Allied
Strengthening of District Poultry Farm, Panisagar, North Tripura District.
Schemes of NEC Schemes of NEC Choose... 2022-03-31 2.21 2025-03-31 2.21 0 2.21 Ongoing
3556 TRIPURA Agriculture and Allied
Strengthening of Exotic Pig Breeding Farm, Birchandra Manu, Tripura
Schemes of NEC Schemes of NEC Dept. of Power 2016-03-09 3.886 2019-03-09 3.5 0 3.5 3.5 Completed
3557 TRIPURA Agriculture and Allied
Strengthening of Pig Breeding Farms at Howaibari, Teliamura, Khowai District and Jalefa, South Tripura district.
Schemes of NEC Schemes of NEC Choose... 2022-03-31 6.16 2025-03-31 6.16 0 6.16 3.5928549 Ongoing
3558 TRIPURA Agriculture and Allied
Strrengthening of upgraded Gram Sevak Training Centre at Lembucherra, West Tripura for Skill Development of the Farmers & Extension Agencies
Schemes of NEC Schemes of NEC 2018-02-26 2.05 2021-02-26 1.85 0 1.85 1.85 Completed
3559 TRIPURA Education
Aspirational District Dhalai, Tripura
Schemes of NEC Schemes of NEC Dept. of Power 2019-06-11 1 2022-06-11 1 0 1 1 Completed
3560 TRIPURA Education
Community Development Programme for Santhal Community in Tripura
Schemes of NEC Schemes of NEC 2021-03-30 1.25 2024-03-30 1.2516 0 1.2516 1.2524 Ongoing
3561 TRIPURA Education
Construction of 100 seated capacity of mens hostel at Regional College of Physical Education at Panisagar, North Tripura.
Schemes of NEC Schemes of NEC Dept. of Youth Resource & 2017-08-16 3.7237 2020-08-16 3.7237 0 3.7237 3.7237 Completed
3562 TRIPURA Education
Construction of 50 Seated Girls' Hostel in Government Degree College, Gondatwisa, Dhalai District Tripura
Schemes of NEC Schemes of NEC Choose... 2023-03-31 4.66 2026-03-31 2 2.4811763 4.4811763 4.4811763 Ongoing
3563 TRIPURA Education
Construction of 50 seated ST Boys Hostel attached to Madhab chandra HS School, LT Valley Sub-Division and 50 seated ST Girls Hostel attached to BC Manu SSVM, Santirbazar, south Tripura including Superintendent Quarters, Boundary wall, etc
Schemes of NEC Schemes of NEC 2022-03-17 4 2025-03-17 4.0092 0 4.0092 2.6056 Ongoing
3564 TRIPURA Education
Construction of 50 seated ST Girls Hostel attched to Darchaw Christian College HS School under Kumarghat Sub Division, Tripura
Schemes of NEC Schemes of NEC 2023-03-31 1.56 2026-03-31 0.1 0 0.1 Foreclosed
3565 TRIPURA Education
Construction of 50 type III residential Quarters for Hostel superintendent in ST & SC Hostels, Tripura. (In the following Districts-Khowai, Sepoyjala, West Tripura, Unakoti, Dhalai, Gomati and South Tripura)
Schemes of NEC Schemes of NEC Other 2013-03-26 6.1048 2019-01-03 6.1048 0 6.1048 6.09992 Ongoing
3566 TRIPURA Education
Improvement of Infrastructure in TTAADC Polytechnic Institute, Khumulwng, West Tripura
Schemes of NEC Schemes of NEC 2021-03-24 4.72 2024-03-24 3.928 0 3.928 3.54 Ongoing
3567 TRIPURA Education
Improvement of Infrastructure in Womens Polytechnic, Hapania, West Tripura under Higher Education Department, Tripura
Schemes of NEC Schemes of NEC 2021-03-31 1.074 2024-03-31 0.8058065 0.2681935 1.074 0.9414347 Ongoing
3568 TRIPURA Education
Infrastructure Development of Kamalpur English Medium HS School Kamalpur Dhalai District, Tripura.
Schemes of NEC Schemes of NEC 2018-02-26 1.59 2020-02-26 1.59 0 1.59 1.59 Foreclosed
3569 TRIPURA Education
Mobile Common Service Centre (CSC)
Schemes of NEC Schemes of NEC 2022-02-24 3.26 2025-02-24 3.264 0 3.264 3.26 Completed
3570 TRIPURA Sports
Construction of 200 bedded (G2), Yuba Awas (Youth Hostel) in Ambasa, Dhalai District
Schemes of NEC Schemes of NEC 2017-01-16 9.33 2020-01-16 8.026 0 8.026 6.97 Completed
3571 TRIPURA Irrigation and Flood Control
Establishment of Solar based submersible irrigation pump at Govt. orchards, Tripura
Schemes of NEC Schemes of NEC Directorate Of Horticultu 2023-03-06 1.653 2026-03-06 1.653 0 1.653 1.653 Completed
3572 TRIPURA Irrigation and Flood Control
Water arrangement in rural areas of Khowai district ad Sepahijila sistricts of Tripura/sinking & development of deep tubewell (DTW)schemes including construction of pump house, installation of pump set laying distribution pipeline etc.
Schemes of NEC Schemes of NEC Dept. of Power 2017-03-02 14.3481 2020-03-02 12.9133 0 12.9133 10 Completed
3573 TRIPURA Industries
Enabling Bulk Production of Bamboo Round Sticks in Tripura through Technological and Infrastructural Upgradation
Schemes of NEC Schemes of NEC Other 2023-03-28 5.9768 2026-03-28 5.68196 0 5.68196 5.39773 Ongoing
3574 TRIPURA Industries
Enhancement of Capacity of the Tea Processing Factory at Brahmakunda Tea Estate, West Tripura
Schemes of NEC Schemes of NEC 2011-06-09 4.9839 2013-06-09 4.49 0 4.49 4.49 Completed
3575 TRIPURA Industries
Enhancement of Capacity of the Tea Processing Factory at Brahmakunda Tea Estate, West Tripura, Department of Industries & Commerce, Govt. of Tripura, Agartala
Schemes of NEC Schemes of NEC 2011-06-09 4.9839 2014-06-09 0.171 0 0.171 0.17 Completed
3576 TRIPURA Industries
Enhancement of Capacity of the Tea Processing Factory at Tebaria, West Tripura by the Department of Industries and Commerce, Govt. of Tripura, Agartala
Schemes of NEC Schemes of NEC 2011-06-09 4.9839 2014-06-09 2.3983 0 2.3983 2.4 Completed
3577 TRIPURA Industries
Integrated Development of Bamboo Handicrafts Cluster in Tripura by the Department of Industries & Commerce, Kunjaban, Govt. of Tripura, Agartala.
Schemes of NEC Schemes of NEC 2012-03-23 4.4125 2015-03-23 0.0633 0 0.0633 0.06 Completed
3578 TRIPURA Industries
Integrated Development of Incense Cluster in Tripura
Schemes of NEC Schemes of NEC 2013-10-30 7.799 2015-10-30 0.4363 0 0.4363 0.44 Completed
3579 TRIPURA Industries
Livelihood generation for returned migrant workers due to pandemic outbreak COVID-19 in the state of Tripura
Schemes of NEC Schemes of NEC 2020-10-27 3 2023-10-27 2.4 0 2.4 2.4 Completed
3580 TRIPURA Industries
Livelihood Generation for returned Migrant Workers due to pandemic outbreak COVID-19 to the state of Tripura(Swabalamban)(Phase-II)
Schemes of NEC Schemes of NEC 2021-01-21 1.5 2024-01-21 0.558 0 0.558 0.56 Completed
3581 TRIPURA Industries
Livelihood Development Through a Pilot Bamboo Enterprise for Rehabilitation of Surrendered Militants by Tribal Welfare Department, Govt. of Tripura, Agartala.
Schemes of NEC Schemes of NEC 2006-05-05 3.8854 2008-05-05 3.5 0 3.5 3.5 Completed
3582 TRIPURA Industries
Machineries and Equipments for Brahmakunda Tea Processing Factory (BTPF)
Schemes of NEC Schemes of NEC 2023-02-15 0.9844 2026-02-15 0.984424 0 0.984424 0.7566148 Ongoing
3583 TRIPURA Industries
Modernization/ Upgradation of Brahmakunda Tea Processing Factory (BTPF), Simna, West Tripura
Schemes of NEC Schemes of NEC 2022-03-31 2.2 2025-03-31 2.2006589 0 2.2006589 1.6519766 Ongoing
3584 TRIPURA Industries
Revival of Bamboo Sticks cluster at Kumarghat, Tripura
Schemes of NEC Schemes of NEC 2017-02-28 4.9929 2020-02-28 1.566 0 1.566 1.57 Completed
3585 TRIPURA Industries
Rubber Wood Based Plywood Manufacturing Unit at Agartala, Tripura
Schemes of NEC Schemes of NEC Choose... 2022-03-29 7.3394 2025-03-29 0.1 0 0.1 Foreclosed
3586 TRIPURA Industries
Strategic Interventions for Revitalization and Value Chain Development of Agarbatti Sector in Tripura.
Schemes of NEC Schemes of NEC 2022-03-04 10.77 2025-03-04 10.5024384 0 10.5024384 10.25935 Ongoing
3587 TRIPURA Information and Public Relatio
3rd North East Connectivity Summit Govt. of Manipur
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.1 2021-04-01 0 Completed
3588 TRIPURA Information and Public Relatio
Emerging North East from 25th to 27th October, 2017organised by Govt. of Tripura
Schemes of NEC Schemes of NEC Choose... 2018-04-01 0.099 2021-04-01 0 Completed
3589 TRIPURA Information and Public Relatio
Strengthening of Hindi Section in the library of 5 government colleges of Tripura
Schemes of NEC Schemes of NEC Other 2021-01-27 0.5 2025-03-19 0.5 0 0.5 0.4999946 Completed
3590 TRIPURA Information and Public Relatio
Strengthening of Hindi Section in the Library of Maharaja Bir Bikram University, Agartala, Tripura
Schemes of NEC Schemes of NEC Other 2021-02-24 0.1 2024-02-24 0.1 0 0.1 0.1 Completed
3591 TRIPURA Health
Accident & Trauma Centre at Agartala, Tripura
Schemes of NEC Schemes of NEC 2006-11-05 1.6081 2009-11-05 1.45 0 1.45 1.45 Completed
3592 TRIPURA Health
Accident & Trauma Centre at Kulai, Tripura
Schemes of NEC Schemes of NEC 2006-11-05 1.6081 2008-11-05 1.24 0 1.24 1.24 Completed
3593 TRIPURA Health
Release of Grant-in-Aid (Plan/ Non-Recurring) to the Government of Tripura for activities related to combating COVID-19 pandemic
Schemes of NEC Schemes of NEC 2020-04-01 3 2023-04-01 3 0 3 3 Completed
3594 TRIPURA Health
Up-gradation of Cancer Hospital, Agartala, Tripura
Schemes of NEC Schemes of NEC 2010-03-19 3.0015 2013-03-19 1.5 0 1.5 1.5 Completed
3595 TRIPURA Power
1X21 MW Baramura Unit-V Gas Based Power Project, Tripura.
Schemes of NEC Schemes of NEC 2007-08-07 80 2009-08-07 72 0 72 72 Completed
3596 TRIPURA Power
Augmentation of Sub-Station capacity by addition of 1x15 MVA, 132/11 kV transformer at Gamai Tilla, Teliamura, Tripura west. 66/33 KV Sub-station
Schemes of NEC Schemes of NEC 2005-02-03 3.25 2008-02-03 2.93 0 2.93 2.93 Completed
3597 TRIPURA Power
Augmentation of Sub-Station capacity by addition of 1x15 MVA, 66/11 kV Sub-station at Rabindra Nagar, Sonamura, Tripura West.
Schemes of NEC Schemes of NEC 2005-02-04 1.094 2008-02-04 0.98 0 0.98 0.98 Completed
3598 TRIPURA Power
Augmentation of Sub-Station capacity by addition of 1x3 MVA, 66/33 KV and 1x6.3 MVA, 66/11 KV transformer at Jirania, Tripura West.
Schemes of NEC Schemes of NEC 2005-02-04 4.8267 2008-02-04 4.34 0 4.34 4.34 Completed
3599 TRIPURA Power
Augmentation by addition of 132/11kV, 1x15 MVA, Transformer along with associated equipments at 132kV Udaipur Substation, South Tripura.
Schemes of NEC Schemes of NEC 2011-12-26 3.6098 2013-12-26 3.25 0 3.25 3.25 Completed
3600 TRIPURA Power
Augmentation by capacity addition of 1X20/25 MVA, 132/33kV transformer and 2X12.5MVA, 132/11kV transformer with associated equipment at Mission Tilla 132kV Sub-Station, Dharmanagar, North Tripura
Schemes of NEC Schemes of NEC 2016-02-29 9.505 2019-02-28 8.5545 0 8.5545 8.55 Completed
3601 TRIPURA Power
Augmentation by capacity addition of 1X20/25 MVA, 132/33kV transformer and 2X12.5MVA, 132/11kV transformer with associated equipments at Mission Tilla 132kV Sub-Station, Dharmanagar, North Tripura
Schemes of NEC Schemes of NEC 2012-02-28 3.8242 2015-02-28 3.44 0 3.44 3.44 Completed
3602 TRIPURA Power
Augmentation of Sub Station Capacity by addition of 1x20/25 MV,132/33kV Transformer along with associated Civil work at Ambassa, Dhalai District. Tripura.
Schemes of NEC Schemes of NEC 2011-12-26 4.42 2014-12-26 3.98 0 3.98 3.98 Completed
3603 TRIPURA Power
Construction of 132kV S/C Transmission Line from 132kV Ambassa substation to Gandacherra Substation (47 Ckm), Tripura
Schemes of NEC Schemes of NEC Dept. of Power 2012-09-04 12.07 2015-09-04 10.86 0 10.86 10.86 Completed
3604 TRIPURA Power
Construction of 2X10MVA 132/33 KV and 2X10 MVA, 33/11 KV Sub-Station including LILO at Bishramganj, Sepahijala District, Tripura
Schemes of NEC Schemes of NEC 2014-11-28 13.9224 2017-11-28 12.53 0 12.53 12.53 Completed
3605 TRIPURA Power
Renovation & Strengthening of 132 KV line from Agartala to Khowai (45 CKM)
Schemes of NEC Schemes of NEC 2005-02-04 3.8778 2008-02-04 3.49 0 3.49 3.49 Completed
3606 TRIPURA Power
Renovation & Strengthening of 132 KV line from Ambassa to Kumarghat (45 CKM)
Schemes of NEC Schemes of NEC 2005-02-03 3.8778 2008-02-03 3.49 0 3.49 3.49 Completed
3607 TRIPURA Power
Renovation & Strengthening of 132 KV line from Teliamura to Ambassa (30 CKM)
Schemes of NEC Schemes of NEC 2005-02-03 2.5932 2008-03-03 2.33 0 2.33 2.33 Completed
3608 TRIPURA Science and Technology
Afforestation of Denuded/Deprived areas in South Tripura and West Tripura District of Tripura State.
Schemes of NEC Schemes of NEC 2022-03-31 4 2025-03-31 0.9398594 2.044636 2.9844954 2.3917354 Ongoing
3609 TRIPURA Science and Technology
Delineation of Run Off Potential Areas and Identification of Suitable sites for Rain Water Harvesting Structures at Dhalai District of Tripura and Jampui Hills of North Tripura, using Geo- Spatial Technology, Tripura
Schemes of NEC Schemes of NEC Other 2022-03-22 1.6157 2025-03-22 1.6157 0 1.6157 1.6157 Completed
3610 TRIPURA Science and Technology
Establishment of Science Park at Vigyan Gram
Schemes of NEC Schemes of NEC Dept. of Power 2021-02-12 10.29 2025-03-31 7.72 0 7.72 5.9734752 Ongoing
3611 TRIPURA Science and Technology
Installation of Intelligent Character Recognition System (ICR) at 2 Institutions of Tripura
Schemes of NEC Schemes of NEC 2008-03-25 0.8191 2011-03-25 0.8191 0 0.8191 0.82 Completed
3612 TRIPURA Science and Technology
Installation of Intelligent Character Recognition System (ICR) at Tripura University
Schemes of NEC Schemes of NEC 2008-03-31 0.4096 2010-03-31 0.4096 0 0.4096 0.41 Completed
3613 TRIPURA Science and Technology
Supply of computers & peripherals at Mohanpur H.S. School, West Tripura
Schemes of NEC Schemes of NEC 2010-01-19 0.0423 2013-01-19 0.0423 0 0.0423 0.04 Completed
3614 TRIPURA Science and Technology
Training Centre on Computer Education and Main Streaming of the Tribal Youths in Tripura by Ashray
Schemes of NEC Schemes of NEC 2006-03-06 0.0613 2008-03-06 0.0613 0 0.0613 0.06 Completed
3615 TRIPURA Transport and Communication
Agartala-Mohanpur-Chebri raod
Schemes of NEC Schemes of NEC 2005-12-16 99.1 2008-12-16 89.19 0 89.19 89.19 Completed
3616 TRIPURA Transport and Communication
Balance work of Manu-Chamanu road
Schemes of NEC Schemes of NEC 2005-07-29 14.88 2008-07-29 13.89 0 13.89 13.89 Completed
3617 TRIPURA Transport and Communication
Bishalgarh-Boxanagar-Sonamura-Borpathari- Belonia
Schemes of NEC Schemes of NEC 2010-07-29 233.41 2013-08-29 205.498 0 205.498 205.5 Completed
3618 TRIPURA Transport and Communication
Dharmanagar-Tilthai-Damcherra road
Schemes of NEC Schemes of NEC 2006-09-22 81.67 2009-09-22 73.5 0 73.5 73.5 Completed
3619 TRIPURA Transport and Communication
ISBT Chandrapur
Schemes of NEC Schemes of NEC 2005-05-09 9.69 2008-05-09 8.72 0 8.72 8.72 Completed
3620 TRIPURA Transport and Communication
ISTT Jirania
Schemes of NEC Schemes of NEC 2005-09-12 24.79 2008-09-12 21.5 0 21.5 21.21 Completed
3621 TRIPURA Transport and Communication
Jayashree-Thumcharai road
Schemes of NEC Schemes of NEC 2006-03-30 3.9442 2009-03-30 3.55 0 3.55 3.55 Completed
3622 TRIPURA Transport and Communication
Kowaifung-Ailmara road
Schemes of NEC Schemes of NEC 2005-03-21 3.1375 2008-03-31 3.12 0 3.12 3.12 Completed
3623 TRIPURA Transport and Communication
Nidaya-Radhanagar road
Schemes of NEC Schemes of NEC 2006-03-30 4.16 2009-03-30 3.74 0 3.74 3.74 Completed
3624 TRIPURA Tourism and Culture
Infrastructure Development of State Institute of Hotel Management (SIHM) Catering Technology & Applied Nutrition at Anandanagar, Agartala
Schemes of NEC Schemes of NEC 2021-03-15 3.7596 2024-03-15 3.5558 0 3.5558 3.1352 Ongoing
3625 TRIPURA Tourism and Culture
Musical Garden in Agartala, Tripura
Schemes of NEC Schemes of NEC 2023-03-31 1.5 2026-03-31 1.5 0 1.5 1.5 Completed
3626 TRIPURA Tourism and Culture
Setting up of a Star Category Hotel at Agartala (Infrastructure Development of Tourism, Tripura)
Schemes of NEC Schemes of NEC 2005-03-24 1 2008-03-24 1 0 1 1 Completed
3627 TRIPURA Health
Establishment of 200 Bedded MCH (Maternal & Child Health) wing at AGMC & GBP Hospital in Tripura
PM-DevINE PM-DevINE Dept. of Health & familly 2024-01-23 192.1 2027-04-14 48 0 48 Ongoing
3628 TRIPURA Health
Establishment of Dental College at Agartala by Government of Tripura
PM-DevINE PM-DevINE Dept. of Health & familly 2024-01-24 202 2027-04-14 50.5 0 50.5 Ongoing
3629 TRIPURA Power
Establishment of Solar Micro Grid for supply of reliable power to Remote Habitations in Tripura by Department of Power
PM-DevINE PM-DevINE Dept. of Power 2023-11-22 80.79 2025-12-31 70.37 0 70.37 Ongoing
3630 TRIPURA Health
Setting up of Integrated Rehabilitation Centre for Drug Addicted in Tripura
PM-DevINE PM-DevINE Dept. of Health & familly 2024-01-23 86.12 2027-01-31 43.06 0 43.06 Ongoing
3631 TRIPURA Power
Upgradation of 132KV Surjamaninagar Sub-Station of TSECL into 400KV in Tripura
NESIDS-OTRI NESIDS Dept. of Power 2019-10-07 120.88 2020-03-31 43.3036 0 43.3036 0.1 Foreclosed
3632 TRIPURA Transport and Communication
Improvement of Road from Jatanbari to Mandirghat via Tirathmukh (L-13.775 km)in Tripura
NESIDS-ROADS NESIDS Public works Department 2021-03-05 50.79 2023-03-05 42.99 0 42.99 29.18 Completed
3633 TRIPURA Transport and Communication
Improvement of Tourist spot connectivity from Amarpur (Fatiksagar) leading to Chabimura and having access to eco- Tourism centre
NESIDS-ROADS NESIDS Public works Department 2019-06-07 22.12 2020-03-31 22.1315 0 22.1315 22.1308 Completed
3634 TRIPURA Transport and Communication
Imrpvement of road from Gandacherra-Raishyabari road at Ch. 18.30 KM to Narikel Kunja (Length-8.00 KM) for easy access for the Tourists from Dhalai, Norh and Unakioti Diricts to Narikel Kunja Island surrounded by Dumbur Lake Water in Tripura
NESIDS-ROADS NESIDS Public works Department 2019-06-07 21.8213 2020-03-31 21.8116 0 21.8116 21.8213 Completed
3635 TRIPURA Transport and Communication
Improvement of KA Road from Erarpar to Ambassa Road(LO-28.90 km) in the State of Tripura
NESIDS-ROADS NESIDS Public works Department 2023-10-16 94.39 2026-10-31 82.6098 0 82.6098 4.0522 Completed
3636 TRIPURA Transport and Communication
Improvement of Road from Udaipur-Kakraban Main Road(Hospital Chomuhani) to Tualmura via Camper Tilla-Ramkrishna Para Road(Length-9.35 km in Tripura)
NESIDS-ROADS NESIDS Public works Department 2023-10-16 33.51 2026-10-31 28.575 0 28.575 Completed
3637 TRIPURA Transport and Communication
Upgradation/Improvement of Hmunpuii NH-44) to Damcherra(Tripura Mizoram border) via Monchung in Tripura
NESIDS-ROADS NERSDS Public works Department 2022-03-15 84.79 2024-03-15 83.5822 0 83.5822 20.2 Completed
3638 TRIPURA Education
Bhavans Science College, Tripura
NESIDS-OTRI NLCPR Higher Education 2005-06-30 5.98 5.2551 0 5.2551 5.2551 Completed
3639 TRIPURA Education
Construction of 175 primary school building with provision of furniture .
NESIDS-OTRI NLCPR Elementary Education 2001-02-20 14.44 2005-02-28 12.9898 0 12.9898 14.421 Completed
3640 TRIPURA Education
Construction of Birchandra State Central Library at Agartala, West Tripura (Phase-I)
NESIDS-OTRI NLCPR Higher Education 2014-02-20 9.7452 2017-02-28 8.1782 0 8.1782 6.0083 Ongoing
3641 TRIPURA Education
Construction of Building for College of Agriculture
NESIDS-OTRI NLCPR Agriculture Department 2009-09-10 56.0476 2011-09-30 49.5234 0 49.5234 49.5234 Completed
3642 TRIPURA Education
Construction of Law College in tripura
NESIDS-OTRI NLCPR Higher Education 2011-03-17 4.1934 2014-02-28 3.46 0 3.46 3.46 Completed
3643 TRIPURA Education
Construction of one (G3) storeyed office building for the accommodation of Directorate of Higher Education, Directorate of School Education, Directorate of Youth Affairs & Sports in the premises vacated by the SDM Sadar, West Tripura, Phase-I
NESIDS-OTRI NLCPR Dept. of Power 2014-02-20 17.71 7.8575 0 7.8575 7.8575 Ongoing
3644 TRIPURA Education
Construction of Tripura Institute of Technology (Phase-II), West Tripura
NESIDS-OTRI NLCPR Dept. of Education 2017-05-12 74.39 59.6558 0 59.6558 59.6558 Completed
3645 TRIPURA Education
Construction of Veterinary College
NESIDS-OTRI NLCPR Animal Resource Developme 2012-01-02 16.3087 2012-01-02 14.39 0 14.39 14.39 Completed
3646 TRIPURA Education
Costruction of Tripura Institute of Techonology(Phase-1)
NESIDS-OTRI NLCPR Higher Education 2010-12-02 7.9386 2013-10-31 7.1447 0 7.1447 7.1447 Completed
3647 TRIPURA Education
Development of 100 seated Boys Hostel and Quarters for Faculty ans Staff at Government Degree College Dharmanagar,
NESIDS-OTRI NLCPR Higher Education 2010-04-20 3.8545 2013-04-20 3.401 0 3.401 3.401 Completed
3648 TRIPURA Education
Development of Tripura University
NESIDS-OTRI NLCPR Higher Education 2000-01-07 20.52 2003-01-31 18.468 0 18.468 20.52 Completed
3649 TRIPURA Education
Establishment of a New College of Teachers Education in North Tripura
NESIDS-OTRI NLCPR Higher Education 2009-03-30 21.1022 2011-03-31 18.6196 0 18.6196 18.6196 Completed
3650 TRIPURA Education
Improvement of State B.Ed. College in Tripura
NESIDS-OTRI NLCPR Higher Education 2009-03-30 8.2559 2012-01-31 6.3783 0 6.3783 6.3783 Completed
3651 TRIPURA Education
Infrastructure development of R.K. Mission, Vivekanagar and Agartala in Tripura
NESIDS-OTRI NLCPR Dept. of Power 2013-02-27 4.429 3.5184 0 3.5184 3.5184 Ongoing
3652 TRIPURA Education
Infrastructure Development of Tripura Engineering College.
NESIDS-OTRI NLCPR Higher Education 2006-12-11 12.2433 2009-11-30 10.825 0 10.825 10.825 Completed
3653 TRIPURA Education
Renovation and Upgradation of Kailashahar Government Girl H.S. School and Boarding House
NESIDS-OTRI NLCPR Secondary Education 2010-04-19 4.7208 2012-04-30 4.1654 0 4.1654 4.1654 Completed
3654 TRIPURA Education
Sarva Shiksha Abhiyan
NESIDS-OTRI NLCPR Higher Education 2006-03-28 14.1404 2007-03-31 14.1404 0 14.1404 14.1404 Completed
3655 TRIPURA Education
Sarva Shiksha Abhiyan (2006-07)
NESIDS-OTRI NLCPR Higher Education 2006-06-29 10.66 2007-06-29 10.66 0 10.66 10.66 Completed
3656 TRIPURA Education
Upgarding of infrastucture of R.K. Mission
NESIDS-OTRI NLCPR Secondary Education 2001-07-09 2.75 2003-08-31 2.475 0 2.475 2.75 Completed
3657 TRIPURA Education
Upgradation of facilities in 15 Government Degree Colleges in Tripura
NESIDS-OTRI NLCPR Higher Education 2009-07-31 47.5459 2011-07-31 38.2358 0 38.2358 44.3782 Completed
3658 TRIPURA Education
Upgradation of Infrastructure of 100 Nos. of Higher secondary Schools
NESIDS-OTRI NLCPR Secondary Education 2006-12-15 45.41 2009-12-31 40.869 0 40.869 43.7831 Completed
3659 TRIPURA Education
Upgradation of Infrastructure of 150 High Schools
NESIDS-OTRI NLCPR Secondary Education 2006-12-11 28.11 2009-11-30 25.299 0 25.299 27.9201 Completed
3660 TRIPURA Education
Upgradation of Regional College of Physical Education,Panisagar
NESIDS-OTRI NLCPR Education (Youth Affair & 2011-03-11 13.8364 2013-02-28 12.2086 0 12.2086 12.2086 Completed
3661 TRIPURA Education
Upgrading of Infrastructure of 25 Upper Primary Schools
NESIDS-OTRI NLCPR Elementary Education 2001-02-20 3.69 2004-02-29 3.006 0 3.006 3.34 Completed
3662 TRIPURA Irrigation and Flood Control
Minor Irrigation Schemes
NESIDS-OTRI NLCPR Public Works Department ( 2001-02-05 4.78 2003-02-28 4.302 0 4.302 4.78 Completed
3663 TRIPURA Health
Development of Gobind Ballabh Pant Hospital
NESIDS-OTRI NLCPR Directorate of Health Ser 2005-10-18 12.8828 2020-03-31 11.5945 0 11.5945 9.8605 Completed
3664 TRIPURA Health
Dhalai District Hospital
NESIDS-OTRI NLCPR Directorate of Health Ser 2005-12-22 3.4723 2008-12-31 2.5938 0 2.5938 2.5938 Completed
3665 TRIPURA Health
Dhalai District Hospital :Phase-II (Hospital Quarters), Tripura
NESIDS-OTRI NLCPR Dept. of Health & familly 2017-05-18 11.3185 9.0412 0 9.0412 7.5069 Completed
3666 TRIPURA Health
Government Medical College and Hospital at Agartala
NESIDS-OTRI NLCPR Higher Education 2005-10-10 104.5136 2009-11-30 94.0622 0 94.0622 94.0622 Completed
3667 TRIPURA Health
Improvement of Teliamura Sub-Divisional Hospital in Tripura
NESIDS-OTRI NLCPR Directorate of Health Ser 2008-11-19 7.3223 2010-05-31 6.4687 0 6.4687 6.4687 Completed
3668 TRIPURA Health
North District Hospital in Tripura
NESIDS-OTRI NLCPR Directorate of Health Ser 2005-06-30 9.4 2008-06-29 8.46 0 8.46 8.434 Completed
3669 TRIPURA Health
North District Hospital: Phase-II (Hospital Quarters), Tripura
NESIDS-OTRI NLCPR Dept. of Health & familly 2017-05-12 11.1005 2019-05-31 8.14 0 8.14 8.14 Completed
3670 TRIPURA Health
South District Hospital (Phase-II) Hospital Quarters in Tripura
NESIDS-OTRI NLCPR Dept. of Power 2013-10-08 9.6758 2016-09-30 8.1116 0 8.1116 8.1116 Completed
3671 TRIPURA Health
South District Hospital in Tripura
NESIDS-OTRI NLCPR Directorate of Health Ser 2005-06-30 9.4 2008-06-29 8.46 0 8.46 8.4489 Completed
3672 TRIPURA Health
State Level Para Medical Institute at Agartala in Tripura
NESIDS-OTRI NLCPR Higher Education 2005-03-17 14.07 2008-03-31 12.3555 0 12.3555 12.67 Completed
3673 TRIPURA Health
Super Speciality Block, G.B.Pant Hospital, Agartala
NESIDS-OTRI NLCPR Directorate of Health Ser 2002-02-22 8.88 2005-08-31 7.2 0 7.2 5.7501 Completed
3674 TRIPURA Miscellaneous
Construction and establishment of Science City in Tripura
NESIDS-OTRI NLCPR Science, Technology & Env 2015-03-25 27.454 2017-08-31 22.6763 0 22.6763 22.6763 Completed
3675 TRIPURA Miscellaneous
Construction of 5 food Storage Godwon in Tripura
NESIDS-OTRI NLCPR Food, Civil Supplies & C 2013-03-25 3.1472 2.4587 0 2.4587 2.4587 Completed
3676 TRIPURA Miscellaneous
Construction of Bus Terminal at Nagerjala, Agartala, Tripura
NESIDS-OTRI NLCPR Urbar Development 2014-02-25 16.889 2017-02-28 11.5993 0 11.5993 8.89 Ongoing
3677 TRIPURA Miscellaneous
Construction of District Administration Complex, Khowai District, Tripura
NESIDS-OTRI NLCPR Revenue Department 2017-12-07 20.6 2019-12-07 14.7512 0 14.7512 5.4318 Completed
3678 TRIPURA Miscellaneous
Construction of District Administration Complex, Sepahijala District, Tripura
NESIDS-OTRI NLCPR Revenue Department 2017-12-07 21.6 2019-12-07 5.4794 0 5.4794 5.4794 Ongoing
3679 TRIPURA Miscellaneous
Construction of Motor Stand at Dharmanagar
NESIDS-OTRI NLCPR Transport Department 2010-12-15 10.3391 2013-06-30 8.9971 0 8.9971 8.9971 Completed
3680 TRIPURA Miscellaneous
Construction of Motor Stand at Khumulwng, TTAADC in Tripura
NESIDS-OTRI NLCPR Transport Department 2010-04-19 1.9415 2012-09-30 1.6383 0 1.6383 1.6383 Completed
3681 TRIPURA Miscellaneous
Nazrul Kala Kshetra (Phase II)
NESIDS-OTRI NLCPR Higher Education 2010-05-05 8.2018 2012-04-30 7.3816 0 7.3816 7.3816 Completed
3682 TRIPURA Miscellaneous
New Capital Complex Project at Agartala
NESIDS-OTRI NLCPR Information and Cultural 2000-01-24 50 2003-01-31 45 0 45 48.172 Completed
3683 TRIPURA Miscellaneous
Rabindra Convention Centre (Satabarshiki Bhavan)
NESIDS-OTRI NLCPR Information and Cultural 2011-12-13 21.9421 2011-12-13 19.3661 0 19.3661 19.3661 Completed
3684 TRIPURA Miscellaneous
Tribal Development Project
NESIDS-OTRI NLCPR Tribal Welfare Department 2001-03-08 28.8 2005-03-31 25.92 0 25.92 28.0379 Completed
3685 TRIPURA Power
132 KV D/C line from suryamaninagar to Rokhia (30 Km and site development and Fdr. Bay at Rokhia)
NESIDS-OTRI NLCPR TSECL 2012-01-02 12.61 2012-01-02 11.0213 0 11.0213 11.0213 Ongoing
3686 TRIPURA Power
1x21 MW Gas Thermal project(Extension )at Rokhia(Phase-2)
NESIDS-OTRI NLCPR TSECL 2000-01-07 85.17 2004-05-27 76.653 0 76.653 85.17 Completed
3687 TRIPURA Power
1x21 MW Gas Thermal projectat Rokhia(Unit VIII)
NESIDS-OTRI NLCPR TSECL 2004-05-21 80.94 2008-12-31 72.8488 0 72.8488 78.0638 Completed
3688 TRIPURA Power
Augmentation of P.K. Bari S/Station with 32 KV Bay for termination of 400 KV line
NESIDS-OTRI NLCPR TSECL 2012-07-12 4.0059 2015-07-12 3.5985 0 3.5985 3.5985 Completed
3689 TRIPURA Power
Electrification of Tribal Village (No.10)
NESIDS-OTRI NLCPR TSECL 2001-09-26 1.44 2004-09-30 0.648 0 0.648 0.72 Completed
3690 TRIPURA Power
Renovation & restrengthening of 132kv single circuit line from Agartala to Dharmanagar
NESIDS-OTRI NLCPR TSECL 2001-12-18 10 2004-12-31 9 0 9 10 Completed
3691 TRIPURA Power
Sub-Transmission and Distribution works (5 Nos.)
NESIDS-OTRI NLCPR TSECL 2000-10-16 45.55 2003-10-31 35.559 0 35.559 25.7142 Completed
3692 TRIPURA Power
Tranasmission Project (Phase-I):400 KV S/Stn at Surajamaninagar(to be charged at 132KV) & Infrastructure development,West Tripura Districtunder NLCPR.
NESIDS-OTRI NLCPR TSECL 2010-12-23 79.9579 2015-01-31 45.4534 0 45.4534 45.4534 Completed
3693 TRIPURA Power
Transmission Project (Phase-1) 132KV D/C line from Surajamaninagar to 79 TillaGrid S/Stn.(11.14Km)inciuding Fdr Bay & site develpomentWest Tripura
NESIDS-OTRI NLCPR TSECL 2010-12-23 9.5081 2013-01-31 8.3422 0 8.3422 8.3422 Completed
3694 TRIPURA Power
Transmission Project (Phase-1):132 KV D/C line from Surajamaninagar to Bhujungnagar (20 Km) & associated Fdr. Bay at Budhjungnagar, West Tripura
NESIDS-OTRI NLCPR TSECL 2010-12-23 7.3853 2013-01-31 6.0287 0 6.0287 6.0287 Completed
3695 TRIPURA Power
Transmission Scheme including Bodhjangnagar Industrial Estate
NESIDS-OTRI NLCPR TSECL 2007-09-26 9.374 2009-03-31 8.3559 0 8.3559 8.3559 Completed
3696 TRIPURA Power
Transmission Schemes (13 Nos.)
NESIDS-OTRI NLCPR TSECL 1999-03-31 40 2004-03-31 36 0 36 40 Completed
3697 TRIPURA Roads and Bridges
Construction of Flyover on Drop Gate-Nagerjala-Battala-Fire Service and Melarmath Areas ( Length 2500 M) at Agartala
NESIDS-OTRI NLCPR Public works Department 2015-11-06 94.71 2018-03-31 85.239 0 85.239 85.239 Completed
3698 TRIPURA Roads and Bridges
Construction of RCC Bridge at Ch 9.00 Km near Tulamura Market over Tulamuracherra on Gargi Tulamura road (ODR)
NESIDS-OTRI NLCPR PWD (R & B) 2009-12-14 3.2833 2011-12-31 2.8971 0 2.8971 2.8971 Completed
3699 TRIPURA Roads and Bridges
Construction of RCC Bridge near causeway at Krishnapur over Balucherra at Ch.6.05 km on Maharani- Tulashikhar road
NESIDS-OTRI NLCPR PWD (R & B) 2010-03-09 1.7814 2012-09-30 1.5718 0 1.5718 1.5718 Completed
3700 TRIPURA Roads and Bridges
Construction of RCC Bridge over Baradupatacherra at Ch.2.80 Km. on Kanchanpur - Jalabassa road (ODR)
NESIDS-OTRI NLCPR PWD (R & B) 2010-04-19 3.8762 2013-03-31 3.27 0 3.27 3.27 Completed
3701 TRIPURA Roads and Bridges
Construction of RCC bridge over Burima river near Golaghati Market on Bishalgarh Golaghati Takarjala road
NESIDS-OTRI NLCPR PWD (R & B) 2010-02-05 3.5319 2013-01-31 3.1164 0 3.1164 3.1164 Completed
3702 TRIPURA Roads and Bridges
Construction of RCC Bridge over Champakcherra at Ch.18.40 Km. on Mohanpur - Simna road (ODR)
NESIDS-OTRI NLCPR PWD (R & B) 2010-04-19 2.8382 2012-03-31 2.5044 0 2.5044 2.5044 Completed
3703 TRIPURA Roads and Bridges
Construction of RCC Bridge over Dhuraicherra at Ch. 0.90 Km on Kamalpur Bilascherra road (ODR)
NESIDS-OTRI NLCPR PWD (R & B) 2010-02-16 2.973 2012-01-31 2.6232 0 2.6232 2.6232 Completed
3704 TRIPURA Roads and Bridges
Construction of RCC Bridge over Ghoramaracherra on NH-44 at Jirania Tripura Engineering College Chalkbasta
NESIDS-OTRI NLCPR PWD (R & B) 2010-04-19 3.1082 2012-03-31 2.7426 0 2.7426 2.7426 Completed
3705 TRIPURA Roads and Bridges
Construction of RCC Bridge over Kakricherra on Thalibari Microsa
NESIDS-OTRI NLCPR PWD (R & B) 2009-09-29 2.0977 2011-08-31 1.851 0 1.851 1.851 Completed
3706 TRIPURA Roads and Bridges
Construction of RCC Bridge over Kalapaniacherra at Ch.0.50 Km on Satchand Block office old Manubankul road
NESIDS-OTRI NLCPR PWD (R & B) 2010-03-09 2.656 2012-03-31 2.3435 0 2.3435 2.3435 Completed
3707 TRIPURA Roads and Bridges
Construction of RCC bridge over Laxmicherra river at Ch.12.01 Km on Khowai Udna road
NESIDS-OTRI NLCPR PWD (R & B) 2010-03-29 2.1569 2012-03-31 1.9031 0 1.9031 1.9031 Completed
3708 TRIPURA Roads and Bridges
Construction of RCC Bridge over local stream at Ch. 14.60 Km on Mohanpur - Simna road
NESIDS-OTRI NLCPR PWD (R & B) 2010-04-19 1.7735 2012-03-31 1.5648 0 1.5648 1.5648 Completed
3709 TRIPURA Roads and Bridges
Construction of RCC Bridge over local stream at ch. 4.40 Km on Jogendranagar to Jampaijala Road
NESIDS-OTRI NLCPR PWD (R & B) 2009-09-29 1.8408 2011-08-31 1.6242 0 1.6242 1.6242 Completed
3710 TRIPURA Roads and Bridges
Construction of RCC Bridge over local stream at ch. 7.50 Km on Jogendranagar to Jampaijala Road
NESIDS-OTRI NLCPR PWD (R & B) 2009-09-29 2.5584 2011-08-31 2.2574 0 2.2574 2.2574 Completed
3711 TRIPURA Roads and Bridges
Construction of RCC Bridge over Local stream at Ch.4.50 Km on Dhanpur to Kakraban
NESIDS-OTRI NLCPR PWD (R & B) 2009-08-17 1.7794 2011-08-31 1.57 0 1.57 1.57 Completed
3712 TRIPURA Roads and Bridges
Construction of RCC Bridge over Local stream at Ch.7.00 Km on Dhanpur to Kakraban
NESIDS-OTRI NLCPR PWD (R & B) 2009-08-17 2.2589 2011-08-31 1.9932 0 1.9932 1.9932 Completed
3713 TRIPURA Roads and Bridges
Construction of RCC Bridge over Lohar at Ch. 0.45 Km on Kamlaghat Gamchakobra Banikya Chowmuhani road
NESIDS-OTRI NLCPR PWD (R & B) 2010-03-09 2.6638 2012-03-31 2.3504 0 2.3504 2.3504 Completed
3714 TRIPURA Roads and Bridges
Construction of RCC bridge over Lohar on Berimura Taltala Road
NESIDS-OTRI NLCPR PWD (R & B) 2010-03-09 2.2933 2012-03-31 2.0235 0 2.0235 2.0235 Completed
3715 TRIPURA Roads and Bridges
Construction of RCC Bridge over river Dhanai at ch. 6.60 Km on Champaknagar - Mandai road (ODR)
NESIDS-OTRI NLCPR PWD (R & B) 2010-02-16 3.2134 2013-02-28 2.4264 0 2.4264 2.4264 Completed
3716 TRIPURA Roads and Bridges
Construction of RCC Bridge over river Howrha at Ch. 0.10 Km. Champaknagar to Udaipur road (ODR)
NESIDS-OTRI NLCPR Public works Department 2010-02-04 3.0167 2012-01-31 2.6618 0 2.6618 2.6618 Completed
3717 TRIPURA Roads and Bridges
Construction of RCC Bridge over river Surmacherra at Ch.30.10 Km. on Mohanpur Simna Raod
NESIDS-OTRI NLCPR PWD (R & B) 2009-08-17 1.6701 2012-06-30 1.4737 0 1.4737 1.4737 Completed
3718 TRIPURA Roads and Bridges
Construction of RCC Bridge over river Surmacherra at Ch.34.53 on Mohanpur Simna Raod
NESIDS-OTRI NLCPR PWD (R & B) 2009-08-17 2.2374 2012-06-30 1.9174 0 1.9174 1.9174 Completed
3719 TRIPURA Roads and Bridges
Construction of RCC Bridge over Ujan Machmaracherra at Ch.9.00 Km. on Kanchanpur - Jalabassa road (ODR)
NESIDS-OTRI NLCPR PWD (R & B) 2010-04-19 3.0701 2012-03-31 2.7089 0 2.7089 2.7089 Completed
3720 TRIPURA Roads and Bridges
Construction of RCC over local stream at Ch. 12.00 Km on Mohanpur - Simna Road (ODR)
NESIDS-OTRI NLCPR PWD (R & B) 2010-02-16 2.3278 2012-02-29 2.054 0 2.054 2.054 Completed
3721 TRIPURA Roads and Bridges
Improvement and Upgradation of the Road connecting Sub- Division Headquarter with Nh-44/Percharthal (NH-44) to Kanchanpur Road (26.50 Km) phase-I portion from Percharthal to Machamara (8.50 km) in Tripura
NESIDS-OTRI NLCPR PWD (R & B) 2014-03-27 24.8856 2017-03-31 17.9176 0 20.8276 20.8177 Ongoing
3722 TRIPURA Roads and Bridges
Improvement of Mailak-Gamukabari via Burbaria (7.50Km) in Tripura
NESIDS-OTRI NLCPR PWD (R & B) 2010-12-23 10.6805 2013-01-31 9.424 0 9.424 9.424 Completed
3723 TRIPURA Roads and Bridges
Improvement of Melagarh-- Sonamura Road (Length: 8.454 Km) Sipahijala District in Tripura
NESIDS-OTRI NLCPR Public works Department 2016-09-28 30.5 23.6845 0 23.6845 23.3977 Completed
3724 TRIPURA Roads and Bridges
Improvement of Pecharthal (NH-44) Kanchanpur Road (Lenth: 26:50) Phase-II from Machmara - Kanchanpur (Length: 18 Km in Unakoti District in Tripura )
NESIDS-OTRI NLCPR Dept. of Power 2017-06-21 56.746 35.4282 0 35.4282 35.338 Completed
3725 TRIPURA Roads and Bridges
Jogendranagar to Takarjal road (26.50Km)
NESIDS-OTRI NLCPR PWD (R & B) 2012-09-25 36.796 2015-09-25 33.1164 0 33.1164 33.1164 Completed
3726 TRIPURA Roads and Bridges
Replacement of 2 existing semi permanent timber (SPT) bridges in Tripura on Kamalpur-Maracherra-Ambassa Road by RCC bridges
NESIDS-OTRI NLCPR PWD (R & B) 2006-03-20 4.2777 2008-03-31 3.7378 0 3.7378 3.7378 Completed
3727 TRIPURA Roads and Bridges
Replacement of 49 Timber Bridges by Belley type Steel bridge in tribal areas.
NESIDS-OTRI NLCPR PWD (R & B) 2001-01-09 28.49 2004-05-27 25.641 0 25.641 28.49 Completed
3728 TRIPURA Roads and Bridges
Road connecting railway station to NH/State highway (4 Nos)
NESIDS-OTRI NLCPR PWD (R & B) 2012-09-25 16.2028 2015-09-25 14.3738 0 14.3738 14.3738 Completed
3729 TRIPURA Roads and Bridges
Upgradation of Halahali-Ambassa-Dangabari-Bel
NESIDS-OTRI NLCPR PWD (R & B) 2001-09-12 189.093 2006-03-31 155.2361 0 155.2361 161.8547 Ongoing
3730 TRIPURA Roads and Bridges
Widening & strengthening of Banikya Chowmuhani Shalbagan road. (9.00 Km.)
NESIDS-OTRI NLCPR PWD (R & B) 2006-03-20 4.77 2008-03-31 4.1897 0 4.1897 4.1897 Completed
3731 TRIPURA Sports
Construction of Boys Hostel (Sports), Tripura
NESIDS-OTRI NLCPR Education (Youth Affair & 2010-09-20 3.0188 2012-08-31 2.6636 0 2.6636 2.6636 Completed
3732 TRIPURA Sports
Construction of District Sports Complex at Ambassa in Tripura
NESIDS-OTRI NLCPR Education (Youth Affair & 2012-05-25 4.906 2014-05-31 4.021 0 4.021 4.021 Ongoing
3733 TRIPURA Sports
Construction of District Sports Complex at Kailashahar, North Tripura District, Tripura
NESIDS-OTRI NLCPR Education (Youth Affair & 2011-09-22 3.9521 2013-08-31 3.4871 0 3.4871 3.4871 Completed
3734 TRIPURA Sports
Construction of District SPorts Complex at Udaipur
NESIDS-OTRI NLCPR Education (Youth Affair & 2012-01-02 4.8014 2012-01-02 4.2366 0 4.2366 4.2366 Completed
3735 TRIPURA Sports
Construction of Girls Hostel (Sports), Tripura
NESIDS-OTRI NLCPR Education (Youth Affair & 2010-11-09 2.7899 2012-10-31 2.4617 0 2.4617 2.4617 Completed
3736 TRIPURA Sports
Construction of Sports Complex at Khumlwng, Sadar
NESIDS-OTRI NLCPR Dept. of Power 2010-12-02 4.7836 2012-11-30 3.4442 0 3.4442 3.4442 Ongoing
3737 TRIPURA Sports
Upgradation of Tripura Sports School, Badharghat
NESIDS-OTRI NLCPR Education (Youth Affair & 2010-03-11 2.7931 2012-03-31 2.4644 0 2.4644 2.4644 Completed
3738 TRIPURA Water Supply
Drinking water supply scheme for Dharamnagar
NESIDS-OTRI NLCPR PWD (DWS) 2003-02-27 5.49 2006-03-31 4.5779 0 4.5779 5.0518 Completed
3739 TRIPURA Water Supply
Drinking water supply scheme for Teliamura
NESIDS-OTRI NLCPR PWD (DWS) 2003-03-17 6.21 2006-03-31 5.1648 0 5.1648 5.717 Completed
3740 TRIPURA Water Supply
Quality improvement of Rural Water Scheme in Tripura by way of constryction of package type (dual media pressure) iron removal plants (IRPs) attched to existing deep tube wells
NESIDS-OTRI NLCPR PWD (DWS) 2011-12-27 12.8308 2011-12-27 11.0797 0 11.0797 11.0797 Completed
3741 TRIPURA Water Supply
Water Supply Scheme at Bishalgarh (1.00 MGD)
NESIDS-OTRI NLCPR Dept. of Power 2007-06-29 7.8116 2009-06-30 6.8926 0 6.8926 6.8926 Ongoing
3742 TRIPURA Water Supply
Water Supply Scheme at Jatanbari - Nutanbazar
NESIDS-OTRI NLCPR PWD (DWS) 2007-04-24 5.2105 2010-03-31 4.5528 0 4.5528 4.5528 Completed
3743 TRIPURA Water Supply
Water Supply Scheme at Melaghar
NESIDS-OTRI NLCPR PWD (DWS) 2007-06-08 8.8646 2009-06-30 7.7457 0 7.7457 7.7457 Completed
3744 TRIPURA Transport and Communication
Construction of road from Debendra Choudhury Para (Belcherra) to Chankala Bazar under Padmabil R.D. Block, Tripura
NESIDS-ROADS NESIDS Public works Department 2024-03-14 40.38 2026-03-31 39.19 0 39.19 Completed
3745 TRIPURA Tourism and Culture
Tourism and Cultural Promotion Hub at Gandhighat Agartala West TRIPURA
NESIDS-OTRI Urban Development 2024-02-28 32.5867 2026-02-28 7.5956 7.595 15.1906 7.5956 Ongoing
3746 TRIPURA Agriculture and Allied
Strengthening of Laboratories at College of Veterinary Science and A.H.R.K Nagar, Agartala, West Tripura
Schemes of NEC Animal Resources Developm 2024-09-04 1.99 2027-09-04 1.6915 0.2935575 1.9850575 1.6868 Ongoing
3747 TRIPURA Education
Integrated Kokborok Development of Language and Literature through research oriented studies and appropriate documentation.
Schemes of NEC Tripura Tribal area Auton 2024-10-22 3.35 2027-10-22 0.8375 0.8375 1.675 0.8375 Ongoing
3748 TRIPURA Science and Technology
Conservation of medicinal plants and promotion of indigenous of knowledge at Dhalai and North Tripura district of Tripura
Schemes of NEC Medicinal plants Board of 2024-10-28 1.92 2027-10-28 0.4071777 0.5528223 0.96 0.4071777 Ongoing
3749 TRIPURA Agriculture and Allied
Fisheries Based Development Project for Dumbur, Tripura
Schemes of NEC Department of Fisheries, 2025-01-27 5.66 2026-01-27 2.83 0 2.83 1.415 Ongoing
3750 TRIPURA Power
Re-conductoring of 132 KV Intra-State Transmission lines by High Tension Low HTLS conductor with allied accessories in Tripura
NESIDS-OTRI Tripura Power Transmissio 2025-02-12 49.0118 2026-02-11 36.75885 12.25295 49.0118 12.2523 Ongoing
3751 TRIPURA Agriculture and Allied
Establishment of Veterinary Clinical Complex VCC at C.V. Sc. and A.H., R.K. Nagar, Agartala, Tripura West
Schemes of NEC Animal Resources Developm 2025-07-30 13 2027-07-30 3.25 0 3.25 Ongoing
3752 TRIPURA Health
Construction of new building for Khowai district hospital at Khowai, Tripura
NESIDS-OTRI Health and family welfare 2025-08-14 48.469 2027-06-14 0 11.3659 11.3659 Ongoing
3753 TRIPURA Tourism and Culture
Development of Tourist Amenities in Sepahijala Zoological Park, Tripura
NESIDS-OTRI Forest Deptt. Govt. of Tr 2025-08-29 57.284 2028-08-29 0 Ongoing
3754 TRIPURA Health
Construction of Transit Accommodation for Tribal Students and Patients at Shillong by Tripura Tribal Areas Autonomous District Council TTAADC.
Schemes of NEC Tripura Tribal area Auton 2025-10-22 4.3269 2027-10-22 1.0817 1.0817 Ongoing
3755 TRIPURA Transport and Communication
Construction of road from Kowaifung Panjirai to Karbook under Julaibari RD Block , Length-9.1 km
NESIDS-ROADS PWD Roads 2025-12-23 30.15 2027-12-22 7.54 7.54 Ongoing
3756 TRIPURA Transport and Communication
Construction of all weather road from Jampui Hill PMGSY Point to Kangrai under Jampui Hill RD Block in Tripura , Length -8.625 Km
NESIDS-ROADS PWD roads 2025-12-26 21.34 2027-12-25 5.335 5.335 Ongoing
3757 TRIPURA Transport and Communication
Improvement and Strengthening of road from Burighat to Sermun-II , Length-15.862 Km
NESIDS-ROADS PWD Roads 2026-01-02 43.65 2028-01-02 10.91 10.91 Ongoing
3758 TRIPURA Tourism and Culture
Development of Amarsagar dighi at udaipur, Gomti District, Tripura
NESIDS-OTRI Tripura Tourism developme 2026-01-15 39.4991 2028-06-15 9.2674 9.2674 Ongoing
3759 TRIPURA Science and Technology
Establishment of Agar International Trade and Research Centre for Promoting Trade and Research in Agarwood Sector, Tripura.
Schemes of NEC NTFP Centre of Excellence 2026-01-21 13.98075 2028-01-21 0 Ongoing
3760 TRIPURA Tourism and Culture
Development of Tourism Infrastructure in Four Island in Dumbur Lake along with other facilities
NESIDS-OTRI Tripura Tourism developme 2026-01-14 29.2804 2028-06-14 0 Ongoing
3761 TRIPURA Health
Establishment of 100 bedded Sepahijala district hospital at Bishramganj, Sepahijala Tripura
NESIDS-OTRI PWD 2026-02-05 47.0022 2027-12-05 0 Ongoing
3762 TRIPURA Industries
Establishment of Model Haat for livelihood Generation of Tribal Youths of Tripura Tribal Areas Autonomous District Council TTADC
Schemes of NEC Tripura Tribal area Auton 2026-02-03 6.63 2028-02-03 1.6575 1.6575 Ongoing
3763 TRIPURA Tourism and Culture
Up-gradation of Khumulwng Eco-Park at TTAADC H/Q, Khumulwng, Tripura.
Schemes of NEC Forest Department, Tripur 2026-03-20 3.99 2029-03-20 0 Ongoing
3764 TRIPURA Sports
Establishment of Sports infrastructure in Tripura
NESIDS-OTRI Youth Affairs and Sports 2026-03-23 25.1988 2028-03-23 0 Ongoing
3765 TRIPURA Tourism and Culture
Procurement of FRP Speed Boats, FRP Electric Solar Boats and FRP Glass Bottom Boats including OBM along with Water Sports Items for different tourist destination of tripura
NESIDS-OTRI Tourist and Culture 2026-03-27 25 2027-09-30 0 Ongoing
3766 TRIPURA Transport and Communication
Up-gradation and strengthening of road from Ambassa NH-08 to Ganganagar in Dhalai district, Tripura , Length-23.285KM
NESIDS-ROADS PWD Roads 2026-03-27 43.17 2028-03-27 0 Ongoing
3767 TRIPURA Education
Construction of New Academic Building In Women's College, Agartala, West Tripura.
Schemes of NEC Publick Works Department, 2026-03-31 14.1045 2028-03-31 0 Ongoing
3768 TRIPURA Education
Construction of School And Hostel Building of Ratan Mani Seva Mission at South Dhumacherra, Dhalai District, Tripura.
Schemes of NEC PWD, R&B, Government of T 2026-03-31 4.387 2028-03-31 0 Ongoing
3769 TRIPURA Education
Upgradation of Darchawi Christian Higher Secondary School, Kumarghat, Tripura.
Schemes of NEC The District Magistrate, 2026-03-31 3.2823 2028-03-31 0 Ongoing
3770 TRIPURA Agriculture and Allied
Queen Pineapple Post-Harvest Management.
Schemes of NEC Directorate Of Horticultu 2026-05-15 51.45 2029-05-15 0 Ongoing
3771 TRIPURA Tourism and Culture
Multi Level Parking Area at Matabari, Udaipur
PM-DevINE TOURISM DEPARTMENT 2026-05-15 38.8274 2028-04-14 0 Ongoing
3772 TRIPURA Tourism and Culture
Bank Development of Kalyan Sagar with Cafeteria and Walking Way Facility at Matabari, Udaipur, Tripura
PM-DevINE Tourist and Culture 2026-05-15 19.3383 2028-04-14 0 Ongoing
TOTAL 51183.724165216 36262.99641915 1262.7149824 37531.69860155 30391.254980301